Facilities Planning Department Building File,

Size: px
Start display at page:

Download "Facilities Planning Department Building File,"

Transcription

1 Facilities Planning Department Building File, Overview of the Collection Title Facilities Planning Department Building File Dates (inclusive) Quantity 72 linear feet, ( 143 containers) Collection Number Archives 14 Summary Collection consists of, reports, budgets, bids, contracts and other papers relative to the design and construction of buildings at Washington State University from approximately Repository Washington State University Libraries, Manuscripts, Archives, and Special Collections. Manuscripts, Archives, and Special Collections Terrell Library Suite 12 Pullman WA Telephone: mascref@wsu.edu Access Restrictions The Collection is open for research use. Sponsor Funding for encoding this finding aid was provided through a grant awarded by the National Endowment for the Humanities. Historical Note In 1967 the University Architect's Office of Washington State University, separately established in 1948, became the Facilities Planning Department. The department oversees the planning and construction or remodeling of all facilities connected with Washington State University. For earlier records, refer to Archives 239. Later records are located multiple locations. Content Description The collection consists of, reports, budgets, bids, contracts and other papers relative to the design and construction of buildings at Washington State University from approximately The materials in this Archive are restricted to the use of authorized personnel only. Administrative Information 1

2 Arrangement The Facilities Planning Department Building File is arranged numerically using the building numbers assigned by the Facilities Planning Department. Acquisition Information The Facilties Planning Department Building File was transferred to the University Archives, Washington State in 1962, 1964, 1968, yearly from 1970 to 1974, and in August 1977 (UA 77-23) in accordance with the approved records schedule. The records were described by Patricia M. Gourd in September A new, more-detailed finding aid was compiled in February, 2000, by Jennifer Ross. Processing Note The records were described by Patricia M. Gourd in September A new, more-detailed finding aid was compiled in February, 2000, by Jennifer Ross. Detailed Description of the Collection Bldg #1 - Administration Building (Thompson Hall) 1 1 General remodeling Remodeling , Otis Elevator Company, Otis Elevator Company Contract Graduate School office remodeling Remodeling bids from other contractors Remodeling - Purvis Construction Company , Contract Furnishings Remodeling , Purvis Construction Company, general 2

3 Bldg #2 - Bryan Hall 1 9 July, Commerical Builders Inc (1/24/1952) Auditorium chairs, general Seating bids July Auditorium chairs, North School Supply, co-contractor Bldg #3 - Fulmer Hall (principally Addition of, 1959) Remodeling contract 1958, Sceva 2 3 Agricultural chemistry building program 2 4 Building program General General Harmon, Pray and Detrich Harmon, Pray, and Detrich, General

4 2 9 Harmon, Pray, and Detrich,, 03/ / Harmon, Pray, and Detrich, contract and change orders Dames and Moore, contract Weekly progress reports 3 1 Purvis Construction Company Purvis Construction Company, Purvis Construction Company, contract and hange orders 3 4 Concrete cylinder tests, U of I 3 5 W.R. O'Rourke Co., Inc. correspondenc (1959) 3 6 Electric Smith, Inc., ( Electric Smith, Inc., contract and change orders 3 8 Equipment, general Metalab Equipment company Metalab, contract and change orders 4 3 Metalab (F.T. Crowe Col, Inc), Rejected bids (general) 4 5 Rejected bids (mechanical) 4 6 Rejected bids (electrical) 4 7 Rejected bids (equipment) 4 8 Weekly statements of compliance, W.R. O'Rourke Co

5 4 9 Weekly statements of compliance, Metalab Equipment Company 4 10 Weekly statements of compliance, Electric Smith Weekly statements of compliance, Purvis Construction Company Budget 5 3 "Building Program" sent to B.A.R. August 16, Ventilation addition, Harmon, Pray, and Detrich 5 5 Ventilation remodeling, Harmon, Pray, and Detrich, contract and change orders 5 6 Ventilation correction, Jaros, Baum, and Bolles, engineers, contract and change orders 5 7 Ventilation correction, Hall and Campbell-Corres and Contract and Company, consulting engineers Ventilation remodeling, general Ventilation remodeling, Warren, Little, and Lund, Inc., general Ventilation remodeling, Warren, Little, and Lund, Inc., change orders and contract 5 11 Rejected bids, ventilation remodeling 5 12 Technical assistance to measure air delivery Ventilation correction 6 1 Ventilation problem, general 1960, 1961, and Ventilation correction, general

6 6 3 Ventilation correction, Jaros, Baum, and Bolles, engineers, 6 4 Ventilation correction, Jaros, Baum, and Bolles, engineers, W.R. O'Rourke Col, Inc., contract and change orders 6 6 Report on ventilating systems 6 7 Report on noise reduction Bldg #4 - College Hall 7 1 H. Halvorson, contract and H. Halvorson, contract and Remodeling, Office of International Programs, general and budget 7 5 Remodling, Office of International Programs, C & S Buildings, Inc., 7 6 Remodeling, Ofice of International Programs, C & S Buildings, Inc., contract and change orders 7 7 Remodeling of Office of International Programs, rejected bids 7 3 Remodeling for English Department Addition for pharmacy, budget 7 9 Program of requirements for College of Pharmacy, research facilties remodeling 6

7 7 10 Remodeling for Pharmacy, N.I.H. submission and carres 1966, regard to application changes 7 11 General General 1966 to 1968 (and before) 7 13 Remodeling, Warren, Little, and Lund, contract and change orders 7 14 Remodel, Carlson and James Architects, Remodeling, Warren, Little, and Lund, 7 16 Alterations, rejected bids 7 17 Alterations Bldg #5 - Commons 8 1 Contract 8 2 Contract Food service renovations, general Renovations, Durkoop and Boyington, agreement and 8 5 Renovations, Sceva Construction Company; and Murphy P.E Renovations, Sceva Construction Company, contract and change orders 8 7 Food service renovations

8 Community Hall and alterations 8 8 Addition to head residents' apartments 1964, general 8 9 Addition to head residents' apartments, Walter M. Varnum, 8 10 Addition to head residents' apartments, Community Hall, Duncan Dunn, Stevens Hall, Walter M. Varnum, contract and change orders 8 11 Addition to head residents' apartments, Community Hall Duncan Dunn, Stevens Hall, rejected bids Bldg #8 - Ferry Hall Entrance, general Entrance, C & S Builders, Inc., contract, change orders and 8 16 Rejected bids, entrance 1963 Bldg # 9 - Hollingberry Field House

9 Bldg #10 - Research Greenhouse B.M. Veltman contracts, evergreenhouse Science Hall greenhouse 9 5 Entomology Bldg #11 - Bohler Gymnasium Old gymnasium Remodeling, general Remodeling, Lyle Cambell,, contract, and c.o Remodeling, C & S Building, general Remodeling, C & S Building, contract and change orders Remodeling, rejected bids A gymnasium and armory for the State College of Washington, a thesis by Stanley Smith Bldg #12 - Smith Gymnasium 9

10 9 14 Women's gymnasium 9 15 Women's gym, dance floor Bldg #14 - White Hall 10 1 Home economics Home economics, sewing labs Remodeling for small animal lab budget 10 4 Affidavit of wages paid, remodeling for small animal lab, S.G. Morin and Son General Remodeling for small animal lab, general Remodeling for small animal lab, S.G. Morin and Son, and subcontractors, 10 8 Remodeling for small animal laboratory, S.G. Morin and son, contract and change orders Rejected bids, remodeling for small animal lab Budget, basement remodeling Building program West basement, general Remodel west basement Aylor-Mauser, architects, 1966, remodeling, west basement 10

11 10 15 Aylor-Mauser, architects, remodel, west basement, contract and change orders Remodeling, west basement, conference notes, Aylor- Mauser, architets Remodel, Commercial Builders, Inc., Remodel, Commercial Builders, Inc., contract and change orders Basement remodel, Pittsburgh testing lab concretetesting Rejected bids Bldg #15 - Finch Memorial Hospital Bldg #17 - Student Health Service Clinic 11 2 Budget 11 3 Program statement 11 4 General Adkison, architect (9/66), Adkison, arhcitect (9/66), contracts and change orders 11 7 Conference notes, Adkison 11

12 Bldg #19 - McCroskey Hall Alterations to McCroskey, Stevens, Scott, and Coman Residence Halls, general Alterations to McCroskey, Stevens, Scott, and Coman Halls, affadavit of wages paid, S.G. Morin and Son Alterations to McCroskey, Stevens, Scott, and Coman Halls, S.G. Morin and Son, Alterations to McCroskey, Stevens, Scott, and Coman Halls, S.G. Morin and Son, contract and change orders Alterations to McCroskey, Stevens, Scott and Coman Hall, rejected bids 1965 Bldg #20 - Carpenter Hall General Elevator, Otis Elevator Company,, contract, change orders Elevator shaft, Sceva Construction Company, and contract Elevator shaft, rejected bids Elevator, general 1959, E. Lyle Campbell, and contract 12

13 Bldg #21 - Old Maintenance Building 12 1 Fire station Bldg #24 - Morrill Hall 12 2 Morrill Hall , accounting Bldg #25 - Kimbrough Music Building 13 1 Ralf E. Decker, architects, Ralf E. Decker, architects, Ralf E. Decker, architects, Acoustical performance of two music buildings, Robin M. Towne and Associates, Inc Ralf E. Decker, A.I.A. Architects, contracts and change orders 13 6 Miss Millwork-budget 13 7 Preliminary presentation 13

14 13 8 Affadavit of wages paid, Johnson's Lumber and Millwork Company 13 9 Affadavit of wages paid, Kehne-Crabtree Electric Company, Inc Affadavit of wages paid, Stanek's Nursery, Inc HHFA Program statement General Ceramic tile floor problem, general 14 1 Hazen and Clark, Inc., Ralf E. Decker, architect, progress notes 14 3 Lyle E. Marquee and Associates, Joseph M. Doyle and Associates, Hazen and Clark, Inc., Finsh hardware 14 7 Miscellaneous millwork, Johnson Lumber and Millwork Company, Miscellaneous millwork, general Hazen and Clark, Inc., contract change orders Miscellaneous millwork, Johnson Lumber and Millwork Company, contract and change orders Testing soil, Washington Testing Laboratories Testing, concrete cylinders, University of Idaho

15 14 13 Testing, concrete cylinders, Washington Testing Lab Warren, Little and Lund, Inc., Warren, Little and Lund, Inc., contract and change order Kehne-Crabtree Electric Company, Kehne-Crabtree Electric Company, contract and change orders Interior furnishings, general Landscape design, Woerner, general Robert L. Woerner, landscape architect, contract and change orders Landscape and sprinkler system, Stanek's Nurseries, Inc. general Landscaping and sprinkler system, Stanek's Nurseries, Inc. contract and change orders Rejected bids Rejected bids, mech Rejected bids Rejected bids, miscellaneous millwork Rejected bids, landscape and sprinkler system 1965 Bldg #27 - Boiler Plant 15 1 Addition

16 15 2 H.W. Beecher January August H.W. Beecher III 15 4 H.W. Beecher Halvorson, Inc Wing Commercial Building, Inc Johnson-Busboom-Rauh General Johnson-Busboom-Rauh Rejected bids 1959 Bldg #28 - Home Management House Bldg #29 - KWSC Radio Station 16 2 Arts hall transmitter Radio booth, Bohler Gym Bldg #30 - Wilmer-Davis Residence Halls 16

17 16 4 Food service renovations, Wilmer-Davis and Duncan- Dunn, general 1964, and budget 16 5 Food service renovations, Wilmer-Davis and Duncan- Dunn, C & S Builders Inc., 16 6 Food service renovations at Wilmer-Davis and Duncan- Dunn, C & Builders, Inc., contract, and Food service renovations at Wilmer-Davis and Duncan- Dunn, C & S Builders, Inc., contract and change orders 16 8 Rejected bids, food service rennovations at Wilmer-Davis and Duncan-Dunn dining Bldg #32 - Science Hall Jurgena & Egelkrout Access improvements, Sceva Construction Company, contract and change orders Access improvement, general Access improvements, Sceva Construction Company, 1962 Bldg #34 - Stevens Hall 17

18 16 15 General Bldg #36 - Troy Hall Creamery , E.O. Johnson contract, #1805 Bldg #37 - Van Doren Hall Bldg #38 - Administration Building Annex Miscellaneous 1948, College Architect's Office Services building Central switchboard, services building General 1963 Bldg #39 - Waller Hall 18

19 Bldg #40 - Wilson Hall Bldg #44 - McCoy Hall 17 1 Large animal convalescent ward Veterinary clinic X-ray room addition Weekly statements of compliance, George and Dunham March Veterinary clinic building, weekly statement of compliance, George & Dunham 17 6 Veterinary clinic building, weekly statements of compliance Warren, Little, and Lund 17 7 Veterinary clinic building, weekly statement of compliance Electric Smith August 1959 to February 1960 August 1959 August Addition building program 17 9 Addition, general July 1957-July

20 17 10 Addition, general August Veterinary clinic addition, Culler, Gale, Martell, and Norrie, general 18 2 Veterinary clinic addition, Culler, Gale, Martell, and Norrie, general 18 3 Veterinary clinic addition, Culler, Gale, Martell, and Norrie general April 1955 to December 1957 January 1958 to July 1959 August Veterinary clinic addition, Culler, Gale, Martell, and Norrie, contract and change orders 18 5 Veterinary clinic addition, H. George and Sons and Dunham Brothers, contract and change orders 18 6 Veterinary clinic addition, H. George and Sons and Dunham Brothers, general 18 7 Veterinary clinic addition, concrete cylinder tests (University of Idaho) 19 1 Veterinary clinic addition, Warren, Little, and Lund, Inc., general 19 2 Veterinary clinic addition, Warren, Little, and Lund, Inc, contract and change orders 19 3 Veterinary clinic addition, Electric Smith, Inc., general 19 4 Veterinary clinic addition, Electric Smith, Inc., contract and change orders 19 5 Electric Smith, Inc., vet clinic, miscellaneous wiring, section c, contract and correspondendence Veterinary clinic addition, equipment general 19 7 Veterinary clinic addition, rejected bids, general, mechanical and electrical 20

21 19 8 Oxygen pipeline system for the veterinary clinic 19 9 Photos of the addition Isolation facility Bldg #45 - Wegner Hall 20 1 Program for a new veterinary medical library 20 2 Library addition 20 3 Vet classroom Library addition, budget 20 5 Vet library addition, HHFA Materials Vet library addition, general Vet library addition, J. Kimball Barnard, architect, Vet library addition, J.. Kimball Barnard, architect, contracts and change orders 20 9 Library addition, Hazen and Clark, Inc., contract and change orders Library addition, Hazen and Clark, Inc., Library addition, hardware schedule University of Idaho testing lab, library addition, concrete tests Library addition, furnishings, general 21

22 20 14 Library addition, rejected bids Veterinary medicine, library addition, grant application Bldg #46 - Engineering Laboratory Building Rigg-Architects Ludberg Ludberg contracts Bldg #47 - Endoparasite Vector Laboratory--EWS and N House Bldg #48 - South House Bldg #49 - Sherwood Hall 21 1 Nettleton-Baldwin Contracts 21 3 Hudson, Columbia, and cafeteria 21 4 Miscellaneous Bldg #54 - Smith Agricultural Engineering Laboratory 22

23 22 1 L.J. Smith Agricultural Engineering Laboratory 22 2 Ludberry Contracts Ag-engineering building budget 22 5 Ag-engineering building, H.U.D Ag-engineering building, H.E.F.A Lab program 22 8 General Evanoff and Kabush, architects, Evanoff and Kabush, architects, Evanoff and Kabush, architects, contract and change orders 23 3 Industrial Builders, Inc., 23 4 Industrial Builders, Inc., contract and change orders general 23 5 Warren, Little, and Lund, 23 6 Warren, Little, and Lund, contract and change orders mechanical construction 23 7 Frost Electric Company, 23 8 Frost Electric Company, contract and change orders, electrical construction 23 9 Rejected bids, general Rejected bids, mechanical

24 23 11 Rejected bids, electrical 1967 Bldg #55 - Todd Hall 24 1 Classroom building Nettleton and Baldwin Todd contracts Maloney Progress reports (classroom) Classroom building, general Guarantees classroom Equipment preliminary Equipment Bldg #56 - Dana Hall 25 1 Technology Building 1945, Whitehouse and Price 25 2 Miscellaneous Tech. and metals annex 25 4 Whitehouse and Price

25 25 5 Whitehouse and price Contracts , Whitehouse and Price 25 7 Henry George and Sons Henry George and Sons, contracts , tech 25 9 Technology building-equipment 26 1 January 16, 1947-July 19, Specifications for the construction of Institute of Technology Building and Institute and Technology Annex Building 26 3 Third floor remodeling, Technology Building weekly statement of compliance, Purvis Construction Company 26 4 Technology building, third floor remodeling, general, (1960-) 26 5 Third floor remodeling, Purvis Construction Company,, and change orders 26 6 Technology building, third floor remodeling, rejected bids August 23, Third floor completion, general Third floor completion, Wood and Landerholdm, contract and 26 9 Third floor completion, Vern Johnson and Sons, Vern Johnson and Sons, third floor completion, contract and change orders Third floor completion, rejected bids August 10, 1961 Bldg #57 - Mining Experiment Station and Wood Products Laboratory 25

26 27 1 Addition Addition, Laboratory Bldg #58 - Old Education Building Basement Bldg #59 - Spillman Hall E.O. Johnson Contractor Basement Bldg #61 - Stadium Commons 27 8 Cafeteria, kitchen Cafeteria Bldg #62 - Holland Library 26

27 28 1 Miscellaneous 28 2 Miscellaneous 28 3 General Progress report 28 6 Maloney--library 28 7 Henry George and Sons 28 8 Contracts Contracts 29 1 Contracts 29 2 Rigg - Library 29 3 Library 29 4 Detweiler and Detweiler 29 5 Excavation 29 6 Contracts 29 7 Subcontract guarantees 29 8 Equipment 29 9 Library sculpturing, D. Pratt Special millwork Bldg #63 - Wilson Compton Union Building 27

28 30 1 Building program for the Washington State College Union 30 2 Working committee 30 3 Concrete test reports 30 4 Union general 30 5 Progress report 30 6 Union, preliminary 30 7 Correspondence Correspondence 30 9 Correspondence 31 1 Construction cost information 31 2 Planning for the operation 31 3 General Union 31 5 Maloney Maloney Maloney Contracts 31 9 Henry George and Sons 32 1 Sub contracts 32 2 Contracts 28

29 32 3 Excavating, Stinson and Levold 32 4 Henry George and Sons Sub contracts, purchase orders 32 6 Equipment purchased 32 7 Interior decoration Interior decoration 1951, (Harrell) 33 2 Harrell, furniture list 33 3 Tech-crafting 33 4 Bid proposals, furniture, carpet, draperies 33 5 Carpet and draperies 33 6 Furniture 33 7 Frederick and Nelson (furniture) 33 8 Bon Marche 33 9 Northern School Supply Co. (sound system) Contracts and purchases Completion contracts and purchases Extra copies, furniture list 1952, including modifications and changes from basic specifications 34 1 Fountain addition, general 34 2 General John W. Maloney, architect, general 34 4 John W. Maloney, architect, contract 29

30 34 5 Sceva Construction Company, addition, general 34 6 Sceva Construction Company, contract 34 7 Brodie National, contract, booths, fountain addition 34 8 Selden's of Kennewick, rubber tile flooring, WCUB, room A 34 9 Bulletin board, class of 1959, coming events sign, Cafeteria line remodeling, Krueger Sheet Metal Company,, contract, and c.o.'s South terrace, Domit Construction Company, contract and change orders and South terrace at P.O. Entrance, rejected bids Cafeteria line remodeling, general South terrace at P.O. entrance, general Ceiling completion, room 1, not B- 1, general October Ceiling completion, room 1, noise control of Spokane, Inc., contract and Butch's Den, room B Completion of room B-1, C & S Builders, Inc., contract, change orders, Completion of room B-1, rejected bids Alteration to entrance, general Alterations to entrances, Sceva Construction Co., Inc., Alterations to entrances, Sceva Construction Co., Inc., contract and change orders 30

31 34 23 Alterations to entrances, rejected bids Addition, DHUD project summary, (ch-wash-87 (s)) Department of Housing and Urban Development, addition Building addition, construction inspection and progress report, Maloney Herrington, et al Building addition, conference notes, Maloney, Herrington, et al Preliminary building program, addition and remodeling 35 4 Color schedule 35 5 Maloney, Herrington, Freesz, and Lund, Architects, 35 6 Maloney, Herrington, Freesz, and Lund, Architects, 35 7 Maloney, Herrington, Freesz, and Lund, Architects, contracts and change orders 35 8 Maloney, Herrington, Freesz, and Lund, Architects, Addition, building program 36 2 Programming 36 3 Addition, general Addition, general Addition, general Addition, budget 36 7 Addition, conference notes, Maloney, Herrington, Freesz, and Lund

32 37 1 Addition, Max J. Kuney Company, Finish hardware 37 3 Addition, Pittsburgh Testing Lab, concrete testing 37 4 Keying schedule 37 5 W.R. O'Rourke Co., Inc., Report on foundation investigation additions 37 7 Addition, W. R. O'Rourke Co., Inc., contract and change orders, mechanical 37 8 Addition, Power City Electric, Inc., contracts and change orders, Electric Addition, Power City Electric, Inc., Addition, John R. Carlson Associates, Ltd.,, consultants Addition, Max J. Kuney Company, contract and change orders, general 38 1 Addition, McKesson and Robbins, Inc., contract and change orders, food service equipment Addition, McKesson and Robbins, Inc., Furnishings Maloney, Herrington, F and L 38 4 Furnishings, Spokane Dry Goods, Spokane Dry Goods Co., contract and change orders 38 6 Addition, Stanek's Inc., Addition, Stanek's, Inc., contract and change orders landscaping Addition 1967, combined rejected bids 32

33 38 9 Rejected bids, furnishing Bldg #64 - Student Book Corporation 39 1 Study for locatiion 39 2 General 39 3 White 39 4 Contracts 39 5 K. Wood 39 6 S.G. Morin and Sons 39 7 Contracts 39 8 Stillwell heating 39 9 Contracts Maxwell's, Inc Contract Behren's Furniture Company 40 1 Contracts 40 2 Display fixture bids 40 3 Fixtures Union Sash and Door Co., contract, display fixtures 40 5 Miscellaneous small contracts 33

34 40 6 Bids, other contractors 40 7 Remodel, general Remodel, Trogdon and Smith, architects, Remodel, Trogdon and Smith, architects, Addition, Hazen and Clark, Inc., contract and change orders Remodel, Trogdon and Smith, contracts and change orders Remodel, Henry Berry Associates, Inc. fixture design consultant Addition, construction reports Addition, Hazen and Clark, Inc., Addition, finish hardware University of Idaho Testing Lab, addition Addition, Powell Plumbing and Heating, contract and change orders 41 2 Addition, Powell Plumbing and Heating, 1963, Rice and Strecker 41 3 Addition, Electric Smith Construction and Equipment Co., Addition, Electric Smith Construction and Equipment Co., contract and change orders 41 5 Addition, casework remodeling, general correspondene Addition existing casework, remodeling, Johnson's Lumber and Millwork Co.,

35 41 7 Addition existing casework, remodeling, John's Lumber and Millwork, contract and change orders 41 8 Addition, store fixtures, Kop Cabinet Shop, 41 9 Addition, store fixtures, Kop Cabinet Shop, contract and change orders Addition, landscape work and sprinker system, general Addition, L. Keith Hellstrom, landscape architect, Addition, landscape architect, L. Keith Hellstrom, ASLA, contracts and orders Landscape, work and sprinker system, Stanek's Nurseries, Inc., Landscape, contracts and change orders, work and sprinkler systems,, Stanek's Nurseries, Inc Landscape, affidavit of wages paid, Stanek's Nurseries, Inc Addition, rejected bids, general Addition, rejected bids, mechanical Addition, rejected bids, electrical Addition, rejected bids, store fixtures Addition, existing casework remodeling, rejected bids Rejected bids, landscape work and sprinkler system 1964 Bldg #65 - Regents Hill 35

36 42 1 Women's dormitory, general 42 2 Thiry, construction Contracts, constructions 42 4 Thiry, construction Thiry, construction Construction, preliminary, general 42 7 Sound Construction Women's dormitory Progress reports, construction Progress reports Construction, concrete test reports 43 1 Contracts, construction 43 2 Sound Construction H.D. Powell , construction 43 4 H.D. Powell 1952, construction 43 5 Contract, construction 43 6 Lighthouse, Baldwin Briggs, construction 43 7 Contracts, construction 43 8 Equipment, construction 36

37 43 9 Furnishings, Bon Marche Furnishings, constructions 44 1 Glossy prints 44 2 Prints, interior sketches 44 3 Negative photographs, floor plan 44 4 Prints 44 5 Briggs vs. W.S.C Alterations and addition to serving counters, Regents Dining 1964, Krueger Sheet Metal Company, contract, orders, general 44 7 Addition 44 8 General 1962, 1964, 1966 Bldg #66A - Physical Plant Garage 45 1 Budget 45 2 General Sceva Construction Company, Sceva Construction Company, contract and change orders 45 5 Rejected bids Automotive service garage, II, completion of interior spaces, general

38 45 7 Automotive service garage, phase 2, Walter M. Varnum, Automotive service garage, II, Walter M. Varnum, contract and change orders 45 9 Rejected bids, phase 2 Bldg #67 - Jewett Observatory Jewett Observatory Purchase orders Halvorson Contracts Timber structures General machinery Bldg #68 - Cattle Disease Building Chain link fence 1954 Bldg #69A - Charles E. McAllister Hall Bldg #69B - William c. Kruegal Hall Bldg #70 - Thomas Neill Hall 38

39 46 1 Men's dormitory, general 46 2 Jones, general Jones, general Jones, contract, General construction, James I. Barnes Construction Company 47 1 Contract 1590, James I. Barnes Construction Company, general 47 2 James I. Barnes, paving walks and streets, contract James I. Barnes, tunnel, general construction, contract Mechanical, James Smyth Plumbing and Heating 47 5 Mechanical contract, James Smyth Plumbing and Heating, Mechanical contract, James Smyth Plumbing and Heating, Miscellaneous bids, residence hall for men, electrical, mechanical and general construction, bonds returned 47 8 Electric Smith, residence halls for men 47 9 Contracts, Electric Smith, residence hall, Contracts, Electric Smith, residence halls, # Build-in, furniture, Roy Hilliard and Associates, general 48 3 Contract, built-in-furniture, Roy Hilliard and Associates, No

40 48 4 Furniture, Roy Hilliard and Associates, general 48 5 Contract, furniture, Roy Hilliard and Associates, 1638, professional services 48 6 Rough draft specifications, interior furnishings Interior furnishings, the Bon Marche 48 8 Interior furnishings, the Bon Marche, contract # Interior furnishings, typical student rooms, wing "B" and ramp "B" Interior furnishings, typical student rooms, wing "A" and ramp "A" Interior furnishings, typical student rooms, wing "C" and ramp "C" Furnishing, small contracts, drapery rods, Brown Furniture Walk contract-insulation, men's dorms Inter-communicatiions system Bldg #71 - Albrook Hydraulics Laboratory 49 1 New hydraulics laboratory site Addition, Hansen and Parr Addition, B and C Construction West addition, E. O. Johnson Phase II and I, south addition, budget 40

41 49 6 General 1960-November Addition, general, 1962, phase I March September Addition, phase I, Benjamin K. Ruehl, 1962, south addition 49 9 Addition, phase I, Commercial Builders, Inc., Office and computer area, addition, phase II, general November Addition, Commerical Builders, Inc., contract 1962 phase I, south addition Addition, phase II (office and computer area), Benjamin K. Ruehl, Alterations, Benjamin K. Ruehl, contract 1962, phase 1 and Office and computer area, phase II, additon, C & S Builders, Office and computer area, phase II 1962, C & S Builders, contract and change orders Rejected bids, phase I and II Concrete flume, Domit Construction Company, contract and change orders, Concrete flume, rejected bids July 14, Water Research Building September 1965-April Water Research Building, Higher Eduction Facilities Act, 1966-March

42 50 3 Water Research Builders, general March , Water Research Building, Carlson and James, architects, general 50 5 Water Research Building, Carlson and James, architects, contracts and change orders 50 6 Water Research Center, C and S Builders, Inc., 50 7 Water Research Center, April 1966-June 1967, C and S Builders, Inc., contract and change orders September 1965-July , September 1965-June 1967 April November Water Research Building, finish hardware November Water Research Center, Washington Testing Lab, Inc., concrete testing September Water Research Center, rejected bids May 1966 Bldg #72 - Coman Hall Bldg #73 - Scott Hall (also Bldg #419) 51 1 Paul Thiry, contract November March Halvorson contracts September 1956-October Change orders, H. Halvorson, Nc., general, women's residence buildings February September Finish hardware, women's residence halls January March

43 51 5 Revised hardware schedule, women's dorms March Senna Mechanical, general September 1956-December Senna Mechanical contract September Change orders, Senna Service, Inc., mechanical, women's residence buildings December June Electric Smith, general September 1956-January Electric Smith, contract June September Change orders, Electric Smith, Inc. January April Neill Furniture, contract and, stock furniture items May October House of Carpets, contract and May October Furnishings, general May November Furniture, hardwood analysis June September Spokane Dry Goods, custom furniture, carpets, and draperies May 1958-April Rejected bids, furnishings May Steps and walks October November Extra copies of material submission, to Regents etc., women's dorms 43

44 52 9 Women's dorms, conc. cycls., lab reports October October Bids Acoustic tile ceiling, Acoustic tile ceiling, Noise Control of Spokane contract change orders and Acoustic tile ceiling, Clyde Stricker, Inc., contract change orders and July and August General Rejected bids Bldg #74 - Nuclear Radiation Center 53 1 General January October L.C. Campbell, consulting engineer January December Sceva Construction, general July February Sceva Construction contract July December Smyth Plumbing and Heating, general July 1957-July Smyth contract July 1957-April

45 53 7 Electric Smith, general September 1957-December Electric Smith contracts July February Kendall M. Wood, engineering services February November Kendall M. Wood, contract, nuclear reactor March February Reactor building, concrete test lab reports, University of Idaho September 1957-August High density concrete, Shielding June March Rejected bids July Pool lining August December General Rejected bids, metal storage building 54 3 Metal storage building, general Hahn and Campbell, structural engineer, Hahn and Campbell, consulting engineering contract 54 6 Metal storage building, Northwestern Construction, Metal storage building, Northwestern Construction, contract and change orders 54 8 Budget 45

46 54 9 Proposal for Science Facilities Grant, nuclear reactor lab Addition, N.S.F Addition, general Addition, general Addition, Miller and Fiedler, architects, July Additions, Miller and Fiedler, architects, contract and change orders Addition, diary inspection report 1969, Addition, R. Redding Construction Company, Addition, R. Redding Construction Company, contract,, payments, c.o.'s 55 5 Addition, Warren, Lund, and Lund, Inc., 55 6 Addition, Warren, Lund, and Lund, Inc., contract and change orders 55 7 Addition, Spence Electric, 55 8 Addition, Spence Electric, contract and change orders 55 9 Addition, Kewaunee Technical Furniture Company, Addition, Kewaunee Technical Furniture Company, contract and change orders Additon, Miller and Fiedler, architects, Cooling tower addition, C & S Builders, Inc., Addition, Pittsburgh Testing Laboratory, concrete testing

47 55 14 Cooling tower addition, C & S Builders, Inc., contracts and company Rector building Rejected bids, mechanical, addition Rejected bids, electrical, Rejected bids, general,addition Cooling tower addition, rejected bids Addition, Industrial Builders, Inc., 56 1 Addition, Industrial Builders, Inc., contract and change orders 56 2 Proposal for a Science Facilities Grant Addition, cooling system Addition Bldg #76 - Johnson Hall and Addition 57 1 Concrete test cylinders, WSU 57 2 Weekly statements of compliance, Warren, Little and Lund Weekly statements of compliance, Johnson-Busboom- Rauh Weekly statements of compliance, Electric Smith Weekly statements of compliance, Metalab Equipment Co Notes, problem areas

48 58 2 T & M Computer center January August General General General, Jones, Lovegren, Helms, and Jones 58 7 General, Jones, Lovegren, Helms, and Jones 58 8 General, Jones, Lovegren, Helms, and Jones 59 1 Work progress reports (reports by Ross), Jones, Lovegren, Helms, and Jones September 1959-June Check list Jones, Lovegren, Helms, and Jones, contract and change orders Johnson-Busboom-Rauh, general 1958/ Plant Science Building 59 6 Warren, Little, and Lund, Inc., general 1958/ Warren, Little, and Lund, Inc., contract and change orders 1958/ Warren, Little, and Lund, Inc., (site, sewer, and water),, contract, and c.o. 1958/ Electric Smith, Inc., general 1958/ Electric Smith, Inc., contract and change orders 1958/ Laboratory equipment, general

49 60 6 Laboratory equipment, general Chairs and stools 1960/ Jones, Lovegren, Helms, and Jones, general (lab equipment) 61 1 Jones, Lovegren, Helms, and Jones, (lab equipment), contract and change orders 61 2 B.F. Shearer Company (lab equipment-tablet arm chairs), contract and change orders 61 3 Northern School Supply (lab equipment-tables), contract and change orders 61 4 Metalab Equipment Company (lab equipment and built-in equipment), contract and change orders 1958/ / / / B.F. Shearer Company (lab equipment-tablet arm chairs) 1959/ Northern School Supply Company (lab equipment tables), general 1959/ Movable equipment, general Metalab Equipment Comapny (lab equipment, built-inequipment), general 61 9 Ewen Construction Company (earth moving),, contract and c.o. 1959/ Rejected bids, general, mechanical, and electrical Rejected bids, laboratory equipment Rejected bids, earth moving Addition, budget 62 2 Addition, NSF application Addition, program statement

50 62 4 Addition Gayne L. Jones and Associates, corresondence Gayne L. Jones and Associates, Gayne L. Jones and Associates, contract and change orders Gayne L. Jones and Associates, construction visit report 62 9 Addition, R. Redding Construction Company, Addition, R. Redding Construction Company, contract and change orders Concrete testing, addition Addition, rejected bids Bldg #77 - Incinerator Building Kenneth W. Brooks Kenneth W. Brooks, contract Ruud Construction Company, contract Ruud Construction, change orders Goder Concrete testing Bids

51 Bldg #78 - R.D. Sloan Hall 64 1 Budget Engineering addition to Technology Building, proposed job file Engineering addition, building program Engineering addition, Culler, Gale, Martell, and Norrie, general 64 5 Engineering addition to Technology Building, Culler, Gale, Martel, and Norrie, general Culler, Gale, Martell, Norrie, and Davis Engineering addition, general Progress reports Completion, general Culler, Gale, Martell, et. al., Engineering addition, Culler, Gale, Martell, and Norrie, contract and change orders 64 1 Engineering addition, Purvis Construction Company, contract and change orders 64 2 Engineering addition, Purvis Construction Company, general 64 3 Concrete cylinder testing, University of Idaho, engineering lab 64 4 Engineering addition, W.R. O'Rourke Co., Inc., general 1959/

52 64 5 Engineering addition, W.R. O'Rourke Co., Inc., contract and change orders 64 6 Engineering addition, Kehne-Crabtree, general 64 7 Engineering addition, Kehne-Crabtree, contract and change orders 64 8 Engineering addition, laboratory casework and equipment, general 64 9 Engineering addition, Hamilton Manufacturing Co., general Engineering addition, Hamilton Manufacturing Co., contract and change orders Rejected bids file and weekly statements of compliance are in top shelf of supply cabinet in print room? Finish hardware schedule and key schedule 66 1 Addition, budget 66 2 Building completion, HHFA, 66 3 General Engineering addition, general Addition, Culler, Gale, Martell, et. al., Building completion, Culler, Gale, Martell, et. al., contract and change orders 66 7 Addition, C & S Builders, Inc., Addition, C & S Builders, Inc., contract and change orders 66 9 Addition, hardware file 52

53 66 10 Addition, Bingham Mechanical and Metal Products, Addition, Bingham Mechanical and Metal Products, contract and change orders Addition, Dillon Electric, Addition, Washington Testing Laboratories, Inc., concrete testing and carres Addition, Dillon Electric, contract and change orders Addition, furniture Addition, rejected bids, general construction Addition, rejected bids, mechanical construction Addition, rejected bids, electrical construction Bldg #79 - Gannon and Goldsworthy Halls 67 1 Hall rotunda, budget 67 2 HHFA material HHFA materials General General Lea, Pearson, and Richards Lea, Pearson, and Richards, general Lea, Pearson, and Richards, general

54 68 2 Lea, Pearson, and Richards, contract and change orders 68 3 Washington Testing Labs, tests and Washington Testing Lab, and contract and tests H. Halvorson, Inc and H. Halvorson, Inc H. Halvorson, Inc., general, general construction H. Halvorson, Inc., "print approval" forms file H. Halvorson, Inc., contract and change orders Landscaping, H. Halvorson, Inc., contract, change orders, and Nelson Landscape Service contract Finish hardware schedule Soils and foundation investigation 69 7 University of Idaho, cylinder tests Concrete cylinder tests, University of Idaho Engineering Lab Lent's Inc., general 1960, mechanical Lent's Inc., contract and change orders Electric Smith, Inc., general, electrical Electric Smith, Inc., contract and change orders Kitchen and kitchen equipment general

55 70 4 Atlas Sheet Metal Works, general, kitchen equipment Atlas Sheet Metal works, contract and change orders Built-in-furniture, general Hilliard and Associates, Inc., general, built-in-furniture Refrigeration section, Lea, Pearson, and Richards, A.I.A Educators Manufacturing Company, general, built-in-furniture Drapery track installation, general Hilliard and Associates, Inc., interior furnishings, contract and change orders 71 2 Educators Manufacturing Co., built-in-furniture, contract and change orders Brown's furniture, contract and Mattresses, general 71 5 Sound Mattress and Felt Company, contract and Interior furniture and furnishings, general Spokane Dry Goods Company, contract and Pictures Rejected bids, general Rejected bids, mechanical Rejected bids, electrical

56 71 12 Rejected bids, kitchen equipment Rejected bids, built-in-furniture Rejected bids for interior furniture Bldg #81 - Streit-Perham Halls 72 1 Budget 72 2 HHFA material HHFA material Walker, McGough, and Trogdon, general Walker, McGough, and Trogdon, general General Walker, McGough, and Trogdon, contract and change orders 72 8 Walker and McGough, architects Inspector's progress reports Walker and McGough, AIA, architects Balcony floor seal painting, general Johnson-Busboom-Rauh, Warren, Little, and Lund, Inc., and Marque, 73 4 Pioneer Masonry Restoration Co., balcony floor seal painting, contract, change orders, and

57 73 5 Johnson-Busboom-Rauh, contract and change orders Hardware schedule 73 7 Washington Testing Laboratories 73 8 Concrete cylinder testing, University of Idaho 73 9 Warren, Little, and Lund, Inc., contract and change orders Electric Smith, Inc. and Joe Doyle, Electric Smith, Inc., contract and change orders Food Service Equipment, general, Walker, McGough, and Trogdon, general Losli Sheet Metal Works, Losli Sheet Metal Works, contract and change orders Interior furnishing, general Interior furnishings, Walker, McGough, and Trogdon, general Interior furnishings, Walker, McGough, and Trogdon Barclay and Brown, Inc., interior furnishings, contract and 74 9 Sound Mattress and Felt Co., contract and Spokane Dry Goods Co., contract and Frederich and Nelson, contract and Rejected bids 1960, general Rejected bids, mechanical

58 74 14 Rejected bids, electrical Rejected bids, interior furnishings Rejected bids, balcony floor seal painting Rejected bids 1960, food service equipment Bldg # 82 - Heald Hall 75 1 Budget 75 2 Building program and building committee 75 3 General Growth rooms, general information Hammel and Green, contract and 1960 (growth room) 75 6 General General High-light intensity cabinets, general Work progress report Longview Plumbing and Heating Company, general Longview Plumbing and Heating Company, contract and change orders 76 3 Kehne-Crabtree Electric Company, Inc., general

Facilities Planning Department Building Specifications,

Facilities Planning Department Building Specifications, Facilities Planning Department Building Specifications, 1925-1964 Overview of the Collection Title Facilities Planning Department Building Specifications Dates 1925-1964 (inclusive) 1925 1964 Quantity

More information

New Hope-Solebury School District Campus Revitalization Plan

New Hope-Solebury School District Campus Revitalization Plan Campus Revitalization Plan 20 January 2016 GODSHALL KANE O ROURKE ARCHITECTS, LLC 12 East Butler Avenue, Suite 205, Ambler, PA 19002 T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com Site Rendering

More information

CUMBERLAND SCHOOLS WORK PROPOSED 2018

CUMBERLAND SCHOOLS WORK PROPOSED 2018 Cost Ashton Elementary School 2 2 Replace HVAC $ 375,000.00 5 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 2 3 Various Technological Improvements $ 191,258.00 2 4 Replace Plumbing Fixtures

More information

Records, Finding aid prepared by Smithsonian Institution Archives

Records, Finding aid prepared by Smithsonian Institution Archives , 1971-1978 Finding aid prepared by Smithsonian Institution Archives Smithsonian Institution Archives Washington, D.C. Contact us at osiaref@si.edu Table of Contents Collection Overview... 1 Administrative

More information

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE EXHIBIT A FULL TEXT OF BOND PROPOSITION 4152-6874-3188.6 HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE This proposition may be known and referred to as the Hilmar

More information

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type Parking Lot Priorities Type 1 Program na Use 1 Severity na New Parking Lots and restriping / regradeing existing

More information

City of Humble 114 W. Higgins, Humble, Texas ( 281 ) ( 281 )

City of Humble 114 W. Higgins, Humble, Texas ( 281 ) ( 281 ) City of Humble 114 W. Higgins, Humble, Texas 77338 ( 281 ) 446-6228 ( 281 ) 446-7902 Building / Inspection Dept. Commercial Plan Submittal Check List Mercantile / Business / Educational / Storage / Factory

More information

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017 2016 Annual Report Enid Public Schools 2016 Bond February 2017 Enid Public Schools Strategic Action Plan The initial goals of the Enid Public Schools Strategic Action Plan have been met, and we are well

More information

Adding Value Through Professional Real Estate Services

Adding Value Through Professional Real Estate Services HISTORIC OFFICE BUILDING MORE INMATION 3,519 TOTAL SQUARE FEET 0.71 ACRES CURRENTLY USED AS CORPORATE OFFICE HEADQUARTERS ORIGINALLY BUILT AS A CHURCH IN 1932 COMPLETELY RENOVATED IN 1997 IMPECCABLY MAINTAINED

More information

518 3 rd Avenue South St. Petersburg, Florida

518 3 rd Avenue South St. Petersburg, Florida 518 3 rd Avenue South St. Petersburg, Florida 33701 813.895.8591 www.viridianfl.com Project Summary Preservation of Senior Housing Project Name: Viridian Address: 518 3 rd Avenue South St. Petersburg,

More information

OFFERING MEMORANDUM. 415 Washington Street. Waukegan, IL PRESENTED BY: COLLIERS INTERNATIONAL

OFFERING MEMORANDUM. 415 Washington Street. Waukegan, IL PRESENTED BY: COLLIERS INTERNATIONAL OFFERING MEMORANDUM 415 Washington Street PRESENTED BY: CONFIDENTIALITY AGREEMENT This Offering Memorandum contains select information pertaining to the business and affairs of the Property at 415 Washington

More information

Guide to the Morley Baer Photographs,

Guide to the Morley Baer Photographs, http://oac.cdlib.org/findaid/ark:/13030/tf8s20074n No online items Processed by Patricia White; machine-readable finding aid created by Patricia White Department of Special Collections Green Library Stanford

More information

MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK

MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK For further information or inquiries please write or call your municipality s Small Cities Consultants: Lisa Low & Associates 293 Riggs Street Oxford,

More information

CONTRUCTION DISBURSMENT HANDBOOK MHDC MISSOURI HOUSING DEVELOPMENT COMMISSION 3435 Broadway Boulevard Kansas City, Missouri

CONTRUCTION DISBURSMENT HANDBOOK MHDC MISSOURI HOUSING DEVELOPMENT COMMISSION 3435 Broadway Boulevard Kansas City, Missouri CONTRUCTION DISBURSMENT HANDBOOK MHDC 2400 MISSOURI HOUSING DEVELOPMENT COMMISSION 3435 Broadway Boulevard Kansas City, Missouri 64111-2415 Revised June 2008 TABLE OF CONTENTS Page INTRODUCTION 3 I. FAILURE

More information

Oliver Greeley Hughson papers,

Oliver Greeley Hughson papers, Overview of the Collection Creator Hughson, Oliver Greeley Title Oliver Greeley Hughson papers Dates 1882-1959 (inclusive) 1882 1959 Quantity 9 cubic feet, (9 record cartons) Collection Number Mss 1712

More information

APPENDIX A BUILDING PERMIT AND RELATED FEES

APPENDIX A BUILDING PERMIT AND RELATED FEES APPENDIX A BUILDING PERMIT AND RELATED FEES Nothing contained herein shall relieve any person of the responsibility for obtaining any permits and paying any other fees which may be required by other codes

More information

South Carolina State University Building Inventory Fall Year of Construction A. Belcher Hall School Bus ,164,298 7,766,274

South Carolina State University Building Inventory Fall Year of Construction A. Belcher Hall School Bus ,164,298 7,766,274 South Carolina State University Building Inventory Fall 2001 Building ID Building Year of Construction Building Orig. Cost Current Replacement Cost 000076 A. Belcher Hall School Bus 1986 6,164,298 7,766,274

More information

WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes

WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes Westbrook III Lot 8 Lot 7 Lot 6 Lot 5 Lot 4 Lot 3 Lot 2 Westbrook III Lot 1 The Westbrook III and are unique three-level live work townhomes

More information

For Sale. El Caporal Restaurant. 117 W. Main Street Everson, WA 98247

For Sale. El Caporal Restaurant. 117 W. Main Street Everson, WA 98247 For Sale El Caporal Restaurant 117 W. Main Street Everson, WA 98247 Asking: 420,000 Contact: 360-305-1329 Coldwell Banker Bain 3610 Meridian St. Bellingham, WA 98226 amwebster99@gmail.com pg. 1 Table of

More information

STATE UNIVERSITY of NEW YORK PROJECT CAPITALIZATION FORM (PCF) INSTRUCTIONS

STATE UNIVERSITY of NEW YORK PROJECT CAPITALIZATION FORM (PCF) INSTRUCTIONS The Project Capitalization Form should be used for all capital projects on State University (SUNY) capital assets where design and construction costs are $100,000 or greater, and for all building and land

More information

BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 ed.)): See subsection (6) for all new

BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 ed.)): See subsection (6) for all new BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 e)): See subsection (6) for all new construction, addition and renovation permit fees for one-

More information

13. Automobile maintenance service, but not commercial truck maintenance service

13. Automobile maintenance service, but not commercial truck maintenance service SECTION 60 B-3 COMMUNITY BUSINESS DISTRICT 60.01 General Description: This business district is intended for the conduct of personal and business services and retail business of the community. Traffic

More information

Millinocket, ME Large historic office building offering professional space (Building class B)

Millinocket, ME Large historic office building offering professional space (Building class B) Millinocket, ME 04462 Large historic office building offering professional space (Building class B) 70 Spring St, Millinocket, ME 04462 13,000 sq ft office building in Maine 40% OCCUPIED PRODUCING A RENTAL

More information

Charles Kozminski Elementary Community Academy

Charles Kozminski Elementary Community Academy Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

COORDINATING COMMITTEE

COORDINATING COMMITTEE COORDINATING COMMITTEE 100 West Washington Street, Room 320 Hagerstown, MD 21740-4748 P: 240.313.2330 F: 240.313.2331 www.washco-md.net PUR-1331 NOTICE TO PROSPECTIVE BUYERS REQUEST FOR PROPOSALS FOR THE

More information

NUMBER: A-7 SUBJECT: Controller APPROVED: Infrastructures Structures and. Software = 3 to. 5 years. capital asset. master file follows: should then

NUMBER: A-7 SUBJECT: Controller APPROVED: Infrastructures Structures and. Software = 3 to. 5 years. capital asset. master file follows: should then ADMINISTRATIVE MEMORANDUM COUNTY OF SAN MATEO NUMBER: A-7 SUBJECT: Accounting for Capital Assets RESPONSIBLE DEPARTMENT: Controller APPROVED: John L. Maltbie, County Manager DATE: September 22, 2014 This

More information

2010 City of San Mateo General Plan Update Zoning Code Revisions

2010 City of San Mateo General Plan Update Zoning Code Revisions 27.16.050 AFFORDABLE HOUSING. To implement the affordable housing goals and policies in the General Plan, the City Council adopted the Below Market Rate (BMR) Program. The BMR Program requires developers

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 215-216 and ASBESTOS MANAGEMENT PLAN for the New Abraham Lincoln High School ULCS# 81 Building # B811-1

More information

CHAPTER 7 WR WATERFRONT RESIDENTIAL DISTRICT

CHAPTER 7 WR WATERFRONT RESIDENTIAL DISTRICT SECT ION 7.01 SECT ION 7.02 SECT ION 7.03 SECT ION 7.04 CHAPTER 7 WR WATERFRONT RESIDENTIAL DISTRICT DESCRIPTION AND PURPOSE This District is intended for medium density single family residential development

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: R. F. WAGNER SEC SCL ARTS & TECH-Q, 47-07 30TH PLACE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-16

More information

Road frontage 287 Sewer and Well Propane Central Air

Road frontage 287 Sewer and Well Propane Central Air FOR SALE/LEASE FOR SALE $149,900 FOR LEASE $13.75/sf Modified Net 1027 Voluntown Rd., Griswold 1,440sf+/- commercial bldg. with full basement (total 2,880sf) 0.96 acre Zone C-1 15 parking spaces John Jensen,

More information

PROPERTY ACQUISITION 2118 Milvia Street Berkeley, CA

PROPERTY ACQUISITION 2118 Milvia Street Berkeley, CA Total Cost of Ownership and Operational Expenditures PROPERTY ACQUISITION 2118 Milvia Street Berkeley, CA Updated Presented to the Board of Trustees April 28, 2015 By: Dr. Sadiq B. Ikharo Vice Chancellor

More information

Fixed Asset Management

Fixed Asset Management Fixed Asset Management Policy/Procedure This policy applies to faculty and staff with responsibility for purchasing, maintaining or disposing of Fixed Assets, including Department Chairs, Department Heads,

More information

AN ORDINANCE PRESCRIBING THE CONNECTION FEE RATE AND MEAN LOADINGS PER UNIT OF USAGE FOR COUNTY SANITATION DISTRICT NO. 4 OF LOS ANGELES COUNTY

AN ORDINANCE PRESCRIBING THE CONNECTION FEE RATE AND MEAN LOADINGS PER UNIT OF USAGE FOR COUNTY SANITATION DISTRICT NO. 4 OF LOS ANGELES COUNTY AN ORDINANCE PRESCRIBING THE CONNECTION FEE RATE AND MEAN LOADINGS PER UNIT OF USAGE FOR COUNTY SANITATION DISTRICT NO. 4 OF LOS ANGELES COUNTY Effective 711 199 ORDINANCE NO. 37 AN ORDINANCE PRESCRIBING

More information

CITY OF NORTH MANKATO CAPITAL ASSET POLICY ADOPTED: JANUARY 1, 2003 REVISED EFFECTIVE: _JANUARY 1, 2016

CITY OF NORTH MANKATO CAPITAL ASSET POLICY ADOPTED: JANUARY 1, 2003 REVISED EFFECTIVE: _JANUARY 1, 2016 CITY OF NORTH MANKATO CAPITAL ASSET POLICY ADOPTED: JANUARY 1, 2003 REVISED EFFECTIVE: _JANUARY 1, 2016 1 TABLE OF CONTENTS SECTION I Define Capital Assets and Capitalization Thresholds SECTION II Reporting

More information

POLICY 6600 CAPITALIZATION AND CONTROL OF ASSETS

POLICY 6600 CAPITALIZATION AND CONTROL OF ASSETS POLICY 6600 CAPITALIZATION AND CONTROL OF ASSETS Policy Category: Finance and Business Services Area of Administrative Responsibility: Finance Board of Trustees Approval Date: March 21, 2017 Effective

More information

Commercial and Manufacturing Districts TABLE ALLOWED USES AND PERMIT REQUIREMENTS FOR COMMERCIAL AND MANUFACTURING DISTRICTS

Commercial and Manufacturing Districts TABLE ALLOWED USES AND PERMIT REQUIREMENTS FOR COMMERCIAL AND MANUFACTURING DISTRICTS TRUCKEE MUNICIAL CODE - TITLE 18, DEVELOMENT CODE TABLE 2-6 - ALLOWED USES AND ERMIT REQUIREMENTS FOR COMMERCIAL AND MANUFACTURING DISTRICTS ERMIT REQUIREMENT BY DISTRICT LAND USE (1) CN (2) CG CH CS M

More information

Campus Sector Animal hospital SE N P (for properties abutting Adams and Van Buren Avenues) Antique shops N P N Appliance sales/ service

Campus Sector Animal hospital SE N P (for properties abutting Adams and Van Buren Avenues) Antique shops N P N Appliance sales/ service 143-136. Use Regulations for. [Amended 7-20-2000 by Ord. o. 448; 2-15-2001 by Ord. o. 453; 9-21-2006 by Ord. o. 556; 12-3-2009 by Ord. o. 586] A. In the, and in the and s, land, buildings or premises shall

More information

FIXED ASSET PROCEDURES

FIXED ASSET PROCEDURES FIXED ASSET PROCEDURES It is the policy of St. Norbert College to maintain accurate and complete records of Fixed Assets held and to capitalize and depreciate them according to appropriate accounting requirements.

More information

ORDINANCE NO An Ordinance Updating Impact Fees. The Common Council of the City of Cedarburg, Wisconsin, hereby ordains as follows:

ORDINANCE NO An Ordinance Updating Impact Fees. The Common Council of the City of Cedarburg, Wisconsin, hereby ordains as follows: ORDINANCE NO. 2014-26 An Ordinance Updating Impact Fees The Common Council of the City of Cedarburg, Wisconsin, hereby ordains as follows: SECTION 1. Section 3-6-3 of the Municipal Code of the City of

More information

SECTION 838 "C-6" - GENERAL COMMERCIAL DISTRICT

SECTION 838 C-6 - GENERAL COMMERCIAL DISTRICT SECTION 838 "C-6" - GENERAL COMMERCIAL DISTRICT The "C-6" District is intended to serve as sites for the many uses in the commercial classifications which do not belong in either the Neighborhood, Community

More information

TEMPLE UNIVERSITY BUILDING CODE AND DESCRIPTIONS 2008

TEMPLE UNIVERSITY BUILDING CODE AND DESCRIPTIONS 2008 A 901 AMBLER ADMINISTRATION BUILDING A AMBLER A 902 AMBLER PHYSICAL PLANT C TUCC A 903 AMBLER BRIGHT HALL D WASHINGTON DC A 904 AMBLER GYMNASIUM F FT.WASHINGTON A 905 AMBLER POOL HOUSE H HSC A 906 AMBLER

More information

Imperial Court. Sector 128, Noida INFOPACK MARKETED BY

Imperial Court. Sector 128, Noida INFOPACK MARKETED BY Imperial Court Sector 128, Noida INFOPACK MARKETED BY List of contents 1. Product brief Page 3 2. Specifications Page 4 3. Price list Page 5-6 4. Project Masterplan Page 7 5. Unit Layout & Cluster plan

More information

REQUEST FOR SEALED BIDS. Tract W Farm House

REQUEST FOR SEALED BIDS. Tract W Farm House REQUEST FOR SEALED BIDS Tract W201701 Farm House PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM Office of the Executive Director 4111 4 th Avenue, Suite 6 Kearney, Nebraska 68845 June 29, 2018 CONTENTS Request

More information

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161 1 School Name Year Built/Renovation Classroom quantity, size, type, usage Glover School Construction 2012-14 Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor

More information

DOWNTOWN FRINGE REZONING EXAMINATION PRESENTATION

DOWNTOWN FRINGE REZONING EXAMINATION PRESENTATION DOWNTOWN FRINGE REZONING EXAMINATION PRESENTATION Wednesday, March 16, 2016 @ 7:00 PM MSTC Community Engagement Room RM 635 1001 Centerpoint Drive, Stevens Point, WI City of Stevens Point Community Development

More information

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers New Bleachers Gym Capacity: 710 Stage Auditeria Capacity: 390 Enlarged plan of new stage configuration showing greater seating capacity of the gym vs. that of the auditeria Proposed 2018 Bond Projects

More information

Finding aid for the John Fitchen papers, No online items

Finding aid for the John Fitchen papers, No online items http://oac.cdlib.org/findaid/ark:/13030/kt6v19s06c No online items Finding aid prepared by Teresa Morales. 910018 1 Descriptive Summary Title: John Fitchen papers Date (inclusive): 1927-1989 Number: 910018

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

HERITAGE OSHAWA MEETING March 22, 2012

HERITAGE OSHAWA MEETING March 22, 2012 HERITAGE OSHAWA MEETING March 22, 2012 Minutes of the THIRD meeting of Heritage Oshawa for 2012 held in the Committee Meeting Room, Council Building, Oshawa Civic Administration Complex on Thursday, March

More information

B 1 Restricted Retail Commercial District

B 1 Restricted Retail Commercial District Pursuant to the zoning information provided below a stand-alone parking lot would not be a permitted use at this location. Permitted uses for the B-1 zoning district will be inserted below for your review.

More information

HISTORICAL BACKGROUND OF THE MACDONALD HOUSE

HISTORICAL BACKGROUND OF THE MACDONALD HOUSE HISTORICAL BACKGROUND OF THE MACDONALD HOUSE Jonathan G. Lammers James J Miller of James J Miller PHD LLC version of February 3, 2017 Bender & Associates, Architects Key West Billy s Tap Room MacDonald

More information

910 S. CEDAR RIDGE DRIVE

910 S. CEDAR RIDGE DRIVE 910 S. CEDAR RIDGE DRIVE RETAIL/OFFICE/WAREHOUSE PROPERTY FOR LEASE Duncanville, TX 75137 OFFERING SUMMARY Available SF: 3,126 SF PROPERTY OVERVIEW Previous print shop; retail space with warehouse. Lease

More information

Prime Northwest gainesville parcel

Prime Northwest gainesville parcel 2925 NW 39 th Ave Gainesville, FL Property Description Large church in excellent condition, a central NW location, and on a huge 11.5 acre lot! Rare find in NW Gainesville, just 4 miles to UF and 640 feet

More information

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive Master Plan Presentation for: 520 Virginia Drive May 22, 2018 Design Presentation Agenda Master Plan Design for 520 Virginia Drive Existing Conditions & Opportunities Project Goals Site Plan & Floor Plans

More information

FOR SALE OR LEASE. Manufacturing / Distribution Facility 85,262± Square Feet (Divisible) Acres

FOR SALE OR LEASE. Manufacturing / Distribution Facility 85,262± Square Feet (Divisible) Acres FOR SALE OR LEASE Manufacturing / Distribution Facility 85,262± Square Feet (Divisible) 15.65 Acres 330 Southwell Boulevard Tifton, Tift County, Georgia 31794 SALES PRICE: $4,000,000 LEASE RATE: $2.00/PSF,

More information

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK I. LANDLORD'S WORK Landlord's Work shall be done in accordance with the specifications set forth below, shall be limited to the work set forth in this Section

More information

SHARPSVILLE AREA SCHOOL DISTRICT

SHARPSVILLE AREA SCHOOL DISTRICT No. 622 SHARPSVILLE AREA SCHOOL DISTRICT SECTION: FINANCES TITLE: GASB STATEMENT 34 ADOPTED: January 22, 2008 REVISED: 622. GASB STATEMENT 34 1. Purpose SC 613 The Board recognizes the need to implement

More information

Washington State Energy Code TABLE C (2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD

Washington State Energy Code TABLE C (2) INTERIOR LIGHTING POWER ALLOWANCES: SPACE-BY-SPACE METHOD Washington State Energy Code TABLE C405.4.2(2) COMMON SPACE-BY-SPACE TYPES a LPD (w/ft 2 ) Atrium - First 40 feet in height Atrium - Above 40 feet in height Audience/seating area - Permanent 0.03 per ft.

More information

The provisions of this Article shall apply to all home occupations as defined in Section of this Code.

The provisions of this Article shall apply to all home occupations as defined in Section of this Code. ARTICLE 8: HOME OCCUPATIONS 305-200. Application The provisions of this Article shall apply to all home occupations as defined in Section 130-91 of this Code. 305-200.5. Purpose It is the purpose of this

More information

ARTICLE 598. PD 598.

ARTICLE 598. PD 598. ARTICLE 598. PD 598. SEC. 51P-598.101. LEGISLATIVE HISTORY. PD 598 was established by Ordinance No. 24683, passed by the Dallas City Council on August 8, 2001, and was amended on the same day by Ordinance

More information

Liberty-Valley Elementary School

Liberty-Valley Elementary School 150024 Liberty-Valley Elementary School Site Plan of Liberty-Valley Elementary Floor Plan of Liberty-Valley Elementary 2 150024; Liberty-Valley Elementary School. This school is located at 175 Liberty

More information

CLAUD E. FORD PAPERS, (BULK ) Accession 1676

CLAUD E. FORD PAPERS, (BULK ) Accession 1676 Finding Aid for CLAUD E. FORD PAPERS, 1860-1965 (BULK 1930-1965) Finding Aid Published: November 2011 Electronic conversion of this finding aid was funded by a grant from the Detroit Area Library Network

More information

Renovation Progress. June 2-15, Weeks 35 & 36

Renovation Progress. June 2-15, Weeks 35 & 36 Renovation Progress June 2-15, 2012 Weeks 35 & 36 Jun 2 Sisters investigate the progress and ponder the finished arrangement of the reception area (right) and the residence area on 2 nd Ottilia (below)

More information

The American University in Cairo. Financial Policies and Procedures

The American University in Cairo. Financial Policies and Procedures The American University in Cairo Financial Policies and Procedures Policy : Capitalization & Depreciation Policy Effective Date : April 1, 2011 Date Revised : December 2016 Prepared by Related Policies

More information

Subject: Class: Number: ( ) Complete Revision Supersedes: Page:

Subject: Class: Number: ( ) Complete Revision Supersedes: Page: ( ) Partial Revision Page 1 of 12 TABLE OF CONTENTS: Purpose Page 1 A. Buildings 2 B. Improvements 3 C. Land 4 D. Construction in Progress 5 E. Personal Property 6 F. Works of Art and Historical Treasures

More information

$595,000. List Price. Lease Price $5,000/mo (3n) For Sale or Lease 345 N Main Street Chatham, Illinois Medical Office Bldg.

$595,000. List Price. Lease Price $5,000/mo (3n) For Sale or Lease 345 N Main Street Chatham, Illinois Medical Office Bldg. For Sale or Lease reet Chatham, Illinois Medical Office Bldg. List Price $595,000 Property Details Highly Visible Building Suitable For A Variety Of Businesses Daily Traffic Count: 14,400 New roof added

More information

Fee Resolution

Fee Resolution Fee Resolution 2016-6 A resolution establishing fees for the filing of applications, permits and licenses for the Township of Leet. WHEREAS, the Board of Commissioners of the Township of Leet has adopted

More information

DRAFT DESIGN REPORT. Kevin Trinastic. WHITEWATER, WI Project Number: 11 L 2 J

DRAFT DESIGN REPORT. Kevin Trinastic. WHITEWATER, WI Project Number: 11 L 2 J DRAFT DESIGN REPORT DIVISION OF FACILITIES DEVELOPMENT 0 East Wilson Street, 7th Floor Post Office Box 7866 Madison, WI 53707 MARCH, 203 WEST CAMPUS RESIDENCE RENOVATIONS PHASE UNIVERSITY OF WISCON SIN

More information

List Price $595,000. Lease Price $5,000/mo (3n) Property Details. For Sale or Lease 345 N Main Street Chatham, Illinois Medical Office Bldg.

List Price $595,000. Lease Price $5,000/mo (3n) Property Details. For Sale or Lease 345 N Main Street Chatham, Illinois Medical Office Bldg. For Sale or Lease reet Chatham, Illinois Medical Office Bldg. List Price $595,000 Lease Price $5,000/mo (3n) Property Details Highly Visible Building Suitable For A Variety Of Businesses Daily Traffic

More information

East Side Community Meeting

East Side Community Meeting East Side Community Meeting November 29, 2017 Pam Thompson, Senior Planner Sustainable Development and Construction City of Dallas Authorized Hearing Process City Plan Commission authorized a hearing to

More information

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628 11411 S Eggleston Ave Chicago, IL 6628 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors

More information

STUDENT HOUSING BUSINESS INNOVATOR AWARDS BEST RENOVATION OF EXISTING PROJECT ENTRY

STUDENT HOUSING BUSINESS INNOVATOR AWARDS BEST RENOVATION OF EXISTING PROJECT ENTRY STUDENT HOUSING BUSINESS INNOVATOR AWARDS BEST RENOVATION OF EXISTING PROJECT ENTRY University Plaza Apartments uplaza.com 900 Crane Drive, DeKalb, IL 60115 Capstone Real Estate Investments, LLC. 402 Office

More information

Administration s Finance Office Approval Date: 4/10/12 Effective Date: 4/10/12 Capital Assets and Property Review Date:

Administration s Finance Office Approval Date: 4/10/12 Effective Date: 4/10/12 Capital Assets and Property Review Date: County of Butte Administration s Finance Office Approval Date: 4/10/12 Effective Date: 4/10/12 Capital Assets and Property Review Date: Control County Wide Version: One Last Revision Date: 4/10/12 PURPOSE

More information

BURJSIDE BOULEVARD. Location: Burj Dubai District, Dubai, UAE

BURJSIDE BOULEVARD. Location: Burj Dubai District, Dubai, UAE BURJSIDE BOULEVARD DEVELOPMENT OVERVIEW Burjside Boulevard is a luxury serviced Dubai apartment development, and is located opposite the Dubai Mall, with unobstructed exclusive views of the Burj Khalifa.

More information

Berkshire Taconic Community Foundation

Berkshire Taconic Community Foundation The Accessory Apartments program is a project of HousingUs, an initiative of Berkshire Taconic Community Foundation. HousingUs is a tri-state collaborative effort of nonprofit organizations and community

More information

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning UNIVERSITY HOUSING DIVISION OF STUDENT AFFAIRS BRIEFING SUMMER 2013 What is RLI? The Residential Life Initiatives (RLI) is a planned approach for the renewal, revitalization, and expansion of University

More information

Architectural Process & Standard for Parish Construction Project Canons of the Episcopal Church in the Diocese of Alabama: Canon 6 Section 6

Architectural Process & Standard for Parish Construction Project Canons of the Episcopal Church in the Diocese of Alabama: Canon 6 Section 6 Canons of the Episcopal Church in the Diocese of Alabama: Canon 6 Section 6 The Diocese and each of its Parishes and other organization shall submit to the Department, for its review and recommendations,

More information

STATE CONTRACTS INFORMATION DEPARTMENT OF GENERAL SERVICES

STATE CONTRACTS INFORMATION DEPARTMENT OF GENERAL SERVICES 6002 STATE CONTRACTS INFORMATION DEPARTMENT OF GENERAL SERVICES Act 266 of 1982 provides for the payment of interest penalties on certain invoices of qualified small business concerns. The penalties apply

More information

THE VILLAGE COLLECTION

THE VILLAGE COLLECTION EXCEPTIONAL INCLUDED FEATURES INTERIOR FEATURES Mohawk porcelain tile in foyer and 3-season room Spacious living room with volume ceiling pre-wired for ceiling fan Superior fireplace with 12x12 ceramic

More information

DEKALB COUNTY ENTERPRISE ZONE APPLICATION. Project Information

DEKALB COUNTY ENTERPRISE ZONE APPLICATION. Project Information DEKALB COUNTY ENTERPRISE ZONE APPLICATION Project Information Project Name: Street Address: City/State/Zip: Mailing Address: City/State/Zip: (the exact legal name under which the business is applying for

More information

Request for Proposals to Purchase Package. Nathan Hale Hall (Formerly Nathan Hale Hotel) 833 Main Street Willimantic, Connecticut SB 09-06

Request for Proposals to Purchase Package. Nathan Hale Hall (Formerly Nathan Hale Hotel) 833 Main Street Willimantic, Connecticut SB 09-06 Nathan Hale Hall (Formerly Nathan Hale Hotel) 833 Main Street Willimantic, Connecticut SB 09-06 Offer Due By: January 29, 2010 Issued By: State of Connecticut Department of Public Works 165 Capitol Avenue

More information

Own your own "Commercial Island" at Branson Landing

Own your own Commercial Island at Branson Landing Own your own "Commercial Island" at Branson Landing Over an acre in size, floating on the water and located in the Bass Pro Shops parking lot Existing Operating Business: The Paddlewheel (Restaurant/Bar/Nightclub)

More information

TABLE OF CONTENTS. Article / Section. Article 1 Administration and Enforcement

TABLE OF CONTENTS. Article / Section. Article 1 Administration and Enforcement TABLE OF CONTENTS Preamble How To Use This Ordinance Article / Section Page Article 1 Administration and Enforcement... 1-1 Sec. 1.01 Short Title... 1-1 Sec. 1.02 Intent... 1-1 Sec. 1.03 Scope... 1-1 Sec.

More information

Jefferson Street Center Winchester Public Schools Winchester, Virginia

Jefferson Street Center Winchester Public Schools Winchester, Virginia Main Office: 6799 Kennedy Road Unit F Warrenton, Virginia 20187 Phone: 540.347.5001 Fax: 540.347.5021 1388 NW 2 nd Ave., Unit 4B, Boca Raton, FL. 33432 Phone: 561.416.1240 Fax: 561.416.1248 Concept -Option

More information

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

PARTNERS IN ECONOMIC PROGRESS

PARTNERS IN ECONOMIC PROGRESS PARTNERS IN ECONOMIC PROGRESS The Partners in Economic Progress (PEP) Program offers incentives to building owners to renovate buildings within the PEP Zone in City Center (see map). If you are a PROPERTY

More information

1. Question: In regards to the facilities are they all Monday thru Friday cleaning? Any facilities Saturday and or Sunday cleaning?

1. Question: In regards to the facilities are they all Monday thru Friday cleaning? Any facilities Saturday and or Sunday cleaning? Proposal No. P18/9957 Custodial Services Answers to Vendor Questions Questions are in black, Answers are in red 1. Question: In regards to the facilities are they all Monday thru Friday cleaning? Any facilities

More information

SALE 5 FLORENCE STREET LOWER SACKVILLE, NOVA SCOTIA FOR OFFICE / COMMERCIAL BUILDING 2,000 SF A DIVISION OF KELLER WILLIAMS SELECT REALTY

SALE 5 FLORENCE STREET LOWER SACKVILLE, NOVA SCOTIA FOR OFFICE / COMMERCIAL BUILDING 2,000 SF A DIVISION OF KELLER WILLIAMS SELECT REALTY FOR SALE OFFICE / COMMERCIAL BUILDING 2,000 SF A DIVISION OF KELLER WILLIAMS SELECT REALTY MAT HOUSTON 902-412-2940 mathouston@kwcommercial.com TOM GERARD, CCIM, SIOR 902-830-1318 tomgerard@kwcommercial.com

More information

Sir James Dunn Building

Sir James Dunn Building The Buildings of Dalhousie University - Sir James Dunn Building - Building History The Buildings of Dalhousie University Buildings Home Sir James Dunn Building About the Project Chronology Building Index

More information

RR Building Area: (sf) 19,800 SF. Cost per Square Foot: $207. Construction Cost $4,100,000. Date of Completion: February 2014

RR Building Area: (sf) 19,800 SF. Cost per Square Foot: $207. Construction Cost $4,100,000. Date of Completion: February 2014 Program Summary: The client, a seminary college, wished to renovate an existing 1960 Mid- Century Modern dormitory structure, converting it to a single room / bath residence hall. Program Statement: The

More information

ROBERT MOON VICE PRESIDENT, BROKERAGE SERVICES

ROBERT MOON VICE PRESIDENT, BROKERAGE SERVICES OFFERING MEMORANDUM MILLENNIUM MEDICAL 28625 NORTHWESTERN HWY SOUTHFIELD, MICHIGAN SEPTEMBER 2013 PREPARED BY: ROBERT MOON VICE PRESIDENT, BROKERAGE SERVICES FRIEDMAN INTEGRATED REAL ESTATE SOLUTIONS 34975

More information

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees Reynoldsburg Code of Ordinances CHAPTER 1305 Permits and Fees 1305.01 Plan review fees. 1305.02 Residential fee schedule. 1305.03 Commercial fee schedule. 1305.04 Plumbing permit. 1305.05 Permit addresses.

More information

For Sale 230 HARRISBURG AVENUE SUITE #4 LANCASTER, PA Industrial/Commercial Realtors

For Sale 230 HARRISBURG AVENUE SUITE #4 LANCASTER, PA Industrial/Commercial Realtors For Sale 717.293.4477 Industrial/Commercial Realtors 230 HARRISBURG AVENUE SUITE #4 LANCASTER, PA 17603 1853 William Penn Way Lancaster, PA 17601 717.293.4477 www.highassociates.com/propertysearch Table

More information

ADMINISTRATIVE MEMORANDUM COUNTY OF SAN MATE0

ADMINISTRATIVE MEMORANDUM COUNTY OF SAN MATE0 ADMINISTRATIVE MEMORANDUM COUNTY OF SAN MATE0 NUMBER: A-7 SUBJECT: Accounting for Fixed Assets RESPONSIBLE DEPARTMENT: Controller APPROVED:_Signature on file DATE: November 4, 2010 David S. Boesh, County

More information

STATE COLLEGE AREA SCHOOL DISTRICT

STATE COLLEGE AREA SCHOOL DISTRICT QUALIFICATIONS & EXPERIENCE TO STATE COLLEGE AREA SCHOOL DISTRICT ARCHITECT FOR ROUTINE PROJECTS August 19, 2011 M.JohnLewArchitects,LLC www.mjlarchitects.com T ABLE O F C ONTENTS Section Cover Letter

More information

Answers to Submitted Questions Request for Qualifications - TIF Scattered Site Rehabilitation Program Date: March 9, 2017

Answers to Submitted Questions Request for Qualifications - TIF Scattered Site Rehabilitation Program Date: March 9, 2017 Answers to Submitted Questions Request for Qualifications - TIF Scattered Site Rehabilitation Program Date: March 9, 2017 1. How do I apply? You can download the application in Word document format here:

More information

EMERGING ALTERNATE DELIVERY LEASE LEASEBACK FOR COMMUNITY COLLEGES CCFC 21 ST ANNUAL CONFERENCE SEPT 9 TH, TUESDAY 10:25 AM 11:40 AM WORKSHOP #1 (CC

EMERGING ALTERNATE DELIVERY LEASE LEASEBACK FOR COMMUNITY COLLEGES CCFC 21 ST ANNUAL CONFERENCE SEPT 9 TH, TUESDAY 10:25 AM 11:40 AM WORKSHOP #1 (CC EMERGING ALTERNATE DELIVERY LEASE LEASEBACK FOR COMMUNITY COLLEGES CCFC 21 ST ANNUAL CONFERENCE SEPT 9 TH, TUESDAY 10:25 AM 11:40 AM WORKSHOP #1 (CC ROOM 202) agenda LEGAL PERSPECTIVE & FRAMEWORK OWNERS

More information

Guide to WSU Vancouver Salmon Creek Campus Building Planning Documents (Phase I- IV) WSUV.Archives.001

Guide to WSU Vancouver Salmon Creek Campus Building Planning Documents (Phase I- IV) WSUV.Archives.001 Guide to WSU Vancouver Salmon Creek Campus Building Planning Documents (Phase I- IV) WSUV.Archives.001 This finding aid was produced using ArchivesSpace on August 17, 2017. English WSU Vancouver Library,

More information

FOR SALE or LEASE 2086 New Danville Pike, Lancaster, PA Pequea Township

FOR SALE or LEASE 2086 New Danville Pike, Lancaster, PA Pequea Township FOR SALE or LEASE 2086 New Danville Pike, Pequea Township 3-Bay Garage Multi-Use Property Office, Farmhouse and Outbuildings Office Building 2-Story Barn Farmhouse Parcel lines are approximate Many opportunities

More information