1 Date: September 21, 2012 To: From: Re: Chairperson and Members Planning and Housing Committee Ken O Brien, MCIP, Manager of Planning and Information Cliff Johnston, MCIP, Director of Planning Department of Planning File No. B-17-N.4 Civic Number: Newfoundland Drive, Virginia Park Plaza (Ward 1) Application to Develop Two Residential Condominium Apartment Buildings and a Commercial Building Applicant: Regal Realty Limited Regal Realty Limited has applied to redevelop Virginia Park Plaza at Newfoundland Drive for residential and commercial use. They propose to develop two five (5) storey buildings with a total of approximately 252 residential apartment units under condominium ownership, plus a small two (2) storey commercial building. The applicant wishes to retain the existing Commercial Neighbourhood (CN) Zone and asks Council to grant a site-specific text amendment for additional building height. For various reasons, staff recommends another planning approach. The development warrants further consideration. BACKGROUND INFORMATION Virginia Park Plaza has an area of 1.53 hectares (3.78 acres) and frontage along Newfoundland Drive of 98 metres (322 feet). The site is fairly level, having a 2-storey commercial building on its western side (built over 30 years ago) and a large paved parking lot with some grassed and gravel areas to the east and at the rear. It is not affected by the presence of a waterway or a wetland; not in a Heritage Area; and is not in a Parking-Exempt Area. The development would involve expanding the existing 2-storey building to 5 storeys and converting it to exclusive residential use in condominium ownership, building another 5-storey condominium apartment building on the other side of the parking lot, and building a 2-storey stand-alone commercial building on the front of the lot. The new commercial building would have a gross floor area of 370 square metres (4,000 square feet) with ground-floor retail and second-floor office space. Virginia Park Plaza serves the Virginia Park neighbourhood. Abutting the property on the west are single detached houses which front on Newfoundland Drive or Glover Place in the R1 Zone. On the opposite side of Newfoundland Drive, there are single detached houses in the R1 Zone. To the east are a

2 Page 2 large number of row houses on Newfoundland Court or Newfoundland Drive in the R2 Zone. Northeast of the subject property are a large number of single detached houses on Drake Crescent in the R2 Zone. The property also adjoins the Drake Crescent/Middleton Street Municipal Park in the Open Space Zone. The Virginia Park Elementary School (in the Institutional Zone) borders the property on the northwest. PLANNING APPROACH St. John s Municipal Plan St. John s Development Regulations Current Commercial General District Commercial Neighbourhood (CN) Zone Proposed Same Commercial Office Hotel (COH) Zone 1. The subject property is in the Commercial Neighbourhood (CN) Zone and the Commercial General Land-Use District. The CN Zone limits building height to a maximum of 3 storeys and allows dwelling units on the upper storeys of a building but not the ground floor. To allow the proposed development, Council would have to make a text amendment to the St. John s Development Regulations. This would not require a Municipal Plan amendment. However, the CN Zone is designed to accommodate neighbourhood commercial services at a moderate level of intensity. It is used throughout the city in residential neighbourhoods and where commercial lots are typically smaller than Virginia Park Plaza. To make the CN Zone text amendment sought by the applicant could have detrimental effects elsewhere in the city. The applicant s wish to make more intense use of the site for residential buildings is desirable and consistent with the City s planning objectives regarding providing opportunities for a variety of housing types and by allowing increased residential densities where appropriate. Given the large size of the subject property, a more appropriate planning approach would be to consider rezoning the site to the Commercial Office Hotel (COH) Zone. This allows building heights up to 10 storeys; dwelling units on the second or higher storey as a Permitted Use; and dwelling units on the ground floor as a Discretionary Use. 2. Because of the proposed size and density of development relative to the neighbouring land uses, the City may require that this development proposal be subject to a land-use assessment report (LUAR) that would be subject to public review. This report would indicate: - Site landscaping and buffering. - Site lighting; screening for garbage dumpsters; location of heating, ventilating and airconditioning (HVAC) equipment. - Potential loss of privacy and sunlight for nearby houses. 3. The applicant should clarify if condominium ownership is to be used only for the apartment

3 buildings or for the commercial building as well; and whether each building will form its own condominium corporation. Page 3 Technical Considerations 1. Municipal water and sewer mains are available along the frontage of the subject property to service the proposed development. Storm-sewer system capacity can accommodate the development. 2. The number of proposed dwelling units will require a traffic impact report by the applicant. This could be done as part of the LUAR. 3. Review and approval of a site development plan, including site access, parking-lot layout, and landscaping and buffering, would ordinarily be addressed at the time an application for development approval is submitted to the City. CONCLUSION/RECOMENDATION The Municipal Plan encourages compact urban form by accommodating development with higher densities and infill development where appropriate, and making more intensive use of municipal infrastructure. This development would be consistent with the Municipal Plan and make good use of this under-used commercial site by providing new housing while maintaining a convenient neighbourhood commercial use. However, rather than the Development Regulations site-specific text amendment to the CN Zone that the applicant asked for, it is the opinion of Planning staff that rezoning to the Commercial Office Hotel (COH) Zone would be a better option. If there were concerns about the potential for building heights up to 10 storeys, Council could place a site-specific restriction on the height of the proposed apartment buildings. If the Planning and Housing Committee concurs, staff could prepare terms of reference for a land-use assessment report (LUAR). Once the report is received and found satisfactory, the application and report could be publicly advertised. Staff has consulted with the Ward Councillor, who agrees with public notification as the appropriate initial step. No Municipal Plan amendment would be required. This is provided for the consideration of the Planning and Housing Committee. Ken O Brien, MCIP Manager - Planning & Information Cliff Johnston, MCIP Director of Planning /dlm I:\JOHNSTON\2012\Planning & Housing Newfoundland Dr - Sept 21, 2012.doc

4

5 For Redevelopment of Virginia Park Plaza Property Into Two (2) Condominium Apartment Buildings And One (1) Commercial Building At Newfoundland Drive, St. John s, NL To: Ken O Brien, MCIP Planning Department City of St. John s P.O. Box 908, St. John s, NL A1C 5M2 Applicant: Regal Realty Ltd. 5 Beck's Cove, Murray Premises St. John's, NL A1C 1B9 Prepared By: RJC Services Development Consultant 79 Rennie's Mill Road St. John's, NL A1C 3R1 18 July 2013 Planning Department File: B-17-N.1/

6 Table of Contents INTRODUCTION.1 Project Rationale... 3 Conception and Design... 4 List of Consultants... 4 Architectural Renderings... 5 City of St. John s LUAR Terms of Reference A BUILDING BY USAGE Phase 1 Building Phase 2 Building Phase 3 Building B ELEVATIONS AND MATERIALS C BUILDING HEIGHTS AND LOCATION Shadow Study Locations: D EXTERIOR LIGHTING AND NOISE E LANDSCAPING AND SCREENING F SNOW CLEARING AND STORAGE G OFF STREET PARKING Building Phase Building Phase Building - Phase H SERVICING I TRAFFIC J CONSTRUCTION WORKER PARKING K CONSTRUCTION LAY DOWN AREA L CONSTRUCTION TIME FRAME CONCLUSION..31 APPENDIX 1 SITE PLANS APPENDIX 2 FLOOR PLANS PHASE 1 BUILDING APPENDIX 3 - FLOOR PLANS PHASE 2 BUILDING APPENDIX 4 - FLOOR PLANS - PHASE 3 BUILDING July 2013

7 Introduction This development will consist of three new buildings, two of which will be for residential condominiums with units of a size and price that will be attractive to the many employees that will be working in this fast developing area. Units will range in size from 567 sq. ft. to 899 sq. ft. We anticipate that it will also be a favorite destination for singles, young couples and first time buyers. The first phase to be constructed will be the redevelopment of the existing two story building. Figure 1 - Aerial View of Existing Virginia Park Plaza Property While the existing structure will be retained, it will be reinforced and totally refurbished to become a five storey building with commercial services on the ground floor level. The upper four levels, along with a portion of the first level, will have 122 residential condominiums. Phase 2 will be a two story commercial building that will include a neighborhood convenience store of approximately 2000 square feet (186 sq. m.),which will not only be for the convenience of the new condo owners, but also for the entire neighborhood. There will be office suites on the second floor of this building. 18 July 2013 Page 1

8 Phase 3 will be a second five level condominium building over a basement level devoted to indoor parking and storage lockers for the condominium owners. The units in this building will be similar in design, size and market value. There will be 140 units in this building, bringing the total number of new condo units on this site to 262. Figure 2 - Aerial Photo of the Area Figure 3 - Aerial Photo of the Virginia Park Neighborhood 18 July 2013 Page 2

9 Project Rationale At the present time there is a growing demand for residential accommodations in the city as a whole, however in the area of St. John s known as Pleasantville there are developments taking place that are causing the area to outpace the rest of the city. These new projects will be attractive to an influx of new workers in the area, where the new long term care facility, the Canadian Forces Headquarters, and the White Hills Industrial Park are located. The type of development we wish to construct will give these younger workers the opportunity of investing into a home of their own at a reasonable price and within walking distance of their employment. Figure 4 - Street View of Existing Virginia Park Plaza Property on the left going east Figure 5 - Street View of Existing Virginia Park Plaza on the right going west. 18 July 2013 Page 3

10 Conception and Design Our concept is to provide 262 condominium units with an adjacent commercial building that will offer services suitable for the condominium owners as well as for the whole neighborhood. There will be two buildings of five condominium levels and a separate two storey commercial building. The project will be built in three phases which, while extending the development period, will permit a more orderly construction site and less congestion in the area. We intend using a modern architectural style that will blend into the area and all of the buildings will be of non-combustible materials for the safety of the residents as well as for the neighborhood. The architectural concept drawings, that form part of this report, indicate the size and style of the buildings that we intend constructing. List of Consultants The following is a list of the consultants that are part of the design and development team for this project: Prime Consultant Architectural Consultant 3D Modeling and Rendering Structural Consultants Mechanical & Electrical Consultants Civil Engineering Consultant RJC Services Douglas Hawes, MRAIC Innovative Development & Design Engineers Ltd. DBA Consulting Engineers Ltd. Innovative Development & Design Engineers Ltd. Dynamic Development Services Ltd. 18 July 2013 Page 4

11 Figure 6 - Front View of Re-Developed Virginia Park Plaza Building Architectural Renderings 3D exterior view renderings of the Regal View condominium complex are presented on the next 5 pages. Figure 7-3D Rendering View of Regal View Complex from Newfoundland Drive Going East 18 July 2013 Page 5

12 Figure 8-3D Rendering View of Regal View Complex from Newfoundland Drive Going East (2) Figure 9-3D Rendering of Regal View Complex from Newfoundland Drive Going West 18 July 2013 Page 6

13 Figure 10-3D Rendering Aerial Front View of Regal View Complex Figure 11-3D Rendering Aerial Back View of Regal View Complex 18 July 2013 Page 7

14 Figure 12-3D Rendering Back View of Regal View Complex Figure 13-3D Rendering Morning Summer View of the back of Regal View Complex 18 July 2013 Page 8

15 Figure 14-3D Rendering View - Facade of Phase 3 Building on the East Side of Regal View Complex Figure 15-3D Rendering Night View of Facade of Phase 3 Building of Regal View Complex 18 July 2013 Page 9

16 Figure 16-3D Rendering Winter View under the snow 18 July 2013 Page 10

17 City of St. John s LUAR Terms of Reference 18 July 2013 Page 11

18 18 July 2013 Page 12

19 A Building by Usage The uses within the project are as outlined in the sections above but more specifically each component will be as follows: Phase 1 Building Gross Floor Area = 9,736.5 m 2 The redevelopment of the existing two story strip mall into a five level condominium building with commercial outlets on its first level. Phase 2 Building Gross Floor Area = m 2 The construction of a two level commercial building the ground level of which will be a convenience store that will serve the entire neighborhood. The second level will have office suites. Phase 3 Building Gross Floor Area = 11,973.3 m 2 The second condominium building will have indoor parking and storage lockers on its first level for the resident owners. The two condominium buildings will have a total of 262 units There will be 54 One Bedroom Units that are m2 (567.6 sq. ft.) and 208 Two Bedroom Units that range in area from m2 (700.5 sq. ft.) to m2 (894 sq. ft.). Table 1 - Building Floor Area Breakdown GROSS FLOOR AREA BREAKDOWN (m 2 ) CATEGORY PHASE 1 PHASE 2 PHASE 3 RESIDENTIAL 8, ,832.5 COMMERCIAL INDOOR PARKING 1,510.5 STORAGE LOCKERS AMENITY AREAS TOTALS 9, ,973.3 Site plans and floor plans for Phase 1, 2 and 3 are presented in Appendix 1, 2, 3 and 4, respectively. 18 July 2013 Page 13

20 B Elevations and Materials The materials to be used throughout this development will be similar on all three buildings in order to blend it together as one unified whole. The buildings will all be of non-combustible construction. The exterior walls will be finished with: 1. Stone on the ground level to provide a surface that is more durable in a high traffic area. 2. Metal clapboard with a profile similar to the types used on housing in the area, and, 3. Glass curtain wall and balcony guard rails, with the glass patio doors and windows in each unit being of a type and scale of a single family home. The commercial building will also have these materials incorporated into its facade. The architectural renderings which form part of this report indicate these finishes as described above. Figure 17 - Elevation Detail Showing Exterior Finishes 18 July 2013 Page 14

21 C Building Heights and Location The height of the overall project will be based on a floor to floor height required for the structural design and the mechanical and electrical service space needs. Generally we use between 10 and 11 feet from floor to floor. In this project: In phase 1 the overall height will be meters or 55 feet. The height is higher than would be required because the height of the existing strip mall is higher than normal for a condominium building. In phase three the height will be meters or 56 feet, slightly higher than phase 1 because of the below grade parking level. The two story commercial building will be 7.3 meters or 24 feet. We have included a section through the Phase 1 building to show the overall height of that phase. 18 July 2013 Page 15

22 3.08 m 3.04 m 3.04 m m 3.65 m 3.65 m Figure 18 - Phase 1 Building Section Showing Overall Height 18 July 2013 Page 16

23 Figure 19 - Phase 1 Building Front Elevation Figure 20 - Phase 3 Building Front Elevation 18 July 2013 Page 17

24 Shadow Study 18 July 2013 Page 18

25 18 July 2013 Page 19

26 18 July 2013 Page 20

27 18 July 2013 Page 21

28 18 July 2013 Page 22

29 18 July 2013 Page 23

30 Locations: The location of this project and the location of each phase are shown on the area map and site plan that forms part of this report. Figure 21 - Bird's Eye View of the Development from Newfoundland Drive Figure 22 - Parking Lot View of the Development looking toward Newfoundland Drive 18 July 2013 Page 24

31 In addition to the above section and elevations, we have also included on the previous pages, some shadow studies that show the shadowing impact to the adjacent properties. D Exterior Lighting and Noise Exterior lighting will be kept to a minimum by only locating it at the entrances canopy, along walkways and the parking lot will have light poles that will cast the lighting downwards. The condominium balconies will have private lighting sufficient to allow the owners to use them in a safe and private manner. Figure 23 - Typical Night View on a Regal View Building Noise problems are not usually associated with any of the occupancies that will be in this building. Any noise generated would be in the private parking lot for these buildings but even this should only be of a nature normally associated with this kind of use. Heating, ventilation, and air conditioning equipment will be small (low noise units) that are individual to each condominium and located on their balcony and therefore not visible nor loud. 18 July 2013 Page 25

32 The HVAC system to be used will have its equipment screened and not visible from the surrounding areas. Impacts on adjacent properties should be very minimal if existent at all. E Landscaping and Screening As the buildings and parking lot will itself occupy a high percentage of the land area, landscaping will be mostly along the boundary lines which will also help it serve as a buffer between adjacent properties and the main street. There will also be a grassed area around the buildings. Trees and shrubbery will be set into these areas and it is also intended to use pots that can be placed at the entrance and along the walkways. Other forms of landscaping may be by the private residents that have a patio or balcony area that they wish to enhance. The electrical transformer for each of these buildings will be located out of sight from the main road and parking lot. They will be located behind buildings and be screened with either landscaping or fencing. There will be no exterior garbage storage as each building will have interior garbage storage rooms. 18 July 2013 Page 26

33 Figure 24 - Landscaping Detail 18 July 2013 Page 27

34 Figure 25 - Back of Property Showing Pad Mounted Electrical Transformers Surrounded By Shrubbery F Snow Clearing and Storage Snow clearing operations will be contracted to a private company, as is normally the case for a condominium or commercial project. See Figure 30 in Appendix 1. In the event of the need for short term storage of the snow during extreme weather, designated areas will be located on-site to facilitate it. G Off Street Parking A minimum of 275 parking spaces will be provided to facilitate the condominium owners, the commercial office areas and the convenience store. 48 of these will be indoor spaces below the phase 3 building. 18 July 2013 Page 28

35 The number of parking spaces currently shown is 55 spaces less than the 299 that are required under the zoning by-laws, however additional parking will be provided to meet the City s requirements prior to the commencement of the Phase 3 building. All 262 condominium owners will have their designated parking space. Refer to Figure 26 below and Figure 28 in Appendix 1. Building Phase 1 Proposed Use: 1st Floor - Office & 10 Residential Units 2 nd to 5 th Floors - Residential Condos. 28 Units Per Floor Floor Gross Area = M 2 Floor Net Area = M 2 (Assume 80% of Gross Floor Area) Office Use = One Parking Space per 30rn2 of Net Floor Area = 22 Parking Spaces Required Residential Condo Use = One Parking Space per Dwelling Unit = 122 Parking Spaces Required Building Phase 2 Proposed Use: 1st Floor - Commercial Retail 2nd Floor - Office Gross Floor Area = M 2 (2,000 Ft 2 ) Per Floor Net Floor Area = M 2 (1,600 Ft 2 ) Per Floor Commercial Retail Use = One Parking Space per 15 M 2 of Net Floor Area = 10 Parking Spaces Required Office Space Use = One Parking Space per 30 M 2 of Net Floor Area Building - Phase 3 Proposed use: Underground Level - Parking Garage 1 st to 5 th Floors - Residential Condos - 28 Units per Floor Underground Parking Residential Condo Use Total Calculated Parking = 48 Parking Spaces Proposed = One Parking Space per Dwelling Unit = 140 Parking Spaces Required = 299 Parking Spaces 18 July 2013 Page 29

36 Total Parking Proposed = 196 Exterior Parking Spaces & 48 U/G Parking = 244 Parking Spaces Proposed H Servicing Figure 38 below presents the servicing plan showing the design flows for sanitary and storm sewers. The points of connection to the City s main are also indicated on the drawing. I Traffic The final report for the Newfoundland Drive Traffic Impact Study prepared by Hatch Mott McDonald and published in February 2013 is available for review upon request. The conclusion of this report is that there is no significant impact to the surrounding road network. J Construction Worker Parking As the phasing of this project means that only a part of the parking lot will be required when Phases 1 and 2 of the project are ready for occupancy, a separate area within the property will be assigned for the workers. The area that will eventually be assigned to the owners of Phase 3 will be used by the workers as the construction of it is proceeding. (Refer to Figure 29 in Appendix 1) K Construction Lay Down Area Using the logistics of timely delivery of materials along with having a fenced off area on the site assigned for the required building materials, which will be delivered on an as needed basis, the actual on-site lay-down area needed can be kept to a minimum. (Refer to Figure 29 in Appendix 1) L Construction Time Frame Phase 1 of the overall project will take 14 months to complete, allowing for winter conditions. 18 July 2013 Page 30

37 Phase 2, the commercial building will not start until month 10 of phase 1 and this should be completed at the same time so it can be available to the new condominium owners. Phase 3 will start in month 12 of phase 1 and should be completed in a 1 year period. Assuming a construction start by August 1 st, 2013, it is realistic to suggest that the total development can be completed in the Spring / Summer of CONSTRUCTION SCHEDULE PHASE 1 EXISTING BUILDING 14 MONTHS PHASE 2 COMMERCIAL BUILDING 4 MONTHS PHASE 3 NEW BUILDING 12 MONTHS YEAR Conclusion Figure 26 - Construction Schedule 2015 We believe that this development will help to fulfill the needs for residential living in this newly developing part of the city. It will also provide additional employment, business opportunities and add to the city s tax base. The developer, Regal Realty Limited of St. John s is proud to be investing in this growing city at a time of unprecedented growth. The company is positioned to move this project forward as soon as a building permit can be issued. We therefore kindly request that an early response to this report be provide so any changes or additional information can be presented as soon as possible. RJC Services July July 2013 Page 31

38 Appendix 1 Site Plans 18 July 2013 Page 32

39 Figure 27 - Civil Site Landscaping Plan - showing the overall site development showing each of the condominium buildings and the commercial building 18 July 2013 Page 33

40 Figure 28 - Site Plan including Parking Areas 18 July 2013 Page 34

41 Figure 29 - Site Servicing Plan 18 July 2013 Page 35

42 Figure 30 - Snow Storage, Workers Parking and Materials Lay Down Areas 18 July 2013 Page 36

43 Appendix 2 Floor Plans Phase 1 Building 18 July 2013 Page 37

44 Figure 31 - Phase 1 Building - Ground Floor Plan 18 July 2013 Page 38

45 Figure 32 - Phase 1 Building - Second Floor Plan 18 July 2013 Page 39

46 Figure 33 - Phase 1 Building - Third Floor Plan 18 July 2013 Page 40

47 Figure 34 Phase 1 - Fourth Floor Plan 18 July 2013 Page 41

48 Figure 35 - Phase 1 Building - Fifth Floor Plan 18 July 2013 Page 42

49 Appendix 3 - Floor Plans Phase 2 Building Figure 36 - Phase 2 Commercial Building - First Floor Plan 18 July 2013 Page 43

50 Figure 37 - Phase 2 Commercial Building - Second Floor Plan 18 July 2013 Page 44

51 Appendix 4 - Floor Plans - Phase 3 Building 18 July 2013 Page 45

52 Figure 38 - Phase 3 Building - Underground Parking Garage Level 18 July 2013 Page 46

53 Figure 39 - Phase 3 Building - Second Level 18 July 2013 Page 47

54 Figure 40 - Phase 3 Building - Third Level Floor Plans 18 July 2013 Page 48

55 Figure 41 - Phase 3 Building - Fourth Level Floor Plans 18 July 2013 Page 49

56 Figure 42 - Phase 3 Building Fifth Level Floor Plan 18 July 2013 Page 50

57 Figure 43 - Phase 3 Building - Sixth Level Floor Plan 18 July 2013 Page 51

μ1:1,250 SUBJECT PROPERTY INST W:\Engwork\Planw\2014 projects\mpa lemarchant road.mxd

μ1:1,250 SUBJECT PROPERTY INST W:\Engwork\Planw\2014 projects\mpa lemarchant road.mxd 55 53 51 49 31 29 47 45 43 41 37 35 33 39 A1 27 25 23 21 92 0 38 O 34 36 39 25 45 43 41 19 17 15 28 30 32 47 21 25 23 49 26 BUCKMASTER'S CIR R2 51 55 53 31 29 27 2 115 126 16 14 6 4 113 R2124 8 20 18 111

More information

μ1:750 SUBJECT PROPERTY RRI INST RRI O RRI DISCLAIMER: This map is based on current information at the date of production.

μ1:750 SUBJECT PROPERTY RRI INST RRI O RRI DISCLAIMER: This map is based on current information at the date of production. W:\Engwork\Planw\applications 2016\147-149 thorburn road.mxd 36 37 38 39 MACLAREN PL R2 μ1:750 93 95 40 41 THORBURN RD RRI 155 SUBJECT PROPERTY R2 42 43 SEABORN ST 97 99 R2 101 103 161 INST 149 RRI O 147

More information

DECISION/DIRECTION NOTE

DECISION/DIRECTION NOTE DECISION/DIRECTION NOTE Title: Proposed rezoning new residential zone PDE file MPA1500006 150 Stavanger Drive Date Prepared: April 12, 2016 Report To: Chair and Members, Planning and Development Committee

More information

It is recommended that this application be considered and that it be referred a public meeting.

It is recommended that this application be considered and that it be referred a public meeting. Date: March 11, 2015 To: Re: Chair and Members Planning & Development Committee PDE File #: REZ1400019 140-156 LADYSMITH DRIVE (Ward 5) Proposed Rezoning to Residential Kenmount (RK) 11368 NL. Ltd. 11368

More information

Director, Community Planning, Etobicoke York District

Director, Community Planning, Etobicoke York District STAFF REPORT ACTION REQUIRED 3555 Don Mills Road Zoning By-law Amendment Application Preliminary Report Date: May 22, 2012 To: From: Wards: Reference Number: North York Community Council Director, Community

More information

1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 1417, 1421-1425, 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: March 24, 2015 To: From: Wards: Reference Number:

More information

Urban Design Brief. Italian Seniors Project 1090, 1092, 1096 Hamilton Road City of London

Urban Design Brief. Italian Seniors Project 1090, 1092, 1096 Hamilton Road City of London Urban Design Brief Italian Seniors Project City of London October 1, 2017 TABLE OF CONTENTS Page No. INTRODUCTION... 2 1.0 LAND USE PLANNING CONCEPT... 2 1.1 Subject Lands... 2 1.2 Official Plan and Zoning

More information

250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report

250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report Date: May 28, 2013 To: From: Wards: Reference

More information

740 and 750 York Mills Road and 17 Farmstead Road Zoning By-law Amendment Application Preliminary Report

740 and 750 York Mills Road and 17 Farmstead Road Zoning By-law Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED 740 and 750 York Mills Road and 17 Farmstead Road Zoning By-law Amendment Application Preliminary Report Date: September 20, 2013 To: From: Wards: Reference Number: North York

More information

3390, 3392, 3394, 3396 and 3398 Bayview Avenue - Official Plan Amendment, Zoning By-law Amendment Application - Preliminary Report

3390, 3392, 3394, 3396 and 3398 Bayview Avenue - Official Plan Amendment, Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 3390, 3392, 3394, 3396 and 3398 Bayview Avenue - Official Plan Amendment, Zoning By-law Amendment Application - Preliminary Report Date: March 14, 2016 To: From: Wards: Reference

More information

1970 Victoria Park Avenue and 9 Clintwood Gate Zoning By-law Amendment Application Preliminary Report

1970 Victoria Park Avenue and 9 Clintwood Gate Zoning By-law Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED 1970 Victoria Park Avenue and 9 Clintwood Gate Zoning By-law Amendment Application Preliminary Report Date: September 23, 2013 To: From: Wards: Reference Number: North York

More information

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS 3. RESIDENTIAL LAND USE DESIGNATIONS INTRODUCTION The Residential land use designations provide for housing and other land uses that are integral to, and supportive of, a residential environment. Housing

More information

Date: May 8, Chair and Members Planning and Housing Standing Committee

Date: May 8, Chair and Members Planning and Housing Standing Committee Date: May 8, 2013 To: Re: Chair and Members Planning and Housing Standing Committee Council Directive #: S2011-04-11/3 St. John s Municipal Plan Amendment Number 96, 2011 St. John s Development Regulations

More information

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

P. H. Robinson Consulting Urban Planning, Consulting and Project Management PLANNING RATIONALE REPORT FOR SITE PLAN AND DRAFT PLAN OF CONDOMINIUM APPLICATIONS 73-75 HARVEY STREET CITY OF OTTAWA PREPARED BY: P H ROBINSON CONSULTING AUGUST 2012 1 This report has been prepared on

More information

Planning & Development. Background. Subject Properties

Planning & Development. Background. Subject Properties Planning & Development APPLICATION BRIEFING Prepared For: Planning Advisory Committee Submitted by: Jason Fox, Director of Planning & Development Date: Subject: Application by Meech Holdings Limited to

More information

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd. Urban Design Brief 1039-1047 Dundas Street London Affordable Housing Foundation November 2017 Zelinka Priamo Ltd. TABLE OF CONTENTS Page No. INTRODUCTION... 3 SECTION 1 LAND USE PLANNING CONTEXT... 3 1.1

More information

5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report

5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report Date: May 16, 2013 To: From: Wards: Reference Number: Toronto

More information

111 Wenderly Drive Official Plan and Zoning By-law Amendment Applications - Preliminary Report

111 Wenderly Drive Official Plan and Zoning By-law Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 111 Wenderly Drive Official Plan and Zoning By-law Amendment Applications - Preliminary Report Date: August 17, 2015 To: From: Wards: Reference Number: North York Community

More information

York Neighbourhood Area Structure Plan

York Neighbourhood Area Structure Plan York Neighbourhood Area Structure Plan Office Consolidation March 2006 Prepared by: Planning and Policy Services Branch Planning and Development Department City of Edmonton Bylaw 7064 was adopted by Council

More information

8.5.1 R1, Single Detached Residential District

8.5.1 R1, Single Detached Residential District 8.5.1 R1, Single Detached Residential District The purpose of this district is to provide for residential development in the form of single detached dwellings. Dwelling, Single Detached Home Business,

More information

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London Urban Design Brief 1635 (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London Site Plan Control Application Holding Provision Application April 1, 2015 Prepared for: Rise Real

More information

1 Application Form 4

1 Application Form 4 1 Application Form 4 5 2 Project Summary Location The proposed development is located at 216 Cobequid Road in Sackville, Nova Scotia. Site Characteristics The mixed-use development is situated on the corner

More information

Date: May 8, Chair and Members Planning and Housing Standing Committee

Date: May 8, Chair and Members Planning and Housing Standing Committee Date: May 8, 2013 To: Re: Chair and Members Planning and Housing Standing Committee Council Directive #: S2011-04-11/3 St. John s Municipal Plan Amendment Number 96, 2011 St. John s Development Regulations

More information

150 Eglinton Avenue East - Zoning Amendment Application - Preliminary Report

150 Eglinton Avenue East - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 150 Eglinton Avenue East - Zoning Amendment Application - Preliminary Report Date: May 15, 2015 To: From: Wards: Reference Number: Toronto and East York Community Council Director,

More information

Director, Community Planning, North York District

Director, Community Planning, North York District STAFF REPORT ACTION REQUIRED 35-53 and 101-113 Valley Woods Road and 1213-1229 York Mills Road Official Plan, Rezoning, Draft Plan of Subdivision and Rental Housing Demolition Applications Final Report

More information

50 and 52 Finch Avenue East - Official Plan and Zoning By-law Amendment Applications - Preliminary Report

50 and 52 Finch Avenue East - Official Plan and Zoning By-law Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 50 and 52 Finch Avenue East - Official Plan and Zoning By-law Amendment Applications - Preliminary Report Date: August 16, 2016 To: From: Wards: Reference Number: North York

More information

39 Thora Avenue Zoning Amendment Application Preliminary Report

39 Thora Avenue Zoning Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED 39 Thora Avenue Zoning Amendment Application Preliminary Report Date: January 28, 2014 To: From: Wards: Reference Number: Scarborough Community Council Director, Community

More information

Housing Issues Report Shoreline Towers Inc. Proposal 2313 & 2323 Lake Shore Boulevard West. Prepared by PMG Planning Consultants November 18, 2014

Housing Issues Report Shoreline Towers Inc. Proposal 2313 & 2323 Lake Shore Boulevard West. Prepared by PMG Planning Consultants November 18, 2014 Housing Issues Report Shoreline Towers Inc. Proposal 2313 & 2323 Lake Shore Boulevard West Prepared by PMG Planning Consultants November 18, 2014 PMG Planning Consultants Toronto, Canada M6A 1Y7 Tel. (416)

More information

Keele Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

Keele Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 406-410 Keele Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report Date: September 20, 2017 To: From: Wards: Reference Number: Etobicoke York

More information

PLANNING RATIONALE REPORT

PLANNING RATIONALE REPORT PLANNING RATIONALE REPORT Zoning By-law Amendment Application 2920 Danbury Way Prepared for: Bravar Custom Builders Inc. and Village View Estates Ltd. by: 6393 Roslyn Street Ottawa (Orleans), Ontario K1C

More information

Jasper 115 Street DC2 Urban Design Brief

Jasper 115 Street DC2 Urban Design Brief Jasper 115 Street DC2 Urban Design Brief Greenlong Construction Ltd. Stantec Consulting Ltd. 2017 Overview The proposed rezoning application supports the development of two mixed-use high-rise buildings

More information

General Manager of Planning, Urban Design, and Sustainability, in consultation with the Director of Legal Services

General Manager of Planning, Urban Design, and Sustainability, in consultation with the Director of Legal Services POLICY REPORT DEVELOPMENT AND BUILDING Report Date: September 27, 2016 Contact: Anita Molaro Contact No.: 604.871.6479 RTS No.: 11685 VanRIMS No.: 08-2000-20 Meeting Date: October 18, 2016 TO: FROM: SUBJECT:

More information

Date: February Chair and Members Planning & Development Committee. To:

Date: February Chair and Members Planning & Development Committee. To: Date: February 13 2015 To: Chair and Members Planning & Development Committee Re: Department of Planning File Number: B-17-B.38 / 12-00306 Proposed Rezoning from Residential Medium Density () Zone to Commercial

More information

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Public Report To: From: Report Number: Development Services Committee Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department DS-16-50 Date of Report: April 14, 2016 Date of Meeting:

More information

PIN , Part 1, Plan SR-713 in Lot 2, Concession 5, Township of McKim (1096 Dublin Street, Sudbury)

PIN , Part 1, Plan SR-713 in Lot 2, Concession 5, Township of McKim (1096 Dublin Street, Sudbury) STAFF REPORT Applicant: Dalron Construction Limited Location: PIN 02124-0103, Part 1, Plan SR-713 in Lot 2, Concession 5, Township of McKim (1096 Dublin Street, Sudbury) Official Plan and Zoning By-law:

More information

Direct Control District No. 1 (DCD1) for The South Downtown

Direct Control District No. 1 (DCD1) for The South Downtown Direct Control District No. 1 (DCD1) for The South Downtown Amended to September 13, 2010 13.1.3 Policies: 13.1.3.1 Linkage and Land Use a) Use of Land Uses for the DCD1 The only permitted uses in the

More information

Church Street and 117 Dundas Street East - Zoning Amendment Application - Preliminary Report

Church Street and 117 Dundas Street East - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 215-229 Church Street and 117 Dundas Street East - Zoning Amendment Application - Preliminary Report Date: February 26, 2015 To: From: Wards: Reference Number: Toronto and

More information

STAFF REPORT. December 18, Etobicoke Community Council. Director, Community Planning, West District

STAFF REPORT. December 18, Etobicoke Community Council. Director, Community Planning, West District STAFF REPORT December 18, 2002 To: From: Subject: Etobicoke Community Council Director, Community Planning, West District Final Report Application to Amend the Etobicoke Zoning Code 1137-1141 Royal York

More information

111 Plunkett Road (formerly part of 135 Plunkett Road) - Zoning By-law Amendment Application and Plan of Subdivision Application - Preliminary Report

111 Plunkett Road (formerly part of 135 Plunkett Road) - Zoning By-law Amendment Application and Plan of Subdivision Application - Preliminary Report STAFF REPORT ACTION REQUIRED 111 Plunkett Road (formerly part of 135 Plunkett Road) - Zoning By-law Amendment Application and Plan of Subdivision Application - Preliminary Report Date: May 27, 2013 To:

More information

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

PREPARED FOR: ADI DEVELOPMENT GROUP INC. Acronym Urban Design and Planning/Mark Sterling Consulting Inc. 111 Clendenan Avenue, Toronto, Ontario M6P 2W7 URBAN DESIGN BRIEF PROPOSED DEVELOPMENT 4880 VALERA ROAD, CITY OF BURLINGTON PREPARED FOR:

More information

200 St. Clair Ave W - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

200 St. Clair Ave W - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 200 St. Clair Ave W - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: December 15, 2014 To: From: Wards: Reference Number: Toronto and

More information

CITY OF KAMLOOPS BYLAW NO A BYLAW TO AMEND THE ZONING BYLAW OF THE CITY OF KAMLOOPS

CITY OF KAMLOOPS BYLAW NO A BYLAW TO AMEND THE ZONING BYLAW OF THE CITY OF KAMLOOPS 67 68 CITY OF KAMLOOPS BYLAW NO. 5-1-2796 A BYLAW TO AMEND THE ZONING BYLAW OF THE CITY OF KAMLOOPS The Municipal Council of the City of Kamloops, in open meeting assembled, enacts as follows: 1. This

More information

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment The Kilmorie Development 21 Withrow Avenue City of Ottawa Prepared by: Holzman Consultants Inc. Land

More information

6040 Bathurst Street and 5 Fisherville Road Zoning Bylaw Amendment Application Preliminary Report

6040 Bathurst Street and 5 Fisherville Road Zoning Bylaw Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED 6040 Bathurst Street and 5 Fisherville Road Zoning Bylaw Amendment Application Preliminary Report Date: January 24, 2017 To: From: Wards: Reference Number: North York Community

More information

PUBLIC HEARINGS. Variance 1916, 1918 and 1920 St. Mary s Road (St. Norbert Ward) File DAV /2013D [c/r DASZ 28/2013]

PUBLIC HEARINGS. Variance 1916, 1918 and 1920 St. Mary s Road (St. Norbert Ward) File DAV /2013D [c/r DASZ 28/2013] Agenda Riel Community Committee January 13, 2014 PUBLIC HEARINGS Item No. 3 Variance 1916, 1918 and 1920 St. Mary s Road (St. Norbert Ward) File DAV 163360/2013D [c/r DASZ 28/2013] WINNIPEG PUBLIC SERVICE

More information

50 Wellesley Street East - Official Plan Amendment & Zoning Amendment Applications - Preliminary Report

50 Wellesley Street East - Official Plan Amendment & Zoning Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 50 Wellesley Street East - Official Plan Amendment & Zoning Amendment Applications - Preliminary Report Date: July 18, 2014 To: From: Wards: Reference Number: Toronto and East

More information

100 Ranleigh Ave - Zoning Amendment Application - Request for Direction Report

100 Ranleigh Ave - Zoning Amendment Application - Request for Direction Report STAFF REPORT ACTION REQUIRED 100 Ranleigh Ave - Zoning Amendment Application - Request for Direction Report Date: May 27, 2016 To: From: Wards: Reference Number: North York Community Council Director,

More information

Director, Community Planning, North York District

Director, Community Planning, North York District STAFF REPORT ACTION REQUIRED 3, 5, 11, 17, 21 Allenbury Gardens & 3, 5 Kingslake Road Official Plan and Zoning By-law Amendment and Rental Housing Demolition Applications Final Report Date: February 6,

More information

Director, Community Planning, North York District NNY 10 OZ and NNY 10 RH

Director, Community Planning, North York District NNY 10 OZ and NNY 10 RH STAFF REPORT ACTION REQUIRED 847 873 Sheppard Avenue West - Official Plan Amendment and Zoning By-law Amendment and Rental Housing Demolition and Conversion Applications - Preliminary Report Date: April

More information

Staff Report for Council Public Meeting

Staff Report for Council Public Meeting Agenda Item 3.3 Staff Report for Council Public Meeting Date of Meeting: September 27, 2017 Report Number: SRPRS.17.134 Department: Division: Subject: Planning and Regulatory Services Development Planning

More information

Islington Avenue - Official Plan and Zoning By-law Amendment Application - Preliminary Report

Islington Avenue - Official Plan and Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 3002-3014 Islington Avenue - Official Plan and Zoning By-law Amendment Application - Preliminary Report Date: Febuary 2, 2016 To: From: Wards: Reference Number: Etobicoke York

More information

Accessory Coach House

Accessory Coach House Updated July 2018 Accessory Coach House Development Permit Guidelines 1 Accessory Coach House Development Permit Guidelines Zoning Bylaw, 1995 DIVISION VII C. Contents Part I General Reglations 1 Introduction

More information

25 Leonard Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

25 Leonard Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 25 Leonard Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: March 8, 2017 To: From: Wards: Reference Number: Toronto and East York

More information

66 Isabella Street Rezoning Application - Preliminary Report

66 Isabella Street Rezoning Application - Preliminary Report STAFF REPORT ACTION REQUIRED 66 Isabella Street Rezoning Application - Preliminary Report Date: November 15, 2010 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community

More information

Planning and Building Department

Planning and Building Department Page 1 of Report PB-83-13 TO: Development and Infrastructure Committee Planning and Building Department SUBJECT: OP & Rezoning 5001 Corporate Drive Appleby Gardens LJM Developers Report Number: PB-83-13

More information

144 and 150 Berry Road - Zoning By-law Amendment Application - Preliminary Report

144 and 150 Berry Road - Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 144 and 150 Berry Road - Zoning By-law Amendment Application - Preliminary Report Date: December 16, 2014 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Public Report To: From: Report Number: Development Services Committee Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department DS-18-64 Date of Report: March 22, 2018 Date of Meeting:

More information

Director, Community Planning, Scarborough District ESC 44 OZ & ESC 44 SB

Director, Community Planning, Scarborough District ESC 44 OZ & ESC 44 SB STAFF REPORT ACTION REQUIRED 6175, 6183 Kingston Road and 1, 2, 4, 5, 7,10 & 11 Franklin Avenue - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Preliminary Report

More information

3445 Sheppard Avenue East - Zoning Amendment Application - Preliminary Report

3445 Sheppard Avenue East - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 3445 Sheppard Avenue East - Zoning Amendment Application - Preliminary Report Date: August 14, 2013 To: From: Wards: Reference Number: Scarborough Community Council Director,

More information

Official Plan & Zoning By-law Amendment Application Preliminary Report

Official Plan & Zoning By-law Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED 847 873 Sheppard Avenue West Official Plan & Zoning By-law Amendment Application Preliminary Report Date: January 13, 2010 To: From: Wards: Reference Number: North York Community

More information

2 Holiday Drive - Zoning Application - Preliminary Report

2 Holiday Drive - Zoning Application - Preliminary Report STAFF REPORT ACTION REQUIRED 2 Holiday Drive - Zoning Application - Preliminary Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council Director, Community Planning,

More information

3 and 5 Southvale Dr - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

3 and 5 Southvale Dr - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 3 and 5 Southvale Dr - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: August 20, 2015 To: From: Wards: Reference Number: North York Community

More information

STAFF REPORT. September 25, City Council. Chief Planner and Executive Director, City Planning Division

STAFF REPORT. September 25, City Council. Chief Planner and Executive Director, City Planning Division STAFF REPORT September 25, 2006 To: From: Subject: City Council Chief Planner and Executive Director, City Planning Division Request for Directions Report Toronto & East York Community Council, Report

More information

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017 Appendix1,Page1 Urban Design Guidelines DRAFT September 2017 Back to Back and Stacked Townhouses Appendix1,Page2 Table of Contents 1 Introduction 1 1.1 Purpose 1 1.2 Urban Design Objectives 1 1.3 Building

More information

Weston Road (Phase 2) - Official Plan and Zoning By-law Amendment and Lifting of the (H) Holding Symbol Applications - Preliminary Report

Weston Road (Phase 2) - Official Plan and Zoning By-law Amendment and Lifting of the (H) Holding Symbol Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 3415-3499 Weston Road (Phase 2) - Official Plan and Zoning By-law Amendment and Lifting of the (H) Holding Symbol Applications - Preliminary Report Date: March 8, 2016 To:

More information

THE CORPORATION OF THE DISTRICT OF PEACHLAND BYLAW NUMBER 2065, A Bylaw to Amend Zoning Bylaw Number 1375, 1996

THE CORPORATION OF THE DISTRICT OF PEACHLAND BYLAW NUMBER 2065, A Bylaw to Amend Zoning Bylaw Number 1375, 1996 THE CORPORATION OF THE DISTRICT OF PEACHLAND BYLAW NUMBER 2065, 2013 A Bylaw to Amend Zoning Bylaw Number 1375, 1996 WHEREAS the Council of the Corporation of the District of Peachland has adopted Zoning

More information

12, 14, 16 and 18 Marquette Avenue and 7 Carhartt Street Zoning By-law Amendment Application - Preliminary Report

12, 14, 16 and 18 Marquette Avenue and 7 Carhartt Street Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 12, 14, 16 and 18 Marquette Avenue and 7 Carhartt Street Zoning By-law Amendment Application - Preliminary Report Date: July 17, 2014 To: From: Wards: Reference Number: North

More information

City of Surrey PLANNING & DEVELOPMENT REPORT File:

City of Surrey PLANNING & DEVELOPMENT REPORT File: City of Surrey PLANNING & DEVELOPMENT REPORT PROPOSAL: Planning Report Date: June 15, 2009 Rezoning from C-4 to CD (based on C-5) in order to permit additional commercial uses in an existing non-conforming

More information

Planning Justification Report

Planning Justification Report Planning Justification Report Kellogg s Lands City of London E&E McLaughlin Ltd. June 14, 2017 Zelinka Priamo Ltd. Page i TABLE OF CONTENTS Page No. 1.0 2.0 2.1 2.2 3.0 4.0 5.0 5.1 5.2 5.3 5.4 5.5 5.6

More information

Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables

Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables 4.5.1 Residential Low Density Zone The provisions in this division relate to the Residential Low Density Zone as follows

More information

Members of the City of Brantford Committee of Adjustment. 1.0 TYPE OF REPORT Committee of Adjustment Decision Regarding an Application for Consent

Members of the City of Brantford Committee of Adjustment. 1.0 TYPE OF REPORT Committee of Adjustment Decision Regarding an Application for Consent DATE: October 18 th 2017 REPORT NO. CD2017-168 TO: Members of the City of Brantford Committee of Adjustment FROM: Brandon Kashin, Current Development Planner 1.0 TYPE OF REPORT Committee of Adjustment

More information

H5. Residential Mixed Housing Urban Zone

H5. Residential Mixed Housing Urban Zone H5. Residential Mixed Housing Urban Zone H5.1. Zone description The Residential Mixed Housing Urban Zone is a reasonably high-intensity zone enabling a greater intensity of development than previously

More information

Urban Design Brief. Proposed Medical / Dental Office 1444 Adelaide Street North. Vireo Health Facility Ltd.

Urban Design Brief. Proposed Medical / Dental Office 1444 Adelaide Street North. Vireo Health Facility Ltd. Urban Design Brief Proposed Medical / Dental Office Vireo Health Facility Ltd. November 27, 2013 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND USE PLANNING CONTEXT... 1 1.1 The Subject Lands...

More information

1555 Midland Avenue - Zoning Amendment & Subdivision Applications - Preliminary Report

1555 Midland Avenue - Zoning Amendment & Subdivision Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 1555 Midland Avenue - Zoning Amendment & Subdivision Applications - Preliminary Report Date: October 24, 2013 To: From: Wards: Reference Number: Scarborough Community Council

More information

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 363-391 Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report Date: May 22, 2015 To: From: Wards: Reference Number: Toronto and East York

More information

25 St. Dennis Drive - Zoning By-law Amendment Application - Preliminary Report

25 St. Dennis Drive - Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 25 St. Dennis Drive - Zoning By-law Amendment Application - Preliminary Report Date: February 4, 2016 To: From: Wards: Reference Number: North York Community Council Director,

More information

45 & 77 Dunfield Avenue - Zoning Amendment Application - Preliminary Report

45 & 77 Dunfield Avenue - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 45 & 77 Dunfield Avenue - Zoning Amendment Application - Preliminary Report Date: January 22, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department COUNTRYSIDE SOUTH OUTLINE PLAN Prepared by: GPEC Consulting Ltd. #202, 10712-100th Street Grande Prairie, AB Council Resolution of August 20, 2001

More information

Richmond Street West Zoning Amendment Application - Preliminary Report

Richmond Street West Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 543-553 Richmond Street West Zoning Amendment Application - Preliminary Report Date: April 24, 2015 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

PLANNING RATIONALE 680 BRONSON AVENUE OTTAWA, ONTARIO PROPOSED ZONING BY-LAW AMENDMENT

PLANNING RATIONALE 680 BRONSON AVENUE OTTAWA, ONTARIO PROPOSED ZONING BY-LAW AMENDMENT PLANNING RATIONALE 680 BRONSON AVENUE OTTAWA, ONTARIO PROPOSED ZONING BY-LAW AMENDMENT FRANK PARAVAN APRIL 2014 Planning Rationale Introduction FOTENN Consultants Inc. has been engaged by Frank and Michael

More information

PUBLIC HEARINGS. Variance Ness Avenue (St. Charles Ward) File DAV /2018C [c/r DCU /2018C]

PUBLIC HEARINGS. Variance Ness Avenue (St. Charles Ward) File DAV /2018C [c/r DCU /2018C] Agenda Board of Adjustment July 25, 2018 PUBLIC HEARINGS Item No. 2 Variance 3045-3059 Ness Avenue (St. Charles Ward) File DAV 143093/2018C [c/r DCU 143080/2018C] WINNIPEG PUBLIC SERVICE RECOMMENDATION:

More information

Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd.

Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd. Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd. Presentation to Ajax Council July 4, 2013 Introduction 1. Background 2. Planning Policies and Regulations 3. Downtown Community Improvement

More information

H4. Residential Mixed Housing Suburban Zone

H4. Residential Mixed Housing Suburban Zone H4. Residential Mixed Housing Suburban Zone H4.1. Zone description The Residential Mixed Housing Suburban Zone is the most widespread residential zone covering many established suburbs and some greenfields

More information

CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING

CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING P2 CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING Report Date: May 1, 2007 Author: Michael Naylor Phone No.: 604.871.6269 RTS No.: 06621 VanRIMS No.: 11-3600-10 Meeting Date: May 15, 2007 TO:

More information

44 Jackes Avenue and 33 Rosehill Avenue - Zoning Amendment Application - Preliminary Report

44 Jackes Avenue and 33 Rosehill Avenue - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 44 Jackes Avenue and 33 Rosehill Avenue - Zoning Amendment Application - Preliminary Report Date: March 16, 2017 To: From: Wards: Reference Number: Toronto and East York Community

More information

Division 6 Residential Medium Density Zone: Assessment Criteria and Assessment Tables

Division 6 Residential Medium Density Zone: Assessment Criteria and Assessment Tables Division 6 Residential Medium Density Zone: Assessment Criteria and Assessment Tables 4.6.1 Residential Medium Density Zone The provisions in this division relate to the Residential Medium Density Zone

More information

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District STAFF REPORT ACTION REQUIRED 1481, 1491, 1501 Yonge Street, 25 & 27 Heath Street East and 30 Alvin Avenue Official Plan and Zoning Amendment Application 06 199698 STE 22 OZ Preliminary Report Date: March

More information

Zoning Amendment. Public Meeting: February 7, 2018

Zoning Amendment. Public Meeting: February 7, 2018 Zoning Amendment Public Meeting: February 7, 2018 Application: Applicant: D14-01/18 HMAT Homes Inc Location of Subject Lands Lot 108 and Part of Lots 107 and 109, Plan 30, Bracebridge Ward of the Town

More information

1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report

1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report Date: March 17, 2017 To: From: Wards: Reference Number: North York Community Council Director,

More information

Yonge Street, 5-9 St. Joseph Street and 11-19, 25 St. Nicholas Street Rezoning Application - Preliminary Report

Yonge Street, 5-9 St. Joseph Street and 11-19, 25 St. Nicholas Street Rezoning Application - Preliminary Report STAFF REPORT ACTION REQUIRED 606-618 Yonge Street, 5-9 St. Joseph Street and 11-19, 25 St. Nicholas Street Rezoning Application - Preliminary Report Date: December 11, 2008 To: From: Wards: Reference Number:

More information

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report.

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report. STAFF REPORT Planning and Development Department Subject: Application by RYC Property to rezone a portion of lands on John Murray Dr. and Megan Lynn Dr. from R2 to R3 and to enter into a Development Agreement

More information

4650 Eglinton Avenue West - Zoning By-law Amendment Application - Preliminary Report

4650 Eglinton Avenue West - Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 4650 Eglinton Avenue West - Zoning By-law Amendment Application - Preliminary Report Date: August 14, 2015 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

75 The Esplanade - Zoning Amendment Application - Preliminary Report

75 The Esplanade - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 75 The Esplanade - Zoning Amendment Application - Preliminary Report Date: August 14, 2015 To: From: Wards: Reference Number: Toronto and East York District Community Council

More information

836 St Clair Ave W - Zoning Amendment Application - Preliminary Report

836 St Clair Ave W - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 836 St Clair Ave W - Zoning Amendment Application - Preliminary Report Date: October 24, 2013 To: From: Wards: Reference Number: Toronto and East York Community Council Director,

More information

30 Widmer Street and Adelaide Street West - Zoning Amendment Application - Preliminary Report

30 Widmer Street and Adelaide Street West - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 30 Widmer Street and 309-315 Adelaide Street West - Zoning Amendment Application - Preliminary Report Date: January 13, 2015 To: From: Wards: Reference Number: Toronto and

More information

14 Strachan Ave and East Liberty St - Rezoning Application - Preliminary Report

14 Strachan Ave and East Liberty St - Rezoning Application - Preliminary Report STAFF REPORT ACTION REQUIRED 14 Strachan Ave and 39-51 East Liberty St - Rezoning Application - Preliminary Report Date: August 19, 2009 To: From: Wards: Reference Number: Toronto and East York Community

More information

Director, Community Planning, North York District

Director, Community Planning, North York District STAFF REPORT ACTION REQUIRED 1-35, 45-69 and 6-66 Adra Villaway, 1-25, 2-24, 30-44 and 37-53 Grado Villaway, 1-29 and 2-28 Tomar Villaway Official Plan and Zoning By-law Amendment Applications and Rental

More information

H6 Residential Terrace Housing and Apartment Buildings Zone

H6 Residential Terrace Housing and Apartment Buildings Zone H6. Residential Terrace Housing and Apartment Buildings Zone [CIV-2016-404-002333: Franco Belgiorno-Nettis]-Note: The properties affected by this appeal are identified on the Auckland Unitary Plan viewer.

More information

Amend. BL 3480, 1982 Amend. BL 4691, 1990 RMH ZONE: MOBILE HOME PARK RESIDENTIAL. 640A.1 Permitted Uses: Dwelling, Mobile Home

Amend. BL 3480, 1982 Amend. BL 4691, 1990 RMH ZONE: MOBILE HOME PARK RESIDENTIAL. 640A.1 Permitted Uses: Dwelling, Mobile Home BL 3480, 1982 BL 6074, 2002 BL 6890, 2011 640A.1 Permitted Uses: Dwelling, Mobile Home RMH ZONE: MOBILE HOME PARK RESIDENTIAL One Dwelling Unit for the accommodation of the owner/manager Common storage