UO Lewis Integrative Science Building

Similar documents
The Carpenter Center for Visual Arts, Harvard University Analysis 4 th and 5 th Floor Studio Spaces

The effect of atrium façade design on daylighting in atrium and its adjoining spaces

DAYLIGHTING DESIGN. Strategies for Achieving Quality Daylighting. Spring 2014 College of Architecture, Texas Tech University 1

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

Tisbury Elementary School

At the same time, this very simple strategy imposed maybe one of the most radical impacts on the structure of the building. By expanding the square

Share on printshare on facebookshare on twittershare on more Sharing Services6

HISTORIC RESOURCE SURVEY FORM University of Oregon Cultural Resources Survey Eugene, Lane County, Oregon Summer 2006

DAYLIGHT SIMULATION FOR CODE COMPLIANCE: CREATING A DECISION TOOL. Krystle Stewart 1 and Michael Donn 1

FULL FLOOR RENOVATED OFFICE / FLEX SPACE. JOAN RUYLE office cell HALEY KLEIN.

2018 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa

MULTIFAMILY PERFORMANCE PROGRAM Technical Topic New Buildings Savings Opportunity - Stairwell Lighting

FINANCING OF AN OFFSHORE-WINDFARM. Risk Management HSH NORDBANK AG. Dr. Jörg Böttcher. Kiel, HSH-NORDBANK.DE

ADDENDUM #2. Date: April 29, Prospective Bidders. Re: Addendum #2 - Request for Proposal #29-14

MANDATORY MEASURES DAYLIGHTING. Reference: Sub-Chapter 4, Section 130.1(d)

Fulton Center, New York. Uday Durg PE, Program Executive and Chief Engineer MTACC, New York Gillian Blake PE, Arup, New Delhi

MANDATORY MEASURES DAYLIGHTING. Reference: Sub-Chapter 4, Section 130.1(d)

UCSD Revelle College Apartments

Passive Cooling Measures for Multi-Unit Residential Buildings

Multidisciplinary Research Building 1 Professional Information Session. September 18, 2015

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016

Simulation at House Type 45 Viewed From Natural Light

New Hope-Solebury School District Campus Revitalization Plan

LAUREL CORPORATE CENTER & 1000 BISHOPS GATE

Tri-Cities Insider September 2015

Certificate in Financial Management

NE Martin Luther King Jr. Blvd & Alberta Street Project. PDC Board of Commissioners Meeting August 19, 2015

CHECK LIST FOR REVIEW OF SURVEY PLATS FOR COMPLIANCE WITH MISSOURI MINIMUM STANDARDS FOR PROPERTY BOUNDARY SURVEYS NAME OF SURVEYOR: DATE OF SURVEY:

CONCESSIONS PROGRAM DOING BUSINESS AT THE AIRPORT 3/2/17

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

Company Newsletter(August 2017)

7951 & 7961 LOISDALE ROAD. Belvoir Corporate Campus

For Sale: $68.71/SF. E. Broadway Blvd. Tucson, AZ Property Features. For Sale Broadway Terrace Owner/User Office Building

THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS AMES HALL RENOVATION AND ADDITION ZONING APPLICATION SUBMISSION NOVEMBER 20, 2009

Quayside Site Plan NOVEMBER 29, 2018

DAYLIGHTING DESIGN. Strategies for Achieving Quality Daylighting. Spring 2014 College of Architecture, Texas Tech University 1

York Conferences DIVERSE VENUES

Cube Land integration between land use and transportation

STAR STREET NEIGHBORHOOD A slice of Hong Kong

D U L L E S AT DULLES CORNER. Smart Business DULLES CORNER BOULEVARD. dullesmetrocntr.com

site analysis maps Houston, TX

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

HISTORIC RESOURCE SURVEY FORM University of Oregon Cultural Resources Survey Eugene, Lane County, Oregon Summer 2006

City of Brooklyn Park Planning Commission Staff Report

THE CAMPUS At LEGACY WEST SIGNATURE CORPORATE CAMPUS 1.8 MILLION SQUARE FEET PRIME DEVELOPABLE LAND ±45.2 ACRES PREMIER LEGACY BUSINESS PARK LOCATION

Figure 1. The chart showing how the effort and cost of the design changes are affected as the project progresses (Anon.) Simulation tools are a key co

Specifications. The other construction document. m.thrailkill.architect.llc. April 27, 2017 Michael Thrailkill AIA CDT LEED AP

Space MODEL. Model as Experience S15 ARCH306

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016

Pico Branch Library at Virginia Ave Park

Planning applications 3 Year Income vs Number of Applications

INVESTOR DAY. October 17 th 2018

Springbrook Estates Sewer Improvement Area Informational Meeting Presented By Allen County Sanitary Engineering Department August 28, 2013

Monthly Indicators. October 2010

Study of the energy performance of Korean apartment buildings with alternative balcony configurations

TOWNSHIP OF CAVAN MONAGHAN NEW COMMUNITY CENTRE

REPORT ON THE SOLIDS / Amsterdam June 2013 Stephen Kendall / Infill Systems US LLC

Larkin Larkin Street LARKIN STREET MALIN GIDDINGS MAX ARMOUR Representing the City s most distinctive properties

Design Phase Award Structural Steel (Early Package) Award Final GMP for Remaining Project Construction Phase

PARAGON TH Avenue, Long Island City, NY BLANCHARD ST Avenue, Long Island City, NY

Designing with Daylight

Financial Modeling Workshop Using Excel

Recreation and Park Commission Capital Committee. Angelo J. Rossi Playground Restroom Replacement Conceptual Plan Approval

All Ratings Affirmed In U.K. RMBS Transaction First Flexible No. 6 Following Review

[BUILDING STATISTICS PART I]

2.0 EXISTING SITE CONDITIONS ALASKAN WAY WESTERN AVE POST ALLEY ANALYSIS

SPACE FOR LEASE 5200 PROFESSIONAL CENTER Babcock Street NE Palm Bay, Florida PROFESSIONAL/MEDICAL OFFICE SPACE BUILDING FACTS

CHRONOLOGY OF TEXT AMENDMENTS

E1-12: Final Decision AS

Shasta Street, Redwood City SLIDESHOW

Oil & Gas Non-Core Asset Divestiture Southern and Central Alberta 129 BOEPD (82% Oil and NGLs)

501 Adelaide Street East: Closing Report

SANDOVAL ARCHITECTURE, P.C. STUDENT SERVICES CENTER IMPROVEMENTS - REBID 02 APRIL UNIVERSITY BLVD. SE ALBUQUERQUE, NEW MEXICO 87106

Potential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch

METROPOLITAN NORTH GEORGIA WATER PLANNING DISTRICT CONSERVATION PRICING GUIDANCE JANUARY 2014

7 th & Grand Air Rights

Financial Analysis Workshop. Contents are subject to change. For the latest updates visit

World Renewable Energy Congress (WRECX) Editor A. Sayigh 2008 WREC. All rights reserved. 822

PLAZA SOUTH TOWER FULL FLOOR CONDO PURCHASE OPPORTUNITY

INDUSTRIAL MIXED-USE ZONING An analysis of design considerations. AsianNeighborhoodDesign Draft:

Triangle Special Planning Area Update. Community Workshop #5 September 17, 2018

CITY OF BOYNTON BEACH SPECIAL MEETING

South Bay Market Intelligence Report Vol. 4 October 2018

Central Piers 4, 5 & 6

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

Karl Smith-Davids, Principal Planner Office of Planning - City of Atlanta 55 Trinity Avenue, Suite 3350 Atlanta, Georgia

Auckland Housing Accord FinalReport for Second Accord Year

ONE SEAPORT SQUARE. Boston Civic Design Commission

D U L L E S AT DULLES CORNER. Smart Business DULLES CORNER BOULEVARD. dullesmetrocntr.com

Housing Market Cycles


Energy Efficient and Passive House Building Design Guidelines

PROPOSED STUDENT ACCOMMODATION DEVELOPMENT AT JOCKEY STREET SWANSEA WALES SA1 1NS

Bidders Conference 4 th /5 th & Arizona

Monthly Indicators % + 9.7% %

The University of Massachusetts Campus Master Plan. Faculty Senate April 21st

Sotheron Place, Fulham

Goal 1 - Retain and enhance Cherry Creek North s unique physical character.

JEA s Future Opportunities and Considerations

5.1 Site Planning & Building Form

Transcription:

UO Lewis Integrative Science Building Coordinating User Group Meeting November 17, 2009

Agenda Introductions Status update CPC approval and SD report Overview of Design Development process Schedule update South elevation developments Entry and up and over developments Lighting Lab Study / Design Update - Atrium - Stair - Openings

Design Status Site Development

Campus Plan Amendment

Campus Plan Amendment

Proposed Site Design

Proposed Site Design Including trees to be removed

Design Status Plan Development

Design Status Building Development

Elevations

Elevations

Proposed Building Design View from Science Green

Proposed Building Design View from Science Green

Proposed Building Design cut-away view at Up-and-Over connection

Proposed Building Design cut-away view at Up-and-Over connection

Proposed Building Design cut-away view at Up-and-Over connection

Proposed Building Design View from North Franklin Blvd

Proposed Building Design View from North Franklin Blvd

Proposed Building Design View from North Franklin Blvd

Proposed Building Design View from Franklin

Proposed Building Design View from 13 th

Proposed Building Design View from Science Green

Schedule Campus Planning Approval October 21 Schematic Design Complete Design Schedule DD Oct 09 Feb 10 CD March 10 Sept 10 Permitting & Bidding Phased Bid Packages Construction Start Target Late summer 2010

Design Status Design Update

Design Update:South Elevation

South Elevation

Exterior Elevations: Context

South Elevation Studies

South Elevation Studies

South Elevation Studies

South Elevation Studies

South Elevation Studies

Design Update:Up & Over

Design Update: Atrium Lighting Lab Study

Lighting Lab Study: Questions Posed What is the optimal skylight placementand sizeto daylight the atrium? - Impact on vertical distribution of daylight -Impact on 4 th flroffices, conf room, public spaces Which stair configurationoptimizes daylight vertically in the atrium? - Four configurations tested. How does light animate the atriumat different times of the year?

Assumptions Skylight VT Horizontal Glazing: 70% Horizontal Maintenance correction: 70% Framing Correction: 85% East Window VT Vertical Glazing: 50% Vertical Maintenance correction: 90% Material Reflectance Painted walls atrium north (white): 80% Wood wall atrium south: 30%

Artificial Sky: Simulates a high overcast sky

Artificial Sky: Sensor locations and extent of model

Heliodon: Simulates direct sunlight by time of day and season

Stair Options Tested: Variations in position and configuration Stacked Stair (SD Stair) Scissor Stair Straight then Switchback Stair Switchback Stair

Artificial Sky: Daylight sensor locations 2 FLR 3 FLR 4 FLR

How do we optimize daylight distribution vertically in the atrium? (DF 2-6 qualifies a space as Day lit ) Daylight factors per floor 4th floor 3rd floor 2rd floor Large skylight aperture: North

How do we optimize daylight distribution vertically in the atrium? (DF 2-6 qualifies a space as Day lit ) Daylight factors per floor 4th floor 3rd floor 2rd floor Large skylight aperture: South

How do we optimize daylight distribution to the 4th level offices and conference rooms? Daylight factors: 4th floor conf. room Daylight factors: 4th floor TYP office Skylight South Skylight North

How do we optimize daylight distribution to the 4th level offices and conference rooms? Daylight factors: 4th floor conf. room Daylight factors: 4th floor TYP office Skylight South Skylight North

What is the optimal skylight size to daylight the 4th level? Skylight Aperture: North Skylight Aperture: South Long Long Short Short

What is the optimal skylight size to daylight the 4th level? 9 Large skylight aperture: South 4th floor Sensor 9 North South Small skylight aperture: North Long Short Long Short

Which stair configuration optimizes daylight vertically in the atrium? Scissor Stair Stacked Stair Straight then Switchback Stair Switchback Stair

Which stair configuration optimizes daylight vertically in the atrium? 5 2 nd Floor 5 Scissor Stair Stacked Stair Straight/ Switchback Stair Switchback Stair

Stair Options Tested: Variations in position and configuration Stacked Stair (SD Stair) Scissor Stair Straight then Switchback Stair Switchback Stair

Straight then Switchback Stair

Heliodon: Simulates direct sunlight by time of day and season

Heliodon: Straight / Switchback Stair, June 21 9 am 11 am 1 pm 3 pm

Heliodon: Straight / Switchback Stair, Sep 21 9 am 11 am 1 pm 3 pm

Heliodon: Reflector test Sept 21st 9 am 11 am 1 pm 3 pm

Heliodon: Reflector test Sept 21st 9 am 11 am 1 pm 3 pm

Heliodon: Reflector test Sept 21st 9 am 11 am 1 pm 3 pm

Design Update:Atrium Openings

Atrium opening studies

END

Exterior Elevations: Building Organization Two Flexible Primary Spaces Atrium Starting at the Second Floor

North Elevation

West Elevation

Artificial Sky: skylight position and stair configuration

Artificial Sky: skylight size and stair configuration East window