DRAFT DESIGN REPORT DIVISION OF FACILITIES DEVELOPMENT 0 East Wilson Street, 7th Floor Post Office Box 7866 Madison, WI 53707 MARCH, 203 WEST CAMPUS RESIDENCE RENOVATIONS PHASE UNIVERSITY OF WISCON SIN - WHITEWATER WHITEWATER, WI Project : L 2 J For the: UNIVERSITY OF WISCON SIN - WHITEWATER Project Manager: Kevin Trinastic Architect/Engineer MEAD & HUNT, INC. 608-273-6380 MADISON, WISCONSIN of Project: Remodeling / New Construction. Project Description: The project will renovate Arey Hall, a 4-story plus basement, (28,2/48,350 ASF/GSF) residence hall constructed in 964, and Fricker Hall, a 4-story plus basement,(28,787/47,739 ASF/GSF), residence hall constructed in 963. It will add 7,20 GSF to connect the two halls and provide program space. These two halls are part of the six west campus dormitories. The project will renovate existing rooms, renewal of building finishes, replace windows and exterior doors, enlargement and reconfiguring of restrooms, address deferred maintenance, replace the roofs, health and safety code compliance issues, replace MEP systems, provide standby power, and add fire sprinklers throughout. The building s overall facilities will be brought into compliance with campus accessibility and universal design standards. The revised program will build an addition linking Fricker and Arey Halls at all floors. The addition includes: elevator redundancy, code compliant accessible exit paths, increased program space in lower levels for activities and study areas, consolidated student services, custodial services, building support, and mechanical spaces, the creation of more flexible universal living and visit-ablility for handicap students. Moving program spaces out of the existing halls into the addition will allow for repurposing space into additional beds. Chilled water will be extended from the existing Drumlin Hall dining facility to accommodate air conditioning in the link building as well as general meeting spaces in the lower levels of Arey and Fricker Halls. Heat recovery will be used to reclaim heat from toilet room exhaust. New electrical panels will be added as well as energy efficient lighting. 2. Authorized Budget and Funding Source: The authorized budget amount is $2,223,000 (Program Revenue Supported Borrowing) The requested budget is $6,598,000 ($2,223,000 PRSB & $4,375,000 Residual Bonding) DR of 2
3. Space Summary: Existing ASF Existing GSF Proposed ASF Proposed GSF Building Efficiency Arey 28,2 47,733 27,960 47,733 59% Fricker 28,787 47,739 29,20 47,739 6% Link - - 3,70 7,20-4. Schedule: Submission of Bid Documents for Final Review: July, 203 Bid Opening: September 25, 203 Start of Construction: October 28, 203 (Fricker & Link) May 5, 204 (Arey) Substantial Completion / Occupancy: June 2, 204 (Fricker & Link) August, 204 (Arey) 5. Budget Summary: Per Enumeration Per Program Construction: $9,522,000 $3,23,000 Contingency: 977,000,32,000 A/E Fees: 684,000 925,000 Mgmt: 430,000 529,000 Plan Review/Testing: - - Pre- Fee: 95,000 95,000 Other Fees 67,000 67,000 Energy Mgmt. Sys.: - - Haz Mat Abatement: 250,000 250,000 Movable Equipment: 98,000 98,000 % for Art: - Total Project Cost: $2,223,000 $6,598,000 Constr. Cost / GSF $9.27 $7.26 Total Cost / GSF $7.6 $47.30 Budget Notes: Renovation Constr. Cost / GSF $05.34 ($0,057,378 / 95,472 GSF) New Constr. Cost / GSF $83.36 ($3,55,622 / 7,20 GSF) 6. Additional Comments: None DR 2 of 2
MEDIUM VOLTAGE MULTI-PURPOSE MULTI-PURPOSE MUSIC CUSTODIAN CUSTODIAN OFFICE CUSTODIAN OFFICE CHILLED WATER ELECTRICAL CORRIDOR RAMP /20 D D D W W W W W W W LAUNDRY VENDING ASSISTED ENCLOSED STUDY UNISEX UNISEX ELECTRICAL MTR REF. PANTRY KITCHENETTE GAME / LOUNGE COMPUTER LAB MECHANICAL MACHINE FIRE PUMP MECHANICAL Room MECHANICAL COMPUTER LAB QUIET STUDY SEMI-QUIET STUDY VESTIBULE QUIET STUDY HD GAME / LOUNGE KITCHENETTE REF. PANTRY LIT ENCLOSED STUDY MULTI-PURPOSE ASSISTED ACESSIBLE UNISEX UNISEX ELECT. MTR SEMI-QUIET STUDY QUIET STUDY QUIET STUDY HD Overall Lower Level Plan No. : By: Description: 3/5/203 2:3:40 PM C:\Users\586mjb\Documents\L2J-00-Link-AS-Central_586mjb.rvt MULTI-PURPOSE LOWER LEVEL PLAN NO SCALE LAUNDRY VENDING W W W W W W W D D D A KEY PLAN B C Scale 0 4.25 8.5 L2J APRIL, 203 A00 7
VESTIBULE CORRIDOR FRONT DESK MEN'S PIPE SPACE VESTIBULE HD RECEPTION HD OFFICE HD OFFICE HD OFFICE MAIL VESTIBULE STIUDENT 3/5/203 2:33:00 PM C:\Users\586mjb\Documents\L2J-00-Link-AS-Central_586mjb.rvt GREAT HD APARTMENT KITCHEN BATHRM. DW REF. BED 2 BED PIPE SPACE MEN'S FIRST FLOOR PLAN NO SCALE A BED 2 BED HD BATH APARTMENT GREAT KITCHEN KEY PLAN B C DW REF. First Floor Plan No. : By: Description: Scale 0 4.25 8.5 7 L2J APRIL, 203 A0
OPEN TO BELOW OPEN TO BELOW CORRIDOR MEN'S PIPE SPACE ROOF BELOW ROOF BELOW 3/5/203 2:5:00 AM C:\Users\586mjb\Documents\2924500-2083.0-Link-AS-Central_586mjb.rvt PIPE SPACE MEN'S SECOND FLOOR PLAN NO SCALE A KEY PLAN B C Second Floor Plan No. : By: Description: Scale 0 4.25 8.5 7 L2J APRIL, 203 A02
CORRIDOR MEN'S PIPE SPACE 3/5/203 2:52:3 AM C:\Users\586mjb\Documents\2924500-2083.0-Link-AS-Central_586mjb.rvt PIPE SPACE MEN'S THIRD FLOOR PLAN NO SCALE A KEY PLAN B C Third Floor Plan No. : By: Description: Scale 0 4.25 8.5 7 L2J APRIL, 203 A03
CORRIDOR MEN'S PIPE SPACE 3/5/203 2:53:23 AM C:\Users\586mjb\Documents\2924500-2083.0-Link-AS-Central_586mjb.rvt PIPE SPACE MEN'S FOURTH FLOOR PLAN : 36 A KEY PLAN B C Fourth Floor Plan No. : By: Description: Scale 0 4.25 8.5 7 L2J APRIL, 203 A04
FIRST FLOOR TO Elev Shaft 40' - 4 7/8" TOW LINK 35' - 0" FOURTH FLOOR 24' - 7 7/8" THIRD FLOOR 6' - 5 /4" SECOND FLOOR 08' - 2 5/8" FIRST FLOOR 00' - 0" AREY ENTRANCE 95' - 4" NORTH ELEVATION /6" = '-0" TOW LINK 35' - 0" FOURTH FLOOR 24' - 7 7/8" THIRD FLOOR 6' - 5 /4" SECOND FLOOR 08' - 2 5/8" 00' - 0" ENTRANCE 95' - 0 /6" 3/5/203 2::06 AM C:\Users\586mjb\Documents\2924500-2083.0-Link-AS-Central_586mjb.rvt 4 EAST ELEVATION 2 /6" = '-0" SOUTH ELEVATION 3 /6" = '-0" WEST ELEVATION /6" = '-0" TOW LINK 35' - 0" FOURTH FLOOR 24' - 7 7/8" THIRD FLOOR 6' - 5 /4" SECOND FLOOR 08' - 2 5/8" FIRST FLOOR 00' - 0" AREY ENTRANCE 95' - 4" TO Elev Shaft 40' - 4 7/8" TOW LINK 35' - 0" FOURTH FLOOR 24' - 7 7/8" THIRD FLOOR 6' - 5 /4" SECOND FLOOR 08' - 2 5/8" FIRST FLOOR 00' - 0" AREY ENTRANCE 95' - 4" OVERALL EXTERIOR ELEVATIONS No. : By: Description: Scale 0 4 6 8 24 L2J APRIL, 203 A-20