Harbour Island Force Main Replacement Design Build Project. South Neighborhood Association October 22, 2018
|
|
- Lester Hicks
- 5 years ago
- Views:
Transcription
1 Harbour Island Force Main Replacement Design Build Project South Neighborhood Association October 22, 2018
2 Agenda Project Update o Surge Facility Construction Update o Status of Route Study o First Segment of Harbour Island Force Main Replacement o Alternatives for Maintaining Wastewater Services to Harbour Island Timeline and Coordination Next Steps Questions
3 Surge Facility Construction Update Road has been reopened Unable to complete construction due to concerns with condition of pipe o Test results showed potential issues at high point on Franklin Street o Test results appeared to be satisfactory at location adjacent to Convention Center o Permit constraints for roadway closure didn t allow for additional assessment Evaluating options to perform additional assessments in the near future
4 Status of Route Alternative Development of Route 7
5 Status of Route Alternative Development of Route 7
6 Status of Route Alternative Parks Department o Utility Easement through Cotanchobee Fort Brooke Park Requires approval of the Trust that controls the land use Exhibits for initial review have been prepared Port Authority o Providing assistance with routes and easements within Port property to the Plant Private Property Owners o Easements are required along Guy Verger/Maritime Blvd. o Initial contact with owners has been made Sub-Consultants o Microtunnel Evaluation
7 First Segment of Harbour Island Force Main City has initiated budget approval for design and construction of First Segment of the Harbour Island Force Main along Water Street Budget approval at mid-november City Council Meeting Designing exact alignment of Route on Water Street o 900 ft. segment from Franklin Street to Morgan Street Coordinating construction activities with Strategic Property Partners Construction of pipeline will not require closure of Franklin Street Timeline o Construction Start: Mid-December 2018
8 Harbour Island Wastewater Collection System
9 Alternatives for Maintaining Wastewater Services to Harbour Island 12 Force Main from Harbour Island Pump Station must be connected to new pipeline Evaluating alternative routes o o Franklin Street option was eliminated due to parking garage extending under roadway Evaluating Routes A, B, C and D
10 Routes A, B, C & D
11 Route A PROS Pipeline mostly located in City Right-of-Way Construction Independent of New 54 Force Main CONS Longest Route Longest Construction Duration Public Inconvenience
12 Route B PROS Pipeline mostly located in City Right-of-Way Shortest Distance CONS Boat Slip Easements Needed Florida Community Trust Approval Needed Difficult Construction Public Inconvenience
13 Route C PROS Construction Independent of New 54 Force Main Shortest length of Pipe on Harbour Island Minimal Public Inconvenience CONS Easement Acquisition
14 Route D PROS Construction Independent of New 54 Force Main Shortest length of pipe on Harbour Island Minimal Public Inconvenience CONS Easement Acquisition
15 Routes A D: Cost Comparison Alternative Total Length (LF) Total Comparative Cost ($) A 2,995 $825,075 B 1,660 $493,725 C 1,560 $405,825 D 1,600 $409,425
16 Easement Requirements For Alternative D - SNA Proposal North half 20 wide permanent easement Temporary easement over the east half of the TECO easement Pipeline will be more than 20 below the deepest floor beneath the boat slip
17 Easement Requirements for Alternative D - HICSA Proposal Final Easement requirements still to be determined based on further investigations Two options Easement in the roadway Easement aligned in the grass
18 What to Expect 12 Force Main Construction Pipe would be staged on Davis Islands 24/7 construction work would be limited to one day Restoration and beautification of the area would be completed to the standards of the SNA
19 Schedule For Alternative D Weeks Mobilize Onsite Construct New Force Main from Pump Station Perform Directional Drill Across Channel Install Pipe Across Channel Make Final Connections Shift Flows to New Line Restoration of Site (Landscaping and Irrigation)
20 Plans for Old 54 Force Main Plan to abandon existing pipe has not been finalized Not practical to remove existing pipeline or fill with grout Pipe will be flushed with clean water to remove sewage and prevent corrosion Valves will be installed at the ends of pipeline to seal the pipe City has no intentions of using pipe in the future, but it could be used in an extreme emergency City will remain responsible for the pipe and will monitor its condition
21 Project Timeline Final Route recommendations to the City by mid-november 2018 First Segment of Harbour Island Force Main Replacement Installation to begin by mid-december 2018 A timeline for design, permitting and construction will be presented once a final route is selected
22 Next Steps Community Task Force Meeting Mid-November Present Final Route Selection Public Meeting #3 Mid/Late November Present Final Route Selection
23 Q & A Project Website: Project Hotline: (813)
PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING February 2, 2017 REGULAR AGENDA ITEM 7
PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING February 2, 2017 REGULAR AGENDA ITEM 7 Regional Integrated Loop System Phase 1 Interconnect Project [U.S. 17 to Punta Gorda]
More informationMunicipality of Anchorage, Alaska Parks & Recreation Department
Municipality of Anchorage, Alaska Parks & Recreation Department 632 W. 6 th Avenue, Suite 630 P.O. Box 196650 Anchorage, AK 99519 Tel 907-343-4355 URL www.muni.org/departments/parks MEMORANDUM Date: September
More informationTOWN OF LEWISTON PLANNING BOARD APPLICATION
TOWN OF LEWISTON PLANNING BOARD APPLICATION DESCRIPTION OF PROPOSED REQUEST: Name of Property Owner: Phone #: Name of Applicant:Phone #: Address or Location of Proposal:_SBL# Size of Parcel or Structure:Existing
More informationCondominium Unit Requirements.
ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion
More informationAGENDA OF THE COUNCIL OF THE CITY OF FORT COLLINS, COLORADO. September 18, Proclamations and Presentations 5:30 p.m. Regular Meeting 6:00 p.m.
AGENDA OF THE COUNCIL OF THE CITY OF FORT COLLINS, COLORADO September 18, 2001 Proclamations and Presentations 5:30 p.m A. Presentation of a Plaque to the Neighborhood Task Force for its Award of Excellence
More information22 History Note: Authority G.S ;
1 1 1 1 1 1 0 1 1A NCAC 0C.01 is proposed for adoption as follows: Section.00 Permitting and Inspection of Private Drinking Water Wells 1A NCAC 0C.01 SCOPE AND PURPOSE (a) The purpose of the rules of this
More informationQUESTIONS AND ANSWERS FOR: RFP# 13-34, RFP for Engineering Services for Gas Distribution System Improvements
QUESTIONS AND ANSWERS FOR: RFP# 13-34, 10-18-13 RFP for Engineering Services for Gas Distribution System Improvements 1. The proposed routing of the high pressure steel gas line appears to follow an existing
More information(2) An identification of the municipality, area, or facility to be served by the proposed system;
As of February 1, 2012 COMAR 26.04.01.36 - Capacity Development Requirements. A. Applicability. (1) This regulation applies to the owner of a new system that applies for a construction permit as required
More information9. GROYNES RESERVE GRAZING LICENCE RR 8019
9. GROYNES RESERVE GRAZING LICENCE RR 8019 Officer responsible Parks Manager Author Rod Whearty, Area Parks Officer Corporate Plan Output: Consents and Applications The purpose of this report is to submit
More informationFranklin Township Green Acres Scoping Hearing
Franklin Township Green Acres Scoping Hearing May 8, 2012 > Introductions Transcontinental Gas Pipe Line Company, LLC Bill Bates, Project Manager Allen Smith, Environmental Scientist Tim Thuston, Public
More informationARTICLE 13 CONDOMINIUM REGULATIONS
ARTICLE 13 CONDOMINIUM REGULATIONS Section 13.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion
More informationCITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY
CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 17, 2017 DATE: June 7, 2017 SUBJECT: Deed of Easement, Temporary Construction Easement and Construction Agreement For Parcel "A," Hurley's
More informationBeltrami County Natural Resource Management Policy: Easements and Access Across County Lands
Page 1 Purpose Beltrami County Natural Resource Management Policy: Easements and Access Across County Lands The procedure and requirements for private, government, commercial, and utility entities to cross
More informationNOTICE OF FEE INCREASE SCHEDULE A - WATER DEVELOPMENT FEES
NOTICE OF FEE INCREASE NOTICE IS HEREBY GIVEN that water development fees collected and credits given within the boundaries of Zone 40 and Zone 50 (Metro Air Park Special Planning Area) of the Sacramento
More informationLAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS
LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS Chapter 1: Chapter 2: Chapter 3: Introduction Fees Engineering & Permitting Requirements Sec. 3.1 Sec. 3.2 Sec. 3.3 Sec. 3.4 Sec. 3.5 Sec.
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 2-2 Problem: The backyards at 962, 97, and 978 Delvin Drive are located in a low area of shallow ponding that takes
More informationR/W PREQUALIFICATION ODOT, 3/14/2018 PROPERTY MAP SHEET
R/W PREQUALIFICATION ODOT, 3/14/2018 3A Title Block 3B Sheet Heading 3C Station Limit Flags 3D Revision Block 3E Ownership Name and Number 3F Centerline Stationing 3G Proposed R/W and Pavement 3H Structures
More informationSection 1: US 19 Overlay District
Section 1: US 19 Overlay District Section 1.1 Intent and Purpose The purpose of the US Highway 19 Overlay District is to manage access to land development along US Highway 19 in a manner that preserves
More informationSHOWN LIVE ON NEWPORT NEWS TELEVISION COX CHANNEL 48 VERIZON CHANNEL 19 AGENDA NEWPORT NEWS CITY COUNCIL REGULAR CITY COUNCIL MEETING
SHOWN LIVE ON NEWPORT NEWS TELEVISION COX CHANNEL 48 VERIZON CHANNEL 19 www.nngov.com AGENDA NEWPORT NEWS CITY COUNCIL REGULAR CITY COUNCIL MEETING JULY 14, 2015 City Council Chambers 7:00 p.m. A. Call
More informationCORPORATION OF THE TOWNSHIP OF LEEDS AND THE THOUSAND ISLANDS BY-LAW
CORPORATION OF THE TOWNSHIP OF LEEDS AND THE THOUSAND ISLANDS BY-LAW 16-025 BEING A BY-LAW TO ADOPT A TANGILBLE CAPITAL ASSET POLICY FOR THE TOWNSHIP OF LEEDS AND THE THOUSAND ISLANDS. WHEREAS Section
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III O DATE: December 12-13, 2012 ****************************************************************************** SUBJECT: Resolution
More informationProspective Builders, Utilities, Public Agencies, and Engineering Firms
MEMORANDUM To: Prospective Builders, Utilities, Public Agencies, and Engineering Firms Subject: District Procedures for Plan Review and Approval This document was prepared to provide guidance to developers,
More informationFIRE ISLAND INLET TO MORICHES INLET FIRE ISLAND STABILIZATION PROJECT TECHNICAL SUPPORT DOCUMENT
FIRE ISLAND INLET TO MORICHES INLET FIRE ISLAND STABILIZATION PROJECT TECHNICAL SUPPORT DOCUMENT EVALUATION OF A STABILIZATION PLAN FOR STORM DAMAGE REDUCTION COST APPENDIX U.S. Army Corps of Engineers
More informationPRIVATE PROPERTY PUBLIC PURPOSE
PRIVATE PROPERTY PUBLIC PURPOSE Understanding Right-of-Way Acquisition for Transmission Lines At Progress Energy, we are committed to providing safe, reliable and affordable energy to our customers. As
More informationPlan Presentation Guide SECTION 60. Chapter 3 RIGHT-OF-WAY SECTION PRESENTATION
Chapter 3 RIGHT-OF-WAY SECTION PRESENTATION Right of Way plans are necessary for the acquisition of the required right of way and easements for projects. Proper representation of the right of way and easements
More informationQ: When will the first SID payment become due?
Rattlesnake Sewer June 19, 2009 FAQs (Frequently Asked Questions) Over the past few months, Rattlesnake Valley residents have asked some very good questions about the sanitary sewer system and creation
More informationROOSEVELT IRRIGATION DISTRICT
ROOSEVELT IRRIGATION DISTRICT 103 West Baseline Road Buckeye, AZ 85326 Phone (623) 386-2046 Fax (623) 386-4360 Board of Directors Superintendent W. Bruce Heiden, President Donovan L. Neese K. C. Gingg
More informationDisplacement and Relocation
Chapter 7: and Relocation 7.1 INTRODUCTION This chapter summarizes the displacement and relocation impacts previously identified in the Final Environmental Impact Statement (FEIS) and then evaluates the
More informationTEMPORARY CONSTRUCTION EASEMENT JEA SEWER SYSTEM CUSTOMER OWNED, OPERATED AND MAINTAINED
Return to: JEA Real Estate Services Attention: Jordan Pope 21 West Church Street (CC-6) Jacksonville, Florida 32202 TEMPORARY CONSTRUCTION EASEMENT JEA SEWER SYSTEM CUSTOMER OWNED, OPERATED AND MAINTAINED
More informationReport to COUNCIL for decision
16 368 Title: Section: Prepared by: Waipaoa Flood Control Scheme Resilience Project Update Environmental & Regulatory Services Neil Daykin (Rivers, Drainage and Coastal Manager) Meeting Date: 1 December
More informationZAREMBA GROUP COMPANY PROFILE
ZAREMBA GROUP COMPANY PROFILE 2017 Welcome to Zaremba Group Zaremba has evolved over the years, but some things never change... Zaremba Group has evolved from a home remodeling business in Cleveland, Ohio
More information-ii~ ADAMS COUNTY. &,.ee8.& PUBLIC HEARING AGENDA ITEM
-ii~ ADAMS COUNTY &,.ee8.& PUBLIC HEARING AGENDA ITEM DATE: January 6,2015 SUBJECT: Easement grant to Molson Coors FROM: Jeffery A. Maxwell, P.E., PTOE, Transportation Director~ AGENCYIDEPARTMENT: Transportation
More informationDocks, Fun Facts to Know and Tell
Docks, Fun Facts to Know and Tell During the real estate boom years of 2005 through 2007, waterfront homes on San Juan Island appreciated around 8-10% per year and homes with docks appreciated around 13%.
More informationBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: CONSENT PRESET: TITLE: ACCEPTANCE OF A DRAINAGE EASEMENT FROM CASA PISCES, LLC (CASA)
4C1 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: CONNT PRET: TITLE: ACCEPTANCE OF A DRAINAGE EAMENT FROM CASA PISCES, LLC (CASA) AGENDA ITEM DATES: MEETING DATE: 4/25/2017 COMPLETED DATE:
More informationINTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY
INTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY This Agreement Permitting Construction of SouthEast Connector on the Truckee Meadows
More informationREGULATIONS GOVERNING WATER SERVICE TO CUSTOMERS OF THE EAST BAY MUNICIPAL UTILITY DISTRICT SECTION 4 MAIN EXTENSIONS
PAGE NUMBER 4-A A. EXTENDING MAINS In general, whenever extension of a water main within the District boundaries is required because a principal part of the premises to be served does not lie along an
More informationDevelopment of a temporary grass multisport pitch and associated works (in addition to the previously approved park - Phase A).
To the Lord Mayor and Report No. 163/2018 Members of Dublin City Council Report of the Chief Executive (a) Planning and Development Act 2000 (as amended) & Planning and Development Regulations 2001 (as
More informationCOUNTY OF SACRAMENTO CALIFORNIA
COUNTY OF SACRAMENTO CALIFORNIA Attachment VI For the Agenda of: February 23, 2010 To: From: Subject: Supervisorial District(s): Board of Supervisors County Clerk/Recorder Department, Real Estate Division
More informationWASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION
WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION DETAILED SPECIFIC WRITTEN REQUEST File Number: SDV- Number of Proposed Lots & their Dimensions: PRELIMINARY SUBDIVISION PLAN REQUIREMENTS The approval of
More informationORANGE BLOSSOM GARDENS PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC.
ORANGE BLOSSOM GARDENS A PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC. REVISED OCTOBER 19, 1992 BY THE COLLIER COUNTY LONG RANGE PLANNING DEPARTMENT REVISED DECEMBER, 2008
More informationNew Hanover County Health Department Application for Improvement Permit and/or Authorization to Construct
New Hanover County Health Department Application for Improvement Permit and/or Authorization to Construct Survey plat to scale* submitted Scaled* site plan submitted Unscaled site plan submitted * scale
More informationEXHIBIT A LEGAL DESCRIPTION
EXHIBIT A LEGAL DESCRIPTION DESCRIPTION LOTS 59 AND 60, BLOCK 24, THE PALM BEACH FARMS CO. PLAT NO. 3, ACCORDING TO THE MAP OR PLAT THEREOF, AS RECORDED IN PLAT BOOK 2, PAGE(S) 45 THROUGH 54, INCLUSIVE,
More information8. CONSTRUCTION SCHEDULE
8. CONSTRUCTION SCHEDULE The project's authorizing legislation (PL 106-382, October 27, 2000) provides that funds for construction are to be appropriated..."over a period of 10 fiscal years..." (114 stat
More informationDESIGN PUBLIC HEARING MAY 18, 2017 GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED
DESIGN PUBLIC HEARING MAY 18, 2017 AT GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED GROVELAND COMMUNITY TRAIL PROJECT Roadway Project Management Section IN THE TOWN OF GROVELAND,
More informationCity of Grande Prairie Development Services Department
City of Grande Prairie Development Services Department COUNTRYSIDE SOUTH OUTLINE PLAN Prepared by: GPEC Consulting Ltd. #202, 10712-100th Street Grande Prairie, AB Council Resolution of August 20, 2001
More informationNew Requirements for Pipeline Projects James D. Bradbury, PLLC
New Requirements for Pipeline Projects James D. Bradbury, PLLC New Pipeline Requirements City of Fort Worth Pipeline Ordinance (1/09); Texas Midstream v. City of Grand Prairie; Legislative Update on pipelines.
More informationOhio State University Extension, 2120 Fyffe Road, Columbus, OH 43210
FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series Understanding and Negotiating Pipeline Easements Peggy Kirk Hall Director,
More informationApplication Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012
Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 IMPORTANT NOTE: This document was created to accompany the City of Fort Collins
More informationWATER AGENCY UPDATE TO SCWA TITLE 5 INCREASE EFFECTIVE MARCH 1, All Developers, Builders, Consulting Engineers, and Other Interested Parties
Department of Water Resources Michael Peterson, Director Including service to the cities of Elk Grove and Rancho Cordova SACR AMENTO COUNTY WATER AGENCY UPDATE TO SCWA TITLE 5 INCREASE EFFECTIVE MARCH
More informationPipeline Easement and Right-of-Way Agreements
Pipeline Easement and Right-of-Way Agreements 4-16-2015 Mark Landefeld OSU Extension Monroe County landefeld.6@osu.edu 740-472-0810 Clif Little OSU Extension Guernsey County little.16@osu.edu 740-489-5300
More informationProposed New SOA/SGCC Agreement. Homeowner Information Presentation
Proposed New SOA/SGCC Agreement Homeowner Information Presentation November 23, 2013 AGENDA History & Background What is in the new agreement? What are the risks? Next Steps Summary Your Turn Agenda History
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Recommendation to Approve Loudoun County s Request for Easement across Washington Dulles International Property For Improvements to Carters School Road July
More informationCODING: Words stricken are deletions; words underlined are additions. hb er
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 An act relating to local government environmental financing; providing a short title; amending s. 212.055, F.S.; expanding the uses
More informationBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY
8D1 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: DEPARTMENTAL PRESET: TITLE: MARTIN COUNTY UTILITIES MAINTAINED GRINDER PUMPS AGENDA ITEM DATES: MEETING DATE: 2/14/2017 COMPLETED DATE:
More informationCHAPTER Committee Substitute for Committee Substitute for House Bill No. 447
CHAPTER 2016-225 Committee Substitute for Committee Substitute for House Bill No. 447 An act relating to local government environmental financing; providing a short title; amending s. 212.055, F.S.; expanding
More informationD2-D4 February 12, 2014 Public Hearing APPLICANT: CITY OF VIRGINIA BEACH
D2 D3 D4 D2-D4 February 12, 2014 Public Hearing APPLICANT: CITY OF VIRGINIA BEACH STAFF PLANNERS: Stephen White & Clay Bernick REQUEST: Discontinuance, closure and abandonment of three portions of the
More informationSTAFF REPORT. DATE: October 7, 2013
STAFF REPORT DATE: October 7, 2013 TO: FROM: SUBJECT: The Honorable Mayor and City Council John Penrod, City Attorney CONSIDERATION OF APPROVING EASEMENT AGREEMENTS WITH THE CORPORATION OF THE PRESIDING
More informationTOWNSHIP OF INDIANA PLANNING COMMISSION MARCH 22, 2017
TOWNSHIP OF INDIANA PLANNING COMMISSION MARCH 22, 2017 A regular meeting of the Indiana Township Planning Commission was called to order at 6:00 p.m. by Chairman Cecil Tranquill with the Pledge of Allegiance.
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 DATE: January 19, 2017 SUBJECT: Deed of Easements, Temporary Construction Easements and Construction Agreement and Deed of
More information2 April 9, 2014 Public Hearing
2 April 9, 2014 Public Hearing APPLICANT (Street Closure): EBENEZER BAPTIST CHURCH APPLICANT & PROPERTY OWNER (Use Permit Modification): EBENEZER BAPTIST CHURCH STAFF PLANNER: Kevin Kemp REQUESTS: A. Street
More informationSAN MATEO UNION HIGH SCHOOL DISTRICT. Site Recommendation Alternative High School Program December 13, 2017
SAN MATEO UNION HIGH SCHOOL DISTRICT Site Recommendation Alternative High School Program December 13, 2017 AGENDA o Background o Original Property Search Criteria o Current Property Search Criteria o Properties
More informationHonorable Mayor and Members of the City Council. Sewer Easement Deed Agreement at 2705 Walker Street
Office of the City Manager CONSENT CALENDAR October 30, 2012 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Andrew Clough, Director, Public Works
More informationCrib Point Pakenham Pipeline Landowner Reference Material & Frequently Asked Questions
Crib Point Pakenham Pipeline Landowner Reference Material & Frequently Asked Questions ISSUE DATE: September 2018 Introduction APA is committed to providing landowners and other project stakeholders with
More informationWelcome! Sarpy Transmission Project. Public Hearing October 23, 2018
Welcome! Sarpy Transmission Project Public Hearing October 23, 2018 Agenda Safety Introductions Purpose of Hearing Explain the project need Present the project timeline Describe rights of each property
More informationACCESSORY DWELLING UNITS
ACCESSORY DWELLING UNITS LAND USE BYLAW C-4841-97 ACCESSORY DWELLING UNIT (ADU): means a subordinate dwelling unit attached to, created within or detached from the principal dwelling, single detached,
More informationHARDIN COUNTY WATER CONTROL & IMPROVEMENT DISTRICT NO. 1 WATER AND SEWER USE ORDER
HARDIN COUNTY WATER CONTROL & IMPROVEMENT DISTRICT NO. 1 WATER AND SEWER USE ORDER AN ORDER RELATING TO CLASSES OF USERS; WATER AND SEWER CHARGES; PROVIDING FOR PERIODIC REVIEW OF WATER AND SEWER RATES;
More informationPublic Sewer Extension Information Packet
Mason Farm/Whitehead Circle eighborhood Public Sewer Extension Information Packet Residents of the Mason Farm/Whitehead Circle eighborhood requested information on the status of sewer extension with their
More informationBurleigh County Water Resource District 1811 East Thayer Avenue Bismarck, North Dakota (701)
Burleigh County Water Resource District 1811 East Thayer Avenue Bismarck, North Dakota 58501 (701) 222-3499 www.bcwrd.org Fox Island Flood Control Project Public Hearing Summary September 7, 2016 General
More informationNORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON-SITE WATER PROTECTION BRANCH
NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON-SITE WATER PROTECTION BRANCH INNOVATIVE WASTEWATER SYSTEM APPROVAL Innovative Wastewater
More informationShared Well Agreement
Shared Well Agreement This information is provided to assist you in developing a shared well agreement. Please remember that each situation is different and may require additional language to protect the
More informationSection 821. PRESERVATION OF LAND MONUMENTS, CONTROL POINTS, AND PROPERTY CORNERS
821.01 Section 821. PRESERVATION OF LAND MONUMENTS, CONTROL POINTS, AND PROPERTY CORNERS 821.01. Description. This work consists of preserving the corners and control points as shown on the plans, identified
More informationUpper Southampton Township US ACOE USF&WS UNH
Upper Southampton Township US ACOE USF&WS UNH 1 Corps of Engineers Who? Heather Jensen, Project Manager Mark Eberle, Project Biologist Sarah Apperson, Jennifer McGrath, Real Estate Rich Pearsall, public
More informationCOMMUNITY REDEVELOPMENT AGENCY AGENDA ITEM SUMMARY
8B1 COMMUNITY REDEVELOPMENT AGENCY AGENDA ITEM SUMMARY PLACEMENT: DEPARTMENTAL PRESET: 4:30 PM TITLE: APPROVE REPORTING METRICS FOR TAX INCREMENT FINANCING FUNDED CAPITAL INVESTMENT PROJECTS LOCATED WITHIN
More informationSection 4 Master Plan Framework
Section 4 Master Plan Framework 4.1 PURPOSE The Master Plan, as an implementation tool of the SPC District, establishes the primary framework for the overall development of the Property. Detailed site
More informationSpring City Municipal Corporation
Spring City Municipal Corporation (435) 462-2244 FAX: (435) 462-2654 www.springcityutah.org 150 East Center Street P.O. Box 189 Spring City, Utah 84662 For Your Information All appointments with Public
More informationTOWN OF PORTSMOUTH PLANNING BOARD 2200 East Main Road Portsmouth, RI
TOWN OF PORTSMOUTH PLANNING BOARD 2200 East Main Road Portsmouth, RI 02871 401-683-3717 PORTSMOUTH PLANNING BOARD Continuation of the Regular Meeting of February 8, 2017 February 15, 2017 Members Present:
More informationVacant Properties Campaign
Vacant Properties Campaign What Are Vacant Properties? Abandoned Buildings Single Family Residential (Owner) Multi-Family (Absentee) Commercial and Industrial Vacant Lots No Legitimate Uses Substandard
More informationR/W PREQUALIFICATION ODOT, 3/14/2018
R/W PREQUALIFICATION ODOT, 3/14/2018 BRETT SHEARER, C.O. REAL ESTATE PROPOSED RIGHT OF WAY DESIGN 172 PROPOSED RIGHT OF WAY DESIGN PROPOSED RIGHT OF WAY DESIGN Section 3200 Types of Title 173 PROPOSED
More informationThis is a sample form for information ONLY. UTILITY INFRASTRUCTURE CONVEYANCE AND SERVICE AGREEMENT
This is a sample form for information ONLY. A CSA will be tailored to your project at the appropriate time during the development process. Please contact the Development Services Team for additional information.
More information3.3 Acquisitions and Displacements/Relocations
Chapter 3 Social Effects 3.3 Acquisitions and Displacements/Relocations This section discusses property displacements, relocations, and acquisitions (partial or full) that might occur due to implementation
More informationEasement Policy Agricultural Crown Land July 2018
Easement Policy July 2018 A. Purpose This policy describes the terms and conditions associated with applications for easement agreements on land for the construction, laying down, maintenance, operation,
More informationFOCUS ENGINEERING, inc.
FEASIBILITY REPORT for OLD VILLAGE PHASE 3 STREET, DRAINAGE AND UTILITY IMPROVEMENTS RESOULTION RECEIVING REPORT AND CALLING FOR PUBLIC HEARING OLD VILLAGE CIP PHASING PLAN Phase 3 2017. Amount: $ 2,557,000.
More informationSubmittal of the Minutes from the January 26, 2010 Cabinet Meeting. ******************************************************************************
AGENDA BOARD OF TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND MARCH 23, 2010 Attachments to the items below can be viewed at the following link: http://www.dep.state.fl.us/secretary/cab/public_notices.htm
More informationThe Villages Master Planned Development Development Agreement. Exhibit F. Traffic Monitoring Plan
Traffic Monitoring Plan TRAFFIC MONITORING PLAN The transportation mitigation measures imposed on The Villages MPD include projects that address the potential full transportation impacts of complete build
More informationii. Minimum Property Requirements and Minimum Property Standards
Underwriting the Property The Mortgagee must underwrite the completed appraisal report to determine if the Property provides sufficient collateral for the FHA-insured Mortgage. The appraisal and Property
More informationCity of East Providence
City of East Providence 145 TAUNTON AVENUE, EAST PROVIDENCE STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS 02914-4505 TEL. (401) 435-7521 FAX (401) 438-1719 TDD (401) 431-1633 CITY MANAGER PETER GRACZYKOWSKI
More informationApril 10, 2017 WATER
April 10, 2017 Toll MD VII Limited Partnership c/o Thomas Mateya 7164 Columbia Gateway Drive Columbia, MD 21046 Re: Phase I Letter of Findings WSSC Project No.. DA6303Z17, WMAL Property Dear Mr. Mateya:
More informationConservation Collier Red Maple Swamp Preserve
Preserve Extended Interim Management Plan First Extension Prepared By: Collier County s Conservation Collier Program Parks & Recreation Department 15000 Livingston Road Naples, FL 34109 May 2013 G:\CDES
More informationValley View Public Meeting WEDNESDAY, SEPTEMBER 9, 2015
Valley View Public Meeting WEDNESDAY, SEPTEMBER 9, 2015 WHY SEWERS, WHY NOW? 1. PUBLIC HEALTH ISSUE. SAMPLING HAS DOCUMENTED FECAL COLIFORM BACTERIA IN STREAMS AND WETLANDS. 2. REQUESTS FROM PROPERTY
More informationState Dredging Study Update NCBIWA Annual Meeting
State Dredging Study Update NCBIWA Annual Meeting November 13, 2017 Study Purpose Three (3) Studies Requested Use of Dredge Manteo for Additional Work Acquisition of Dedicated Dredging Capacity Cost/Benefit
More informationVILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL
VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL SECTION I. OVERVIEW AND GENERAL INSTRUCTIONS INTRODUCTION A stormwater
More informationHOLLEY NAVARRE WATER SYSTEM, INC. IMPACT FEE POLICIES, PROCEDURES & CALCULATIONS
HOLLEY NAVARRE WATER SYSTEM, INC. IMPACT FEE POLICIES, PROCEDURES & CALCULATIONS EFFECTIVE: AUGUST 4, 2017 REVISED: NOVEMBER 9, 2017 8574 Turkey Bluff Road, Navarre, FL 32566 Phone: (850) 939 2427 Fax:
More informationSTAFF REPORT. Grandview Beach and Paradise Point Water System Funding and Connection Costs
STAFF REPORT Department/Function: Chair: Public Works Councillor Jim Crawford Meeting Date: March 8, 2017 Report No: Report Title: Grandview Beach and Paradise Point Water System Funding and Connection
More information***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS
105.11. Permit requirements. 105.12. Waiver of permit requirements. Title 25 Environmental Protection Part I. Department of Environmental Protection Subpart C. Protection of Natural Resources Article I.
More informationTEMPORARY CONSTRUCTION EASEMENT AND AGREEMENT JEA WATER AND WASTEWATER SYSTEMS CUSTOMER OWNED, OPERATED AND MAINTAINED
Return to: Greg Corcoran, Manager JEA 21 West Church Street Jacksonville, Florida 32202 TEMPORARY CONSTRUCTION EASEMENT AND AGREEMENT JEA WATER AND WASTEWATER SYSTEMS CUSTOMER OWNED, OPERATED AND MAINTAINED
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 14, 2013 DATE: November 12, 2013 SUBJECT: Deed of Dedication, Deeds of Easement and Deeds of Temporary Easement and Construction
More informationMarch 26, Sutter County Planning Commission
March 26, 2003 To: Re: Sutter County Planning Commission Agenda Item #12: Public hearing on Rezoning #03-04 to change the zoning classification of two parcels totaling 324+ acres from the AG (General Agricultural)
More informationCITY OF EAU CLAIRE, WISCONSIN. SPECIAL ASSESSMENT POLICY (Dated: November 8, 2016)
CITY OF EAU CLAIRE, WISCONSIN SPECIAL ASSESSMENT POLICY (Dated: November 8, 2016) (Adopted by reference by Ordinance No. 7207 adopted November 8, 2016) PURPOSE The purpose of this Policy is to assure fair
More informationTHE REDEVELOPMENT PLAN
PAGE 37 THE REDEVELOPMENT PLAN FUTURE LAND USE The Silver Terrace Redevelopment Area is currently designated as Redevelopment Area #4 on the City of Delray Beach Future Land Use Map (FLUM). This designation
More information