San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package Terminal 1 March, 2012 Civic Design Review_Phase III Design Development May 5, 2017 All rights reserved, Andrew Choi
SFO T1 CIVIC DESIGN REVIEW PHASE III DESIGN DEVELOPMENT TABLE OF CONTENTS 1. CONCEPT 2. PROJECT SCOPE 3. GLASS FRITT PATTERN STUDY 4. CURBSIDE VIEW 5. CURBSIDE EXPRESSION 6. BRIDGE CONNECTOR EXPRESSION 7. SOUTH EAST CORNER EXPRESSION 8. GLARE ANALYSIS 9. TERMINAL VESTIBULE EXPRESSION 10. CONSTRUCTION DETAILS AIRSIDE DRAWINGS CDRC comments & response from April 24, 2017 Comments from CDRC : Fritted glazing should extend to the bridge portal, and fading it along the curve past the point of solar gain is encouraged. Response : Frit pattern has been extended to provide coverage from the North end to the Bridge Connector as requested Comments from CDRC : Not the bridge, but the reentrant wall plane metal panels adjacent to the bridge connecting T1 to the International Terminal. We encourage the design team to look at a simplified panelization patterning. Response : after careful consideration, the landside facade is designed as composition of elements reflecting the forest pattern interpretation. This pattern has been simplified, and occurs at the South entry, Bridge connector, and Concourse C facade. The single color metal panel occurs to mark the Airside from the Landside. Comments from CDRC : Along the upper glazing fascia of the Terminal Landside facade, we encourage the design team to see if the intermediate horizontal mullion cap can be done as a structually glazed horizontal detail, not a capped one. Response : The Landside Facade glazing is now designed without mullion end caps. Structural glazing details of the system are on sheets 19 Comments from CDRC : Agreed, and encourage the design team to explore other faux bois finishes that appear less plastic than phenolic panels Response : Construction details and material selection to appear authentic, See Detail page 14 San Francisco International Airport Terminal 1 Renovation 2
1. CONCEPT The Building is not a solid object, it s a transparent box offering views and personal connections with the bay area naturalism represented. Warmth of the interior comes through as a simple clear box. You can also see vegetation and natural elements through the glass. The opportunity to enter this enclosed natural environment manifests itself in vestibules carved out of natural materials, creating a sense of a walk-through nature, providing a sense of relaxation and place upon entering the building. San Francisco International Airport Terminal 1 Renovation 3
2. PROJECT SCOPE NEED TO UPDATE San Francisco International Airport Terminal 1 Renovation 4
3. CREATING A BAY AREA NATURALISM EXPERIENCE: FRITT PATTERN MAKING PROCESS Comments from CDRC : Fritted glazing should extend to the bridge portal, and fading it along the curve past the point of solar gain is encouraged. Response : Frit pattern has been extended to provide coverage from the North end to the Bridge Connector as requested San Francisco International Airport Terminal 1 Renovation 5
4. TERMINAL CURBSIDE VIEW Comments from CDRC : Not the bridge, but the reentrant wall plane metal panels adjacent to the bridge connecting T1 to the International Terminal. We encourage the design team to look at a simplified panelization patterning. Response : after careful consideration, the landside facade is designed as composition of elements reflecting the forest pattern interpretation. This pattern has been simplified, and occurs at the South entry, Bridge connector, and Concourse C facade. The single color metal panel occurs to mark the Airside from the Landside. San Francisco International Airport Terminal 1 Renovation 6
5. TERMINAL CURBSIDE EXPRESSION Comments from CDRC : Along the upper glazing fascia of the Terminal Landside facade, we encourage the design team to see if the intermediate horizontal mullion cap can be done as a structually glazed horizontal detail, not a capped one. Response : The Landside Facade glazing is now designed without mullion end caps. Structural glazing details of the system are on sheets 19 San Francisco International Airport Terminal 1 Renovation 7
6. BRIDGE CONNECTOR EXPRESSION San Francisco International Airport Terminal 1 Renovation 8
7. SOUTH EAST CORNER EXPRESSION San Francisco International Airport Terminal 1 Renovation 9
8. GLARE ANALYSIS San Francisco International Airport Terminal 1 Renovation 10
9. TERMINAL VESTIBULE EXPRESSION Comments from CDRC : Agreed, and encourage the design team to explore other faux bois finishes that appear less plastic than phenolic panels Response : Construction details and material selection to appear authentic, See Detail page 14 San Francisco International Airport Terminal 1 Renovation 11
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) PARTIAL SECTION - LANDSIDE @GRID 9 San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WALL SECTION AT VESTIBULE, TYPICAL AT DEPARTURE LEVEL San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) LANDSIDE CANOPY DETAIL @ CANOPY BEAM CONNECTION - 1/4 SLOPE San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) MULLION - CANOPY - WT-06 - PURLIN MULLION - CANOPY - WT-06 - RAFTER San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW SILL (LANDSIDE DEPARTURES) San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW JAMB (LANDSIDE DEPARTURES) WINDOW VERTICAL (LANDSIDE DEPARTURES) San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW HORIZONTAL, INTERM.VERT. AT TOP (LANDSIDE ARRIVAL) WINDOW HORIZONTAL, INTERM.VERT. AT BOTTOM (LANDSIDE ARRIVAL) San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW HEAD (AIRSIDE) San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW SILL (AIRSIDE) San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) 90 DEGREE WINDOW CORNER (AIRSIDE) San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) PARAPET DETAIL AT LANDSIDE, T1S MOD LANDSIDE PARAPET, TYPICAL San Francisco International Airport Terminal 1 Renovation
10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) LANDSIDE BASE OF WALL DETAIL - GL WA.1 LANDSIDE BASE OF WALL DETAIL San Francisco International Airport Terminal 1 Renovation
B36 B35 B34 B33 B32 B31 B30 SHEET NOTES AREA 66 AREA 64 MATCH LINE SEE 01 / A03.0.01 T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 03 / A03.0.00 56' - 11" 39' - 9" SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA 94128 03 A03.1.06 03 A03.1.06 T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" 207 King St., Suite 300 San Francisco, CA 94107 Phone (415) 978-1000 EXTERIOR EAST PARTIAL ELEVATION (AREA 62, 64 & 66) 04 SCALE: 1/16" = 1'-0" 539 Bryant Street Suite 100 San Francisco CA 94107 Phone (415) 356-3800 B30 B29 B28 AREA 62 B27 B26 B25 B24 AREA 60 B23 10 09 A03.3.03 A03.3.03 B22 B21 MATCH LINE SEE 04 / A03.0.00 T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 02 / A03.0.00 56' - 11" GENERAL NOTES 1. REFER TO THE A02. 1 SERIES DRAWINGS FOR APRON LEVEL PLANS 2. REFER TO THE A02.2 SERIES DRAWINGS FOR CONCOURSE LEVEL PLANS 3. REFER TO THE A02.2M SERIES DRAWINGS FOR MEZZANINE LEVEL PLANS 39' - 9" 4. REFER TO THE A03.0 SERIES DRAWINGS FOR EXTERIOR ELEVATIONS 5. REFER TO THE A03.2 SERIES DRAWINGS FOR BUILDING SECTIONS BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt MATCH LINE SEE 03 / A03.0.00 B21 MATCH LINE SEE 02 / A03.0.00 B9 AREA 58 03 A03.1.06 B20 B8 B19 03 A03.1.06 B7 B18 B17 03 A03.1.06 B16 08 07 05 A03.3.03 A03.3.03 A03.3.01 B6 B5 AREA 56 B4 B15 B3 B14 B2 06 05 A03.3.03 A03.3.03 02 02 04 04 03 02 03 A03.3.03 01 A03.1.06A03.3.03 A03.3.01 A03.3.01 A03.3.01 A03.3.03 A03.3.03 AREA 52 Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. AREA 50 01 A03.1.06 03 A03.1.06 B13 B1 T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" EXTERIOR EAST PARTIAL ELEVATION (AREA 58 & 60) 03 SCALE: 1/16" = 1'-0" MATCH LINE SEE 01 / A03.0.00 T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" 39' - 9" 56' - 11" 71' - 2" T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" EXTERIOR EAST PARTIAL ELEVATION (AREA 56 & 58) 02 SCALE: 1/16" = 1'-0" B0 CJ T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" 39' - 9" 56' - 11" 71' - 2" T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" EXTERIOR NORTH-EAST ELEVATION 01 SCALE: 1/16" = 1'-0" 6. REFER TO THE A03.3 SERIES DRAWINGS FOR WALL SECTIONS 7. REFER TO THE A04.7 SERIES DRAWINGS FOR WALL SECTIONS 8. REFER TO THE BB02.1 SERIES DRAWINGS FOR PBB's 01 GRAPHIC LEGEND 50 TRUE 52 VG - VISION GLASS METAL PANEL (AMF-01) METAL LOUVER (AMF-01) CONCRETE MASONARY UNIT WITH TAC-01 FINISH CONCRETE WITH TAC-01 FINISH GALV. CHAIN LINK FENCE 54 PLAN CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable 51 53 56 02 03 04 55 58 57 59 60 62 61 63 64 65 66 10010.66 SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION As indicated DATE A03.0.00 EXTERIOR BUILDING ELEVATIONS Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 A SEPT 2, 2016 100% DESIGN DEVELOPMENT ISSUE DATE DESCRIPTION Sheet Printed On: 23-03-17 12:56:03 PM
B15 AREA 55 02 09 01 2 9 B16 B17 B18 B19 AREA 57 B20 B21 B22 B23 A03.3.02 A03.1.06 A03.3.02 A03.3.04 A03.3.01 SHEET NOTES MATCH LINE SEE 01 / A03.0.02 T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 04 / A03.0.01 56' - 11" 39' - 9" SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA 94128 T1C - ARRIVALS LEVEL 1 11' - 6" T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" 207 King St., Suite 300 San Francisco, CA 94107 Phone (415) 978-1000 EXTERIOR WEST PARTIAL ELEVATION (AREA 55 & 57) 05 SCALE: 1/16" = 1'-0" 539 Bryant Street Suite 100 San Francisco CA 94107 Phone (415) 356-3800 8 B23 B24 B25 08 1 07 AREA 59 A03.1.06 B26 B27 B28 AREA 61 B29 A03.3.01 A03.3.04 A03.3.01 BA MATCH LINE SEE 05 / A03.0.01 T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" MATCH LINE SEE 04 / A03.0.01 T1C PENTHOUSE FF T.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 02 / A03.0.01 56' - 11" GENERAL NOTES 1. REFER TO THE A02. 1 SERIES DRAWINGS FOR APRON LEVEL PLANS 2. REFER TO THE A02. 2 SERIES DRAWINGS FOR CONCOURSE LEVEL PLANS 3. REFER TO THE A02. 2M SERIES DRAWINGS FOR MEZZANINE LEVEL PLANS 39' - 9" 4. REFER TO THE A03. 1 SERIES DRAWINGS FOR ENLARGED ELEVATION 5. REFER TO THE A03. 2 SERIES DRAWINGS FOR BUILDING SECTIONS 6. REFER TO THE A03. 3 SERIES DRAWINGS FOR WALL SECTIONS BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt T1C - ARRIVALS LEVEL 1 11' - 6" MATCH LINE SEE 03 / A03.0.01 B29 B30 B31 B32 AREA 63 B33 B34 B35 AREA 65 B36 07 A03.1.06 EXTERIOR WEST PARTIAL ELEVATION (AREA 59 & 61) 04 SCALE: 1/16" = 1'-0" MATCH LINE SEE 02 / A03.0.01 05 A03.1.06 04 A03.1.06 06 A03.1.06 BA AREA 65 BB BC BD BE AREA 66 BG Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. 10 A03.1.06 T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 01 / A03.0.01 39' - 9" 56' - 11" T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 04 / A03.0.00 39' - 9" 56' - 11" T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" EXTERIOR NORTH PARTIAL ELEVATION (AREA 61) 03 SCALE: 1/16" = 1'-0" EXTERIOR WEST PARTIAL ELEVATION (AREA 63 & 65) 02 SCALE: 1/16" = 1'-0" T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" EXTERIOR SOUTH PARTIAL ELEVATION (AREA 65 & 66) 01 SCALE: 1/16" = 1'-0" 7. REFER TO THE BB02.1 SERIES DRAWINGS FOR PBB's GRAPHIC LEGEND 50 TRUE 52 54 PLAN VG - VISION GLASS METAL PANEL (AMF-01) METAL LOUVER (AMF-01) CONCRETE MASONARY UNIT WITH TAC-01 FINISH CONCRETE WITH TAC-01 FINISH GALV. CHAIN LINK FENCE CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable 51 53 56 55 05 58 57 59 60 04 03 62 61 63 64 65 66 01 10010.66 SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 As indicated DATE A03.0.01 EXTERIOR BUILDING ELEVATIONS A SEPT 2, 2016 100% DESIGN DEVELOPMENT 02 ISSUE DATE DESCRIPTION Sheet Printed On: 23-03-17 12:56:26 PM
SHEET NOTES SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA 94128 207 King St., Suite 300 San Francisco, CA 94107 Phone (415) 978-1000 539 Bryant Street Suite 100 San Francisco CA 94107 Phone (415) 356-3800 GENERAL NOTES 1. REFER TO THE A02. 1 SERIES DRAWINGS FOR APRON LEVEL PLANS 2. REFER TO THE A02.2 SERIES DRAWINGS FOR CONCOURSE LEVEL PLANS 3. REFER TO THE A02.2M SERIES DRAWINGS FOR MEZZANINE LEVEL PLANS 4. REFER TO THE A03.0 SERIES DRAWINGS FOR EXTERIOR ELEVATIONS 5. REFER TO THE A03.2 SERIES DRAWINGS FOR BUILDING SECTIONS 6. REFER TO THE A03.3 SERIES DRAWINGS FOR WALL SECTIONS 7. REFER TO THE A04.7 SERIES DRAWINGS FOR WALL SECTIONS BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt MATCH LINE SEE 02 / A03.0.02 04 3 03 B4 A03.3.02 B5 A03.3.04 B6 A03.3.02 B7 AREA 53 B8 B9 Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. AREA 51 MATCH LINE SEE 01 / A03.0.02 T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" 37' - 2 1/2" T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" MATCH LINE SEE 05 / A03.0.01 T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" 37' - 2 1/2" 56' - 11" 56' - 11" 71' - 2" 71' - 2" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" EXTERIOR SOUTH PARTIAL ELEVATION (AREA 51 & 53) 02 SCALE: 1/16" = 1'-0" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" EXTERIOR SOUTH-WEST ELEVATION 01 SCALE: 1/16" = 1'-0" 8. REFER TO THE BB02.1 SERIES DRAWINGS FOR PBB's GRAPHIC LEGEND 50 TRUE 52 54 PLAN VG - VISION GLASS METAL PANEL (AMF-01) METAL LOUVER (AMF-01) CONCRETE MASONARY UNIT WITH TAC-01 FINISH CONCRETE WITH TAC-01 FINISH GALV. CHAIN LINK FENCE CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable 51 53 56 02 55 58 57 01 59 60 62 61 63 64 65 66 10010.66 SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION As indicated DATE A03.0.02 EXTERIOR BUILDING ELEVATIONS Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 A SEPT 2, 2016 100% DESIGN DEVELOPMENT ISSUE DATE DESCRIPTION Sheet Printed On: 23-03-17 12:56:39 PM
DRAWINGS ARE IN PROGRESS IN RESPONSE TO THE UPDATED AGA BUILDING ENVELOPE SYSTEM 04 E.O.S. BB 04 E.0.S. BJ T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 2' - 7" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 2' - 7" 13' - 3 1/2" 10 13' - 1 1/2" 06 22' - 1 1/2" 19' - 6 1/2" 19' - 6 1/2" SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA 94128 9' - 10" 05 A08.1.02 9' - 0" 05 207 King St., Suite 300 San Francisco, CA 94107 Phone (415) 978-1000 2' - 0" 539 Bryant Street Suite 100 San Francisco CA 94107 Phone (415) 356-3800... 9 TYPICAL SPANDREL PANEL AT FIXED LINK GATE 03 04 E.O.S. BB 04 E.0.S. BG 04 E.0.S. BJ BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 22' - 1 1/2" 22' - 1 1/2" 2' - 7" 19' - 6 1/2" 2' - 7" 19' - 6 1/2" 10" 9' - 0" 5' - 4 1/2" 7' - 11" 13' - 3 1/2" 8' - 10" C.O.M. C.O.M. C.O.M. 10 01 A08.1.02 GLASS PANEL AT GREEN ROOF 8 04 10 05 A08.1.02 FULL SPANDREL PANEL AT GREEN ROOF 07 E.O.S. E.O.S. BB T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. 22' - 1 1/2" 22' - 1 1/2" 19' - 6 1/2" 2' - 7" 2' - 7" 19' - 6 1/2" 13' - 1 1/2" 9' - 0" 2' - 0" 13' - 3" 10' - 10 3/4" 2' - 0" 08 07 04 10 09 TYPICAL FULL SPANDREL AT CONCOURSE LEVEL 04 E.0.S. BJ T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" TYPICAL SPANDREL PANEL AT EXIT DOOR 01 05 TYPICAL VISION PANEL AT CONCOURSE 02 T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 2' - 7" 19' - 6 1/2" 22' - 1 1/2" 7' - 10 7/8" 5' - 4" 9' - 0 3/4" 2" 1' - 10" 2' - 7" 19' - 6 1/2" C.O.M. C.O.M. C.O.M. N.I.C. 03 01 10 A08.1.02 SEISMIC JOINT AT CONCOURSE & R1 LEVEL 01 CJ B0 CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable 10010.66 SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J E OCT 28, 2016 C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 ISSUE DATE DESCRIPTION 1/4" = 1'-0" DATE A03.3.01 EXTERIOR WALL SECTIONS Sheet Printed On: 23-03-17 1:47:12 1:47:13 PM
DRAWINGS ARE IN PROGRESS IN RESPONSE TO THE UPDATED AGA BUILDING ENVELOPE SYSTEM E.O.S. BN E.O.S. BB 04 A08.1.02 04 A08.1.02 T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" 2' - 7" 8' - 3 1/2" T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" 8' - 3" T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" 03 C.O.M. C.O.M. 17' - 1 1/2" 19' - 8 1/2" SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA 94128 F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" 41' - 3 1/2" 11' - 7" 5' - 2 1/2" C.O.M. 07 A08.1.02 03 F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" 39' - 3 1/2" 11' - 7 1/2" 5' - 2 1/2" C.O.M. 07 A08.1.02 207 King St., Suite 300 San Francisco, CA 94107 Phone (415) 978-1000 539 Bryant Street Suite 100 San Francisco CA 94107 Phone (415) 356-3800 C.O.M. C.O.M. 02 5' - 4 1/2" 19' - 7" C.O.M. 8' - 10" 14' - 4 3/4" 01 01 A08.1.02 2' - 0" 1' - 10" 2" C.O.M. 10" 2" C.O.M. BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" 39' - 3 1/2" N.I.C. 12 A08.1.02 11 A08.1.02 10 A08.1.02 CJ B0 T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL AT CONCOURSE & MEZZANINE LEVEL - 04 04 T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" 41' - 3 1/2" 2' - 7" 17' - 3 5/8" 19' - 5" 10' - 10" 10' - 7" 11' - 7" 8' - 3 1/2" C.O.M. C.O.M. 04 A08.1.02 10 09 E.O.S. BN T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" SEISMIC JOINT AT CONCOURSE, MEZZANINE & R2 LEVEL 05 CURTAIN WALL AT CONCOURSE & MEZZANINE LEVEL - 03 03 Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. CURTAIN WALL AT CONCOURSE & MEZZANINE LEVEL - 02 02 39' - 3 1/2" 2' - 7" 17' - 5 5/8" 19' - 5" 10" 2" 8' - 10" 5' - 4 1/2" 5' - 0 1/2" 11' - 9 1/2" 8' - 3" C.O.M. C.O.M. C.O.M. 04 A08.1.02 02 A08.1.02 01 A08.1.02 E.O.S. BB T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL AT CONCOURSE & MEZZANINE LEVEL - 01 01 CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable 10010.66 SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J E OCT 28, 2016 C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 ISSUE DATE DESCRIPTION 1/4" = 1'-0" DATE A03.3.02 EXTERIOR WALL SECTIONS Sheet Printed On: 23-03-17 1:47:30 PM
BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 19' - 9" 19' - 9" 2' - 7" 14' - 7" 2' - 7" 2' - 7" 14' - 7" 2' - 7" 17' - 2" 17' - 2" 04 11 10 05 E.0.S. BE T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL LOUVER AT MECHANICAL PENTHOUSE AT R2 LEVEL 10 19' - 9" 14' - 7" 2' - 7" 2' - 7" 17' - 2" 02 12 E.0.S. BE T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" OPAQUE PANEL AT MECHANICAL PENTHOUSE AT R2 LEVEL 09 BE T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" SCREEN WALL AT MECHANICAL WELL - 01 08 T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 19' - 9" 2' - 7" 14' - 7" 2' - 7" 17' - 2" SCREEN WALL AT MECHANICAL WELL - 02 07 BE DRAWINGS ARE IN PROGRESS IN RESPONSE TO THE UPDATED AGA BUILDING ENVELOPE SYSTEM T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T1C PENTHOUSE FF T.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" E.0.S. E.0.S. T1C PENTHOUSE FF NAVD88: 66' - 7 1/2".. 06. 05 T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T1C PENTHOUSE FF T.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 34' - 0" 2' - 7" 14' - 7" 2' - 7" 11' - 9 1/2" 2' - 5 1/2" 2' - 5 1/2" 11' - 9 1/2" 17' - 2" 2' - 7" 14' - 3" 9' - 8" 7' - 4" 2" 14' - 3" 9' - 8" 7' - 4" 2" C.O.M. C.O.M. C.O.M. C.O.M. 09 08 03 09 08 01 E.0.S. E.0.S. BK BK T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL AT MARS GATE B7 04 Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 34' - 0" 19' - 9" 2' - 7" 14' - 7" 2' - 7" 11' - 9 1/2" 2' - 5 1/2" 2' - 7" 14' - 7" 2" 7' - 4" 9' - 8" 14' - 3" 2' - 7" 7' - 1" 7' - 4" 2" 2' - 7" C.O.M. C.O.M. C.O.M. C.O.M. 02 08 02 01 E.0.S. BK BK T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL AT MEZZANINE & PENTHOUSE LEVEL 02 CURTAIN WALL AT MEZZANINE & PENTHOUSE LEVEL 03 CURTAIN WALL AT MEZZANINE LEVEL CLERESTORY AREA 01 CONTRACT NO. T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" SAN FRANCISCO INTERNATIONAL AIRPORT PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable 10010.66 SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA 94128 207 King St., Suite 300 San Francisco, CA 94107 Phone (415) 978-1000 539 Bryant Street Suite 100 San Francisco CA 94107 Phone (415) 356-3800 SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J E OCT 28, 2016 C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 ISSUE DATE DESCRIPTION 1/4" = 1'-0" DATE A03.3.03 EXTERIOR WALL SECTIONS Sheet Printed On: 23-03-17 1:47:59 PM
DRAWINGS ARE IN PROGRESS IN RESPONSE TO THE UPDATED AGA BUILDING ENVELOPE SYSTEM SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA 94128 207 King St., Suite 300 San Francisco, CA 94107 Phone (415) 978-1000 BM 13 T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" 16' - 10" E.0.S. 539 Bryant Street Suite 100 San Francisco CA 94107 Phone (415) 356-3800 11' - 9 1/2" 14' - 3" 2' - 5 1/2" 12 BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 19' - 9" 2' - 7" 2' - 7" 14' - 7" 2' - 7" 2' - 7" 14' - 7" 2' - 7" 1 1/4" 16' - 9 1/4" 3 1/2" 02 12 07 06 E.0.S. E.0.S. BC BC E.0.S. T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" OPAQUE PANEL AT PENTHOUSE LEVEL 3 T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" FORMED METAL WALL PANEL SYSTEM AT MEZZANINE ROOF LEVEL 2 T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" 07 08 OPAQUE PANEL AT PENTHOUSE CORRIDOR 1 CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable 10010.66 SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z ISSUE DATE DESCRIPTION 1/4" = 1'-0" DATE A03.3.04 EXTERIOR WALL SECTIONS Sheet Printed On: 23-03-17 1:48:10 PM
B A B C VISION GLASS PAINTED METAL PANEL PAINTED LOUVERS C B A B B A A A A B B TYPICAL ELEVATIONS - BAB AIRSIDE
THANK YOU