1 Attachment # Page-1 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION APPLICATION FOR TRANSPORTATION ENHANCEMENT PROJECTS 8a of 7. 2/2003 Page 1 Of 3 Project Title: Meridian Greenway Trail Project Sponsor (municipal, county, state, orfederal agency, or tribal council): City of Tallahassee. Florida Contact: Steve Hodqes Title: Senior Planner Address: Tallahassee-Leon County Planninq Dept.. City Hall. 300 S. Adams St.. TLH, FL Phone: (850) FAX: (850) Priority (relative to other applications submitted by the Project Sponsor): _ Name of Applicant (If other than Project Sponsor): _ 1. Qualifying Enhancement Activities: Check the enhancement activity that the proposed project will address. (NOTE: Checking all activities possible does not ensure or increase eligibility. Each activity checked must meet all criteria listed for that activity in Appendix A of FDOT Procedure # , Transportation Enhancement Projects). L Provision of facilities for pedestrians and bicycles The provision of safety and educational activities for pedestrian and bicyclists Acquisition of scenic easements and scenic or historic sites Scenic or historic highway programs, (including the provision of tourist and welcome center facilities) Landscaping and other scenic beautification Historic preservation Rehabilitation of historic transportation buildings, structures or facilities (including historic railroad facilities and canals) Preservation of abandoned railway corridors (including the conversion and use thereof for pedestrian or bicycle trails) Control and removal of outdoor advertising Archaeological planning and research Environmental mitigation to address water pollution due to highway runoff or reduce vehiclecaused wildlife mortality while maintaining habitat connectivity Establishment of transportation museums
2 Attachment i. ~ ~ 8of ' Project Description: Use additional sheets as necessary to respond to the following: (a) What type of work is being proposed? (Check all that apply) Planning Activities Project Development and Environmental Studies Engineering and Final Plans Preparation Work ~ Construction Right of Way Acquisition _v_ Construction Engineering and Inspection Activities (b) Describe how the proposed project is related to the intermodal transportation system by either function, proximity or impact. (One or more may apply). The Meridian Greenway Trail, Phase I, is a three-mile proposed shared-use path adjacent to an existing roadway (Meridian Road) that cannot be widened because it is a historical, two-lane "canopy road" protected by local ordinance. This project has been identified in both the Tallahassee - Leon County Master Greenway Plan and the Blueprint 2000 and Beyond report. The Blueprint 2000 and Beyond report is a compendium of critically needed community initiatives focusing on stormwater and flood control projects, greenspace acquisition and parks/recreation improvements, and additional transportation projects funded by an extension of the current extra one cent sales tax to the year The portion of Meridian Road between Maclay Road and Spanish Moss Drive where the Trail project is be built is within the City of Tallahassee, and this portion of road is owned and maintained by Leon County. The ROW is limited to the maintained edge of the roadway. There is no paved shoulder, and because the roadway is delimited by clay banks and protected trees, there is no room to add paved shoulders or bicycle lanes. The intention of this trail or shared-used path is to provide bicycle and pedestrian access from five surrounding neighborhoods to the 668-acre Elinor Klapp Phipps Park, the 23 acre Forest Meadows Athletic Center, the Alfred B. Maclay Gardens State Park, Hawks Rise Elementary School, and Maclay School. At this time, there is no way for the thousands of neighborhood residents within walking or riding distance of these destinations without driving along a narrow canopy road. Provision of a shared-used path adjacent and parallel to this portion of Meridian Road will give these residents the option of walking or riding to these destinations, as well as removing a significant number of automotive trips from Meridian Road from nearby residents who wish to visit these parks and schools. (c) Where is the project located (and what are the termini, if appropriate)? Include location map. The project is located within the City of Tallahassee in Leon County. This phase is intended to run along the eastern side of Meridian Road from the intersection of Maclay and Meridian Roads north to an existing crossing of Meridian Road at the Forest Meadows Athletic Center, then north along the west side of Meridian Road as far as Ox Bottom Road. At this location, the path or trail will cross this intersection at a controlled intersection crossing that will be constructed as part of another road project, and it will continue north adjacent to Meridian Road to Spanish Moss Drive, where it will terminate at a City-owned municipal water well and pumping station. Please see Location Map on the following page.
3 Meridian Greenway Trail- Nl:egend Sidewalks Text Minrdnm Text Majrdnm Text Lakenm 'YConceptual ifillbldgs Trail Alignment.t Schools Parcel Boundaries Watercourse Water T_Phlpps Property Leon County School Board ~~tit~jcity Park. State Park City Property City Limits sm F~ ~ ~r9g:ram ~eenwavs tlii "......,....,... NOTE:ltt',~hiIJbref,a.l'fIIlrdfrDlntl\r nat Deantr ~ ctm fran~tfl COUIltylDtd theotyr#t~. ~.Ihbpnx!lnh ffll"rd_a~al'lty.hi""ottobe IDl!bwd M a t..pl dcxur~lit rs turyey ItJSl:I\lf'tl:lIt..l'jratIllICeouthe.Ifa1TDtk1I axrtlllllr;d hetell Is lit ~ IIII!1"'J _II1!k. \.coil CotIIty.lllldtheOtyofTJ!hI~lID.Irr"lI ~slbtt1tyfrsld USl:dthc'rf""IIItICIII QllltAl"edhen:tllarll~IDSSrcsuttb,tht:no(f'IIn. ~""pan:d dam dld~ Is (CllosIcSo:red 10 _III draftfclf'l".tdtm"~~1i.\iu_"p ~slbll1tyfrst""byer. DAre Dctd:ter t5. 1m3 CAfATED!lY:Sto:PIS1M.HDdget PU;.lM2ATII:»f:nD'O PItIIlSOiI<JH"" ~.blp.can Fll.f:c:\uRrdm'Gft:eIYoGVPrtljI!~ /il:tfdbll RmdGn"~phId. PtbJedloapfl,pdr l~ ati icnj!. ",1ItJ 00 fd>
4 Typical Section Attachment ~ Page~,"_-5. A of 7. 2' 2' shoulder 8' trall surface shoulder J-l :!-l
5 ~ of 2 (d) Summarize any special characteristics of project. Provide typical section drawings for appropriate projects. The project will traverse a protected canopy road zone which is historic and environmentally sensitive. A portion of the trail will tie into an existing short sidewalk along a portion of Meridian Road. A longer portion of the trail will be located on an existing natural gas pipeline easement that is cleared. The majority of the trail (approximately 1.7 miles) will be located along an old system of perimeter firebreaks that were created before the subdivisions and state park were in place. A boardwalk will be necessary for a portion of the trail where it crosses a perennial stream. Please see Conceptual Section Map on the following page. (e) Describe the project's existing right of way ownerships. This description shall identify when the right of way was acquired and how ownership is documented (Le. plats, deeds, prescriptions, certified surveys). Approximately 1.5 miles of the trail is on public property owned by the State of Florida, the City of Tallahassee, and the Leon County School Board. This information is recorded in the Leon County Clerk of Courts. All three government property owners have committed to working with the City to establish a trail. Approximately 1.5 miles of the trail will be located on private land controlled by three property owners. The property owner have the largest link has agreed to be approached by the State of Florida for the purposes of selling a fee-simple or less-than-fee-simple trail easement. This is a Florida Forever grant application that is currently on the state's "A" list. Another property owner who controls one-half mile of the trail (Maclay School) has committed to the City as part of a development permit to provide a trail easement, and another property owner who controls approximately 100' of the corridor has been contacted. (f) Describe any proposed right of way acquisition, including expected matching fund source, limitations on fund use or availability, and who will acquire and retain ownership of proposed right of way. As previously described, there is an ongoing property (fee simple or less-than-fee-simple) acquisition effort being conducted by the Planning Department and Blueprint 2000, a joint government program, to fill in the missing links of this trail. The Florida Forever grant application does not require a match. Assuming this grant application is signed off by the Florida Cabinet, the property or easement will be owned by the State of Florida, and managed by the City of Tallahassee. The other two easements will be acquired and managed by the City of Tallahassee. (g) Describe any related project work phases that are already complete or currently underway. At this time, a $50K state grant was used to do planning activities, including the selection of a corridor, several public meetings, a color brochure mailed to property owners affected by the project, a survey of the proposed corridor, and an environmental impact assessment. There are no other activities underway at present. (h) Other specific project information that should be considered. 3. Project Implementation Information: Attach documentation as exhibits to this application. (a) Describe the proposed method of performing (Le. contract or in-house) and administering (Le. local or state) each work phase of the project. If it is proposed that the project be administered by a governmental entity other than the Department of Transportation, the agency must be certified to administer Federal Aid projects in accordance with the department's Local Agency Program Manual (topic no ).
6 IUtaCl'llnent" ~--.~. Each work phase of the project will be conducted by the City of Tallahassee's Public Works Departmentor by consultants currently under open contract with the City as necessary, depending on workload. The City is certified with administer Federal Aid projects in accordance with FDOT. (b) Describe any public (and private, if applicable) support of the proposed project. (Examples include: written endorsement, formal declaration, resolution, financial donations or other appropriate means). In early 2002, the Florida Department of Environmental Protection offered a $50,000 no-match, cost-reimbursable grant to the City of Tallahassee to conduct planning, permitting, and any other actions towards the creation of a greenway trail connecting Rose Hill, Ox Bottom, Ox Bottom Manor, Summerbrooke, and Paramore Estates to the Klapp - Phipps - Maclay Greenway, including Alfred Maclay State Gardens. This greenway trail corridor has been identified in the draft Greenway Master Plan being prepared by Tallahassee - Leon County Planning Department staff, the Blueprint 2000 and Beyond Project Definitions Report, and in the City's Public Works CIP as a sidewalk project. The City of Tallahassee accepted the grant and directed staff to begin planning for this trail. Three subsequent public meetings were held, as well as numerous meetings with state and local government staff, and private landowners affected by the trail. Public and private support has been expressed by the large majority of these actors, as well as the State of Florida, Blueprint 2000, and both the Tallahassee City Commission and the Leon County Board of County Commissioners. This support has been both public and private, and documentation can be produced upon request. (c) Describe the proposed ownership and maintenance responsibilities for the project when it is completed. The full length of the Meridian GreenwayTrail will be on land or easements held by the State of Florida, the City of Tallahassee,and the Leon County School Board. The trail will be managed by the City of Tallahassee's Parks and Recreation Department as a unit of the City's parks system. (d) Describe source of matching funds and any restrictions on availability. Twenty-five percent of the anticipated survey, engineering, permitting, construction, and inspection costs of Phase I of the trail ($100,000) has been committed by Blueprint There are no restrictions. Blueprint 2000 is a local interagency program that has been created to implement the Blueprint 2000 and Beyond planning report which guides the expenditure of the one-penny local sales tax extension for 15 years. (e) Other specific implementation information that should be considered.
7 4. Project Cost: Attachment ~ Page '1 A- of-2 2/2003 What is the total estimated cost of the work requested to be funded as an enhancement this application? Planning Activities. $_0 project through Project Development and Environmental Studies. Engineering and Final Plans Preparation Work. Right of Way Acquisition. Construction. Construction Engineering and Inspection Activities. Other. (Describe) TOTAL: $_. _0 $ 75,000 $----- $ 300,000 $ 25,000 $----- $ How will the project be funded? FOOT Enhancement Funds $300K + Local $ 100K = Total $ 400,000 FOOT Enhancement Funds 75 % + Local 25 % = 100% CERTIFICATION OF PROJECT SPONSOR I hereby certify that the proposed project herein described is supported by, (municipal, county, state or federal agency, or tribal council) and that said entity will: (1) provide any required funding match; (2) enter into a maintenance agreement with the Florida Department of Transportation; (3) comply with the Federal Uniform Relocation Assistance and Acquisition Policies Actfor any Right of Way actions required for the project, and (4) support other actions necessary to fully implement the proposed project. I further certify that the estimated costs included herein are reasonable and understand that significant increases in these costs could cause the project to be removed from the Florida Department of Transportation work program. ~ Signature ~...;~,-..;;;...;:.. _. ~\~EL WQ.\G.~ Name (please type or print)
CHAPTER 3: IDENTIFYING SECTION 4(f) PROPERTIES
CHAPTER 3: IDENTIFYING SECTION 4(f) PROPERTIES Section 4(f) and its provisions state that publicly owned parks, recreation areas, wildlife and waterfowl refuges, and publicly and privately owned historic
More informationDraft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018.
Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018. No changes were made at the 1st Public Hearing. Proposed wording for the 1 st Public Hearing in red, eliminated text in
More informationGWINNETT COUNTY CSO CONSERVATION SUBDIVISION OVERLAY DISTRICT REQUIREMENTS
GWINNETT COUNTY CSO CONSERVATION SUBDIVISION OVERLAY DISTRICT REQUIREMENTS Section 1316. CSO Conservation Subdivision Overlay District. 1. Purposes. The purposes of this overlay district are as follows:
More informationFM 1626 Public Hearing - January 14, 2016
FM 1626 Public Hearing - January 14, 2016 Travis County, in conjunction with the Texas Department of Transportation (TxDOT), welcomes you to tonight s public hearing concerning proposed improvements to
More informationSECTION 7000 LAND DEVELOPMENT REQUIREMENTS
SECTION 7000 LAND DEVELOPMENT REQUIREMENTS 7000 LAND DEVELOPMENT REQUIREMENTS... 1 7001 LEGISLATIVE AUTHORITY... 1 7001.1 LAND DEVELOPMENT... 1 7001.1.1 Title 40, Idaho Code... 1 7001.1.2 Idaho Code 40-1415
More informationTERRA. Forest CORE Fund Project Application. Applicant Information Applicant Partner Organization Contact Person
TERRA Forest CORE Fund Project Application Applicant Information Applicant Partner Organization Contact Person Phone Number Address Type of Applicant/ Partner Organization Title Email Address Federal State
More informationTransportation - Corridor Management. Intent and Purpose
CHAPTER 900. SECTION 90 DEVELOPMENT STANDARDS TRANSPORTATION 90 Transportation - Corridor Management A. Intent and Purpose 3. 4. The intent of this section is to coordinate the full development of roads
More informationIV. IMPLEMENTATION PLAN
IMPLEMENTATION IV. IMPLEMENTATION PLAN IV.A Phasing and Priorities The proposed city-wide network plan for the Decatur Preservation Corridor is a long term vision and guide for future implementation. It
More informationSARASOTA COUNTY GOVERNMENT
SARASOTA COUNTY GOVERNMENT Parks, Recreation and Natural Resources TO: Sarasota County Commission THROUGH: Jonathan R. Lewis, County Administrator FROM: Carolyn Brown, Director, Parks, Recreation and Natural
More informationGuide to Combined Preliminary and Final Plats
Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested
More information(Draft Glenville ordinance, June 2008) ARTICLE XXII Transfer of Development Rights
(Draft Glenville ordinance, June 2008) ARTICLE XXII Transfer of Development Rights 270-161. Purpose. The primary purpose of establishing a transfer of development rights (TDR) program is to permanently
More informationBLUEPRINT REAL ESTATE POLICY
DATE September 19,2007 TITLE BLUEPRINT REAL ESTATE POLICY ORG. AGENCY Blueprint Intergovernmental Agency APPROVED.01 STATEMENT OF POLICY The purpose of this administrative regulation is to establish a
More information(c) County board of commissioners means 1 of the following, as applicable: (ii) In all other counties, 1 of the following:
TOWNSHIP PLANNING Act 168 of 1959, as amended, (including 2001 amendments, 2006 amendments) AN ACT to provide for township planning; for the creation, organization, powers and duties of township planning
More informationDevelopment Program Report for the Alamo Area of Benefit
Julia R. Bueren, Director Deputy Directors Brian M. Balbas, Chief Mike Carlson Stephen Kowalewski Carrie Ricci Joe Yee ADOPTED BY BOARD OF SUPERVISORS ON Development Program Report for the Alamo October,
More informationWRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC
WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC Application of Hayden Signature, LLC, an Idaho limited liability company,
More informationPlease review the Draft PTF Grant Manual with the above background information in mind. AGC
Board of Trustees Anna G. Chisholm, PTF Program Administrator 3.15.2017 Proposed Updates to the PTF Grant Manual The PTF Grant Manual was last updated in 2006 and many details of the easement process have
More informationARTICLE XI - CONSERVATION SUBDIVISIONS
ARTICLE XI - CONSERVATION SUBDIVISIONS Section 1101: Purpose and Intent. This Article is intended to provide for residential subdivisions that are designed based first and foremost on the preservation
More informationo Completed o Not Completed o In Process o No Longer Applicable
Page 1 of 25 FIVE YEAR ACTION PLAN WORKSHEET Year 1 2009 Milestone Responsible Parties Evaluation Date /Additional Launch Master Plan visioning process Planning Consultant Prepare status report of 1998
More informationAppendix B. North Carolina Parks and Recreation Trust Fund. Submitting Requests for Reimbursement for Land Acquisition
Appendix B North Carolina Parks and Recreation Trust Fund Submitting Requests for Reimbursement for Land Acquisition 41 N. C. Parks and Recreation Trust Fund Reimbursement Request for Land Acquisition
More informationCITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY
CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort
More informationLand Acquisition Strategy and Implementation Policy Public Opinion Survey Results
Land Acquisition Strategy and Implementation Policy Public Opinion Survey Results Presentation to Council and Parks & Planning Commissions May 9, 2017 Background Parks CIP: - Allocated $13 million to Land
More informationThe Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division
The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.
More informationChapter 10: Implementation
Chapter 10: Introduction Once the Comprehensive Plan has been adopted by the City of Oakdale, the City can begin to implement the goals and strategies to make this vision a reality. This chapter will set
More informationTown of Cary, North Carolina Rezoning Staff Report 14-REZ-20 Habitat for Humanity Evans Road Town Council Meeting October 16, 2014
Town of Cary, North Carolina Rezoning Staff Report 14-REZ-20 Habitat for Humanity Evans Road Town Council Meeting October 16, 2014 REQUEST To amend the Town of Cary Official Zoning Map by rezoning 0.53
More informationARTICLE FIVE FINAL DRAFT
ARTICLE FIVE 021218 FINAL DRAFT Sec. 503.6 Open Space Preservation Option Open Space Preservation Option Open Space Preservation developments may be approved in the AR, R-1, R-2 and R-3 zoning districts,
More informationa. provide for the continuation of collector streets and thoroughfare streets between adjacent subdivisions;
Section 7.07. Intent The requirements of this Section are intended to provide for the orderly growth of the Town of Holly Springs and its extra-territorial jurisdiction by establishing guidelines for:
More informationAppendix A. Definitions
Definitions 1. Terms Defined. Words contained in this are those having a special meaning relative to the purposes of this Ordinance. Words not listed in this section shall be defined by reference to: (1)
More informationRESOLUTION NO. RESOLUTION APPROVING ZONING PETITION 84-71, Special Exception. WHEREAS, the Board of County Commissioners, as the governing
/. ;C- C, i RESOLUTION NO. R-@+-l2?8 RESOLUTION APPROVING ZONING PETITION 84-71, Special Exception WHEREAS, the Board of County Commissioners, as the governing body, pursuant to the authority vested in
More informationCity of Owasso Public Work Department STATUS REPORT January 2, 2018
City of Owasso Public Work Department STATUS REPORT January 2, 2018 E 76 St N Widening (from U.S. Hwy169 to N 129 E Avenue) HDH - In 2010, federal funding was awarded for the engineering, right-ofway and
More informationDevelopment Program Report for the Bethel Island Area of Benefit
Julia R. Bueren, Director Deputy Directors R. Mitch Avalon Brian M. Balbas Stephen Kowalewski Stephen Silveira ADOPTED BY BOARD OF SUPERVISORS ON Development Program Report for the Bethel Island August,
More informationGeorgia Conservation Tax Credit Program Frequently Asked Questions
Georgia Conservation Tax Credit Program Frequently Asked Questions What are the minimum requirements for eligibility under the Georgia Conservation Tax Credit Program (GCTCP)? Individual and corporate
More informationImplementation TOWN OF LEON COMPREHENSIVE PLAN 9-1
9 Implementation 9.1 Implementation Chapter Purpose and Contents This element includes a compilation of regulatory and non-regulatory measures to implement the objectives of this comprehensive plan. The
More informationCOASTAL CONSERVANCY. Staff Recommendation August 2, 2012 HARE CREEK BEACH COASTAL ACCESS TRAIL. Project No Project Manager: Lisa Ames
COASTAL CONSERVANCY Staff Recommendation August 2, 2012 HARE CREEK BEACH COASTAL ACCESS TRAIL Project No. 08-001-02 Project Manager: Lisa Ames RECOMMENDED ACTION: Authorization to disburse up to $60,000
More informationSidewalk Program Policy Revised: 06 November 13
Sidewalk Program Policy Revised: 06 November 13 Program Scope: A program to coordinate identification, selection, design, funding sources and construction management for new sidewalk projects in the City
More informationAppendix G. Non-Federal Letters of Support and Draft Real Estate Plan
Appendix G Non-Federal Letters of Support and Draft Real Estate Plan REAL ESTATE PLAN UPPER DELAWARE RIVER WATERSHED FEASABILITY STUDY LIVINGSTON MANOR, NEW YORK 1. GENERAL 2. REAL ESTATE REQUIREMENTS
More informationDRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS
Formatting: Changes recommended by the Board and accepted by the County Commission are formatted in RED: Changes made by the Park County Commission are formatted in YELLOW highlight: and changes made by
More informationEasements, Establishments, Abandonments and Vacations
Easements, Establishments, Abandonments and Vacations A highway easement conveys, in perpetuity, the right to construct and maintain a highway facility on the land of the fee holder. (Property owner) The
More informationPUBLIC HEARING AGENDA Gregg Manor Road - From Hill Lane to US 290 Travis County, Texas
July 26, 2012 The Texas Department of Transportation (TxDOT) and the City of Manor welcome you to tonight s Public Hearing concerning the proposed extension of Gregg Manor Road from Hill Lane to United
More informationPima Country, Arizona Code of Ordinances : Residential recreation areas.
Pima Country, Code of Ordinances 18.69.090: Residential recreation areas. A. Purpose. 1. The purpose of this section is to ensure that recreation areas are available for the use and enjoyment of subdivision
More informationDRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS
DRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS I. TITLE These regulations and the accompanying map(s) shall be known as, and shall be cited and
More informationCERTIFICATE OF RECOMMENDATION
DEPARTMENT OF PLANNING AND ZONING 308 Byers Ave P.O. Box 239 Hot Sulphur Springs Colorado 80451 970-725-3347 Ext 129 or Fax 970-725-3303 CERTIFICATE OF RECOMMENDATION TO: FROM: Grand County Board of Commissioners
More informationImplementation Strategy
7 Implementation Strategy Trail - Raleigh, NC Introduction The Zebulon Greenway Master Plan is an overall vision and foundation for implementation of the system illustrated. The town would be challenged
More informationChapter Development Standards Table of Contents. Section Name Page
Chapter 900 - Development Standards Table of Contents Section Name Page Section 901 Transportation 901.1-1 901.1 Transportation Corridor Spacing 901.1-1 901.2 Transportation - Corridor Management 901.2-1
More informationPalmerton Area Comprehensive Plan
DRAFT Palmerton Area Comprehensive Plan Bowmanstown Borough, Lower Towamensing Township, Palmerton Borough and Towamensing Township Carbon County, Pennsylvania Draft - With Minor Revisions - March 2008
More informationCity of Owasso Public Work Department STATUS REPORT February 6, 2018
City of Owasso Public Work Department STATUS REPORT February 6, 2018 E 76 St N Widening (from U.S. Hwy169 to N 129 E Avenue) HDH - In 2010, federal funding was awarded for the engineering, right-ofway
More informationEasements, Establishments, Abandonments and Vacations
Easements, Establishments, Abandonments and Vacations Highway Easements: Where there is a right to construct and maintain a highway facility SH - Standard Highway easement LA - Limited Access Easement
More informationIndividual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None
Please Answer the Following Questions: (attach sheet if needed). What type of facility is being proposed? Campground Recreational Vehicle (RV) Park Both 2. What is the total acreage of the proposed facility?
More informationTOWN OF WHITBY REPORT RECOMMENDATION REPORT
TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Planning and Development Committee REPORT NO: PL 4-08 DATE OF MEETING: January 21, 2008 FILE NO(S): MI-01-07 (SW- 2002-03) PREPARED BY: Planning Department
More informationPROJECT NH 0050(99)381 PCN 6926 YANKTON COUNTY. SD HWY 50 (4 th Street) from Broadway Ave to Archery Road in Yankton, SD
Public Meeting/ Open House April 4, 2013 PROJECT NH 0050(99)381 PCN 6926 YANKTON COUNTY SD HWY 50 (4 th Street) from Broadway Ave to Archery Road in Yankton, SD Grading, PCC Pavement, Asphalt Concrete
More informationCOUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND, SITTING AS THE DISTRICT COUNCIL ORDER OF APPROVAL OF REVISED SITE PLAN CONDITIONS
Case No. SP-04049 Applicant: PPC/CHP Maryland Limited Partnership COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND, SITTING AS THE DISTRICT COUNCIL ORDER OF APPROVAL OF REVISED SITE PLAN CONDITIONS IT
More informationINTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY
INTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY This Agreement Permitting Construction of SouthEast Connector on the Truckee Meadows
More informationSection Preliminary Plat Checklist and Application Forms
Section 201 - Preliminary Plat Checklist and Application Forms PRELIMINARY SUBDIVISION PLAT REVIEW PROCESS CHART PRELIMINARY SUBDIVISION PLAT APPLICATION PRELIMINARY PLAT REVIEW CHECKLIST CITY OF NAMPA
More informationCity of Owasso Public Work Department STATUS REPORT November 7, 2017
City of Owasso Public Work Department STATUS REPORT November 7, 2017 E 76 St N Widening (from U.S. Hwy169 to N 129 E Avenue) HDH - In 2010, federal funding was awarded for the engineering, right-ofway
More informationMETROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)
METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 DATE: November 23, 2009 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior
More informationConservation Easement Stewardship
Conservation Easements are effective tools to preserve significant natural, historical or cultural resources. Conservation Easement Stewardship Level of Service Standards March 2013 The mission of the
More informationOPEN SPACE PRESERVATION. Reflections on the Value of Acquiring Property for Preservation Purposes
OPEN SPACE PRESERVATION Reflections on the Value of Acquiring Property for Preservation Purposes What is open space and what does it do? The Town Plan of Conservation and Development defines it as follows:
More informationExecutive Summary: This is a preliminary plat to construct 8 residential lots and 2 commons lots with a private road on 3.87-acres in Meridian, Idaho.
Development Services Department DATE: July 7, 2015 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner III Kentucky Villas/ MPP15-0012/ PP15-009 Executive Summary: This is a preliminary
More informationCover Letter with Narrative Statement
Cover Letter with Narrative Statement March 31, 2017 rev July 27, 2017 RE: Rushton Pointe Residential Planned Unit Development Application for Public Hearing for RPUD Rezone PL2015 000 0306 Mr. Eric Johnson,
More informationARTICLE 15. RULES, REGULATIONS AND DEFINITIONS
ARTICLE 15. RULES, REGULATIONS AND DEFINITIONS Section 1. Interpretation and Construction: The following rules and regulations regarding interpretation and construction of the Ulysses-Grant County, Kansas,
More information7. IMPLEMENTATION STRATEGIES
7. IMPLEMENTATION STRATEGIES A. GENERAL APPROACH FOR IMPLEMENTATION Implementing the plan will engage many players, including the Municipality of Anchorage (MOA), the Government Hill Community Council,
More informationTown of Hull Planning Board PRESENTATION: COMMUNITY PRESERVATION ACT
Town of Hull Planning Board PRESENTATION: COMMUNITY PRESERVATION ACT 2015 WHAT IS CPA? CPA is a Community Development Tool that creates a local fund for the purpose of advancing: - Historic Preservation
More informationELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO
ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO. 3-2011 AN ORDINANCE TO REPLACE THE SUBDIVISION CONTROL ORDINANCE WITH A NEW SUBDIVISION DEVELOPMENT ORDINANCE, IN ACCORD WITH THE LAND DIVISION
More informationORDINANCE NO
ORDINANCE NO. 2013-028 AN ORDINANCE OF THE COUNTY OF SARASOTA, FLORIDA, RELATING TO THE PROTECTION OF ENVIRONMENTALLY SENSITIVE LANDS; AMENDING ORDINANCE NO..99-004, AS AMENDED, AS CODIFIED IN CHAPTER
More informationSTATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE
STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE Adopted: August 8 th, 2008 Effective: August 28 th, 2008 Sec.100. Title ARTICLE I GENERAL
More informationAmelia Walk Community Development District. September 27, 2018
Amelia Walk Community Development District September 27, 2018 AGENDA Amelia Walk Community Development District Continued Meeting Agenda Thursday Amelia Walk Amenity Center September 27, 2018 85287 Majestic
More informationPENINSULA TOWNSHIP DONATION of DEVELOPMENT RIGHTS ORDINANCE (DDR, No. 45)
PENINSULA TOWNSHIP DONATION of DEVELOPMENT RIGHTS ORDINANCE (DDR, No. 45) THE TOWNSHIP OF PENINSULA, GRAND TRAVERSE COUNTY, MICHIGAN ORDAINS: Section 101 General Provisions A. Title: This Ordinance shall
More informationSafe Waterfront Access, PID Council Report -2 - May 10, 2016 BACKGROUND
14.3.1 Safe Waterfront Access, PID 00560789 Council Report -2 - May 10, 2016 BACKGROUND A staff information report dated April 11, 2016 regarding safe waterfront access at PID 00560789 was before the Halifax
More informationChapter Planned Residential Development Overlay
Chapter 19.29 Planned Residential Development Overlay Sections 010 Purpose 020 Scope 030 Definitions 030 Minimum Size 040 Allowable Uses 050 Minimum Development Standards 060 Density Bonus 070 Open Space
More informationDRAFT. Development Impact Fee Model Ordinance. Mount Pleasant, SC. Draft Document. City Explained, Inc. J. R. Wilburn and Associates, Inc.
City Explained, Inc. J. R. Wilburn and Associates, Inc. Development Impact Fee Model Ordinance Mount Pleasant, SC Draft Document January 11, 2017 ARTICLE I. TITLE This ordinance shall be referred to as
More informationGuide to Preliminary Plans
Guide to Preliminary Plans Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures
More informationBoard of Supervisors' Agenda Items
A. Roll Call B. Closed Session COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, SEPTEMBER 14, 2016, 9:00 A.M. BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY,
More informationCOUNCIL COMMUNICATION
Meeting Date: October 24, 2017 COUNCIL COMMUNICATION Agenda Item: Agenda Location: Public Hearings Work Plan # Legal Review: X 1 st Reading 2 nd Reading Subject: A public hearing regarding Zoning and a
More informationCHAPTER 10 Planned Unit Development Zoning Districts
CHAPTER 10 Planned Unit Development Zoning Districts Section 10.1 Intent and Purpose The Planned Unit Development (PUD) districts are intended to offer design flexibility for projects that further the
More informationOpen Space. Introduction. Vision. Defining Open Space. Midway City 2017 General Plan
Open Space Midway City 2017 General Plan Introduction The importance of preserving open space to meet the goals and objectives of the General Plan cannot be overstated. Indeed, references to preserving
More informationOAKGREEN AVENUE. Project Goals. (County Road 65) Corridor Improvement Project. Turn lanes Resurfacing Stormwater management
Project Overview Washington County is leading a study to develop a preliminary design concept for Oakgreen Avenue (County Road 65) between 40th Street N and 10th Street N in Baytown Township and West Lakeland
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Hearing Date: 10/8/15 Howard Hughes Medical Institute, Limited Amendment of the Preliminary
More informationSTAFF REPORT. January 25, North York Community Council. Director, Community Planning, North District
STAFF REPORT January 25, 2005 To: From: Subject: Purpose: North York Community Council Director, Community Planning, North District Refusal Report OPA & Rezoning Application 04 194214 NNY 33 OZ Applicant:
More informationALBEMARLE COUNTY CODE APPENDIX A.1 ACQUISITION OF CONSERVATION EASEMENTS PROGRAM
APPENDIX A.1 ACQUISITION OF CONSERVATION EASEMENTS PROGRAM Sections: A.1-100 A.1-101 A.1-102 A.1-103 A.1-104 A.1-105 A.1-106 A.1-107 A.1-108 A.1-109 A.1-110 A.1-111 A.1-112 A.1-113 Short title. Purpose.
More informationRemains eligible for state or federal farm programs. Can use land as collateral for loans. Can reserve home lots for children
December 2002 B-1132 Conservation Easements: An Introductory Review for Wyoming By Allison Perrigo and Jon Iversen, William D. Ruckelshaus Institute of Environment and Natural Resources William D. Ruckelshaus
More informationARTICLE 12 PLANNED UNIT DEVELOPMENT DISTRICTS (PUDS) Sec Intent CHARTER TOWNSHIP OF BRIGHTON ZONING ORDINANCE
ARTICLE 12 PLANNED UNIT DEVELOPMENT DISTRICTS (PUDS) Sec. 12-01 Intent 1 2 (a) The intent of this Article is to permit the coordinated development on larger sites, protect significant natural features
More informationFinal Plat Mapping Requirements
CURRENT PLANNING DIVISION 410 E. 5 th Street Loveland, CO 80537 970-962-2523 eplan-planning@cityofloveland.org cityofloveland.org/dc Final Plat Mapping Requirements All Final plats shall comply with the
More informationTECHNICAL PRESENTATION Project History and Description of the Proposed Improvements Perry Steger, Steger & Bizzell Engineering, Inc.
December 2, 2008 The Texas Department of Transportation (TxDOT), the Federal Highway Administration and Williamson County welcome you to tonight s Public Hearing concerning plans to improve Ranch-to-Market
More informationCommitted to Service
Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner August 25, 2017 Development Services TO:
More informationPASCO COUNTY, FLORIDA INTEROFFICE MEMORANDUM
PASCO COUNTY, FLORIDA INTEROFFICE MEMORANDUM TO: Debra M. Zampetti Zoning/Code Compliance Administrator DATE: 3/11/11 FILE: ZN11-260 SUBJECT: Class II, Commercial Development Review - Trinity Apartments
More informationRIVER VALE MASTER PLAN PZ CITY COUNCIL PUBLIC HEARING JULY 19, 2017 CITY OF BEND
RIVER VALE MASTER PLAN PZ-16-0954 CITY COUNCIL PUBLIC HEARING JULY 19, 2017 RIVER VALE MASTER PLAN Master Plan process Required for developments over 20 acres Application submitted under old Master Plan
More informationCITY OF FARMERSVILLE CITIZEN ADVISORY COMMITTEE AGENDA November 17, :30 P.M. 1, COUNCIL CHAMBERS, CITY HALL
I. PRELIMINARY MATTERS CITY OF FARMERSVILLE CITIZEN ADVISORY COMMITTEE AGENDA November 17, 2014 6:30 P.M. 1, COUNCIL CHAMBERS, CITY HALL Call to Order, Roll Call, Prayer and Pledge of Allegiance Welcome
More informationChapter Plat Design (LMC)
Chapter 18.14 Plat Design (LMC) Sections: 18.14.010 Lot width 18.14.020 Right-of-way requirements 18.14.030 Pipe stem lots 18.14.040 Division resulting in minimum lot sizes 18.14.050 Flood prone and bad
More informationPINELLAS COUNTY, FLORIDA STATE HOUSING INIITATIVES PARTNERSHIP (SHIP) PROGRAM LOCAL HOUSING ASSISTANCE PLAN (LHAP) FISCAL YEARS ,
PINELLAS COUNTY, FLORIDA STATE HOUSING INIITATIVES PARTNERSHIP (SHIP) PROGRAM LOCAL HOUSING ASSISTANCE PLAN (LHAP) FISCAL YEARS 2006-2007, 2007-2008 and 2008-2009 TABLE OF CONTENTS I. PROGRAM DESCRIPTION...
More informationPUBLIC HEARING FM 2499 Section 4
PUBLIC HEARIG FM 2499 Section 4 From FM 47 to FM 2181 October 4, 2 University of orth Texas Coliseum 6 orth Texas Boulevard Denton, Texas Tonight s Agenda Purpose of Tonight s Hearing Welcome & Introduction
More informationSecondary Street Acceptance Requirements Virginia Administrative Code
Secondary Street Acceptance Requirements Virginia Administrative Code 24VAC30-92-10. Definitions. The following words and terms when used in these regulations shall have the following meanings unless the
More informationPage 1 of 8 Highlands County, Florida, Code of Ordinances >> - CODE OF ORDINANCES >> Chapter 5.4 - HOUSING >> ARTICLE II. STATE HOUSING INITIATIVES PARTNERSHIP PROGRAM >> ARTICLE II. STATE HOUSING INITIATIVES
More informationCITY COUNCIL AND BURA AGENDA MEMORANDUM
City and County of Broomfield, Colorado CITY COUNCIL AND BURA AGENDA MEMORANDUM To: From: By: Agenda Title Mayor, City Council, and Broomfield Urban Renewal Authority Charles Ozaki, City and County Manager
More informationWASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION
WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION DETAILED SPECIFIC WRITTEN REQUEST File Number: SDV- Number of Proposed Lots & their Dimensions: PRELIMINARY SUBDIVISION PLAN REQUIREMENTS The approval of
More informationFINDINGS OF FACT. Page 1 of 8
FINDINGS OF FACT The City/County Planning staff has prepared the Findings of Fact for the Emerald View Park Subdivision, Amended Lot 1A, Block 3. These findings are based on the preliminary plat application
More informationCHECKLIST FOR DEVELOPMENT REVIEW
CHECKLIST FOR DEVELOPMENT REVIEW Petitions and related documents and plans for land development or other proposals regulated by Title 16 of the Municipal Code (Development Ordinance) and Title 17 of the
More informationUNIFORM RULE 5. Administration of Williamson Act Contracts
UNIFORM RULE 5 Administration of Williamson Act Contracts I. PROCEDURE TO ESTABLISH AN AGRICULTURAL PRESERVE AND WILLIAMSON ACT CONTRACT See Appendices 1 and 2 for the following forms: Application Form
More informationTHE BOARD OF COUNTY COMMISSIONERS
THE BOARD OF COUNTY COMMISSIONERS ORDINANCE NO. AN ORDINANCE AMENDING CHAPTER 78, ARTICLE II, DIVISION 2 OF THE PASCO COUNTY CODE OF ORDINANCES, AND SECTION 402 OF THE PASCO COUNTY LAND DEVELOPMENT CODE,
More information5.5 Relocations and Displacements
I-70 East Supplemental Draft EIS 5.5 Relocations and Displacements 5.5 Relocations and Displacements This section investigates the impacts to residential units, businesses, and non-profit associations
More informationWelcome to the Location & Design Public Hearing for: Baymont Inn & Suites, Lake Hamilton, Arkansas Thursday, June 25, How do I become involved?
Welcome to the Location & Design Public Hearing for: AHTD JOB NO. 060432 HIGHWAY 7 WIDENING HIGHWAY 290-OUACHITA RIVER BRIDGE Baymont Inn & Suites, Lake Hamilton, Arkansas Thursday, June 25, 2015 How do
More informationHIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS
HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Title: Date Adopted: Effective Date: Non-Maintained Public Right of Way Improvement Program August 21, 2018 August 21, 2018 It shall be the policy of the
More information