1 Project Updates - III.d Cunningham-Dooms 500 kv Rebuild 1 of 19

2 Project Updates - III.d.i virginiaoutdoorsfoundation.org Memorandum To: VOF Committee on Energy and Infrastructure From: Brian Fuller Date: 05/12/2016 Re: Dominion Virginia Power Transmission Line Upgrade Cunningham to Dooms 03/02/2016 Dominion files the project with SCC (Case No. PUE ) 03/17/2016 VOF receives request for comment on SCC filing from DEQ 03/30/2016 VOF responds to DEQ request for comment, noting the following: o VOF easements on 25 properties within 1.5 miles of the transmission corridor o Of those 25 properties, the line physically crosses 4 properties under easement o VOF is working on 1 new proposal within 1.5 miles of the transmission corridor 04/04/2016 VOF sends a letter to all 4 property owners along the Dominion ROW notifying them of the SCC filing and VOF s response 04/14/ /02/2016 Martha Little responds to DEQ and Dominion about additional questions regarding VOF s comments (see attached correspondence) 04/26/2016 Landowners along the route (David King and Robert Carter) contact Brian Fuller voicing their opposition to the project; Mr. Carter files comments with SCC 2 of 19

3 5/12/2016 Cunningham Dooms 500kV Rebuild Project Updates - III.d.ii Cunningham-Dooms 500kV Rebuild Dominion Virginia Power is committed to meeting our obligation to provide safe and reliable service to its customers. As the demand for electricity has grown steadily, Dominion has continued to replace aging infrastructure across our service territory in particular, we are working to replace high voltage lines built and placed into service in the 1960s. One segment to be rebuilt is an existing corridor located between the Cunningham Substation in Fluvanna County and the Dooms Substation in Augusta County which passes through Albemarle County. No new right of way is needed for Dominion s proposal to rebuild this line. Project Need and Description As the demand for electricity has grown steadily, Dominion has continued to replace aging infrastructure across our service territory in particular, we are working to replace the 500 kilovolt (500kV) highvoltage lines that were placed into service in the 1960s. This line, between the Cunningham and Dooms substations, is nearing the end of its useful life and needs to be replaced with new equipment to meet current standards. Approximate total line length is 33 miles No additional right of way is need for this rebuild Typical structure description The existing 500kV structures average 106 feet tall with a range from 72 feet to 149 feet. The preliminary approximate heights of the proposed towers range from 108 feet to 174 feet with an overall average height of 134 feet over this 32 mile rebuild project. Compared to the existing structures, the increase in average height is 28 feet. View existing and proposed configurations below: Section #1 0.8 mile Preliminary engineering, as of February 8, 2016 Section #2 1.2 miles Preliminary engineering, as of February 8, 2016 Section #3 2 miles Preliminary engineering, as of February 8, 2016 Section # miles Preliminary engineering, as of February 8, 2016 Section #5 9 miles Preliminary engineering, as of 3 of 19 we do/electricity/transmission lines and projects/cunningham dooms 500kv rebuild?print=true 1/5

4 5/12/2016 Cunningham Dooms 500kV Rebuild February 8, 2016 Section #6 0.7 mile Preliminary engineering, as of February 8, 2016 Project Updates - III.d.ii Project Benefits Help strengthen the electrical grid Replace aging infrastructure Ensure reliable electric service for the customers consistent with North American Electric Reliability Corporation reliability standards Additionally, Dominion electric transmission projects provide numerous, positive economic benefits to local communities Replacing infrastructure provides an incremental increase to local property taxes Dominion employees and contractors support local businesses during construction Route Map View a basic map of the route. Project Timeline Late 2015/Early 2016 Public outreach to counties, elected officials and adjacent property owners February 2016 Informational open houses in Crozet, Waynesboro, Charlottesville Early 2016 File application with the State Corporation Commission (SCC) Summer 2017 Secure necessary permits for construction; pending SCC approval, construction scheduled to begin December 2018 Target date to energize the rebuilt transmission line SCC Approval Process The State Corporation Commission (SCC) is responsible for determining the need, route and environmental impact of transmission lines at 138kV and above in Virginia. Dominion filed an application with the SCC on March 2, Links to the two volume application are below: Volume One Volume Two Contact Us 4 of 19 we do/electricity/transmission lines and projects/cunningham dooms 500kv rebuild?print=true 2/5

5 5/12/2016 Cunningham Dooms 500kV Rebuild Contact Us Project Updates - III.d.ii Contact us if you have questions or would like more information about the project. Let us know if you would like to receive project updates via . You may also call us directly at Questions and Answers Expand All Collapse All Will Dominion require additional right of way? No, the proposed transmission line will be constructed within an existing right of way. I ve read the new structures will be, on average, about 28 feet taller. Why are the new towers taller? Aging Cor Ten steel towers will be replaced with new galvanized steel lattice towers. Use of modern materials, compliance with National Electrical Safety Code (NESC) clearance requirements, and application of good utility engineering practices require the new towers to be taller structures. Dominion's Transmission Engineering Group determines structure locations and structure types for high voltage transmission lines based on a wide variety of data and factors including, but not limited to, National Electrical Safety Code (NESC) clearance requirements, terrain, line sag between towers, voltage levels, equipment needs, route design, land use, and natural or manmade obstacles. Given the statutory preference to use existing rights of way to avoid additional costs and environmental impacts, Dominion plans to optimize the use of the existing corridor as already built between the Cunningham and Dooms substations. Will Dominion repair damage due to construction? Yes. Our easement agreements allow us access to private roads of property owners crossed by the right of way. The company, at its expense, will repair any private roads damaged by Dominion or its contractors during construction of the line or during future maintenance. In addition, we will reimburse property owners for crop damage, and repair or replace fences or gates if we damage them. Should I be concerned about Electric and Magnetic Fields? Dominion is sensitive to public concern about possible health effects from exposure to electric and magnetic fields (EMF). Dominion includes data on the levels of both electric and magnetic fields produced by proposed facilities in all applications submitted with the 5 of 19 we do/electricity/transmission lines and projects/cunningham dooms 500kv rebuild?print=true 3/5

6 5/12/2016 Cunningham Dooms 500kV Rebuild SCC. We continually monitor EMF research and speak to our customers and employees regularly to share the latest information available. Project Updates - III.d.ii The Virginia SCC, which regulates the construction and operation of electric transmission lines of 138kV and above, considers EMF in every application. Hearing Examiner s remarks from recent proceedings are below. March 23, 2009 Beaumeade NIVO (Case Number PUE ) Report of Michael D. Thomas, Hearing Examiner concludes that " electric transmission line electromagnetic fields do not represent a human health hazard. May 4, 2010 Hayes Yorktown (Case Number PUE ) Report of Deborah V. Ellenberg, Chief Hearing Examiner, states, I find that EMF has not been identified as a carcinogen for human beings despite extensive study over many years, and there is, therefore, no basis on which to prohibit the Company from authorizing appropriate uses of its right of way. August 23, 2011 Hollymead (Case Number PUE ) Report of Michael D. Thomas, Hearing Examiner, states, The proposed facilities do not represent a hazard to human health, which finding is consistent with the Virginia Department of Health s report entitled Monitoring of Ongoing Research on the Health Effects of High Voltage Transmission Lines (Final Report) dated October 31, May 1, 2015 Brambleton Mosby (Case Number PUE ) Report of Howard P. Anderson, Hearing Examiner, states, Expert panels formed by national and international scientific agencies have evaluated the scientific research related to health and power frequency EMF and provided conclusions that form the basis of guidance to governments and industries. It is the general scientific consensus of the health agencies reviewing this research that at levels associated with the operation of the proposed transmission line, or other common sources of EMF in the environment, the research does not support the conclusion that EMF causes any long term, adverse health effects. The Virginia Department of Health in its final report evaluating EMF research concluded: "Based on the review and analysis of the exhaustive literature review and other research projects completed under the EMF RAPID program, the Virginia Department of Health is of the opinion that there is no conclusive and convincing evidence that exposure to extremely low frequency EMF emanated from nearby high voltage transmission lines is causally associated with an increased incidence of cancer or other detrimental health effects in humans. Even if it is assumed that 6 of 19 we do/electricity/transmission lines and projects/cunningham dooms 500kv rebuild?print=true 4/5

7 5/12/2016 Cunningham Dooms 500kV Rebuild there is an increased risk of cancer as implied in some epidemiologic studies, the empirical relative risk appears to be fairly small in magnitude and the observed association appears to be tenuous. The studies published in the literature lack clear demonstration of a cause and effect relationship as well as a definitive dose response gradient." Project Updates - III.d.ii Additional information: National Institute of Environmental Health Sciences Electrical and Magnetic Fields Virginia Department of Health Final Report on EMF Research View Dominion's latest EMF update. How can I get involved and better understand the transmission line planning and approval process? Dominion welcomes comments and suggestions from property owners and the general public. If you have any questions, send an to powerline@dom.com and let us know if you would like for Dominion to send you project updates or invitations to future opportunities for public participation. Dominion welcomes comments and suggestions from property owners and the general public. If you have any questions, send an to powerline@dom.com and let us know if you would like for Dominion to send you project updates or invitations to future opportunities for public participation. Copyright 2016 Dominion 7 of 19 we do/electricity/transmission lines and projects/cunningham dooms 500kv rebuild?print=true 5/5

8 Galvanized Steel Proposed H Project Updates - III.d.ii Existing G PRELIMINARY ENGINEERING 8 of 19

9 December 22, 2015 VIA Ms. Amanda Mayhew Dominion Virginia Power P.O. Box Richmond, VA RE: Dominion Virginia Power s Proposed Transmission Project Dooms - Cunningham 500kV Line Rebuild Augusta, Albemarle and Fluvanna Counties Dear Ms. Mayhew: The Virginia Outdoors Foundation (VOF) is in receipt of a letter from you dated December 7, 2015, concerning the above-referenced project. VOF, an agency of the Commonwealth, was established by the General Assembly in 1966 to promote the preservation of Virginia s natural and cultural resources by encouraging private philanthropy in fulfillment of state policy. As a result of Virginia s commitment to ensure a vibrant natural environment for today and future generations, VOF owns thousands of acres managed for public access and holds more than 3,600 easements across the Commonwealth, and these easements protect in perpetuity over 750,000 acres of open-space. We thank you for the opportunity to provide additional comments regarding upgrades to the electric transmission corridor running through VOF open-space easements in the aforementioned counties. This project is located in a region of Virginia that contains a high concentration of our open-space easements. In advance of your filing with the SCC, you are requesting VOF s input on the proposed project. VOF understands that the proposed rebuild will occur within the existing ROW, but VOF requests information on the heights and materials of the proposed new towers. While the replacement may occur within the existing ROW, VOF requests additional information on whether there are existing forests or vegetation that will need to cleared, including any clearing outside of the official ROW in the safety fall zone. VOF also requests additional information on whether any of the temporary construction infrastructure (roads, bridges, etc.) will need to occur on open-space easement property. VOF holds open-space easements on 28 properties within 1.5 miles of the transmission line, a majority of which could be visually-impacted by the proposed rebuild and upgrade. Of those 28 virginiaoutdoorsfoundation.org Richmond Office 600 E. Main Street, Suite 402, Richmond, VA of 19 Page 1 of 3

10 properties, the line physically crosses 3 properties under open-space easements within Dominion s existing ROW. Should the proposal require any additional ROW through a VOF easement, Dominion will need complete a utility easement application. Staff will evaluate the request according to the specific conservation values of each easement in determining the feasibility of additional utility right of way, which determination will be transmitted to the board for final approval. Please contact VOF staff to request this application and please note that Dominion is required to obtain separate approval from the fee owner of the subject property. In considering the impact of this proposal on conservation lands, an open-space easement is a legal interest in real property that creates a relationship between the holders of the easement and the property owner. By means of the easement, VOF has an interest in specific conservation values of the property and a legal obligation to protect these values. VOF easements provide important public benefits by protecting in perpetuity significant tracts of mostly undeveloped land which may contribute to the protection of water quality, productive soils, natural heritage resources, historic resources, and scenic viewsheds. VOF easements represent over $1 billion of public investment and fulfillment of Title XI of the Virginia Constitution and other public policies to ensure conservation of natural and cultural resources. These investments in conservation and future conservation opportunities may be jeopardized if large-scale utility development impairs the protected resources and their character-defining setting. Degradation of protected resources may result in a loss of confidence in the effectiveness of conservation easements by the public. As mentioned above, the proposed project both crosses protected lands, and will be in the viewshed of many others. VOF is concerned about the potential impact that a large-scale utility development like this may have on the scenic viewsheds and pastoral settings provided by these protected properties, especially for the driving public along I-64, US Route 29 and State Route 20. As such, VOF requests that full consideration be given to the importance of these openspace properties and their extensive conservation values in the upgrading of this transmission corridor. Alternatives of less visual impact should be fully considered and modifications to siting, location, materials and height in the design of the transmission line should be made to avoid or minimize any adverse impacts to these open-space properties and their public values. If the SCC certificate is issued, the permit should require implementation of all industry best practices, including, but not limited to, (1) minimal removal of vegetation through use of a clearing plan and (2) use of non-reflecting or de-glared conductors and dulled steel for towers and structures. Thank you for the notice and we look forward to working with you and Dominion in the continued planning and evolution of this project. If you have any further questions or comments, please feel free to contact me at (804) or mlittle@vofonline.org. virginiaoutdoorsfoundation.org Richmond Office 600 E. Main Street, Suite 402, Richmond, VA of 19 Page 2 of 3

11 Sincerely, Martha Little Deputy Director, VOF cc: Brian Fuller, VOF (via ) Mike Hallock-Solomon, VOF (via ) virginiaoutdoorsfoundation.org Richmond Office 600 E. Main Street, Suite 402, Richmond, VA of 19 Page 3 of 3

12 March 30, 2016 VIA Ms. Julia Welman Department of Environmental Quality (DEQ) Office of Environmental Impact Review 629 E. Main St., 6th Floor Richmond, VA RE: PUE ; DEQ #16-049S Dominion Virginia Power s Proposed Transmission Project Dooms - Cunningham 500kV Line Rebuild Augusta, Albemarle and Fluvanna Counties Dear Ms. Welman: The Virginia Outdoors Foundation (VOF) is in receipt of an from Ms. Valerie Fulcher of DEQ, dated March 17, 2016, concerning the above-referenced project. We thank you for the opportunity to provide additional comments regarding upgrades to the electric transmission corridor running through VOF open-space easements in the aforementioned counties. This project is located in a region of Virginia that contains a high concentration of our open-space easements. VOF, an agency of the Commonwealth, was established by the General Assembly in 1966 to promote the preservation of Virginia s natural and cultural resources by encouraging private philanthropy in fulfillment of state policy. As a result of Virginia s commitment to ensure a vibrant natural environment for today and future generations, VOF owns thousands of acres managed for public access and holds more than 3,600 easements across the Commonwealth, and these easements protect in perpetuity over 780,000 acres of open-space. This transmission line was constructed in the mid-1960s with COR-TEN weathering steel towers and according to Dominion, has now reached the end of its 50-year expected life span. Dominion is proposing to replace the towers with galvanized steel lattice towers that will be approximately taller than the existing towers. The proposed galvanized towers could have a significant visual impact along the corridor in this highly scenic area of Central Virginia. Dominion states that the proposed rebuild will occur within the existing ROW. While the replacement may occur within the existing ROW, VOF requests additional information on whether there are existing forests or vegetation that will need to be cleared, including any clearing outside of the official ROW in the safety fall zone. VOF also requests additional information on whether any of the temporary construction infrastructure (roads, bridges, etc.) will need to occur on open-space easement property. virginiaoutdoorsfoundation.org Richmond Office 600 E. Main Street, Suite 402, Richmond, VA of 19 Page 1 of 3

13 VOF holds open-space easements on 25 properties within 1.5 miles of the transmission line, a majority of which could be visually-impacted by the proposed rebuild and upgrade to galvanized steel lattice towers. Of those 25 properties, the line physically crosses 4 properties under openspace easements within Dominion s existing ROW. Dominion has stated that since the proposed project is the rebuild of an existing transmission line and no additional right-of-way is required, no impact to conservation easements is expected. However, should the proposal require any additional ROW through a VOF easement, Dominion will need complete a utility easement application. Staff will evaluate the request according to the specific conservation values of each easement in determining the feasibility of additional utility right of way, which determination will be transmitted to the board for final approval. Please contact VOF staff to request this application and please note that Dominion is required to obtain separate approval from the fee owner of the subject property. In considering the impact of this proposal on conservation lands, an open-space easement is a legal interest in real property that creates a relationship between the holders of the easement and the property owner. By means of the easement, VOF has an interest in specific conservation values of the property and a legal obligation to protect these values. VOF easements provide important public benefits by protecting in perpetuity significant tracts of mostly undeveloped land which may contribute to the protection of water quality, productive soils, natural heritage resources, historic resources, and scenic viewsheds. VOF easements represent over $1 billion of public investment and fulfillment of Title XI of the Virginia Constitution and other public policies to ensure conservation of natural and cultural resources. These investments in conservation and future conservation opportunities may be jeopardized if large-scale utility development impairs the protected resources and their character-defining setting. Degradation of protected resources may result in a loss of confidence in the effectiveness of conservation easements by the public. As mentioned above, the proposed project both crosses protected lands, and will be in the viewshed of many others. VOF is concerned about the potential impact that a large-scale utility development like this may have on the scenic viewsheds and pastoral settings provided by these protected properties, especially for the driving public along Interstate 64, US Route 29, US Route 250 and State Route 20. As such, VOF requests that full consideration be given to the importance of these open-space properties and their extensive conservation values in the upgrading of this transmission corridor. Specifically, VOF is concerned about the proposed galvanized steel lattice towers. Alternatives of less visual impact should be fully considered and modifications to siting, location, materials and height in the design of the transmission line should be made to avoid or minimize any adverse impacts to these open-space properties and their public values. If the SCC certificate is issued, the permit should require implementation of all industry best practices, including, but not limited to (1) minimal removal of vegetation through use of a clearing plan and (2) use of nonreflecting or de-glared conductors and dulled steel for towers and structures. virginiaoutdoorsfoundation.org Richmond Office 600 E. Main Street, Suite 402, Richmond, VA of 19 Page 2 of 3

14 Thank you for the notice and we look forward to working with you and Dominion in the continued planning and evolution of this project. If you have any further questions or comments, please feel free to contact me at (804) or Sincerely, Martha Little Deputy Director, VOF cc: Amanda Mayhew, Dominion (via ) Brian Fuller, VOF (via ) Tracy Hibbitts, VOF (via ) Mike Hallock-Solomon, VOF (via ) virginiaoutdoorsfoundation.org Richmond Office 600 E. Main Street, Suite 402, Richmond, VA of 19 Page 3 of 3

15 April 4, 2016 Landowner Address Address RE: Dominion Virginia Power s Proposed Transmission Project Dooms Cunningham 500kV Line Rebuild (Across Property: VOF-0XXXX) Dear Mr. and Mrs. Landowner: The Virginia Outdoors Foundation (VOF) is currently working with the Department of Environmental Quality (DEQ) in the review of Dominion s plans to rebuild a high-voltage electrical transmission line that traverses your property. Since your property is also held in openspace easement with VOF, we wanted to provide you with a brief update of information received from DEQ and the State Corporation Commission (SCC). The proposal is requesting to rebuild the existing 500kV line alongside the existing 230kV line within the existing ROW from Dooms in Augusta County, across Albemarle County, to Cunningham in Fluvanna County. Dominion states that the proposed rebuild will occur within the existing ROW. However, Dominion is proposing to replace the existing COR-TEN weathering steel lattice towers with galvanized steel lattice towers that will be approximately 28 taller, on average, than the existing towers. The proposed galvanized steel towers could have a significant visual impact along the corridor in this highly scenic area of Central Virginia. On March 30, VOF formally commented on the SCC review of the project in a letter to DEQ. In our letter (enclosed), VOF requested that full consideration be given to the importance of openspace easement properties and their extensive conservation values in the upgrading of this transmission corridor. We will keep you updated as this project progresses. If you have any specific comments or concerns regarding this proposed rebuild project, please provide your comments to DEQ, SCC or Dominion directly. If you have any further questions regarding your open-space easement, please feel free to contact me via phone at (434) or via at bfuller@vofonline.org. Sincerely, Brian G. Fuller Assistant Director of Stewardship Central Region, Charlottesville Office Encl: VOF Letter to DEQ dated March 30, 2016 virginiaoutdoorsfoundation.org Central Region 1010 Harris Street, Suite 6, Charlottesville, VA of 19 Page 1 of 1

16 Fuller, Brian (VOF) From: Sent: To: Cc: Subject: Little, Martha (VOF) Friday, April 15, :19 PM Fuller, Brian (VOF); Glymph, Brett (VOF) Hibbitts, Harry (VOF) FW: Cunningham-Dooms 500 kv Transmission Line, PUE / DEQ #16-049S fyi From: Little, Martha (VOF) Sent: Friday, April 15, :18 PM To: 'Charlotte P McAfee (Services - 6)'; Wellman, Julia (DEQ) Cc: Amanda M Mayhew (VirginiaPower - 6); G. W. Jackson (VirginiaPower - 6) Subject: RE: Cunningham-Dooms 500 kv Transmission Line, PUE / DEQ #16-049S Julia and Charlotte, VOF would like to respond with the following: We appreciate Dominion Virginia Power s responses to the concerns outlined in our letter dated, March, regarding: PUE ; DEQ #16-049SDominion Virginia Power s Proposed Transmission Project Dooms - Cunningham 500kV Line Rebuild Augusta, Albemarle and Fluvanna Counties VOF would like to reiterate the points made in that letter and specifically the following points: VOF is concerned about the proposed galvanized steel lattice towers. Alternatives of less visual impact should be fully considered and modifications to siting, location, materials and height in the design of the transmission line should be made to avoid or minimize any adverse impacts to these open-space properties and their public values. If the SCC certificate is issued, the permit should require implementation of all industry best practices, including, but not limited to (1) minimal removal of vegetation through use of a clearing plan and (2) use of non-reflecting or de-glared conductors and dulled steel for towers and structures. We appreciate Dominion Virginia Power s response to our concern regarding the removal of vegetation and have no further comments on that. However, with regard to our request for consideration of the use of low reflective visual mitigations, we would like to point out that we have worked with other utilities, specifically the Appalachian Power Company (ACP) who has implemented these visual mitigations in the construction of electric transmission lines. ACP has used a darkened or low-reflective treatment applied to the finish of galvanized steel lattice towers to reduce the visual presence of the structures in scenic areas. They have also applied a non-specular finish to reduce glare and mitigate visual impacts to the conductors. These significant and proven visual mitigations demonstrate that it is possible to make changes to the design and materials of electric transmission lines in some cases. VOF would ask that Dominion Virginia Power consider any measures that might minimize the visual impacts to the important scenic, and cultural resources of this region. VOF hopes to continue to work with Dominion Virginia Power in a collaborative way to ensure that the Commonwealth s investments in the protection of open space are not jeopardized in any way. Thank you again for the opportunity to comment. Martha Little 1 16 of 19

17 From: Charlotte P McAfee (Services - 6) [mailto:charlotte.p.mcafee@dom.com] Sent: Thursday, April 14, :45 AM To: Wellman, Julia (DEQ) Cc: Little, Martha (VOF); Amanda M Mayhew (VirginiaPower - 6); G. W. Jackson (VirginiaPower - 6) Subject: RE: Cunningham-Dooms 500 kv Transmission Line, PUE / DEQ #16-049S Julia, Thank you for providing Dominion Virginia Power (Dominion) the opportunity to respond to the Virginia Outdoors Foundation s (VOF) letter dated March 30, 2016 regarding Dominion s Dooms-Cunningham 500kV transmission line rebuild project proposed in State Corporation Commission Case No. PUE VOF raised concerns regarding vegetation removal and use of galvanized steel towers. Dominion s response to VOF s concerns is below. 1) Vegetation removal The rebuilding of this line will not require additional tree clearing outside of the existing right-ofway, which varies in width. However, as required by North American Electrical Reliability Corporation, trees that are determined to be danger trees (any tree alive or dead that could fall within ten feet of the line) will be removed. Access to structures within the right of way will include minor improvements through the use of mats or gravel. Landowners will be notified of work on their property before the construction starts. Dominion s clearing methods are described in greater detail in Section II.A.5 of the Appendix (p. 38) and Section 2.K of the DEQ Supplement (p ) filed with the Application. 2) Materials for towers and structures Dominion has proposed to use its typical transmission line materials and structures to rebuild this line. The existing steel lattice towers (brown structures) proved to be inferior and degraded greatly over time. Dominion now uses galvanized lattice towers for all 500 kv lines. The galvanized steel is used throughout the industry and has proven to be the best type of finish for lattice towers. Depending on environmental conditions, galvanized steel lattice structures take between 24 and 48 months to achieve the typical dullness that is seen on older galvanized steel structures. Using galvanized steel towers provides the greatest protection against the elements and ensures that structures can meet the year lifespan with minimal maintenance. Dominion does not believe that the additional cost and potential decrement in structural integrity posed by the use of non-reflecting or de-glared conductors and dulled steel for structures, as requested by VOF, is appropriate. Dominion appreciates the opportunity to provide comments on the VOF letter. If there are any questions on this project please feel free to contact me. Thank you, Charlotte McAfee Charlotte P. McAfee Senior Counsel, Law Department Dominion Resources Services, Inc of 19

18 120 Tredegar Street, Riverside 2 Richmond, VA Charlotte.P.McAfee@dom.com (office) (cell) From: Wellman, Julia (DEQ) [mailto:julia.wellman@deq.virginia.gov] Sent: Tuesday, April 05, :26 AM To: Charlotte P McAfee (Services - 6) Subject: FW: Cunningham-Dooms 500 kv Transmission Line Please see the attached letter from the Virginia Outdoors Foundation. Does Dominion have any comments or response to VOF regarding its concerns on the scenic viewshed and galvanized steel lattice towers? Julia Wellman Environmental Impact Review Coordinator Department of Environmental Quality 629 E Main Street Richmond, VA (804) Julia.Wellman@deq.virginia.gov **** For program updates and public notices, please subscribe to the OEIR News Feed.**** From: Little, Martha (VOF) Sent: Friday, April 01, :34 PM To: Wellman, Julia (DEQ) Cc: Hallock-Solomon, Michael (VOF); Fuller, Brian (VOF) Subject: Cunningham-Dooms 500 kv Transmission Line Julia, Please see VOF s comments on the following project attached: Document Type: SCC Application Project Sponsor: State Corporation Commission Project Title: Cunningham-Dooms 500 kv Transmission Line Rebuild Location: Albemarle, Augusta, & Fluvanna Counties Project Number: DEQ #16-049S 3 18 of 19

19 Martha Little Deputy Director, VOF 600 East Main St., Suite 402 Richmond, Virginia P CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you of 19

December 17, VIA

December 17, VIA December 17, 2015 VIA Email Ms. Janine Howard Department of Environmental Quality Office of Environmental Impact Review 629 E. Main St., 6th Floor Richmond, VA 23219 RE: PUE 2015-00117 Dominion Virginia

More information

PRIVATE PROPERTY PUBLIC PURPOSE

PRIVATE PROPERTY PUBLIC PURPOSE PRIVATE PROPERTY PUBLIC PURPOSE Understanding Right-of-Way Acquisition for Transmission Lines At Progress Energy, we are committed to providing safe, reliable and affordable energy to our customers. As

More information

F R E QUENTLY AS K E D QUESTIONS

F R E QUENTLY AS K E D QUESTIONS F R E QUENTLY AS K E D QUESTIONS Mountain Home Substation and 138-kV Transmission Line Project Gillespie, Kerr and Kimble counties PROJECT OVERVIEW 1. What is the Mountain Home Substation and 138-kV Transmission

More information

People, Property and Power Lines. Frequently asked questions about power lines on or near your property

People, Property and Power Lines. Frequently asked questions about power lines on or near your property People, Property and Power Lines Frequently asked questions about power lines on or near your property Great River Energy is a not-for-profit wholesale electric power cooperative which provides electricity

More information

About the Project. The project consists of two new high voltage transmission lines to be built by Sharyland Utilities, L.P. (Sharyland).

About the Project. The project consists of two new high voltage transmission lines to be built by Sharyland Utilities, L.P. (Sharyland). Sharyland Utilities, L.P. 1900 North Akard Street Dallas, Texas 75201 Toll-free: (866) 354-3335 Frequently Asked Questions Regarding Sharyland Utilities Proposed Wadsworth to New Oliver to Farmland 345

More information

Recommendation to Approve Dominion Virginia Power s Request for an Easement along Route 606 at Washington Dulles International Airport.

Recommendation to Approve Dominion Virginia Power s Request for an Easement along Route 606 at Washington Dulles International Airport. REPORT TO THE STRATEGIC DEVELOPMENT COMMITTEE Recommendation to Approve Dominion Virginia Power s Request for an Easement along Route 606 at Washington Dulles International Airport June 2017 Requested

More information

Right-of-Way and Easements for Electric Facility Construction

Right-of-Way and Easements for Electric Facility Construction Right-of-Way and Easements for Electric Facility Construction The Public Service Commission of Wisconsin (PSC) offers this overview to landowners who must negotiate easement contracts with utilities for

More information

OPEN-SPACE CONVERSION REQUEST

OPEN-SPACE CONVERSION REQUEST OPEN-SPACE CONVERSION REQUEST Applicant: Board Meeting: February 9, 2017 Landowner: Normandy Capital, LLC VOF Easement: BAT-03678 Table of Contents: Cover Page 1 Table of Contents 2 Application Overview

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario EB-2013-0040 EB-2013-0041 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B); AND IN THE MATTER OF an application

More information

Welcome! Sarpy Transmission Project. Public Hearing October 23, 2018

Welcome! Sarpy Transmission Project. Public Hearing October 23, 2018 Welcome! Sarpy Transmission Project Public Hearing October 23, 2018 Agenda Safety Introductions Purpose of Hearing Explain the project need Present the project timeline Describe rights of each property

More information

[Landowner name and address] Notification of Public Informational Meeting Re: [Insert Tax ID] Dear [Title] [Landowner],

[Landowner name and address] Notification of Public Informational Meeting Re: [Insert Tax ID] Dear [Title] [Landowner], [Landowner name and address] Notification of Public Informational Meeting Re: [Insert Tax ID] Dear [Title] [Landowner], We are writing to inform you about an important clean energy project in your area

More information

REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS

REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS October 1, 2018 Northern Wasco County People s Utility District ( NWCPUD )

More information

Conservation Easement Stewardship

Conservation Easement Stewardship Conservation Easements are effective tools to preserve significant natural, historical or cultural resources. Conservation Easement Stewardship Level of Service Standards March 2013 The mission of the

More information

West Whiteland Township Historical Commission Agenda March 13, 2017

West Whiteland Township Historical Commission Agenda March 13, 2017 West Whiteland Township Historical Commission Agenda March 13, 2017 6:30 P.M. WORK SESSION CANCELLED THIS MONTH 7 P.M. Business Meeting I. Call to Order II. III. Public Comment Old Business There is no

More information

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort

More information

RE: Applicant s Report for a Community Unit Plan Amendment at 2100 Sheila Lane

RE: Applicant s Report for a Community Unit Plan Amendment at 2100 Sheila Lane M A R K H A M P L A N N I N G August 10, 2018 Mr. Mark Olinger, Director Department of Planning & Development Review 900 East Broad Street, Suite 511 Richmond, VA 23219 Mark.Olinger@richmondgov.com RE:

More information

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 IMPORTANT NOTE: This document was created to accompany the City of Fort Collins

More information

EB Hydro One Networks' Section 99 Bruce to Milton Transmission Reinforcement project Application Filing

EB Hydro One Networks' Section 99 Bruce to Milton Transmission Reinforcement project Application Filing Hydro One Networks Inc. th Floor, South Tower Bay Street Toronto, Ontario MG P www.hydroone.com Tel: () -00 Fax: () -0 Cell: () - Susan.E.Frank@HydroOne.com Susan Frank Vice President and Chief Regulatory

More information

) ) ) ) ) ) (Issued September )

) ) ) ) ) ) (Issued September ) BEFORE THE PUBLIC SERVICE COMMISSION OF WYOMING IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT THE ARROWHEAD SUBSTATION AND

More information

GRANT OF TRAIL ACCESS EASEMENT, COVENANTS AND RESTRICTIONS

GRANT OF TRAIL ACCESS EASEMENT, COVENANTS AND RESTRICTIONS This is a sample easement provided for discussion and illustrative purposes only. Easements for each property will be customized based upon the needs of each landowner and the Path. GRANT OF TRAIL ACCESS

More information

FACT SHEET: Tenure requirements for Major Customer Connections

FACT SHEET: Tenure requirements for Major Customer Connections FACT SHEET: for Major Customer Connections Purpose February 2014 Version 1.0 This fact sheet describes the types of underlying land tenure required by Ergon Energy in situations where a Major Customer

More information

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES EXHIBIT JC-7 BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PETITION OF JERSEY CENTRAL POWER & LIGHT COMPANY PURSUANT TO N.J.S.A. 0:55D-19 FOR A DETERMINATION THAT THE OCEANVIEW 30

More information

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING DESIGN PUBLIC HEARING October 25, 2016 AT STEVENS MEMORIAL LIBRARY 345 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Chickering Road (Route 125) & Massachusetts Avenue Intersection

More information

TOWN OF RUTLAND Ordinance No. 12.5

TOWN OF RUTLAND Ordinance No. 12.5 TOWN OF RUTLAND Ordinance No. 12.5 AN ORDINANCE RELATING TO CHANGES TO ZONING DISTRICT BOUNDARIES AND CONDITIONAL USE PERMITS REQUESTED TO ALLOW THE CONSTRUCTION AND OPERATION OF COMMUNICATION TOWERS The

More information

SPECIAL COUNCIL MEETING AND WORK SESSION AGENDA #23

SPECIAL COUNCIL MEETING AND WORK SESSION AGENDA #23 Monday, May 21, 2018 Council Chambers and Steve Lampi Room 7:00 p.m. 5200 85 th Avenue North SPECIAL COUNCIL MEETING AND WORK SESSION AGENDA #23 If due to a disability, you need auxiliary aids or services

More information

PUBLIC RIGHTS OF WAY. Guidance for Planners and Developers

PUBLIC RIGHTS OF WAY. Guidance for Planners and Developers PUBLIC RIGHTS OF WAY Guidance for Planners and Developers 1. Introduction Public rights of way (PROW) are significant highway assets, highly valued by local people. They are a material consideration in

More information

Belfast Municipal Airport Airspace Obstruction Analysis

Belfast Municipal Airport Airspace Obstruction Analysis Belfast Municipal Airport Airspace Obstruction Analysis BST MEETING NOTES project: meeting date: location: subject: EA AND DATA COLLECTION FOR AIRSPACE OBSTRUCTION ANALYSIS WEDNESDAY, MARCH 18, 2015 6:30

More information

New Proposed Regulations Regarding Lead-based Paint Requirements

New Proposed Regulations Regarding Lead-based Paint Requirements New Proposed Regulations Regarding Lead-based Paint Requirements June 7, 1996 For CPD Newsbrief... June 1996 NEW PROPOSED REGULATIONS REGARDING LEAD-BASED PAINT REQUIREMENTS On June 7, 1996, HUD published

More information

TRI-COUNTY RURAL ELECTRIC COOPERATIVE, INC. POLICY BULLETIN NO. 3-4

TRI-COUNTY RURAL ELECTRIC COOPERATIVE, INC. POLICY BULLETIN NO. 3-4 TRI-COUNTY RURAL ELECTRIC COOPERATIVE, INC. POLICY BULLETIN NO. 3-4 SUBJECT: DISTRIBUTION LINE EXTENSIONS I. POLICY: All transmission and distribution line extensions shall be located and designed by the

More information

Management of Easement Co-Use Requests Guideline

Management of Easement Co-Use Requests Guideline Management of Easement Co-Use Requests Guideline Page 1 of 14 Management of Easement Co-use Requests Guideline Updated 31 March 2016 Version 6.2 CONTENTS PAGE Management of Easement Co-Use Requests Guideline...

More information

Architectural Control Committee (ACC) Packet for Miscellaneous Construction 1 February 2018

Architectural Control Committee (ACC) Packet for Miscellaneous Construction 1 February 2018 Architectural Control Committee (ACC) Packet for Miscellaneous Construction 1 February 2018 Bulkheads, Remodeling, Fences, Roofing, Overhangs, Decks, Porches, Driveways, Walks Retaining Walls and other

More information

LAND OWNER OF SITE ADDRESS PHONE NUMBER FAX NUMBER. APPLICANT (if other than owner) ADDRESS PHONE NUMBER FAX NUMBER

LAND OWNER OF SITE ADDRESS PHONE NUMBER FAX NUMBER. APPLICANT (if other than owner) ADDRESS PHONE NUMBER FAX NUMBER TELECOMMUNICATION TOWER CONDITIONAL USE PERMIT APPLICATION FOR WALWORTH COUNTY - $1025 The undersigned hereby applies to the Walworth County Zoning Agency (Walworth County Land Use and Resource Management

More information

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Regulation No May 2015

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Regulation No May 2015 CEMP-CR DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000 ER 405-1-19 Regulation No. 405-1-19 29 May 2015 Real Estate ACQUISITION BY CONDEMNATION PROCEEDINGS 1. Purpose. Engineer

More information

Department of Energy

Department of Energy Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-3621 ENVIRONMENT, FISH AND WILDLIFE February 5, 2010 In reply refer to: KEW-4 Dear Fish and Wildlife Project Sponsor:

More information

2018 Requirements Manual An In-Depth Look at Changes to the Requirements

2018 Requirements Manual An In-Depth Look at Changes to the Requirements 2018 Requirements Manual An In-Depth Look at Changes to the Requirements Executive Summary The Requirements Manual helps land trusts understand how the Land Trust Accreditation Commission verifies that

More information

ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED FEBRUARY 1, 2018

ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED FEBRUARY 1, 2018 ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED FEBRUARY, 0 Sponsored by: Assemblyman WAYNE P. DEANGELO District (Mercer and Middlesex) SYNOPSIS Permits construction of electric transmission

More information

Packet for New Home Construction

Packet for New Home Construction Architectural Control Committee (ACC) Packet for New Home Construction As of: 1 February 2018 Questions, - email acc@elkinslake.net or Call 936-295-8181 or visit an ACC meeting Introduction and Welcome

More information

REQUEST FOR PROPOSALS APPRAISAL SERVICES

REQUEST FOR PROPOSALS APPRAISAL SERVICES REQUEST FOR PROPOSALS APPRAISAL SERVICES Issued By: Philadelphia Land Bank Proposals Must Be Received No Later Than: Friday, February 5, 2016, 4:00 PM, Local Time at the Offices of the Philadelphia Land

More information

Establishing a Wetland Bank in Minnesota

Establishing a Wetland Bank in Minnesota Establishing a Wetland Bank in Minnesota Updated February 1, 2018 This document provides a general summary of the key steps in establishing an individual wetland bank site within the state wetland banking

More information

Conditional Use Permit / Standard Subdivision Application

Conditional Use Permit / Standard Subdivision Application Conditional Use Permit / Standard Subdivision Application Name of Proposed Subdivision: Total Area (Acres) Is Proposed Subdivision to be built in phases? Number of Lots If yes, how many phases? Applicant/Owner

More information

Chapter 5. Competitive Sealed Bidding: Procedure

Chapter 5. Competitive Sealed Bidding: Procedure Chapter 5. Competitive Sealed Bidding: Procedure Summary This chapter provides an overview of the procedure for procuring goods and nonprofessional services using the competitive sealed bidding procedure.

More information

ACTIVITIES ON AN EASEMENT POWERLINK QUEENSLAND

ACTIVITIES ON AN EASEMENT POWERLINK QUEENSLAND POWERLINK QUEENSLAND ACTIVITIES ON AN EASEMENT Information on activities that can and can t be carried out on, or near, Powerlink easements to ensure the safe and reliable operation of the network 2 An

More information

60. ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 14, DATE: July 13, 2018

60. ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 14, DATE: July 13, 2018 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 14, 2018 DATE: July 13, 2018 SUBJECT: Request to authorize advertisement of public hearings by the Planning Commission and County Board

More information

15 July Ms E Young Team Leader Protected Area Establishment Department of Environment and Natural Resources Adelaide

15 July Ms E Young Team Leader Protected Area Establishment Department of Environment and Natural Resources Adelaide 15 July 2011 Ms E Young Team Leader Protected Area Establishment Department of Environment and Natural Resources Adelaide PROTECTED AREAS ON PRIVATE LAND DISCUSSION PAPER The Environmental Defenders Office

More information

Techniques for Stewardship of Preserved Farms: Three Programs Saving America s Farms and Farmland Conference

Techniques for Stewardship of Preserved Farms: Three Programs Saving America s Farms and Farmland Conference Techniques for Stewardship of Preserved Farms: Three Programs Saving America s Farms and Farmland Conference May 13, 2014 June Mengel, Farmland Preservation Specialist, Lancaster County, Pennsylvania Chuck

More information

TERRA. Forest CORE Fund Project Application. Applicant Information Applicant Partner Organization Contact Person

TERRA. Forest CORE Fund Project Application. Applicant Information Applicant Partner Organization Contact Person TERRA Forest CORE Fund Project Application Applicant Information Applicant Partner Organization Contact Person Phone Number Address Type of Applicant/ Partner Organization Title Email Address Federal State

More information

Silver Line Acceptance

Silver Line Acceptance Finance & Administration Committee Action Item III-A June 12, 2014 Silver Line Acceptance Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

NEW BUSINESS APPLICATION

NEW BUSINESS APPLICATION NEW BUSINESS APPLICATION Information Packet City of Delafield Clerk s Office 500 Genesee Street Delafield WI 53018 262-646-6220 www.cityofdelafield.org The steps to opening a business in Delafield are thorough

More information

July 10, Mayor Lisa Helps & Council City of Victoria 1 Centennial Square Victoria BC V8W 1P6

July 10, Mayor Lisa Helps & Council City of Victoria 1 Centennial Square Victoria BC V8W 1P6 July 10, 2017 Mayor Lisa Helps & Council City of Victoria 1 Centennial Square Victoria BC V8W 1P6 RE: FORMER TALLY HO HOTEL SITE - 3020 DOUGLAS STREET TEMPORARY USE PERMIT APPLICATION Dear Mayor Helps

More information

Together with Tenants

Together with Tenants Together with Tenants Our draft plan Your feedback needed by 19 April 20 February 2019 About this plan The National Housing Federation is the membership body for housing associations in England. Our housing

More information

DESIGN PUBLIC HEARING JULY 7, 2016 CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING JULY 7, 2016 CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED DESIGN PUBLIC HEARING JULY 7, 2016 AT CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED AIRPORT ROAD OVER ROUTE 24, BRIDGE DECK REPLACEMENT

More information

Public Inspection for the Kuala Lumpur-Singapore High Speed Rail Frequently Asked Questions (FAQ)

Public Inspection for the Kuala Lumpur-Singapore High Speed Rail Frequently Asked Questions (FAQ) Public Inspection for the Kuala Lumpur-Singapore High Speed Rail Frequently Asked Questions (FAQ) Public Inspection 1. What is the purpose of Public Inspection? The Public Inspection is a mandatory process

More information

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division #1 Courthouse Plaza, 2100 Clarendon Boulevard, Suite 700 Arlington, VA 22201 TEL 703.228.3525 FAX 703.228.3543 www.arlingtonva.us

More information

Georgia Conservation Tax Credit Program Frequently Asked Questions

Georgia Conservation Tax Credit Program Frequently Asked Questions Georgia Conservation Tax Credit Program Frequently Asked Questions What are the minimum requirements for eligibility under the Georgia Conservation Tax Credit Program (GCTCP)? Individual and corporate

More information

Ken Wade, Eileen Fitzgerald, Jeffrey Bryson and Michael Foster. From: Frederick Udochi. Michael Butchko, Robert Burns, Ron Johnston, Mia Bowman

Ken Wade, Eileen Fitzgerald, Jeffrey Bryson and Michael Foster. From: Frederick Udochi. Michael Butchko, Robert Burns, Ron Johnston, Mia Bowman To: Ken Wade, Eileen Fitzgerald, Jeffrey Bryson and Michael Foster From: Frederick Udochi cc: Michael Butchko, Robert Burns, Ron Johnston, Mia Bowman Date: December 23, 2008 Subject: Audit Review: Network

More information

Municipal Planning Commission. AGENDA June 14, :00 PM COUNCIL CHAMBERS Main Floor, City Hall Avenue South

Municipal Planning Commission. AGENDA June 14, :00 PM COUNCIL CHAMBERS Main Floor, City Hall Avenue South Municipal Planning Commission AGENDA June 14, 2011 3:00 PM COUNCIL CHAMBERS Main Floor, City Hall 910 4 Avenue South Municipal Planning Commission DATE OF MEETING June 14, 2011 TIME OF MEETING PLACE OF

More information

Telecommunications Development Permit Application Package

Telecommunications Development Permit Application Package Telecommunications Development Permit Application Package POLICY POL#308 Title: Policy Guidelines to Evaluate Commercial Communications Facilities Legal References: Radio Communication Act Municipal Government

More information

Establishing an Individual Wetland Bank Site in Minnesota

Establishing an Individual Wetland Bank Site in Minnesota Establishing an Individual Wetland Bank Site in Minnesota March 14, 2013 This document provides a general summary of the key steps in establishing a an individual wetland bank site within the state wetland

More information

John Machado et al (PLN040304)

John Machado et al (PLN040304) PLANNING COMMISSION COUNTY OF MONTEREY, STATE OF CALIFORNIA RESOLUTION NO. 04051 A.P. # 207-022-017-000 In the matter the application John Machado et al (PLN040304) FINDINGS & DECISION for a Use in accordance

More information

GOOCHLAND COUNTY REQUEST FOR QUOTATION LANDSCAPE ARCHITECTURE DESIGN SERVICES

GOOCHLAND COUNTY REQUEST FOR QUOTATION LANDSCAPE ARCHITECTURE DESIGN SERVICES GOOCHLAND COUNTY REQUEST FOR QUOTATION LANDSCAPE ARCHITECTURE DESIGN SERVICES FROM: Leigh Dunn, Environmental Planner P.O. Box 103, 1800 Sandy Hook Road Goochland, VA 23063 Phone (804) 556-5850 Fax (804)

More information

Frequently Asked Questions EAST-WEST TIE TRANSMISSION PROJECT

Frequently Asked Questions EAST-WEST TIE TRANSMISSION PROJECT Frequently Asked Questions Connecting Ontario s Northwest August 2014 What s Inside? Answers to Frequently Asked Questions On: NextBridge Infrastructure and the East-West Tie Project Electricity in Northern

More information

ADMINISTRATIVE HEARING STAFF REPORT Country Club Acres Second Amended Subdivision Amendment PLNSUB E Parkway Avenue December 12, 2013

ADMINISTRATIVE HEARING STAFF REPORT Country Club Acres Second Amended Subdivision Amendment PLNSUB E Parkway Avenue December 12, 2013 ADMINISTRATIVE HEARING STAFF REPORT Country Club Acres Second Amended Subdivision Amendment PLNSUB2013-00925 2167 E Parkway Avenue December 12, 2013 Planning Division Department of Community & Economic

More information

April 6, Nathaniel J. Davis, Sr., Deputy Secretary Federal Energy Regulatory Commission 888 First St. NE, Room 1A Washington, DC 20426

April 6, Nathaniel J. Davis, Sr., Deputy Secretary Federal Energy Regulatory Commission 888 First St. NE, Room 1A Washington, DC 20426 April 6, 2017 Nathaniel J. Davis, Sr., Deputy Secretary Federal Energy Regulatory Commission 888 First St. NE, Room 1A Washington, DC 20426 Re: Atlantic Coast Pipeline Comments on Draft Environmental Impact

More information

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item CUP-15-00474 Item No. 5-1 PC Staff Report 11/16/15 ITEM NO. 5 PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item CONDITIONAL USE PERMIT FOR PUBLIC WHOLESALE WATER SUPPLY DISTRICT NO. 25; E 1300

More information

Land Transaction Procedures Approved July 17, 2012

Land Transaction Procedures Approved July 17, 2012 Land Transaction Procedures Approved July 17, 2012 Purpose: The Greenbelt Land Trust (GLT) acquires fee title or conservation easements for lands to fulfill its mission to conserve and protect in perpetuity

More information

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed.

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed. Ordinance #68 AN ORDINANCE ENTITLED, AN ORDINANCE AMENDING ARTICLE II DEFINITIONS AND CHAPTER 5.22 (WIND ENERGY SYSTEMS) OF ARTICLE V GENERAL REQUIREMENTS OF ORDINANCE 65 AN ORDINANCE AMENDING ORDINANCE

More information

Next Generation Stewardship: Ensuring the Long-term Viability of Conservation Easements

Next Generation Stewardship: Ensuring the Long-term Viability of Conservation Easements N Next Generation Stewardship: Ensuring the Long-term Viability of Conservation Easements The Big Question How do we preserve conservation purposes in a changing world? Keys to Long-Term Viability of Easements

More information

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item CONDITIONAL USE PERMIT FOR VERIZON WIRELESS; 1287 E 1200 RD (SLD)

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item CONDITIONAL USE PERMIT FOR VERIZON WIRELESS; 1287 E 1200 RD (SLD) PC Staff Report 9/26/2016 CUP-16-00312 Item No. 5-1 PC Staff Report 9/26/2016 ITEM NO. 5 PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item CONDITIONAL USE PERMIT FOR VERIZON WIRELESS; 1287

More information

MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT

MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT Complete this form, print, and mail to: Minnehaha County Highway Dept. 2124 E 60 th St N, Sioux Falls, SD 57104, or Email: jmaras@minnehahacounty.org

More information

TRUSTEE RESPONSIBILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING

TRUSTEE RESPONSIBILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING TRUSTEE RESPONSIBILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING CHAPTER 468 OF THE CODE OF IOWA Drainage Districts are governed under this chapter of the Code of Iowa. PETITION Triggers

More information

ACTIVITIES ON AN EASEMENT POWERLINK QUEENSLAND

ACTIVITIES ON AN EASEMENT POWERLINK QUEENSLAND POWERLINK QUEENSLAND ACTIVITIES ON AN EASEMENT Information on activities that can and can t be carried out on, or near, Powerlink easements to ensure the safe and reliable operation of the network 2 3

More information

Comprehensive Plan 2030

Comprehensive Plan 2030 Introduction The purpose of this chapter of the Comprehensive Plan is to accurately describe, in words and images, the goals and visions for the future of Clearfield, as determined by the people who live

More information

Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements

Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements Don Wiese Natural Resources Manager Fort Worth District September 13, 2017 US Army Corps of Engineers

More information

I203 GOVERNOR'S SQUARE BOULEVARD (850) TALLAHASSEE, florjda FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES

I203 GOVERNOR'S SQUARE BOULEVARD (850) TALLAHASSEE, florjda FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES OFFICE OF J\.GJUCULTURAL MAGNOLIA CENTER, Sun:B 200 \.x/ater POLICY I203 GOVERNOR'S SQUARE BOULEVARD (850) 617-1700 TALLAHASSEE, florjda 32301 FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES COMMISSIONER

More information

KANE COUNTY AGRICULTURE COMMITTEE AGENDA

KANE COUNTY AGRICULTURE COMMITTEE AGENDA SMITH, Kenyon, Davoust, Haimann, Lewis, Taylor, Vazquez KANE COUNTY AGRICULTURE COMMITTEE AGENDA Monday, June 17, 2013 9:00 a.m. 1. Call to Order 2. Opening Remarks 3. Approval of Minutes: May 20, 2013

More information

Montana Alberta Tie Ltd. and AltaLink Management Ltd.

Montana Alberta Tie Ltd. and AltaLink Management Ltd. Decision 2010-302 Time Extensions for New Transmission Line 941L, Alteration to Transmission Line 940L, Alteration to Transmission Line 923L, and New MATL 120S Substation June 28, 2010 ALBERTA UTILITIES

More information

Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS EMERGENCY SERVICES COMPREHENSIVE REVIEW

Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS EMERGENCY SERVICES COMPREHENSIVE REVIEW Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS EMERGENCY SERVICES COMPREHENSIVE REVIEW Township of Salisbury 2900 South Pike Avenue Allentown, PA 18103 (610) 797-4000 Cathy Bonaskiewich

More information

Subdivision FAQ s. Prepared by the Sitka Planning Office, Sara Russell, Planning Assistant Wells Williams, Planning Director

Subdivision FAQ s. Prepared by the Sitka Planning Office, Sara Russell, Planning Assistant Wells Williams, Planning Director Subdivision FAQ s Prepared by the Sitka Planning Office, 747-1814 Sara Russell, Planning Assistant Wells Williams, Planning Director Outline of Questions Answered on the following Pages - What defines

More information

Special exception for a garage apartment on Transitional Agriculture/Enterprise Community Overlay/Low Impact Urban (A- 3E(1)) zoned property.

Special exception for a garage apartment on Transitional Agriculture/Enterprise Community Overlay/Low Impact Urban (A- 3E(1)) zoned property. GROWTH AND RESOURCE MANAGEMENT DEPARTMENT PLANNING AND DEVELOPMENT SERVICES DIVISION CURRENT PLANNING ACTIVITY 123 W. Indiana Avenue, Room 202, DeLand, FL 32720 (386) 943-7059 PUBLIC HEARING: CASE NO:

More information

MODEL WIRELESS TELECOMMUNICATIONS ORDINANCE for Siting of "Small Cell" Telecommunication Infrastructure in Public Rights-Of-Way

MODEL WIRELESS TELECOMMUNICATIONS ORDINANCE for Siting of Small Cell Telecommunication Infrastructure in Public Rights-Of-Way MODEL WIRELESS TELECOMMUNICATIONS ORDINANCE for Siting of "Small Cell" Telecommunication Infrastructure in Public Rights-Of-Way This document is intended for use by towns and villages that have existing

More information

PROPOSED METRO JOINT DEVELOPMENT PROGRAM: POLICIES AND PROCESS July 2015 ATTACHMENT B

PROPOSED METRO JOINT DEVELOPMENT PROGRAM: POLICIES AND PROCESS July 2015 ATTACHMENT B PROPOSED METRO JOINT DEVELOPMENT PROGRAM: POLICIES AND PROCESS ATTACHMENT B TABLE OF CONTENTS I. INTRODUCTION / PURPOSE............................ 3 II. OBJECTIVES / GOALS..................................

More information

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

Chapter 100 Planned Unit Development in Corvallis Urban Fringe 100.100 Scope and Purpose. Chapter 100 Planned Unit Development in Corvallis Urban Fringe (1) All applications for land divisions in the Urban Residential (UR) and Flood Plain Agriculture (FPA) zones within

More information

Please review the Draft PTF Grant Manual with the above background information in mind. AGC

Please review the Draft PTF Grant Manual with the above background information in mind. AGC Board of Trustees Anna G. Chisholm, PTF Program Administrator 3.15.2017 Proposed Updates to the PTF Grant Manual The PTF Grant Manual was last updated in 2006 and many details of the easement process have

More information

DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT APPENDIX E REAL ESTATE PLAN MT. SINAI MEDICAL CENTER, CONTINUTING AUTHORITIES PROGRAM (CAP) SECTION 14, PROJECT DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT September 2016 DRAFT APPENDIX

More information

Administrative Penalty Order (APO) Plan for Buffer Law Implementation

Administrative Penalty Order (APO) Plan for Buffer Law Implementation Administrative Penalty Order (APO) Plan for Buffer Law Implementation June 28, 2017 This document was adopted by the Board of Water and Soil Resources (BWSR) pursuant to Minn. Stat. 103B.101, subd. 12(a)

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT

MONTGOMERY COUNTY PLANNING DEPARTMENT MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION Forest Conservation Law Amendments - Modifications MCPB Item No. 7 Date: 5/24/2018 SUMMARY Mark Pfefferle,

More information

An application to the Zoning Board of Appeals is not complete and will not be scheduled until all of the following information has been provided:

An application to the Zoning Board of Appeals is not complete and will not be scheduled until all of the following information has been provided: INCORPORATED VILLAGE OF PORT JEFFERSON ZONING BOARD OF APPEALS 88 North Country Road, Port Jefferson, NY 11777 Telephone: (631) 473-4744 Fax: (631) 473-2049 FILING REQUIREMENTS An application to the is

More information

MEMORANDUM OF AGREEMENT AMONG VIRGINIA ELECTRIC AND POWER COMPANY, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, U.S

MEMORANDUM OF AGREEMENT AMONG VIRGINIA ELECTRIC AND POWER COMPANY, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, U.S MEMORANDUM OF AGREEMENT AMONG VIRGINIA ELECTRIC AND POWER COMPANY, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE, U.S. ARMY CORPS OF ENGINEERS NORFOLK DISTRICT, AND THE ADVISORY COUNCIL ON HISTORIC PRESERVATION

More information

PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES

PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES Town of Mono Procedure ESTABLISHING TELECOMMUNICATION FACILITIES PLANNING DEPARTMENT Approved by Council: December 20, 2002 by Resolution #9-23-2002 PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES

More information

DESIGN PUBLIC HEARING MAY 18, 2017 GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED

DESIGN PUBLIC HEARING MAY 18, 2017 GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED DESIGN PUBLIC HEARING MAY 18, 2017 AT GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED GROVELAND COMMUNITY TRAIL PROJECT Roadway Project Management Section IN THE TOWN OF GROVELAND,

More information

Precondemnation Procedures: Acquiring Right of Way in a New World October 9, Presented by David Graeler and Brad Kuhn

Precondemnation Procedures: Acquiring Right of Way in a New World October 9, Presented by David Graeler and Brad Kuhn Precondemnation Procedures: Acquiring Right of Way in a New World October 9, 2015 Presented by David Graeler and Brad Kuhn Pre-Litigation Phases Project Planning Engineering / Design Appraisal Offer /

More information

EFRAG s Letter to the European Commission Regarding Endorsement of Transfers of Investment Property

EFRAG s Letter to the European Commission Regarding Endorsement of Transfers of Investment Property Regarding Endorsement of Transfers of Investment Property Olivier Guersent Director General, Financial Stability, Financial Services and Capital Markets Union European Commission 1049 Brussels 6 April

More information

Displacement and Relocation A. INTRODUCTION B. METHODOLOGY

Displacement and Relocation A. INTRODUCTION B. METHODOLOGY Appendix F: Displacement and Relocation A. INTRODUCTION This appendix provides additional information to support the analyses provided in Chapter 8, Displacement and Relocation. The focus of Chapter 8,

More information

Chair Thiesse and Planning Commission Members Doug Reeder, Interim City Administrator

Chair Thiesse and Planning Commission Members Doug Reeder, Interim City Administrator Item 10 Date Application Received: 02/22/17 Date Application Considered as Complete: 03/06/17 60-Day Review Period Expires: 05/05/17 To: From: Chair Thiesse and Planning Commission Members Doug Reeder,

More information

Major Impact Review for Solar Energy System, Large River Frontage Road, New Castle - Garfield County File Number MIPA

Major Impact Review for Solar Energy System, Large River Frontage Road, New Castle - Garfield County File Number MIPA March 23, 2016 Clean Energy Collective c/o Richard Miller 361 Centennial Parkway, Third Floor Louisville, CO 80027 Reference: Major Impact Review for Solar Energy System, Large 35960 River Frontage Road,

More information

AMENDMENT 1. State of Florida Office of the Attorney General INVITATION TO NEGOTIATE (ITN) 14/15-5 LEASED SPACE IN MIAMI

AMENDMENT 1. State of Florida Office of the Attorney General INVITATION TO NEGOTIATE (ITN) 14/15-5 LEASED SPACE IN MIAMI AMENDMENT 1 State of Florida Office of the Attorney General INVITATION TO NEGOTIATE (ITN) 14/15-5 LEASED SPACE IN MIAMI The Department hereby formally provides written responses to questions received and

More information

September 13, Mr. Russell Golden, Chairman Financial Accounting Standards Board 401 Merritt 7 PO Box 5116 Norwalk, CT 06856

September 13, Mr. Russell Golden, Chairman Financial Accounting Standards Board 401 Merritt 7 PO Box 5116 Norwalk, CT 06856 GATX Corporation 222 West Adams Street Chicago, IL 60606-5314 2013-270 September 13, 2013 Mr. Russell Golden, Chairman Financial Accounting Standards Board 401 Merritt 7 PO Box 5116 Norwalk, CT 06856 Mr.

More information

MTAS MORe. Sincerely,

MTAS MORe. Sincerely, Published on MTAS (http://www.mtas.tennessee.edu) Home > Printer-friendly PDF > Printer-friendly PDF > Permanent Utility Easement and Temporary Construction Easement Dear Reader: The following document

More information

THE CHAIRPERSON. Hans Hoogervorst Chairman International Accounting Standard Board 30 Cannon Street London EC4M 6XH.

THE CHAIRPERSON. Hans Hoogervorst Chairman International Accounting Standard Board 30 Cannon Street London EC4M 6XH. Floor 18 Tower 42 25 Old Broad Street London EC2N 1HQ United Kingdom t +44 (0)20 7382 1770 f +44 (0)20 7382 1771 www.eba.europa.eu THE CHAIRPERSON +44(0)20 7382 1765 direct andrea.enria@eba.europa.eu Hans

More information

ICP/IDNO Land Rights Guide

ICP/IDNO Land Rights Guide ICP/ID Land Rights Guide Our guide about land rights for connections involving Independent Connection Providers (ICPs) and Independent Distribution Network Operators (IDs) Welcome We hope this guide will

More information