1 December 17, 2015 VIA Ms. Janine Howard Department of Environmental Quality Office of Environmental Impact Review 629 E. Main St., 6th Floor Richmond, VA RE: PUE Dominion Virginia Power s Proposed Transmission Project Remington Gordonsville 230kV Line Rebuild Albemarle, Orange and Culpeper Counties Dear Ms. Howard: The Virginia Outdoors Foundation (VOF) is in receipt of an from Ms. Valerie Fulcher of DEQ, dated December 2, 2015, concerning the above-referenced project. VOF, an agency of the Commonwealth, was established by the General Assembly in 1966 to promote the preservation of Virginia s natural and cultural resources by encouraging private philanthropy in fulfillment of state policy. As a result of Virginia s commitment to ensure a vibrant natural environment for today and future generations, VOF owns thousands of acres managed for public access and holds more than 3,600 easements across the Commonwealth, and these easements protect in perpetuity over 750,000 acres of open-space. We thank you for the opportunity to provide additional comments regarding upgrades to the electric transmission corridor running through VOF open-space easements in the aforementioned counties. VOF has been working very closely with Greg Baka and others from Dominion on this proposal since March This project is located in a region of Virginia that contains a high concentration of our open-space easements, including some co-held with the Virginia Department of Historic Resources. The project has gone through several variations, including potential alternatives that would construct a new line west to a new substation at Pratts in Madison County. However, currently, the proposal is requesting to rebuild the existing line within the existing ROW from Remington to Gordonsville. Dominion would prefer to have a 100 ROW along the entire corridor; however, several properties, including many under open-space easement, only have a 70 ROW. Page 1 of 4

2 While Dominion can accomplish this rebuild within the 70 ROW, it will require a greater number of towers. Richmond Office 600 E. Main Street, Suite 402, Richmond, VA Currently, a majority of the existing line is comprised of wooden H-frame towers that are approximately 50 tall on average. The proposed towers would be made of core-ten weathering steel that are approximately 103 tall on average. Although Dominion intends to upgrade the line within its existing ROW, the height of the new towers may result in a visual impact on the specific open-space easement properties that the transmission line crosses, as well as on other conserved lands within the viewshed of the line. VOF holds open-space easements on 87 properties within 1.5 miles of the transmission line, a majority of which could be visually-impacted by the proposed rebuild and upgrade. Of those 87 properties, the line physically crosses 26 properties under open-space easements within Dominion s existing ROW. Furthermore, VOF is currently working on 2 additional new openspace easement proposals within 1.5 miles of the transmission corridor. On the 26 properties crossed by this transmission line, 14 will require additional ROW to accomplish Dominion s preferred goal of establishing a 100 ROW along the entire corridor to achieve a one-to-one tower replacement, as opposed to a greater than one-to-one tower replacement that would be required where the ROW is 70 wide. Request for additional ROW through a VOF easement will require that Dominion complete the utility easement application. Staff will evaluate the request according to the specific conservation values of each easement in determining the feasibility of additional utility right of way, which determination will be transmitted to the board for final approval. Please contact VOF staff to request this application and please note that Dominion is required to obtain separate approval from the fee owner of the subject property. In considering the impact of this proposal on conservation lands, an open-space easement is a legal interest in real property that creates a relationship between the holders of the easement and the property owner. By means of the easement, VOF has an interest in specific conservation values of the property and a legal obligation to protect these values. VOF easements provide important public benefits by protecting in perpetuity significant tracts of mostly undeveloped land which may contribute to the protection of water quality, productive soils, natural heritage resources, historic resources, and scenic viewsheds. VOF easements represent over $1 billion of public investment and fulfillment of Title XI of the Virginia Constitution and other public policies to ensure conservation of natural and cultural resources. These investments in conservation and future conservation opportunities may be jeopardized if large-scale utility development impairs the protected resources and their character-defining setting. Degradation of protected resources may result in a loss of confidence in the effectiveness of conservation easements by the public. As mentioned above, the proposed project both crosses protected lands, and will be in the viewshed of many others. VOF is concerned about the potential impact that a large-scale utility development like this may have on the scenic viewsheds and pastoral settings provided by these protected properties, especially for the driving public along US Route 15. As such, VOF Page 2 of 4

3 requests that full consideration be given to the importance of these open-space properties and their extensive conservation values in the upgrading of this transmission corridor. Alternatives Richmond Office 600 E. Main Street, Suite 402, Richmond, VA of less visual impact should be fully considered and modifications to siting, location, materials and height in the design of the transmission line should be made to avoid or minimize any adverse impacts to these open-space properties and their public values. If the SCC certificate is issued, the permit should require implementation of all industry best practices, including, but not limited to, (1) minimal removal of vegetation through use of a clearing plan and (2) use of nonreflecting or de-glared conductors and dulled steel for towers and structures. Thank you for the notice and we look forward to working with you and Dominion in the continued planning and evolution of this project. If you have any further questions or comments, please feel free to contact me at (804) or mlittle@vofonline.org. Sincerely, Martha Little Deputy Director, VOF cc: Greg Baka, Dominion (via ) Elizabeth Tune, VDHR (via ) Martha Little, VOF (via ) Brian Fuller, VOF (via ) Mike Hallock-Solomon, VOF (via ) Page 3 of 4

4 Richmond Office 600 E. Main Street, Suite 402, Richmond, VA Page 4 of 4

5 VIA Ms. Charlotte McAfee Senior Counsel, Law Department Dominion Resources Services, Inc. 120 Tredegar Street, Riverside 2 Richmond, VA July 21, 2016 RE: Dominion s Remington-Gordonsville Electric Transmission Project Dear Ms. McAfee: We appreciate the meeting on July 20, 2016 where you and the other Dominion Electric Transmission staff provided us with an overview of the current status of the Remington-Gordonsville Electric Transmission Project. VOF previously provided comments on the proposed project to build steel pole monopole designed structures at an average height of 103 feet. Our comments in our letter filed during the Environmental Impact review on December 17, 2015 outlined VOF s concerns regarding the potential impacts to VOF open space lands and their viewsheds. We had asked that you consider modifications to siting, location, materials and height in the design of the transmission line to minimize impacts to the public values protected by open space properties. At our meeting on July 20, 2016, you stated that in response to community and agency concerns, Dominion filed rebuttal testimony with the SCC on July 12, 2016 to provide some flexibility in the height of the proposed structures. In your rebuttal testimony, you are offering to construct double circuit H-frame structures made of COR-TEN weathering steel with an average height of approximately 85 feet and within a right of way of 140 feet if certain conditions can be met. These conditions include (1) consent by all affected property owners, (2) agency consent where applicable (including VOF), (3) grant of easements for the 40 feet beyond the 100 feet needed for the proposed Project without additional compensation from the company, and (4) uninterrupted line distance of approximately three miles. In addition, we understand that there are several VOF open space easements where the existing right of way is 70 feet, and that in order to maintain a one-for-one replacement of structures, Dominion would require a 100 foot right of way. To accommodate the shorter towers, new right of way on VOF easements for the properties with an existing 70 foot right of way would be a total of an additional 70 feet. For the properties that currently have a 100 foot right of way, the additional right of way would be 40 feet. You have stated that there will be no structures or improvements in the additional right of way, but there may be some vegetation clearing. We appreciate the opportunity to consider the proposed changes identified in Dominion s rebuttal testimony and Dominion s efforts to be responsive to concerns of the landowners and the Central Region 1010 Harris Street, Suite 6, Charlottesville, VA Page 1 of 2

6 agencies. VOF is willing to consider requests from landowners for additional right of way and an encroachment into the VOF easement for the shorter towers if VOF can determine that the conservation values of the properties will not be adversely impacted. As Mr. McGuire mentioned at the meeting yesterday, there is precedent for this action by the VOF Board in a previous request. I am attaching the resolution adopted by the Board of Trustees on October 7, 2008, where the Board approved additional right of way for the former Pearl Property in Rappahannock County (RAP-00721) to accommodate shorter towers in the Meadowbrook-Loudoun transmission line. In addition, the Board granted the authority for staff to determine on a case-by-case basis whether such a grant of additional right of way to Dominion would be permissible under easements for other landowners that requested the shorter towers. In this current case, staff will similarly evaluate the requests from landowners according to the specific conservation values of each easement in determining the feasibility of additional utility right of way. The staff determination will be transmitted to the Board for final approval. Please also note that Dominion will be required to obtain separate approval from the fee owner of each subject property. We look forward to working with you on coordinating with landowners to determine if the shorter H-frame towers can be an option for the VOF easement landowners along the transmission line route. If you have any further questions or comments, please feel free to contact me at (804) or mlittle@vofonline.org. Sincerely, Martha Little Deputy Director, VOF encl: VOF Board of Trustees Resolution cc: Brett Glymph, VOF (via ) Greg Baka, Dominion (via ) Bobby McGuire, Dominion (via ) Rusty Meadows, Dominion (via ) Elizabeth Tune, VDHR (via ) Richmond Office Main Street Centre, 600 E. Main St., Suite 402, Richmond, VA Page 2 of 2

Cunningham-Dooms 500 kv Rebuild

Cunningham-Dooms 500 kv Rebuild Project Updates - III.d Cunningham-Dooms 500 kv Rebuild 1 of 19 Project Updates - III.d.i virginiaoutdoorsfoundation.org Memorandum To: VOF Committee on Energy and Infrastructure From: Brian Fuller Date:

More information

Recommendation to Approve Dominion Virginia Power s Request for an Easement along Route 606 at Washington Dulles International Airport.

Recommendation to Approve Dominion Virginia Power s Request for an Easement along Route 606 at Washington Dulles International Airport. REPORT TO THE STRATEGIC DEVELOPMENT COMMITTEE Recommendation to Approve Dominion Virginia Power s Request for an Easement along Route 606 at Washington Dulles International Airport June 2017 Requested

More information

Please review the Draft PTF Grant Manual with the above background information in mind. AGC

Please review the Draft PTF Grant Manual with the above background information in mind. AGC Board of Trustees Anna G. Chisholm, PTF Program Administrator 3.15.2017 Proposed Updates to the PTF Grant Manual The PTF Grant Manual was last updated in 2006 and many details of the easement process have

More information

OPEN-SPACE CONVERSION REQUEST

OPEN-SPACE CONVERSION REQUEST OPEN-SPACE CONVERSION REQUEST Applicant: Board Meeting: February 9, 2017 Landowner: Normandy Capital, LLC VOF Easement: BAT-03678 Table of Contents: Cover Page 1 Table of Contents 2 Application Overview

More information

MINUTES VIRGINIA OUTDOORS FOUNDATION (VOF) BOARD OF TRUSTEES MEETING March 24, 2016

MINUTES VIRGINIA OUTDOORS FOUNDATION (VOF) BOARD OF TRUSTEES MEETING March 24, 2016 MINUTES VIRGINIA OUTDOORS FOUNDATION (VOF) BOARD OF TRUSTEES MEETING March 24, 2016 Attendees: Board of Trustees Ms. Stephanie Ridder, Chair Mr. Childs Burden Ms. Elizabeth Obenshain Mr. John Richardson

More information

Commitment for Title Insurance

Commitment for Title Insurance Commitment for Title Insurance Schedule A Issued by Fidelity National Title Insurance Company Fidelity National Title Insurance Company 310 First Street, Suite 1210 Roanoke, VA 24011 Phone: 540-982-2121

More information

Right-of-Way and Easements for Electric Facility Construction

Right-of-Way and Easements for Electric Facility Construction Right-of-Way and Easements for Electric Facility Construction The Public Service Commission of Wisconsin (PSC) offers this overview to landowners who must negotiate easement contracts with utilities for

More information

F R E QUENTLY AS K E D QUESTIONS

F R E QUENTLY AS K E D QUESTIONS F R E QUENTLY AS K E D QUESTIONS Mountain Home Substation and 138-kV Transmission Line Project Gillespie, Kerr and Kimble counties PROJECT OVERVIEW 1. What is the Mountain Home Substation and 138-kV Transmission

More information

People, Property and Power Lines. Frequently asked questions about power lines on or near your property

People, Property and Power Lines. Frequently asked questions about power lines on or near your property People, Property and Power Lines Frequently asked questions about power lines on or near your property Great River Energy is a not-for-profit wholesale electric power cooperative which provides electricity

More information

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES EXHIBIT JC-7 BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PETITION OF JERSEY CENTRAL POWER & LIGHT COMPANY PURSUANT TO N.J.S.A. 0:55D-19 FOR A DETERMINATION THAT THE OCEANVIEW 30

More information

Elizabeth Augustina Kraehling INTERROGATORY #1 List 1

Elizabeth Augustina Kraehling INTERROGATORY #1 List 1 Filed: October, 0 EB-0-00 Tab Schedule 0 Elizabeth Augustina Kraehling INTERROGATORY # List Does the Applicant acknowledge that it made an offer to acquire an easement interest over Part of Lot and, Concession

More information

West Whiteland Township Historical Commission Agenda March 13, 2017

West Whiteland Township Historical Commission Agenda March 13, 2017 West Whiteland Township Historical Commission Agenda March 13, 2017 6:30 P.M. WORK SESSION CANCELLED THIS MONTH 7 P.M. Business Meeting I. Call to Order II. III. Public Comment Old Business There is no

More information

TERRA. Forest CORE Fund Project Application. Applicant Information Applicant Partner Organization Contact Person

TERRA. Forest CORE Fund Project Application. Applicant Information Applicant Partner Organization Contact Person TERRA Forest CORE Fund Project Application Applicant Information Applicant Partner Organization Contact Person Phone Number Address Type of Applicant/ Partner Organization Title Email Address Federal State

More information

Before the Office of Administrative Hearings. For the. Minnesota Public Utility Commission

Before the Office of Administrative Hearings. For the. Minnesota Public Utility Commission Mr. Michael Harris Mr. Paul Norgren EXHIBIT Before the Office of Administrative Hearings For the Minnesota Public Utility Commission In the Matter of the Application of Enbridge Pipelines (Southern Lights)

More information

Conservation Easement Stewardship

Conservation Easement Stewardship Conservation Easements are effective tools to preserve significant natural, historical or cultural resources. Conservation Easement Stewardship Level of Service Standards March 2013 The mission of the

More information

THE CITY OF MOBILE, ALABAMA MOBILE CITY PLANNING COMMISSION. LETTER OF DECISION March 20, 2018

THE CITY OF MOBILE, ALABAMA MOBILE CITY PLANNING COMMISSION. LETTER OF DECISION March 20, 2018 P. 0. Box 4087 Re: 255, 257, 259 and 265 Dogwood Drive SUB-000402-2018 (Subdivision) Dogwood Airport Subdivision Dear Applicant(s): At its meeting on March 1, 2018, the Planning Commission considered the

More information

PLANNING COMMISSION STAFF REPORT. Merrimac PLNSUB Planned Development 38 West Merrimac November 9, Request. Staff Recommendation

PLANNING COMMISSION STAFF REPORT. Merrimac PLNSUB Planned Development 38 West Merrimac November 9, Request. Staff Recommendation PLANNING COMMISSION STAFF REPORT Merrimac PLNSUB2011-00374 Planned Development 38 West Merrimac November 9, 2011 Planning and Zoning Division Department of Community and Economic Development Applicant:

More information

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE INFORMATION ITEM. Conservation Easement Stewardship Program

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE INFORMATION ITEM. Conservation Easement Stewardship Program BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE INFORMATION ITEM Date of Meeting: April 17, 2015 # 2 SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Conservation Easement Stewardship

More information

MONTEREY COUNTY PLANNING COMMISSION

MONTEREY COUNTY PLANNING COMMISSION MONTEREY COUNTY PLANNING COMMISSION Meeting: June 11, 2003 @ 9:30 AM Agenda Item: D2 Project Description: Use Permit (Associated Tagline/Sprint #PLN000669) for the construction of a 50 Ft. monopole with

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario EB-2013-0040 EB-2013-0041 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); AND IN THE MATTER OF an application

More information

Working Together to Conserve Land

Working Together to Conserve Land Working Together to Conserve Land A Resource for Landowners Protecting land for future generations About Loon Echo was formed as a 501(c)(3)nonprofit organization in 1987 to preserve land in the northern

More information

[Landowner name and address] Notification of Public Informational Meeting Re: [Insert Tax ID] Dear [Title] [Landowner],

[Landowner name and address] Notification of Public Informational Meeting Re: [Insert Tax ID] Dear [Title] [Landowner], [Landowner name and address] Notification of Public Informational Meeting Re: [Insert Tax ID] Dear [Title] [Landowner], We are writing to inform you about an important clean energy project in your area

More information

VII CHARLOTTESVILLE. VII Demolition & Moving. Demolition & Moving ARCHITECTURAL DESIGN CONTROL DISTRICTS DESIGN GUIDELINES

VII CHARLOTTESVILLE. VII Demolition & Moving. Demolition & Moving ARCHITECTURAL DESIGN CONTROL DISTRICTS DESIGN GUIDELINES Demolition & Moving CHARLOTTESVILLE ARCHITECTURAL DESIGN CONTROL DISTRICTS DESIGN GUIDELINES Approved by City Council, September 17, 2012 Demolition & Moving A. B. C. Introduction...5 Demolition of Historic

More information

BOARD OF SUPERVISORS PUBLIC HEARING

BOARD OF SUPERVISORS PUBLIC HEARING Date of Hearing: July 13, 2016 BOARD OF SUPERVISORS PUBLIC HEARING # 2 SUBJECT: Grant of Temporary Easements to Dominion Transmission, Inc. (Natural Gas), Over and Across County Property (Stone Ridge Proffered

More information

SIGNATURE STATION RETAIL DEVELOPMENT

SIGNATURE STATION RETAIL DEVELOPMENT OFFERING BROCHURE RETAIL DEVELOPMENT GERMANNA HIGHWAY / SOMERSET RIDGE ROAD LOCUST GROVE, VA 28.15 ACRES PARCEL 00400000000030 SOMERSET RIDGE RD WALMART SUPER CENTER GERMANNA HIGHWAY MATT SUMMERS 434 284

More information

LOUDOUN COUNTY BOARD OF SUPERVISORS PUBLIC HEARING. Wednesday, May 10, :00 p.m. Board Room, First Floor, Government Center AGENDA SUMMARY

LOUDOUN COUNTY BOARD OF SUPERVISORS PUBLIC HEARING. Wednesday, May 10, :00 p.m. Board Room, First Floor, Government Center AGENDA SUMMARY LOUDOUN COUNTY BOARD OF SUPERVISORS PUBLIC HEARING Wednesday, 6:00 p.m. Board Room, First Floor, Government Center I. CALL TO ORDER AGENDA SUMMARY II. BOARD OF SUPERVISORS PUBLIC HEARING ITEMS FOR CONSIDERATION:

More information

GRANT OF TRAIL ACCESS EASEMENT, COVENANTS AND RESTRICTIONS

GRANT OF TRAIL ACCESS EASEMENT, COVENANTS AND RESTRICTIONS This is a sample easement provided for discussion and illustrative purposes only. Easements for each property will be customized based upon the needs of each landowner and the Path. GRANT OF TRAIL ACCESS

More information

MINUTES VIRGINIA OUTDOORS FOUNDATION (VOF) BOARD OF TRUSTEES ENERGY & INFRASTRUCTURE COMMITTEE MEETING March 24, 2016

MINUTES VIRGINIA OUTDOORS FOUNDATION (VOF) BOARD OF TRUSTEES ENERGY & INFRASTRUCTURE COMMITTEE MEETING March 24, 2016 MINUTES VIRGINIA OUTDOORS FOUNDATION (VOF) BOARD OF TRUSTEES ENERGY & INFRASTRUCTURE COMMITTEE MEETING March 24, 2016 Attendees: Trustees Tom Slater, Committee Chair Childs Burden Steph Ridder John Richardson

More information

FINAL ACTIONS Planning Commission Meeting of June 4, 2013

FINAL ACTIONS Planning Commission Meeting of June 4, 2013 FINAL ACTIONS Meeting of June 4, 2013 AGENDA ITEM/ACTION FOLLOW-UP ACTION 1. Call to Order. Meeting was called to order at 6:00 p.m. by Mr. Morris, Chair. PC members present were Mr. Morris, Mr. Dotson,

More information

MINUTES VIRGINIA OUTDOORS FOUNDATION (VOF) BOARD OF TRUSTEES MEETING JOHN BARTON PAYNE BUILDING WARRENTON, VA June 25, :00 am

MINUTES VIRGINIA OUTDOORS FOUNDATION (VOF) BOARD OF TRUSTEES MEETING JOHN BARTON PAYNE BUILDING WARRENTON, VA June 25, :00 am MINUTES VIRGINIA OUTDOORS FOUNDATION (VOF) BOARD OF TRUSTEES MEETING JOHN BARTON PAYNE BUILDING WARRENTON, VA June 25, 2015 10:00 am Attendees: Board of Trustees Stephanie Ridder, Chair Childs Burden Brent

More information

April 6, Nathaniel J. Davis, Sr., Deputy Secretary Federal Energy Regulatory Commission 888 First St. NE, Room 1A Washington, DC 20426

April 6, Nathaniel J. Davis, Sr., Deputy Secretary Federal Energy Regulatory Commission 888 First St. NE, Room 1A Washington, DC 20426 April 6, 2017 Nathaniel J. Davis, Sr., Deputy Secretary Federal Energy Regulatory Commission 888 First St. NE, Room 1A Washington, DC 20426 Re: Atlantic Coast Pipeline Comments on Draft Environmental Impact

More information

Chapter XX Purchase of Development Rights Program

Chapter XX Purchase of Development Rights Program Chapter XX Purchase of Development Rights Program Short Title. This ordinance is to be known and may be cited as the Purchase of Development Rights ( PDR ) Program. Purpose Pursuant to the authority granted

More information

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist Prior to filing any application for SUBDIVISION approval, the applicant shall request in writing that the zoning administrator schedule a pre-submission conference. APPLICATION TO THE PLANNING BOARD TOWN

More information

ALBEMARLE COUNTY PLANNING STAFF REPORT SUMMARY

ALBEMARLE COUNTY PLANNING STAFF REPORT SUMMARY ALBEMARLE COUNTY PLANNING STAFF REPORT SUMMARY Project Name: SDP2010-94 Hillsdale Farm/Cosner Property (AT&T CV427 Tier II) - Final Planning Commission Public Hearing: March 1, 2011 Owners: Kimco, LC Acreage:

More information

DOUGLAS COUNTY ZONING RESOLUTION Section 4 LRR - Large Rural Residential District 3/10/99. -Section Contents-

DOUGLAS COUNTY ZONING RESOLUTION Section 4 LRR - Large Rural Residential District 3/10/99. -Section Contents- SECTION 4 LRR LARGE RURAL RESIDENTIAL DISTRICT -Section Contents- 401 Intent... 4-2 402 Principal Uses... 4-2 403 Accessory Uses... 4-3 404 Uses Permitted by Special Review... 4-4 405 Land Dedication...

More information

TOWN OF RUTLAND Ordinance No. 12.5

TOWN OF RUTLAND Ordinance No. 12.5 TOWN OF RUTLAND Ordinance No. 12.5 AN ORDINANCE RELATING TO CHANGES TO ZONING DISTRICT BOUNDARIES AND CONDITIONAL USE PERMITS REQUESTED TO ALLOW THE CONSTRUCTION AND OPERATION OF COMMUNICATION TOWERS The

More information

Central Pennsylvania Conservancy Project Selection Criteria Form

Central Pennsylvania Conservancy Project Selection Criteria Form Central Pennsylvania Conservancy Project Selection Criteria Form The following criteria guide the actions of the Central Pennsylvania Conservancy s Land Protection Committee and Board of Directors in selecting

More information

The Ironwood proclamation includes the same language and similar language is provided in the Military Lands Withdrawal Act of 1999, which states:

The Ironwood proclamation includes the same language and similar language is provided in the Military Lands Withdrawal Act of 1999, which states: Federal land withdrawals are only applicable to federal lands or interests in land and do not have jurisdiction over private or state properties including inholdings. Consider this excerpt from the Sonoan

More information

) ) ) ) ) ) (Issued September )

) ) ) ) ) ) (Issued September ) BEFORE THE PUBLIC SERVICE COMMISSION OF WYOMING IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT THE ARROWHEAD SUBSTATION AND

More information

Next Generation Stewardship: Ensuring the Long-term Viability of Conservation Easements

Next Generation Stewardship: Ensuring the Long-term Viability of Conservation Easements N Next Generation Stewardship: Ensuring the Long-term Viability of Conservation Easements The Big Question How do we preserve conservation purposes in a changing world? Keys to Long-Term Viability of Easements

More information

Audit and Finance Committee Recommended Amendment to Fee Schedule

Audit and Finance Committee Recommended Amendment to Fee Schedule To: From: Re: Date: Virginia Outdoors Foundation Board of Trustees Brett Glymph Audit and Finance Committee Recommended Amendment to Fee Schedule June 10, 2015 Recommendation: To sustain current operations,

More information

ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED FEBRUARY 1, 2018

ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED FEBRUARY 1, 2018 ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED FEBRUARY, 0 Sponsored by: Assemblyman WAYNE P. DEANGELO District (Mercer and Middlesex) SYNOPSIS Permits construction of electric transmission

More information

Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018.

Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018. Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018. No changes were made at the 1st Public Hearing. Proposed wording for the 1 st Public Hearing in red, eliminated text in

More information

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed.

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed. Ordinance #68 AN ORDINANCE ENTITLED, AN ORDINANCE AMENDING ARTICLE II DEFINITIONS AND CHAPTER 5.22 (WIND ENERGY SYSTEMS) OF ARTICLE V GENERAL REQUIREMENTS OF ORDINANCE 65 AN ORDINANCE AMENDING ORDINANCE

More information

Wind Energy Easements

Wind Energy Easements Wind Energy Easements Prepared by Robert R. Nardi Willeke & Daniels 210 Ridgewood Avenue Minneapolis, MN 55403 (612) 870-4000 Presented by John H. Daniels, Jr. Willeke & Daniels 210 Ridgewood Avenue Minneapolis,

More information

EB Hydro One Networks' Section 99 Bruce to Milton Transmission Reinforcement project Application Filing

EB Hydro One Networks' Section 99 Bruce to Milton Transmission Reinforcement project Application Filing Hydro One Networks Inc. th Floor, South Tower Bay Street Toronto, Ontario MG P www.hydroone.com Tel: () -00 Fax: () -0 Cell: () - Susan.E.Frank@HydroOne.com Susan Frank Vice President and Chief Regulatory

More information

Stewardship Division Report September 2016

Stewardship Division Report September 2016 Stewardship Division Report September 2016 This report provides an overview of Stewardship Services provided to the Commonwealth during the initial three quarters of 2016. It concludes with an outlook

More information

IRS FORM 8283 SUPPLEMENTAL STATEMENT DONATION OF CONSERVATION EASEMENT

IRS FORM 8283 SUPPLEMENTAL STATEMENT DONATION OF CONSERVATION EASEMENT Name(s) shown on income tax return Identifying Number Robert T. Landowner 021-34-1234 Susan B. Landowner 083-23-5555 IRS FORM 8283 SUPPLEMENTAL STATEMENT DONATION OF CONSERVATION EASEMENT On November 12,

More information

gary b. coursey & associates architects inc. a.i.a. architecture interior design planning RE: CC: Attiva Malone 5251 Peachtree Boulevard Chamblee, Georgia 30071 Akash Gaur, Cortland Partners Gary Coursey,

More information

RE: Applicant s Report for a Community Unit Plan Amendment at 2100 Sheila Lane

RE: Applicant s Report for a Community Unit Plan Amendment at 2100 Sheila Lane M A R K H A M P L A N N I N G August 10, 2018 Mr. Mark Olinger, Director Department of Planning & Development Review 900 East Broad Street, Suite 511 Richmond, VA 23219 Mark.Olinger@richmondgov.com RE:

More information

June Published by the Virginia REALTORS Data recorded July 20,

June Published by the Virginia REALTORS Data recorded July 20, Data recorded July 20, 2018 1 The Virginia REALTORS association publishes monthly and quarterly home sales reports to provide our members, the media, and real estate-related industries with current data

More information

Charlotte LYNX Blue Line Economic Development Impact and Land Use Patterns

Charlotte LYNX Blue Line Economic Development Impact and Land Use Patterns Charlotte LYNX Blue Line Economic Development Impact and Land Use Patterns National Governors Association Policy Academy on Shaping a New Approach to Transportation and Land Use Peter Zeiler Economic Development

More information

Chapter 26. Open-Space and Conservation Easements, Land Use Valuation, and Other Laws Related to the Use of Land

Chapter 26. Open-Space and Conservation Easements, Land Use Valuation, and Other Laws Related to the Use of Land 26-100 Introduction Chapter 26 Open-Space and Conservation Easements, Land Use Valuation, and Other Laws Related to the Use of Land A locality s comprehensive plan, zoning ordinance, and subdivision ordinance

More information

Virginia HOME SALES REPORT JULY Published by the Virginia REALTORS, the advocate for real estate professionals and property owners in Virginia.

Virginia HOME SALES REPORT JULY Published by the Virginia REALTORS, the advocate for real estate professionals and property owners in Virginia. Virginia HOME SALES REPORT JULY Published by the Virginia REALTORS, the advocate for real estate professionals and property owners in Virginia. The Virginia REALTORS association publishes monthly and quarterly

More information

Virginia HOME SALES REPORT MAY Published by the Virginia REALTORS, the advocate for real estate professionals and property owners in Virginia.

Virginia HOME SALES REPORT MAY Published by the Virginia REALTORS, the advocate for real estate professionals and property owners in Virginia. Virginia HOME SALES REPORT MAY 2018 Published by the Virginia REALTORS, the advocate for real estate professionals and property owners in Virginia. The Virginia REALTORS association publishes monthly and

More information

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE 15 - PLANNED UNIT DEVELOPMENT Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned

More information

Virginia AUGUST 2018

Virginia AUGUST 2018 Virginia HOME SALES REPORT AUGUST 2018 Published by the Virginia REALTORS, the advocate for real estate professionals and property owners in Virginia. The Virginia REALTORS association publishes monthly

More information

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. June 3, 2011

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. June 3, 2011 MOBILE CITY PLANNING COMMISSION LETTER OF DECISION P.O. Box 421 Mobile, AL 36601 Re: Case #SUB2011-00029 (Subdivision) Alabama West Subdivision, Unit Four 2600 McVay Drive North (North side of McVay Drive

More information

PLANNING COMMISSION PUBLIC HEARING STAFF REPORT. Steve Barney, Project Manager, Planning & Zoning Ricky Barker, AICP, Director, Planning & Zoning

PLANNING COMMISSION PUBLIC HEARING STAFF REPORT. Steve Barney, Project Manager, Planning & Zoning Ricky Barker, AICP, Director, Planning & Zoning Date of Hearing: PLANNING COMMISSION PUBLIC HEARING STAFF REPORT SUBJECT: ELECTION DISTRICT: ZRTD-2016-0001, Davis Drive Substation CMPT-2016-0003, Davis Drive Substation SPMI-2016-0015, Davis Drive Substation

More information

FACT SHEET: Tenure requirements for Major Customer Connections

FACT SHEET: Tenure requirements for Major Customer Connections FACT SHEET: for Major Customer Connections Purpose February 2014 Version 1.0 This fact sheet describes the types of underlying land tenure required by Ergon Energy in situations where a Major Customer

More information

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item CONDITIONAL USE PERMIT FOR VERIZON WIRELESS; 1287 E 1200 RD (SLD)

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item CONDITIONAL USE PERMIT FOR VERIZON WIRELESS; 1287 E 1200 RD (SLD) PC Staff Report 9/26/2016 CUP-16-00312 Item No. 5-1 PC Staff Report 9/26/2016 ITEM NO. 5 PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item CONDITIONAL USE PERMIT FOR VERIZON WIRELESS; 1287

More information

John Machado et al (PLN040304)

John Machado et al (PLN040304) PLANNING COMMISSION COUNTY OF MONTEREY, STATE OF CALIFORNIA RESOLUTION NO. 04051 A.P. # 207-022-017-000 In the matter the application John Machado et al (PLN040304) FINDINGS & DECISION for a Use in accordance

More information

Wind Energy Conversion System Ordinance No. 467

Wind Energy Conversion System Ordinance No. 467 Wind Energy Conversion System Ordinance No. 467 AN ORDINANCE ESTABLISHING A PERMITTING PROCESS FOR WIND ENERGY CONVERSION SYSTEMS ADOPTED BY THE Big Timber City Council on this day of, 2006. ADOPTED BY

More information

Belcher 1 USING THE EASEMENT ASSIGNMENT PROCESS FOR EFFICIENT UTILITY RELOCATION OF A LOCALLY ADMINISTERED PROJECT

Belcher 1 USING THE EASEMENT ASSIGNMENT PROCESS FOR EFFICIENT UTILITY RELOCATION OF A LOCALLY ADMINISTERED PROJECT Belcher 0 USING THE EASEMENT ASSIGNMENT PROCESS FOR EFFICIENT UTILITY RELOCATION OF A LOCALLY ADMINISTERED PROJECT Paper No. -0 Submitted to the Transportation Research Board for presentation at the st

More information

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF PUBLIC UTILITIES D.P.U. 09-

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF PUBLIC UTILITIES D.P.U. 09- COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF PUBLIC UTILITIES D.P.U. 09- PETITION OF WESTERN MASSACHUSETTS ELECTRIC COMPANY FOR EXEMPTIONS FROM THE ZONING ORDINANCES OF THE TOWNS OF AGAWAM AND WEST SPRINGFIELD

More information

100% Leased, Best-In-Class Retail Strip Center Opportunity PANTOPS PLAZA 2040 ABBEY ROAD CHARLOTTESVILLE, VA

100% Leased, Best-In-Class Retail Strip Center Opportunity PANTOPS PLAZA 2040 ABBEY ROAD CHARLOTTESVILLE, VA 100% Leased, Best-In-Class Retail Strip Center Opportunity PANTOPS PLAZA 2040 ABBEY ROAD CHARLOTTESVILLE, VA EXECUTIVE SUMMARY The Offering Cushman & Wakefield Thalhimer is pleased to exclusively offer

More information

Silver Line Acceptance

Silver Line Acceptance Finance & Administration Committee Action Item III-A June 12, 2014 Silver Line Acceptance Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Tools for Conservation: Land Trusts & Easements

Tools for Conservation: Land Trusts & Easements Tools for Conservation: Land Trusts & s CSS 235 Dr. Ed Krumpe 2 4 Basic Ways to Protect Land Acquisition the only permanent solution? Regulation Protect sensitive areas Control development patterns Address

More information

LEGISLATIVE PURPOSES. 2. Provide sources of agricultural products within the state for the citizens of the state

LEGISLATIVE PURPOSES. 2. Provide sources of agricultural products within the state for the citizens of the state LEGISLATIVE PURPOSES 1. Assist in sustaining the farming community 2. Provide sources of agricultural products within the state for the citizens of the state 3. Control the urban expansion which is consuming

More information

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes 1 Local Area Plan - Project Alignment Overview Directions Report, October 2008 (General Summary Of Selected

More information

EXHIBIT D ESCROW AGREEMENT

EXHIBIT D ESCROW AGREEMENT EXHIBIT D ESCROW AGREEMENT This ESCROW AGREEMENT ( Escrow Agreement ) is made and entered into as of December 5, 2011 by and among the VIRGINIA DEPARTMENT OF TRANSPORTATION (the Department ), an agency

More information

BOARD OF SUPERVISORS PUBLIC HEARING AGENDA SUMMARY Board Room, First Floor, Government Center Wednesday, September 13, :00 P.M.

BOARD OF SUPERVISORS PUBLIC HEARING AGENDA SUMMARY Board Room, First Floor, Government Center Wednesday, September 13, :00 P.M. Loudoun County, Virginia Board of Supervisors 1 Harrison Street, S.E., 5th Floor, P.O. Box 7000, Leesburg, VA 20177-7000 Telephone (703) 777-0204 Fax (703) 777-0421 www.loudoun.gov BOARD OF SUPERVISORS

More information

MEMORANDUM OF AGREEMENT AMONG VIRGINIA ELECTRIC AND POWER COMPANY, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, U.S

MEMORANDUM OF AGREEMENT AMONG VIRGINIA ELECTRIC AND POWER COMPANY, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, U.S MEMORANDUM OF AGREEMENT AMONG VIRGINIA ELECTRIC AND POWER COMPANY, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, U.S. ARMY CORPS OF ENGINEERS NORFOLK DISTRICT, AND THE ADVISORY COUNCIL ON HISTORIC PRESERVATION

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LETTER OF DECISION March 9, 2018 Byrd Surveying, Inc. 2609 Halls Mill Road Mobile, AL 36606 Re: 4439 Rangeline Road (Northwest corner of Rangeline Road and Halls Mill Road).

More information

A Guide for Property Owners and Tenants

A Guide for Property Owners and Tenants A Guide for Property Owners and Tenants Contents 1 Introduction 2-4 Important Terms Used In This Brochure 5 Public Involvement 6-7 Property Appraisal 7 Just Compensation 8 Exceptions to the Appraisal

More information

Chapter SWAINSON S HAWK IMPACT MITIGATION FEES

Chapter SWAINSON S HAWK IMPACT MITIGATION FEES The Swainson s Hawk ordinance can also be viewed online at: http://qcode.us/codes/sacramentocounty/ Once at the website, click on Title 16 BUILDINGS AND CONSTRUCTION, then Chapter 16.130 SWAINSON S HAWK

More information

ARTICLE FIVE FINAL DRAFT

ARTICLE FIVE FINAL DRAFT ARTICLE FIVE 021218 FINAL DRAFT Sec. 503.6 Open Space Preservation Option Open Space Preservation Option Open Space Preservation developments may be approved in the AR, R-1, R-2 and R-3 zoning districts,

More information

DEED OF EASEMENT & MAINTENANCE AGREEMENT FOR STORMWATER MANAGEMENT FACILITIES THIS DEED OF EASEMENT AND MAINTENANCE AGREEMENT FOR

DEED OF EASEMENT & MAINTENANCE AGREEMENT FOR STORMWATER MANAGEMENT FACILITIES THIS DEED OF EASEMENT AND MAINTENANCE AGREEMENT FOR (The City of Chesapeake is exempt from recordation taxes pursuant to Section 58.1-811.A.3. and Grantors are exempt pursuant to Section 58.1-811.C.5. of the 1950 Code of Virginia as amended.) DEED OF EASEMENT

More information

MODEL CONSERVATION RESTRICTION AMENDMENT POLICY GUIDELINES Massachusetts Easement Defense Subcommittee March 6, 2007 PREAMBLE

MODEL CONSERVATION RESTRICTION AMENDMENT POLICY GUIDELINES Massachusetts Easement Defense Subcommittee March 6, 2007 PREAMBLE MODEL CONSERVATION RESTRICTION AMENDMENT POLICY GUIDELINES Massachusetts Easement Defense Subcommittee March 6, 2007 PREAMBLE Because conservation restrictions are an important tool for permanently protecting

More information

C o u n t y o f F a i r f a x, V i r g i n i a

C o u n t y o f F a i r f a x, V i r g i n i a C o u n t y o f F a i r f a x, V i r g i n i a To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County Reston Association Board of Directors C/O

More information

Introduction. Wireless Facilities in the Right of Way(ROW)

Introduction. Wireless Facilities in the Right of Way(ROW) Introduction Wireless Facilities in the Right of Way(ROW) Granting Access to the ROW Statutory Basics Edward Purcell, Esq. Tel. (908) 757-7800 epurcell@newjerseylaw.net Overview of What We ll Cover What

More information

A Guide for Property Owners and Tenants

A Guide for Property Owners and Tenants A Guide for Property Owners and Tenants Contents 1 Introduction 2-4 Important Terms Used In This Brochure 5 Public Involvement 6-7 Property Appraisal 7 Just Compensation 8 Exceptions to the Appraisal

More information

A. Preserve natural resources as identified in the Comprehensive Plan.

A. Preserve natural resources as identified in the Comprehensive Plan. 1370.08 Conservation Residential Overlay District. Subd. 1 Findings. The City finds that the lands and resources within the Conservation Residential Overlay District are a unique and valuable resource

More information

COUNTY OF ALBEMARLE APPLICATION FOR FAMILY DIVISION. Family Division = $742 (Provide 5 copies of plat)

COUNTY OF ALBEMARLE APPLICATION FOR FAMILY DIVISION. Family Division = $742 (Provide 5 copies of plat) Page 1 APPLICATION FOR FAMILY DIVISION Family Division = $742 (Provide 5 copies of plat) Tier 2 Groundwater Review = $355 (Required for all plats showing lots less than 21 acres) Tier 3 Groundwater Review

More information

TRUSTEE RESPONSIBILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING

TRUSTEE RESPONSIBILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING TRUSTEE RESPONSIBILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING CHAPTER 468 OF THE CODE OF IOWA Drainage Districts are governed under this chapter of the Code of Iowa. PETITION Triggers

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of February 22, 2014 DATE: January 28, 2014 SUBJECT: Deed of Easement for a Department of Environmental Services Project Located on a Portion

More information

Philip Garber, Chief Gas Engineer. Release of Portion of Gas Line Easement in Lochlyn Hills Subdivision

Philip Garber, Chief Gas Engineer. Release of Portion of Gas Line Easement in Lochlyn Hills Subdivision CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: September 15, 2014 Action Required: Presenter: Staff Contacts: Title: Approval of Ordinance (1 st reading) after Public Hearing Lauren

More information

Memorandum of Understanding between County Board of Arlington County, Virginia and The Northern Virginia Conservation Trust

Memorandum of Understanding between County Board of Arlington County, Virginia and The Northern Virginia Conservation Trust Memorandum of Understanding between County Board of Arlington County, Virginia and The Northern Virginia Conservation Trust In consideration of the County Board of Arlington County (the County ) having

More information

Walworth County Farmland Preservation Plan Update, Chapter 1 Plan Summary (Cover Document)

Walworth County Farmland Preservation Plan Update, Chapter 1 Plan Summary (Cover Document) Background Walworth County Farmland Preservation Plan Update, 2012 Chapter 1 Plan Summary (Cover Document) For over 30-years, the Wisconsin Farmland Preservation Program has served to preserve Walworth

More information

Land Use. Land Use Categories. Chart 5.1. Nepeuskun Existing Land Use Inventory. Overview

Land Use. Land Use Categories. Chart 5.1. Nepeuskun Existing Land Use Inventory. Overview Land Use State Comprehensive Planning Requirements for this Chapter A compilation of objectives, policies, goals, maps and programs to guide the future development and redevelopment of public and private

More information

XIV. County of Hanover. Board Meeting: May 11, 2016

XIV. County of Hanover. Board Meeting: May 11, 2016 XIV. Agenda Item County of Hanover Board Meeting: May 11, 2016 Subject: Public Hearing Department of Public Works Conveyance of Signal Easement to Virginia Department of Transportation Fleet Services Facility

More information

THE 2006 VIRGINIA ASSESSMENT/SALES RATIO STUDY

THE 2006 VIRGINIA ASSESSMENT/SALES RATIO STUDY THE 2006 VIRGINIA ASSESSMENT/SALES RATIO STUDY Virginia Department of Taxation P.O. Box 2460 Richmond, Virginia 23218-2460 February 2008 Table of Contents Page Introduction 2 Results of the Study 3 Figure

More information

60. ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 14, DATE: July 13, 2018

60. ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 14, DATE: July 13, 2018 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 14, 2018 DATE: July 13, 2018 SUBJECT: Request to authorize advertisement of public hearings by the Planning Commission and County Board

More information

Subject: Addendum No. 2 Request for Expressions of Interest (RFEI) for Development of Brooklyn College School of Business.

Subject: Addendum No. 2 Request for Expressions of Interest (RFEI) for Development of Brooklyn College School of Business. Subject: Addendum No. 2 Request for Expressions of Interest (RFEI) for Development of Brooklyn College School of Business. Date: August 9, 2018 Facilities Planning, Construction, and Management Office

More information

protect your place Guide to Understanding Conservation Easements

protect your place Guide to Understanding Conservation Easements protect your place Guide to Understanding Conservation Easements To the Landowner Founded in 1990, the Teton Regional Land Trust is a community-based non-profit conservation organization that works to

More information

RYE CONSERVATION COMMISSION TRAIL MANAGEMENT SUBCOMMITTEE Monday, April 25, :00 p.m. Rye Town Hall

RYE CONSERVATION COMMISSION TRAIL MANAGEMENT SUBCOMMITTEE Monday, April 25, :00 p.m. Rye Town Hall RYE CONSERVATION COMMISSION TRAIL MANAGEMENT SUBCOMMITTEE Monday, April 25, 2016 4:00 p.m. Rye Town Hall Members Present: Chairman Mike Garvan, Susan Shepcaro, Shawn Joyce and Ritchie White I. CALL TO

More information

APPRAISAL INSTITUTE SPEECH

APPRAISAL INSTITUTE SPEECH APPRAISAL INSTITUTE SPEECH Introduction Changing Technology Creates Other Change Telegraph Telephone Fiber Optic Come a Long Way Since First Condemnation [Story on First Condemnation] Two Topics 1) Resale

More information

THE CORPORATION OF THE TOWNSHIP OF KING THE CERTIFICATE PAGE FOR AMENDMENT NO. 89 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF KING

THE CORPORATION OF THE TOWNSHIP OF KING THE CERTIFICATE PAGE FOR AMENDMENT NO. 89 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF KING THE CORPORATION OF THE TOWNSHIP OF KING THE CERTIFICATE PAGE FOR AMENDMENT NO. 89 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF KING (KING CITY COMMUNITY PLAN) The attached text and schedules constituting Amendment

More information

MONTEREY COUNTY PLANNING & BUILDING INSPECTION DEPARTMENT st AVENUE MARINA, CA (831) FAX: (831)

MONTEREY COUNTY PLANNING & BUILDING INSPECTION DEPARTMENT st AVENUE MARINA, CA (831) FAX: (831) MONTEREY COUNTY PLANNING & BUILDING INSPECTION DEPARTMENT 2620 1st AVENUE MARINA, CA 93933 (831) 883-7500 FAX: (831)384-3261 MONTEREY COUNTY PLANNING COMMISSION Meeting: September 8, 2004 8:00 a.m. Agenda

More information

ALBEMARLE COUNTY CODE CHAPTER 18. ZONING SECTION 10. RURAL AREAS DISTRICT, RA

ALBEMARLE COUNTY CODE CHAPTER 18. ZONING SECTION 10. RURAL AREAS DISTRICT, RA CHAPTER 18. ZONING SECTION 10. RURAL AREAS DISTRICT, RA Sections: 10.1 Intent, where permitted. 10.2 Permitted uses. 10.2.1 By right. 10.2.2 By special use permit. 10.3 Application of regulations for development