DRAFT DESIGN REPORT. Kevin Trinastic. WHITEWATER, WI Project Number: 11 L 2 J

Similar documents
DESIGN PRIORITIES. Avenues for Homeless Youth. Charrette Goals AVENUES FOR HOMELESS YOUTH

EAST CAMPUS DEVELOPMENT UPDATE Board of Trustees January 20, 2011

FAIRFIELD INN & SUITES

PROGRAM AREAS - MIDDLE SCHOOL

MAINE STATE LEGISLATURE

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

Funding Capital Projects: CHEFA Financed Bond Sales for Auxiliary Services Facilities FY

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning

MEETING NOTICE BOARD OF REGENTS OF THE UNIVERSITY OF WISCONSIN SYSTEM EXECUTIVE COMMITTEE


Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System

FLOOR AND ROOM NUMBERING GUIDELINES

YHA Bristol Access Statement

MEMORIAL UNION: PLANNING FOR THE FUTURE. WTW Architects November 30, 2016 presentation to the Steering Committee

University Housing. Welcome Home

Division of Facilities Development

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

Sponsored Programs Summer Housing Information Manual for Summer Participants

3. The only type of unit we could not cost-effectively renovate to was apartment or suite-style.

VACANT WEST VILLAGE TOWNHOUSE FOR SALE 146 WAVERLY PLACE

Element Z General Design Requirements Owner Standards and Other Requirements

Colonial Place I & II 2111 & 2101 Wilson Boulevard Arlington, VA 22201

PIPE (E) BELL HOP ELEVATOR GREENLEAF AVENUE EDGE OF HISTORICAL BLDG. BUILDING "B" EXIT -30" +0" GREENLEAF ENTRY EXIT EXIT BUILDING "C"

TENANT DESIGN MANUAL UPDATED AUGUST 2016

INSTITUTIONAL AGREEMENTS, LEASES AND EASEMENTS

Marina 87 Developer's Resumes

Goetzmann Custom Homes

LAMBTON HALL & FAMILY HOUSING RENOVATIONS

PROPOSED ACCOMMODATION DESIGN HALLS DEVELOPMENT BY 2022

YHA Langdale - Access Statement

University Housing. Welcome Home

ONE GATEWAY FOR LEASE. 615 Elsinore Place Cincinnati, OH HOME INTERIORS AVAILABLE LOCATION PARKING & ACCESS

G0.1 BURR OAKS SENIOR HOUSING. Architecture & Engineering: Dimension IV Madison Design Group 6515 Grand Teton Plaza, Suite 120 Madison, WI 53719

Access Statement for Doles Ash Farm Holiday Cottages

Project overview. Golden Sand Hotel DOHA QATAR

M A G N I F I C O THE MAGNIFICO COLLECTION

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

PLANNING APPLICATION (REVISION 2.1)

Sponsored Programs Summer Housing Information Manual for Program Administrators

Residence One. Single Level Approx. 2,665 Square Feet 3 Bedrooms, 3.5 Baths Great Room, Formal Dining Room, Outdoor Room 2-Car Garage

WAYNE STATE UNIVERSITY. Housing Facilities Master Plan

USER COORDINATED SIGN TEXT

Thompson Library, Stoke An accessible guide

The Old Water Station, Lochfoot, Dumfries DG2 8NN

St. Char l es B orromeo Church A Roman Catholic faith community in the heart of Brooklyn Heights

UNILODGE D1 FACTSHEET

Request for Letters of Interest Lease of the Preschool Building at Bloedel Donovan Park

A New College Living Experience East Village, Manhattan, New York City

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

UNIQUE CONVERSION OPPORTUNITY SHADYSIDE FULL BUILDING 5428 Walunut Street Pittsburgh, PA Between Copeland & Bellefont Streets

Interiors. Bob Michels Construction, Inc.

12/18/2017. Objective. Accessibility Code MN 1341 Frequent Questions and Key Criteria. Agenda. Code Documents

Isiah Senior Apartments Westchester, IL

39A Castlevennon Road Katesbridge, Banbridge Co. Down, BT32 5QD

17 N Centre Ave Leesport, PA 19533

CITY OF LAKE MARY, FLORIDA NON-RESIDENTIAL DEVELOPMENT FEE ESTIMATE PACKET

ITN 15TM-122 Off-Campus Housing Solutions. Notification of Short-Listing and Posting of Proposers. Thursday, February 19, 2015

HUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design:

Albright/Benton. 2 moveable 2-drawer wardrobes 2 moveable desks & chairs 2 twin XL loftable beds

Sleeps 8 Pool Private Pool Bedrooms 4 Views Mountain and valley Bathrooms 4 Beach 5km

Fabled Further Lane Near Ocean Estate

Real Estate Assessment Checklist. 1. This assessment checklist has most of the essential features to look for in a house,

Technical and Regulatory Nuances Building codes & Accreditation

Access Update Newsletter

UNILODGE ON SWANSTON FACTSHEET

Ithaca College Accessibility Guide

UNIVERSITY OF VIRGINIA BOARD OF VISITORS MEETING OF THE BUILDINGS AND GROUNDS COMMITTEE NOVEMBER 13, 2015

On arrival to the property there is a wooden gate which is open 24 hours when the B&B is operating.

Colonial Place I & II 2111 & 2101 Wilson Boulevard Arlington, VA 22201

CONSTRUCTION COST ESTIMATE AND ANALYSIS

CITY HALL PROJECT UPDATE/DIRECTION BRIEF September 19, 2017

INTENT TO AWARD POSTING

2700 J STREET SACRAMENTO MIDTOWN BUILDING FOR SALE $4,300,000 (±$287.00/RSF) SACRAMENTO

Harmony Row Dublin 2. Dublin 2

38 GLASGOW ROAD, DENNYLOANHEAD, FK4 1QG FIXED PRICE 300,000 ENERGY PERFORMANCE RATING: D

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: DISCUSSION ITEM


2700 J STREET SACRAMENTO SACRAMENTO MIDTOWN BUILDING FOR LEASE OR SALE

SALVATION ARMY: HARBOR LIGHT CENTER EXISTING PROPOSED SALVATION ARMY: HARBOR LIGHT CENTER

COMMERCIAL PROPERTY FACT SHEET

APPENDIX I GLOSSARY OF FACILITIES TERMS

HOUSING & RESIDENCE LIFE living the experience

Windmill Office Plaza E. Windmill Lane, Las Vegas, NV 89123

ROOM NUMBERING STANDARDS

Central Arizona College. AED Locations

BANK OF INDIA, GROUND FLOOR, GOD 345- PU-4, SCHEME NO -54, A. B. ROAD, INDORE OFFER DOCUMENT FOR

City of Shakopee, MN. Planning Objectives: City Hall Plan Options. City Hall Plan Options

NYC Department of Education

Charles Kozminski Elementary Community Academy

Design-Architecture Workshop

Section 3: Primary Function, Employee Work Areas, & Kitchens

Access Statement For Sea Breeze

Sale Luxury villa on the sea of Fano.

Online Housing Application, Room Selection & Dining Plan Instructions

Experience. Firm Experience General. University of Colorado - As Needed Services

5. Turnover Condition : Bare Shell, rough flooring, fire sprinkler and smoke detectors for installation., Fan Coil Units provided

We Bring Real Estate to Life

Greeley County Available Residential Properties 10/3/2017

LONDON ACCOMMODATION

Transcription:

DRAFT DESIGN REPORT DIVISION OF FACILITIES DEVELOPMENT 0 East Wilson Street, 7th Floor Post Office Box 7866 Madison, WI 53707 MARCH, 203 WEST CAMPUS RESIDENCE RENOVATIONS PHASE UNIVERSITY OF WISCON SIN - WHITEWATER WHITEWATER, WI Project : L 2 J For the: UNIVERSITY OF WISCON SIN - WHITEWATER Project Manager: Kevin Trinastic Architect/Engineer MEAD & HUNT, INC. 608-273-6380 MADISON, WISCONSIN of Project: Remodeling / New Construction. Project Description: The project will renovate Arey Hall, a 4-story plus basement, (28,2/48,350 ASF/GSF) residence hall constructed in 964, and Fricker Hall, a 4-story plus basement,(28,787/47,739 ASF/GSF), residence hall constructed in 963. It will add 7,20 GSF to connect the two halls and provide program space. These two halls are part of the six west campus dormitories. The project will renovate existing rooms, renewal of building finishes, replace windows and exterior doors, enlargement and reconfiguring of restrooms, address deferred maintenance, replace the roofs, health and safety code compliance issues, replace MEP systems, provide standby power, and add fire sprinklers throughout. The building s overall facilities will be brought into compliance with campus accessibility and universal design standards. The revised program will build an addition linking Fricker and Arey Halls at all floors. The addition includes: elevator redundancy, code compliant accessible exit paths, increased program space in lower levels for activities and study areas, consolidated student services, custodial services, building support, and mechanical spaces, the creation of more flexible universal living and visit-ablility for handicap students. Moving program spaces out of the existing halls into the addition will allow for repurposing space into additional beds. Chilled water will be extended from the existing Drumlin Hall dining facility to accommodate air conditioning in the link building as well as general meeting spaces in the lower levels of Arey and Fricker Halls. Heat recovery will be used to reclaim heat from toilet room exhaust. New electrical panels will be added as well as energy efficient lighting. 2. Authorized Budget and Funding Source: The authorized budget amount is $2,223,000 (Program Revenue Supported Borrowing) The requested budget is $6,598,000 ($2,223,000 PRSB & $4,375,000 Residual Bonding) DR of 2

3. Space Summary: Existing ASF Existing GSF Proposed ASF Proposed GSF Building Efficiency Arey 28,2 47,733 27,960 47,733 59% Fricker 28,787 47,739 29,20 47,739 6% Link - - 3,70 7,20-4. Schedule: Submission of Bid Documents for Final Review: July, 203 Bid Opening: September 25, 203 Start of Construction: October 28, 203 (Fricker & Link) May 5, 204 (Arey) Substantial Completion / Occupancy: June 2, 204 (Fricker & Link) August, 204 (Arey) 5. Budget Summary: Per Enumeration Per Program Construction: $9,522,000 $3,23,000 Contingency: 977,000,32,000 A/E Fees: 684,000 925,000 Mgmt: 430,000 529,000 Plan Review/Testing: - - Pre- Fee: 95,000 95,000 Other Fees 67,000 67,000 Energy Mgmt. Sys.: - - Haz Mat Abatement: 250,000 250,000 Movable Equipment: 98,000 98,000 % for Art: - Total Project Cost: $2,223,000 $6,598,000 Constr. Cost / GSF $9.27 $7.26 Total Cost / GSF $7.6 $47.30 Budget Notes: Renovation Constr. Cost / GSF $05.34 ($0,057,378 / 95,472 GSF) New Constr. Cost / GSF $83.36 ($3,55,622 / 7,20 GSF) 6. Additional Comments: None DR 2 of 2

MEDIUM VOLTAGE MULTI-PURPOSE MULTI-PURPOSE MUSIC CUSTODIAN CUSTODIAN OFFICE CUSTODIAN OFFICE CHILLED WATER ELECTRICAL CORRIDOR RAMP /20 D D D W W W W W W W LAUNDRY VENDING ASSISTED ENCLOSED STUDY UNISEX UNISEX ELECTRICAL MTR REF. PANTRY KITCHENETTE GAME / LOUNGE COMPUTER LAB MECHANICAL MACHINE FIRE PUMP MECHANICAL Room MECHANICAL COMPUTER LAB QUIET STUDY SEMI-QUIET STUDY VESTIBULE QUIET STUDY HD GAME / LOUNGE KITCHENETTE REF. PANTRY LIT ENCLOSED STUDY MULTI-PURPOSE ASSISTED ACESSIBLE UNISEX UNISEX ELECT. MTR SEMI-QUIET STUDY QUIET STUDY QUIET STUDY HD Overall Lower Level Plan No. : By: Description: 3/5/203 2:3:40 PM C:\Users\586mjb\Documents\L2J-00-Link-AS-Central_586mjb.rvt MULTI-PURPOSE LOWER LEVEL PLAN NO SCALE LAUNDRY VENDING W W W W W W W D D D A KEY PLAN B C Scale 0 4.25 8.5 L2J APRIL, 203 A00 7

VESTIBULE CORRIDOR FRONT DESK MEN'S PIPE SPACE VESTIBULE HD RECEPTION HD OFFICE HD OFFICE HD OFFICE MAIL VESTIBULE STIUDENT 3/5/203 2:33:00 PM C:\Users\586mjb\Documents\L2J-00-Link-AS-Central_586mjb.rvt GREAT HD APARTMENT KITCHEN BATHRM. DW REF. BED 2 BED PIPE SPACE MEN'S FIRST FLOOR PLAN NO SCALE A BED 2 BED HD BATH APARTMENT GREAT KITCHEN KEY PLAN B C DW REF. First Floor Plan No. : By: Description: Scale 0 4.25 8.5 7 L2J APRIL, 203 A0

OPEN TO BELOW OPEN TO BELOW CORRIDOR MEN'S PIPE SPACE ROOF BELOW ROOF BELOW 3/5/203 2:5:00 AM C:\Users\586mjb\Documents\2924500-2083.0-Link-AS-Central_586mjb.rvt PIPE SPACE MEN'S SECOND FLOOR PLAN NO SCALE A KEY PLAN B C Second Floor Plan No. : By: Description: Scale 0 4.25 8.5 7 L2J APRIL, 203 A02

CORRIDOR MEN'S PIPE SPACE 3/5/203 2:52:3 AM C:\Users\586mjb\Documents\2924500-2083.0-Link-AS-Central_586mjb.rvt PIPE SPACE MEN'S THIRD FLOOR PLAN NO SCALE A KEY PLAN B C Third Floor Plan No. : By: Description: Scale 0 4.25 8.5 7 L2J APRIL, 203 A03

CORRIDOR MEN'S PIPE SPACE 3/5/203 2:53:23 AM C:\Users\586mjb\Documents\2924500-2083.0-Link-AS-Central_586mjb.rvt PIPE SPACE MEN'S FOURTH FLOOR PLAN : 36 A KEY PLAN B C Fourth Floor Plan No. : By: Description: Scale 0 4.25 8.5 7 L2J APRIL, 203 A04

FIRST FLOOR TO Elev Shaft 40' - 4 7/8" TOW LINK 35' - 0" FOURTH FLOOR 24' - 7 7/8" THIRD FLOOR 6' - 5 /4" SECOND FLOOR 08' - 2 5/8" FIRST FLOOR 00' - 0" AREY ENTRANCE 95' - 4" NORTH ELEVATION /6" = '-0" TOW LINK 35' - 0" FOURTH FLOOR 24' - 7 7/8" THIRD FLOOR 6' - 5 /4" SECOND FLOOR 08' - 2 5/8" 00' - 0" ENTRANCE 95' - 0 /6" 3/5/203 2::06 AM C:\Users\586mjb\Documents\2924500-2083.0-Link-AS-Central_586mjb.rvt 4 EAST ELEVATION 2 /6" = '-0" SOUTH ELEVATION 3 /6" = '-0" WEST ELEVATION /6" = '-0" TOW LINK 35' - 0" FOURTH FLOOR 24' - 7 7/8" THIRD FLOOR 6' - 5 /4" SECOND FLOOR 08' - 2 5/8" FIRST FLOOR 00' - 0" AREY ENTRANCE 95' - 4" TO Elev Shaft 40' - 4 7/8" TOW LINK 35' - 0" FOURTH FLOOR 24' - 7 7/8" THIRD FLOOR 6' - 5 /4" SECOND FLOOR 08' - 2 5/8" FIRST FLOOR 00' - 0" AREY ENTRANCE 95' - 4" OVERALL EXTERIOR ELEVATIONS No. : By: Description: Scale 0 4 6 8 24 L2J APRIL, 203 A-20