1 Phase I Environmental Site Assessment Standard Practice Update West Virginia Brownfields Conference September 2013

2 President, Wasatch Environmental, Inc. Chair of the ASTM E1527 Task Group Chair of the ASTM E50 Committee on Environmental Assessment, Risk Management, and Corrective Action Member of the EPA Federal Advisory Committee established to develop the proposed All Appropriate Inquiry (AAI) regulation Salt Lake City, Utah

3 ASTM Standards have 8-Year shelf life Prior E1527 publications: 1993, 1994, 1997, 2000, 2005 Action Options No Action standard will sunset upon expiration Ballot to re-approve with no change Reconvene Task Group, draft revision language, ballot revisions

4 Task group convened in early 2010 TG agreed on two primary objectives: Clarify existing language Strengthen the deliverable

5 Over 150 task group members with broad stakeholder representation: SBA HUD Lenders Utilities Insurance Facilities State/Local agencies Attorneys Environmental professionals Not all focus groups resulted in proposed changes Not all proposed changes survived ballot

6 More closely aligned with the EPA s All Appropriate Inquiries (AAI) objective de minimis extracted as a stand-alone definition Some instructional language added to historical and site visit sections

7 A Recognized Environmental Condition includes the presence of a release de minimis added to allow the Environmental Professional to immediately dismiss a minor spill de minimis used by some to describe contamination left in place and accepted by an agency E1527 Task Group (and EPA) concluded that the same term should not be used to describe both situations

8 Historical Recognized Environmental Condition definition originally developed pre-2002 before the Bona Fide Prospective Purchaser landowner liability protection/continuing obligations requirements) Conditionally-closed sites currently handled four different ways Consistency needed

9 Redefined Historical Recognized Environmental Condition Past releases addressed to unrestricted residential use Must consider current regulatory framework (rules change) HRECs are not RECs Created new Controlled Recognized Environmental Condition term Past releases addressed to non-residential standard, subject to some type of control CRECs are RECs and must be included in the conclusions section of the report de minimis CAN be used to describe an HREC de minimis CAN NOT be used to describe a CREC

10 Presence or likely presence of HS/PP in, on or at the Property Phase-I ESA Process Is the HS/PP under conditions indicative of a release? Yes Does the release present a threat to human health or the environment (would it be the subject of enforcement action)? Yes Has release been addressed? Yes No No De minimis No Is there a material threat of a release? No Yes REC HREC Not a Rec Yes Addressed to most stringent cleanup criteria (residential) with no restrictions (no AULs) CREC No

11 Some argued additional records review already required under current standard Some argued additional records beyond a database report are not required under current standard Clients thought it was already being done Consistency needed New language: Should be conducted for property and adjoining properties If not conducted, explain why Alternate sources ok

12 The purpose of the User Responsibilities not previously explained Grounded in Factors the Courts will Consider CERCLA amendments Re-iterated in the 2002 amendments to CERCLA 2002 amendments extended these responsibilities to include brownfield grantees Loan officers/realtors/brokers/etc., not typically seeking CERCLA liability protections or brownfields grant Some EPs asking the wrong people to the complete the User questionnaire Clarification needed

13 E1527 has been silent on vapor EPA recommended the task group not ignore the vapor pathway 2013 revision acknowledges the vapor pathway in migration definition Proposed language acknowledges soil vapor in Activity and Use Limitations definition Added discussion in Legal Appendix regarding vapor intrusion as it relates to CERCLA Clarifies Indoor Air non-scope

14 Clarified indoor air exclusion Added unrelated to releases of hazardous substances or petroleum products into the environment Revamped non-binding appendices Revised Legal Appendix Revised Report Table of Contents and Format Developed a Business Environmental Risk Appendix to provide references and resource guidance

15 Task group split about 50/50 Ultimately agreed that: Recommendations are not required by the standard. User should consider whether recommendations are desired. Recommendations are an additional service

16 Anticipate ASTM/EPA process and publication completed sometime in 2013 Can re-ballot existing E as-is if necessary

17 Comments or Questions? Julie Kilgore Wasatch Environmental, Inc

ASTM Phase I Changes and AAI Webinar

ASTM Phase I Changes and AAI Webinar New Jersey Institute of Technology (NJIT) Technical Assistance to Brownfield Communities (TAB) ASTM Phase I Changes and AAI Webinar Elizabeth Limbrick Bob Blauvelt March 13, 2014 973-642-4165 (Hotline)

More information

Credit Risk. 72 March 2013 The RMA Journal Copyright 2013 by RMA

Credit Risk. 72 March 2013 The RMA Journal Copyright 2013 by RMA The Ch CR Credit Risk 72 March 2013 The RMA Journal Copyright 2013 by RMA ENVIRONMENTAL RISK MANAGEMENT anging Landscape of Phase I ESAs A discussion of some upcoming changes to ASTM E1527-05 and what

More information

Different Levels of Environmental Site Assessment and the Benefits to M&A Due Diligence

Different Levels of Environmental Site Assessment and the Benefits to M&A Due Diligence Different Levels of Environmental Site Assessment and the Benefits to M&A Due Diligence A White Paper by Dennis Papa, PE, BCEE, Principal of dpstudio environmental consulting & design LLC November 2016

More information

ASTM E : Applying the New Phase I Site Assessment Standard

ASTM E : Applying the New Phase I Site Assessment Standard Presenting a live 90-minute webinar with interactive Q&A ASTM E1527-13: Applying the New Phase I Site Assessment Standard Navigating the Material Changes to Meet All Appropriate Inquiries Requirements

More information

Voluntary standard; accepted by USEPA to comply with AAI rule. 2. Regulatory/Developmental History

Voluntary standard; accepted by USEPA to comply with AAI rule. 2. Regulatory/Developmental History This table summarizes some of the primary differences between the New Jersey Department of Environmental Protection (NJDEP) Preliminary Assessment Report (PAR), pursuant to the April 2013 NJDEP Site Remediation

More information

BROWNFIELDS Connecticut All Grantee Meeting July Getting the most out of All Appropriate Inquiries (AAI)

BROWNFIELDS Connecticut All Grantee Meeting July Getting the most out of All Appropriate Inquiries (AAI) BROWNFIELDS Connecticut All Grantee Meeting July 11 2012 Getting the most out of All Appropriate Inquiries (AAI) 1 AAI in Perspective All Appropriate Inquiries often is a critical step in a continuum of

More information

Change is in the air with regard. feature

Change is in the air with regard. feature em feature Amy L. Edwards is a partner in the law firm of Holland & Knight LLP, Washington, DC, where she co-chairs the firm s national environmental team. Sarah C. Smith is an associate at Holland & Knight.

More information

Environmental Audit Standards

Environmental Audit Standards Environmental Audit Standards Lender requires an acceptable Phase I Environmental Audit Report, directed to Lender and historical in nature, which is to be prepared in accordance with the standards set

More information

October 29, 2013 Florida Brownfields Association Conference, Orlando

October 29, 2013 Florida Brownfields Association Conference, Orlando Site Inventories October 29, 2013 Florida Brownfields Association Conference, Orlando Andrew M. Lawn, M.S., P.G. Principal Hydrogeologist Holden Heights Areas HSW & Orange County Environmental Protection

More information

Due Diligence April 10, 2018

Due Diligence April 10, 2018 Due Diligence April 10, 2018 Elizabeth Limbrick, LSRP New Jersey Institute of Technology (NJIT) Technical Assistance to Brownfields Communities (TAB) Meade Anderson, CPG Virginia Department of Environmental

More information

EPA s All Appropriate Inquiry Rule: When is Enough, Enough?

EPA s All Appropriate Inquiry Rule: When is Enough, Enough? EPA s All Appropriate Inquiry Rule: When is Enough, Enough? JANE KIMBALL WARREN McCarter & English LLP, Hartford, CT In January 2002, CERCLA was amended to provide liability protection for certain landowners

More information

Flawed Phase 1 CREC Definition Poses Challenges to Property Owners and Lenders

Flawed Phase 1 CREC Definition Poses Challenges to Property Owners and Lenders Flawed Phase 1 CREC Definition Poses Challenges to Property Owners and Lenders Larry Schnapf Purchasers should not assume that a CREC means human exposures are safely controlled. Lawrence P. Schnapf is

More information

Technical Information Paper No

Technical Information Paper No Environmental Condition of Property (ECOP) Investigations Technical Information Paper No. 38-001-0312 PURPOSE. To provide information on ECOP investigations for Federal real property transactions and military

More information

Mitigating Risk Through Environmental Due Diligence in California Real Estate Deals

Mitigating Risk Through Environmental Due Diligence in California Real Estate Deals Mitigating Risk Through Environmental Due Diligence in California Real Estate Deals Kevin C. Mayer Harmon L. (Monty) Cooper Crowell & Moring 1 Outline Why Environmental Due Diligence? I. Purpose II. Roles

More information

EPA Issues Guidance On New CERCLA Landowner Defenses

EPA Issues Guidance On New CERCLA Landowner Defenses EPA Issues Guidance On New CERCLA Landowner Defenses Last December, Congress amended the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA or Superfund) to modify the innocent

More information

Vapor Intrusion - ASTM E2600 Overview

Vapor Intrusion - ASTM E2600 Overview PDHonline Course C294 (3 PDH) Vapor Intrusion - ASTM E2600 Overview Instructor: Jeffrey R. Sotek, PE, CSP, CIH 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

Assessment. Guidance CLEANUP. Liability Release. Petroleum Brownfields Eligibility Letter Remediation Oversight. Project Endorsement

Assessment. Guidance CLEANUP. Liability Release. Petroleum Brownfields Eligibility Letter Remediation Oversight. Project Endorsement BROWNFIELD PROGRAM Guidance FOR SITES CONTAMINATED BY OLD OIL AND GAS EXPLORATION AND PRODUCTION ACTIVITIES, PETROLEUM STORAGE TANKS, AND PIPELINES. Assessment Petroleum Brownfields Eligibility Letter

More information

ENVIRONMENTAL DUE DILIGENCE

ENVIRONMENTAL DUE DILIGENCE ENVIRONMENTAL DUE DILIGENCE Developing Solar on Landfills & Brownfields June 12-13, 2017 Chicago, Illinois Matthew E. Cohn Greensfelder Hemker & Gale, P.C. 200 West Madison Street Suite 3300 Chicago, Illinois

More information

Hazardous Materials in Project Development Additional Guidance

Hazardous Materials in Project Development Additional Guidance Hazardous Materials in Project Development Additional Guidance Contents:...2 AASHTO Guidance...3 USDOT Brownfields Guidance...4 ASTM Standard Practices...6 Hazardous Materials in Project Development 1

More information

Managing Environmental Risks

Managing Environmental Risks Managing Environmental Risks Presented by: Jeff Civins Mary Mendoza November 4, 2014 Agenda Basic Principles Tools for managing environmental risks Environmental due diligence Contractual Extra-contractual

More information

Highlights of USEPA All Appropriate Inquiries (AAI) Final Rule and Revised ASTM Phase I Environmental Site Assessment

Highlights of USEPA All Appropriate Inquiries (AAI) Final Rule and Revised ASTM Phase I Environmental Site Assessment chapter 9b Highlights of USEPA All Appropriate Inquiries (AAI) Final Rule and Revised ASTM Phase I Environmental Site Assessment Barry A. Cik, PE, CP, DEE, QEP, CHMM, REM Chief Engineer G.E.M. Testing

More information

Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Identifying and Mitigating Risks and Liabilities in Real Estate Transactions

Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Identifying and Mitigating Risks and Liabilities in Real Estate Transactions Presenting a live 90-minute webinar with interactive Q&A Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Identifying and Mitigating Risks and Liabilities in Real Estate Transactions

More information

New Environmental Diligence Standards for All Appropriate Inquiries (AAI)

New Environmental Diligence Standards for All Appropriate Inquiries (AAI) New Environmental Diligence Standards for All Appropriate Inquiries (AAI) (a live interactive 90-Minute Teleconference Program) Peter Murphy 1050 Connecticut Ave., N.W. Washington, D.C. 20036 pmurphy@gibsondunn.com

More information

Phase I Environmental Site Assessments for Corridors

Phase I Environmental Site Assessments for Corridors Phase I Environmental Site Assessments for Corridors Prepared by: Kimberly Perkins and Jill Biesma 1 Environmental Advisors and Engineers 19211 W. 64 th Terrace, Shawnee, KS 66218 (913) 599-4326 Goal Of

More information

Phase I ESAs and the USEPA's All Appropriate Inquiry Final Rule

Phase I ESAs and the USEPA's All Appropriate Inquiry Final Rule Page 1 of 8 Phase I ESAs and the USEPA's All Appropriate Inquiry Final Rule An Electronic Newsletter of EEA's Environmental Consulting Activities Spring 2007 EEA, Inc. 55 Hilton Avenue, Garden City, New

More information

The Bona Fide Prospective Purchaser Defense and the use of Comfort Letters

The Bona Fide Prospective Purchaser Defense and the use of Comfort Letters The Bona Fide Prospective Purchaser Defense and the use of Comfort Letters Frank J. Deveau and Kimberly S. Lewis Taft Stettinius & Hollister, LLP Kyle Hendri IFA 1 CERCLA and Brownfield Redevelopment Historically,

More information

Phase 1 Legal Lessons

Phase 1 Legal Lessons Development of ASTM Methodology Prospective Purchaser Defense & Liability Protection, Recent Court Actions "Friends never let their friends bet chalk Florida Brownfields Conference 2011 November 14, 2011

More information

Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders

Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Presenting a live 90-minute webinar with interactive Q&A Environmental Due Diligence for Real Estate Buyers, Sellers and Lenders Identifying and Mitigating Risks and Liabilities in Real Estate Transactions

More information

Environmental. Due Diligence 9 Steps Companies Should Take to Effectively Manage. Environmental. Risks in Commercial Real Estate Deals

Environmental. Due Diligence 9 Steps Companies Should Take to Effectively Manage. Environmental. Risks in Commercial Real Estate Deals ESIS Health, Safety, and Advisory Series Due Diligence 9 Steps Companies Should Take to Effectively Manage Risks in Commercial Real Estate Deals By Bill Felix, Due Diligence Practice Leader, ESIS Health,

More information

Environmental Due Diligence

Environmental Due Diligence 2017 NJ Land Conservation Rally Environmental Due Diligence Stephen Kehayes Michelle Slosberg Peter Sorge, LSRP 1. Introduction 2. Due Diligence Process 3. Potential Problems 4. Investigation 5. Regulatory

More information

PHASE I ENVIRONMENTAL ENGINEERING PHASE I REPORT 3264 PREPARED FOR: Mark Hopkins. Liberty Real Estate, LLC. 741 North State Road.

PHASE I ENVIRONMENTAL ENGINEERING PHASE I REPORT 3264 PREPARED FOR: Mark Hopkins. Liberty Real Estate, LLC. 741 North State Road. PHASE I ENVIRONMENTAL ENGINEERING PHASE I REPORT 3264 PREPARED FOR: Mark Hopkins Liberty Real Estate, LLC 741 North State Road Salem, Utah 84653 May 25, 2012 SITE LOCATION Hawthorn Mobile Home Park 10682

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT

PHASE I ENVIRONMENTAL SITE ASSESSMENT PHASE I ENVIRONMENTAL SITE ASSESSMENT ACME Gas 55 Garden Street Columbus, Ohio, 45123 Prepared for ACME Oil & Gas Ltd. Prepared by GAEA Environmental Services 87 Garden Street Whitby, Ontario L1N 9E7 November

More information

Speaker 10: Matthew Joy of Jorden Bischoff & Hiser PLC Page 1 TWO RECENT DEVELOPMENTS POTENTIALLY AFFECTING REAL ESTATE TRANSACTIONS

Speaker 10: Matthew Joy of Jorden Bischoff & Hiser PLC Page 1 TWO RECENT DEVELOPMENTS POTENTIALLY AFFECTING REAL ESTATE TRANSACTIONS Speaker 10: Matthew Joy of Jorden Bischoff & Hiser PLC Page 1 TWO RECENT DEVELOPMENTS POTENTIALLY AFFECTING REAL ESTATE TRANSACTIONS By: Matthew Joy Jorden Bischoff & Hiser, P.L.C. Phoenix, Arizona mjoy@jordenbischoff.com

More information

Environmental due diligence has been an integral

Environmental due diligence has been an integral ENVIRONMENTAL LIABILITY What Level of Due Diligence Is Enough? By Samuel W. Butcher and Susan A. Bernstein A framework to evaluate costs and risks. Environmental due diligence has been an integral part

More information

DRAFT - Subject to Change. Cathedral Building 212 North Ash Street Crookston, Minnesota. Prepared For. Project FA June 29, 2011

DRAFT - Subject to Change. Cathedral Building 212 North Ash Street Crookston, Minnesota. Prepared For. Project FA June 29, 2011 DRAFT Phase I Environmental Site Assessment Cathedral Building 212 North Ash Street Crookston, Minnesota Prepared For Braun Intertec Corporation Ms. Kay Hegge Prairie Skyline Foundation 27048 310th Street

More information

Due Diligence & Environmental Compliance Issues for Tribal Energy Projects: Hazardous Waste

Due Diligence & Environmental Compliance Issues for Tribal Energy Projects: Hazardous Waste Due Diligence & Environmental Compliance Issues for Tribal Energy Projects: Law Seminars International Seattle, WA October 23, 2007 Connie Sue Manos Martin Hazardous Waste Overview Environmental Due Diligence:

More information

In previous editions of Environment and the

In previous editions of Environment and the environment and the appraiser The EPA s Proposed All Appropriate Inquiries Rule and the Appraisal of Contaminated Properties by Thomas O. Jackson, PhD, MAI In previous editions of Environment and the Appraiser,

More information

DUE DILIGENCE. Presented at. Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc.

DUE DILIGENCE. Presented at. Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc. DUE DILIGENCE Presented at Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc. due dil i gence appropriate carefulness: the degree of care that a prudent person would exercise,

More information

WORK PHASE I ENVIRONMENTAL SITE ASSESSMENT

WORK PHASE I ENVIRONMENTAL SITE ASSESSMENT PO Box 844523 Boston, MA 02284-4523 Tel: (781) 273-2500 www.ebiconsulting.com SENT VIA EMAIL TO: peter.krahenbuhl@simoncre.com August 4, 2015 Josh Simon 5111 N. Scottsdale Road Suite 200 Scottsdale, AZ

More information

ENVIRONMENTAL SITE ASSESSMENT (AAI COMPLIANT PHASE I)

ENVIRONMENTAL SITE ASSESSMENT (AAI COMPLIANT PHASE I) ENVIRONMENTAL SITE ASSESSMENT (AAI COMPLIANT PHASE I) IPP.MORELAND AVENUE ASSEMBLAGE 785-793 MORELAND AVENUE ATLANTA, GEORGIA, 30316 ONE GROUP PROJECT #A6092 JANUARY 28, 2008 PREPARED FOR: FAIRVIEW COMMERCIAL

More information

Limited Environmental Due Diligence: Transaction Screen. McCampbell Property San Patricio County

Limited Environmental Due Diligence: Transaction Screen. McCampbell Property San Patricio County Limited Environmental Due Diligence: Transaction Screen McCampbell Property San Patricio County 0 LAN_McCampbellProperties_Xstrategic_November,2017 LIMITED ENVIRONMENTAL DUE DILIGENCE Executive Summary

More information

Sustainable development for the future of Arkansas

Sustainable development for the future of Arkansas Sustainable development for the future of Arkansas The Brownfields Program Encourages the clean up and reuse of abandoned or underutilized properties. What is a Brownfield? Real Property where Expansion

More information

Resolution No R. A resolution authorizing the City Manager to execute an amendment to the

Resolution No R. A resolution authorizing the City Manager to execute an amendment to the purposes. Resolution No. 2017-103 R A resolution authorizing the City Manager to execute an amendment to the professional consulting services agreement with Burns & McDonnell for landfill evaluation services

More information

Renewable Energy Development on Contaminated Properties. Liability Concerns

Renewable Energy Development on Contaminated Properties. Liability Concerns Renewable Energy Development on Contaminated Properties Addressing Potential Liability Concerns Suzanne Armor Associate Regional Counsel Office of CERCLA Legal Support U.S. Environmental Protection Agency

More information

Ohio EPA Guidance - VAP Environmental Covenants May 2005 Updated February 2012

Ohio EPA Guidance - VAP Environmental Covenants May 2005 Updated February 2012 Ohio EPA Guidance - VAP Environmental Covenants May 2005 Updated February 2012 Drafting Proposed Environmental Covenants with Activity and Use Limitations for Properties Seeking Covenants Not to Sue Overview

More information

Preparing for Negotiations: The Environmental Lawyer s Checklist In Oil and Gas Transactions

Preparing for Negotiations: The Environmental Lawyer s Checklist In Oil and Gas Transactions Preparing for Negotiations: The Environmental Lawyer s Checklist In Oil and Gas Transactions Presented by Jim Morriss Thompson & Knight LLP james.morriss@tklaw.com The Process Drives the Checklist Confidentiality

More information

Phase I Environmental Site Assessment Phase I Environmental Site Assessment. Siena Lakes Site Naples, Collier County, Florida

Phase I Environmental Site Assessment Phase I Environmental Site Assessment. Siena Lakes Site Naples, Collier County, Florida `` Phase I Environmental Site Assessment Phase I Environmental Site Assessment Siena Lakes Site Naples, Collier County, Florida Parcel ID Nos. 00235960009, 00236000007, 00235560001, 855 NW State 00235520009

More information

BROWNFIELD CLEANUP PROGRAM (BCP) APPLICATION FORM

BROWNFIELD CLEANUP PROGRAM (BCP) APPLICATION FORM BROWNFIELD CLEANUP PROGRAM (BCP) APPLICATION FORM PART A (note: application is separated into Parts A and B for DEC review purposes) Section I. Requestor Information - See Instructions for Further Guidance

More information

SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM (225 CMR 20.00) GUIDELINE

SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM (225 CMR 20.00) GUIDELINE PURPOSE Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs DEPARTMENT OF ENERGY RESOURCES DEPARTMENT OF ENVIRONMENTAL PROTECTION SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM

More information

Environmental Due Diligence in the Wake of the EPA s New All Appropriate Inquiry Rule

Environmental Due Diligence in the Wake of the EPA s New All Appropriate Inquiry Rule Environmental Due Diligence in the Wake of the EPA s New All Appropriate Inquiry Rule BY DIANNE CROCKER AS ANY SEASONED DEALMAKER KNOWS, there are regulatory hurdles that need to be addressed before initiating

More information

FACT SHEET Brownfields Cleanup Program (BCP) KEY DEFINITIONS (see also ECL )

FACT SHEET Brownfields Cleanup Program (BCP) KEY DEFINITIONS (see also ECL ) KEY DEFINITIONS (see also ECL 27-1405) Brownfield A Brownfield is any real property where redevelopment or re-use may be complicated by the presence or potential presence of a hazardous waste, petroleum,

More information

REQUEST FOR EXPRESSIONS OF INTEREST Environmental Assessment Services

REQUEST FOR EXPRESSIONS OF INTEREST Environmental Assessment Services REQUEST FOR EXPRESSIONS OF INTEREST Environmental Assessment Services February 12, 2008 TREASURE COAST BROWNFIELDS PROGRAM I. INTRODUCTION A. Purpose REQUEST FOR EXPRESSIONS OF INTEREST Environmental Assessment

More information

Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process 1

Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process 1 Designation: E1527 13 Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process 1 This standard is issued under the fixed designation E1527; the number immediately

More information

Environmental Legal Issues and Due Diligence When Cities Acquire Real Property

Environmental Legal Issues and Due Diligence When Cities Acquire Real Property Environmental Legal Issues and Due Diligence When Cities Acquire Real Property Thursday, September 4, 2014 General Session; 8:00 9:30 a.m. Danielle G. Sakai, Best Best & Krieger DISCLAIMER: This paper

More information

Ohio EPA Guidance - VAP Environmental Covenants Updated July 2015

Ohio EPA Guidance - VAP Environmental Covenants Updated July 2015 Ohio EPA Guidance - VAP Environmental Covenants Updated July 2015 Drafting Proposed Environmental Covenants with Activity and Use Limitations for Properties Seeking Covenants Not to Sue OVERVIEW This guidance

More information

STATE OF NEW JERSEY NEW JERSEY LAW REVISION COMMISSION. Final Report. Relating to. Uniform Environmental Covenants Act. July 2009

STATE OF NEW JERSEY NEW JERSEY LAW REVISION COMMISSION. Final Report. Relating to. Uniform Environmental Covenants Act. July 2009 STATE OF NEW JERSEY NEW JERSEY LAW REVISION COMMISSION Final Report Relating to Uniform Environmental Covenants Act July 2009 John M. Cannel, Esq., Executive Director NEW JERSEY LAW REVISION COMMISSION

More information

University of Houston Law Center. Environmental Issues in Real Estate Course #7297 SYLLABUS. Scott A. Sherman Adjunct Professor

University of Houston Law Center. Environmental Issues in Real Estate Course #7297 SYLLABUS. Scott A. Sherman Adjunct Professor University of Houston Law Center Environmental Issues in Real Estate Course #7297 SYLLABUS Scott A. Sherman Adjunct Professor Fall 2014 Environmental Issues in Real Estate Instructor Scott A. Sherman,

More information

Due Diligence. Jeffrey C. O Brien Mansfield, Tanick & Cohen, PA. Presented by: 2007 Mansfield Tanick & Cohen, P.A.

Due Diligence. Jeffrey C. O Brien Mansfield, Tanick & Cohen, PA. Presented by: 2007 Mansfield Tanick & Cohen, P.A. Due Diligence Presented by: Jeffrey C. O Brien Mansfield, Tanick & Cohen, PA 2007 Mansfield Tanick & Cohen, P.A. . Introduction Once the purchase agreement is signed and purchaser applies for financing,

More information

Chapter XII BROWNFIELDS & BUSINESS TRANSACTIONS. A. Business Transactions

Chapter XII BROWNFIELDS & BUSINESS TRANSACTIONS. A. Business Transactions Chapter XII BROWNFIELDS & BUSINESS TRANSACTIONS A. Business Transactions Since a purchaser of real estate or corporate assets may take on environmental liabilities, it is important to conduct environmental

More information

Broker. Environmental Concerns Affecting Real Estate Transactions. Chapter 17. Copyright Gold Coast Schools 1

Broker. Environmental Concerns Affecting Real Estate Transactions. Chapter 17. Copyright Gold Coast Schools 1 Broker Chapter 17 Environmental Concerns Affecting Real Estate Transactions Copyright Gold Coast Schools 1 Learning Objectives Define potentially responsible person List the criteria for the innocent landowner

More information

ENVIRONMENTAL DUE DILIGENCE AND DEFECT PROCEDURE

ENVIRONMENTAL DUE DILIGENCE AND DEFECT PROCEDURE ROCKY MOUNTAIN MINERAL LAW FOUNDATION OIL AND GAS AGREEMENTS: PURCHASE AND SALE AGREEMENTS ENVIRONMENTAL DUE DILIGENCE AND DEFECT PROCEDURE Larry Nettles (713) 758-4586 lnettles@velaw.com May 12, 2016

More information

Tools for Managing Potential Liabilities Associated with Contaminated Port Land. David Ashton Assistant General Counsel Port of Portland 02/13/07

Tools for Managing Potential Liabilities Associated with Contaminated Port Land. David Ashton Assistant General Counsel Port of Portland 02/13/07 Tools for Managing Potential Liabilities Associated with Contaminated Port Land David Ashton Assistant General Counsel Port of Portland 02/13/07 1 Managing Potential Liabilities Some Environmental Issues

More information

ADMINISTRATIVE GUIDANCE

ADMINISTRATIVE GUIDANCE 11 ADMINISTRATIVE GUIDANCE ON CONTAMINATED SITES Effective date: April 1, 2013 Version 1.1 May 2013 Expectations and Requirements for Contaminant Migration Introduction This guidance focusses on the ministry

More information

Minnesota s Brownfield Programs. Gary L Krueger Supervisor, Superfund/Brownfields May 23, 2018

Minnesota s Brownfield Programs. Gary L Krueger Supervisor, Superfund/Brownfields May 23, 2018 Minnesota s Brownfield Programs Gary L Krueger Supervisor, Superfund/Brownfields May 23, 2018 Minnesota s Brownfield Program Petroleum Brownfields Program (PBP) MN Statute 115.C, the Petroleum Tank Release

More information

CERCLA Amendments Will Impact How Due Diligence is Conducted. By Larry Schnapf

CERCLA Amendments Will Impact How Due Diligence is Conducted. By Larry Schnapf CERCLA Amendments Will Impact How Due Diligence is Conducted By Larry Schnapf On January 11, 2002, President Bush signed into law the Small Business Liability Relief and Brownfields Revitalization Act

More information

Environmental Questionnaire

Environmental Questionnaire SBA Loan Number: Environmental Questionnaire Applicant Name: of Site Visit: Name/Title of Person Doing Site Visit: Site Name or Business Name: Site Street Address: City, State, Postal Code: County: Site

More information

New Phase I Requirements for Real Estate Transactions: Implications of the New All Appropriate Inquiries Rule

New Phase I Requirements for Real Estate Transactions: Implications of the New All Appropriate Inquiries Rule New Phase I Requirements for Real Estate Transactions: Implications of the New All Appropriate Inquiries Rule Helen Currie Foster Graves, Dougherty, Hearon & Moody, P.C. 1 State Bar of Texas 28 th Annual

More information

ADDENDUM #1 TO THE INVITATION TO BID PHASE 1 ENVIROMENTAL SITE ASSESSMENTS

ADDENDUM #1 TO THE INVITATION TO BID PHASE 1 ENVIROMENTAL SITE ASSESSMENTS ADDENDUM #1 TO THE INVITATION TO BID PHASE 1 ENVIROMENTAL SITE ASSESSMENTS ISSUED: September 15, 2016 The answers to questions, additions and revisions to the INVITATION TO BID PHASE 1 ENVIROMENTAL SITE

More information

Guide Note 6 Consideration of Hazardous Substances in the Appraisal Process

Guide Note 6 Consideration of Hazardous Substances in the Appraisal Process Guide Note 6 Consideration of Hazardous Substances in the Appraisal Process Introduction The consideration of environmental conditions along with social, economic, and governmental conditions is fundamental

More information

A. Threshold Criteria

A. Threshold Criteria II. Background The bona fide prospective purchaser provision, CERCLA 107(r), provides a new landowner liability protection and limits EPA s recourse for unrecovered response costs to a lien on property

More information

CERCLA AMENDMENT CREATES NEW EXEMPTIONS AND DEFENSES

CERCLA AMENDMENT CREATES NEW EXEMPTIONS AND DEFENSES By Jay A. Jaffe and Thomas F. Quinn CERCLA AMENDMENT CREATES NEW EXEMPTIONS AND DEFENSES PROTECTS AGAINST LIABILITY FOR CLEANUP COSTS, ENCOURAGES REDEVELOPMENT OF BROWNFIELDS The Small Business Liability

More information

Environmental Protection Division

Environmental Protection Division Environmental Protection Division 6 Name of procedure: Establishing the Boundaries of a Site Staff affected: Ministry of Environment and Land Remediation Section staff Authority: Environmental Management

More information

NDEQ Brownfields Overview. Charlene R. Sundermann Nebraska Department of Environmental Quality Voluntary Cleanup Program and Brownfield Coordinator

NDEQ Brownfields Overview. Charlene R. Sundermann Nebraska Department of Environmental Quality Voluntary Cleanup Program and Brownfield Coordinator NDEQ Brownfields Overview Charlene R. Sundermann Nebraska Department of Environmental Quality Voluntary Cleanup Program and Brownfield Coordinator 1 What is a Brownfield?... Real property, and the expansion,

More information

Phase I Environmental Site Assessment Update Memorandum Vacant Property 1585 Santa Clara Avenue Santa Ana, California 92507

Phase I Environmental Site Assessment Update Memorandum Vacant Property 1585 Santa Clara Avenue Santa Ana, California 92507 March 1, 2011 Mr. Vincent C. Fregoso, AICP City of Santa Ana 20 Civic Center Plaza Santa Ana, CA 92702 Re: Phase I Environmental Site Assessment Update Memorandum Vacant Property 1585 Santa Clara Avenue

More information

The University of Texas System Systemwide Policy. Policy: UTS Title. Environmental Review for Acquisition of Real Property. 2.

The University of Texas System Systemwide Policy. Policy: UTS Title. Environmental Review for Acquisition of Real Property. 2. 1. Title 2. Policy Environmental Review for Acquisition of Real Property Sec. 1 Sec. 2 Policy Statement. It is the policy of The University of Texas System to minimize its potential for exposure to claims

More information

DTSC BROWNFIELDS Services

DTSC BROWNFIELDS Services DTSC BROWNFIELDS Services Maryam Tasnif-Abbasi California Environmental Protection Agency Department of Toxic Substances Control Brownfields Coordinator RESOURCES FOR SUSTAINABLE REDEVELOPMENT AND LAND

More information

18 Sale and Other Disposition of Regional Lands Policy

18 Sale and Other Disposition of Regional Lands Policy Clause 18 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 19, 2018. 18 Sale and Other Disposition

More information

MW Lender s Review Panel AEC & Environmental Review Discussion

MW Lender s Review Panel AEC & Environmental Review Discussion MW Lender s Review Panel AEC & Environmental Review Discussion Midwest Lenders Conference Chicago, IL Panelists: Carl Corrado Great Lakes Financial Group, LP. Moderator MAP Lender Staige Miller Jesse Pasco

More information

Condemnation Summit XIX

Condemnation Summit XIX Condemnation Summit XIX October 21, 2016 Arizona Biltmore I 2400 East Missouri Avenue I Phoenix, Arizona The Intersection of Environmental Due Diligence, Condemnation and Valuation Presenters: Barbara

More information

Anthony Banfield, FRICS Banfield Real Estate Solutions Ltd

Anthony Banfield, FRICS Banfield Real Estate Solutions Ltd Anthony Banfield, FRICS Banfield Real Estate Solutions Ltd } RICS Practice Statement GN13/2010 Contamination, the environment and sustainability What is it and why should we care? What does it cover? Implications

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT

PHASE I ENVIRONMENTAL SITE ASSESSMENT PHASE I ENVIRONMENTAL SITE ASSESSMENT Of Issued to: ABC Inc. 1234 Main Street Tampa, Florida 33601 Prepared by: Issue Date: August 28, 2017 6408 West Linebaugh Avenue Suite 111 Tampa, Florida 33625 813/335-5811

More information

New Developments in Brownfield Redevelopment Navigating Recent Challenges in the Remediation of Contaminated Sites

New Developments in Brownfield Redevelopment Navigating Recent Challenges in the Remediation of Contaminated Sites Presenting a live 90-minute webinar with interactive Q&A New Developments in Brownfield Redevelopment Navigating Recent Challenges in the Remediation of Contaminated Sites TUESDAY, MARCH 19, 2013 1pm Eastern

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT 3.3-ACRE ECKENRODE PROPERTY WARWICK TOWNSHIP, TUSCARAWAS COUNTY, OHIO. Prepared for: OHIOLAND, LLC

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT 3.3-ACRE ECKENRODE PROPERTY WARWICK TOWNSHIP, TUSCARAWAS COUNTY, OHIO. Prepared for: OHIOLAND, LLC PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT 3.3-ACRE ECKENRODE PROPERTY WARWICK TOWNSHIP, TUSCARAWAS COUNTY, OHIO Prepared for: OHIOLAND, LLC Prepared by: CIVIL & ENVIRONMENTAL CONSULTANTS, INC. COLUMBUS,

More information

Environmental Management Chapter

Environmental Management Chapter Environmental Management Chapter 335-5-1 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISIONS - UNIFORM ENVIRONMENTAL COVENANTS PROGRAM ADMINISTRATIVE CODE CHAPTER 335-5-1 GENERAL TABLE OF CONTENTS

More information

A Primer on Environmental Due Diligence and Remedial Programs that Can Save a Real Estate Transaction

A Primer on Environmental Due Diligence and Remedial Programs that Can Save a Real Estate Transaction A Primer on Environmental Due Diligence and Remedial Programs that Can Save a Real Estate Transaction I. Why is Environmental Due Diligence Necessary? A. Potential Legal Liabilities from Becoming the Landowner

More information

Proposed Laurel 2 Solar Facility Jessup Road at Vaughn & Diehl Roads Imperial County, California

Proposed Laurel 2 Solar Facility Jessup Road at Vaughn & Diehl Roads Imperial County, California Phase I ESA Report Proposed Laurel 2 Solar Facility Jessup Road at Vaughn & Diehl Roads Imperial County, California Prepared for: 9FI 8ME, LLC 221 Sutter Street, 6 th Floor San Francisco, CA 9418 Prepared

More information

GUIDANCE ON IMPLEMENTING ACTIVITY AND USE LIMITATIONS Policy #WSC

GUIDANCE ON IMPLEMENTING ACTIVITY AND USE LIMITATIONS Policy #WSC GUIDANCE ON IMPLEMENTING ACTIVITY AND USE LIMITATIONS Policy #WSC 11-300 This document is intended to guide parties conducting cleanups, Licensed Site Professionals (LSPs), attorneys, MassDEP staff, and

More information

CERCLA Bona Fide Prospective Purchaser

CERCLA Bona Fide Prospective Purchaser Presenting a live 90-minute webinar with interactive Q&A CERCLA Bona Fide Prospective Purchaser Defense: Securing and Maintaining Liability Protection Strategies for Overcoming BFPP Defense Challenges

More information

Re: Proposed Accounting Standards Update, Applying Variable Interest Entity Guidance to Common Control Leasing Arrangements

Re: Proposed Accounting Standards Update, Applying Variable Interest Entity Guidance to Common Control Leasing Arrangements Financial Reporting Advisors, LLC 100 North LaSalle Street, Suite 2215 Chicago, Illinois 60602 312.345.9101 www.finra.com VIA EMAIL TO: director@fasb.org Technical Director File Reference No. PCC-13-02

More information

Using HEROS as an FHA Partner

Using HEROS as an FHA Partner Using HEROS as an FHA Partner The purpose of this document is to provide instructions to consultants and lenders assisting with environmental reviews for Multifamily FHA-insured projects. Consultants will

More information

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: Acquisition of Real Property located at 182 E. 9th Street, Reno NV

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: Acquisition of Real Property located at 182 E. 9th Street, Reno NV BOARD OF REGENTS BRIEFING PAPER 1. Agenda Item Title: Acquisition of Real Property located at 182 E. 9th Street, Reno NV Meeting Date: September 5 & 6, 2013 2. BACKGROUND & POLICY CONTEXT OF ISSUE: Location

More information

Section 4 Port Environmental Management Tools

Section 4 Port Environmental Management Tools Port ownership and operation generally falls into three basic categories: # Operating ports where the port authority itself develops and operates the majority of activities. # Landlord ports where the

More information

How the CERCLA Notification Requirements Facilitate the Creation of Brownfields and What EPA Can Do to Address this Problem

How the CERCLA Notification Requirements Facilitate the Creation of Brownfields and What EPA Can Do to Address this Problem Sustainable Development Law & Policy Volume 11 Issue 1 Fall 2010: Sustainable Development in the Urban Environment Article 11 How the CERCLA Notification Requirements Facilitate the Creation of Brownfields

More information

Three decades after the passage of the Comprehensive

Three decades after the passage of the Comprehensive Playing Poker with Pollution: Why It Is Time to Change the CERCLA Reporting Obligations Larry Schnapf Three decades after the passage of the Comprehensive Environmental Response, Compensation and Liability

More information

ENVIRONMENTAL QUESTIONNAIRE AND DISCLOSURE STATEMENT

ENVIRONMENTAL QUESTIONNAIRE AND DISCLOSURE STATEMENT ENVIRONMENTAL QUESTIONNAIRE AND DISCLOSURE STATEMENT The purpose of this questionnaire is to provide information about the past and present ownership and uses of the real property upon which lender will

More information

Report to: Development Services Committee Report Date: October 5, 2015

Report to: Development Services Committee Report Date: October 5, 2015 SUBJECT: PREPARED BY: REVIEWED BY: INFORMATION REPORT Update on Markham s New Comprehensive Zoning By-law Project, PR 13 128340 Anna Henriques, MCIP, RPP, Senior Planner Zoning & Special Projects, ext.

More information

VOLUNTARY CLEAN UP PROGRAMS IN GEORGIA

VOLUNTARY CLEAN UP PROGRAMS IN GEORGIA VOLUNTARY CLEAN UP PROGRAMS IN GEORGIA AUGUST 27, 2015 OVERVIEW Voluntary Remediation Program Brownfield Program Tax incentives GEORGIA VOLUNTARY REMEDIATION PROGRAM ACT Purpose: to encourage the voluntary

More information

MISSOURI HOUSING DEVELOPMENT COMMISSION ENVIRONMENTAL REVIEW GUIDELINES. MHDC Form 1400

MISSOURI HOUSING DEVELOPMENT COMMISSION ENVIRONMENTAL REVIEW GUIDELINES. MHDC Form 1400 MISSOURI HOUSING DEVELOPMENT COMMISSION ENVIRONMENTAL REVIEW GUIDELINES MHDC Form 1400 Original Version 10.09.2009 Amended 06.23.2015 3435 Broadway Boulevard Kansas City, Missouri 64111 ENVIRONMENTAL REVIEW

More information

ENVIRONMENTAL DISCLOSURE FOR TRANSFER OF REAL PROPERTY (IC ) State Form (R / 1-07) Indiana Department of Environmental Management

ENVIRONMENTAL DISCLOSURE FOR TRANSFER OF REAL PROPERTY (IC ) State Form (R / 1-07) Indiana Department of Environmental Management ENVIRONMENTAL DISCLOSURE FOR TRANSFER OF REAL PROPERTY (IC 13-25-3-7.5) State Form 52653 (R / 1-07) Indiana Department of Environmental Management A WARNING TO THE PARTIES TO A TRANSFER OF PROPERTY: The

More information

SUBJECT: The Appraisal of Real Property That May Be Impacted by Environmental Contamination

SUBJECT: The Appraisal of Real Property That May Be Impacted by Environmental Contamination 1 ADVISORY OPINION 9 (AO-9) 1 2 3 4 This communication by the Appraisal Standards Board (ASB) does not establish new standards or interpret existing standards. Advisory Opinions are issued to illustrate

More information