GREAT FALLS HIGH SCHOOL MASTER PLAN. GFHS Master Plan Task Force

Similar documents
New Hope-Solebury School District Campus Revitalization Plan

PROGRAM AREAS - MIDDLE SCHOOL

CUMBERLAND SCHOOLS WORK PROPOSED 2018

Waverley Elementary School Feasibility Study

POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers

NYC Department of Education

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures

The Partnership for Building Reuse: Learning from Los Angeles

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

Architectural Renderings. The following is intended to provide a preview of renovations and additions planned for McKinney High School.

4. connect city road to the arts centre and yarra river

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning

Room & Floor Renumbering. Floor Level Numbering Room Renumbering

RGM Architects. Eduardo Mata Elementary School

Learning to Leverage

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016

Charles Kozminski Elementary Community Academy

DRAFT -- PROPOSED EXPANSION AND REVISIONS TO DIVISION 24. SPECIAL DISTRICT--COLLEGE AND UNIVERSITY NEIGHBORHOODS DISTRICT

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update

PLUMBING SYSTEMS CHAPTER 29

BOARD WORK SESSION Construction Projects Discussion & Superintendent Evaluation MINUTES

McCLATCHY FACILITY SUMMARIES

CITY HALL PROJECT UPDATE/DIRECTION BRIEF September 19, 2017

BALLOT MEASURE SUBMITTAL FORM. Jurisdiction Name: San Leandro Unified School District Election Date: 8 November 2016

Equality and Access Plan The Abbey School, Reading

Summary of Tower Road Property Planning and Maintenance

2019 SUMMER CONSTRUCTION PROGRAM 4/16/19

Pocatello High School New Building Addition Board Interview

Element Z General Design Requirements Owner Standards and Other Requirements

RSA Coffee House Fellows Evening 04 August 2016

Chapter 3. Planning Options

EAST-WEST CORRIDOR EXISTING CONDITIONS

2. The Purpose of the Estates Strategy

Harvard University Science and Engineering Complex BCDC 01 December 2015

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

OPTION 1 MAX RENOVATION/ADDITION

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

2015 Limited Campus Master Plan Update NSHE Board of Regents Informational Update October 23, 2015

Goals, Objectives and Policies

Project overview. Golden Sand Hotel DOHA QATAR

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017

HOLLEY NAVARRE WATER SYSTEM, INC. IMPACT FEE POLICIES, PROCEDURES & CALCULATIONS

TROWBRIDGE & WOLF. August 21, 2002 WEST CAMPUS RESIDENTIAL INITIATIVE DEIS ADDENDUM THREE

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

FLOOR AND ROOM NUMBERING GUIDELINES

CONSTRUCTION COST ESTIMATE AND ANALYSIS

Section 3: Primary Function, Employee Work Areas, & Kitchens

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type

Financing Municipal Services for Sustainable Development Getting the Prices Right

3. Miscellaneous Instructions and Definitions.

ORDINANCE # CITY OF MOUNDVILLE BUILDING INSPECTOR RULES AND PROCEDURE AND BUILDING CODES AND FEES

NORTH CAMPUS. North Campus & Northwest Residence Halls. North Garage. Jorgensen. Center. X Lot H2. Admissions. Werth. Residence.

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

CONRAD ENGINEERS Description of Scheme. The disciplines imposed upon the design and grouping of off-site preassembled residential units follow:

Local Ballot Measure: E. Enterprise Elementary School District Bond Measure

RA After Hours On Call (971) Your Guide to. Broadway. 625 SW Jackson St Portland, OR 97201

Hardwick State of the Town Forum & Charrette Summary

PROPOSED BOND PROJECT DETAILS. New School Facilities to Prevent Overcrowding

paddington house words by Tom Rubenach

PASSAIC BOARD OF EDUCATION IMPROVEMENT OF FACILITIES REPORT

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

Ashland City Hall Feasibility Study City Council Presentation Monday, October 17, 2016

Request for Information (RFI)

# Alexander Leigh Center for Autism Final PUD and SUP Amendment Project Review for Planning and Zoning Commission

PART ONE - GENERAL INFORMATION

SALVATION ARMY: HARBOR LIGHT CENTER EXISTING PROPOSED SALVATION ARMY: HARBOR LIGHT CENTER

NYC Department of Education

Review #1 They also have a 2% discount for students/employees of UTHSCSA.

Table of Contents. Concept Plan Overview. Statement of Compliance with Design Guidelines. Statement of Compliance with Comprehensive Plan

Your Guide to. Blackstone SW Park Ave Portland, OR 97201

HOUSING ELEMENT. 3. group and foster home construction. 1. increase the supply of new affordable housing with: a regional housing trust fund;

PINNACLE PROPERTIES ANNEXATION AND ADOPTION OF PROPOSED ZONING REGULATIONS

smart remodeling renovations that will yield you the greatest return when you sell

The University of Texas at Dallas Campus Master Plan Update Town Hall Meetings. September 6-7, 2018

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: GBC Pahrump Property Exchange Meeting Date: March 1-2,2012

RA2.01. Building Area: 89,222 SF. Cost per Square Foot: $162.22

Innovative features such as bridges (3 total on this site), leak detection for the gas main crossing, acoustic berm/barrier adjacent to the railway,

Urbanization. Urbanization in Chindia -- India Struggles with the Next 500 Million. Asian Experience with Compact Growth

From Page 1 of form:

Tisbury Elementary School

Village of Port Jefferson Urban Renewal Plan

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

DESIGN PUBLIC HEARING

Morehead State University

Post-Apartheid Cities in Transformation for Social Justice and Sustainability

Prime Northwest gainesville parcel

CfE Higher Geography HUMAN ENVIRONMENTS: URBAN CHANGE IN MUMBAI

PARTNERS IN ECONOMIC PROGRESS

From Page 1 of form:

Developing DITA Expertise Across Your Virtual Team. Martha Morgan Architect, Information Engineering October 14, 2009

(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code)

The Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017

CHANGE IN VALUE ALTERATIONS MADE OCCUPANCY CHANGES

Explain in writing if the address of the building is different than the address on this form:

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

Transcription:

GREAT FALLS HIGH SCHOOL MASTER PLAN GFHS Master Plan Task Force

Serving our community for over 80 years! Overriding premise: Retain GFHS Architectural Integrity

Infrastructure

Issues 1) Heat, ventilation, controls (Great Falls High School, Fieldhouse and South Campus) 2) Inadequate electrical power throughout GFHS 3) Inadequate and inefficient lighting throughout GFHS. Retain existing historical lighting in main corridors 4) Inadequate / outdated plumbing and toilets 5) Original windows replaced then covered up; (little natural light)

Issues Solutions Costs 1) Heat, ventilation controls (Great Falls High School and South Campus) New high efficiency modular boilers New digital controls Utilize existing ventilation shafts for duct work for air distribution Electrical upgrades to support new mechanical systems and controls $7,000,000 2) Inadequate electrical power throughout GFHS 3) Inadequate and inefficient lighting throughout GFHS. Do not replace existing historical lighting in main corridors (s); supplement with new New electrical power distribution New electrical outlets everywhere New energy efficient lighting $4,416,000 4) Inadequate / outdated plumbing and toilets New Plumbing - - water supply - gas supply - waste lines - add water in appropriate areas not currently served $552,000 5) Original windows replaced then covered up; (little natural light) Replace windows with energy efficient units historically acceptable to SHPO $2,415,000

21 st Century Learning Environment In 1930 S Era Building

21 st Century Learning Environment

Issues 1) Classrooms do not support 21 st Century Teaching / Learning techniques 2) Public spaces (auditorium / old gym, corridors) are in need of refreshing 3) Create more flexible classroom space 4) Existing library is too small and outdated 5) Existing science labs are not fully functional and are outdated 6) Technology not keeping up with 21 st Century and hard to incorporate (mostly on carts)

Technology Integration Model Ruben Puentedura, PhD, Hippasus

Room 107

Issues Solutions Costs 1) Classrooms do not support 21 st Century Teaching / Learning techniques 2) Public spaces (auditorium / old gym, corridors) are in need of refreshing Remodel all classrooms - - refinish wood floors - new white boards - new finishes - new integrated storage - new furnishings Remodel public spaces - finishes - lockers - seating - flooring (except terrazzo) $22,080,000 3) Need more classrooms 4) Existing library is too small and outdated 5) Existing science labs are not fully functional and are outdated Remodel former office spaces on main level into 5 new classrooms Incorporate adjacent counseling area and remodel the library into an info commons Remodel / update all science labs 6) Technology not keeping up with 21 st Century and hard to incorporate (mostly on carts) Incorporate new technology in all areas of building $5,520,000

Safety & Security

Issues 1) Unsafe and unsecured conditions between campus buildings (difficult slope between buildings) 2) No controllable main entrance / exit from GFHS / campus 3) Cafeteria inadequate for numbers of students and bad location 4) No place for students to congregate (social, studying, interact with faculty 5) Traffic, parking and drop-off emphasis is to the main residential area to the east (20 th St) 6) 1 st responder (Fire/EMS/Police) access is poor and unorganized (conflicts with traffic on east drop-off (20 th St) 7) East side (20 th St) has extreme vehicular / pedestrian conflicts)

STREET S STREET S PARKING PARKING STREET S 2 ND AVENUE S STAFF PARKING 3 RD AVENUE S STADIUM CAMPUS GREEN STUDENT/ EVENT PARKING PRACTICE FIELDS MAIN CAMPUS PARKING th AVENUE S 4 th STUDENT ENTRY PROPOSED CONNECTOR MAIN ENTRY ENTRANCE VISITOR 17 th STREET S 18 th STREET S SOUTH CAMPUS 20 th STREET S 5 th AVENUE S

Issues Solutions Costs 1) Unsafe and unsecured conditions between campus buildings 2) No controllable main entrance / exit from GFHS / campus 3) Cafeteria inadequate for numbers of students and bad location The connector! Enclosed from GFHS to fieldhouse and south campus Student commons Food service (s) Culinary arts Support back of house areas Main offices include counseling (frees up 5 classrooms in GFHS) $8,900,000 4) No place for students to congregate (social, studying, interact with faculty 5) Traffic, parking and drop-off emphasis is to the main residential area to the east (20 th St) 6) 1 st responder (Fire/EMS/Police) access is poor and unorganized (conflicts with traffic on east drop-off (20 th St) Redirect main entrance into the connector building and from the west Create single location for first responders Create multiple drop-off areas to reduce congestion around campus 7) East side (20 th St) has extreme vehicular / pedestrian conflicts)

Neighborhood Impacts / Traffic

Issues 1) Parking is inadequate (numbers) and poorly located (to the east on 20 th St) forcing parking onto adjacent city streets 2) Traffic pattern around campus is broken up and difficult to navigate with closed streets creating congestion and confusion 3) Traffic T s on 20 th and 3 rd Ave. S turn around real bottleneck

17 th STREET S 18 th STREET S PARKING PARKING 20 th STREET S 2 ND AVENUE S STAFF PARKING 80 NEW SPACES STUDENT/ EVENT PARKING 3 RD AVENUE S PRACTICE FIELDS 230 NEW SPACES PARKING 4 th AVENUE S STADIUM CAMPUS GREEN MAIN CAMPUS PROPOSED CONNECTOR MAIN ENTRANCE SOUTH CAMPUS 5 th AVENUE S

Issues Solutions Costs 1) Parking is inadequate (numbers) and poorly located (to the east on 20 th St) forcing parking onto adjacent city streets 2) Traffic pattern around campus is broken up and difficult to navigate with closed streets creating congestion and confusion 3) Traffic T s on 20 th and 3 rd Ave. S turn around real bottleneck Add 230+/- parking spaces to the west for students and events Add 80 +/- parking spaces on the NE corner of the campus (2oth St & 2 nd Ave S. for faculty and staff Implement a parking plan with a management plan - - incentives - enforcement Continue to work with City and City s consultants to further define the desired traffic patterns $975,000

Industrial Technology - Shop

Issues 1) Shop building is inadequate to house all programs 2) Shop building has unresolved structural issues 3) Shop building is in a very poor location - traffic (pedestrian vs vehicle) - no good expansion - blocks historic view of GFHS from SW

17 th STREET S 18 th STREET S PARKING PARKING 20 th STREET S 2 ND AVENUE S STAFF PARKING STUDENT/ EVENT PARKING 3 RD AVENUE S PRACTICE FIELDS STADIUM CAMPUS GREEN MAIN CAMPUS PARKING 4 th AVENUE S PROPOSED CONNECTOR MAIN ENTRANCE SOUTH CAMPUS NEW SHOPS 5 th AVENUE S

20 th STREET S CONNECTOR VISITOR ENTRY SOUTH CAMPUS NEW SHOPS 5 th AVENUE S

Issues Solutions Costs 1) Shop building is inadequate to house all programs 2) Shop building has unresolved structural issues 3) Shop building is in a very poor location - traffic (pedestrian vs vehicle) - no good expansion - blocks historic view of GFHS from SW New construction for entry level shop classes on south side of south campus Upper level Industrial Technology classes relocated to Paris Gibson Education Center Demolish existing building OR New construction for entry level shop classes on south side of south campus Upper level Industrial Technology classes relocated to Paris Gibson Education Center Repurpose existing building $5,000,000 * OR $6,750,000 * * Costs not including work to be done at Paris Gibson Education Center Note: The Task Force feels this issue needs additional study.

An Investment of $57,000,000-$59,000,000 Result: A revitalized Great Falls High School to last our community another 80 years!

Questions & Answers

Thank you