1 Hackstaff Gessler LLC Developer Evaluation(1) Brad Haight (2) Hackstaff Gessler LLC 1601 Blake Street, Suite 301 Denver, CO
2 Renewable energy drivers Federal incentives (e.g. Production Tax Credit and Investment Tax Credit and accelerated depreciation) State mandates (i.e. renewable portfolio standards) Increasing fossil-fuel fuel power costs Improved equipment and technology Increasing utility comfort and familiarity with intermittent resources Climate change concerns (and related regulatory issues) Foreign developer entry in the US wind business Threat of a carbon tax or cap and trade system
3 Wind energy potential, alone By the end of 2007, wind energy accounted for less than 1% of US electricity production(3) Potential for wind energy to supply 20% of US electricity(4) (compare 20% of Danish electricity supplied by wind; 9% in Spain; 7% in Germany(5) ) By third quarter 2007, 13,884 installed MW in the US, with 5720 MW under construction(6) (6) To satisfy 20% of US electricity production (based on current figures and without considering increased electricity consumption), over 250,000 MW of wind must be built
4 Why developer evaluation? The dynamic, rich market means more developers from which to choose and more developer competition Developers are not created equal Protect your opportunity Avoid wasting time -- At the very least, renewables project development requires an extraordinary time commitment, and you want to commit your time to the best-suited suited developer Ensure the developer s s plan and abilities match your plan and requirements
5 When to evaluate a developer? Principally, before signing documents, particularly before signing final agreements, but also before signing an LOI or NDA Pre-execution execution evaluation will help you define your interests and requirements During development (to keep the developer honest)
6 Sample developer checklist DEVELOPER BACKGROUND Formation, corporate information Human and financial resources (e.g. employee experience; principal investor(s) ) and amount(s)) Financial condition; backing Development relationships (e.g. EPC and BOP) Supply agreements (what manufacturer(s), number of units, forward pricing arrangements) Litigation
7 Checklist (cont d) DEVELOPMENT AND OPERATIONS HISTORY Projects developed and/or co- developed (locations, number, and size) Projects operating (locations, number, and size) Projects sold (when in the development/operation cycle, where, why, and to whom) Percentage of projects developed (historical) Development, construction, and operations financing for projects (e.g. balance sheet financing or otherwise) Equipment used and supply arrangements
8 Checklist (cont d) PROJECT PARTICULARS Individual developer (and his/her experience) Target project size Total acreage required Total acreage leased Intended number of MW on property Property to be encumbered Intended power purchaser(s) Project sale plans, possibilities
9 Checklist (cont d) PROJECT STATUS Assessment status (e.g. meteorological towers installed (if so, when and where)) Resource information (e.g. capacity factors, insolation level) Interconnection (study, application, and/or agreement) Studies (archaeological, avian, environmental, soils,.) Anticipated equipment or equipment supply arrangements (type and size; order status)
10 Checklist (cont d) PROJECT INTERCONNECTION AND TRANSMISSION Transmission route and interconnection location Transmission and interconnection studies Existing capacity on proposed lines and at proposed interconnection Transmission to be built, capacity to be upgraded Rights of way secured and to secure
11 Checklist (cont d) AGREEMENT (e.g. easement/lease) Form provided Wind, only (e.g. no separate transmission easement or easement for other forms of energy production) Term and renewal Development milestones (e.g. assessment, studies, land rights) Development covenant (e.g. minimum MW to be installed on property)
12 Checklist (cont d) OTHER PROJECTS Other projects being pursued Area(s) where other project(s) being pursued Intended power purchaser for other project(s) Priority rank of project proposed to other project(s)
13 Checklist (cont d) COMPENSATION Execution fee Option/evaluation fee Installation fee Royalty percentage and escalator; minimum royalty and escalator Miscellaneous fees (transmission, substation, roads, renewal fees)
14 Checklist (cont d) OWNER DEVELOPMENT Small turbine (smaller than 150 kw) development Solar development Mineral development
15 Conclusion Do your homework Evaluate all aspects of the developer and project, not just the economics You may only get one bite at the apple, and therefore partnering with a developer that offers the best chance of development is critical
16 Endnotes (1) No part of this presentation may be considered or substituted for professional advice, such as accounting, legal, and tax advice. Before considering any project opportunity, project participants should engage professional advisors. (2) Brad Haight practices renewable energy law. Primarily, he represents ents developers and landowners (both individuals and groups) in wind and solar projects in CA, CO, KS, NE, NM, TX, and WY. He also represents ents designers and manufacturers of renewable energy equipment and developers of small solar and wind projects. Lawyers with Brad s s firm are also licensed to practice in IL, KS, NE, and TX. (3) (4) id. (5) (6) (7)
Wind Development in Montana: Leases, Options, and Update
Wind Development in Montana: Leases, Options, and Update I. General Introduction: What is a Wind Lease? A Wind Lease is a Contract to use the surface of the land for a term of years for a specific purpose.
More informationPRE-FEASIBILITY ASSESSMENTS & PROJECT FINANCE FEBRUARY 7 TH, 2018 CALGARY, AB
PRE-FEASIBILITY ASSESSMENTS & PROJECT FINANCE FEBRUARY 7 TH, 2018 CALGARY, AB Your Speakers Jai Roberts, Renewable Energy Project Manager 10 years in manufacturing 10 years in industrial project management
More informationLANDOWNER GUIDELINES FOR EVALUATING WIND ENERGY PRODUCTION CONTRACTS. Stephen B. Harsh David Schweikhardt Lynn Hamilton
Revised July 2008 LANDOWNER GUIDELINES FOR EVALUATING WIND ENERGY PRODUCTION CONTRACTS Stephen B. Harsh David Schweikhardt Lynn Hamilton Department of Agricultural, Food and Resource Economics Michigan
More informationLandowner Guide to Wind Leases and Easements. Pace Energy and Climate Center August, Project Manager: Zywia Wojnar
Landowner Guide to Wind Leases and Easements Pace Energy and Climate Center August, 2011 Project Manager: Zywia Wojnar Contributors: Anne Marie Hirschberger Todd Olinsky-Paul Leasing Your Land If you own
More informationSolar Power Purchase Agreement
Request for Proposal Solar Power Purchase Agreement Cedar Rapids/Linn County Solid Waste Agency 1954 County Home Road Marion, Iowa 52302 www.solidwasteagency.org Issued: September 18, 2015 Proposals Due:
More informationWind Energy Easements
Wind Energy Easements Prepared by Robert R. Nardi Willeke & Daniels 210 Ridgewood Avenue Minneapolis, MN 55403 (612) 870-4000 Presented by John H. Daniels, Jr. Willeke & Daniels 210 Ridgewood Avenue Minneapolis,
More informationWho Owns the Wind and Other Strange Questions
Who Owns the Wind and Other Strange Questions January 18, 2013 1 Four States Irrigation Council 2 Wind Growth 2002 total wind power capacity operating in the U.S. < 5,000 megawatts Now tops 35,000 megawatts
More informationREAL ESTATE TOPICS JUNE 1, 2008 NEGOTIATING AND STRUCTURING JOINT VENTURE AND LLC AGREEMENTS
BENNETT VALLEY LAW REAL ESTATE TOPICS JUNE 1, 2008 NEGOTIATING AND STRUCTURING JOINT VENTURE AND LLC AGREEMENTS Parties negotiate joint venture agreements in the spirit of optimism. Anxious to combine
More informationCommunity Wind Project Development
Community Wind Project Development Melissa Peterson, Melissa Peterson Windustry Program Analyst Feb 10 th, 2009 Pre-Conference Workshop-CERTS Community Based Energy Development Windustry Program Analyst
More informationWind and State Trust Lands
Wind and State Trust Lands Wind Powering America State Summit Evergreen, Colorado May 19, 2005 Terri Walters National Renewable Energy Laboratory 303-275-3005 terri_walters@nrel.gov What are State Trust
More informationTuscola Wind II, LLC Wisner Township Special Use Permit Presentation
Tuscola Wind II, LLC Wisner Township Special Use Permit Presentation Questions or concerns may be addressed by calling NextEra at (800) 951-9211. This number is answered 24 hours a day, 7 days a week.
More informationKIRKLAND ALERT. IRS Unveils Start of Construction Rules for Solar, Other ITC-Eligible Technologies. Attorney Advertising
KIRKLAND ALERT June 26, 2018 IRS Unveils Start of Construction Rules for Solar, Other ITC-Eligible Technologies The IRS released long-awaited guidance for developers of solar and other projects that qualify
More informationBEFORE THE WASHINGTON UTILITIES AND TRANSPORTATION COMMISSION
Docket UE- Witness: Timothy J. Hemstreet BEFORE THE WASHINGTON UTILITIES AND TRANSPORTATION COMMISSION In the Matter of the Petition of PACIFIC POWER & LIGHT COMPANY Docket UE- For an Order Approving a
More informationAugust 10, 2017 BOARD MATTER D-9 CONSIDER AMENDMENT TO WIND ENERGY LEASE. W.S ; Board of Land Commissioners Rules and Regulations, Chapter 6
August 10, 2017 BOARD MATTER D-9 ACTION: AUTHORITY: CONSIDER AMENDMENT TO WIND ENERGY LEASE W.S. 36-5-114; Board of Land Commissioners Rules and Regulations, Chapter 6 Type of Use: Wind Farm Power Generation
More informationCONSERVATION EASEMENTS FREQUENTLY ASKED QUESTIONS
CONSERVATION EASEMENTS FREQUENTLY ASKED QUESTIONS CCALT Founder and Steamboat rancher, Jay Fetcher notes, You shouldn t even be considering a conservation easement unless two things have happened: (1)
More informationWind Lease Terms/ Provisions. Byron Kentor
Wind Lease Terms/ Provisions Byron Kentor Renewable Energy? I m a big fan! 1. What is a gust of wind s favorite color? 2. How do you stop your newspaper from flying away in the wind? 3. What day of the
More informationAPPLICATION FOR A BUILDING PERMIT (To be completed by applicant) (Please Print or Type)
CARBON COUNTY Department of Planning and Development Application Fee $: 215 West Buffalo, Suite 336 Check #: Rawlins, WY 82301 Receipt #: Tel (307) 328-2651 FAX (307) 328-2735 Permit #: Date Issued: www.carbonwy.com
More informationSOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM (225 CMR 20.00) GUIDELINE
Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs DEPARTMENT OF ENERGY RESOURCES SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM (225 CMR 20.00) BACKGROUND AND PURPOSE GUIDELINE
More informationUnderstanding Wind Energy Leases
Understanding Wind Energy Leases Photo source: Stephanie Buway, OWPI Dr. Shannon L. Ferrell Assistant Professor Agricultural Law OSU Department of Agricultural Economics Power is a function of air density,
More informationThomas H. Warren Ram C. Sunkara February 22, 2011
Thomas H. Warren Ram C. Sunkara February 22, 2011 Electric Cooperative M&A Issues: Power Asset M&A Our Coop Power Project Experience In the past two years, we have assisted our Electric Cooperative clients
More informationConservation Easement Stewardship
Conservation Easements are effective tools to preserve significant natural, historical or cultural resources. Conservation Easement Stewardship Level of Service Standards March 2013 The mission of the
More informationDuring the initial term of 15-years these two additional wind turbines, TREC/THESI will pay gross rents of $76,000.
May 20, 2009 To: The Board of Governors of Exhibition Place 19 ACTION REQUIRED From: Subject: Dianne Young, Chief Executive Officer Additional Wind Turbines at Exhibition Place Summary: TREC Windpower
More informationProcess. Thomas Dvorsky Director, Office of Electric, Gas and Water New York State Public Service Commission May 23, 2011
Electric Distribution Rate Setting Process Thomas Dvorsky Director, Office of Electric, Gas and Water New York State Public Service Commission May 23, 2011 Rate Case Schedule NY Public Service Law Requires
More informationResolution No. The following resolution is now offered and read:
Resolution No. RESOLUTION OF THE BOARD OF SUPERVISORS OF IMPERIAL COUNTY CALIFORNIA, GRANTING TENTATIVE APPROVAL OF CANCELLATION OF WILLIAMSON ACT LAND CONSERVATION CONTRACT ON LAND LOCATED AT 7096 ENGLISH
More informationOrganizational Models
Organizational Models Exploring a menu of models for Community Power project ownership Simon Gill; Membership Kris Stevens; Policy Agenda AGENDA INTRODUCTION PROJECT OWNERSHIP MODELS Examples Advantages
More informationDescription of Zoning Resolution Amendment: (attach additional sheets if necessary)
CARBON COUNTY www.carbonwy.com Department of Planning and Development 215 West Buffalo, Suite 336 Application Fee $200.00 (plus public notice cost) Rawlins, WY 82301 Fee Paid $ Date Tel (307) 328-2651
More informationCONSERVATION EASEMENTS FREQUENTLY ASKED QUESTIONS
CONSERVATION EASEMENTS FREQUENTLY ASKED QUESTIONS CCALT Founder and Steamboat rancher, Jay Fetcher notes, You shouldn t even be considering a conservation easement unless two things have happened: (1)
More informationCan the Landowner Ride the Wind? By: Brandon L. Jensen Budd-Falen Law Offices, LLC
Can the Landowner Ride the Wind? By: Brandon L. Jensen Budd-Falen Law Offices, LLC There are a lot of reasons that western landowners love to hate the wind --- it s relentless, constant, never ceasing,
More informationAn Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois
An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois The County of Coles, Illinois hereby establishes this Wind Energy Conversion Systems Ordinance
More informationBig Changes in Leasing Policy
A WHOLE NEW BALLGAME Indian Leasing Under the HEARTH Act Bryan Newland Fletcher, PLLC bnewland@fletcherlawpllc.com Big Changes in Leasing Policy HEARTH Act was signed into law in 2012 BIA Leasing Regulations
More informationSharing ownership of renewable energy with communities
Sharing ownership of renewable energy with communities Mike Smyth, Chair, Energy4All Winner of a 2012 Ashden Award. Potential for community ownership talk structure What is community energy Why is community
More informationRENTS, ROYALTIES, EASEMENTS AND LAND VALUES
RENTS, ROYALTIES, EASEMENTS AND LAND VALUES M. Ragheb 3/26/2011 INTRODUCTION Developers and landowners have invested in long term leases for wind farms potential sites in the American Midwest in states
More informationSANTA MONICA RENT CONTROL BOARD STAFF REPORT
SANTA MONICA RENT CONTROL BOARD STAFF REPORT TO: FROM: Santa Monica Rent Control Board Commissioners Garrett Wong, Sustainability Analyst, Office of Sustainability and the Environment FOR MEETING OF: August
More informationWind Energy Leasing Issues for Oklahoma Landowners
Wind Energy Leasing Issues for Oklahoma Landowners Photo source: Stephanie Buway, Oklahoma Wind Power Dr. Shannon L. Ferrell Assistant Professor Agricultural Law OSU Department of Agricultural Economics
More informationPresenting a live 90-minute webinar with interactive Q&A. Today s faculty features:
Presenting a live 90-minute webinar with interactive Q&A Renewable Energy Projects: Negotiating Ancillary Agreements for the Real Estate Facility Strategies for Structuring Project Contracts After Negotiating
More informationITC Beginning of Construction Guidance
Legal Update June 26, 2018 ITC Beginning of Construction Guidance On June 22, 2018, the US Internal Revenue Service ( IRS ) released Notice 2018-59 ( Guidance ). The Guidance provides rules to determine
More informationTexas Parks and Wildlife Foundation Buffer Lands Program Program Description and Application
Texas Parks and Wildlife Foundation Texas Parks and Wildlife Foundation s mission is to provide private support to Texas Parks and Wildlife Department to manage and conserve the natural and cultural resources
More informationPlanning with Conservation Easements
Planning with Conservation Easements Succession, Tax & Estate Planning Issues & Ideas for Legacy Land October 23, 2015 Intergenerational Planning for Legacy Land Begin with the end in mind. Your goals
More informationAppendix E: C-PACE FINANCING FOR SOLAR PV SYSTEMS AND FUEL CELLS
Appendix E: C-PACE FINANCING FOR SOLAR PV SYSTEMS AND FUEL CELLS 1. Solar PV Feasibility Study Recommendations 2. Commissioning and Performance Verification Guidelines for Solar PV Systems 3. C-PACE Solar
More informationInterconnection Checklist For Customer-owned Renewable Generation Systems (RGS)
Interconnection Checklist For Customer-owned Renewable Generation Systems (RGS) Documents required Other requirements Customer Name: Account Number: Complete Interconnection Agreement for Customer-owned
More informationGetting Back to Net Zero Energy
Getting Back to Net Zero Energy Ecology Action Centre Speaker Series 21 September 2016 H-19 Dalhousie School of Architecture John Crace NSAA FRAIC LEED AP BD+C Overview 1. Energy is mysterious, ubiquitous,
More informationRate Case Dismissal & Asset Exchange July 24, 2017
Rate Case Dismissal & Asset Exchange July 24, 2017 Safe Harbor Forward Looking Statements This presentation contains forward-looking statements about the business, financial performance, contracts, leases
More informationNET METERING INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS
NET METERING INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS This Interconnection Agreement for Customer-Owned Renewable Generation Systems ("Interconnection Agreement") is made
More informationChanging Lands, Changing Hands
Changing Lands, Changing Hands Red Lion Denver Central Wednesday, June 10, 2009 Scott G. Buchanan, Esq. Buchanan, Bibler, Gabor and Meis sgb@buchlaw.com www.northiowalaw.com 515-295-3565 For you may palm
More informationALGIERS RATE CASE FREQUENTLY ASKED QUESTIONS
ALGIERS RATE CASE FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS Entergy Louisiana, LLC and Entergy Gulf States Louisiana, L.L.C. Rate Case 2013 How are electrical rates set for Entergy Louisiana
More informationPS Business Parks, Inc. Reports Results for the Quarter Ended March 31, 2017
News Release PS Business Parks, Inc. 701 Western Avenue Glendale, CA 91201-2349 psbusinessparks.com For Release: Immediately Date: April 25, 2017 Contact: Edward A. Stokx (818) 244-8080, Ext. 1649 PS Business
More informationNumber Same. This document provides procedural direction to implement Policy PL Onshore Windpower Development on Crown Land.
Ministry of Natural Resources Subject ONSHORE WINDPOWER DEVELOPMENT ON CROWN LAND NON-COMPETITIVE APPLICATION Procedure PL 4.10.04 Compiled by Renewable Energy Program Replaces Directive Title Same Number
More informationREQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS
REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS October 1, 2018 Northern Wasco County People s Utility District ( NWCPUD )
More informationSummary of Professional and Administrative Services
Summary of Professional and Administrative Services Accounts and Book Keeping We offer the following accounts and book keeping services for Farms and Estates: Budgets Cash flows Payroll administration.
More informationOne Cablevision Center Ferndale, New York APPLICATION FOR FINANCIAL ASSISTANCE
COUNTY OF SULLIVAN INDUSTRIAL DEVELOPMENT AGENCY I. A. APPLICANT INFORMATION: One Cablevision Center Ferndale, New York 12734 845-295-2603 APPLICATION FOR FINANCIAL ASSISTANCE Company Name: NY Delaware
More informationFinancial Assistance Application SUN8 PDC, LLC Cost / Benefit Analysis
Financial Assistance Application SUN8 PDC, LLC Cost / Benefit Analysis The information included herein is taken from the attached Tioga County Industrial Development Agency (IDA) Application for Financial
More informationEXHIBIT A TRI-COUNTY ELECTRIC COOPERATIVE, INC INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS
EXHIBIT A TRI-COUNTY ELECTRIC COOPERATIVE, INC INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS This Interconnection Agreement for Customer-Owned Renewable Generation Systems ("Interconnection
More informationPS Business Parks, Inc. Reports Results for the Quarter Ended March 31, 2018
News Release PS Business Parks, Inc. 701 Western Avenue Glendale, CA 91201-2349 psbusinessparks.com For Release: Immediately Date: April 24, 2018 Contact: Maria R. Hawthorne (818) 244-8080, Ext. 1370 PS
More informationA Guide to Commercial Property Due Diligence. The 15 checks you should always make before buying a commercial property
A Guide to Commercial Property Due Diligence The 15 checks you should always make before buying a commercial property About the Author Claire Russell - BA LLB (Hons) Director Domus Holmes Property Group
More informationPatrick L. Reznik
Patrick L. Reznik 512-894-5426 preznik@braungresham.com www.braungresham.com 1 LCRA/CTEC Blumenthal Substation Saturday, September 6, 2014 Hill Country Alliance, Fredericksburg, TX 2 Big Picture Phase
More informationPart 1. Estimating Land Value Using a Land Residual Technique Based on Discounted Cash Flow Analysis
Table of Contents Overview... v Seminar Schedule... ix SECTION 1 Part 1. Estimating Land Value Using a Land Residual Technique Based on Discounted Cash Flow Analysis Preview Part 1... 1 Land Residual Technique...
More informationYolo Habitat Conservancy County of Yolo City of Davis City of Winters City of West Sacramento City of Woodland University of California, Davis
Yolo Habitat Conservancy County of Yolo City of Davis City of Winters City of West Sacramento City of Woodland University of California, Davis Science & Technical Advisory Committee (STAC) Operational
More informationRequest for Proposals University Park, SIUE, Inc.
Request for Proposals University Park, SIUE, Inc. www.siue.edu/universitypark RFP for Real Estate Consulting, Development, Marketing and Brokerage Services for University Park Properties Proposal Announcement:
More informationLand Transaction Procedures Approved July 17, 2012
Land Transaction Procedures Approved July 17, 2012 Purpose: The Greenbelt Land Trust (GLT) acquires fee title or conservation easements for lands to fulfill its mission to conserve and protect in perpetuity
More informationLease accounting survey Preparing for implementation
Lease accounting survey Preparing for implementation Executive summary The new lease accounting standard proposed by the Financial Accounting Standards Board (FASB) fundamentally changes the rules that
More informationInvestigating Rates Mechanisms (IRM): Project Findings and Action Plan
Investigating Rates Mechanisms (IRM): Project Findings and Action Plan Report prepared by: Rob Law: Program Manager, Northern Alliance for Greenhouse Action & Jason Cox: Program Coordinator, Moreland Energy
More informationCity of South Daytona Municipalization Evaluation. December 19, 2006 WHH Enterprises, Inc.
City of South Daytona Municipalization Evaluation December 19, 2006 WHH Enterprises, Inc. 1 Purpose of WHH Assignment Evaluate feasibility of purchasing FPL electric facilities used to provide retail electric
More information13. Land Acquisition In order to exploit a wind resource, a developer must first have the legal right to use the land. Broadly
13. Land Acquisition In order to exploit a wind resource, a developer must first have the legal right to use the land. Broadly speaking, developers have two alternatives for acquiring the right to install
More informationSustainable Asset Valuation Tool (SAVi) Case Study
Sustainable Asset Valuation Tool (SAVi) Case Study Financing Sustainable Cities November 2017 David Uzsoki Financing sustainable infrastructure By 2050 more than 66% of the global population will be in
More informationPUBLIC ACCEPTANCE AND LOCAL ENGAGEMENT in Wind Energy Projects: the Danish Experience
PUBLIC ACCEPTANCE AND LOCAL ENGAGEMENT in Wind Energy Projects: the Danish Experience BIRGITTE EGELUND OLSEN PROFESSOR PH.D. LL.M. Head of Section Research & External Funding Director of Study Master of
More informationFPL Institutional Investor Information. August 2013
FPL Institutional Investor Information August 2013 What is the Earnings Surveillance Reporting (ESR)? Florida Public Service Commission (FPSC) Surveillance Reporting Monitors the reasonableness of Florida
More informationWhat will you do with Your GReen SavingS?
What will you do with Your GReen SavingS? Introducing PACE Financing for energy upgrades about figtree energy financing FIGTREE is a San Diego-based clean energy finance company providing breakthrough
More informationIncentive and Tax Credit Programs. Council of Development Finance Agencies Intro Energy Finance Course July 31 st August 1 st, 2012 Washington, D.C.
Incentive and Tax Credit Programs Council of Development Finance Agencies Intro Energy Finance Course July 31 st August 1 st, 2012 Washington, D.C. AGENDA Introduction Tax Credit Overview Energy Credit
More informationHighlights Highlights of a review of Newfoundland and Labrador Housing Corporation s Rental Housing Program from January 2007 to December 2007.
Office of the Auditor General Newfoundland and Labrador Highlights Highlights of a review of Newfoundland and Labrador Housing Corporation s Rental Housing Program from January 2007 to December 2007. Why
More informationWELCOME Garland Power & Light
WELCOME WELCOME Need & Benefit The Federal Energy Regulatory Commission has ordered the City of Garland/ under section 210 of the Federal Power Act to interconnect with Southern Cross Transmission LLC
More informationPS Business Parks, Inc. Reports Results for the Quarter and Year Ended December 31, 2018
News Release PS Business Parks, Inc. 701 Western Avenue Glendale, CA 91201-2349 psbusinessparks.com For Release: Immediately Date: February 20, 2019 Contact: Jeff Hedges (818) 244-8080, Ext. 1649 PS Business
More informationRegulatory Impact Statement
Regulatory Impact Statement Establishing one new special housing area in Queenstown under the Housing Accords and Special Housing Areas Act 2013. Agency Disclosure Statement 1 This Regulatory Impact Statement
More informationSolar Basics for the Real Estate Practitioner
Solar Basics for the Real Estate Practitioner By Sarah D. Cline Sarah D. Cline practices with the Potomac, Maryland, firm of Shulman, Rogers, Gandal, Pordy & Ecker, P.A., and is a 2016-2018 Section Fellow.
More information-vv- Los Angeles Department of.. P_.Water & Power RESOLUTION NO. MARCIE L. EDWARDS General Manager. DATE: May 28, 2015
n -vv- Los Angeles Department of.. P_.Water & Power RESOLUTION NO. BOARD LETTER APPROVAL Senior Assistant General Manager Power System MARCIE L. EDWARDS General Manager DATE: May 28, 2015 SUBJECT: Beacon
More information10 TH European IFRS power and utilities roundtable
10 TH European IFRS power and utilities roundtable Victor Chan, Partner, EY 29 November 2016 European IFRS Power and Utilities roundtable IFRS 16 Leases: the journey so far November 2016 Agenda Overview
More informationFARMLAND AMENITY PROTECTION. A Brief Guide To Conservation Easements
FARMLAND AMENITY PROTECTION A Brief Guide To Conservation Easements The purpose of this guide is to help landowners access their land amenity value and to provide direction to be compensated for this value.
More informationMARCH 2019 CITI 2019 GLOBAL PROPERTY CEO CONFERENCE
MARCH 2019 CITI 2019 GLOBAL PROPERTY CEO CONFERENCE SAFE HARBOR This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, and Section 21E of
More informationDivestiture of Generation Assets
Divestiture of Generation Assets 1 May 1996: Competitive Opportunities Opinion Price Reductions are a Priority Emphasis on Market Based Solutions to Public Policy Issues Competition, though not perfect,
More informationThis is a conditional use permit request to establish a commercial wind energy conversion system.
Public Works 600 Scott Boulevard South Hutchinson, Kansas 67505 620-694-2976 Road & Bridge Planning & Zoning Noxious Weed Utilities Date: March 28, 2019 To: From: Reno County Planning Commission Russ Ewy,
More informationExpression of Interest to Develop PV Solar Project(s) on City Owned Property
888 Prospect St. Suite 200 La Jolla, CA 92037 October 10, 2017 Mr. Lowell Crow City Manager City of Freeport 314 W. Stephenson St., Suite 200 Freeport, IL 61032 Expression of Interest to Develop PV Solar
More informationA TALE OF TWO USES: LANDOWNER PERSPECTIVES ON WIND LEASING AND TRANSMISSION EASEMENTS
Presented: 2010 Wind, Solar and Renewables Fundamentals February 2, 2010 Austin, Texas A TALE OF TWO USES: LANDOWNER PERSPECTIVES ON WIND LEASING AND TRANSMISSION EASEMENTS Gregory S. Friend Author contact
More informationLand and Easement Donation Process and Requirements Summary
Land and Easement Donation Process and Requirements Summary Many of the steps involved in donating land or conservation easements to American Friends of Canadian Land Trusts (AF) will be familiar to people
More information15 July Ms E Young Team Leader Protected Area Establishment Department of Environment and Natural Resources Adelaide
15 July 2011 Ms E Young Team Leader Protected Area Establishment Department of Environment and Natural Resources Adelaide PROTECTED AREAS ON PRIVATE LAND DISCUSSION PAPER The Environmental Defenders Office
More informationThe Remodeling Market International Builders Show January 21, Paul Emrath VP-Survey and Housing Policy Research
The Remodeling Market International Builders Show January 21, 2010 Paul Emrath VP-Survey and Housing Policy Research Outline NAHB Remodeling Market Index (RMI) NAHB forecasts Legislative/regulatory developments
More informationSpectrum of Wind Projects Levels of Local Involvement
Windustry Creating an understanding of wind energy opportunities for rural economic benefit. Non-profit organization based in Minneapolis, MN The Windustry Newsletter www.windustry.org Wind Easement Agreements
More informationEnergy efficiency and condition standards in private rented housing. A Scotland s Energy Efficiency Programme Consultation
Energy efficiency and condition standards in private rented housing A Scotland s Energy Efficiency Programme Consultation April 2017 Ministerial Foreword The Scottish Government s vision is for a private
More informationIRS guidance on claiming a payment in lieu of investment tax credits for solar, fuel cells, wind, biomass, geothermal, and other facilities
JULY 14, 2009 IRS guidance on claiming a payment in lieu of investment tax credits for solar, fuel cells, wind, biomass, geothermal, and other facilities By Forrest David Milder and Michael J. Goldman
More informationPACE is transforming energy and water performance
PACE is transforming energy and water performance Property Assessed Clean Energy (PACE) is a government financing policy that classifies building energy-improvement upgrades as a public benefit like a
More informationPublished by: Alberta Agriculture and Rural Development Street Edmonton, Alberta T6H 5T6. Printed in Canada
Published by: Alberta Agriculture and Rural Development 7000-113 Street Edmonton, Alberta T6H 5T6 Printed in Canada Copies of this publication are available from: Publications Office Alberta Agriculture
More informationVesteda Market Watch Q
Vesteda Market Watch Q1 2018 7.6 Housing Market Indicator 1 Housing Market Indicator The Housing Market Indicator in the first quarter of 2018 hits a level of 7.6. This score clearly reflects the positive
More informationHere Comes The. MIKE COURI & BOB RUPPE COURI & RUPPE (763)
Here Comes The Sun MIKE COURI & BOB RUPPE COURI & RUPPE mike@coruiruppe.com bob@couriruppe.com (763) 497-1930 ST. JOHN S SOLAR PROJECT ST. JOHN S SOLAR PROJECT ST. JOHN S SOLAR PROJECT 2013 SOLAR ENERGY
More informationWIND LAW. Wind Energy Seminar Wednesday, February 22, Severance of Wind Rights
WIND LAW Wind Energy Seminar Wednesday, February 22, 2012 Severance of Wind Rights Steven K. DeWolf sdewolf@bd-law.com & Rod E. Wetsel wetsel@wetsel-carmichael.com Office Hours: Wednesdays 2:00 to 3:30
More information2016 Rate Case Summary & Frequently Asked Questions Regarding Sharyland Utilities Regulated Delivery Rates
2016 Rate Case Summary & Frequently Asked Questions Regarding Sharyland Utilities Regulated Delivery Rates January 2017 The purpose of this document is to provide a summary of our 2016 rate case currently
More informationPS Business Parks, Inc. Reports Results for the Quarter Ended September 30, 2018
News Release PS Business Parks, Inc. 701 Western Avenue Glendale, CA 91201-2349 psbusinessparks.com For Release: Immediately Date: October 23, 2018 Contact: Jeff Hedges (818) 244-8080, Ext. 1649 PS Business
More informationFarmland and Open Space Preservation Purchase of Development Rights Program Frequently Asked Questions
Farmland and Open Space Preservation Purchase of Development Rights Program Frequently Asked Questions Why should a community consider farmland preservation programs? Farmland preservation is important
More informationHousing. Imagine a Winnipeg...: Alternative Winnipeg Municipal Budget
Housing Housing, and the need for affordable housing in cities and towns across Canada, has finally caught the attention of politicians. After a quarter century of urging from housing advocates, there
More informationPublic Storage Reports Results for the Quarter Ended March 31, 2017
News Release Public Storage 701 Western Avenue Glendale, CA 91201-2349 www.publicstorage.com For Release Immediately Date April 26, 2017 Contact Clemente Teng (818) 244-8080, Ext. 1141 Public Storage Reports
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS for Engineering, Procurement and Construction of a 4.99 MW-AC Solar Photovoltaic Project in Vermont RFP Participant Instructions November 17, 2017 TABLE OF CONTENTS ARTICLE ONE. GENERAL
More informationJoe Ritter. Seminole Financial Services
Joe Ritter Seminole Financial Services Seminole Financial Services National boutique lender that provides financing for renewable energy projects from $2 million to $30 million SEC-registered Investment
More informationThe Process The Options The Recommendation
GVEA Solar Project The Process The Options The Recommendation Why consider a Solar Project at GVEA? The simple answer is. member interest The Process Chairman Bill Nordmark proposes the Solar Committee-
More information