Corvallis School District 2002 Long Range Facilities Master Plan Projects Update

Similar documents
Corvallis School District 509J. Long Range Facilities Master Plan

New Hope-Solebury School District Campus Revitalization Plan

BALLOT MEASURE SUBMITTAL FORM. Jurisdiction Name: San Leandro Unified School District Election Date: 8 November 2016

CUMBERLAND SCHOOLS WORK PROPOSED 2018

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE

HARRISON COUNTY BOARD OF EDUCATION BOND ELECTION ORDER

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers

THE REDEVELOPMENT PLAN

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017

a) Tenant shall require its Contractor to provide and maintain the following insurance coverage:

WORKSHEET FOR ACCESSIBILITY UPGRADE REQUIREMENTS FOR EXISTING NON-RESIDENTIAL BUILDINGS

The City of Boise Building Excellence Awards

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

CITY OF NORTH MANKATO CAPITAL ASSET POLICY ADOPTED: JANUARY 1, 2003 REVISED EFFECTIVE: _JANUARY 1, 2016

CORDOVAN PARK W I-20, Arlington PROPERTY REPOSITIONING Case Study

STATE UNIVERSITY of NEW YORK PROJECT CAPITALIZATION FORM (PCF) INSTRUCTIONS

Request for Proposal (RFP) Goodwill Industries of Greater Detroit (Goodwill) for OAKLAND COUNTY MICHIGAN WORKS! PONTIAC June 12, 2018

RGM Architects. Eduardo Mata Elementary School

Charter Township of Plymouth Zoning Ordinance No. 99 Page 331 Article 27: Nonconformities Amendments: ARTICLE XXVII NONCONFORMITIES

County of Monterey. Capital Asset Policy

PROPOSED BOND PROJECT DETAILS. New School Facilities to Prevent Overcrowding

RIDGEDALE A VENUE E AST H ANOVER, NEW J ERSEY

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

Local Ballot Measure: E. Enterprise Elementary School District Bond Measure

SELLER S PROPERTY DISCLOSURE STATEMENT

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

House Bill 2140 Sponsored by Representative BOONE (Presession filed.)

Jefferson Street Center Winchester Public Schools Winchester, Virginia

BUI L DIN G A ND E L E V A T O R F E ES

Greenbrier County Building Code Administrative Policy Manual

Facility Assessment. Municipal Facilities 1245 and 1885 North Hacienda Road La Habra Heights, California 90631

Building Re-use Presentation. A look at City Hall, the Police Station and the Briscoe Building. December 6, 2016

OREGON SELLER S PROPERTY DISCLOSURE STATEMENT

TENANT IMPROVEMENT APPLICATION Page 1 of 4

WASHTENAW COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY ACT 381 WORK PLAN TO CONDUCT ELIGIBLE DEQ RESPONSE AND/OR MSF NON-ENVIRONMENTAL ACTIVITIES

Cost Segregation Opportunities

PROPERTY INSPECTION REPORT

General Statement Regarding Assessment Analysis Recommendations

OFFERING MEMORANDUM. 415 Washington Street. Waukegan, IL PRESENTED BY: COLLIERS INTERNATIONAL

WISCONSIN REAL ESTATE CONDITION REPORT 1

ORDINANCE NO

GENERAL INFORMATION. Landlord s Tenant Coordinator

West Atlanta Retail Former SaveRite

For Sale. El Caporal Restaurant. 117 W. Main Street Everson, WA 98247

2012 PHARE Project Summaries

SELLER DISCLOSURE STATEMENT IMPROVED PROPERTY

Sudler Annex 092/3725 Various Accessibility Improvements 04/2012 Included accessible ramp to entrance and accessible restroom.

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

Accessible drinking fountain does not have a clear 30 wide floor space centered on the drinking fountain (centerline to the counter edge is 12 ).

General Statement Regarding Assessment Analysis Recommendations

ROBERT MOON VICE PRESIDENT, BROKERAGE SERVICES

**PRICE REDUCTION** ~INVESTMENT OFFERING~

MEDINA COUNTY BUILDING REGULATIONS

Durant Apartments Durant Avenue, Berkeley. Applicant OPHCA's Amended Statement for August 21, 2014 DRC Meeting

TOWN OF HAVERHILL, NH

Carrathool Shire Council Section 94A Development Contributions Plan

PROGRAM AREAS - MIDDLE SCHOOL

FOR LEASE MID-CITY RETAIL SPACE ON THE LAFITTE GREENWAY

Michael A. Gross Tucson Realty & Trust Co. Executive Vice President. 333 N. Wilmot Rd. Ste. 340 Tucson, AZ 85711

PATIO PERMIT REGULATIONS

CITY OF LOS ANGELES OFFICE OF THE CITY CLERK ROOM 395, CITY HALL LOS ANGELES, CALIFORNIA CALIFORNIA ENVIRONMENTAL QUALITY ACT

PLUMBING SYSTEMS CHAPTER 29

COLD DARK SHELL LEASE EXHIBIT

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

FERRY COUNTY BUILDING ORDINANCE # UPDATED

Rent Stabilization, Vacancy Decontrol and Reinvestment in Rental Property in Berkeley, California

Pre-Pour Foundation Inspection Report. Point to Point Inspections, PLLC Peter J. Day TREC Lic. # 21160

Natural beauty and privacy in the heart of the Assembly

Washington Municipal Building- Feasibility Study

COLORADO STATE UNIVERSITY Financial Procedure Instructions FPI 4-1

DESCRIPTION OF IMPROVEMENTS

OWNER/MANAGER: RENOVATED: 2009 HEIGHT: Blue Star Properties. 10 floors RENTABLE SQUARE FEET: 278,535 FLOOR SIZES:

City of Pomona 2008 Mills Act Program REVISED Application Guide

Meeting Date: February 26, 2018 Agenda Item No:

CHAPTER 1321 Permit and Inspection Fees

Meeting Date: December 3, 2018 Agenda Item No:

2019 SUMMER CONSTRUCTION PROGRAM 4/16/19

NEBRASKA REAL ESTATE COMMISSION SELLER PROPERTY CONDITION DISCLOSURE STATEMENT Residential Real Property

No Surprises: What You Need to Know About the TPRs and Cost Segregation. Trent Baeckl, CPA Tax Senior Manager

The American University in Cairo. Financial Policies and Procedures

PINNACLE PROPERTIES ANNEXATION AND ADOPTION OF PROPOSED ZONING REGULATIONS

B-11-MN April 1, 2016 thru June 30, 2016 Performance Report. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

Santa Cruz Elementary School District Bond Measure

Renovation Progress. June 2-15, Weeks 35 & 36

ST KILDA ROAD WORKS, DOMAIN PRECINCT

ARTICLE 44. PD 44. Unless otherwise stated, the definitions and interpretations in Chapter 51 apply to this

Exhibit C - Shops 1 & 2

PROTECTIVE COVENANTS DEED RESTRICTIONS SPENCER BUSINESS/INDUSTRIAL PARK August 11, 1999 Amended, March 3, 2014

Department of Public Works Permit Fee Schedule

SECTION 900 PARKS AND SCHOOLS

Real Estate Transfer Disclosure Statement

F A C I L I T I E S P L A N N I N G & C O N S T R U C T I O N

Development of Public Properties Downtown. June 4, 2013

Multi-family Asset - 84 Units $7,000,000

Point Aquarius Property Owners Association Architectural Control Committee REQUEST FOR ARCHITECTURAL CONTROL COMMITTEE APPROVAL

CHAPTER 48. PROPERTY MAINTENANCE STANDARDS

Transcription:

Corvallis School District 2002 Long Range Facilities Master Plan Projects Update Phase 1 (Each estimate includes contingency, indirect and inflation costs) 1. Replacement School for Existing Corvallis High School Construct new building of approximately 215,000 square feet and upgrade / refurbish approximately 40,000 square feet of existing facilities (the 1966 portion of the building) with a total capacity of 1300-1500 students Location will be at the existing CHS site Rationale: Portions of CHS were identified as high risk for life safety in recent engineering studies. Most of the structure is 50-75 years old. Many maintenance issues need to be addressed, including failing roofs, wiring, plumbing, and heating/ventilation systems. In addition, many of the educational spaces are not the appropriate size for their current and future function. Renovation, with a price tag of $37 million, would not be cost-effective, according to the industry standard. A new facility will be more energy efficient, saving ongoing operating costs. A new facility also will better address educational needs now and in the future. Cost: $46,000,000 December 2008 update Demolition of the old high school was completed in the summer of 2005. The replacement building was occupied by students in September 2005. Final completion of the project, including the construction of tennis courts was completed in the summer of 2008. 2. Replacement Middle School Facility Replaces Western and Highland View Middle Schools. Construct new building of approximately 120,000 square feet and upgrade / refurbish 7,200 square feet of the existing building (the library) with a capacity of 600 800 students Located at Highland site Rationale: Both Highland View and Western View structures were identified as high risk for life safety in the event of an earthquake. The current building is constructed of concrete slabs (walls and ceilings) which are not properly reinforced. Separately, each school would require $17,000,000 in overall facility improvements. Building one new

facility is much more cost effective. With projected declining enrollment, one facility will meet the needs of our student population for the next 10-15 years. Cost: $25,000,000 Linus Pauling Middle School was occupied by student in the September of 2004. Final wrap up of the project was completed in summer of 2006. 3. Address Water Quality Issues Carry out mitigation plan to lower lead content to within federal requirements The mitigation plan will include selective piping and fixture replacement and/or installation of flushing and water purification systems Rationale: Recent water testing has shown that all facilities in the district have some drinking water sources that exceed the level of lead recommended by the EPA. Cost: $318,000 All buildings were tested All fixtures have been replaced or retrofitted to meet federal requirements for lead levels in drinking water 4. Address Seismic High-Risk Portions of Lincoln Elementary School Seismic upgrades for the 1948/49 section of the building (approximately 21,875 square feet). Rationale: This part of the building has masonry bearing block walls that are not reinforced. Engineering studies identified this area of Lincoln as high risk for life safety in the event of an earthquake. Cost: $439,250 This project was completed during the summer of 2005. 5. Fire/Life/Safety Improvements Complete replacement of obsolete fire detection systems at 10 district facilities Automatic Fire Sprinkler Systems upgrades in three district facilities 2002 LRFMP Projects Update- Page 2 of 10

High security lock systems (345 outside doors @ $750 each) Rationale: These improvements address safety issues across the district. Fire detection/alarm systems in 10 schools are obsolete. Replacement parts are not available, and the technology is outmoded. Several times these systems have failed, and schools have had to hold fire watches, where a staff member must walk through the building every 30 minutes. The high security lock systems provide instantaneous lockdown of all outside doors. Cost: $638,750 Fire detection systems have been replaced at all schools except Dixie, Fairplay, Harding, Inavale, and the Western View Center. Sprinkler system upgrades have been completed at Crescent Valley High School, District Office, and the Corvallis High School shop areas. High security locks (AMAG) have been installed at all facilities except Dixie, Fairplay, Harding, and Inavale. High security locks were included at our new buildings (LPMS & CHS). 6. Improvements to Crescent Valley High School Instructional Space Upgrades/modifications to ceilings, walls, floors and fixtures C wing and F wing Improve natural lighting Upgrade heating/ventilation systems Upgrade science labs Rationale: Improvements will change configuration of educational areas to better utilize space. Upgrades will improve lighting, ventilation and heating. The majority of educational spaces have no natural lighting and many have poor ventilation. Cost: $7,500,000 Improvements at CVHS were completed for student occupancy in September of 2004. 2002 LRFMP Projects Update- Page 3 of 10

7. Address American Disability Act (ADA) Needs Complete the upgrade of visual/audio alarms (strobes) Access routes to existing buildings brought into compliance Door hardware: closer tensions, automatic closures and replacement of knobs with levers Add Braille to interior building signage Provide proper parking spaces (van compliance) Physical modifications to structures to eliminate barriers as required Rationale: The district is not in complete compliance with federal law. This addresses the most critical ADA requirements. Another $721,000 will be required in the future. Cost: $905,000 This project was completed in the summer of 2004 8. Roof Replacement at Five Schools Complete roof replacement at five schools: Cheldelin, Mt. View, Lincoln, Jefferson and Wilson As roofs are replaced, seismically upgrade roof diaphragms to meet current structural codes (3,471 squares of roofing replacement @$984 per square) Rationale: Life expectancy for roofs is 20-30 years. The majority of roofs in the district are nearing or have exceeded their life expectancy. Some already are failing, and are continually being patched because of the need for replacement. It is more cost effective to make seismic repairs on roofs as the roofs replaced. Cost: $3,415,546 These projects were completed in the summers of 2003, 2004, and 2005. In January of 2006, the school board approved additional roof replacement projects at Garfield (completed summer of 2006) and Adams (scheduled for summer 2008). Deferred maintenance for the roofs at Hoover (completed in summer of 2006) and the district office (completed in summer of 2007) were also approved. 2002 LRFMP Projects Update- Page 4 of 10

9. Gymnasium Bleacher Repairs/Code Upgrades at Crescent Valley High School and Cheldelin Middle School Replace fatigued metal structural hardware Upgrade safety railings to current code Rationale: The current bleachers at both schools don t meet safety code requirements. In addition to safety concerns, this is a potential liability issue for the district. Cost: $42,000 This project is complete. 10. Crescent Valley All-weather Track Replacement Major overhaul/replacement of entire track Rationale: The majority of the track is not usable as it currently exists due to safety issues. The existing rubberized track surface is worn through to bare asphalt, the sub base and base materials are failing, and subsurface drainage repairs are needed. Cost: $312,500 The track was replaced in the summer of 2003. We have outstanding warranty issues that are scheduled for repair in spring/summer of 2008. 11. Playground, Parking Lot and Driveway Improvements Overlay approximately 338,000 square feet of existing asphalt parking lots and driveways at eight district facilities @ $1.25 per square foot Rationale: Playground and parking lot surfaces have a life expectancy of about 30 years. Many of these surfaces have exceeded their life expectancy and are deteriorating significantly. Decaying playground surfaces create safety hazards for children. It is more cost effective to maintain now than to replace later on. Cost: $422,500 December 2008 Update Playground improvements were completed in the summer of 2007 at all schools except Jefferson Elementary School which was installed in summer of 2008). 2002 LRFMP Projects Update- Page 5 of 10

All of the parking lot and driveway improvements were completed by the summer of 2008. 12. Additional Vehicle Parking at Garfield Add 17 parking spaces to southwest parking lot Rationale: According to city ordinances, Garfield does not have adequate parking. This is contributing to safety issues because of problems with traffic flow. Cost: $30,525 This project was completed in the summer of 2003. 13. Improve Heating/Ventilation Systems at Nine District Facilities Upgrade equipment Replace controls Rationale: Some buildings do not meet current state and federal air quality standards. Rooms are unevenly heated and some have improper ventilation. Methods of air delivery and equipment are obsolete. These replacements and upgrades will lower ongoing energy costs. A comfortable environment helps create optimal conditions for learning. Cost: $819,170 (may qualify for energy savings grant dollars) HVAC systems have been improved at all district facilities except Dixie, Fairplay, Harding, Inavale, and Western View Center. 14. Technology Upgrades Recabling and system upgrades at Adams, Garfield, Inavale, Jefferson, Cheldelin, and Crescent Valley Rationale: The current wiring is obsolete and expensive to maintain. Cost: $282,000 This project is complete. 15. Kitchen Upgrades/Equipment Replacement Replace worn-out equipment 2002 LRFMP Projects Update- Page 6 of 10

Rationale: Kitchen equipment is obsolete. Replacement parts are hard to find and the equipment is inefficient to run. In some schools, these improvements will bring kitchens up to current county sanitation/health code requirements. Cost: $272,400 December 2008 Update Freezer replacements at Cheldelin and district office, and gas oven replacements throughout the district were completed in the summer of 2007. Final completion of the project in the summer of 2008. Phase I includes: Maintenance $7,928,166 Remodel / Modernize $7,469,475 New Construction $71,000,000 Total Cost for Phase I $86,397,641 Phase 2 (Phase 2 begins five years after completion of Phase 1) 1. Complete CHS Master Site Relocate/replace Franklin School to an alternate site (South Corvallis or current Western View or Harding sites with new facility). Purchase residential properties located on the SE corner of existing CHS site. Rationale: The addition of these properties to the CHS campus will create more functional space for athletic fields and parking. The school board has elected to keep Franklin in operation for 5-10 years. Two properties adjacent to the CHS campus have been purchased. The 2008 Long Range Facilities Master Plan Committee recommends that this item be removed from the Long Range Facilities Master Plan. Please see committee report for details. 2. Identify and Purchase Acreage in South Corvallis for Future Replacement School Site 2002 LRFMP Projects Update- Page 7 of 10

Rationale: In future years, as the population of Corvallis extends south, the district should be prepared to build a school in that portion of town. This new facility might serve as a K-8 school. 3. Modernization and Seismic Upgrades to Crescent Valley High School Rationale: In this phase, modernization begun in Phase 1 will be completed, and seismic safety issues identified in engineering studies will be addressed. 4. Modernization and Seismic Upgrades to Cheldelin Middle School Rationale: By Phase 2, the Cheldelin building will be almost 40 years old. In addition to modernizing educational spaces, maintenance issues due to aging of the building will need to be addressed. Seismic safety upgrades as identified in engineering studies also will be part of this modernization. 5. Roofing Replacement, Including Seismic Upgrades to Roof Diaphragms at Adams, Garfield, Hoover, Crescent Valley, Administration, and Inavale Rationale: Life expectancy for roofs is 20-30 years. The majority of these roofs will have already exceeded their life expectancy. It is more cost effective to make seismic repairs on roofs as the roofs are replaced. December 2008 Update Garfield seismic upgrades to the roof diaphragm and roof replacement was completed in the summer of 2006 Adams was completed in the summer of 2008 6. Balance of Modernization and Seismic Upgrades to Adams, Garfield, Hoover, Jefferson, Mountain View, Wilson, and Administration Rationale: Most of these buildings are 50-60 years old. Educational spaces will need to be updated, and long-range maintenance issues due to aging buildings addressed. Seismic safety upgrades as identified in engineering studies also will be part of this modernization. 2002 LRFMP Projects Update- Page 8 of 10

Phase 3 (Phase 3 begins five years after completion of Phase 2) 1. Replace Lincoln Elementary School at new site purchased in Phase 2 The size of the facility will be based on future and projected enrollment. Consider creating a K-8 school in this facility as recommended by the K-8 Middle School Board Subcommittee. (This recommendation was adopted by the Board in October, 2001.) Rationale: The Lincoln facility has significant long-range maintenance issues. In the future, it will be more cost efficient to rebuild rather than renovate. Because of its proximity to Highway 99, the current site has safety issues. Also, the size of the current campus does not allow for future expansion. 2. Replace Inavale School at existing site if enrollment warrants Will require temporary modulars during construction. Rationale: The current Inavale structure has significant long-range maintenance issues. In the future, it will cost more to renovate than to rebuild. A new Long Range Facilities Master Plan was adopted by the Corvallis School Board on March 11, 2008. 2002 LRFMP Projects Update- Page 9 of 10

Recommendations for Sales of Current Properties Appendix A 1. Sell and/or Trade these District-Owned Properties Edgewood Park Estates, lots 28, 29, and 30 Rationale: This property is not an adequate size for a school campus. Pleasant View Fruit Farms (11.49 acres) Rationale: The district already owns property at the current Western View site in southwest Corvallis; the long-range plan does not identify a need for other school property in this part of town at this time. In addition, thirty per cent of the Pleasant View parcel is not suitable for building because of wetlands. Fairplay Elementary (10.96 acres) Rationale: Fairplay School will close in July 2002. The district s long-range plan does not identify the need for a school at this site in the future. Dixie Facility (7.00 acres) Rationale: Dixie (CIMC) will close a portion of its operation and relocate the remainder of the services to Harding Facility in July 2002. Timberhill Property (11.84 acres-6.84 to School District, 5.00 acres to City Parks & Recreation Department) Rationale: The long-range plan does not identify a need for other school properties in north Corvallis. There is a deed covenant, which reverts property to the City for a park if not developed for a school facility within 10 years of original deed transfer. All funds received from property transactions will be placed in district designated Land Fund for purchase of future properties as per Board Resolution on January 12, 1998. 2. Reserve, or Land Bank, the Following District-Owned Properties for Future Educational Sites Western View site 22.82 acres Harding site 7 acres Village Green (11.01 acres) Rationale: These properties are centrally located with good access to the community, and should be reserved as potential future school sites. 2002 LRFMP Projects Update- Page 10 of 10