1 BELGRADE LAND DEVELOPMENT PROJECTS AND CONSTRUCTION
2 CONSTRUCTION CONTRACTS OVERVIEW
3 MAP OF WORKS LEGEND EXECUTED WORKS CONTRACTED WORKS
4 MAJOR PROJECTS
5
6 BELGRADE WATERFRONT
7 BELGRADE WATERFRONT Commencement of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Old Sava Bridge Reconstruction Oct Design Mid of 2018 Works End of Tender published and conceptual designs prepared. Urban - architectural design competition on-going. Once the first prize design is awarded, preliminary design to be prepared. After preliminary design, design and build under Yellow FIDIC Book possible. 2 Belgrade Waterfront Approach Roads January % of land plot forming completed, Conceptual design prepared. Two New Belgrade building plots CP3 and CP5 under court appeal. Savski Trg design competition of ideas required. Resolving acquisition issues and provision of Location Conditions. Once location conditions are provided, design development will follow, as well as building permit issuance and construction. Tenders will be arranged continuously street by street, aiming at completion of all of the works in Ada Bridge Tram 1st April Preliminary design prepared. Building Permit issued. Tender for Construction on-going. Construction 4 Savska - Dunavska Slopes Tunnel Oct Design 2018 Works Detailed Regulation Plan contracted. Variants prepared. It's been decided to go to the next development phase with two variants. Contract for conceptual design including preliminary design elements signed. Development of conceptual designs including preliminary design elements, variant selection, plan completion and tender for the Design for the Building Permit and construction.
8 1. BELGRADE WATERFRONT OLD SAVA BRIDGE REDEVELOPMENT
9 2. BELGRADE WATERFRONT APPROACH ROADS
10 3. ADA BRIDGE TRAM
11 4. SVASKA DUNAVSKA SLOPES TUNNEL
12 NORTH ARTERIAL TANGENT ROAD Southern and Western Part
13 North Arterial Tangent Road (NATR) Southern and Western Part 1 Bridge over the Danube River - Ada Huja to Pancevo Road Commencemen t of Works December 2017 Design Second half of 2018 Construction Completion of Works End of 2021 Investment Value (EUR) Past and On-going Activities General Design with preliminary design elements was prepared in Feasibility study with conceptual designs prepared by JETRO for the purposes of the STEP loan by the Government of Japan. Detailed Regulation Plan prepared and approved. Forming of land plots on-going, CM of Krnjaca completed, Srbijavode Company has submitted the appeal. There are 31 claims and 3 complaints in CM of Visnjica. There are 60 facilities on the route between Pancevo Road and Slanacki Road in total. Taking into consideration the situations like this, a request for amendments to the Law submitted to Republic Geodetic and Cadastre Authority. Tender for Preliminary Design and Feasibility Study on-going. Future Activities Preliminary design for bridge construction with accompanying roads. Request for protection of rights submitted, outcome awaited. 2 Borska Lasta Sectors 1 and 2 April 2017 Early Design for the Building Permit and for construction under preparation. Acquisition issues are being resolved in parallel. During cooperation with Srbijagas Company some new procedural activities emerged. In case acquisition issues are resolved by March 2017, contract signing and commencement of construction will follow. 3 Borska Lasta Sector 3 September 2017 September Design development and solving of acquisition issues on-going. In case acquisition issues are resolved by June 2017, contract signing and commencement of construction will follow.
14 Commence ment of Works North Arterial Tangent Road (NATR) Southern and Western Part Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 4 Patrijarha Pavla Street (from ICSRR to Pionirska Street) Patrijarha Pavla Street (from Pionirska Street 5 to Pere Velimirovica Street) 6 Pere Velimirovica Street 1st September March 2018 End of Mid of Design documents prepared, location conditions issued. Land plots formed. Design sent to Republic Audit Committee for review. Acquisition issues under resolution. Design documents prepared, location conditions issued. Some of the land plots have not been formed yet due to the appeals. Acquisition issues are being resolved for the land plots formed. Building plot formed and resolving of acquisition issues commenced. Road Main Design including infrastructure prepared. Since there is a legalized building the value of which is estimated to EUR 5 million the route has been reconsidered and variants prepared. Amendments to the Plan possible so as to avoid solving of acquisition issues in the current scope. Once the acquisition issues are resolved, contract signing and construction will follow. Once the acquisition issues are resolved, contract signing and construction will follow. Changes to DRP, land plots forming and design development. 7 Borska Street June 2018 End of Land plots forming started in 2010, land plots P2, P3, P4 and part of P1 formed, and another part is under the appeal against previous requests made in 2005 and on, in CM of Stara Rakovica. Once land plots are formed solving of acquisition issues and design will follow.
15 8 Commence ment of Works Borska Lasta Sectors 6, North Arterial Tangent Road (NATR) Southern and Western Part Completion of Works Investment Value (EUR) Past and On-going Activities Building plots formed, solving of acquisition issues on-going. One of the building plots formed is currently under error correction in Cadastre. Possibility for exception from the planning document is currently reconsidered so as to avoid exhumation of illegal graves in Mokri Lug cemetery and demolition of part of the operating building of GSP "Kosmaj". Future Activities Planning document amendment possible or allotment design development in order to avoid exhumation of illegal graves in Mokri Lug cemetery and demolition of part of the operating building of GSP "Kosmaj". Solving of acquisition issues, design documents preparation subject to Revision Committee's review, issuance of the building permit and construction to be continued. 9 NATR from highway to Bulevar Kralja Aleksandra (King Alexandar Boulevard) Preliminary Design prepared in DRP adopted. Land plots division on-going. Once land plots are divided, solving of acquisition issues, design and construction will follow. 10 NATR from Bulevar Kralja Aleksandra (King Alexandar Boulevard) to Belgrade 20 Power Substation Preliminary Design prepared in DRP adopted. Land plots division on-going. Once land plots are divided, solving of acquisition issues, design and construction will follow. 11 NATR from Beograd 20 Power Substation to Slanacki Put Preliminary Design prepared in DRP adopted. Land plots division on-going. Once land plots are divided, solving of acquisition issues will follow.
16 PROKOP
17 PROKOP STATION APPROACH Commencement of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Approach from Level 105 September 2016 June Building Permit issued, Construction Contract signed with the most favourable Contractor. Construction on-going. 2 Approach from the highway Invitation to Tender published and land plots division contracted. Site visited. 68 flats and approximately 1500m2 of business space to be resettled. There are 93 previous requests submitted to the Republic Geodetic Authority. Urgent steps taken, land plots division not started. Taking into consideration situations like this, a request for amendments to the Law has been submitted to the Republic Geodetic and Cadastre Authority Once land plots are formed solving of acquisition issues, provision of location conditions and design development will follow.
18 SLAVIJA SQUARE
19 SLAVIA SQUARE and VRACAR ROADS Commencement of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Roundabout Fountain November 2016 May Contractor selected. Construction on-going 2 Slavija-Zicka Phase from Slavija Square to Kataniceva Street Preliminary designs prepared in the past. Land plot formed. Solving of land acquisition issues on-going. Commencement of construction depends on resolution of acquisition issues. 3 Bore Stankovica Street May 2017 December Contractor selected. Commencement of Construction
20 1. ROUNDABOUT FOUNTAIN
21 2. SLAVIJA-ZICKA PHASE FROM SLAVIJA SQUARE TO KATANICEVA STREET
22 3.BORE STANKOVICA STREET
23 BLOCK 42 BUS STATION AND TERMINI
24 BLOCK 42 BUS STATION AND TERMINI Commencement of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Block 20 Terminus and Branko's Bridge (Design and Build) 2016 Completed Des igns prepared, Contractor s elected and Works completed. Works completed 2 Block 42 Terminus at Milutina Milankovica Street (Desigh and Build) Augus t 2017 May Land plots forming on-going. The application for transfer of land property rights to the City of Belgrade submitted to the Property Directorate of the Republic of Serbia. Solving of acquisition is sues with a legal entity and transfer of property rights from the Republic to the City to follow. 3 Bus Station Building Underneath ICSRR (Desigh and Build) April 2017 Augus t Open tender procedure initiated. Tenders were incomplete. Tenderer s elected in the Negotiated Tender Procedure. Des ign development on-going, building permit is suance and construction to follow. 4 Parking Lot Underneath ICSRR July 2017 October Design for the parking lot included in the procurement under Item 3 above. Invitation to Tender for parking lot construction works will be made once the data from the Des igner are obtained. Tender for Construction 5 Bus Station Building and Platforms Augus t It was agreed to arrange tender for bus s tation des ign including s tation platforms for the final position defined in the DRP. Tender procedure conducted and contracting on-going. A Decision made to return the land requested under res titution procedure. After contract signing the des ign development, tender for cons truction works and is suance of the building permit and cons truction will follow.
25 1. BLOCK 20 TERMINUS AND BRANKO S BRIDGE
26 TERMINUS BLOCK BLOCK 42 TERMINUS AT MILUTINA MILANKOVICA STREET
27 BUS STATION UNDER THE ICSRR 3. BUS STATION BUILDING UNDERNEATH ICSRR
28 4. PARKING LOT UNDERNEATH ICSRR
29 5. BUS STATION BUILDING AND PLATFORMS
30 ROADS
31 ROADS Commencemen t of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Reconstruction of Branko's Bridge (Design and Build) March 2017 December Design documents in the past prepared by "Most Project" and "Mostogradnja" Companies. Tender for construction works including updating of design documents completed. Upon decision on multiyear funding, the decision on initiating the tender and invitation to tender will follow. 2 Reconstruction of Francuska Street March2017 December 2017 Reconstruction method needs to be agreed. Design documents preparation 3 Preliminary Design for ICSRR - Sector III, from Topcider Tunnel exit to the entrance into the Sumice Tunnel Preliminary Design for Detailed Regulation Plan development purposes Development and adoption of the Plan, solving of acquisition issues, design documents preparation and construction.
32 SEWERAGE
33 SEWERAGE Commenceme nt of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Sewerage Pumping Station at Veliko Selo WWTP - putting Interceptor into operation 2017 Design 2018 Construction Meetings held with all relevant institutions. Possibility of pumping station (PS) construction prior to construction of the WWTP confirmed. Tender documents for development of the urban planning design, allotment design, preliminary design for the building permit purposes and construction under preparation. Urban planning design and design documents for construction of WWTP Veliko Selo - Phase Ia 2 Sewerage in Krnjaca Settlement - Block Brace Maric March 2017 March Tender for construction works including design documents preparation Design and Construction 3 New Storm Water Sewer in Kumodraz Preliminary Design for Detailed Regulation Plan development purposes. Detailed Regulation Plan Development
34 WASTE WATER TREATMENT PLANTS PLANNED IN THE WIDER BELGRADE CITY AREA
35
36 MAP OF SITES
37
INVITATITION TO PUBLIC BIDDING
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY Sites Analysis, Marketing and IT Department Number: Date: Based on the Planning and Construction Law ( Official Gazette of the Republic of Serbia, No. 72/09, 81/09
More informationREQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA
REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA Project Description The County of Wise, Virginia has been awarded CDBG
More informationGovernment Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 );
219 Chapter 16 PPP & Concessions 1. General Public-private partnership ( PPP ) refers to forms of cooperation between public authorities and the world of business which aim to ensure the design, funding,
More informationDesigning for transparency and participation in the Hellenic Cadastral Project
Designing for transparency and participation in the Hellenic Cadastral Project Dr. Dimitris Rokos Director of Planning and Investments, Hellenic National Cadastre and Mapping Agency S.A. Table of Contents
More informationRecommendation to Approve Dominion Virginia Power s Request for an Easement along Route 606 at Washington Dulles International Airport.
REPORT TO THE STRATEGIC DEVELOPMENT COMMITTEE Recommendation to Approve Dominion Virginia Power s Request for an Easement along Route 606 at Washington Dulles International Airport June 2017 Requested
More informationQuality Improvement of the Real Estate Cadastre in Serbia
, Serbia Key words: quality improvement, real estate information, quality assurance, Serbia SUMMARY The concept of cadastral modernization in the Republic of Serbia was defined in 1992, and it is being
More informationREDAN CAPITAL LTD 13 Ikeja Close, Off oyo St, Area 2, Garki-, Abuja, Nigeria GUIDELINES FOR PREPARING PROJECT PROPOSALS
GUIDELINES FOR PREPARING PROJECT PROPOSALS INTRODUCTION SHELTER-AFRIQUE's major objective is to promote housing in Africa. In order to achieve this objective, the Company cooperates with private sector,
More informationSECTION 7000 LAND DEVELOPMENT REQUIREMENTS
SECTION 7000 LAND DEVELOPMENT REQUIREMENTS 7000 LAND DEVELOPMENT REQUIREMENTS... 1 7001 LEGISLATIVE AUTHORITY... 1 7001.1 LAND DEVELOPMENT... 1 7001.1.1 Title 40, Idaho Code... 1 7001.1.2 Idaho Code 40-1415
More informationInternational funding projects in Republic Geodetic Authority
International funding projects in Republic Geodetic Authority Serbia: Republic Geodetic Authority Workshop Exploring Funding Instruments for NMCA 7-8 November 2012 Republic Geodetic Authority Republic
More informationProposal for Belgrade City Centre Regeneration. May 2011
Proposal for Belgrade City Centre Regeneration May 2011 The region s real estate dynamics are changing In the last 20 years: Downtown areas were neglected outside of limited historical streets and squares.
More informationSANDOVAL COUNTY PLANNING AND ZONING COMMISSION DECEMBER 10, 2015 PUBLIC HEARING
SANDOVAL COUNTY PLANNING AND ZONING COMMISSION DECEMBER 10, 2015 PUBLIC HEARING To: Sandoval County Planning and Zoning Commission From: Sandoval County Planning and Zoning Division Staff Date: December
More informationHERITAGE GREEN DEVELOPMENT
BID DATE: JAN. 18, 2018! HERITAGE GREEN DEVELOPMENT 1,034 Acre Fully Entitled Mixed-Use Development La Plata, Charles County, Maryland The fully entitled property known as Heritage Green is a 1,034 acre
More informationCountry Project Funding Agency. Design and supervision of operational connecting road within Camp Arena, Herat Airport
Roads & Highways Country Project Funding Agency Afghanistan Albania Armenia Azerbaijan Bosnia & Herzegovina Design and supervision of operational connecting road within Camp Arena, Herat Airport Supervision
More informationPlot For Sale Blvd. Timisoara Area, Bucharest - Romania
IMRA Ltd. (A unit part of IMRA Group) Plot For Sale Blvd. Timisoara Area, Bucharest - Romania Brief Presentation Short Description Summary: Property Location Property Photos Area Developments Development
More informationGreater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action
More informationTask Force on Harbourfront Developments on Hong Kong Island. Study on Pedestrian Connectivity between Wan Chai and Sheung Wan
Task Force on Harbourfront Developments on Hong Kong Island For discussion On 7 September 2018 TFHK/07/2018 Study on Pedestrian Connectivity between Wan Chai and Sheung Wan PURPOSE This paper seeks Members
More informationCibuk 1 Wind Farm Land Acquisition Plan Vetroelektrane Balkana d.o.o. October 2014
Vetroelektrane Balkana d.o.o. October 2014 Table of contents Chapter Pages 1. Introduction 3 2. Project Land Acquisition 3 2.1. Land previously acquired 3 2.2. Land in the process of acquisition 4 3. Legal
More informationAbout. Contacts. The real estate boutique law firm Artyushenko & Partners was founded in Kazakhstan in 2005.
About The real estate boutique law firm Artyushenko & Partners was founded in Kazakhstan in 2005. The company lawyers are members in the leading law societies. Our partners as an educators/tutors are hold
More informationFactsheet DEVELOPER LEGAL ENTITY LOCATION. Within close proximity to Sava Promenada, Belgrade Park, BW Galerija and world-class hotels.
Factsheet DEVELOPER DEVELOPER LEGAL ENTITY LOCATION Within close proximity to Sava Promenada, Belgrade Park, BW Galerija and world-class hotels. WORLD-CLASS DESIGN TEAM INTERNATIONAL CONSULTANT LOCAL CONSULTANCY
More informationDevelopment of Market of Geodetic Services and Geodetic Companies in the Republic of Serbia
Development of Market of Geodetic Services and Geodetic Companies in the Republic of Serbia Zagorka GOSPAVIC, Branko BOZIC and Olivera VASOVIC, Serbia Key words: Development of geodetic services market,
More informationLand consolidation and rural development in Serbia
1 Land consolidation and rural development in Serbia Stevan Marosan University of Belgrade, Faculty of Civil Engineering, Department for Geodesy and Geoinformatics Maja Trajkovic Ministry of Finance Vladan
More informationHennepin County Department of. Housing, Community Works and Transit. Transit Oriented Development (TOD) Guidelines
Hennepin County Department of Housing, Community Works and Transit 2007 Transit Oriented Development (TOD) Guidelines Hennepin County Transit Oriented Development (TOD) Bond Funds Hennepin County Housing,
More informationRevised translation by legal affairs Department CIB/CDC
Revised translation 26.08.07 by legal affairs Department CIB/CDC Law on Concessions CHAPTER I GENERAL PROVISIONS Article 1. The purpose of this Law is to promote and facilitate the implementation of privately
More informationNAGPUR IMPROVEMENT TRUST
NAGPUR IMPROVEMENT TRUST CONSULTATION PAPER FOR IMPLEMENTATION OF TOWN PLANNING SCHEMES UNDER THE NAGPUR IMPROVEMENT TRUST ACT 1936 AND PROPOSAL OF DEVELOPMENT OF NAGPUR METRO POLITAN AREA ON PUBLIC PARTICIPATION
More informationRESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension
RESOLUTION NO. R2018-07 To Acquire Real Property Interests Required for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 03/08/2018
More informationCommitted to Service
Committed to Service Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner July 18, 2016 Development Services TO:
More informationCommitted to Service
Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner August 25, 2017 Development Services TO:
More informationHow Swaziland Is Upgrading Its Slums
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized How Swaziland Is Upgrading Its Slums CIVIS chose to profile this example from Swaziland
More informationREQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington
REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington Issue Date: March 2, 2018 Prepared By: Rural Municipality of Wellington Wellington, PEI
More informationFrom 2D representation of the buildings into cadastral maps towards 3D GIS applications and BIM a case study for Prishtina
From 2D representation of the buildings into cadastral maps towards 3D GIS applications and BIM a case study for Prishtina This is a Peer Reviewed Paper Fisnik LOSHI, Kosovo Keywords: 3D cadastre, property
More informationRESIDENTIAL DEVELOPMENT DEMOLITION OF EXISTING HOTEL AND ERECTION OF 29 FLATS SITE AREA APPROX HECTARES (0.99 ACRES)
RESIDENTIAL DEVELOPMENT DEMOLITION OF EXISTING HOTEL AND ERECTION OF 29 FLATS SITE AREA APPROX - 0.4 HECTARES (0.99 ACRES) Normanton Park Hotel, 34-36 Normanton Road, South Croydon, Surrey, CR2 7AR FOR
More informationBYLAW 5781 ****************
BYLAW 5781 **************** A BYLAW OF THE CITY OF LETHBRIDGE PROVIDING FOR THE IMPOSITION OF AN OFF-SITE LEVY IN RESPECT OF LAND TO BE DEVELOPED OR SUBDIVIDED FOR THE YEARS 2013, 2014, 2015 and 2016 ************************************************************
More informationFOR SALE. 200 dwellings residential development site. with a resolution to grant planning permission THE STEEDS, GREAT COXWELL, OXFORDSHIRE SN7 7NN
FOR SALE 200 dwellings residential development site with a resolution to grant planning permission THE STEEDS, GREAT COXWELL, OXFORDSHIRE SN7 7NN Outline Planning permission for up to 130 Private and 70
More informationWatkinsville First Baptist Church Building and Parking Masterplan Norton Road & Simonton Bridge Road Oconee County Georgia
Watkinsville First Baptist Church Building and Parking Masterplan Norton Road & Simonton Bridge Road Oconee County Georgia Special Use Approval A-1 CUP to A-1 with Special Use Approval Total Site Area
More informationKazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy
More informationGOVERNMENT REGULATION OF THE REPUBLIC OF INDONESIA. NUMBER 38 of 2008 REGARDING
GOVERNMENT REGULATION OF THE REPUBLIC OF INDONESIA NUMBER 38 of 2008 REGARDING AMENDMENT OF GOVERNMENT REGULATION NUMBER 6 OF 2006 REGARDING THE MANAGEMENT OF STATE/REGIONAL OWNED ASSETS Considering: BY
More informationQUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG, VIRGINIA SPECIAL ASSESSMENT REPORT. Prepared By: MuniCap, Inc.
QUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG, VIRGINIA SPECIAL ASSESSMENT REPORT Prepared By: MuniCap, Inc. October 25, 2011 QUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG,
More informationGoverning Body 323rd Session, Geneva, March 2015
INTERNATIONAL LABOUR OFFICE Governing Body 323rd Session, Geneva, 12 27 March 2015 Programme, Financial and Administrative Section Programme, Financial and Administrative Segment GB.323/PFA/3 PFA Date:
More informationRobert Street Gateway, West St. Paul, Minnesota. A Premier Development Opportunity at the Gateway to West St. Paul and Dakota County
Robert Street Gateway, West St. Paul, Minnesota A Premier Development Opportunity at the Gateway to West St. Paul and Dakota County Robert Street Gateway, West St. Paul, Minnesota A Premier Development
More informationInvoluntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing
Involuntary Resettlement Due Diligence Report Loan 2860 (SF) July 2015 ARM: Water Supply and Sanitation Sector Project Additional Financing Prepared by the Armenian Water and Sewerage Closed Joint Stock
More informationREFORM OF LAND CADASTRE IN LITHUANIA
REFORM OF LAND CADASTRE IN LITHUANIA Romualdas KASPERAVICIUS, Lithuania Key words: ABSTRACT Main aim for every Government is to create legal, financial and organisational circumstances for real property.
More informationAthens Township Authority March 17, 2014
Athens Township Authority March 17, 2014 Meeting was called to order by Chairman, Pat Musto at 5:45 p.m. Members also present were Meade Murtland and Terry Depew. CITIZENS Vincent DeSisti wanted ATA to
More informationThinking of becoming a developer?
Thinking of becoming a developer? A simple message from Peter Comben When acquiring wholesale property to achieve 100% finance is the near impossible in today s market, investors turn to development. With
More informationTOWN OF MANSFIELD RULES AND REGULATIONS FOR THE EXTENSION OF PUBLIC SEWERS
TOWN OF MANSFIELD RULES AND REGULATIONS FOR THE EXTENSION OF PUBLIC SEWERS BOARD OF WATER & SEWER COMMISSIONERS Mansfield Board of Selectmen Adopted April 3, 1996 CONTENTS DEFINITIONS... Page 2 POLICY
More informationFOCUS ENGINEERING, inc.
FEASIBILITY REPORT for OLD VILLAGE PHASE 3 STREET, DRAINAGE AND UTILITY IMPROVEMENTS RESOULTION RECEIVING REPORT AND CALLING FOR PUBLIC HEARING OLD VILLAGE CIP PHASING PLAN Phase 3 2017. Amount: $ 2,557,000.
More informationWASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION
WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION DETAILED SPECIFIC WRITTEN REQUEST File Number: SDV- Number of Proposed Lots & their Dimensions: PRELIMINARY SUBDIVISION PLAN REQUIREMENTS The approval of
More informationRC ; Reclassification The Garrison at Stafford Proffer Amendment (formerly Stafford Village Center)
Board of Supervisors Robert Bob Thomas, Jr., Chairman Laura A. Sellers, Vice Chairman Meg Bohmke Jack R. Cavalier Wendy E. Maurer Paul V. Milde, III Gary F. Snellings Anthony J. Romanello, ICMA CM County
More informationCity of Norwalk. Commercial Development Permit Process
City of Norwalk Commercial Development Permit Process City of Norwalk Zoning Department 38 Whittlesey Avenue, PO Box 30 Norwalk, OH 44857 (419) 663-6736 www.norwalkoh.com 1 TABLE OF CONTENTS OVERVIEW...
More informationBRIDGETON SUBDIVISION APPLICATION CHECKLIST
APPLICATION NAME AND # CHECKLIST COMPLETED BY: DATE: Signature and printed name BRIDGETON SUBDIVISION APPLICATION CHECKLIST TO SUBDIVISION APPLICANTS: The attached checklist is to assist you in the submission
More informationDevelopment of Market of Geodetic Services and Geodetic Companies in the Republic of Serbia
FIG Working Week 2009 Development of Market of Geodetic Services and Geodetic Companies in the Republic of Serbia Zagorka GOSPAVIC, Branko BOZIC and Olivera VASOVIC The Faculty of Civil Engineering, Serbia
More informationPlat Checklist PLAT TYPES AND DESCRIPTIONS
Master Plan / Revision to Master Plan (For Platting Purposes Only) Preliminary/Final Plat Preliminary Plat Final Plat Minor Plat Replat Amended Plat Plat Checklist So that we may efficiently review your
More informationThe Multi-Purpose Information System of Real Estates in the Czech Republic. Vladimíra ŽUFANOVÁ, Czech Republic
The Multi-Purpose Information System of Real Estates in the Czech Republic Vladimíra ŽUFANOVÁ, Czech Republic Key words: Cadastre; Land management SUMMARY The Cadastre of Real Estate and Land administration,
More informationNATIONAL BANK OF SERBIA TENDER DOCUMENTS PP 77/2016
NATIONAL BANK OF SERBIA TENDER DOCUMENTS PP 77/2016 Belgrade, July 2016 Page 1 of 55 Pursuant to Article 61 of the Law on Public Procurement (RS Official Gazette, Nos 124/2012, 14/2015 and 68/2015, hereinafter:
More informationINTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY
INTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY This Agreement Permitting Construction of SouthEast Connector on the Truckee Meadows
More informationSPECIALIST, EXPERIENCED ADVICE THAT PUTS YOU IN CONTROL OF YOUR CONSTRUCTION PROJECT
SPECIALIST, EXPERIENCED ADVICE THAT PUTS YOU IN CONTROL OF YOUR CONSTRUCTION PROJECT CLIENT ADVISERS Royal Institute of British Architects 66 Portland Place London W1B 1AD T 020 7580 5533 www.architecture.com
More informationPunjab Private Housing Schemes and Land Sub-division Rules
Punjab Private Housing Schemes and Land Sub-division Rules 2010 Notification: GOVERNMENT OF THE PUNJAB LOCAL GOVERNMENT AND COMMUNITY DEVELOPMENT DEPARTMENT Dated Lahore 13-3-2010 No.SOR(LG)38-2/2004-P.
More informationCALL FOR BINDING OFFERS TO PURCHASE CLAIMS
CALL FOR BINDING OFFERS TO PURCHASE CLAIMS Call for binding offers to purchase claims of the Bank Assets Management Company, Davčna ulica 1000, Ljubljana, as the creditor, against the company NUBA, svetovanje
More informationSUBDIVISION REGULATIONS
CHAPTER 14 SUBDIVISION REGULATIONS 14-100 Provisions 14-200 Preliminary Plat 14-300 Final Plat 14-400 Replat 14-500 Minor Subdivision 14-600 Administrative Replat 14-700 Vacation of Roadways, Public Easements,
More informationUse of data in Ukraine for sustainable economic growth. Oleksandr Maliuk State Service of Ukraine for Geodesy, Cartography and Cadastre
Use of data in Ukraine for sustainable economic growth Oleksandr Maliuk State Service of Ukraine for Geodesy, Cartography and Cadastre Kehl, 2017 Content of the presentation Ukraine & StateGeoCadastre:
More informationDTI Procurement. Department of Transportation and Infrastructure May / June 2018
DTI Procurement Department of Transportation and Infrastructure May / June 2018 Key Messages What opportunities are available? How do you become aware of these opportunities? How do you bid on contracts?
More informationPotential Property Impacts Lawrence to Bryn Mawr Modernization
Potential Property Impacts Lawrence to Bryn Mawr Modernization In order to increase train speeds, reduce delays and modernize stations, the agency has identified a minimal number of properties that would
More informationPeters Township Sanitary Authority Capital Assets
Peters Township Sanitary Authority Capital Assets Section 1 -Capital Fixed Assets Capital Assets are property, plant and equipment that are in service. They are recorded at cost or estimated historical
More informationCounty of Kern HOME Program Housing Developer Pre-Application
County of Kern HOME Program Housing Developer Pre-Application Instructions: Complete Items 1 through 4 below. On separate pages respond to Items 5 through 16 listed on the following pages. Respond as completely
More informationIMPORTANT INFORMATION TRANSPORT CHANGES AND CONSTRUCTION WORKS, DOMAIN
IMPORTANT INFORMATION TRANSPORT CHANGES AND CONSTRUCTION WORKS, DOMAIN Works in preparation for major construction of the Metro Tunnel are underway in Domain. New tram infrastructure will be built on and
More informationDEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division
DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division #1 Courthouse Plaza, 2100 Clarendon Boulevard, Suite 700 Arlington, VA 22201 TEL 703.228.3525 FAX 703.228.3543 www.arlingtonva.us
More informationAGENDA Special Infrastructure Committee Thursday, October 11, 5:00 PM Peoria County Courthouse, Room 402
AGENDA Special Infrastructure Committee Thursday, October 11, 2018 @ 5:00 PM Peoria County Courthouse, Room 402 1. Call to Order 2. Resolution Purchase of Public Right of Way for the Kickapoo Edwards Safety
More informationTownships and the County Engineer
Townships and the County Engineer Dean C. Ringle, P.E., P.S. Executive Director County Engineers Association of Ohio New Trustees Role of & Working with the County Engineer The county engineer is responsible
More informationRequest for Proposals for the Development of the Downtown Vision
Request for Proposals for the Development of the Downtown Vision Issued by: The City of Kenosha, Wisconsin Date of Issuance: September 19, 2018 Proposal Due Date: 4pm, Friday, November 2, 2018 Delivered
More informationSerbia Should Have Online Cadastre for Property Like Other Countries in the Region
Serbia Should Have Online Cadastre for Property Like Other Countries in the Region Tamara Borovcanin USAID Business Enabling Project The online real estate registry allows citizens to quickly and easily
More informationZONING & LAND USE APPLICATION
City of Maple Plain 5050 Independence St P.O. Box 97 Maple Plain, MN 55359 Office: (763) 479-0515 Fax: (763) 479-0519 ZONING & LAND USE APPLICATION APPLICANT INFORMATION Applicant Name Company, if applicable
More informationCommunity Development Department
Community Development Department SUBJECT: Consideration of a Resolution and recommendation to enter into an Easement Agreement with Glenview School District 34 for the Stormwater Detention Project at the
More informationBy-law C.P Guide to Development Charges
By-law C.P.-1496-244 Guide to Development Charges Purpose of development charges The Development Charges Act, 1997- enacted by the Province of Ontario - states that:... a municipality may by By-law impose
More informationDecree on State Land Lease or Concession
Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity ~~~~~~~~~~~~~ Prime Minister s Office No. 135/PM VCC, Date 25/05/2009 Decree on State Land Lease or Concession - Pursuant
More informationRiverside County Transportation Commission Rail Station Joint Development Guidelines June 2005
Riverside County Transportation Commission Rail Station Joint Development Guidelines June 2005 PURPOSE These guidelines are issued under the authority of the Riverside County Transportation Commission
More informationPPP Project Realization Roadmap for Public Entities. based on the PPP Act and the Act on Concessions for Construction Work or Services
PPP Project Realization Roadmap for Public Entities based on the PPP Act and the Act on Concessions for Construction Work or Services 1. Identification of needs and possibilities to fulfil them by means
More informationToken Sale Agreement
Token Sale Agreement CryptoFinance OÜ, registration 14337507, registered at: Narva mnt 7-634, Tallinn, Harju maakond, 10117, (hereinafter referred to as "the Company"), and the Buyer have entered into
More informationAPPENDIX 2 PROCEDURES AND SUPPLEMENTARY INFORMATION
APPENDIX 2 PROCEDURES AND SUPPLEMENTARY INFORMATION APPENDIX 2 - PROCEDURES AND SUPPLEMENTARY INFORMATION 1. Building Code Act 1.1 General The Building Code Act provides the enabling authority for Councils
More informationELIZA JORDAN CORNER SUBDIVISION
ELIZA JORDAN CORNER SUBDIVISION Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm water detention and drainage
More information2018 Street and Utility Improvement Project. Assessment Hearing Open House October 02, 2018
2018 Street and Utility Improvement Project Assessment Hearing Open House October 02, 2018 Presentation Overview Project Location Improvement Summary Remaining Work 2018 Remaining Work 2019 Project Costs
More informationCOMPLIANCE APPRAISAL: SUMMARY OF RESULTS
October 22, 2015 Office of the Compliance Advisor Ombudsman (CAO) COMPLIANCE APPRAISAL: SUMMARY OF RESULTS IFC Investment in Lydian International Ltd. (Project #27657), Armenia Complaint 02 Lydian International
More informationLAND CADASTRE Today and Challanges for the future Damjan DOLER
LAND CADASTRE Today and Challanges for the future Damjan DOLER Head of Real Estate Department Regional surveying office Celje Mariborska cesta 88, Celje, SLOVENIA 32nd Conference of Surveyin Authorities,
More informationRobbinsville Board of Education POLICY Section: PROPERTY Policy 7102: Site Selection and Acquisition Date Edited: July 17
R Robbinsville Board of Education POLICY Section: PROPERTY Policy 7102: Site Selection and Acquisition Date Edited: July 17 7102 SITE SELECTION AND ACQUISITION The Board of Education may need to select
More informationOur Polish team is part of one of the largest real estate teams in the world: a single unit, cutting across borders and simplifying your projects.
real estate in poland one team no borders DLA Piper s real estate team in Warsaw offers legal advice for domestic and foreign clients operating in the Polish market. Our goal is to provide commercial and
More informationScheme of Service. for. Housing Officers
REPUBLIC OF KENYA Scheme of Service for Housing Officers APPROVED BY THE PUBLIC SERVICE COMMISSION AND ISSUED BY THE PERMANENT SECRETARY MINISTRY OF STATE FOR PUBLIC SERVICE OFFICE OF THE PRIME MINISTER
More informationBIOMASS-BASED DISTRICT HEATING PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Biomass-Based District Heating Project BIOMASS-BASED DISTRICT HEATING PROJECT Construction
More informationTo provide an update on the Tauranga Marine Precinct project for the period to 30 June 2015.
41 Monitoring Committee 27"^ July 2015 DC No: 202 Purpose To provide an update on the Tauranga Marine Precinct project for the period to 30 June 2015. Executive Summary 2. The first draft of the Regional
More informationAt Knight Frank Occupier Solutions, we make it our business to know your business.
1 At Knight Frank Occupier Solutions, we make it our business to know your business. Your organisation is your passion, and your objectives are paramount. At Knight Frank Occupier Solutions, we take the
More informationTOWN PLANNING: RESIDENTIAL
TOWN PLANNING: RESIDENTIAL OUR CAPABILITIES The UK housing challenge The famous saying that an Englishman s home is his castle is under threat with the significant housing crisis that continues to grip
More informationENACTMENT AND EXECUTION OF THE PRELIMINARY AGREEMENT BETWEEN NT VALDOS UAB AND KARALIENĖS MORTOS MOKYKLA UAB ON 11 SEPTEMBER 2015
Executive summary of the public audit report ENACTMENT AND EXECUTION OF THE PRELIMINARY AGREEMENT BETWEEN NT VALDOS UAB AND KARALIENĖS MORTOS MOKYKLA UAB ON 11 SEPTEMBER 2015 01 June 2016, No. VA-P-60-1-9
More informationDevelopment Opportunity: Priority Development Site
Development Opportunity: Priority Development Site NORTHBRIDGE, MASSACHUSETTS Super Wal Mart National Grid Distribution Facility Route 146 Subject property: Assessor Map 1 Parcels 113, 114, 115, (117),
More informationLIVE STREAMING & AUDIO RECORDING. Now In Progress
LIVE STREAMING & AUDIO RECORDING Now In Progress COLLABORATE. CREATE. DEVELOP. COMPLETE. Board of Commissioners Regular Meeting April 9, 2018 AGENDA I. Call to Order Chair Zuckerman II. Agenda Changes
More informationVHDA Low Income Housing Tax Credit Manual Version: K. Appraisal Guidelines
VHDA Low Income Housing Tax Credit Manual Version: 2018.1 K. Appraisal Guidelines VHDA LIHTC Program Page 119 Last Modified: 11/30/2017 Appraisal Information Appraisals are required to be submitted with
More informationTask Force on Kai Tak Harbourfront Development
Task Force on Kai Tak Harbourfront Development For discussion on 14 May 2013 TFKT/07/2013 Central Kowloon Route - Kai Tak and Ma Tau Kok PURPOSE This paper seeks Members views on preliminary proposals
More informationPENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL TELEPHONE MEETING JUNE 2, :00 A.M. AGENDA
PENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL TELEPHONE MEETING JUNE 2, 2015 10:00 A.M. AGENDA A. Roll Call Sunshine Announcement Public Participation B. Minutes-May 19, 2015 C. Communications-
More informationGENERAL PROVISIONS, DISTRICTS, AND DISTRICT MAPS
4-1 ARTICLE 4. GENERAL PROVISIONS, DISTRICTS, AND DISTRICT MAPS Section 4-1. Organization of the Regulations Permitted uses by right and by special exception are listed for each district. Along with these
More informationAir Rights Development Project Briefing August 6, Speakers: Tony Kinn, Director Sam Beydoun, Program Manager Jonathan Walk, Jones Lang LaSalle
Air Rights Development Project Briefing August 6, 2013 Speakers: Tony Kinn, Director Sam Beydoun, Program Manager Jonathan Walk, Jones Lang LaSalle Meeting Objectives Provide background on the Office of
More informationThe following is a list of assumptions on which this Term Sheet is based:
NONBINDING TERM SHEET BETWEEN CITY OF LAS VEGAS, CITY PARKWAY V, THE CORDISH COMPANIES, AND FINDLAY SPORTS AND ENTERTAINMENT, LLC This Nonbinding Term Sheet ( Term Sheet ) dated this day of September,
More informationExecutive Summary: This is a preliminary plat to construct 8 residential lots and 2 commons lots with a private road on 3.87-acres in Meridian, Idaho.
Development Services Department DATE: July 7, 2015 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner III Kentucky Villas/ MPP15-0012/ PP15-009 Executive Summary: This is a preliminary
More informationRiverton Properties Ltd Proposed Special Housing Area
Riverton Properties Ltd Proposed Special Housing Area Housing Accords and Special Housing Areas Act 2013 Expression of Interest 1 This Expression of Interest is made on behalf of Riverton Properties Ltd,
More informationRepublika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly
Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Law No. 04/L-144 ON ALLOCATION FOR USE AND EXCHANGE OF IMMOVABLE PROPERTY OF THE MUNICIPALITY Assembly of Republic
More information