Tuscola Wind II, LLC Wisner Township Special Use Permit Presentation

Size: px
Start display at page:

Download "Tuscola Wind II, LLC Wisner Township Special Use Permit Presentation"

Transcription

1 Tuscola Wind II, LLC Wisner Township Special Use Permit Presentation Questions or concerns may be addressed by calling NextEra at (800) This number is answered 24 hours a day, 7 days a week. 1

2 NextEra Energy is a premier U.S. power company comprised of three strong businesses Traded on New York Stock Exchange (Symbol: NEE) Over 15,000 full time employees 42,365 MW in operation One of the largest U.S. electric utilities Vertically integrated, retail rateregulated 4.6 MM customer accounts 24,594 MW in operation Successful wholesale generator U.S. leader in renewable generation Assets in 24 states and Canada 17,700 MW in operation A growing, diversified and financially strong company 2

3 NextEra Energy Resources is the largest wind energy producer in the U.S. 10,060 MW NextEra Energy 5,444 MW Iberdrola 3,637 Horizon (EDP) 2,623 E.On 2,285 MidAm Top U.S. Wind Owners Source: AWEA 3

4 NextEra Energy Resources has a national, diversified presence that spans from nuclear power in New Hampshire to wind and solar in California 4

5 5

6 NextEra Energy Resources has assembled a project team with significant wind project development and siting experience Project Team Mark Trumbauer Project Manager, NextEra Energy Resources Ted Weisman- NextEra Energy Resources Randy Kraker - Attorney, Varnum Law Firm Sean Gearhart - Project Manger, Atwell Tim Jones Engineering Consult, Atwell David Hollander - Land Acquisition, Atwell Richard Lampeter - Senior Scientist, Epsilon Associates Dick Rausch- Construction Manager, NextEra Energy Resources Chris Mogler- Construction Specialist, NextEra Energy Resources Questions or concerns may be addressed by calling NextEra at (800) This number is answered 24 hours a day, 7 days a week. 6

7 The Tuscola Wind II project spans four townships in Tuscola County: Wisner, Fairgrove, Gilford, and Wisner Tuscola Wind II Energy Center NextEra Energy Resources, through a subsidiary, would build, own and operate the facility A megawatt wind project, using 59 GE 1.7-megawatt turbines Will use approximately 88 acres for turbines and access roads Will generate enough electricity to power about 45,000 homes 7

8 The Tuscola Wind II project has been under development for several years Identify a site Gather wind data The Development Process Meet landowners and local officials Determine Point of Interconnection and initiate related transmission studies Conduct environmental and other studies Work closely with landowners on lease terms Develop and refine a site plan Secure a Power Purchase Agreement Obtain all necessary permits/approvals Construct, Commission and Operate 8

9 9 Environmental Studies and Agency Coordination Environmental Studies: Avian, raptor and bat surveys Sound and shadow flicker studies Wetlands delineation Hydraulic study for drain crossings Threatened/endangered species study Photo simulations FAA/Beam path/radar analysis Agency Coordination: Michigan Department of Environmental Quality Michigan Department of Natural Resources U.S. Fish and Wildlife Service Tuscola County Drain and Road Commissions

10 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Property Set-Back Sound Pressure Level Shadow Flicker Decommissioning Complaint Resolution 10

11 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Set-Back: The distance between a wind turbine and: Residences and Churches Property lines Participating parcel Non-participating parcel Public roads Transmission Lines 11

12 GE1.7 MW xle feet 426-feet 262-feet 98-feet 12

13 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Tuscola Wind II Energy Center Setbacks 13

14 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Property Set-Back Sound Pressure Level Shadow Flicker Decommissioning Complaint Resolution 14

15 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Sound Pressure Level: The sound pressure level generated by a utility grid wind energy system shall not exceed 50 db(a) as measured at any residence or church. 15

16 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Property Set-Back Sound Pressure Level Shadow Flicker Decommissioning Complaint Resolution 16

17 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Shadow Flicker Modeling Report Depict 30 hour per year contour on site plan Shadow Flicker Mitigation Plan 17

18 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Property Set-Back Sound Pressure Level Shadow Flicker Decommissioning Complaint Resolution 18

19 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Decommissioning: The applicant shall provide a decommissioning plan. The plan shall include: a) the anticipated life of the project, b) the estimated decommissioning cost net of salvage value in current dollars, c) the method of ensuring that funds will be available for decommissioning and restoration, d) the anticipated manner in which the project will be decommissioned and the site restored, and e) One year notice of decommissioning and provision of surety instrument. 19

20 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Tuscola Wind II Energy Center Decommissioning The decommissioning plan for the proposed Tuscola Wind II Energy Center includes the following: Equipment Removal including turbine and meteorological tower Foundation Removal to a minimum depth of 60 inches Roadways roadways and crane pads will be removed and restored to a condition and density consistent with the surrounding field 20 Decommissioning funding as required by our Landowner Easement Agreements Tuscola Wind II will establish and maintain a cash escrow, a performance bond or letter of credit in the amount of Estimated Net Removal Cost All Tuscola Wind II landowner easement agreements contain an obligation and financial guarantee to decommission facilities

21 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Property Set-Back Sound Pressure Level Shadow Flicker Decommissioning Complaint Resolution 21

22 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Wisner Township Standards and Requirements Complaint Resolution: The applicant shall develop a process to resolve complaints from nearby residents concerning the construction or operation of the project. Questions or concerns may be addressed by calling NextEra at (800) This number is answered 24 hours a day, 7 days a week. 22

23 The Tuscola Wind II Energy Center is designed to comply with the Wisner Township Zoning Ordinance Tuscola Wind II Complaint Resolution The Tuscola Wind II Complaint Resolution Process contains the following main elements: Purpose: provide a process to resolve complaints from local residents and/or property owners concerning the construction or operation of the Tuscola Wind II Energy Center Duration: start of construction through the life of the project Contact Information: an address, street address and phone number will be provided and posted at the township hall. Plant Manager will make all efforts to respond to all complaints within 24 hours after receipt of a complaint Maintain records of all complaints received, resolutions and any unresolved complaints A report of all complaints and resolutions will be filed with the Township annually Every effort will be made to assess and correct all complaints in a timely manner to the best of the Plant Manager s ability and resources 23

24 The Tuscola Wind II Center will bring significant benefits to Tuscola County Tuscola II Benefits Project benefits four townships Approximately $200 million of investment 200 jobs at the peak of construction Expected to create four additional permanent jobs Will pay millions of dollars in state and local taxes and landowner royalties over the first 25 years of operation Support of local schools and community activities through corporate donations Potential spinoff jobs and local spending Creates no air or water pollution Uses no water to generate electricity Compatible with current land use 24

25 The Tuscola Wind II Energy Center complies with the Wisner Township Zoning Ordinance Our Request We respectfully request the Township Planning Commission approve Applicant s Special Use Request 25

26 26

Chapter 9 Wind Energy

Chapter 9 Wind Energy SECTION 9.01 PURPOSE AND INTENT This ordinance balances the need for clean renewable energy resources with the necessity to protect the public health, safety, and welfare of the community. Tuscola Township

More information

Howard County Checksheet for Large Wind to Energy Facilities (WEF)

Howard County Checksheet for Large Wind to Energy Facilities (WEF) Wind to Energy Facility, Large permitted in AG IA I1 I2 IU Howard County Checksheet for Large Wind to Energy Facilities (WEF) Zoning of Property: Address of Property: Number of Components: General Information:

More information

EXHIBIT A SHIAWASSEE COUNTY ZONING ORDINANCE ARTICLE 4 SPECIFIC USE REGULATIONS RECOMMENDED AMENDMENTS TO SECTION (REVISED MAY 11, 2018)

EXHIBIT A SHIAWASSEE COUNTY ZONING ORDINANCE ARTICLE 4 SPECIFIC USE REGULATIONS RECOMMENDED AMENDMENTS TO SECTION (REVISED MAY 11, 2018) EXHIBIT A SHIAWASSEE COUNTY ZONING ORDINANCE ARTICLE 4 SPECIFIC USE REGULATIONS RECOMMENDED AMENDMENTS TO SECTION 4.3.76 (REVISED MAY 11, 2018) Section 4.3.76 Wind Energy Conversion Systems ( WECS ) 1.

More information

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed.

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed. Ordinance #68 AN ORDINANCE ENTITLED, AN ORDINANCE AMENDING ARTICLE II DEFINITIONS AND CHAPTER 5.22 (WIND ENERGY SYSTEMS) OF ARTICLE V GENERAL REQUIREMENTS OF ORDINANCE 65 AN ORDINANCE AMENDING ORDINANCE

More information

1. Assure that any development and production of wind-generated electricity in Boone County is safe and effective.

1. Assure that any development and production of wind-generated electricity in Boone County is safe and effective. 4.8. WIND ENERGY CONVERSION SYSTEMS SITING 4.8.1. Purpose. It is the purpose of this Section to: 1. Assure that any development and production of wind-generated electricity in Boone County is safe and

More information

SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations

SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations Section 4.3.76 Wind Energy Conversion Systems 1. Purpose A. Through this section it is hereby set forth that Shiawassee County promotes

More information

Community Wind Project Development

Community Wind Project Development Community Wind Project Development Melissa Peterson, Melissa Peterson Windustry Program Analyst Feb 10 th, 2009 Pre-Conference Workshop-CERTS Community Based Energy Development Windustry Program Analyst

More information

This is a conditional use permit request to establish a commercial wind energy conversion system.

This is a conditional use permit request to establish a commercial wind energy conversion system. Public Works 600 Scott Boulevard South Hutchinson, Kansas 67505 620-694-2976 Road & Bridge Planning & Zoning Noxious Weed Utilities Date: March 28, 2019 To: From: Reno County Planning Commission Russ Ewy,

More information

Landowner Guide to Wind Leases and Easements. Pace Energy and Climate Center August, Project Manager: Zywia Wojnar

Landowner Guide to Wind Leases and Easements. Pace Energy and Climate Center August, Project Manager: Zywia Wojnar Landowner Guide to Wind Leases and Easements Pace Energy and Climate Center August, 2011 Project Manager: Zywia Wojnar Contributors: Anne Marie Hirschberger Todd Olinsky-Paul Leasing Your Land If you own

More information

CHOWAN WIND ENERGY FACILITIES ORDINANCE REVIEW. Chairman Lou Sarratt March 31, 2015 Sub-Committee Members: Patti Kersey Jim Leggett Jim Robison

CHOWAN WIND ENERGY FACILITIES ORDINANCE REVIEW. Chairman Lou Sarratt March 31, 2015 Sub-Committee Members: Patti Kersey Jim Leggett Jim Robison CHOWAN WIND ENERGY FACILITIES ORDINANCE REVIEW Chairman Lou Sarratt March 31, 2015 Sub-Committee Members: Patti Kersey Jim Leggett Jim Robison 1 Project Overview Review of County 2013 Wind Ordinance The

More information

TITLE 7, CHAPTER 3 TAZEWELL COUNTY

TITLE 7, CHAPTER 3 TAZEWELL COUNTY TITLE 7, CHAPTER 3 TAZEWELL COUNTY WIND FARM ORDINANCE ADOPTED SEPTEMBER 2004 Amendment Dates: February, 2008 March, 2008 February 25, 2009 September 1, 2018 7TCC 3-1. Wind Energy Conversion Systems Purpose.

More information

RIGA TOWNSHIP ORDINANCE NO. AMENDMENT TO THE 1974 ZONING ORDINANCE OF RIGA TOWNSHIP

RIGA TOWNSHIP ORDINANCE NO. AMENDMENT TO THE 1974 ZONING ORDINANCE OF RIGA TOWNSHIP RIGA TOWNSHIP ORDINANCE NO. AMENDMENT TO THE 1974 ZONING ORDINANCE OF RIGA TOWNSHIP RIGA TOWNSHIP ORDAINS: Section 1. Purpose and Findings. A. Purpose. The most common and prevalent land use within Riga

More information

FPL Energy Illinois Wind, LLC Response to Staff Report of DeKalb County Planning/Zoning/Building Department. March 20, 2009

FPL Energy Illinois Wind, LLC Response to Staff Report of DeKalb County Planning/Zoning/Building Department. March 20, 2009 FPL Energy Illinois Wind, LLC Response to Staff Report of DeKalb County Planning/Zoning/Building Department March 20, 2009 Planning/Zoning/Building Department STAFF REPORT TO: FROM: Dave Dockus DeKalb

More information

PREAMBLE. That the Gratiot County Zoning Ordinance be amended as follows:

PREAMBLE. That the Gratiot County Zoning Ordinance be amended as follows: Amendment of Gratiot County Zoning Ordinance AN ORDINANCE TO AMEND THE GRATIOT COUNTY ZONING ORDINANCE REQUIREMENTS FOR SOLAR ENERGY SYSTEMS AND SOLAR FARMS FOR THE COUNTY-ZONED TOWNSHIPS OF ELBA, HAMILTON,

More information

LAKE TOWNSHIP HURON COUNTY, MICHIGAN. Ordinance No. ORDINANCE AMENDING TOWNSHIP ZONING ORDINANCE TO ADD SECTION 1613, ALTERNATIVE ENERGY

LAKE TOWNSHIP HURON COUNTY, MICHIGAN. Ordinance No. ORDINANCE AMENDING TOWNSHIP ZONING ORDINANCE TO ADD SECTION 1613, ALTERNATIVE ENERGY LAKE TOWNSHIP HURON COUNTY, MICHIGAN Ordinance No. ORDINANCE AMENDING TOWNSHIP ZONING ORDINANCE TO ADD SECTION 1613, ALTERNATIVE ENERGY LAKE TOWNSHIP ORDAINS: Section 1. Amendment of Zoning Ordinance Lake

More information

KOSSUTH COUNTY ORDINANCE #310

KOSSUTH COUNTY ORDINANCE #310 KOSSUTH COUNTY ORDINANCE #310 AN ORDINANCE REGULATING THE CONSTRUCTION AND OPERATION OF COMMERCIAL WIND ENERGY CONVERSION SYSTEMS IN KOSSUTH COUNTY, IOWA Introduction The purpose and intent of this Ordinance

More information

KOSSUTH COUNTY ORDINANCE #310 - A

KOSSUTH COUNTY ORDINANCE #310 - A KOSSUTH COUNTY ORDINANCE #310 - A AN ORDINANCE REGULATING THE CONSTRUCTION AND OPERATION OF COMMERCIAL WIND ENERGY CONVERSION SYSTEMS IN KOSSUTH COUNTY, IOWA Introduction The purpose and intent of this

More information

Model Wind Energy Facility Local Law for St. Lawrence County Municipalities. Local Law No. of 20

Model Wind Energy Facility Local Law for St. Lawrence County Municipalities. Local Law No. of 20 Local Law No. of 20 Be it hereby enacted by the Town Board of the Town of as follows: Section 1: Local Law No. of 20, entitled 'WIND ENERGY FACILITIES;" is hereby adopted to read in its entirety as follows:

More information

Gates County Planning and Zoning

Gates County Planning and Zoning Gates County Planning and Zoning PO Box 411, 200 Court Street, Gatesville, NC 27938 phone: 252-357-2411 fax: 252-357-0073 Application for Technical Review Committee For Staff Use Only: Date: Application

More information

An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois

An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois The County of Coles, Illinois hereby establishes this Wind Energy Conversion Systems Ordinance

More information

Local Law No. 1 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Hartsville as follows:

Local Law No. 1 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Hartsville as follows: Local Law No. 1 of 2006 Wind Energy Facilities Be it hereby enacted by the Town Board of the Town of Hartsville as follows: SECTION 1: Local Law No. 1 of 2006, entitled WIND ENERGY FACILITIES, is hereby

More information

ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES

ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES 20.1 TITLE. This ordinance shall be known as the Solar Energy Ordinance.

More information

Developer Evaluation(1)

Developer Evaluation(1) Hackstaff Gessler LLC Developer Evaluation(1) Brad Haight (2) Hackstaff Gessler LLC 1601 Blake Street, Suite 301 Denver, CO 80202 303-534 534-43174317 bhaight@hackstaffgessler.com www.hackstaffgessler.com

More information

Local Law No. 2 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Jasper as follows:

Local Law No. 2 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Jasper as follows: Local Law No. 2 of 2006 Wind Energy Facilities Be it hereby enacted by the Town Board of the Town of Jasper as follows: SECTION 1: Local Law No. 2 of 2006, entitled WIND ENERGY FACILITIES, is hereby adopted

More information

Easement Program Guidelines for Locating Towers and Communication Devices

Easement Program Guidelines for Locating Towers and Communication Devices Easement Program Guidelines for Locating Towers and Communication Devices The following guidelines are established by the Easement Committee to create standards for reviewing requests by landowners to

More information

JERSEY COUNTY ORDINACE REGULATING DEVELOPMENT OF COMMERCIAL SOLAR ENERGY SYSTEMS AND WIND ENERGY COVERSION SYSTEMS ADOPTED ORD # 01-19

JERSEY COUNTY ORDINACE REGULATING DEVELOPMENT OF COMMERCIAL SOLAR ENERGY SYSTEMS AND WIND ENERGY COVERSION SYSTEMS ADOPTED ORD # 01-19 JERSEY COUNTY ORDINACE REGULATING DEVELOPMENT OF COMMERCIAL SOLAR ENERGY SYSTEMS AND WIND ENERGY COVERSION SYSTEMS ADOPTED ORD # 01-19 AN ORDINANCE REGULATING RENEWABLE ENERGY SYSTEMS DEVELOPMENT IN JERSEY

More information

ORDINANCE NO. BEAVER TOWNSHIP, BAY COUNTY, MICHIGAN, ORDAINS:

ORDINANCE NO. BEAVER TOWNSHIP, BAY COUNTY, MICHIGAN, ORDAINS: ORDINANCE NO. An ordinance amending Beaver Township Ordinance No. 15, as amended, the Township Zoning Ordinance, in the following particulars: by changing Chapter II by adding Section 2.60 to provide a

More information

Town of Fort Fairfield Wind Energy Technical Review Committee Council Chambers Monday, March 30, :00 P.M.

Town of Fort Fairfield Wind Energy Technical Review Committee Council Chambers Monday, March 30, :00 P.M. Town of Fort Fairfield Council Chambers Monday, 6:00 P.M. Members: Dick Langley, Todd Maynard, Tim Goff, David McCrea, Phil Christensen, Jim Everett, John Herold, Brent Churchill, Michael Bosse and Carl

More information

TOWNSHIP OF WHITE PLANNING BOARD COUNTY OF WARREN, STATE OF NEW JERSEY

TOWNSHIP OF WHITE PLANNING BOARD COUNTY OF WARREN, STATE OF NEW JERSEY Application # 757 Resolution Approved: 4/12/11 TOWNSHIP OF WHITE PLANNING BOARD COUNTY OF WARREN, STATE OF NEW JERSEY RESOLUTION GRANTING PRELIMINARY AND FINAL MAJOR SITE PLAN APPROVAL TO PPL RENEWABLE

More information

Extractive Industrial Regulatory Ordinance No. 21 revised Dec. 28, 2010 EXTRACTIVE INDUSTRIAL REGULATORY ORDINANCE TYRONE TOWNSHIP, MICHIGAN

Extractive Industrial Regulatory Ordinance No. 21 revised Dec. 28, 2010 EXTRACTIVE INDUSTRIAL REGULATORY ORDINANCE TYRONE TOWNSHIP, MICHIGAN 40.101 Sec. 1. TITLE. EXTRACTIVE INDUSTRIAL REGULATORY ORDINANCE TYRONE TOWNSHIP, MICHIGAN ord. no. 21 eff. May 12, 1979, revised Dec. 28, 2010 This ordinance shall be known and cited as the Tyrone Township

More information

Antelope Ridge Wind Farm Habitat Mitigation Plan November 2011

Antelope Ridge Wind Farm Habitat Mitigation Plan November 2011 Antelope Ridge Wind Farm Habitat Mitigation Plan November 2011 I. Introduction The Antelope Ridge Wind Farm will be constructed in two phases, in the locations as shown on the attached map, Exhibit A.

More information

BYRON TOWNSHIP ZONING APPLICATION

BYRON TOWNSHIP ZONING APPLICATION BYRON TOWNSHIP ZONING APPLICATION Phone: (616) 878-9104 * Fax: (616) 878-3980 * Website: www.byrontownship.org This application will not be accepted if incomplete. APPLICATION FOR & REQUIRED COPIES Private

More information

Wind Energy Conversion System Ordinance No. 467

Wind Energy Conversion System Ordinance No. 467 Wind Energy Conversion System Ordinance No. 467 AN ORDINANCE ESTABLISHING A PERMITTING PROCESS FOR WIND ENERGY CONVERSION SYSTEMS ADOPTED BY THE Big Timber City Council on this day of, 2006. ADOPTED BY

More information

P a g e 1. DRAFT August 31, 2018 Version

P a g e 1. DRAFT August 31, 2018 Version A. Wind Energy Conversion Systems 1. Purpose a. It is the purpose of this section to: 1) Assure the protection of health, safety, welfare, and property values for all DeKalb County residents and landowners.

More information

Appendix Eric Miller Director, Business Development Invenergy LLC. June 27, Altona Town Board 3124 Miner Farm Rd.

Appendix Eric Miller Director, Business Development Invenergy LLC. June 27, Altona Town Board 3124 Miner Farm Rd. Appendix 31-3 June 27, 2016 Altona Town Board 3124 Miner Farm Rd. Altona, NY 12910 RE: Bull Run Wind Energy Center, Applicable Local Laws Dear Altona Town Board, We hope this letter finds you well. We

More information

LANDOWNER GUIDELINES FOR EVALUATING WIND ENERGY PRODUCTION CONTRACTS. Stephen B. Harsh David Schweikhardt Lynn Hamilton

LANDOWNER GUIDELINES FOR EVALUATING WIND ENERGY PRODUCTION CONTRACTS. Stephen B. Harsh David Schweikhardt Lynn Hamilton Revised July 2008 LANDOWNER GUIDELINES FOR EVALUATING WIND ENERGY PRODUCTION CONTRACTS Stephen B. Harsh David Schweikhardt Lynn Hamilton Department of Agricultural, Food and Resource Economics Michigan

More information

Torch Lake Township Antrim County, Michigan

Torch Lake Township Antrim County, Michigan Torch Lake Township Antrim County, Michigan Farmland and Open Space Development Rights Ordinance Ordinance No. 04-01 Effective September 3, 2004 AN ORDINANCE creating a farmland and open space protection

More information

APRIL 30, ILL. ADM. CODE 2580 CH. I, SEC. 2580

APRIL 30, ILL. ADM. CODE 2580 CH. I, SEC. 2580 TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER f: ADMINISTRATIVE SERVICES PART 2580 CONSERVATION STEWARDSHIP PROGRAM Section 2580.10 Definitions 2580.20 Eligibility 2580.30

More information

13. Land Acquisition In order to exploit a wind resource, a developer must first have the legal right to use the land. Broadly

13. Land Acquisition In order to exploit a wind resource, a developer must first have the legal right to use the land. Broadly 13. Land Acquisition In order to exploit a wind resource, a developer must first have the legal right to use the land. Broadly speaking, developers have two alternatives for acquiring the right to install

More information

DENMARK TOWNSHIP, TUSCOLA COUNTY, MICHIGAN ORDINANCE NO

DENMARK TOWNSHIP, TUSCOLA COUNTY, MICHIGAN ORDINANCE NO DENMARK TOWNSHIP, TUSCOLA COUNTY, MICHIGAN ORDINANCE NO. 2018-02 ORDINANCE AMENDING TOWNSHIP ZONING ORDINANCE TO ADD SECTION 1422, SOLAR ENERGY FACILITIES THE TOWNSHIP OF DENMARK ORDAINS: Denmark Township

More information

PRE-FEASIBILITY ASSESSMENTS & PROJECT FINANCE FEBRUARY 7 TH, 2018 CALGARY, AB

PRE-FEASIBILITY ASSESSMENTS & PROJECT FINANCE FEBRUARY 7 TH, 2018 CALGARY, AB PRE-FEASIBILITY ASSESSMENTS & PROJECT FINANCE FEBRUARY 7 TH, 2018 CALGARY, AB Your Speakers Jai Roberts, Renewable Energy Project Manager 10 years in manufacturing 10 years in industrial project management

More information

PLANNING & ZONING COMMISSION RESOLUTION A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ALBANY, COUNTY

PLANNING & ZONING COMMISSION RESOLUTION A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ALBANY, COUNTY PLANNING & ZONING COMMISSION RESOLUTION 0-0 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ALBANY, COUNTY OF ALAMEDA, STATE OF CALIFORNIA, APPROVING A TENTATIVE PARCEL MAP TO CREATE A PARCEL AT

More information

Wind Development in Montana: Leases, Options, and Update

Wind Development in Montana: Leases, Options, and Update Wind Development in Montana: Leases, Options, and Update I. General Introduction: What is a Wind Lease? A Wind Lease is a Contract to use the surface of the land for a term of years for a specific purpose.

More information

DALLAS TOWNSHIP CLINTON COUNTY, MICHIGAN ORDINANCE NO

DALLAS TOWNSHIP CLINTON COUNTY, MICHIGAN ORDINANCE NO DALLAS TOWNSHIP CLINTON COUNTY, MICHIGAN ORDINANCE NO. 2012-03 At a duly scheduled and noticed meeting of the Township Board of the Township of Dallas, Clinton County, Michigan, held at the Dallas Township

More information

"C" COMMERCIAL DISTRICT SECTION 7

C COMMERCIAL DISTRICT SECTION 7 "C" COMMERCIAL DISTRICT PURPOSE: The purpose of the limited business district is to provide for commercial land uses which can be compatible with a prominently rural residential area without central sewer

More information

TABLE OF CONTENTS. Township of Clyde i

TABLE OF CONTENTS. Township of Clyde i TABLE OF CONTENTS ARTICLE 1 - TITLE, PURPOSE, SCOPE, AND LEGAL BASIS... 1-1 1.01 TITLE...1-1 1.02 PURPOSE... 1-1 1.03 SCOPE AND INTERPRETATION...1-1 1.04 THE EFFECT OF ZONING... 1-2 1.05 LEGAL BASIS...1-2

More information

state the date and place of a hearing thereon, which shall be held within fourteen (14) days of the notice.

state the date and place of a hearing thereon, which shall be held within fourteen (14) days of the notice. state the date and place of a hearing thereon, which shall be held within fourteen (14) days of the notice. At the hearing the Planning Commission may modify the terms of the original notice as to the

More information

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS - Larimer County Planning Dept. Procedural Guide for 1041 PERMITS PLEASE NOTE: A PRE-APPLICATION CONFERENCE IS REQUIRED PRIOR TO SUBMITTING THIS APPLICATION. PURPOSE: State Statutes allow local governments

More information

RENTS, ROYALTIES, EASEMENTS AND LAND VALUES

RENTS, ROYALTIES, EASEMENTS AND LAND VALUES RENTS, ROYALTIES, EASEMENTS AND LAND VALUES M. Ragheb 3/26/2011 INTRODUCTION Developers and landowners have invested in long term leases for wind farms potential sites in the American Midwest in states

More information

Local Law No. of Town of Lyme, NY

Local Law No. of Town of Lyme, NY Local Law No. of 2012- Town of Lyme, NY Be it hereby enacted by the Town Board of the Town of Lyme as follows: Section 1: Local Law No. _ of2012, entitled, "Wind Energy Conversion Systems", is hereby adopted

More information

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015 ARTICLE 4 PRELIMINARY PLAN 401 Intent An in-depth analysis of the proposed subdivision, including a review of the design considering the ability to obtain water and sanitation, identified geologic hazards,

More information

INTERROGATORIES OF THE CORPORATION THE COUNTY OF MIDDLESEX

INTERROGATORIES OF THE CORPORATION THE COUNTY OF MIDDLESEX EB-2013-0040 EB-2013-0041 ONTARIO ENERGY BOARD THE MATTER OF the Ontario Energy Board Act 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Bornish Wind, LP, Kerwood Wind, Inc.

More information

About the Project. The project consists of two new high voltage transmission lines to be built by Sharyland Utilities, L.P. (Sharyland).

About the Project. The project consists of two new high voltage transmission lines to be built by Sharyland Utilities, L.P. (Sharyland). Sharyland Utilities, L.P. 1900 North Akard Street Dallas, Texas 75201 Toll-free: (866) 354-3335 Frequently Asked Questions Regarding Sharyland Utilities Proposed Wadsworth to New Oliver to Farmland 345

More information

New Cingular Wireless Telecommunication Tower at County Road 48, Milner Conditional Use Permit

New Cingular Wireless Telecommunication Tower at County Road 48, Milner Conditional Use Permit New Cingular Wireless Telecommunication Tower at 39415 County Road 48, Milner ACTIVITY #: Conditional Use Permit PP2012-023 HEARING DATES: Planning Commission (PC): August 16, 2012 at 6:00pm PETITIONER:

More information

ROBINSON TOWNSHIP PLANNING COMMISSION August 28, 2018

ROBINSON TOWNSHIP PLANNING COMMISSION August 28, 2018 ROBINSON TOWNSHIP PLANNING COMMISSION August 28, 2018 The regular meeting of the Robinson Township Planning Commission was called to order at 7:30 PM at the Robinson Township Hall. Present Shawn Martinie

More information

Gilford Township Master Plan

Gilford Township Master Plan Gilford Township Master Plan Mailing Address Gilford Township 171 N. Garner Road Fairgrove, MI 48733 Physical Address Gilford Township Hall 6230 Gilford Rd. Fairgrove, MI 48733 Phone: (989) 693-6394 Fax:

More information

I. Requirements for All Applications. C D W

I. Requirements for All Applications. C D W 108-16.1. Application checklists. Checklist for Required Submissions to the Planning Board or Zoning Board of Adjustment of Monroe Township All required submissions are to be made to the Administrative

More information

CITY OF WILDOMAR PLANNING COMMISSION Agenda Item #2.3 PUBLIC HEARING Meeting Date: January 6, 2016

CITY OF WILDOMAR PLANNING COMMISSION Agenda Item #2.3 PUBLIC HEARING Meeting Date: January 6, 2016 CITY OF WILDOMAR PLANNING COMMISSION Agenda Item #2.3 PUBLIC HEARING Meeting Date: January 6, 2016 TO: FROM: Chairman and Members of the Planning Commission Matthew C. Bassi, Planning Director SUBJECT:

More information

Understanding Wind Energy Leases

Understanding Wind Energy Leases Understanding Wind Energy Leases Photo source: Stephanie Buway, OWPI Dr. Shannon L. Ferrell Assistant Professor Agricultural Law OSU Department of Agricultural Economics Power is a function of air density,

More information

TOWN OF FARMERSVILLE LOCAL LAW NO. OF THE YEAR 2018 A Proposed Local Law Entitled "Wind Energy Facility Law of the Town of Farmersville, New York"

TOWN OF FARMERSVILLE LOCAL LAW NO. OF THE YEAR 2018 A Proposed Local Law Entitled Wind Energy Facility Law of the Town of Farmersville, New York TOWN OF FARMERSVILLE LOCAL LAW NO. OF THE YEAR 2018 A Proposed Local Law Entitled "Wind Energy Facility Law of the Town of Farmersville, New York" Be it hereby enacted by the Town Board of the Town of

More information

County Engineers Workshop February 4, Little River Casino and Resort Manistee, Michigan

County Engineers Workshop February 4, Little River Casino and Resort Manistee, Michigan County Engineers Workshop 2015 February 4, 2015 Little River Casino and Resort Manistee, Michigan Stumbling Blocks for Local Agency Projects MDOT Local Agency Program (LAP) Bruce Kadzban, PE Rural & Enhancement

More information

Can the Landowner Ride the Wind? By: Brandon L. Jensen Budd-Falen Law Offices, LLC

Can the Landowner Ride the Wind? By: Brandon L. Jensen Budd-Falen Law Offices, LLC Can the Landowner Ride the Wind? By: Brandon L. Jensen Budd-Falen Law Offices, LLC There are a lot of reasons that western landowners love to hate the wind --- it s relentless, constant, never ceasing,

More information

Resolution No. The following resolution is now offered and read:

Resolution No. The following resolution is now offered and read: Resolution No. RESOLUTION OF THE BOARD OF SUPERVISORS OF IMPERIAL COUNTY CALIFORNIA, GRANTING TENTATIVE APPROVAL OF CANCELLATION OF WILLIAMSON ACT LAND CONSERVATION CONTRACT ON LAND LOCATED AT 7096 ENGLISH

More information

Local Law No. 1, of 2012

Local Law No. 1, of 2012 Local Law No. 1, of 2012 TOWN OF HANCOCK LOCAL LAW NO. 1 OF THE YEAR 2012 A local law TOWN OF HANCOCK SITE PLAN REVIEW LAW 1 GENERAL PROVISION A. Enactment. The Town Board of the Town of Hancock, Delaware

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application

More information

ORDINANCE NO. 875 (AS AMENDED THROUGH 875

ORDINANCE NO. 875 (AS AMENDED THROUGH 875 ORDINANCE NO. 875 (AS AMENDED THROUGH 875.1) AN ORDINANCE OF THE COUNTY OF RIVERSIDE TO ESTABLISH A LOCAL DEVELOPMENT MITIGATION FEE FOR FUNDING THE PRESERVATION OF NATURAL ECOSYSTEMS IN ACCORDANCE WITH

More information

APPLICATION FOR A BUILDING PERMIT (To be completed by applicant) (Please Print or Type)

APPLICATION FOR A BUILDING PERMIT (To be completed by applicant) (Please Print or Type) CARBON COUNTY Department of Planning and Development Application Fee $: 215 West Buffalo, Suite 336 Check #: Rawlins, WY 82301 Receipt #: Tel (307) 328-2651 FAX (307) 328-2735 Permit #: Date Issued: www.carbonwy.com

More information

Town of Jupiter Island Delegated Mangrove Authority For the State of Florida

Town of Jupiter Island Delegated Mangrove Authority For the State of Florida Town of Jupiter Island Delegated Mangrove Authority For the State of Florida Mangroves are regulated by the State of Florida. The Town of Jupiter Island is a delegated regulatory agency for the State for

More information

CHAPTER 10 Planned Unit Development Zoning Districts

CHAPTER 10 Planned Unit Development Zoning Districts CHAPTER 10 Planned Unit Development Zoning Districts Section 10.1 Intent and Purpose The Planned Unit Development (PUD) districts are intended to offer design flexibility for projects that further the

More information

UMATILLA COUNTY CODE REQUIREMENTS FOR WIND FACILITIES IN THE EFU ZONE

UMATILLA COUNTY CODE REQUIREMENTS FOR WIND FACILITIES IN THE EFU ZONE UMATILLA COUNTY CODE REQUIREMENTS FOR WIND FACILITIES IN THE EFU ZONE 152.060 (EFU) CONDITIONAL USES PERMITTED. (F) Commercial utility facilities for the purpose of generating power for public use by sale.

More information

WELCOME Garland Power & Light

WELCOME Garland Power & Light WELCOME WELCOME Need & Benefit The Federal Energy Regulatory Commission has ordered the City of Garland/ under section 210 of the Federal Power Act to interconnect with Southern Cross Transmission LLC

More information

WIND ENERGY CONVERSION SYSTEM (WECS) APPLICATION

WIND ENERGY CONVERSION SYSTEM (WECS) APPLICATION PLANNING & DEVELOPMENT SERVICES PO Box 4169, 911 North 7 Avenue Pocatello, Idaho 83205 WIND ENERGY CONVERSION SYSTEM (WECS) APPLICATION Submittal Date: Contact Person: Permit #: Receipt Date: Plan Review

More information

LIVING LANDS BIODIVERSITY GRANTS: INFORMATION AND APPLICATION. Due: January 16, 2009

LIVING LANDS BIODIVERSITY GRANTS: INFORMATION AND APPLICATION. Due: January 16, 2009 LIVING LANDS BIODIVERSITY GRANTS: INFORMATION AND APPLICATION Due: January 16, 2009 PURPOSE OF LIVING LANDS PROJECT Defenders of Wildlife s Living Lands project provides financial, technical and educational

More information

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist Prior to filing any application for SUBDIVISION approval, the applicant shall request in writing that the zoning administrator schedule a pre-submission conference. APPLICATION TO THE PLANNING BOARD TOWN

More information

FINDINGS OF FACT. Page 1 of 8

FINDINGS OF FACT. Page 1 of 8 FINDINGS OF FACT The City/County Planning staff has prepared the Findings of Fact for the Emerald View Park Subdivision, Amended Lot 1A, Block 3. These findings are based on the preliminary plat application

More information

COUNCIL MINUTES November 17, 2008

COUNCIL MINUTES November 17, 2008 Corporation of the Township of Adelaide Metcalfe 104 THE CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE COUNCIL MINUTES November 17, 2008 Present: Mayor John Milligan, Deputy Mayor Adrian debruyn, Councillor

More information

Cibuk 1 Wind Farm Land Acquisition Plan Vetroelektrane Balkana d.o.o. October 2014

Cibuk 1 Wind Farm Land Acquisition Plan Vetroelektrane Balkana d.o.o. October 2014 Vetroelektrane Balkana d.o.o. October 2014 Table of contents Chapter Pages 1. Introduction 3 2. Project Land Acquisition 3 2.1. Land previously acquired 3 2.2. Land in the process of acquisition 4 3. Legal

More information

ARTICLE 3 GENERAL PROVISIONS

ARTICLE 3 GENERAL PROVISIONS ARTICLE 3 GENERAL PROVISIONS 3.01 ACCESS TO A STREET All lots must abut on a street or road for an uninterrupted distance equal to or greater than the minimum lot width specified for the district in which

More information

Case Study: Impact of a Wind Turbine Project on a Rural Community

Case Study: Impact of a Wind Turbine Project on a Rural Community Case Study: Impact of a Wind Turbine Project on a Rural Community Study Location: Suncor/Acciona Ripley Wind Project Huron-Kinloss Township, Bruce County Elma-Mornington Concerned Citizens Introduction

More information

NEWPORT CODE DRAFT latest revision 11/11/13 APPENDIX A. SPECIAL USE and CONDITIONAL USE PERMITS

NEWPORT CODE DRAFT latest revision 11/11/13 APPENDIX A. SPECIAL USE and CONDITIONAL USE PERMITS PROVISIONS FOR SPECIAL and CONDITIONAL USES 9-6 Tall Structures, General Tall Structures are defined as but not limited to: Steeples, Towers, Smoke Chimneys, Wind activated Devices, Wind Energy Facilities

More information

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Date Received: Fee Paid (amount): Applicant: Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Subdivision Name/Title: This application must be received at the Town Office by close of business on the

More information

A LOCAL LAW GOVERNING WIND ENERGY FACILITIES IN THE TOWN OF FREMONT. Be hereby enacted by the Town Board of the Town of Fremont as follows:

A LOCAL LAW GOVERNING WIND ENERGY FACILITIES IN THE TOWN OF FREMONT. Be hereby enacted by the Town Board of the Town of Fremont as follows: Local Law No. 2 of 2018 A LOCAL LAW GOVERNING WIND ENERGY FACILITIES IN THE TOWN OF FREMONT Be hereby enacted by the Town Board of the Town of Fremont as follows: Section 1: Title This Local Law shall

More information

Tentative Map Application Review Procedures

Tentative Map Application Review Procedures FOR REFERENCE ONLY This page is not part of the application. Tentative Map Application Review Procedures The tentative map process in Churchill County is designed to provide a mechanism in order to divide

More information

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651)

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651) 8150 Barbara Avenue Inver Grove Heights, MN 55077 (651) 450-2545 www.invergroveheights.org FINAL PLANNED UNIT DEVELOPMENT (City Code Section 10-13A) The following must be submitted prior to review and

More information

Renewable Energy in Alberta

Renewable Energy in Alberta Photo Credit: @istock.com/republica Renewable Energy in Alberta Ag Dex 817-15 August 14, 2017 Farmers Advocate Office www.farmersadvocate.gov.ab.ca farmers.advocate@gov.ab.ca 310-FARM (3276) Twitter: @fao_alberta

More information

Guide to Combined Preliminary and Final Plats

Guide to Combined Preliminary and Final Plats Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested

More information

APPLICATION FOR SITE PLAN REVIEW AND APPROVAL PERMIT FOR THE PALO ALTO WIND ENERGY PROJECT. Submitted By:

APPLICATION FOR SITE PLAN REVIEW AND APPROVAL PERMIT FOR THE PALO ALTO WIND ENERGY PROJECT. Submitted By: APPLICATION FOR SITE PLAN REVIEW AND APPROVAL PERMIT FOR THE PALO ALTO WIND ENERGY PROJECT Submitted By: AUGUST 31st, 2017 Table of Contents Contents PREAMBLE... 1 1. PURPOSE - SECTION 1.... 3 2. JURISDICTION

More information

ZONING & LAND USE APPLICATION

ZONING & LAND USE APPLICATION City of Maple Plain 5050 Independence St P.O. Box 97 Maple Plain, MN 55359 Office: (763) 479-0515 Fax: (763) 479-0519 ZONING & LAND USE APPLICATION APPLICANT INFORMATION Applicant Name Company, if applicable

More information

Morton County Commission Meeting Agenda March 10, 2014 Commission Room, Morton County Courthouse nd Ave NW, Mandan ND 5:30 PM

Morton County Commission Meeting Agenda March 10, 2014 Commission Room, Morton County Courthouse nd Ave NW, Mandan ND 5:30 PM Morton County Commission Meeting Agenda March 10, Commission Room, Morton County Courthouse 210 2 nd Ave NW, Mandan ND 5: PM 1. Call to order Roll Call Approval of Agenda Approval of minutes of previous

More information

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1 Proposed Name of Subdivision: City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1 FOR PRELIMINARY SUBDIVISION APPROVAL This application must be filled out legibly, in

More information

Wind Lease Terms/ Provisions. Byron Kentor

Wind Lease Terms/ Provisions. Byron Kentor Wind Lease Terms/ Provisions Byron Kentor Renewable Energy? I m a big fan! 1. What is a gust of wind s favorite color? 2. How do you stop your newspaper from flying away in the wind? 3. What day of the

More information

Planning and Zoning Minutes July 17, :00 pm. Chairman Joe Dolphy, Tom Searing, Amanda Anderson, Gary Gustafson, Tom Sausen, Jim Garrison

Planning and Zoning Minutes July 17, :00 pm. Chairman Joe Dolphy, Tom Searing, Amanda Anderson, Gary Gustafson, Tom Sausen, Jim Garrison LINWOOD TOWNSHIP ANOKA COUNTY 22817 Typo Creek Drive N.E. Stacy, Minnesota 55079 (651) 462-2812 Fax (651) 462-0500 E-Mail: info@linwoodtownship.org Website: http://linwoodtownship.org Planning and Zoning

More information

Color Key. Red = BBR Current Comments. Purple/Pink = Amy Cornell s Highlights. Blue/Orange = Opponent Accepted Changes

Color Key. Red = BBR Current Comments. Purple/Pink = Amy Cornell s Highlights. Blue/Orange = Opponent Accepted Changes Color Key Red = BBR Current Comments Purple/Pink = Amy Cornell s Highlights Blue/Orange = Opponent Accepted Changes Black Strikeouts = Opponent Proposed Changes TITLE 5 UTILITIES SECTION 1.0 UTILITIES:

More information

Here Comes The. MIKE COURI & BOB RUPPE COURI & RUPPE (763)

Here Comes The. MIKE COURI & BOB RUPPE COURI & RUPPE  (763) Here Comes The Sun MIKE COURI & BOB RUPPE COURI & RUPPE mike@coruiruppe.com bob@couriruppe.com (763) 497-1930 ST. JOHN S SOLAR PROJECT ST. JOHN S SOLAR PROJECT ST. JOHN S SOLAR PROJECT 2013 SOLAR ENERGY

More information

Public Hearing Published 8/21/2017 Public Hearing 9/21/2017 Approved 10/5/2017 RESOLUTION NO

Public Hearing Published 8/21/2017 Public Hearing 9/21/2017 Approved 10/5/2017 RESOLUTION NO Public Hearing Published 8/21/2017 Public Hearing 9/21/2017 Approved 10/5/2017 RESOLUTION NO. 17-009 A RESOLUTION OF THE CITY OF FLOWERY BRANCH CITY COUNCIL APPROVING A CONDITIONAL USE PERMIT (CUP) TO

More information

Who Owns the Wind and Other Strange Questions

Who Owns the Wind and Other Strange Questions Who Owns the Wind and Other Strange Questions January 18, 2013 1 Four States Irrigation Council 2 Wind Growth 2002 total wind power capacity operating in the U.S. < 5,000 megawatts Now tops 35,000 megawatts

More information

Town of Lyme Draft of Local Law No. 3 of the year 2016 {revision 12/28/16} [Note: Consequential changes from the 6/27/16 version are in green.

Town of Lyme Draft of Local Law No. 3 of the year 2016 {revision 12/28/16} [Note: Consequential changes from the 6/27/16 version are in green. NEW YORK STATE DEPARTMENT OF STATE Local Law Filing 41 STATE STREET, ALBANY, NY 12231 (Use this form to file a local law with the Secretary of State) Town of Lyme Draft of Local Law No. 3 of the year 2016

More information

Issues in Wetland Protection

Issues in Wetland Protection This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp John Helland, Legislative

More information

Article 2 Application Type and Standards Requirements

Article 2 Application Type and Standards Requirements Article 1 Article 2 Division 1 Application Type and Standards Requirements General Provisions Sec. 2.1.1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 Division 9 Sec. 2.9.1

More information

CHARTER TOWNSHIP OF LYON APPLICATION FOR LAND DIVISION (LOT SPLIT)

CHARTER TOWNSHIP OF LYON APPLICATION FOR LAND DIVISION (LOT SPLIT) File #: Date Submitted: CHARTER TOWNSHIP OF LYON APPLICATION FOR LAND DIVISION (LOT SPLIT) NOTICE TO APPLICANT: Applications for land divisions (also called lot splits ) are reviewed in accordance with

More information