LANCASTER AVENUE WARREN STREET N. 33RD STREET N. 34TH STREET FILBERT STREET SITE PLAN ACC-DREXEL UNIVERSITY LANCASTER TOWER HALL CALHOUN HALL

Similar documents
erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

353 W. Grand June 18, 2018

C O P Y R I G H T , S U L L I V A N G O U L E T T E W I L S O N, L T D.

HUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design:

TOWER 4 PLAZA 88 GREAT PATIO OPPORTUNITY! AREA TENANTS 1,200-3,300 SF. 898 Carnarvon Street New Westminster, BC

URBAN DESIGN BRIEF WELLINGTON STREET GREY STREET, CITY OF LONDON April 23, 2018

Memo to the Planning Commission HEARING DATE: JUNE 30, 2016

CONTEXT MAP & STATISTICS

SPRINGBANK SIX CORNERS, LLC

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

SAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010


8150 SUNSET BOULEVARD 8150 SUNSET BLVD., LOS ANGELES, CA ALTERNATIVE 9 DRAWING SET MAY 13, 2016

MEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean

320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525

L1.01 LEE HIGHWAY SHREVE APARTMENTS ENLARGEMENT 2 SEE SHEET - L COURTYARD HARDSCAPE PLAN SEE SHEET - L COURTYARD LANDSCAPE PLAN

FRAMELESS GLAZING WITH 2" CLEAR GLASS STAINLESS STEEL AWNING & SIGNAGE NATURAL STONE PLASTER COLOR 1


14 SE 4th Street, Boca Raton, FL Tel Fax Web

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

Sky Sk l y in l e in e To T w o e w r

MEMORANDUM. B4S-2 Downtown Service District DP Downtown Parking Overlay District 42,390 square feet / 0.97 acres. DMNA; adjacent to North Loop

Commercial Drive - Public Open House Commercial Drive - Rendering of Commercial Drive Elevation. Project Statistics

G0.1 BURR OAKS SENIOR HOUSING. Architecture & Engineering: Dimension IV Madison Design Group 6515 Grand Teton Plaza, Suite 120 Madison, WI 53719

2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015

YURCHESHEN RESIDENCE BZA APPLICATION

UCB - STILES RESIDENCE HALL CITY DESIGN REVIEW COMMITTEE PACKAGE

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.

EMERYVILLE PLANNING COMMISSION STAFF REPORT. Study Session II: Marketplace Redevelopment Project, Theater Site (FDP14-003)

625 San Anselmo Ave. Planning Submittal A0.00

FAR: (existing) (proposed) Building area excluded from FAR: s.f.

Emma Grand Mixed-use Building 100, 108 & 114 Emma St. South Grand Valley, Ontario

1950 ADDISON. Berkeley, CA December 17, Design Reivew. Westwood BayRock Addison, L.P. c/o BayRock Multifamily, LLC

DESIGN CRITERIA Ridegedale Center-Outparcel Restaurant, Minnetonka, MN

Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch

RIDGEDALE A VENUE E AST H ANOVER, NEW J ERSEY

KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen.

ONE SEAPORT SQUARE. Boston Civic Design Commission

1 EAST ELEVATION 2 NORTH ELEVATION 3 COURTYARD ELEVATION

Appendix C Built Form Guidelines

D U L L E S AT DULLES CORNER. Smart Business DULLES CORNER BOULEVARD. dullesmetrocntr.com

PIPE (E) BELL HOP ELEVATOR GREENLEAF AVENUE EDGE OF HISTORICAL BLDG. BUILDING "B" EXIT -30" +0" GREENLEAF ENTRY EXIT EXIT BUILDING "C"

NYC Department of Education

2700 J STREET SACRAMENTO MIDTOWN BUILDING FOR SALE $4,300,000 (±$287.00/RSF) SACRAMENTO

2700 J STREET SACRAMENTO SACRAMENTO MIDTOWN BUILDING FOR LEASE OR SALE

Sodded Area. 8.5 m Storm Easement Typ. R12000 FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE

3 3 MIXED-USE DISTRICTS

Washington Square. 100 Washington Square > Office Space. FOR lease > OFFICE SPACE. 100 washington avenue, minneapolis, mn 55401

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

467 FIRST STREET Three-Story Class A Boutique Office Plaza Development

Response to Urban Design Panel Comments

510 MAIN STREET WINNIPEG CITY HALL Green Blankstein Russell and Associates (Bernard Brown and David Thordarson, principal designers),

Etobicoke York Community Council Item [#], as adopted by City of Toronto Council on [date] Draft Zoning By-law Amendment (March 20, 2019)

414 BRANNAN ST SAN FRANCISCO, CA

Saint Cloud Business Center

DOT BLOCK 22 SEP 2015 RODE ARCHITECTS INC

Appendix 1 OAS Real Estate Asset Location (GSB and Constitution Avenue Complex)

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

CERRITOS INDUSTRIAL PARK A 15,337 SQ. FT. MULTI-TENANT BUSINESS PARK INVESTMENT OPPORTUNITY

OPPORTUNITY TO ACQUIRE AN INDUSTRIAL BUILDING PART OF THE SOUTH HILL SAP

Urban Design Brief. 112 St. James Street. St. James Development Corp. December 5 th, 2018 Updated December 11 th, Zelinka Priamo Ltd.

Rêve Boulder Boulder, Co Retail L E A S I N G

722 WILLIAMSON STREET

Internal Finishes. Floor Finishes. Mouldings. Wall Finishes. Paint Finish

WESTPORT CUPERTINO GENERAL PLAN AMENDMENT APP STEVENS CREEK BLVD, CUPERTINO, CA. KT Urban PRELIMINARY PLANTING PLAN 1" = 40'-0" 0' 10' 25'

TOWER PLAZA 88 DETAILS. CONTACT Dan Clark GREAT PATIO OPPORTUNITY! 898 Carnarvon Street, New Westminster, BC

CORPORATE HQ NEW GAME ROOM + BREAK/ ALL-HANDS AREA NEW 7,500 SF OUTDOOR PAVILION NEW FITNESS CENTER NEW 2,800 SF ROOF DECK

Development Plan DP13-3 (Arlington Lofts) Planning and Zoning Meeting Date: Document Being Considered: Ordinance

CITY OF TORONTO. BY-LAW No

Brand New Class A Office Building on Libbie Mill Lake Delivering 2020

12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential

Homes close to all that you love.

Proposal. Model of building in site from the street

Bethesda Downtown Design Advisory Panel Submission Form

Ashfield Colstoun Rd. OFFERS $600k to $650k. Soon to be Triplex Home Site

FOR LEASE. Capitol Hill Corner Cafe/Restaurant Space th Avenue, Seattle, WA Please call brokers for more information:

2nd & Pike Tower Design Review Board Olson Kundig Architects Urban Visions LLC Gustafson Guthrie Nichol Ltd

Contemporary villas Panoramic view 3 minutes from Bonita Beach

Long Bay Village Apartments: Outline Specification for Sale & Purchase

DURANT AVE. ATTACHMENT 2 DRC Page 1 of ' 80' AGAVA ATTENUATA "BLUE GLOW AND NOVA" LOROPETALUM "PURPLE DIAMIND MEXICAN WEEPING BAMBOO

LOOP HOUSE. elevated tube for working and a wrapping tube for living.

D U L L E S AT DULLES CORNER. Smart Business DULLES CORNER BOULEVARD. dullesmetrocntr.com

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

Residence 51. LOCATION John Kennedy Area, Limassol. STATUS Under Construction for SALE. COMPLETION DATE September 2010

714 BRADDOCK VIEW DRIVE LEMONT FURNACE, PA FOR LEASE INDUSTRIAL MARKETING FLYER

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

LEGEND. A Apartments. T Townhouses

CENTURY OFFICE CAMPUS. 4, 5 & 6 Century Drive, Parsippany, N.J.

MIDTOWN S CLASS-A BOUTIQUE OFFICE TOWER, PROVIDING BUSINESS WITH FIRST-CLASS OFFICE SPACE AND UNPARALLELED SERVICE

RESIDENCES EFFORTLESS LUXURY IN ONE OF CANBERRA S MOST PRESTIGIOUS SUBURBS BY VILLAGE BUILDING CO. 15 CURLEWIS CRESCENT GARRAN

24-story, Class A Office Building Climate Control LEED Gold Certified Fire Life Safety Large, Efficient Floor Plates Elevators Ample Ceiling Height

136 Shawmut Avenue. Article 80 - Small Project Review Application. Owner and Developer 136 Shawmut LLC 540 Tremont Street, Suite 8 Boston, MA 02116

DOMUS, INC. P:

Design Review Board (DRB) Staff Report. Exterior Building Renovation. 400 Monroe Ave. Memphis, TN Hwy. 64 Memphis, TN 38123

2720 SAN PABLO AVENUE BERKELEY, CA 94702

Greater Goethe Neighborhood Association Zoning and Planning Committee

LAKE JONATHAN FLATS 1 1/14/2017

RODE. Article 80 Small Project Review Application. 232 Old Colony Avenue Mixed Use Development 232 Old Colony Avenue South Boston, MA 02127

Transcription:

TOWER HALL CALHOUN HALL LANCASTER AVENUE COMMUNITY EDUCATION CENTER N. 36TH STREET 7-ELEVEN ARCH STREET WARREN STREET BUCKLEY GREEN URBN CENTER ANNEX FILBERT STREET N. 34TH STREET RUSH BUILDING N. 33RD STREET URBN CENTER 1.3 ARMORY (BUCKLEY COURTS) DASKALAKIS ATHLETIC CENTER DREXEL RECREATION CENTER SITE PLAN 0 50 100 1.2

4. 9. 6. STREET TYPE 9. SECURED ENTRY 2. MIDRISE ROOF EL: +70-0 3. 5. 6. 2. LANCASTER AVENUE 4. 7. 8. 6. 1. 5. 9. 3. LANCASTER AVENUE WALKABLE COMMERCIAL CORRIDOR N. 34TH STREET URBAN ARTERIAL WARREN STREET LOCAL * PHILLY STREETS DEPARTMENT AMENITY DECK EL: +81 9. 6. STREETSCAPE REQUIREMENTS PER CITY ZONING CODE/ DREXEL DESIGN GUIDELINES 1.4 AMENITY DECK EL: +85 WARREN STREET AMENITY DECK EL: +87 10. 4. 2. AMENITY DECK 18,396 S.F. 9. 6. RES. TOWER ROOF EL: +250-0 4. 2. AMENITY DECK EL: +75 1. 6. 9. AHU 4. 2. AHU COOLING TOWER 2. MIDRISE ROOF EL: +100-0 2. TYPE 1-A STUDENT RES. PROPOSED 24 STORY TYPE 1-A STUDENT RES. TOWER 4. MECH. ROOF EL: +280-0 7. 8. 1. 7. 8. 10. 2. 3. 2. ENTRY PLAZA 1,197 SF 4. N. 34TH STREET 1. CAST-IN-PLACE CONCRETE SIDEWALK - CONTROL JOINTS EVERY 4 & EXPANSION JOINT EVERY 24 2. HANOVER ARCHITECTURAL PRODUCTS INC. TRADITIONAL PREST BRICK PAVER - CHARCOAL W/ NATURAL FINISH 3. RAISED PLANTERS WITH RUSTICATED PRECAST STONE UNITS 4. GRATED PLANTERS - 4 WIDE RECESS - TOPPED WITH MULCH AND CONSTRAINED BY METAL EDGING 5. LANDSCAPE FORMS STAY BENCH - STEEL/ALUMINUM W/ BRONZE FINISH 6. LOUIS POULSEN KIPP POST LIGHT - DIE CAST ALUMINUM FRAME W/ BLACK FINISH - APPROX. 60 O.C. 7. LANDSCAPE FORMS CHASE PARK LITTER/RECYCLING BINS - STEEL W/ BLACK FINISH 8. NO BUTTS TOWER BIN (TBHO4) - STEEL W/ BLACK FINISH (SILVER VEIN) 9. BICYCLE PARKING PROJECT BICYCLE HITCH 2 - STEEL W/ BLACK FINISH 10. BLUE LIGHT TELEPHONE - PER DREXEL CAMPUS STANDARD BICYCLE PARKING - REQUIRED BY PROGRAM ON-STREET 67 RACKS 134 BICYCLES (10% OF BED COUNT) (58 REQUIRED BY CITY CODE) COURTYARD 100 RACKS 200 BICYCLES (15% OF BED COUNT) FILBERT STREET 5. 6. 4. 2. 9. TOTAL 167 RACKS 334 BICYCLES (25% OF BED COUNT) * ASSUMING 2 BICYCLES PER RACK 6. 10. LANDSCAPE / TOPOGRAPHY PLAN 5. 2012 Solomon Cordwell Buenz 8. 7. Philadelphia, Pennsylvania 0 20 40 1.3

SECURED ENTRY A. LANCASTER AVENUE B. D. 6. MIDRISE ROOF EL: +70-0 C. 7. 9. 5. AMENITY DECK EL: +81 C. AMENITY DECK EL: +85 AMENITY DECK 18,396 S.F. AHU AHU WARREN STREET AMENITY DECK EL: +87 AMENITY DECK EL: +75 MIDRISE ROOF EL: +100-0 TYPE 1-A STUDENT RES. 3.5 MIN. CALIPER 6. 9. 1. RES. TOWER ROOF EL: +250-0 MECH. ROOF EL: +280-0 B. 4. COOLING TOWER PROPOSED 24 STORY TYPE 1-A STUDENT RES. TOWER D. N. 34TH STREET ENTRY PLAZA 1,197 SF 3.5 MIN. CALIPER 3. 2. FILBERT STREET A. 2. 2012 Solomon Cordwell Buenz STREETSCAPE DETAILS 0 20 40 1.4

BRICK e-gl-02 w/ alum. frame 6 PRECAST PANEL operable units 5th Floor 51-6 T 4th Floor 42-4 ALUM. SLAB EDGE COVER stone composite 3rd Floor 33-2 BALCONY AREA T RAILING 2nd Floor 24-0 AIR INTAKE GRILLE METAL PANEL CANOPY Ground Floor @ Retail B 3-0 T Ground Floor @ Retail C 0-0 (75-0 ) patterned pavers - sizes vary from 6-12 METAL PANEL CANOPY ABOVE LITTER/RECYCLING BINS - ash urn T/Sidewalk 74-0 SLOPE 2% POURED-IN-PLACE CONCRETE PREST BRICK PAVERS BIKE RACK HERITAGE TREE NOTES 4-0 28-5 16-0 9-7 RAISED PLANTER W/ RUSTICATED PRECAST STONE UNITS LOUIS POULSEN KIPP POST LIGHT 24-5 38-3 20-0 LANCASTER AVE. recessed grated planter 4 MIN. CALIBER TREE LANCASTER AVE. STREETSCAPE PLAN / ELEVATION 1.5

BRICK e-gl-02 w/ alum. frame 6 PRECAST PANEL 5th Floor 51-6 T 4th Floor 42-4 ALUM. SLAB EDGE COVER 3rd Floor 33-2 BALCONY AREA T RAILING 2nd Floor 24-0 AIR INTAKE GRILLE METAL PANEL CANOPY stone composite Ground Floor @ Retail A 6-0 T Ground Floor @ Retail C 0-0 (75-0 ) PREST BRICK PAVERS LITTER/RECYCLING BINS - ash urn BIKE RACK POURED-IN-PLACE CONCRETE SLOPE 2% METAL PANEL CANOPY ABOVE 4-0 +82 LANDSCAPE FORMS STAY BENCH recessed grated planter 16-0 28-5 29-3 16-0 9-7 16-0 46-1 24-5 37-3 20-0 42-9 25-2 LANCASTER AVE. 4 MIN. CALIBER TREE LOUIS POULSEN KIPP POST LIGHT RAISED PLANTER W/ RUSTI- CATED PRECAST STONE UNITS LANCASTER AVE. STREETSCAPE PLAN / ELEVATION 1.6

T/PARAPET 26-8 4-SIDED SILICONE JOINT CURTAINWALL SYSTEM EXO-STRUCTURAL FRAME, SEE SYSTEM SHEET 4.2 Lower Level @ DINING -10-0 Lower Level @ Prod. Kitchen -14-0 3RD FLOOR 33-2 ALUM. SLAB EDGE COVER 2ND FLOOR 24-0 BACKLIT PIN LETTER SIGNAGE AIR INTAKE GRILLE METAL PANEL CANOPY T/WALL 3-6 GROUND FLOOR @ RETAIL C 0-0 (75-0 ) T POURED-IN-PLACE CONCRETE RETAIL PODIUM DIREC- TORY SLOPE 2% METAL PANEL CANOPY ABOVE T/Plaza 75-0 patterned pavers - size varying from 6-12 WIDE recessed grated planter 26-0 22-0 40-0 22-0 34TH STREET 4-0 26-0 RAISED PRECAST STONE PLANTER BOX W/ INTEGRAL IRRIGATION 4 MIN. CALIBER TREE LITTER/RECYCLING BINS - ash urn RAISED PLANTER W/ RUSTICATED PRECAST STONE UNITS PREST BRICK PAVERS BIKE RACK T/Sidewalk 65-0 34TH ST. STREETSCAPE PLAN / ELEVATION 1.7

6 PRECAST PANEL 4th Floor 42-4 3rd Floor 33-2 T/Deck 10-0 PARKING ENTRY 2nd Floor 24-0 METAL PANEL FRAME 4-SIDED CAPTURED CUTAINWALL SYSTEM W/ INTEGRAL STRUCTURAL STEEL Ground Floor @ Amenity 0-0 (75-0 ) MTL MESH GREEN SCREEN 6 PRECAST PANEL Lower Level @ Kitchen -14-0 LOADING DOCK RAMP DN. PREST BRICK PAVERS BIKE RACK POURED-IN-PLACE CON- CRETE SLOPE 2% recessed grated planter SLOPE 2% T/Sidewalk 71-0 SLOPE 2% 4-0 T/Sidewalk 4 MIN. CALIBER TREE 74-0 WARREN ST. 24-0 LOUIS POULSEN KIPP POST LIGHT 20-0 40-0 WARREN ST. STREETSCAPE PLAN / ELEVATION 1.8

ALUM. SLAB EDGE COVER 4th Floor 42-4 3rd Floor 33-2 CERAMIC FRIT PATTERN S T/Parapet 26-8 2nd Floor 24-0 METAL PANEL CLAD EXO-STRUCTURE FRAME METAL PANEL Ground Floor @ Amenity 0-0 (75-0 ) 4-SIDED SILICONE JOINT CURTAINWALL SYSTEM Lower Level @ Prod. Kitchen -14-0 Lower Level @ Dining -10-0 POURED-IN-PLACE CON- CRETE T/Sidewalk 65-0 BIKE RACK LANDSCAPE FORMS STAY BENCH SLOPE 2% LITTER/RECYCLING BIN 24-0 24-0 WARREN ST. 24-0 4-0 LOUIS POULSEN KIPP POST LIGHT 4 MIN. CALIBER TREE 20-0 46-7 20-0 40-0 20-0 PRECAST BRICK PAVERS WARREN ST. STREETSCAPE PLAN / ELEVATION 1.9

10 AM Noon 2 PM 4 PM 6 PM 8 PM December 23rd September 23rd June 22nd March 21st SUN STUDY 1.10

Roof Parapet 280-0 T/Roof 276-0 Parapet 245-8 Mech./Amenity 242-2 24th Floor 229-8 23rd Floor 220-6 22nd Floor 211-4 21st Floor 202-2 20th Floor 193-0 19th Floor 183-10 18th Floor 174-8 17th Floor 165-6 16th Floor 156-4 15th Floor 147-2 14th Floor 138-0 13th Floor 128-10 12th Floor 119-8 11th Floor 110-6 T/Parapet 100-0 10th Floor 101-4 9th Floor 92-2 T/Roof 92-2 T/Screen Wall 78-2 2 A4.0 T/Parapet 70-0 8th Floor 81-0 7th Floor 71-10 T/Roof 62-8 5th Floor 51-6 2 A4.1 4th Floor 42-4 3rd Floor 33-2 T/Railing 27-6 2nd Floor 24-0 1st Floor 0-0 (75-0 ) Lower Level @ Dining -10-0 LANCASTER AVE. ELEVATION 3.0

Roof Parapet 280-0 T/Roof 276-0 2 A4.6 2 A4.5 Parapet 245-8 Mech./Amenity 242-2 24th Floor 229-8 23rd Floor 220-6 22nd Floor 211-4 21st Floor 202-2 20th Floor 193-0 19th Floor 183-10 18th Floor 174-8 17th Floor 165-6 16th Floor 156-4 15th Floor 147-2 14th Floor 138-0 13th Floor 128-10 12th Floor 119-8 11th Floor 110-6 10th Floor 101-4 9th Floor 92-2 8th Floor 81-0 7th Floor 71-10 6th Floor 62-8 2 2 A4.2A4.3 5th Floor 51-6 4th Floor 42-4 3rd Floor 33-2 2nd Floor 24-0 1st Floor 0-0 (75-0 ) Lower Level @ Dining -10-0 34TH ST. ELEVATION 3.1

Roof Parapet 280-0 T/Roof 276-0 Parapet 245-8 Mech./Amenity 242-2 24th Floor 229-8 23rd Floor 220-6 22nd Floor 211-4 21st Floor 202-2 20th Floor 193-0 19th Floor 183-10 18th Floor 174-8 17th Floor 165-6 16th Floor 156-4 15th Floor 147-2 14th Floor 138-0 13th Floor 128-10 12th Floor 119-8 11th Floor 110-6 10th Floor 101-4 9th Floor 92-2 8th Floor 81-0 7th Floor 71-10 6th Floor 62-8 2 A4.4 2 A4.3 5th Floor 51-6 4th Floor 42-4 3rd Floor 33-2 2nd Floor 24-0 1st Floor 0-0 (75-0 ) Lower Level @ Dining -10-0 WARREN ST. ELEVATION 3.2

Roof Parapet 280-0 T/Roof 276-0 Parapet 245-8 Mech./Amenity 242-2 24th Floor 229-8 23rd Floor 220-6 22nd Floor 211-4 21st Floor 202-2 20th Floor 193-0 19th Floor 183-10 18th Floor 174-8 17th Floor 165-6 16th Floor 156-4 15th Floor 147-2 14th Floor 138-0 13th Floor 128-10 12th Floor 119-8 11th Floor 110-6 T/Parapet 100-0 10th Floor 101-4 9th Floor 92-2 8th Floor 81-0 T/Parapet 70-0 7th Floor 71-10 6th Floor 62-8 5th Floor 51-6 4th Floor 42-4 3rd Floor 33-2 2nd Floor 24-0 T/Deck 12-0 1st Floor 0-0 (75-0 ) Lower Level @ Dining -10-0 WEST ELEVATION 3.3

15 16 ROOF PARAPET 280' 272' - 0" 2" 95' - 8" 9' - 2" 9' - 2" 9' - 2" 11' - 2" 9' - 2" 9' - 2" 11' - 2" 3' - 6" 9th Floor Parapet 100' 95' - - 8" 0" 9th Floor 92' - 2" 8th Floor 81' - 0" 7th Floor 71' - 10" 6th Floor Parapet 70' 66' - 0" 2" 6th Floor 62' - 8" 5th Floor 51' - 6" 4th Floor 42' - 4" 3rd Floor 33' - 2" 1 2 3 4 5 6 7 8 9 3' - 6" UNIT "E" UNIT "E" UNIT "E" UNIT "E" 4' - 0" UNIT "J" UNIT "J" UNIT "J" UNIT "J" UNIT "J" UNIT "J" UNIT "J" UNIT "J" 10 11 12 13 14 UNIT "E" UNIT "E" UNIT "E" UNIT "E" UNIT "E" UNIT "E" UNIT "E" 8' - 6" UNIT "X1" UNIT "X1" UNIT "X1" UNIT "X1" UNIT "X1" UNIT "X1" UNIT "X1" MECHANICAL PENTHOUSE 4' - 0" 8' - 6" Parapet 245' - 8" Mech./ Amenity 242' - 2" 24th Floor 229' - 8" 23rd Floor 220' - 6" 22nd Floor 211' - 4" 21st Floor 202' - 2" 20th Floor 193' - 0" 19th Floor 183' - 10" 18th Floor 174' - 8" 17th Floor 165' - 6" 16th Floor 156' - 4" 15th Floor 147' - 2" 14th Floor 138' - 0" 13th Floor 128' - 10" 12th Floor 119' - 8" 11th Floor 110' - 6" 10th Floor 101' - 4" 9th Floor 92' - 2" 8th Floor 81' - 0" 7th Floor 71' - 10" 6th Floor 62' - 8" 5th Floor 51' - 6" 4th Floor 42' - 4" 3rd Floor 33' - 2" 2nd Floor 24' - 0" 9' - 2" 9' - 2" 9' - 2" 11' - 2" 9' - 2" 9' - 2" 11' - 2" 15 FLOORS @ 9'-2" = 137' - 6" 12' - 6" 30' - 0" 282' - 2" 24' - 0" 10' - 0" 1st Floor 0" Lower Level -10' - 0" STAIR EMER. GEN. RETAIL "A" 6' - 0" 14' - 0" 3' - 0" RETAIL "B" 3' - 0" PARKING 3' - 0" RETAIL "C" 6" 1st Floor 0" Lower Level -10' - 0" 24' - 0" 10' - 0" KEY PLAN SCALE: 1/16 =1-0 BUILDING SECTION EAST - WEST LOOKING NORTH 3.4

KEY PLAN SCALE: 1/16 =1-0 BUILDING SECTION NORTH - SOUTH LOOKING EAST 3.5

17 18 19 20 21 22 23 24 ROOF PARAPET 280' 272' - 0" 2" MECHANICAL PENTHOUSE Parapet 245' - 8" 30' - 0" Mech./ Amenity 242' - 2" 14' - 0" 24th Floor 229' - 8" 23rd Floor 220' - 6" 22nd Floor 211' - 4" 21st Floor 202' - 2" 20th Floor 193' - 0" 19th Floor 183' - 10" 18th Floor 174' - 8" 17th Floor 165' - 6" 16th Floor 156' - 4" 15th Floor 147' - 2" 14th Floor 138' - 0" 13th Floor 128' - 10" 12th Floor 119' - 8" 11th Floor 110' - 6" 10th Floor 101' - 4" 9th Floor 92' - 2" 8th Floor 81' - 0" 7th Floor 71' - 10" 6th Floor 62' - 8" 5th Floor 51' - 6" 4th Floor 42' - 4" 3rd Floor 33' - 2" 2nd Floor 24' - 0" 9' - 2" 9' - 2" 9' - 2" 11' - 2" 9' - 2" 9' - 2" 11' - 2" 15 FLOORS @ 9'-2" = 137' - 6" 12' - 6" 282' - 2" 10' - 0" PARKING LOADING DOCK THEATER SOCIAL LOUNGE/ MULTI-PURPOSE ROOM STUDY AREA DINING ROOM 1st Floor 0" 24' - 0" MAINTENANCE KITCHEN/SERVERY DINING Lower ROOM Level -10' - 0" 10' - 0" PROD. KITCH. -14' - 0" KEY PLAN SCALE: 1/16 =1-0 BUILDING SECTION 3.6

KEY PLAN SCALE: 1/16 =1-0 BUILDING SECTION 3.7

KEY PLAN SCALE: 1/16 =1-0 BUILDING SECTION 3.8

T/PARAPET EL: +70'-0" T/PARAPET EL: +70'-0" 4 A4.0 3 A4.0 BRICK SHELF ANGLE T/ROOF DECK EL: +62'-8" BRICK T/ROOF DECK EL: +62'-8" PRECAST 1" PRECAST REVEAL 6" PRECAST PANEL BUTT GLAZED MULLION ZERO-SIGHTLINE OPERABLE WINDOW BUTT GLAZED MULLION T T T T/5TH FLOOR EL: +51'-6" T/5TH FLOOR EL: +51'-6" 1" PRECAST REVEAL INSULATED ALUMINUM SLAB EDGE COVER 1 A4.0 T T T/4TH FLOOR EL: +42'-4" BRICK T T/4TH FLOOR EL: +42'-4" BRICK INSULATED ALUMINUM SLAB EDGE COVER BRICK T/3RD FLOOR EL: +33'-2" T/3RD FLOOR EL: +33'-2" LANCASTER AVE. MASONRY SYSTEM SHEET 2 A4.0 4.0

3 A4.1 T/RAILING EL: +27'-6" T RAILING UNIT BALCONY T/2ND FLOOR EL: +24'-0" STRUCTURAL SLAB SLOPED TO DRAIN W/TRAFFIC TOPPING ROOF DRAIN AIR INTAKE GRILLE BACKLIT PIN LETTER SIGNAGE METAL PANEL CANOPY (DASHED) 4-SIDED CAPTURED CURTAINWALL SYSTEM W/INTEGRAL STRUC. STL RETAIL C 1 A4.1 T STAINLESS STEEL SLAB EDGE COVER T/RETAIL C SLAB EL: +0'-0" (75'-0") CANOPY ABOVE 2 A4.1 RETAIL CURTAIN WALL SYSTEM SHEET 4.1

EXTERNAL BEAM 3 A4.2 METAL PANEL PARAPET T/ROOF DECK EXTERNAL BEAM BEYOND PUNCHED OPENING, 4-SIDED SILICONE JOINT CURTAINWALL SYSTEM METAL COLUMN ENCLOSURE EXTERNAL STRUCTURAL STEEL COLUMN DINING T/LOBBY SLAB EL: +0'-0" (75'-0") T METAL PANEL STAINLESS STEEL SLAB EDGE COVER 1 A4.2 T/DINING SLAB EL: -10'-0" METAL PANEL DINING CURTAIN WALL SYSTEM SHEET 4.2

3 A4.3 STUDENT HOUSING T T/2ND FLOOR EL: +24'-0" METAL PANEL FRAME S CEILING MECHANICAL MEZZANINE 4-SIDED CAPTURED CURTAINWALL SYSTEM W/INTEGRAL STRUCTURAL STEEL PRECAST REVEALS SOCIAL LOUNGE CLEAR TEMPERED VISION GLASS T/LOBBY SLAB EL: +0'-0" (75'-0") 6" PRECAST PANEL PRODUCTION KITCHEN WARREN ST. PODIUM SYSTEM SHEET 4.3

3 A4.4 PRE-VEGETATED LIVING WALL PANELS PRE-VEGETATED LIVING WALL PANELS EXTENSIVE GREEN ROOF, SEE PLAN GLASS RAIL AMENITY DECK T/AMENITY DECK SLAB EL: +6'-0" 1 A4.4 GARAGE T/LOBBY SLAB EL: +0'-0" (75'-0") T/LOWER LEVEL EL: -10'-0" GREEN WALL SYSTEM SHEET 4.4

3 A4.5 NOTE: PROVIDE AN OPERABLE WINDOW IN EVERY BEDROOM AND LIVING ROOM 4-SIDED CAPTURED WINDOW WALL SYSTEM T/4TH FLOOR EL: +41'-4" ALUM. INSULATED SLAB EDGE COVER BUTT-GLAZED MULLION ZERO SIGHTLINE OPERABLE WINDOW E-GL-03 S BUTT-GLAZED MULLION E-GL-03T T/3RD FLOOR EL: +32'-2" T TOWER WINDOW WALL SYSTEM SHEET 4.5

3 A4.6 E-GL-03 E-GL-03T ZERO SIGHTLINE OPERABLE WINDOW T/4TH FLOOR EL: +41'-4" T T OPERABLE WINDOW 8" PRECAST PANEL PRECAST PANEL REVEAL T/3RD FLOOR EL: +32'-2" STAINED PRECAST W/FORMLINER (AT BEVELED PORTION OF PANEL) TOWER PRECAST SYSTEM SHEET 4.6