1 East King Street Parking Garage Expansion Project
2 Mifflin Street Site Prior to Laundry Demolition Removed blighted structure Removal mitigated continued point source contamination from Laundry site View of North Mifflin Street Looking East 150 North Mifflin Street Proposed Garage Addition 150 North Mifflin Street, Current Location of Surface Lot Site Plan Prior to Laundry Demolition
3 2004 LNP Article Addressing the need for parking to allow City growth One step forward for the convention center project. And hopefully, a giant leap for downtown Lancaster. On Wednesday, the Lancaster County Convention Center Authority announced it is buying the land owned by Lancaster Laundry, E. Mifflin St., to build a new 300-space parking garage. Authority officials say building a new parking garage moves the convention center project closer to fruition. City officials say it will provide badly needed parking just 1 1/2 blocks east of the proposed convention center, and will mean a lot to other downtown revitalization projects. "This is going to help the convention center, but it also going to play a big role in rebuilding downtown," said Mayor Charlie Smithgall. When the new garage is built, sometime late next year, some 300 parkers will move from the existing King Street Garage into the new garage. That will clear spaces in the King Street Garage for future conventioneers and hotel guests. The authority bought the Lancaster Laundry site and another building on East King Street owned by ACTS Covenant Fellowship Church, E. King St., for $1.7 million. The purchase provides about an acre of land to construct the garage, which authority officials say will be designed to expand at a later date. The authority expects to close the real estate deal by the end of the year and could begin construction of the garage by late winter. It will take about eight months to build the garage. The garage is a necessary step toward making the $124 million convention center and hotel project a reality. The center, expected to open in 2007, is considered a keystone of downtown revitalization. The authority and its private sector partners, Penn Square Partners, are working jointly to design and build a 200,000-square-foot meeting center along South Queen Street and an adjacent 294- room Marriott hotel behind the former Watt & Shand department store on downtown Lancaster's Penn Square. The existing King Street garage is next door to the planned convention center. The authority recently finalized a deal with the Lancaster Parking Authority for the management of the new garage. The Parking Authority, which owns and manages most of the parking garages in the city, will move 300 of its customers that currently lease spaces in the King Street Garage to the Convention Center Authority for future hotel customers. Smithgall promised the authority at its Wednesday meeting that he will leave "no stone unturned" to find money from state and federal grants to add a few hundred more parking spaces onto the planned garage.
4 He said it is necessary to build more parking spaces downtown, to keep revitalization efforts all over the city moving ahead. "Now it is my job to bring the rest of the spaces. Up to 700. This is a step you had to do, so I can do what I have to do," said the mayor. According to a 2001 parking study by Walker Parking Consultants, a national firm, completed for the Parking Authority, the city needs as many as 2,300 new parking spaces to make downtown revitalization possible. Authority officials credit the mayor with kick-starting the negotiations for the garage a few months ago after the last deal had faltered. Smithgall said a 700 space garage will bring more businesses to downtown and will allow the development of the Excelsior Hall, E. King St. The 300 space garage will cost about $5 million to build. Smithgall needs to find another $4 to $5 million to build another 400 parking spaces. Several developers have tried to rehabilitate the historic Excelsior, but each proposal has fallen flat because of a lack of adequate parking in the neighborhood. The new parking garage will be located across the street from Excelsior Hall. A York development company recently announced plans for an Irish pub in the building. The 2001 Walker study also suggested that the Lancaster Laundry site was the perfect location for a parking garage. City officials say they are hoping the company that owns the Lancaster Laundry, Deick Enterprises Inc., will stay in the city. Chuck Maneval, director of the city's Department of Economic and Community Development, said the Keystone Opportunity Zone, located between Hazel and Seymour streets in the city's southwest, may be a good fit for the laundry. Several years ago, Maneval added, Deick Enterprises had considered moving to the KOZ. The KOZ offers a break on state taxes to businesses that locate there. The Marriott hotel is being financed privately by Penn Square Partners, which includes general partner Penn Square General Corp., a High Industries' affiliate, and limited partners Fulton Bank and Lancaster Newspapers Inc., publisher of the New Era.
5 2007 LNP Article Addressing the demolition of the existing structures and the use of the area as a surface lot. Council backs parking lot plan OKs demolition of Laundromat Intelligencer Journal (Lancaster, PA) Publication Date: January 24, 2007 By Larry Alexander Intelligencer Journal Staff Dissension on Lancaster's Historic Architectural Review Board nearly led to more trouble for the embattled city convention center, now under construction on the site of the former Watt & Shand building. The 4-2 vote by HARB at a special meeting Jan. 15 concerned a proposed 68-space surface parking lot at the site of the former Lancaster Laundry, 152 E. King St. The proposed parking lot is a temporary measure until a planned 400-space parking garage can be built in the future in the same location. HARB was asked to allow the demolition of, in addition to the laundry building, the rear "ell" portions of the former ACTS Covenant Fellowship building, E. King St., and the former Cooper & Jackson LLC site, 156 E. King St. The Lancaster Convention Center Authority owns the buildings, which are vacant. Two HARB members, Nancy Morris and Mimi Shapiro, voted against razing the rear of the buildings. The two appeared before council Tuesday to explain their decisions. Shapiro said just removing the laundry building would give the city parking authority 52 spaces and objected to removing 19th-century buildings to gain a "measly" 16 spaces. Shapiro said no one since the late 1960s "has proposed tearing down historic buildings for surface parking" and that the city "needs better ideas and better solutions." "Surface parking deadens the downtown," she said. "It detracts from its appearance, its character and its ambiance. Surface parking, she said, is "an ugly waste of space at best." Morris said it's "easy to demolish" buildings, but once it's done, they can never be reclaimed. Demolishing the buildings, she said, "flies in the face of historic preservation." Steve Funk, the HARB chairman, voted with the majority. He called the plan "a reasonable compromise" that allowed for redevelopment of the site and "a more economic use of the site by providing additional parking for that neighborhood." David Hixon, executive director of the Lancaster Convention Center Authority, said approval of the $3.2 million plan was "so critical" to the overall convention center project. Refusal, he said, would jeopardize a scheduled bond refinancing and give him and the authority board "serious pause" in considering how to proceed with the project
6 HARB Review Comments Excerpt from HARB review by: Suzanne Stallings December 6, 2004 Since parking garages are typically exposed structures to allow for adequate ventilation, the proposed elevations visible along East Mifflin Street have been left open. Rather than creating another series of façades, these elevations are more utilitarian and functional, along a street that is currently used as an access alley and is largely defined by surface parking lots. The use of brick-faced corner stair towers with false gables helps to anchor the structure and improves the vistas from South Duke and South Lime Streets. The four-bay center section breaks up the wide horizontal deck construction. While treatment of this elevation purposely differs from the design of the East King façade, the pedestrian entrances at the two corners on East Mifflin Street could be enhanced to provide greater visual appeal as well as improved safety and comfort for pedestrians. Excerpt from HARB Meeting Minutes January 2, 2007 The review also cited The City of Lancaster s 1993 Comprehensive Plan, Which recommended against the creation of commercial parking lots along street fronts.
7 Excerpt from HARB review by: Suzanne Stallings June 4, 2007 In contrast to the simulated building façades that comprise the East King Street elevation, the west side elevation and the south elevation facing East Mifflin Street consist of long, exposed horizontal concrete decks broken up by vertical columns and brick-faced towers with false gables. This more functional approach is appropriate along Mifflin Street, currently used as an access alley and largely defined by surface parking lots. The center tower facing East Mifflin appears to contain large areas of glazing, but the submitted drawing of the south elevation is extremely schematic. The applicant must provide more detailed renderings of the Mifflin Street elevation for the HARB's review. In recommending demolition of the existing structures at this site in 2004, the HARB recognized the need to meet downtown parking demands as well as the altered physical condition of the historic buildings. Reference Secretary of the Interior's Standards No. 9, which states in part that new construction "shall be differentiated from the old and shall be compatible with the massing, size, scale, and architectural features to protect the historic integrity of the property and its environment."
8 Response to HARB Comment Comments Size, Scale and Proportion Response East Vine Street Proposed expansion is a continuation of the existing structure, relating to the mix of structures present throughout the city and the neighborhood. John Hoff Place
9 Response to HARB Comments Comment Mass does not step back at top Response Unable to step back and still maximize parking spaces however with exception on adjacent church, neighboring properties are approximately 60-0 away from the face of the new garage.
10 Response to HARB Comments Comment Causes tunneling affect on Mifflin St. Response Clear height at 2 nd tier pedestrian crossing is 16-4 Average clearance to garage structure is 25-0 Pedestrian scaled streetscape at protected pathway Well lit streetscape Together these features will provide an open, inviting, and safe pedestrian experience
11 City Wide Mixed Use & Mixed Scale Residential and Apartment Complex Residential and Hospital/Parking Complex Residential and Office/Warehouse Residential and Educational Note: The proposed garage is located in the Central Business District and permitted by Lancaster City Zoning Code.
12 City Wide Mixed Use & Mixed Scale
13 East Vine Street Elevation Study Neighborhood Views
14 Perspective View
15 South Lime Street Elevation Study Neighborhood Views
16 Addressing the Community Concerns Adding screening to limit light spill and pointsource glare as well as reduce the potential of objects being thrown from the garage. PROPOSED GRILLE ELEVATION RELATIONSHIP BETWEEN EXISTING HOUSING AND PROPOSED GRAGE
17 Addressing the Community Concerns 4 th Tier from 20 Light is Defused Proposed grille placed at lighting fixture. 4 th Tier from Property Line
18 Structure over Mifflin St. will be well-lit, open and provide safe passageway for pedestrians. Significant upgrades to landscaping will be part of project along with LPA s commitment to maintain the landscaping. Proposed Site Plan
19 Proposed East Elevation Proposed South Elevation
20 Proposed West Elevation
21 Deleted Slides Follow
22 Proposed Aerial Views South East View North East View
MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres
Department of Community Planning & Economic Development 250 South 4th Street, Room 300 Minneapolis, MN 55415-1385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,
More informationBEGINNING OF PART 5 OF 6 PARTS. Innovative ordinance adopted
BEGINNING OF PART 5 OF 6 PARTS Innovative ordinance adopted Over a period of several years, Planning Commission chairman Tom Hylton wrote a new zoning ordinance, pro bono, assisted by experts hired with
More informationSTAFF REPORT NEW BEDFORD HISTORICAL COMMISSION MEETING July 10, 2017
PATRICK J. SULLIVAN DIRECTOR City of New Bedford Department of Planning, Housing & Community Development 608 Pleasant St, New Bedford, Massachusetts 02740 Telephone: (508) 979.1500 Facsimile: (508) 979.1575
More informationWRT. October 16, Arthur Collins President Collins Enterprises, LLC 2001 West Main Street, Suite 175 Stamford, CT 06902
Planning & Design October 16, 2010 Arthur Collins President Collins Enterprises, LLC 2001 West Main Street, Suite 175 Stamford, CT 06902 Re: Review of The Landmark at Talbot Park Philadelphia Dallas Lake
More informationThese design guidelines were adopted by: Knoxville-Knox County Metropolitan Planning Commission on August 10, 2000 Knoxville Historic Zoning
Fort Sanders Neighborhood Conservation District Design Guidelines These design guidelines were adopted by: Knoxville-Knox County Metropolitan Planning Commission on August 10, 2000 Knoxville Historic Zoning
More informationMONROE WARD REZONING SUMMARY. October 2018
MONROE WARD REZONING SUMMARY October 2018 WHY IS THE CITY REZONING MONROE WARD? In July of 2017 Richmond City Council adopted The Pulse Corridor Plan, a corridor-long planning document that outlines steps
More informationArchitectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch
Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual character of the building is intended to symbolically
More informationRequest for Expansion of Target Investment Zone Boundaries in Hagerstown December 7, 2006
Request for Expansion of Target Investment Zone Boundaries in Hagerstown December 7, 2006 1. Hagerstown Target Investment Zone Boundaries: The Target Investment Zone in Downtown Hagerstown, which is outlined
More informationRR Building Area: (sf) 8,200 sf. Cost per Square Foot: $207. Construction Cost $1,700,000. Date of Completion: 2014
Program Summary: The project is the rehabilitation of adjoined 3-story brick buildings in the Central Business District to support an office space and five residential apartments. Program Statement: This
More informationThe State of North Broad
Welcome to the second issue of our monthly newsletter for Stamm Development Group. The targeted markets where we focus continue to be vibrant. We are seeing a lot of interest in the general areas of our
More informationCity of Coral Gables Planning and Zoning Staff Report
Applicant: Application: City of Coral Gables Planning and Zoning Staff Report Biltmore Parc Homes, LLC Subdivision Review for a Tentative Plat Property: Biltmore Parc Homes (760 Valencia Ave.; 2605, 2611,
More informationTree-lined streets, multilevel
THINKING BIG A look at the present and future of downtown Jackson ~ By Bonnie Gretzner Tree-lined streets, multilevel parking structures, new businesses, residential apartments all are part of the new
More informationDIEPENBROCK A R C H I T E C T U R E
DIEPENBROCK A R C H I T E C T U R E OUTREACH MEETING REPORT JUNE 13, 2018 Project Number: 3032169-EG Address: 2617 Franklin Ave E. Applicant: Rudd Development Co. Date of Outreach Meeting: June 5, 2018
More informationAppendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017
Appendix1,Page1 Urban Design Guidelines DRAFT September 2017 Back to Back and Stacked Townhouses Appendix1,Page2 Table of Contents 1 Introduction 1 1.1 Purpose 1 1.2 Urban Design Objectives 1 1.3 Building
More informationDEVELOPMENT DEPARTMENT STAFF REPORT THE PARK AT 5 TH
DEVELOPMENT DEPARTMENT STAFF REPORT ARB Meeting Date: July 3, 2018 Item #: _PZ2018-293_ THE PARK AT 5 TH Request: Site Address: Project Name: Parcel Number: Applicant: Proposed Development: Current Zoning:
More informationRR Program Summary: Renovation and facade restoration of a severely modified historic building for residential and retail use.
Program Summary: Renovation and facade restoration of a severely modified historic building for residential and retail use. Program Statement: The building was originally constructed circa 1844 as a Livery
More informationDurant Ave., Berkeley
Page 1 of 6 Attachment: 2121-2123 Durant Ave., Berkeley Proposed Project Analysis for New Construction Prepared for: Kahn Design Associates 1810 6 th Street Berkeley, CA. 94710 19 December 2014 Revised
More informationCITY OF KAMLOOPS BYLAW NO A BYLAW TO AMEND THE ZONING BYLAW OF THE CITY OF KAMLOOPS
67 68 CITY OF KAMLOOPS BYLAW NO. 5-1-2796 A BYLAW TO AMEND THE ZONING BYLAW OF THE CITY OF KAMLOOPS The Municipal Council of the City of Kamloops, in open meeting assembled, enacts as follows: 1. This
More informationMulti-unit residential uses code
9.3.11 Multi-unit residential uses code 9.3.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Multi-unit residential uses code by the tables
More information2.0 EXISTING SITE CONDITIONS ALASKAN WAY WESTERN AVE POST ALLEY ANALYSIS
2.0 ANALYSIS EXISTING SITE CONDITIONS The Union Street corridor offers an excellent visual connection to the waterfront and bay, but due to the sharp changes in grade, its role as a pedestrian link is
More informationWASHTENAW COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY ACT 381 WORK PLAN TO CONDUCT ELIGIBLE DEQ RESPONSE AND/OR MSF NON-ENVIRONMENTAL ACTIVITIES
WASHTENAW COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY ACT 381 WORK PLAN TO CONDUCT ELIGIBLE DEQ RESPONSE AND/OR MSF NON-ENVIRONMENTAL ACTIVITIES 400 NORTH RIVER STREET THE HISTORIC THOMPSON BLOCK REDEVELOPMENT
More informationOak Cliff Gateway District PD 468
Oak Cliff Gateway District PD 468 August 21, 2014 2013 Authorized Hearing Authorized Hearing September, 2013 September 12, 2013 City Plan Commission expanded boundaries to represent current Oak Cliff Gateway
More informationA G E N D A Thursday, March 9, :30 PM
THE TOPEKA LANDMARKS COMMISSION MEETING I. Roll Call Holliday Office Building 620 SE Madison Ave., Holliday Conference Room, 1 st Floor A G E N D A Thursday, March 9, 2017 5:30 PM II. III. IV. Approval
More informationComposition of traditional residential corridors.
Page 1 of 7 St. Petersburg, Florida, Code of Ordinances >> PART II - ST. PETERSBURG CITY CODE >> Chapter 16 - LAND DEVELOPMENT REGULATIONS >> SECTION 16.20.060. CORRIDOR RESIDENTIAL TRADITIONAL DISTRICTS
More informationCOMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING
COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN AND FINANCIAL REVIEW 401 SE 6 TH STREET- CONNOLLY
More informationDRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes
Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes 1 Local Area Plan - Project Alignment Overview Directions Report, October 2008 (General Summary Of Selected
More informationRestoring Properties, Revitalizing Neighborhoods.
Restoring Properties, Revitalizing Neighborhoods. 2016: 358 Properties Acquired Residential Acquisitions Other Acquisitions Lot, 58 Industrial Lot, 2 Commercial Structure, 2 Structure, 292 Industrial Structure,
More informationUrban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.
Urban Design Brief 1039-1047 Dundas Street London Affordable Housing Foundation November 2017 Zelinka Priamo Ltd. TABLE OF CONTENTS Page No. INTRODUCTION... 3 SECTION 1 LAND USE PLANNING CONTEXT... 3 1.1
More informationStaff Report PLANNED DEVELOPMENT. Salt Lake City Planning Commission. From: Lauren Parisi, Associate Planner; Date: December 14, 2016
Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS To: Salt Lake City Planning Commission From: Lauren Parisi, Associate Planner; 801-535-7932 Date: December 14, 2016 Re: 1611 South 1600 East PLANNED
More informationUrban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London
Urban Design Brief 1635 (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London Site Plan Control Application Holding Provision Application April 1, 2015 Prepared for: Rise Real
More informationGeneral Manager of Planning, Urban Design, and Sustainability in consultation with the Director of Legal Services
POLICY REPORT DEVELOPMENT AND BUILDING Report Date: October 26, 2016 Contact: Anita Molaro Contact No.: 604.871.6479 RTS No.: 11689 VanRIMS No.: 08-2000-20 Meeting Date: November 15, 2016 TO: FROM: SUBJECT:
More informationREDEVELOPMENT PLAN FOR THE ALBANY AVENUE/WOODLAND STREET PROJECT
REDEVELOPMENT PLAN FOR THE ALBANY AVENUE/WOODLAND STREET PROJECT HARTFORD REDEVELOPMENT AGENCY DEPARTMENT OF DEVELOPMENT SERVICES 250 CONSTITUTION PLAZA, 4 th FLOOR HARTFORD, CONNECTICUT 0603 APPROVED
More informationCounty Lot C Redevelopment
County Lot C Redevelopment La Crosse County La Crosse, WISCONSIN 03.20.14 Orientation What is the purpose of this process? La Crosse County is exploring ways to maximize the value of Lot C by completing
More information722 WILLIAMSON STREET
PROJECT DESCRIPTION The organizing principle of the design is a simple stepped massing that initially addresses urban context of Williamson Street; relating contextually to the height, mass, materials
More informationNOW, THEREFORE, THE COUNCIL OF THE CITY OF CALGARY ENACTS AS FOLLOWS:
PUD2017-0081 ATTACHMENT 1 BYLAW NUMBER 13M2017 BEING A BYLAW OF THE CITY OF CALGARY TO DESIGNATE THE WHITE RESIDENCE AS A MUNICIPAL HISTORIC RESOURCE * * * * * * * * * * * * * * * * * * * * * * * * * *
More informationLINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P JENSON, K P CLARKE, T P
Planning and Development Department Land Use Planning Division ACTION SUMMARY FOR DESIGN REVIEW COMMITTEE MEETING September 21, 2017 7:00 PM LINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P
More informationThe demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.
D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t 2072 ADDISON STREET PRELIMINARY DESIGN REVIEW For Committee Discussion/ Majority Recommendation JULY 20, 2017 Design Review #DRCP2016-0002
More informationM E M O R A N D U M. MEETING DATE: July 10, 2018 CASE NUMBER: PC
M E M O R A N D U M TO: FROM: PREPARED BY: Plan Commission Technical Review Committee Tim Semmann, AICP Principal Planner DATE DISTRIBUTED: July 3, 2018 MEETING DATE: July 10, 2018 CASE NUMBER: PC18-2603
More informationCITY OF MANHATTAN BEACH [DRAFT] PLANNING COMMISION MINUTES OF REGULAR MEETING JANUARY 28, 2015
CITY OF MANHATTAN BEACH [DRAFT] PLANNING COMMISION MINUTES OF REGULAR MEETING JANUARY 28, 2015 A Regular Meeting of the Planning Commission of the City of Manhattan Beach, California, was held on the 28
More informationPLNPCM : Attached Garage Regulations for Residential Districts ZONING TEXT AMENDMENT
Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission Daniel Echeverria (801) 535-7165 or daniel.echeverria@slcgov.com Date: September 3, 2015 Re:
More informationPart 4.0 DEVELOPMENT REGULATIONS
M A I N S T R E E T N O R T H Part 4.0 DEVELOPMENT REGULATIONS 4.1 Districts 4.2 Permitted and Prohibited Uses, Standards and Standard Specific Criteria and Other General Provisions 4.3 DPS REGULATIONS
More information3.1 Existing Built Form
3.1 Existing Built Form There is a wide variety of built form in the study area, generally comprising 2 and 3 storey buildings. This stretch of Queen Street East is somewhat atypical of Toronto's main
More informationCITY OF MERCED SMALL LOT SINGLE-FAMILY HOME DESIGN GUIDELINES
CITY OF MERCED SMALL LOT SINGLE-FAMILY HOME DESIGN GUIDELINES Development Services Department Planning and Permitting Adopted August 15, 2005 SMALL LOT SINGLE FAMILY HOME GUIDELINES A. Purpose and Applicability.
More informationMEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean
Department of Community Planning & Economic Development 250 South 4th Street, Room 300 Minneapolis, MN 55415-1385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,
More informationRURAL SETTLEMENT ZONE - RULES
Chapter 38 RURAL SETTLEMENT ZONE - RULES INTRODUCTION This Chapter contains rules managing land uses in the. The boundaries of this zone are shown on the planning maps. There is limited opportunity for
More informationA Better Community Through Cooperation
Denver Landmarks Preservation Commission 201 W Colfax Ave., Denver, CO To the Landmarks Preservation Commission, Baker Historic Neighborhood Association P.O. Box 9171 Denver, CO 80223 board@bakerneighborhood.org
More informationCASTLES OF CALEDON URBAN DESIGN REPORT
CASTLES OF CALEDON URBAN DESIGN REPORT PROPOSED RESIDENTIAL DEVELOPMENT CALEDON, ONTARIO 10 JULY, 2015 TABLE CONTENTS: 1.0 DEVELOPMENT 4.0 CONCLUSION 1.1 Introduction 1.2 Castles of Caledon- Urban Design
More informationVillage of Galena ZONING AND PLANNING COMMISSION
Village of Galena ZONING AND PLANNING COMMISSION MINUTES OF THE MEETING OF APRIL 16, 2014 The Zoning and Planning Commission of the Village of Galena met on Wednesday April 16, 2014 in the Council Chambers
More informationSHIMBERG CENTER FOR AFFORDABLE HOUSING
A F F O R D A B L E H O U S I N G ISSUES SHIMBERG CENTER FOR AFFORDABLE HOUSING M.E. Rinker, Sr., School of Building Construction College of Design, Construction & Planning PO Box 115703, University of
More informationCity of Stockton. Legislation Text AUTHORIZE ACQUISITION OF REAL PROPERTY LOCATED AT 501 AND 509 WEST WEBER AVENUE
City of Stockton Legislation Text File #: 17-3966, Version: 1 AUTHORIZE ACQUISITION OF REAL PROPERTY LOCATED AT 501 AND 509 WEST WEBER AVENUE RECOMMENDATION It is recommended that the City Council adopt
More informationPlanning Commission Report
cjly City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 TEL. (310) 285-1141 FAX. (370) 858-5966 Planning Commission Report Meeting Date: April 28, 2016 Subject: Project
More informationSub-Areas Development Review
Sub-Areas Development Review Sub-Area 1: 14 th Street Corridor Sub-Area 2: East Lake Gateway Sub-Area 3: Peralta/Laney College Sub-Area 4: I-880 Sub Area 5: Chinatown 5A BART Sites and Madison Park 5B
More informationH30. Special Purpose Tertiary Education Zone
H30. Special Purpose Tertiary Education Zone H30.1. Description The Special Purpose Tertiary Education Zone applies to tertiary education facilities in locations where the surrounding zoning will not appropriately
More informationRequirements for accepted development and assessment benchmarks for assessable development
9.3.10 Small Lot Housing Design Code 9.3.10.1 Application (1) This code applies to development identified as requiring assessment against the Small Lot Housing Design Code by the categories of development
More informationBUILDINGS IN TALBOT YARD, YORKERSGATE, MALTON. Case UID: RECOMMENDATION. Recommended Grade: II
ADDRESS BUILDINGS IN TALBOT YARD, YORKERSGATE, MALTON Parish MALTON District RYEDALE County NORTH YORKSHIRE Case UID: 169678 Date First Listed: 27-OCT-2010 Formerly Listed As: RECOMMENDATION Outcome: Yes,
More informationRT-3 District Schedule
District Schedule 1 Intent The intent of this Schedule is to encourage the retention of neighbourhood and streetscape character, particularly through the retention, renovation and restoration of existing
More informationTask Force Kickoff Meeting January 10, 2016
Task Force Kickoff Meeting January 10, 2016 AGENDA Welcome (2:45pm) Introductions (2:50pm) How the Group Will Operate (3:25pm) Staff Presentation (3:40pm) Project Scope Project Schedule Urban Design and
More informationLITTLE MOUNTAIN ADJACENT AREA REZONING POLICY
LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY JANUARY 2013 CONTENTS 1.0 INTENT & PRINCIPLES...1 2.0 APPLICATION...2 3.0 HOUSING TYPES, HEIGHT & DENSITY POLICIES...3 3.1 LOW TO MID-RISE APARTMENT POLICIES...4
More informationRe: TP , Flinders Street MELBOURNE, demolition and construction of 13 storey building.
16 March 2017 City of Melbourne City Planning and Infrastructure, PO Box 1603 Melbourne Vic 3001 planning@melbourne.vic.gov.au Attn: Ben Nicholson Supported by the National Trust P.O. Box 24198, Melbourne
More informationDemolition of Three Heritage Properties in the South Rosedale Heritage Conservation District - 5, 7, and 9 Dale Avenue
REPORT FOR ACTION Demolition of Three Heritage Properties in the South Rosedale Heritage Conservation District - 5, 7, and 9 Dale Avenue Date: January 30, 2018 To: Toronto Preservation Board Toronto and
More informationBOSTON REDEVELOPMENT AUTHORITY
FEBRUARY 14, 2013 BOSTON REDEVELOPMENT AUTHORITY REPORT AND DECISION ON THE APPLICATION OF BW OFFICE OWNER LIMITED PARTNERSHIP, BW ANCHOR RETAIL OWNER LIMITED PARTNERSHIP AND BW RESIDENTIAL-RETAIL OWNER
More informationAGENDA SLOT HOME EVALUATION & TEXT AMENDMENT. 5:30 - Welcome
AGENDA 5:30 - Welcome Please sign-in, put a sticker on the map, grab snacks, materials and a seat 5:45 - Staff Presentation 6:15 - Open House Stations Background Information Mixed Use Districts Multi Unit
More informationDurant Apartments Durant Avenue, Berkeley. Applicant OPHCA's Amended Statement for August 21, 2014 DRC Meeting
Durant Apartments 2631-2637 Durant Avenue, Berkeley ATTACHMENT 1 Page 1 of 6 Applicant OPHCA's Amended Statement for August 21, 2014 DRC Meeting The existing 18-unit apartment building at 2631-2637 Durant
More informationMATTER OF Mr. & Mrs. Anthony Flynn, 3 Soder Road Block 1003, Lot 54 Front and Rear Yard Setbacks POSTPONED Carried to meeting on March 21, 2018
The Meeting of the North Caldwell Board of Adjustment was held at Borough Hall, Gould Avenue on Wednesday, starting at 8:05 pm. The meeting was held in accordance with the Open Public Meetings Law and
More informationMINUTES KNOXVILLE DOWNTOWN DESIGN REVIEW BOARD MEETING OF MARCH 17, 2010 SMALL ASSEMBLY ROOM
MINUTES KNOXVILLE DOWNTOWN DESIGN REVIEW BOARD MEETING OF MARCH 17, 2010 SMALL ASSEMBLY ROOM Present: Kim Henry David Dewhirst Anne Wallace John Sanders Joe Petre Amy Haynes Carol Montgomery Bob Alcorn
More informationG. HRA Member Area Surveys a. Area 1 Survey Sample b. Area 1-10 descriptions for surveys
G. HRA Member Area Surveys a. Area 1 Survey Sample b. Area 1-10 descriptions for surveys CENTER CITY URBAN REVITALIZATION PLAN RANKING OF URBAN RENEWAL ACTIONS Area 1 Dwight Street Gateway This area includes
More information1 Accessory Dwelling Unit Project
1 Welcome Welcome, and thank you for coming to tonight s open house! The purpose of tonight s meeting is to provide information, discuss, and gather input on the topic of Accessory Dwelling Units (s).
More informationDEVELOPMENT DEPARTMENT STAFF REPORT STAFF REPORT EASTSIDE CHAMBLEE LINK DCI
DEVELOPMENT DEPARTMENT STAFF REPORT Public Hearing Date: April 12, 2018 Item #: PZ-2018-248 STAFF REPORT EASTSIDE CHAMBLEE LINK DCI Request: Development of Community Compact (DCI), ten concurrent variances,
More informationHastings CBD Heritage Inventory Project
Hastings CBD Heritage Inventory Project HOLDEN S BUILDINGS OTHER NAMES: Nutters Building, Café Camille LOCATION: Street and Number: 200-206 Heretaunga Street East Location: Corner of Heretaunga Street
More informationBuilding Livable Communities with Transit. Introduction to Financing Livable Communities. Portland Lindbergh City Center Case Study
Portland 2010 Introduction to Financing Livable Communities Lindbergh City Center Case Study A Livable Community Is A pedestrian oriented neighborhood with good sidewalks and street trees and outdoor furnishings
More informationUpdate on the Avenues and Mid-Rise Buildings Action Plan
STAFF REPORT INFORMATION ONLY Update on the Avenues and Mid-Rise Buildings Action Plan Date: May 15, 2009 To: From: Wards: Reference Number: Planning and Growth Management Committee Chief Planner and Executive
More informationConsider retention of existing low-rise family housing where this does not prevent the achievement of wider regeneration objectives
Site Allocation SA3.4 Greater Carpenters District This note is prepared in response to the Inspector s additional questions of 24 th March 2015 in relation to Site Allocation 3.4 Greater Carpenters District.
More informationThe Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017
The Cannery Marketplace Narrative Cannery Commerce District 10/18/2017 Purpose: A number of entitlements are being requested for the Cannery Marketplace inclusive of a Master Conditional Use Permit (Master
More informationRiverfront site abuzz with activity
Riverfront site abuzz with activity By: Chuck Slothower in Scrolling Box July 31, 2018 1:01 pm The Waterfront Vancouver development s first phase includes restaurant buildings with Columbia River views
More informationOCEANSIDE DEVELOPER S CONFERENCE
1 AGENDA OCEANSIDE DEVELOPER S CONFERENCE Wednesday, September 5, 2018, 9:30 a.m. City Hall South, 1 st Floor, Guajome Room 1. 9:30-10:30 a.m. Proposed 6-story mixed-use development with (6) live/work
More informationMINUTES OF A REGULAR MEETING ZONING BOARD OF ADJUSTMENT OF THE BOROUGH OF MOUNTAIN LAKES February 24, 2016
MINUTES OF A REGULAR MEETING ZONING BOARD OF ADJUSTMENT OF THE BOROUGH OF MOUNTAIN LAKES February 24, 2016 Chair Chris Richter called the meeting to order and announced: Adequate notice of this meeting
More informationDESIGN, ACCESS & PLANNING STATEMENT
(MADRON STREET) LONDON SE1 5UB DESIGN, ACCESS & PLANNING STATEMENT The architectural response for the site has been designed with regard to the following: The New Southwark Plan The London Plan: Spatial
More informationZA and ZA Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center
ZA16-051 and ZA16-052 Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center ZA16-051 and ZA16-052 Owner: Applicant: Requests: Dominion Southlake Properties, LLC, White Chapel Village
More informationBelfast Municipal Airport Airspace Obstruction Analysis
Belfast Municipal Airport Airspace Obstruction Analysis BST MEETING NOTES project: meeting date: location: subject: EA AND DATA COLLECTION FOR AIRSPACE OBSTRUCTION ANALYSIS WEDNESDAY, MARCH 18, 2015 6:30
More informationARTICLE 6.07 FENCES Division 1. Generally
FENCE REGULATIONS ARTICLE 6.07 FENCES Division 1. Generally Sec. 6.07.001 Definitions For the purpose of this article, the following terms, phrases and words shall have meanings respectively ascribed to
More informationProposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd.
Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd. Presentation to Ajax Council July 4, 2013 Introduction 1. Background 2. Planning Policies and Regulations 3. Downtown Community Improvement
More information1827 FREEDOM ROAD SUITE 101 LANCASTER, PA 17601
For Lease 717.293.4477 1827 FREEDOM ROAD SUITE 101 LANCASTER, PA 17601 Table of Contents 1827 Freedom Road, Suite 101 Property Information Sheet Property Photos Location Maps Aerial Photo/Tax Map Zoning
More informationPoten ally Eligible Structures
Poten ally Eligible Structures (Note: Construction dates for many properties are based on County Assessor s records and have not been verified by historical research.) Fifteen commercial or public buildings
More information159 Cottage Road, LLC Request to Purchase City-owned Property
City Council Workshop Agenda Item #1 June 24, 2013 159 Cottage Road, LLC Request to Purchase City-owned Property 159 Cottage Rd, LLC is requesting to purchase City-owned property adjacent to its property
More informationFig. 16 & 17 Left: Carved limestone detail. Right: Carved limestone and metal screen at main entrance on west elevation.
Assessment and Feasibility Study Statement of Significance The historic Hall of Waters Building, located along the Fishing River in Downtown Excelsior Springs, Missouri, is a significant Art Deco building,
More informationPLANNING COMMISSION MAY 3, 2018 PUBLIC HEARING
PLANNING COMMISSION MAY 3, 2018 PUBLIC HEARING SUBJECT: REQUEST TO DEMOLISH TWO SINGLE-FAMILY DWELLINGS ON TWO ADJOINING LOTS AND CONSTRUCT TEN RESIDENTIAL CONDOMINIUM UNITS AT 947 GENESEE AVENUE AND 944
More informationDAYLIGHTING / COURTYARD
SITE / CONTEXT MASS / MODULAR DAYLIGHTING / COURTYARD VIEWS /VENTILATION CIRCULATION / PARKING The building is located in the San Fernando Valley. On the West Side of the site is the main access road;
More informationRT-11 and RT-11N Districts Schedules
Districts Schedules 1 Intent The intent of this schedule is to allow a variety of housing options by encouraging development of multiple small houses and duplexes on larger lots and assembled sites, while
More informationCITY OF MURFREESBORO BOARD OF ZONING APPEALS
CITY OF MURFREESBORO BOARD OF ZONING APPEALS Regular Meeting, July 27, 2011, at 1:00 p.m. City Hall, 111 West Vine Street, Council Chambers, 1 st Floor 1. Call to order A G E N D A 2. Consideration of
More informationVillage of Algonquin Request for Proposals Purchase, Relocation and Rehabilitation of the Franke House NOTE: House MUST be moved
Village of Algonquin Request for Proposals Purchase, Relocation and Rehabilitation of the Franke House NOTE: House MUST be moved Issue Date: February 5, 2016 Summary: The Village of Algonquin is accepting
More informationCUMBERLAND COUNTY BLIGHTED PROPERTY REINVESTMENT BOARD
CUMBERLAND COUNTY BLIGHTED PROPERTY REINVESTMENT BOARD INFORMATION SHEET Cumberland County adopted Ordinance No. 99-1, as amended, established the Cumberland County Blighted Property Reinvestment Board
More informationthings to consider if you are selling your house
things to consider if you are selling your house KEEPINGCURRENTMATTERS.COM WINTER 2012 EDITION PAGE TABLE OF CONTENTS 1 3 5 7 9 House Prices: Where They Will Be in the Spring Understanding the Impact OF
More informationTown Centre Community Improvement Plan
2012 Town Centre Community Improvement Plan City of Greater Sudbury Growth and Development Department 1.0 PLAN BACKGROUND 1.1 Introduction The following Community Improvement Plan (CIP) has been prepared
More informationCity of Brandon Brownfield Strategy
City of Brandon Brownfield Strategy 2017 Executive Summary A brownfield is a property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous
More informationCompatible-Scale Infill Housing (R-2 Zones) Project
Project Scope: A targeted amendment to the regulations for building bulk/height in the R-2 zones. Objectives: Allow more housing opportunities in the R-2A, R-2D, and R-2M zones, while ensuring the height
More informationINGHAM COUNTY LAND BANK FAST TRACK AUTHORITY. June 13, 2011 Minutes. Comm. Bahar-Cook, Comm. DeLeon, Comm. Nolan and Comm. McGrain
APPROVED July 11, 2011 INGHAM COUNTY LAND BANK FAST TRACK AUTHORITY June 13, 2011 Minutes Members Present: Comm. Bahar-Cook, Comm. DeLeon, Comm. Nolan and Comm. McGrain Members Excused: Eric Schertzing
More informationCITY OF NAPLES STAFF REPORT
Meeting of 05/13/15 Conditional Use Petition 15-CU3 CITY OF NAPLES STAFF REPORT To: Planning Advisory Board From: Planning Department Subject: Conditional Use Petition 15-CU3 Petitioner: Hazelden Betty
More informationDo You See What I See? Most Likely Not! Visibility Covenants in Commercial Leases
C:\Users\ajohnson\Downloads\Visibility_Covenants_in_Commercial_Leases_-_JP_rev_July_30-2014.doc Do You See What I See? Most Likely Not! Visibility Covenants in Commercial Leases Jamie Paquin Introduction
More informationSherwood Forest (Trinity) Housing Corporation. Urban Design Brief
Sherwood Forest (Trinity) Housing Corporation Sherwood Place Affordable Housing Apartments Trinity Presbyterian Church Orchard Park Nursery School 590 Gainsborough Road, London Urban Design Brief REVISED
More informationUrban Design Brief. Italian Seniors Project 1090, 1092, 1096 Hamilton Road City of London
Urban Design Brief Italian Seniors Project City of London October 1, 2017 TABLE OF CONTENTS Page No. INTRODUCTION... 2 1.0 LAND USE PLANNING CONCEPT... 2 1.1 Subject Lands... 2 1.2 Official Plan and Zoning
More information