Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

Similar documents
Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Charles Kozminski Elementary Community Academy

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

Salmon P Chase Elementary School 2021 N Point St Chicago, IL 60647

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619

William Howard Taft High School

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE

CUMBERLAND SCHOOLS WORK PROPOSED 2018

NYC Department of Education

Shoreview Corporate Center

PROGRAM AREAS - MIDDLE SCHOOL

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS


LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

Type A-g 1-Bedroom 66 sq m / 710 sq ft #01-01

HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS

NYC Department of Education

Four Bedroom 2.5 Bath Colonial: The Grand Maple 2,319 sq. ft. Starting at $329,990

Attic Floor Bedrooms 1 & 2 Family Dwellings

HOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist

Accessible drinking fountain does not have a clear 30 wide floor space centered on the drinking fountain (centerline to the counter edge is 12 ).

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045

Exhibit C - Shops 1 & 2

Residencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)

Investigation Reference No. Investigation Status. Investigation Description

Tiny House on Wheels A Tiny House

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

Technical Specifications

Property Details 916 Youngs Road

Renovation Progress. July 21 Aug 3, Week 42 & 43

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

ACCESSORY DWELLING UNITS

Beirut East Gate is a residential and commercial project majestically rising on the shoulder of a beautiful hill

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado),

Feelwood Village. Baabdat. Technical specifications for the buildings on lots # 569 & Baabdat

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

ACCESSORY DWELLING UNITS

INFO-PACK. Knight s Court Info Pack Page 1

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED DECEMBER 2018

New Hope-Solebury School District Campus Revitalization Plan

General Information RETAIL AND RESTAURANT

The Promenade at Casa Grande 1005 N Promenade Pkwy Casa Grande, AZ 85294

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

Sr. No This option is applicable for Options Remarks / Details required

Positano Waterfront Residences. Copyright 2016, Miromar Development Corporation.

14400 Bear Valley Road, Victorville, CA 92392

M001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE

TENANT DESIGN MANUAL UPDATED MAY 2016

518 3 rd Avenue South St. Petersburg, Florida

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585)

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

Luxury Homes FROM separate entry exits D L F B A Y V I E W

TECHNICAL CRITERIA ARROWHEAD TOWNE CENTER THE PLACE TO SHOP

Residence 51. LOCATION John Kennedy Area, Limassol. STATUS Under Construction for SALE. COMPLETION DATE September 2010

The New NYC Building Code Chapter 10 Means of Egress. New York City Department of Buildings. Technical Affairs. Fatma M. Amer, P.E.

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

TENANT DESIGN MANUAL UPDATED JULY 2015

ADAPTABLE DESIGN GUIDELINES

Renovation Progress. June 2-15, Weeks 35 & 36

TENANT DESIGN MANUAL UPDATED JUNE 2015

MERRILLVILLE CORPORATE CENTER BUILDING FACTS & AMENITIES

320 Bay Street TORONTO ONTARIO. Tracy Macdonald Vice President,

Real Estate Assessment Checklist. 1. This assessment checklist has most of the essential features to look for in a house,

San Tan Village 2218 E. Williams Field Rd. #235, Gilbert, AZ 85295

TENANT DESIGN CRITERIA V. Technical Criteria 34

Contemporary villas Panoramic view 3 minutes from Bonita Beach

Saint Cloud Business Center

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2016

JAYPEE GREENS Greater Noida CRESCENT COURT APARTMENTS PRICE LIST

1. PRESENTATION OF THE PROJECT

A Contemporary Arts & Culture Neighbourhood

APPENDIX A BUILDING PERMIT AND RELATED FEES

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

17 N Centre Ave Leesport, PA 19533

TENANT DESIGN MANUAL UPDATED JULY 2016

City of Wausau Building, Housing and Zoning Fee Schedule 2019

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

Common Areas and Building Finishes

THE INSIDE STORY EXTERIOR VARIETY KITCHENS TO SAVOR PERSONALIZING OPPORTUNITIES LUXURIOUS BATHS WATER AND ENERGY SAVERS

Harmony Row Dublin 2. Dublin 2


TENANT DESIGN MANUAL UPDATED OCTOBER 2016

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JANUARY 2016

THE INSIDE STORY EXTERIOR VARIETY PERSONALIZING OPPORTUNITIES KITCHENS TO SAVOR LUXURIOUS BATHS WATER AND ENERGY SAVERS

The Kaleden. 11 Suite Apartment Building. For Sale. Prime South Granville Location West 13th Avenue, Vancouver, BC

Construction information

FICO Realty Group Presents 485 Washington Street Woburn MA 01801

FOR LEASE. Capitol Hill Corner Cafe/Restaurant Space th Avenue, Seattle, WA Please call brokers for more information:

1513 & 1515 Greenleaf Street Evanston, IL Karla Thomas & Lina Zoraikat

INFO-PACK. KUBE The Luxury Apartments. Kube Info Pack Page 1

THE TEN AT LAKE FORREST. FROM THE $850's

Property ID: Englantilaisaukio 10, Helsinki

The Peaks Features List

Transcription:

Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 895 3 4,483 $,64,885 Addition 927 3 56,506 $2,067,584 Addition 2 937 3 28,236 $92,7 Addition 3 978 3 7,04 $764,067 SITE $705,6 Campus Total 43,266 $6,09,3 Building: Main Category: Building Exterior Entrance Exterior Doors - Exterior FRP Door Door - ortheast 2 EA 6 $,263 Exterior Doors - Exterior Steel Door Door - orthwest 2 EA 6 $96 Exterior Doors - Exterior Steel Door Door. - Fire escape st 2 EA 6 $96 Exterior Doors - Exterior Steel Door Door.3 - Fire escape 2nd 2 EA 6 $96 Exterior Doors - Exterior Steel Door Door.5 - Fire escape gym EA 6 $48 Exterior Doors - Exterior Steel Door Door 5 - Boiler south EA 6 $48 Exterior Doors - Exterior Steel Door Door 6 - Boiler east EA 6 $48 Exterior Doors - Exterior Steel Door Door 9 - West EA 6 $48 Exterior Doors - Transom Lite Door - ortheast EA 6 $33 Exterior Doors - Transom Lite Door 5 - Boiler south EA 6 $33 Exterior Stairs - Concrete Door - ortheast 2 LF 6 $,77 Exterior Stairs - Concrete Door - orthwest 6 LF 6 $49 Exterior Stairs - Concrete Door 9 - West 3 LF 6 $245 Stair Handrail - Steel_Stair Handrail Door - ortheast LF 6 $87 Fire Escape Fire Escape orth Façade 80 LF 6 $50,54 BRADWELL Page of 56

Building: Main Category: Building Exterior Foundation Lighting Roof System Myra Bradwell Communications Arts & Sciences ES Foundation - Concrete Entire Building LF 6 $7,769 seepage Foundation - Concrete Entire Building / Boiler Room 38 LF 7 Foundation - Masonry Entire Building 333 LF 7 Superstructure - Concrete Entire Building / Boiler Room 2,207 SF 7 Superstructure - Heavy Timber Entire Building 29,276 SF 7 Exterior Lighting - Parapet or Roof Mounted Entire Building / Roof 5 EA 6 $2,683 Exterior Lighting - Wall Mounted Entire Building EA 6 $2,887 Chimney - Brick Chimney- Concrete/ Mortar Liner Roof 4 20 LF 6 $4,562 Coping - Clay Tile Roof 290 LF 6 $9,34 Coping - Clay Tile Roof 2 45 LF 6 $,445 Coping - Metal Roof 3 0 LF 6 $3,22 Coping - Metal Roof 5 86 LF 6 $2,762 Coping - Stone Roof 5 25 LF 6 $803 Coping - Stone Roof 3 7 LF 6 $3,758 Coping - Terra Cotta Roof 2 45 LF 6 $,445 Coping - Terra Cotta Roof 4 33 LF 6 $,63 Downspouts - Exterior Downspouts Roof 2 LF 6 $3,722 Downspouts - Exterior Downspouts Roof 2 320 LF 6 $,635 Downspouts - Exterior Downspouts Roof 3 0 LF 6 $3,323 Downspouts - Exterior Downspouts Roof 5 24 LF 6 $798 Downspouts - Interior Downspouts Roof 4 LF 6 $,329 Parapet - 6" - 30" Height Roof 80 LF 6 $3,96 Parapet - 6" - 30" Height Roof 3 92 LF 6 $7,67 Parapet - 6" - 30" Height Roof 4 228 LF 6 $9, Parapet - Parapet < 6" Height Roof 5 25 LF 6 $533 Parapet - Parapet < 6" Height Roof 2 90 LF 6 $,98 Parapet - Parapet < 6" Height Roof 3 25 LF 6 $533 Parapet - Parapet < 6" Height Roof 4 3 LF 6 $2,95 Parapet - Parapet < 6" Height Roof 5 86 LF 6 $,832 Parapet - Parapet > 30" Roof 2 LF 6 $3,423 Roof Structure - Concrete Roof 4 4,0 SF 7 Roof Structure - Concrete Roof 5 484 SF 7 Roof Structure - Heavy Timber Roof 4,563 SF 7 Roof Structure - Heavy Timber Roof 5 0 SF 7 BRADWELL Page 2 of 56

Building: Main Category: Building Exterior Roof System Roof Structure - Heavy Timber Roof 2 2,860 SF 7 Roof Structure - Heavy Timber Roof 3 2,575 SF 7 Roof - Asphalt Shingle Roof 2 2,860 SF 6 $3,28 Roof - Metal Roof 2 / Cupola 90 SF 6 $,206 Roof - Modified Bitumen Roof 4,563 SF 6 $42,935 Roof - Modified Bitumen Roof 5 0 SF 6 $94 Roof - Modified Bitumen Roof 3 2,575 SF 6 $24,229 Roof - Modified Bitumen Roof 4 4,0 SF 6 $4, Roof - Modified Bitumen Roof 5 484 SF 6 $4,554 Walls Cheek-Wall - Stone Entire Building 20 SF 6 $205 Cornice - Masonry Projecting Limestone Entire Building 73 LF 6 $25,349 Exterior Walls - Brick Entire Building 3,749 SF 6 $23,385 Exterior Walls - Stone-Cast Entire Building,462 SF 6 $9,826 Exterior Walls - Stone-Cut Entire Building 2,220 SF 6 $4,92 Windows Guard - Guards perforated Entire Building,558 SF 6 $9,896 Guard - Guards wire guard Entire Building 470 SF 6 $6,002 Lintels - Brick Entire Building 265 LF 6 Lintels - Steel Entire Building 6 LF 6 $3,367 Lintels - Stone Entire Building 238 LF 6 Skylite - Glass Double-Pane Entire Building / Boiler Room 8 SF 6 $,936 Windows - Decorative Entire Building / West Façade 6 SF 6 $45 Windows - Sash Aluminum Double-pane Entire Building 3,38 SF 6 $23,424 Windows - Sash Aluminum Entire Building 950 SF 6 $7,09 Building Exterior Subtotal: $735,6 Building: Main Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs Entire Building 5,679 SF 6 $,705 Emergency A/C Power - Gym Entire Building / 3rd Floor 2,548 SF 6 $947 Emergency Battery Packs - Corridors and Stairs Entire Building 7 EA 6 $,48 Exit signs. Emergency Battery Packs - Gym Entire Building / 3rd Floor 3 EA 6 $608 Exit signs. BRADWELL Page 3 of 56

Building: Main Category: Electrical System Emergency System Exit Signs - Corridors and Stairs Entire Building 7 EA 6 $,048 Exit Signs - Gym Entire Building / 3rd Floor 3 EA 6 $472 Security System - CCTV Entire Building 4,483 SF 6 $2,457 Security System - Intrusion Detection Entire Building 4,483 SF 6 $,678 Main Service Independent Electrical Service for emergency power Mechanical Room EA 6 $2,92 Additional service for the fire pump. PA System Entire Building 4,483 SF 6 $3,644 Serves main and all additions. Control console located in Addition. Power Distribution Lighting and Power Panels - 0 A Entire Building EA 6 $299 Lighting and Power Panels - Above 0 A Entire Building 6 EA 6 $2,982 Lighting and Power Panels - Above 0 A Entire Building EA 6 $497 Main Distribution Panels - 0-600 amp Entire Building / Basement EA 6 $528 Electrical System Subtotal: $50,204 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel Entire Building / Boiler Room EA 6 $6,6 Serves main and all additions. Fire Alarm Strobe Lights Entire Building 4,483 SF 6 $4,830 Fire Alarm_System Entire Building 4,483 SF 6 $20,69 Fire Pump Controller Entire Building / Mechanical Room EA 6 $,823 Pump Room Assembly Fire Pump - Less than 25hp Mechanical Room EA 5 $5,674 o nameplate with make or model number. Only serves main building. Sprinkler System Dry Sprinkler System Entire Building 4,483 SF 6 $,678 Sprinkler Heads Entire Building 4,483 SF 7 Sprinkler Piping Entire Building 4,483 SF 6 $7,72 Safty System Subtotal: $67,292 Building: Main BRADWELL Page 4 of 56

Category: Mechanical System Air Handling Systems Boiler Systems Gas Booster Air Handling Unit- Built Up-Multi Zone- Steam Coils - 2500-35000 Mechanical Room EA 5 $78,608 Serve the entire main building. Air Intake Mechanical Room / Areaway EA 6 $5,765 Auxiliaries - 2500-35000 cfm Mechanical Room EA 5 $6,577 Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 300 LF 7 Zone Dampers Mechanical Room EA 6 $9,63 Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 20-300 HP Boiler Room 2 EA 6 $,996 Chemical Feed System Boiler Room EA 6 $,078 Chemical Feeder Boiler Room EA 6 $,078 Combustion Dampers Boiler Room 2 EA 6 $88 Condensate Pump Boiler Room / Mechanical Room EA 6 $2,02 Duplex Feed Water Pumps and Tank Boiler Room EA 6 $2,545 4 pumps at 3/4 HP each. on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler Room 2 EA 6 $,996 Serves the main and addition and 2. Boiler - 20-300 HP Piping - Condensate Pipe- Steel Boiler Room / Entire Building 800 LF 6 $,5 Heating Devices Piping - Steam Pipe- Steel Boiler Room / Entire Building 800 LF 6 $,5 Steam Traps Boiler Room / Entire Building 20 EA 6 $5,283 () AHU, (2) unit heater, and (8) radiators. Gas Booster Boiler Room EA 6 $499 Radiators - Steam Entire Building 6 EA 6 $,667 Electric wall thermostats. Radiators - Steam Entire Building 2 EA 5 $3,35 Manual control valves. Unit Heater - Steam Boiler Room 2 EA 6 $556 Wall Heater - Electric Entire Building 3 EA 6 $47 Temperature Control Ventilation DDC System Entire Building 4,483 SF 6 $23,728 Electric Thermostat Entire Building 6 EA 6 Radiator thermostats. Thermostats - DDC Entire Building EA 6 Exhaust Fans- Roof Mounted - 500-500 CFM Roof 2 EA 6 $,85 Exhaust Fans- Roof Mounted - Greater than 8000 CFM Roof EA 6 $592 Mechanical System Subtotal: $6,943 Building: Main BRADWELL Page 5 of 56

Category: Plumbing System Hot Water Myra Bradwell Communications Arts & Sciences ES Gas Heater - 50000-300000 BTU/HR Boiler Room EA 6 $3 Serves main, addition and 2. Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures Entire Building 4,483 SF 6 $8,305 Domestic Piping-Cold Water Horizontal Lines Entire Building 4,483 SF 6 $,085 Domestic Piping-Cold Water Risers Entire Building 4,483 SF 6 $7,72 Domestic Piping-Hot Water from Risers to Fixtures Entire Building 4,483 SF 6 $6,525 Domestic Piping-Hot Water Horizontal Lines Entire Building 4,483 SF 6 $7,72 Domestic Piping-Hot Water Return Lines Entire Building 4,483 SF 6 $5,932 Domestic Piping-Hot Water Return Risers Entire Building 4,483 SF 6 $5,932 Sanitary Piping Entire Building 4,483 SF 6 $37,965 Storm Piping Entire Building 4,483 SF 6 $36,86 Vent Piping Entire Building 4,483 SF 6 $27,88 Pumps - Domestic Booster Pump-Simplex Mechanical Room EA 5 $8,937 Serves main and all additions. Plumbing System Subtotal: $63,480 Building: Main Category: Classrooms Classroom #6 (Music Room) AC Units Basement EA 6 $496 Ceiling - Plaster/Drywall Basement,038 SF 6 $3,592 Doors - Wood Doors inclu hw Basement 2 EA 6 $602 Floor - Tile Basement,038 SF 6 $2,27 Lighting - Pendent/Surface Basement 5 EA 7 Marker Board Basement 20 LF 7 Walls - Plaster/Drywall Basement,258 SF 6 $3,472 Classroom #7 () AC Units st Floor EA 6 $496 Casework st Floor 5 LF 6 $26 Ceiling - Plaster/Drywall st Floor 552 SF 6 $,9 Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor EA 6 $30 Floor - Tile st Floor 550 SF 6 $,203 Floor - Tile st Floor 2 SF 5 $2 damaged BRADWELL Page 6 of 56

Building: Main Category: Classrooms Classroom #7 () Lighting - Pendent/Surface st Floor 2 EA 7 Marker Board st Floor 8 LF 7 Storage/ Closet st Floor 95 SF 6 $689 Walls - Plaster/Drywall st Floor,242 SF 6 $3,428 Classroom #8 () AC Units st Floor EA 6 $496 Casework st Floor 4 LF 6 $ Ceiling - Plaster/Drywall st Floor 825 SF 6 $2,855 Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor EA 6 $30 Floor - Wood st Floor 825 SF 6 $5,86 Lighting - Pendent/Surface st Floor 2 EA 7 Marker Board st Floor 20 LF 7 Storage/ Closet st Floor 84 SF 6 $,334 Walls - Plaster/Drywall st Floor,250 SF 6 $3,450 Classroom #9 (Kindergarten) AC Units st Floor EA 6 $496 Casework st Floor 5 LF 6 $26 Ceiling - Plaster/Drywall st Floor 552 SF 6 $,9 Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor EA 6 $30 Floor - Tile st Floor 552 SF 6 $,208 Lighting - Pendent/Surface st Floor 2 EA 7 Marker Board st Floor 2 LF 7 Storage/ Closet st Floor 64 SF 6 $,89 Walls - Plaster/Drywall st Floor,242 SF 6 $3,428 Classroom #20/23 () AC Units st Floor EA 6 $496 Casework st Floor 4 LF 6 $ Ceiling - Plaster/Drywall st Floor 735 SF 6 $2,544 Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor EA 6 $30 Floor - Wood st Floor 735 SF 6 $5,82 Lighting - Pendent/Surface st Floor 2 EA 7 Marker Board st Floor 24 LF 7 Storage/ Closet st Floor 20 SF 6 $870 BRADWELL Page 7 of 56

Building: Main Category: Classrooms Classroom #20/23 () Walls - Plaster/Drywall st Floor,250 SF 6 $3,450 Classroom #27 () AC Units 2nd Floor 2 EA 6 $99 Casework 2nd Floor 5 LF 6 $26 Ceiling - Plaster/Drywall 2nd Floor 805 SF 6 $2,786 Chalk Board 2nd Floor 50 LF 4 $4,590 Doors - Transom Window 2nd Floor 8 SF 6 $305 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Tile 2nd Floor 805 SF 6 $,76 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 6 LF 7 Storage/ Closet 2nd Floor 60 SF 6 $435 Walls - Plaster/Drywall 2nd Floor,362 SF 6 $3,759 Classroom #29 () AC Units 2nd Floor EA 6 $496 Ceiling - Plaster/Drywall 2nd Floor 735 SF 6 $2,544 Doors - Transom Window 2nd Floor 8 SF 6 $305 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Tile 2nd Floor 735 SF 6 $,608 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 8 LF 7 Storage/ Closet 2nd Floor 60 SF 6 $435 Walls - Plaster/Drywall 2nd Floor,250 SF 6 $3,450 Classroom #22 () AC Units 2nd Floor 2 EA 6 $99 Casework 2nd Floor 5 LF 6 $26 Ceiling - Plaster/Drywall 2nd Floor 805 SF 6 $2,786 Chalk Board 2nd Floor 50 LF 4 $4,590 Doors - Transom Window 2nd Floor 8 SF 6 $305 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Tile 2nd Floor 805 SF 6 $,76 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 6 LF 7 Storage/ Closet 2nd Floor 60 SF 6 $435 Walls - Plaster/Drywall 2nd Floor,362 SF 6 $3,759 BRADWELL Page 8 of 56

Building: Main Category: Classrooms Classroom #223 () AC Units 2nd Floor EA 6 $496 Ceiling - Plaster/Drywall 2nd Floor 735 SF 6 $2,544 Doors - Transom Window 2nd Floor 8 SF 5 $762 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Wood 2nd Floor 735 SF 6 $5,82 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 8 LF 7 Storage/ Closet 2nd Floor 60 SF 6 $435 Walls - Plaster/Drywall 2nd Floor,250 SF 6 $3,450 Work Sink 2nd Floor EA 6 $379 Classroom #37 () AC Units 3rd Floor EA 6 $496 Casework 3rd Floor 5 LF 6 $26 Ceiling - Plaster/Drywall 3rd Floor 805 SF 6 $2,786 Chalk Board 3rd Floor 50 LF 4 $4,590 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor 2 EA 6 $602 Floor - Wood 3rd Floor 805 SF 6 $5,675 Lighting - Pendent/Surface 3rd Floor 2 EA 7 Marker Board 3rd Floor 6 LF 7 Storage/ Closet 3rd Floor 74 SF 6 $,262 Walls - Plaster/Drywall 3rd Floor,357 SF 6 $3,745 Walls - Plaster/Drywall 3rd Floor 5 SF 5 $77 wall piece/trim broken away Classroom #39 () AC Units 3rd Floor EA 6 $496 Casework 3rd Floor 5 LF 6 $26 Ceiling - Plaster/Drywall 3rd Floor 805 SF 6 $2,786 Chalk Board 3rd Floor 50 LF 4 $4,590 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Transom Window 3rd Floor 6 SF 5 $254 broken glazing Doors - Wood Doors inclu hw 3rd Floor 2 EA 6 $602 Floor - Wood 3rd Floor 805 SF 6 $5,675 Lighting - Pendent/Surface 3rd Floor 2 EA 7 Marker Board 3rd Floor 6 LF 7 Storage/ Closet 3rd Floor 74 SF 6 $,262 Walls - Plaster/Drywall 3rd Floor,356 SF 6 $3,742 BRADWELL Page 9 of 56

Building: Main Category: Classrooms Classroom #39 () Myra Bradwell Communications Arts & Sciences ES Walls - Plaster/Drywall 3rd Floor 6 SF 5 $3 water damage Classrooms Subtotal: $47,8 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Gymnasia AC Unit st Flr- Social worker's office next to room 7 EA 5 $,826 Ceiling - Plaster/Drywall st Flr- Social worker's office next to 73 SF 6 $599 room 7 Doors - Steel Doors incl hw st Flr- Social worker's office next to EA 6 $30 room 7 Floor - Wood st Flr- Social worker's office next to 73 SF 6 $,220 room 7 Lighting - Pendent/Surface st Flr- Social worker's office next to 2 EA 7 room 7 Lighting - Wall Mounted st Flr- Social worker's office next to EA 6 $24 room 7 Power Distribution st Flr- Social worker's office next to 6 EA 7 room 7 Walls - Plaster/Drywall st Flr- Social worker's office next to 900 SF 6 $2,484 room 7 Ceiling - Plaster/Drywall Basement- Rm 6A Speech Therapist 225 SF 6 $779 Doors - Wood Doors inclu hw Basement- Rm 6A Speech Therapist EA 6 $30 cover missing Floor - Tile Basement- Rm 6A Speech Therapist 6 SF 6 $6 damaged Floor - Tile Basement- Rm 6A Speech Therapist 29 SF 6 $479 Lighting - Pendent/Surface Basement- Rm 6A Speech Therapist 4 EA 7 Power Distribution Basement- Rm 6A Speech Therapist 4 EA 7 Walls - Plaster/Drywall Basement- Rm 6A Speech Therapist 664 SF 6 $,833 Ceiling - Plaster/Drywall Engineer's office 84 SF 6 $637 Doors - Wood Doors inclu hw Engineer's office EA 6 $30 Floor - Tile/Sheet Engineer's office 84 SF 6 $84 Lighting - Lay-in Engineer's office 2 EA 7 Power Distribution Engineer's office 4 EA 7 Walls - Plaster/Drywall Engineer's office 397 SF 6 $,096 Ceiling - Plaster/Drywall 3rd Floor 2,58 SF 6 $3,899 exposed wires, in open outlet box BRADWELL Page of 56

Building: Main Category: Rooms (Other Than Classrooms) Gymnasia Myra Bradwell Communications Arts & Sciences ES Ceiling - Plaster/Drywall 3rd Floor 30 SF 5 $60 peeling Doors - Transom Window 3rd Floor 36 SF 6 $6 Doors - Wood Doors inclu hw 3rd Floor 4 EA 6 $,204 Floor - Wood 3rd Floor 2,548 SF 6 $7,963 Lighting - Metal Halide/Sodium Vapor 3rd Floor EA 7 Walls - Plaster/Drywall 3rd Floor 3,900 SF 6 $,764 Walls - Plaster/Drywall 3rd Floor 30 SF 5 $53 peeling Locker/Shower Room Accessories Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 32 SF 6 $25 Benches, ped mounted Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 2 LF 6 $,307 Ceiling - Plaster/ Drywall Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 332 SF 6 $,49 Doors - Steel Doors incl hw Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 3 EA 6 $903 Doors - Wood Doors inclu hw Basement- Janitor's Locker Rm (Engineer RR #2 in photos) EA 6 $30 Floor Drain Basement- Janitor's Locker Rm (Engineer RR #2 in photos) EA 6 $,059 in shower Floor - Concrete Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 7 SF 6 $38 in hall between locker room & storage rm Floor - Tile Ceramic/ Porcelain Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 48 SF 5 $767 in toilet area Floor - Tile/Sheet Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 23 SF 5 $956 old Lavatory Basement- Janitor's Locker Rm (Engineer RR #2 in photos) EA 6 $320 Lighting - Pendent/Surface Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 6 EA 6 $743 T2's Showers Basement- Janitor's Locker Rm (Engineer RR #2 in photos) EA 6 $3 Storage/ Closet Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 33 SF 5 $5,339 water damaged ceiling Student Lockers - One Tier Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 6 EA 6 $557 Walls - Plaster/Drywall Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 308 SF 5 $,36 in toilet area- damaged Walls - Plaster/Drywall Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 590 SF 6 $,628 Walls - Structural Glazed Tile Basement- Janitor's Locker Rm (Engineer RR #2 in photos) 322 SF 6 $,03 BRADWELL Page of 56

Building: Main Category: Rooms (Other Than Classrooms) Locker/Shower Room Water Closet Basement- Janitor's Locker Rm (Engineer RR #2 in photos) EA 6 $336 Mechanical/ Service Rooms Prep Room Restroom Janitor's Closet 3rd Floor 9 SF 6 $64 Storage Room 3rd Floor 49 SF 5 $790 Entire space water damaged with efflorescence Boiler Room Basement 2,65 SF 6 $5,5 Interior Stairs Basement 6 LF 6 $44 in boiler house Janitor's Closet Basement 247 SF 6 $,770 janitor's supply room, some water damage on brick wall Mechanical/ Service Rooms Basement,678 SF 5 $27,067 Pump Rm- approx 5' of wall is damaged / Engine Rm- T2's Storage Room Basement,33 SF 6 $9,7 Storage Room Basement 3,825 SF 5 $6,699 Book & music storage outside of 6-5' of wall is damaged & 50' of concrete floor is sunk in / Old lunch rm- Peeling throughout, no floor tiles & T2's / Receiving Area T2's, water damaged ceiling Ceiling - Exposed Basement- Laundry Rm 20 SF 5 $78 water damaged Ceiling - Exposed Basement- Laundry Rm 424 SF 6 $63 Doors - Steel Doors incl hw Basement- Laundry Rm EA 6 $30 Floor - Concrete Basement- Laundry Rm 454 SF 6 $2 Lighting - Pendent/Surface Basement- Laundry Rm 4 EA 7 Walls - Masonry Basement- Laundry Rm 828 SF 6 $2,605 Work Sink Basement- Laundry Rm EA 6 $379 Accessories st Flr- In 7 33 SF 6 $304 Ceiling - Plaster/Drywall st Flr- In 7 33 SF 6 $4 Doors - Wood Doors inclu hw st Flr- In 7 EA 6 $30 Floor - Tile Ceramic/ Porcelain st Flr- In 7 33 SF 6 $70 Lavatory st Flr- In 7 EA 6 $320 Lighting - Pendent/Surface st Flr- In 7 EA 7 Walls - Plaster/Drywall st Flr- In 7 2 SF 6 $662 Walls - Tile Ceramic/ Porcelain st Flr- In 7 45 SF 6 $2 Water Closet st Flr- In 7 EA 6 $336 Accessories In engineer's office SF 6 $,05 Ceiling - Plaster/Drywall In engineer's office SF 6 $38 Doors - Wood Doors inclu hw In engineer's office EA 6 $30 BRADWELL Page 2 of 56

Building: Main Category: Rooms (Other Than Classrooms) Restroom Floor Drain In engineer's office EA 6 $,059 Floor - Concrete In engineer's office SF 6 $58 Lavatory In engineer's office EA 6 $320 Myra Bradwell Communications Arts & Sciences ES Lighting - Pendent/Surface In engineer's office 2 EA 4 $,08 t-2 lights Partitions In engineer's office EA 6 $297 Showers In engineer's office EA 6 $3 Walls - Plaster/Drywall In engineer's office 4 SF 7 Water Closet In engineer's office EA 6 $336 Rooms (Other Than Classrooms) Subtotal: $203,628 Building: Main Category: Building Interior Corridor Ceiling - Plaster/Drywall st Floor,780 SF 6 $,022 Doors - Steel Doors incl hw st Floor 4 EA 6 $,204 Doors - Transom Window st Floor 30 EA 6 $508 Drinking Fountains - Double Fountain st Floor 2 EA 6 $672 Floor - Tile/Sheet st Floor,780 SF 6 $967 Lighting - Pendent/Surface st Floor 5 EA 7 Lighting - Wall Mounted st Floor 2 EA 7 Stairs - Terrazzo st Floor 34 LF 6 $36 Walls - Plaster/Drywall st Floor 2,225 SF 6 $9,863 Ceiling - Plaster/Drywall 2nd Floor,780 SF 6 $,022 Doors - Wood Doors include hw 2nd Floor 4 EA 6 $,204 Drinking Fountains - Double Fountain 2nd Floor EA 6 $336 Floor - Tile/Sheet 2nd Floor,780 SF 6 $967 Lighting - Pendent/Surface 2nd Floor 3 EA 7 Lighting - Wall Mounted 2nd Floor 2 EA 7 Walls - Plaster/Drywall 2nd Floor 2,255 SF 6 $9,996 Ceiling - Plaster/Drywall 3rd Floor,780 SF 6 $,022 Doors - Wood Doors include hw 3rd Floor 2 EA 6 $602 Drinking Fountains - Double Fountain 3rd Floor EA 6 $336 Floor - Tile/Sheet 3rd Floor,774 SF 6 $964 Floor - Tile/Sheet 3rd Floor 6 SF 5 $35 broken tile Lighting - Pendent/Surface 3rd Floor 4 EA 7 BRADWELL Page 3 of 56

Building: Main Category: Building Interior Corridor Walls - Plaster/Drywall 3rd Floor 2,252 SF 6 $9,983 Myra Bradwell Communications Arts & Sciences ES Walls - Plaster/Drywall 3rd Floor 3 SF 5 $30 cracking Safety Stairs Camera Viewing Station st Floor 4 EA 6 $2,730 Main Office, Security, Engineer & Operations Manager Security Cameras st Floor / Entire Building EA 4 $,326 broken interior camera Security Cameras st Floor / Entire Building 8 EA 6 $,552 Security Cameras st Floor / Entire Building 2 EA 6 $388 Ceiling - Plaster/Drywall orth East Stairwell 474 SF 6 $3,470 Floor - Terrazzo orth East Stairwell 339 SF 6 $2,846 Handrails orth East Stairwell 72 LF 6 $624 Lighting - Pendent/Surface orth East Stairwell EA 7 Stairs - Terrazzo orth East Stairwell 72 LF 6 $668 Walls - Plaster/Drywall orth East Stairwell 3,306 SF 6 $9,24 Walls - Plaster/Drywall orth East Stairwell 6 SF 5 $37 cracking Vertical Conveyance Elevator - Hydraulic Elevator st Floor EA 6 $9,238 Building Interior Subtotal: $3,052 Total Building Cost $,64,885 Building: Addition Category: Building Exterior Entrance Entrance Control - Audio and Video Door 4 - East EA 6 $702 Entrance Control - Audio and Video Door 7 - West EA 6 $702 Exterior Doors - Exterior FRP Door Door 4 - Southeast 2 EA 6 $,263 Exterior Doors - Exterior FRP Door Door 3A - East, north 2 EA 6 $,263 Exterior Doors - Exterior FRP Door Door 4 - East 2 EA 6 $,263 Exterior Doors - Exterior FRP Door Door 5 - Southeast 2 EA 6 $,263 Exterior Doors - Exterior FRP Door Door 7 - West 2 EA 6 $,263 Exterior Doors - Transom Lite Door 4 - Southeast EA 6 $33 BRADWELL Page 4 of 56

Building: Addition Category: Building Exterior Entrance Exterior Doors - Transom Lite Door 5 - Southeast EA 6 $33 Exterior Stairs - Concrete Door 4 - Southeast 44 LF 6 $,775 Exterior Stairs - Concrete Door 3A - East, north 30 LF 6 $2,453 Exterior Stairs - Concrete Door 4 - East 60 LF 6 $4,906 Exterior Stairs - Concrete Door 5 - Southeast 72 LF 6 $5,887 Exterior Stairs - Concrete Door 7 - West 36 LF 6 $2,944 Power Door Operator and Controls Door 4 - East EA 6 Ramp Handrail - Steel_Ramp Handrail Door 4 - East 80 LF 6 $693 Ramps - Concrete Door 4 - East LF 6 $6,009 Stair Handrail - Steel_Stair Handrail Door 4 - Southeast 52 LF 6 $45 Stair Handrail - Steel_Stair Handrail Door 3A - East, north LF 6 $347 Stair Handrail - Steel_Stair Handrail Door 4 - East 30 LF 6 $260 Stair Handrail - Steel_Stair Handrail Door 5 - Southeast 35 LF 6 $303 Stair Handrail - Steel_Stair Handrail Door 7 - West 30 LF 6 $260 Fire Escape Foundation Lighting Roof System Fire Escape West Façade 60 LF 6 $37,906 Foundation - Concrete Entire Building 443 LF 7 Superstructure - Concrete Entire Building 56,506 SF 7 Exterior Lighting - Parapet or Roof Mounted Entire Building 8 EA 6 $4,292 Exterior Lighting - Wall Mounted Entire Building 8 EA 6 $2,3 Coping - Clay Tile Roof 8 3 LF 6 $48 Coping - Terra Cotta Roof 6 520 LF 6 $6,70 Coping - Terra Cotta Roof 7 87 LF 6 $6,006 Coping - Terra Cotta Roof 9 20 LF 6 $642 Downspouts - Exterior Downspouts Roof 9 LF 6 $332 Downspouts - Interior Downspouts Roof 6 38 LF 6 $4,586 Downspouts - Interior Downspouts Roof 7 62 LF 6 $2,060 Parapet - 6" - 30" Height Roof 6 478 LF 6 $9,098 Parapet - 6" - 30" Height Roof 9 20 LF 6 $799 Parapet - Parapet < 6" Height Roof 8 3 LF 6 $277 Parapet - Parapet > 30" Roof 6 42 LF 6 $2,685 Parapet - Parapet > 30" Roof 7 87 LF 6 $,953 BRADWELL Page 5 of 56

Building: Addition Category: Building Exterior Roof System Walls Windows Roof Structure - Concrete Roof 6 2,52 SF 7 Roof Structure - Concrete Roof 7 3,705 SF 7 Roof Structure - Concrete Roof 8 350 SF 7 Roof Structure - Concrete Roof 9 350 SF 7 Myra Bradwell Communications Arts & Sciences ES Roof - Modified Bitumen Roof 6 2,52 SF 6 $7,730 Ponding Roof - Modified Bitumen Roof 7 3,705 SF 6 $34,862 Roof - Modified Bitumen Roof 8 350 SF 6 $3,293 Roof - Modified Bitumen Roof 9 350 SF 6 $3,293 Cornice - Masonry Projecting Limestone Entire Building 886 LF 6 $30,724 Exterior Walls - Brick Entire Building 5,756 SF 6 $5,896 Exterior Walls - Stone-Cast Entire Building 443 SF 6 $2,977 Guard - Guards perforated Entire Building 2,052 SF 6 $26,204 Lintels - Steel Entire Building 628 LF 6 $8,230 Windows - Sash Aluminum Double-pane Entire Building 5,966 SF 6 $44,534 Building Exterior Subtotal: $542,442 Building: Addition Category: Electrical System Emergency System Automatic Transfer Switch Mechanical and Electrical Room / EA 6 $8 Electrical Room Automatic Transfer Switch Mechanical and Electrical Room / EA 6 $8 Mechanical Room Automatic Transfer Switch Mechanical and Electrical Room / EA 6 $8 Mechanical Room Emergency A/C Power - Auditoium and Aisle Lighting Entire Building / st Floor 3,049 SF 6 $,63 Emergency A/C Power - Corridors and Stairs Entire Building,693 SF 6 $3,5 Emergency A/C Power - Students Toilets Entire Building,654 SF 6 $65 Emergency Battery Packs - Auditoium and Aisle Lighting Entire Building / st Floor 7 EA 6 $,48 Exit signs. Emergency Battery Packs - Corridors and Stairs Entire Building 6 EA 6 $3,2 Exit signs. Emergency Generator- Outdoor- Diesel - 60-0 KW Site West EA 6 $9,865 Serves main and all additions. Exit Signs - Auditoium Entire Building / st Floor 7 EA 6 $,048 Exit Signs - Corridors and Stairs Entire Building 6 EA 6 $2,396 BRADWELL Page 6 of 56

Building: Addition Category: Electrical System Emergency System Security System - CCTV Entire Building 56,506 SF 6 $6,969 Security System - Intrusion Detection Entire Building 56,506 SF 6 $4,545 UPS - Less than 30 KW MDF Room EA 7 Main Service Independent Electrical Service for emergency power Electrical Room EA 6 $2,92 Secondary service from utility company. Main Electrical Service - 200 to 3000 A 20/208/3PH Electrical Room EA 6 $,867 Serves main and all additions. PA System Entire Building 56,506 SF 6 $8,585 Serves main and all additions. Control console located in main building. Power Distribution Lighting and Power Panels - 0 A Entire Building / st Floor EA 6 $299 Fuses, emergency power Lighting and Power Panels - 0 A Entire Building / st Floor 2 EA 6 $598 Lighting and Power Panels - 0 A Entire Building / Mechanical Room EA 6 $299 Emergency power Lighting and Power Panels - Above 0 A Entire Building 7 EA 6 $3,479 Lighting and Power Panels - Above 0 A Entire Building EA 6 $497 Lighting and Power Panels - Above 0 A Entire Building 5 EA 6 $2,485 Main Distribution Panels - 0-600 amp Entire Building EA 6 $528 Electrical System Subtotal: $97,002 Building: Addition Category: Safty System Fire Alarm Fire Alarm Strobe Lights Entire Building 56,506 SF 6 $20,20 Fire Alarm_System Entire Building 56,506 SF 6 $27,473 Panel located in main building. Safty System Subtotal: $47,674 Building: Addition Category: Mechanical System Air Handling Systems Air Handling Unit- Built Up- Single Zone- Steam Coils - 800-5000 cfm Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - Greater than 35000 cfm Mechanical Room EA 5 $34,007 Serves the auditorium. Mechanical Room EA 5 $7,32 Serves the classrooms of Addition and 2. BRADWELL Page 7 of 56

Building: Addition Category: Mechanical System Air Handling Systems Boiler Systems Air Intake Mechanical Room / Areaway EA 6 $5,765 Air Intake Mechanical Room / Areaway EA 6 $5,765 Auxiliaries - 800-5000 cfm Mechanical Room EA 5 $2,908 Auxiliaries - Greater than 35000 cfm Mechanical Room EA 5 $20,98 Outdoor Return Fans- Air Handling Unit Type - Greater than 20000 Roof EA 6 $2,077 CFM Reheat Boxes - Reheat Boxes with Steam Coil Mechanical Room / Plenum 8 EA 6 $8,9 Heating Devices Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / st Floor 50 LF 6 Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 750 LF 7 Myra Bradwell Communications Arts & Sciences ES AHU-2 return fan. Zone Dampers Mechanical Room / Plenum 24 EA 6 $9,993 Additional zones located in Addition 2. Refer to AHU section under Addition 2. Condensate Pump Entire Building / Mechanical Room 2 EA 6 $4,042 Piping - Condensate Pipe- Steel Entire Building,000 LF 6 $,888 Piping - Steam Pipe- Steel Entire Building,000 LF 6 $,888 Steam Traps Entire Building 53 EA 5 $69,690 (2) AHU's, (8) reheat boxes, and (9) radiators. Cabinet Heaters - With Steam Coil 2nd Floor EA 6 $357 Electrical wall thermostat. Radiators - Steam Entire Building 5 EA 5 $25,30 Manual control valves. Radiators - Steam Entire Building 3 EA 6 $833 Electric wall thermostat. Unit Heater - Electric Entire Building 6 EA 6 $,667 Wall Heater - Electric Entire Building 6 EA 6 $833 Temperature Control Ventilation DDC System Entire Building 56,506 SF 6 $32,32 Electric Thermostat Entire Building 4 EA 6 (3) radiators and () cabinet heater. Thermostats - DDC Entire Building 24 EA 6 Exhaust Fans- Roof Mounted - 50-8000 CFM Roof EA 6 $592 Exhaust Fans- Roof Mounted - 500-500 CFM Roof 2 EA 6 $,85 Roof Mounted Duct Work Roof 70 LF 7 Roof Mounted Duct Work Roof 30 LF 6 $,37 Insulation falling off. Engineer has work order in for repairs. Mechanical System Subtotal: $333,020 Building: Addition BRADWELL Page 8 of 56

Category: Plumbing System Piping Domestic Piping-Cold Water from Risers to Fixtures Entire Building 56,506 SF 6 $,33 Domestic Piping-Cold Water Horizontal Lines Entire Building 56,506 SF 6 $3,737 Domestic Piping-Cold Water Risers Entire Building 56,506 SF 6 $,504 Domestic Piping-Hot Water from Risers to Fixtures Entire Building 56,506 SF 6 $8,888 Domestic Piping-Hot Water Horizontal Lines Entire Building 56,506 SF 6 $,504 Domestic Piping-Hot Water Return Lines Entire Building 56,506 SF 6 $8,080 Domestic Piping-Hot Water Return Risers Entire Building 56,506 SF 6 $8,080 Sanitary Piping Entire Building 56,506 SF 6 $5,74 Storm Piping Entire Building 56,506 SF 6 $49,290 Vent Piping Entire Building 56,506 SF 6 $37,978 Pumps Pumps - Sump-Duplex Mechanical Room EA 6 $,387 Plumbing System Subtotal: $2,476 Building: Addition Category: Classrooms Classroom #5 (Other Instructional Use) AC Units st Floor EA 6 $496 Casework st Floor LF 6 $253 Ceiling - Plaster/Drywall st Floor 722 SF 6 $2,499 Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor 2 EA 6 $602 Floor - Wood st Floor 722 SF 6 $5,090 Lighting - Pendent/Surface st Floor 2 EA 7 Marker Board st Floor 6 LF 7 Walls - Plaster/Drywall st Floor,246 SF 6 $3,439 Classroom #20 () AC Units 2nd Floor EA 6 $496 Casework 2nd Floor LF 6 $253 Ceiling - Plaster/Drywall 2nd Floor 722 SF 6 $2,499 Chalk Board 2nd Floor 34 LF 4 $3,2 Doors - Transom Window 2nd Floor 8 SF 6 $305 Doors - Wood Doors inclu hw 2nd Floor EA 5 $,74 hinge broken Floor - Wood 2nd Floor 722 SF 6 $5,090 Lighting - Pendent/Surface 2nd Floor 2 EA 7 BRADWELL Page 9 of 56

Building: Addition Category: Classrooms Classroom #20 () Marker Board 2nd Floor 6 LF 7 Walls - Plaster/Drywall 2nd Floor,246 SF 6 $3,439 Classroom #203 () AC Units 2nd Floor EA 6 $496 Casework 2nd Floor LF 6 $253 Ceiling - Plaster/Drywall 2nd Floor 722 SF 6 $2,499 Doors - Transom Window 2nd Floor 8 SF 6 $305 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Wood 2nd Floor 722 SF 6 $5,090 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 6 LF 7 Walls - Plaster/Drywall 2nd Floor,246 SF 6 $3,439 Classroom #204 (Art Room) AC Units 2nd Floor EA 6 $496 Casework 2nd Floor 26 LF 6 $657 Ceiling - Plaster/Drywall 2nd Floor 780 SF 6 $2,699 Doors - Transom Window 2nd Floor 8 SF 6 $305 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Wood 2nd Floor 780 SF 6 $5,499 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 2 LF 7 Walls - Plaster/Drywall 2nd Floor,232 SF 6 $3,0 Work Sink 2nd Floor EA 6 $379 Classroom #205 () AC Units 2nd Floor EA 6 $496 Casework 2nd Floor LF 6 $253 Ceiling - Plaster/Drywall 2nd Floor 722 SF 6 $2,499 Doors - Transom Window 2nd Floor 8 SF 6 $305 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Tile 2nd Floor 722 SF 6 $,580 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 6 LF 7 Walls - Plaster/Drywall 2nd Floor,246 SF 6 $3,439 Classroom #206 (Science Classroom) AC Units 2nd Floor EA 6 $496 BRADWELL Page 20 of 56

Building: Addition Category: Classrooms Classroom #206 (Science Classroom) Casework 2nd Floor 8 LF 6 $455 Ceiling - Plaster/Drywall 2nd Floor,243 SF 6 $4,302 Doors - Side-lite 2nd Floor 8 SF 6 $30 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Tile 2nd Floor,243 SF 6 $2,720 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 2 LF 7 Walls - Plaster/Drywall 2nd Floor,66 SF 6 $4,584 Work Sink 2nd Floor 3 EA 6 $,37 Classroom #207 () AC Units 2nd Floor EA 6 $496 Casework 2nd Floor LF 6 $253 Ceiling - Plaster/Drywall 2nd Floor 722 SF 6 $2,499 Doors - Transom Window 2nd Floor 8 SF 6 $305 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Wood 2nd Floor 722 SF 6 $5,090 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 6 LF 7 Walls - Plaster/Drywall 2nd Floor,246 SF 6 $3,439 Classroom #209 () AC Units 2nd Floor EA 6 $496 Casework 2nd Floor LF 6 $253 Ceiling - Plaster/Drywall 2nd Floor 722 SF 6 $2,499 Doors - Transom Window 2nd Floor 8 SF 6 $305 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Wood 2nd Floor 722 SF 6 $5,090 Lighting - Pendent/Surface 2nd Floor 2 EA 7 Marker Board 2nd Floor 6 LF 7 Walls - Plaster/Drywall 2nd Floor,246 SF 6 $3,439 Classroom #30 () AC Units 3rd Floor EA 6 $496 Casework 3rd Floor LF 6 $253 Ceiling - Plaster/Drywall 3rd Floor 78 SF 6 $2,485 Ceiling - Plaster/Drywall 3rd Floor 4 SF 5 $50 water damage Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor EA 6 $30 BRADWELL Page 2 of 56

Building: Addition Category: Classrooms Classroom #30 () Floor - Tile 3rd Floor 78 SF 6 $,57 Myra Bradwell Communications Arts & Sciences ES Floor - Tile 3rd Floor 4 SF 5 $23 broken tile Lighting - Pendent/Surface 3rd Floor 2 EA 7 Marker Board 3rd Floor 6 LF 7 Walls - Plaster/Drywall 3rd Floor,242 SF 6 $3,428 Classroom #302 () AC Units 3rd Floor EA 6 $496 Casework 3rd Floor LF 6 $253 Ceiling - Plaster/Drywall 3rd Floor 74 SF 6 $2,47 Ceiling - Plaster/Drywall 3rd Floor 8 SF 5 $0 water damage Chalk Board 3rd Floor LF 4 $3,672 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor 2 EA 6 $602 Floor - Tile 3rd Floor 722 SF 6 $,580 Lighting - Pendent/Surface 3rd Floor 2 EA 7 Marker Board 3rd Floor 6 LF 7 Walls - Plaster/Drywall 3rd Floor SF 5 $5 damaged Walls - Plaster/Drywall 3rd Floor,236 SF 6 $3,4 Classroom #303 () AC Units 3rd Floor EA 6 $496 Casework 3rd Floor LF 6 $253 Ceiling - Plaster/Drywall 3rd Floor 76 SF 6 $2,478 Ceiling - Plaster/Drywall 3rd Floor 6 SF 5 $75 water damage/cracking Chalk Board 3rd Floor 50 LF 4 $4,590 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor 2 EA 6 $602 Floor - Wood 3rd Floor 722 SF 6 $5,090 Lighting - Pendent/Surface 3rd Floor 2 EA 7 Marker Board 3rd Floor 6 LF 7 Walls - Plaster/Drywall 3rd Floor,246 SF 6 $3,439 Classroom #304 (Other Instructional Use) AC Units 3rd Floor EA 6 $496 Casework 3rd Floor 8 LF 6 $202 Ceiling - Plaster/Drywall 3rd Floor 722 SF 6 $2,499 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor 2 EA 6 $602 BRADWELL Page 22 of 56

Building: Addition Category: Classrooms Classroom #304 (Other Instructional Use) Floor - Wood 3rd Floor 722 SF 6 $5,090 Lighting - Pendent/Surface 3rd Floor 2 EA 7 Marker Board 3rd Floor 20 LF 7 Walls - Plaster/Drywall 3rd Floor,26 SF 6 $3,356 Myra Bradwell Communications Arts & Sciences ES Walls - Plaster/Drywall 3rd Floor 30 SF 5 $53 peeling and cracking Classroom #305 () AC Units 3rd Floor EA 6 $496 Casework 3rd Floor LF 6 $253 Ceiling - Plaster/Drywall 3rd Floor 722 SF 6 $2,499 Chalk Board 3rd Floor 50 LF 4 $4,590 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor EA 6 $30 Floor - Tile 3rd Floor 76 SF 6 $,567 Floor - Tile 3rd Floor 6 SF 5 $35 damaged tiles Lighting - Pendent/Surface 3rd Floor 2 EA 7 Marker Board 3rd Floor 6 LF 7 Walls - Plaster/Drywall 3rd Floor,246 SF 6 $3,439 Classroom #306 () AC Units 3rd Floor EA 6 $496 Casework 3rd Floor 8 LF 6 $202 Ceiling - Plaster/Drywall 3rd Floor 722 SF 6 $2,499 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor EA 6 $30 Floor - Wood 3rd Floor 722 SF 5 $,562 sub-floor is bowed and warping Lighting - Pendent/Surface 3rd Floor 2 EA 7 Lighting - Wall Mounted 3rd Floor EA 6 $24 open clock box, exposed wires Marker Board 3rd Floor 20 LF 7 Walls - Plaster/Drywall 3rd Floor,236 SF 6 $3,4 Walls - Plaster/Drywall 3rd Floor SF 5 $5 water damaged Classroom #307 () AC Units 3rd Floor EA 6 $496 Casework 3rd Floor LF 6 $253 Ceiling - Plaster/Drywall 3rd Floor 722 SF 6 $2,499 Chalk Board 3rd Floor 50 LF 4 $4,590 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor EA 6 $30 BRADWELL Page 23 of 56

Building: Addition Category: Classrooms Classroom #307 () Floor - Wood 3rd Floor 722 SF 6 $5,090 Lighting - Pendent/Surface 3rd Floor 2 EA 7 Marker Board 3rd Floor 6 LF 7 Walls - Plaster/Drywall 3rd Floor,246 SF 6 $3,439 Classroom #308 (Counseling Room) AC Units 3rd Floor EA 6 $496 Ceiling - Plaster/Drywall 3rd Floor 34 SF 6 $,087 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor EA 6 $30 Floor - Tile 3rd Floor 34 SF 6 $687 Lighting - Pendent/Surface 3rd Floor 4 EA 7 Marker Board 3rd Floor 2 LF 7 Walls - Plaster/Drywall 3rd Floor 742 SF 6 $2,048 Walls - Plaster/Drywall 3rd Floor SF 5 $5 cracking Classroom #309 () AC Units 3rd Floor EA 6 $496 Casework 3rd Floor LF 6 $253 Ceiling - Plaster/Drywall 3rd Floor 722 SF 6 $2,499 Chalk Board 3rd Floor 50 LF 4 $4,590 Doors - Transom Window 3rd Floor 9 SF 6 $52 Doors - Wood Doors inclu hw 3rd Floor EA 6 $30 Floor - Wood 3rd Floor 722 SF 5 $,562 sub-floor popping and warping, needs replacement Lighting - Pendent/Surface 3rd Floor 2 EA 7 Lighting - Wall Mounted 3rd Floor EA 6 $24 electrical outlet needs mounting & cover Marker Board 3rd Floor 6 LF 7 Walls - Plaster/Drywall 3rd Floor,230 SF 6 $3,395 Walls - Plaster/Drywall 3rd Floor 2 SF 5 $6 water damage and cracking Classrooms Subtotal: $229,42 Building: Addition Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit Rm 6- Case Manager's Office EA 6 $496 Ceiling - Plaster/Drywall Rm 6- Case Manager's Office 348 SF 6 $,204 BRADWELL Page 24 of 56

Building: Addition Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Doors - Transom Window Rm 6- Case Manager's Office 9 SF 6 $52 Doors - Wood Doors inclu hw Rm 6- Case Manager's Office EA 6 $30 Floor - Carpet Rm 6- Case Manager's Office 348 SF 6 $74 Lighting - Pendent/Surface Rm 6- Case Manager's Office 5 EA 7 Power Distribution Rm 6- Case Manager's Office 6 EA 7 Walls - Plaster/Drywall Rm 6- Case Manager's Office 988 SF 6 $2,727 AC Unit Rm 8- Principal's Office EA 6 $496 Ceiling - Plaster/Drywall Rm 8- Principal's Office 348 SF 6 $,204 Doors - Transom Window Rm 8- Principal's Office 9 SF 6 $52 Doors - Wood Doors inclu hw Rm 8- Principal's Office EA 6 $30 Floor - Carpet Rm 8- Principal's Office 348 SF 6 $74 Lighting - Pendent/Surface Rm 8- Principal's Office 5 EA 7 Power Distribution Rm 8- Principal's Office 8 EA 7 Storage/ Closet Rm 8- Principal's Office 93 SF 6 $,399 Walls - Plaster/Drywall Rm 8- Principal's Office 937 SF 6 $2,586 AC Unit Rm 8A- Principal's Conference Rm EA 6 $496 Ceiling - Plaster/Drywall Rm 8A- Principal's Conference Rm 44 SF 6 $498 Doors - Wood Doors inclu hw Rm 8A- Principal's Conference Rm EA 6 $30 Floor - Carpet Rm 8A- Principal's Conference Rm 44 SF 6 $307 Lighting - Pendent/Surface Rm 8A- Principal's Conference Rm 4 EA 7 Power Distribution Rm 8A- Principal's Conference Rm 6 EA 7 Walls - Plaster/Drywall Rm 8A- Principal's Conference Rm 600 SF 6 $,656 AC Unit Rm - Coaches Office EA 6 $496 Ceiling - Plaster/Drywall Rm - Coaches Office 230 SF 6 $796 Doors - Transom Window Rm - Coaches Office 9 SF 6 $52 Doors - Wood Doors inclu hw Rm - Coaches Office EA 6 $30 Myra Bradwell Communications Arts & Sciences ES Floor - Tile Rm - Coaches Office 230 SF 5 $,033 old Lighting - Pendent/Surface Rm - Coaches Office 3 EA 7 Power Distribution Rm - Coaches Office 4 EA 7 Walls - Plaster/Drywall Rm - Coaches Office 822 SF 6 $2,269 Work SInk Rm - Coaches Office EA 6 $508 AC Unit Ceiling - Plaster/Drywall Doors - Transom Window Doors - Wood Doors inclu hw Room 4 - teacher's lounge/ resource room Room 4 - teacher's lounge/ resource room Room 4 - teacher's lounge/ resource room Room 4 - teacher's lounge/ resource room EA 6 $496 780 SF 6 $2,699 9 SF 6 $52 EA 6 $30 BRADWELL Page 25 of 56

Building: Addition Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Floor - Tile Room 4 - teacher's lounge/ resource 780 SF 6 $,707 room Lighting - Pendent/Surface Room 4 - teacher's lounge/ resource 2 EA 7 room Power Distribution Room 4 - teacher's lounge/ resource 8 EA 7 room Walls - Plaster/Drywall Room 4 - teacher's lounge/ resource,232 SF 6 $3,0 room AC Unit Room 7 clinic EA 6 $496 Ceiling - Plaster/Drywall Room 7 clinic 276 SF 6 $955 Doors - Transom Window Room 7 clinic 9 SF 6 $52 Doors - Wood Doors inclu hw Room 7 clinic EA 6 $30 Floor - Tile Room 7 clinic 276 SF 5 $,239 Lighting - Pendent/Surface Room 7 clinic 5 EA 7 Power Distribution Room 7 clinic 4 EA 7 Walls - Plaster/Drywall Room 7 clinic 854 SF 6 $2,357 Work SInk Room 7 clinic EA 6 $508 AC Unit Room 9 main office EA 6 $496 Ceiling - Plaster/Drywall Room 9 main office,07 SF 6 $3,59 Doors - Transom Window Room 9 main office 9 SF 6 $52 Doors - Wood Doors inclu hw Room 9 main office EA 6 $30 Myra Bradwell Communications Arts & Sciences ES Floor - Tile Room 9 main office,07 SF 5 $4,567 old Lighting - Pendent/Surface Room 9 main office 6 EA 7 Power Distribution Room 9 main office 4 EA 7 Storage/ Closet Room 9 main office SF 6 $80 Walls - Plaster/Drywall Room 9 main office,470 SF 6 $4,057 Auditorium & Theater Balcony Seating st Floor 95 EA 6 $6,522 Ceiling - Plaster/Drywall st Floor 2,99 SF 6 $24,936 Ceiling - Plaster/Drywall st Floor 58 SF 5 $,827 water damaged Doors - Steel Doors incl hw st Floor 2 EA 6 $602 Doors - Transom Window st Floor 9 SF 6 $52 Doors - Wood Doors inclu hw st Floor 7 EA 6 $2,7 Floor - Concrete Epoxy/ Painted st Floor 3,049 SF 5 $5,232 needs refinishing Lighting - Pendent/Surface st Floor 3 EA 7 Lighting - Wall Mounted st Floor 6 EA 7 Main Floor Seating st Floor 269 EA 6 $46,784 Sound System st Floor EA 6 $,72 BRADWELL Page 26 of 56

Building: Addition Category: Rooms (Other Than Classrooms) Auditorium & Theater Stage st Floor 529 SF 6 $3,056 Stage Curtain st Floor 4 EA 6 Stage Lift st Floor EA 6 $6,5 Stage Lighting System st Floor EA 7 Stage-Stairs - Wood st Floor LF 6 $7 Myra Bradwell Communications Arts & Sciences ES Stairs - Terrazzo st Floor 5 LF 6 $38 in side hall up to stage Walls - Plaster/Drywall st Floor 6,899 SF 6 $32,852 Walls - Plaster/Drywall st Floor 2 SF 6 $78 water damaged Walls - Structural Glazed Tile st Floor 245 SF 6 $77 marble base around room Walls - Structural Glazed Tile st Floor 5 SF 5 $39 damaged marble base Library AC Unit Room 3- Lovett Hall 2 EA 6 $99 Casework Room 3- Lovett Hall 39 LF 6 $985 Ceiling - Plaster/Drywall Room 3- Lovett Hall,388 SF 6 $4,803 Ceiling - Plaster/Drywall Room 3- Lovett Hall 20 SF 5 $250 peeling Doors - Side-lite Room 3- Lovett Hall 42 SF 6 $702 Doors - Steel Doors incl hw Room 3- Lovett Hall 2 EA 6 $602 Doors - Transom Window Room 3- Lovett Hall 8 SF 6 $305 Floor - Carpet Room 3- Lovett Hall,8 SF 6 $3,000 Lighting - Pendent/Surface Room 3- Lovett Hall 26 EA 7 Walls - Plaster/Drywall Room 3- Lovett Hall,842 SF 6 $5,084 MDF_IDF AC Unit 2nd Floor EA 6 $496 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Finishes 2nd Floor 285 SF 6 $2,034 Mechanical/ Service Rooms Restroom Janitor's Closet st Floor 8 SF 5 $290 across from auditorium damaged Janitor's Closet 2nd Floor 8 SF 5 $290 peeling plaster Storage Room 3rd Floor 7 SF 6 $509 Storage Room 3rd Floor 8 SF 5 $290 unused storage space adjacent to girl's wr all walls water damaged with efflorescence Accessories st Flr -Across from 3 (Library) 8 SF 6 $,669 Ceiling - Plaster/Drywall st Flr -Across from 3 (Library) 8 SF 6 $626 Doors - Transom Window st Flr -Across from 3 (Library) 8 SF 6 $305 BRADWELL Page 27 of 56

Building: Addition Category: Rooms (Other Than Classrooms) Restroom Doors - Wood Doors inclu hw st Flr -Across from 3 (Library) 2 EA 6 $602 Floor Drain st Flr -Across from 3 (Library) EA 6 $,059 Floor - Tile Ceramic/ Porcelain st Flr -Across from 3 (Library) 8 SF 6 $383 Lavatory st Flr -Across from 3 (Library) 2 EA 6 $639 Lighting - Pendent/Surface st Flr -Across from 3 (Library) 5 EA 7 Partitions st Flr -Across from 3 (Library) EA 6 $297 Myra Bradwell Communications Arts & Sciences ES Partitions st Flr -Across from 3 (Library) EA 5 $75 missing door Urinals st Flr -Across from 3 (Library) 4 EA 6 $,344 Walls - Plaster/Drywall st Flr -Across from 3 (Library) 824 SF 6 $2,274 Walls - Tile Ceramic/ Porcelain st Flr -Across from 3 (Library) 6 SF 6 $239 Water Closet st Flr -Across from 3 (Library) 2 EA 6 $672 door is locked, unsure if toilet is working Accessories st Flr- Across hall from Auditorium 34 SF 6 $3,45 Ceiling - Plaster/Drywall st Flr- Across hall from Auditorium 34 SF 6 $,80 Doors - Transom Window st Flr- Across hall from Auditorium 8 SF 6 $305 Doors - Wood Doors inclu hw st Flr- Across hall from Auditorium 2 EA 6 $602 Floor Drain st Flr- Across hall from Auditorium EA 6 $,059 Floor - Tile Ceramic/ Porcelain st Flr- Across hall from Auditorium 34 SF 6 $722 Lavatory st Flr- Across hall from Auditorium EA 6 $320 Lavatory st Flr- Across hall from Auditorium EA 5 $,590 leaking pipes Lighting - Pendent/Surface st Flr- Across hall from Auditorium 5 EA 7 Partitions st Flr- Across hall from Auditorium 2 EA 6 $3,563 Walls - Plaster/Drywall st Flr- Across hall from Auditorium,06 SF 6 $2,804 Water Closet st Flr- Across hall from Auditorium EA 6 $3,360 is missing a seat Water Closet st Flr- Across hall from Auditorium 3 EA 5 $4,032 out of order Accessories st Flr- In Main office 58 SF 6 $535 Ceiling - Plaster/Drywall st Flr- In Main office 58 SF 6 $20 Doors - Wood Doors inclu hw st Flr- In Main office EA 6 $30 Floor - Tile Ceramic/ Porcelain st Flr- In Main office 58 SF 6 $23 Lavatory st Flr- In Main office EA 6 $320 Lighting - Pendent/Surface st Flr- In Main office EA 7 Walls - Plaster/Drywall st Flr- In Main office 325 SF 6 $897 Walls - Tile Ceramic/ Porcelain st Flr- In Main office 20 SF 6 $27 Walls - Tile Ceramic/ Porcelain st Flr- In Main office 4 SF 5 $84 damaged Water Closet st Flr- In Main office EA 6 $336 Accessories st Flr- In Principal's office 36 SF 6 $332 Ceiling - Plaster/Drywall st Flr- In Principal's office 36 SF 6 $25 Doors - Wood Doors inclu hw st Flr- In Principal's office EA 6 $30 BRADWELL Page 28 of 56

Building: Addition Category: Rooms (Other Than Classrooms) Restroom Floor - Tile Ceramic/ Porcelain st Flr- In Principal's office 36 SF 6 $76 Lavatory st Flr- In Principal's office EA 6 $320 Lighting - Pendent/Surface st Flr- In Principal's office EA 7 Partitions st Flr- In Principal's office EA 6 $297 Myra Bradwell Communications Arts & Sciences ES Walls - Plaster/Drywall st Flr- In Principal's office 4 SF 5 $20 damaged Walls - Plaster/Drywall st Flr- In Principal's office 35 SF 6 $869 Water Closet st Flr- In Principal's office EA 6 $336 Accessories st Flr- Men's in Auditorium Lobby 82 SF 6 $756 Ceiling - Plaster/Drywall st Flr- Men's in Auditorium Lobby 82 SF 6 $284 Doors - Wood Doors inclu hw st Flr- Men's in Auditorium Lobby EA 6 $30 Floor - Tile Ceramic/ Porcelain st Flr- Men's in Auditorium Lobby 82 SF 6 $74 Lavatory st Flr- Men's in Auditorium Lobby EA 6 $320 Lighting - Pendent/Surface st Flr- Men's in Auditorium Lobby 2 EA 7 Partitions st Flr- Men's in Auditorium Lobby EA 6 $297 Urinals st Flr- Men's in Auditorium Lobby EA 6 $336 Walls - Plaster/Drywall st Flr- Men's in Auditorium Lobby 50 SF 5 $22 peeling Walls - Plaster/Drywall st Flr- Men's in Auditorium Lobby 330 SF 6 $9 Water Closet st Flr- Men's in Auditorium Lobby EA 6 $336 Accessories st Flr- Women's in Auditorium Lobby 39 SF 6 $,282 Ceiling - Plaster/Drywall st Flr- Women's in Auditorium Lobby 39 SF 6 $48 Doors - Wood Doors inclu hw st Flr- Women's in Auditorium Lobby EA 6 $30 Floor - Tile Ceramic/ Porcelain st Flr- Women's in Auditorium Lobby 39 SF 6 $294 Lavatory st Flr- Women's in Auditorium Lobby EA 6 $320 Lighting - Pendent/Surface st Flr- Women's in Auditorium Lobby 2 EA 7 Partitions st Flr- Women's in Auditorium Lobby EA 6 $297 Walls - Plaster/Drywall st Flr- Women's in Auditorium Lobby 475 SF 5 $3,600 peeling throughout Water Closet st Flr- Women's in Auditorium Lobby EA 6 $336 Accessories 2nd Floor boy's room 8 SF 6 $,669 Ceiling - Plaster/Drywall 2nd Floor boy's room 8 SF 6 $626 Doors - Transom Window 2nd Floor boy's room 26 SF 6 $4 Doors - Wood Doors inclu hw 2nd Floor boy's room 2 EA 6 $602 Floor Drain 2nd Floor boy's room EA 6 $,059 Floor - Tile Ceramic/ Porcelain 2nd Floor boy's room 8 SF 6 $383 Lavatory 2nd Floor boy's room 2 EA 6 $639 Lighting - Pendent/Surface 2nd Floor boy's room 5 EA 7 Partitions 2nd Floor boy's room 2 EA 6 $594 Urinals 2nd Floor boy's room 4 EA 6 $,344 BRADWELL Page 29 of 56