INDIANA UNIVERSITY Major Construction Projects (over $1 million) In Planning, Design, and Construction 3/15/13

Similar documents
Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

UNIVERSITY OF VIRGINIA MAJOR PROJECTS STATUS REPORT September 2017 Authorized June 9, 2017 Last Update Sept 2017

Indiana University Bloomington Summary of Space by Department & Building

New Hope-Solebury School District Campus Revitalization Plan

City of Surrey Land Development Applications

The University of Massachusetts Campus Master Plan. Faculty Senate April 21st

SFR Condo Residential Lot Sales Inventory Sales Inventory Sales Inventory. Month YTD Month Month YTD Month Month YTD Month

Design Phase Award Structural Steel (Early Package) Award Final GMP for Remaining Project Construction Phase

TABLE OF CONTENTS ASKING PRICE $27,500,000 EXECUTIVE SUMMARY THE NEIGHBORHOOD FINANCIAL OVERVIEW PROPERTY PHOTOS DUE DILIGENCE


The University of Texas at Dallas Campus Master Plan Update Town Hall Meetings. September 6-7, 2018

URBAN DEVELOPMENT ARCHITECTURE

MLS of Greater Cincinnati - Charts for the Month: November 2017

In Development. Consultant Selection. Consultant - Scope of Work. Design-Permitting. Planning. Construction. Closeout

Project State General Debt Gift/Grants Auxiliary F&A Other Total Working Budget Approval

July 2012 was $162,256. ($153,956). was $314,607. was $172,488. ($164,426). Kansas City Region Average Sales Price - Existing Homes

Floor Best Available Refuge Area

Forum on University Street

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT

2015 Limited Campus Master Plan Update NSHE Board of Regents Informational Update October 23, 2015

PROGRAM AREAS - MIDDLE SCHOOL

Tisbury Elementary School

Muhlenberg College- Campus Accessibility

MetroGrid Report: Roosevelt Island

STATE COLLEGE AREA SCHOOL DISTRICT

RESIDENTIAL REVIEW. Better Technology Better Marketing BETTER RESEARCH Better Education Better Support

Schedule of Insurance in Force as of July 1, 2009

England Occupancy Survey May 2017 SUMMARY OF RESULTS

JES2 and JES3 Releases. RSU Level. r6.0 build 151 r2.3, r2.2, r2.1 r2.3, r2.2, r2.1 RSU1803

Buchanan Centre. 475 Rolling Ridge Drive, State College, PA 16801

In Development. Property Acquisition. Design-Permitting. Construction Phase. Closeout Phase. Planning

Visit 4 Clarifying Priorities

Monthly Indicators % + 9.7% %

plaza A VALUE-ADD GROCERY-ANCHORED SHOPPING CENTER IN SIMI VALLEY, CA

Building & Land Summary Single Family Houses Excluded 17-AUG-17

CONCEPTUAL DOWNTOWN REDEVELOPMENT PLAN PROPOSED CONCEPTUAL PLAN

45 Court Street New Haven, CT 06511

Village of Glenview Plan Commission

While a project is typically acquired on a specific date

Multi-Family Methodology Analysis


METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended December 31, 2006

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

PROPINSIGHT A Detailed Property Analysis Report

UCSF Mission Bay Community Task Force Meeting #1

Campus Master Plan. Board of Trustees Meeting. December 10, 2004

City Avenue District Rezoning. Regional Center Area & Bala Cynwyd Retail District December 14, 2011 Public Hearing

Ithaca Market Statistics

Manhattan Residential Rental Market Report

Village of Glenview Plan Commission

Long Range Master Facilities Plan Phase I: Southern Feeder Pattern

Changing Economic Times. Market Pulse. Dr. Gary Jackson Director, Regional Economic Research Institute Florida Gulf Coast University April 8, 2008

MEMORIAL UNION: PLANNING FOR THE FUTURE. WTW Architects November 30, 2016 presentation to the Steering Committee

California Housing Market Update. Monthly Sales and Price Statistics September 2018

224 South Allen Street Reuse or Redevelopment Update on the site, proposals and process for discussion

Village of Glenview Plan Commission

PROPINSIGHT A Detailed Property Analysis Report

Greater Las Vegas Snapshot by Sale Type

Waverley Elementary School Feasibility Study

North Campus Master Plan

Monthly Indicators % % %

4791 BROADWAY. A 69 Unit Corner Mixed-Use Building Northern Manhattan

California Housing Market Update. Monthly Sales and Price Statistics December 2018

Charming and Updated 2 Bedroom with High End Finishes!

THE OUTLOOK FOR HOUSING IN ILLINOIS

Village of Glenview Plan Commission

South Carolina State University Building Inventory Fall Year of Construction A. Belcher Hall School Bus ,164,298 7,766,274

PROPINSIGHT A Detailed Property Analysis Report

May 2008 MLS Month in Review

Innovations in Education at Faculty ITC and within Land Administration Programme

Monthly Indicators % % - 9.2%

, NE MIAMI CT

32,610 RSF CLASS A INNOVATIVE WORKSPACE

Permits Issued

PROPINSIGHT A Detailed Property Analysis Report

CUMBERLAND SCHOOLS WORK PROPOSED 2018

Downtown Salt Lake City Proposed Arts and Cultural District

PROPINSIGHT A Detailed Property Analysis Report

M onthly arket. July Table of Contents. Monthly Highlights

California Housing Market Update. Monthly Sales and Price Statistics October 2018

FOR LEASE. 128 PETER STREET TORONTO Retail Space

657 S Belvoir South Euclid, OH Mark Khuri

CONCESSIONS PROGRAM DOING BUSINESS AT THE AIRPORT 3/2/17

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

Housing market feels the chill as oversupply continues Feb. 2019

Register Report for Philip KIMMEL

SAMOA MASTER PLAN PROJECT DESCRIPTION (8-4-05)

Bureau of Business Research Webinar Series October 2016

New year kicks off with slow sales Jan. 2019

Great Holland All Saints baptisms

EAST CHOCOLATE PLAZA - ADMINISTRATIVE MEDICAL OFFICE BUILDING

COMMUNITY DEVELOPMENT DEPARTMENT. DEVELOPMENT SUMMARY January Building Division. Summary of building permits by year

CONTINUUM Multigenerational and Mixed-Income Community Living

Competitive Strategies and Value Innovation. Contents are subject to change. For the latest updates visit

REPORT TO THE BOARD OF GOVERNORS

PROPINSIGHT A Detailed Property Analysis Report

California Housing Market Update. Monthly Sales and Price Statistics November 2018

Monthly Indicators + 4.8% - 3.5% %

Subway Sale-Leaseback

Transcription:

Major Projects (over $1 million) In Planning, Design, and 1 All Indiana University Campuses Near Term Planning (2013-2015) General Repair and Rehabilitation H. Hewetson Near Term Planning / State Approval $45,800,000 Multi-Campus Special R&R H. Hewetson Near Term Planning / State Approval $29,000,000 $74,800,000 Indiana University Bloomington Programming / Academic Core Renovations - Phase I A. Bolling Awating Funding - CAR 20085136 TBD $21,000,000 TBD TBD TBD New Apartment Complex - 110 beds R. Richardson Programming TBD TBD TBD TBD TBD New Apartment Complex - 250 beds R. Richardson Programming TBD TBD TBD TBD TBD Art Museum - Renovation and Expansion R. Richardson Programming BL153 / 20085136 TBD TBD TBD TBD TBD Campus Electrical Distribution Improvements J. Kaden Planning TBD TBD Campus Utility Infrastructre Repairs J. Kaden Awaiting Funding - CAR TBD TBD Classroom Office Building II F. Young / R. Richardson On Hold BL068/ 20074398 40,000 GSF $8,000,000 TBD TBD TBD Communication Services Building R. Richardson On Hold BL571 / 20106515 14,373 GSF $1,000,000 TBD TBD TBD Qualified Energy Savings Projects C. Matson Completing RFP Package 20096119 N/A $15,000,000 TBD TBD TBD Eigenmann Electonic Access Control R. Richardson Design Development TBD Ernie Pyle Renovation R. Richardson Awaiting Funding - CAR TBD Franklin Hall Renovation R. Richardson Programming TBD Forest Quad Interior Renovations and Code Improvements F. Young Design Development May-13 Aug-15 ArcDesign Indiana Geological Survey - New Building A. Bolling On Hold - Fundraising 20063453 49,389 ASF N/A TBD TBD TBD Informatics - New Building A. Bolling Awaiting Funding - CAR 121,000 GSF $30,000,000 Global and International Studies Building R. Richardson Design Development BL197 / 20084867 188000 GSF $53,000,000 May-13 Jun-15 Polshek Partnership Architects Jordan Avenue Safetu Improvements - Phase 1 M. Williams Design Development N?A TBD TBD Kelley School of Business Renovation R. Richardson Programming BL451 / 78,000 ASF $29,000,000 Sep-14 Aug-16 BSA LifeStructures Kirkwood Hall Renovation R. Richardson Programming TBD TBD Law School Addition F. Young On Hold BL001 / 20051654 106,000 GSF TBD TBD TBD Moody - Nolan Mcnutt Hall Window Replacement D. Walter On Hold N/A TBD TBD TBD Multi-Disciplinary Life Sciences Building III R. Thompson Awaiting Funding - CAR BL / 20084865 60,000 ASF $40,000,000 TBD TBD TBD Musical Arts Center Renovation F. Young Capital Campaign BL177 / 20041075 TBD TBD TBD TBD TBD Optometry Renovation R. Richardson Programming TBD TBD Optometry - Mechanical Systems Replacement - Phase 1 PK Patel Design Development N/A $1,750,000 TBD TBD School of Public Health Roof Replacement D. Walter Design Development N/A $1,750,000 TBD TBD Read Hall Renovations R. Richardson Programming 38321 GSF $7,000,000 Sep-13 Aug-14 VPS SPEA Plaza - Phase 2 D. Walter Design Development N/A $3,000,000 May-13 Dec-13 Teter Quad Bathroom Renovations - Phase IV J. Moulden Design Development TBD TBD Teter Quad Window Replacement D. Walter On Hold N/A May-13 Aug-13 Mussett Nicholas & Associates Wells Library Renovations - Phase 1 F. Young Feasibility Study BL209 / 20095721 55,584 ASF $30,000,000 TBD TBD Woolan-Molzan Wells Library Elevator Rehabilitation D. Walter Design Development N/A $1,200,000 Wells Main Library - Reading Room F. Young Fundraising BL209 / 20052070 10,180 GSF $2,500,000 TBD TBD Veazey Parrott Durkin & Shoulders Wells Library - Sprinkler Infrastructure PK Patel Design Development N/A $1,200,000 TBD TBD Wright Place Dining J. Moulden Programming TBD TBD $245,400,000 Phase

Major Projects (over $1 million) In Planning, Design, and 2 Athletics - Baseball & Softball Stadiums R. Richardson BL593-594 / 20052143 N/A $19,800,000 May-11 Mar-13 BDMD Central Heating Plant Refurbishment M. Menefee 84,020 GSF $34,054,000 Jun-06 Sep-13 Forest Quad - New Dining Facility R. Richardson 67,188 GSF $22,000,000 Aug-12 Aug-13 VPS/Gund Jacobs School of Music Studio Building R. Richardson BL150 / 20084991 155,000 GSF $44,000,000 Apr-11 Jul-13 Browning Day Mullins Dierdorf / Flad Architects Jordan Hall - Life Sciences Lab Renovations - Phase 2 R. Thompson BL107 / 20096114 24,000 GSF $9,000,000 Sep-11 Mar-13 arcdesign / Mussett Nicholas Kelley School of Business Addition R. Richardson BL451 / 20063286 126613GSF $37,000,000 May-12 Aug-14 BSA LifeStructures Southeast Side Residence Hall (188 units/450 beds) R. Richardson 20106837 155,000 GSF $38,000,000 Mar-12 Aug-13 MSKTD / Mackey Mitchell Woodlawn Field - Phase 1 M. Williams N/A $980,000 Jun-12 May-13 Rundell Ernstberger Associates, LLC $204,834,000 Ashton Apartment Complex - 837 Bed Student Housing R. Richardson Completed BL 276A-K / 20027371 410,000 GSF $80,000,000 Feb-09 Jan-July 2010 Ratio Architects Ashton Chiller / Satellite Chilled Water Facility PK Patel Completed BL 276L / 20085098 5,152 GSF $2,203,500 Jun-09 Feb-10 Vector Consulting Athletics Academic Center Renovation J. Moulden Completed BL601 / 20095667 26,415 GSF $3,000,000 Aug-10 TBD Ratio Architects Athletics - Billy Hayes Track - Reconstruction J. Moulden Completed BSH100 / 20085037 N/A $1,500,000 Sep-09 Apr-10 Browning Day Mullins Dierdorf (BDMD) Athletics - Cook Hall - Basketball Player Development Facility M. Crowe/ R. Richardson Completed BL607 / 20063181 64,571 GSF $15,000,000 Dec-07 Mar-10 Populus Athletics - Field Hockey Facility M. Crowe Completed BL609H / 20005622 N/A $1,255,000 Jun-06 Nov-07 HOK Sports Athletics - Memorial Stadium North End Zone Facility (Building Pkg.) M. Crowe/ R. Richardson Completed BL601 / 20074130 130,000 GSF $25,000,000 Dec-07 Aug-09 Ratio Architects / Moody-Nolan Athletics - Memorial Stadium North End Zone Facility (Foundation/Utilities) M. Crowe/ R. Richardson Completed BL601 / 20052142 N/A $1,775,000 Jun-07 Dec-07 Ratio Architects / Moody-Nolan Bloomington Campus Integrated Energy Master Plan J. Kaden Completed 20096161 N/A $508,000 Aug-11 Dec-12 8760 Engineering / Loftus Engineering Botany Greenhouse on 10th Street - Jordan D. Walter Completed BL549G / 20051761 20,000 GSF $2,136,000 Jun-07 Mar-08 OMS (Odle McGuire Shook) Briscoe Quad Renovation (includes new Chiller Plant) PK Patel Completed BL433 / 20085371 279,424 GSF $46,000,000 May-10 Aug-12 Vector Consulting Campus Classroom / Office Building (Design-Build) F. Young Completed BL066 / 20051682 32,000 GSF $4,300,000 Feb-07 Aug-07 Shiel-Sexton Campus Masterplan R. Meadows Completed 20074299 N/A N/A Jan-08 Feb-09 JJR/SmithGroup Central Heating Plant Economizers & Soot Blowers M. Menefee Completed BL445 / 20085236 N/A $1,828,827 Oct-10 Sep-11 Stanley Group Central Heating Plant Renovations - Phase I J. Kaden Completed BL445 / 20063094 N/A $4,228,000 Jun-07 Apr-08 Stanley Group Central Heating Plant Renovations - Phase II J. Kaden Completed BL445 / 20063094 N/A $7,444,845 Jun-08 Oct-09 Stanley Group Cyberinfrastructure Building (CIB) R. Richardson Completed BL578 / 20005509 118,000 GSF $35,700,000 Mar-10 Jul-11 SmithGroup Cyber Infrastructure Data Center - Demolition/Site Package F. Young Completed BL579 / 20063574 90,000 GSF $540,500 Nov-07 Jan-08 SmithGroup / EYP Cyclotron Accelerator Reroof D. Walter Completed BL608 / 20063358 N/A $1,071,000 May-08 Oct-08 RQAW Cyber Infrastructure Data Center - Building Package F. Young Completed BL579 / 20074101 90,000 GSF $32,700,000 Oct-07 Sep-09 SmithGroup Big Red / Data Center Upgrade-Infrastructure PK Patel Completed BL579 / 20085353 N/A $2,000,000 Jun-09 Sep-09 Heapy Engineering Edward Hutton Honors College D. Walter Completed BL050 / 20051669 13,254 GSF $3,600,000 Dec-07 Dec-08 Williams-Dotson / BSA LifeStructures Eigenmann Parking Lot Improvements M. Williams Completed 20084920 570 stalls $1,870,000 Apr-10 Aug-10 Bledsoe, Riggert, Guerrettaz Franklin Hall Grand Reading Room Renovation R. Richardson Completed 20117179 12,198 GSF $2,500,000 Jun-12 Feb-13 Schmidt Forest Quad - Heating and Air Conditioning System Upgrades - Phase I P. Patel Completed BL257 / 20063278 N/A $6,690,000 Mar-07 Jan-08 Vector Consulting Forest Quad - Heating and Air Conditioning System Upgrades - Phase II P. Patel Completed BL257 / 20074110 N/A $3,086,000 May-08 Aug-08 Vector Consulting Henderson/Atwater St. Parking Garage D. Walter Completed BL063 / 20026876 558 cars / 30,000 GSF $10,945,000 Dec-06 Dec-07 CSO Architects / Arsee Engineers HPER Building Courtyard R. Richardson Completed BL091 / 20074380 13,700 GSF $6,340,000 May-10 Jun-11 VPS Architecture Incubator Building (Innovation Center) Design-Build R. Richardson Completed BL563 / 20073955 40,000 GSF $10,000,000 Oct-08 Jul-09 BSA LifeStructures / Messer Informatics - 919 E. 10th Street Remodel F. Young Completed BL/990P / 20051924 28,173 GSF $2,251,100 Jan-07 Apr-08 CSO Schenkel Shultz Informatics - Office and Classroom Addition F. Young Completed BL414 / 20095855 12,000 GSF $1,500,000 Feb-10 Oct-10 Axis Architecture IU Cinema - Theatre-Drama Renovation B. Richardson Completed BL171 / 20074146 36,300 GSF $15,000,000 Oct-09 Aug-10 MGA Partners / Rowland Design IU Police Dept. HQ Relocation (former Kappa Alpha Psi House) J. Moulden Completed BL990Y / 20051861 14,880 GSF $1,725,000 Mar-07 Feb-08 Tabor/Bruce Architects / Strauser Jordan Hall - Renovate for Labs on Ground and Second Floors R. Thompson Completed BL107 / 20074208 11,141 GSF $3,862,000 Feb-09 Nov-09 ArcDesign / Mussett Nicholas

Major Projects (over $1 million) In Planning, Design, and 3 Jordan Hall - Life Sciences Lab Renovations - Phase 1 R. Thompson Completed BL107 / 20096114 24,000 GSF $1,520,000 Oct-10 Apr-11 arcdesign / Mussett Nicholas / SHP Leading Design Kirkwood Hall - Reroof and Tuckpointing D. Walter Completed BL058 / 20063098 36,672 GSF $1,180,000 Oct-06 May-08 University Architect's Office Law School 2nd and 3rd Floor Renovation F. Young Completed BL001 / 20051654 11,229 GSF $1,550,000 Oct-06 Jul-07 BSA LifeStructures Memorial Stadium Passenger Waiting Facility M. Williams Completed BL601T / 20095866 420 GSF $700,000 Jun-11 Sep-11 Bledsoe, Riggert, Guerrettaz McNutt - Food Court Renovation J. Moulden Completed BL439 / 20074324 1,500 GSF $854,500 Dec-08 Aug-09 Sean Bright Architects McNutt-Delgado & Teter-Boisen Wings Restroom Renovations J. Moulden Completed BL441 & BL243 / 20074112 4,859 GSF $3,347,763 Mar-08 Aug-08 Mussett Nicholas & Associates McNutt - Dejoya, Delgado, Bocobo - Asbestos Abatement D. Walter Completed BL437/BL243 / 20085177 129,665 GSF $1,100,000 Feb-07 Aug-08 Mussett Nicholas & Associates McNutt Quad and Teter Quad - Restroom Renovations J. Moulden Completed BL437 & BL243 / 20063279 4,582 GSF $2,277,000 Feb-07 Aug-07 Mussett Nicholas & Associates McNutt Quad - Dejoya Wing & Teter Quad - Wissler Wing - Restroom RenovaJ. Moulden Completed BL441 & BL243/ 20106518 15,000 GSF $3,552,200 May-11 Aug-11 Mussett Nicholas & Associates McNutt - Bryan & Thompson Wings Restroom Renovations J. Moulden Completed BL437/BL243 / 20085178 15,000 GSF $3,862,000 Jul-09 Aug-10 Mussett Nicholas & Associates McNutt Quad - Crone Wing & Teter Quad Rabb Wing - Restroom Renovation J. Moulden Completed BL441 & BL243/ 20117458 15,000 GSF $5,362,744 May-12 Jul-12 Mussett Nicholas & Associates McNutt-Student Access Card Project J. Koryta Completed BL439 / 20074420 N/A $1,500,000 May-08 Aug-08 Mussett Nicholas & Associates Men & Women's Varsity Golf Practice Facility J. Moulden Completed BL607P / 20063042 4,900 GSF $863,500 Apr-09 Sep-09 Sean Bright Architects Multi-Disciplinary Science Bldg. - Phase 2 (MSB) R. Thompson Completed BL423 / 20038075 125,000 GSF $51,681,000 Jun-07 Oct-09 Flad & Associates / AEI / Odle McGuire & Shook Musical Arts Center - M100 Chiller Replacement J. Kaden Completed 20117512 N/.A $4,350,000 Jan-12 Sep-12 Vector Consulting Psychology - Classroom 100 Renovation K. Reed Completed BL419 / 20096034 2,700 GSF $912,000 May-11 Aug-11 Sean Bright Architects Optometry Clinic (Design-Build) J. Moulden Completed BL062 / 20051848 20,000 GSF $3,000,000 Feb-08 Nov-08 Weddle Brothers / VPS / Bright Architects Research and Teaching Preserve Building (Bio/Field Station) R. Richardson Completed BL617P / 20041464 6,000 GSF $750,000 Aug-08 Mar-09 Turner / WDI Ruth Lilly Auxiliary Library Facility II F. Young / R. Richardson Completed BL614 / 20074008 22,000 GSF $5,112,200 May-09 May-10 FRP Service Building Replacement (Design-Build) F. Young Completed BL630 / 20051636 64,000 GSF $7,000,000 Oct-06 Mar-07 AXIS / Wilhelm Spea - Room 150 - Info Commons & Café Renovation F. Young Completed BL452 / 20074029 31,747 GSF $2,200,000 Feb-10 Nov-10 Marc Lohr Design / Mussett Nicholas Simon Music Center - Auer Hall Renovation F. Young Completed BL181 / 20074066 7,000 GSF $984,800 Oct-08 Jun-09 McQuiston Architects Simon Hall - Multi-Disciplinary Science Bldg. - Phase 1 (MSB) R. Thompson Completed BL070 / 20005441 145,455 GSF $58,038,331 May-04 Aug-07 Flad & Associates / AEI / Odle McGuire & Shook Southeast Side Apartments (106 units) R. Richardson Completed 20106828 84,000 GSF $16,000,000 Dec-11 Aug-12 CSO Telecommunication Ductbank Replacement J. Koryta Completed 20063629 N/A $1,126,438 Jun-08 Dec-08 Mussett Nicholas & Associates Tulip Tree Renovation F. Young Completed BL555 / 20063277 263,003 GSF $32,500,000 May-10 Jun-12 Sean Bright Architects Wells Library - Black Film Archives F. Young Completed BL209 / 20063544 5,971 GSF $904,000 Sep-09 Dec-09 VPS Architecture Wells Main Library - Reroof D. Walter Completed BL209 / 20063352 100,000 GSF $1,511,110 Aug-08 Dec-09 ACE Wells Library Stone Repair F. Young Completed BL209 / 20063655 N/A $1,706,600 Mar-07 Mar-08 Arsee Engineers Wildermuth Center Roof Replacement D. Walter Completed BL091 / 20084973 N/A $1,250,000 Apr-11 Jul-12 STR Building Resources Wright Education - Suite 2100 Renovation J. Moulden Completed BL245 / 20085188 5,500 GSF $701,000 Feb-10 Nov-10 Sean Bright Architects Wright School of Education - Roof Replacement D. Walter Completed BL245 / 20084972 39,000 GSF $649,000 Oct-08 Oct-09 American StructurePoint Wylie Education Center (Design-Build) F. Young Completed BL655G / 20041275 3,874 GSF $750,000 Jun-09 May-10 Neidigh / Kirkwood Design Studio 1319 E. 10th St. - Remodel - Business School Undergrad Advising (JOC) R. Richardson / F. Young Completed BL465D / 20085139 8,600 GSF $750,000 Jan-10 TBD UAO/Sean Bright Architects 10th and Bypass High Voltage J. Koryta Completed Blsite / 20074023 N/A $1,430,000 Dec-08 Jun-09 Mussett Nicholas & Associates $558,535,958 Indiana University Bradford Woods Bradford Woods Wastewater Treatment Replacement System J. Kaden Completed 20041551 N/A $1,200,000 May-06 May-07 American Consulting Inc. Bradford Woods Indoor Riding Facility & Covered Sport Court (Design-Build) D. Wallter Completed BL262 / 20085462 7,200 GSF $460,000 Apr-10 Dec-10 Neidigh / Kirkwood Design Studio $1,660,000 Indiana University-Purdue University Columbus Indiana University East - Richmond, IN

Major Projects (over $1 million) In Planning, Design, and 4 Qualified Energy Savings Project C. Matson Preparing RFP Package 20074403 N/A $2,200,000 TBD TBD TBD Student Event Center Addition - Springwood Hall L. Lucas Awaiting Funding EA804 / 20106447 45,000 ASF $5,500,000 TBD TBD MSKTD $7,700,000 Phase Indiana University-Purdue University Fort Wayne IU School of Medicine - Fort Wayne J. Stuff Completed FW902 / 20037932 41,175 GSF $12,000,000 Jun-07 May-09 MSKTD Associates / Flad & Associates $12,000,000 Indiana University-Purdue University Indianapolis Ball Gardens Renovation - Phase 4 M. Williams Awaiting Funding - CAR 20095682 N/A $1,100,000 Mar-11 TBD Rundell Ernstberger Associates, LLC Campus Facilities Services (CFS) Bldg. Replacement P. Murray Programming 20041478 27,500 ASF TBD TBD TBD TBD Dentistry and Oral Health Research - Phase 1 Awaiting Funding 85,000 GSF $30,000,000 Emerson Hall Renovation Awaiting Funding - CAR $9,600,000 Eugene and Marilyn Glick Eye Institute - Third and Fourth Floor Lab Buildout R. Thompson On Hold IN032E / 20096094 31,600 GSF $4,500,000 TBD TBD Ratio Architects / AEI Power Lines on West Street P. Barry On Hold 20084872 N/A $6,720,000 TBD TBD TBD Rotary Building Laboratory Expansion L. Lucas Awaiting Funding - CAR 60,000 GSF $25,000,000 Science Engineering Laboratory Building (SELB) - Phase 2 R. Thompson Awaiting Funding - CAR 20096269 30,835 GSF $15,000,000 TBD TBD TBD Taylor Hall Renovation - Phase 2 Awaiting Funding - CAR $10,000,000 University Hall - Administration Building Replacement / International Center P. Murray Awaiting Funding 20074453 106,000 ASF $27,000,000 TBD TBD TBD VanNuys Med Science Lab Renovations - Phase 4 R. Thompson Awaiting Funding - CAR IN024 / $22,000,000 TBD TBD TBD $150,920,000 Phase Ball Gardens Renovation - Phase 3 M. Williams 20095682 N/A $1,100,000 Feb-13 Aug-13 Rundell Ernstberger Associates, LLC Herron School of Design Ceramics and Sculpture Buidling Addition J. Stuff IN338 / 20074302 20,247 GSF $3,200,000 Oct-11 Feb-13 Ratio Architects Qualified Energy Savings Project C. Matson 20096119 N/A $15,000,000 Nov-11 Aug-13 PSI / ESG Neurosciences Research Building R. Thompson IN204 / 20084870 143,000 GSF $45,000,000 Apr-12 Feb-14 BSA LifeStructures Riley Hospital - Wells Pediatric Center R. Thompson IN013 / 20096172 18,560 GSF $8,500,000 Dec-11 Apr-13 BSA LifeStructures Science Engineering Laboratory Building (SELB) - Phase 1 R. Thompson 20085478 81,500 GSF $25,000,000 Mar-12 Oct-13 Blackburn BSA LLC VanNuys Med Science Lab Renovations - Phase 2 and 3 R. Thompson IN024 / 20096115 48,600 GSF $9,000,000 Aug-11 May-13 BSA LifeStructures South Campus Quad M. Williams 20117165 N/A $1,500,000 May-12 May-13 Cripe / Ratio Architects $108,300,000 Campus Center J. Stuff Completed IN083 / 20005098 250,000 GSF $50,000,000 Aug-05 Mar-08 SmithGroup / Ratio Architects Campus Center / Cavanaugh Hall - Sky Bridge J. Stuff Completed IN083 & IN084 / 20005098 N/A $1,600,000 Aug-06 Oct-07 SmithGroup / Ratio Architects Campus Masterplan P. Sullivan Completed 20074299 N/A N/A Jan-08 Aug-11 JJR/SmithGroup Cavanaugh Hall Classroom Project L. Lucas 20106966 5,300 GSF $1,400,000 Aug-11 Aug-12 ROSK Group Cavanaugh Hall - Replacement of Air Handlers 1 & 2 K. Hopper Completed IN084 / 20074346 N/A $1,100,000 Mar-08 Oct-08 Mussett Nicholas & Associates Clinical Quad Improvements R. Thompson Completed 20096173 N/A $1,500,000 7/1/11` Dec-11 Ratio Architects

Major Projects (over $1 million) In Planning, Design, and 5 Dental School Simulation Lab - Phases I & IA C. Stephens Completed IN064 / 20074449 23,412 GSF $5,500,000 Jan-10 Feb-11 arcdesign Dental School Simulation Lab - Phase II C. Stephens Completed IN064 / 20074449 23,412 GSF $5,500,000 Feb-10 Aug-11 arcdesign Emerson Hall - 5th Floor Renovation R. Thompson Completed IN036 / 20052098 7,996 GSF $949,000 Apr-07 Nov-07 arcdesign Environmental Management Facility - Relocation L. Lucas Completed 20096045 N/A $2,500,000 Mar-11 Sep-11 Blackburn Architects Gatch Clinical Building - Rooms 374-390 J. Stuff Completed IN033A / 20074225 5,497 GSF $1,188,400 Dec-08 Jun-09 arcdesign Gateway Parking Garage J. Stuff Completed IN043P / 20085449 1,300 parking spaces $18,500,000 Nov-09 Jan-11 Arsee Engineers Eugene and Marilyn Glick Eye Institute R. Thompson Completed IN032E / 20074011 67,698 GSF $20,000,000 Sep-09 Jun-11 Ratio Architects HITS (Health Information and Translational Sciences Bldg - MISB) R. Thompson Completed IN202 / 20027139 166,000 GSF $42,250,000 Oct-04 Mar-07 Beyer Blinder Belle / CSO Architects Lilly House Renovation - JOC M. Medley Completed IN581 / 20074302 20,599 GSF $2,567,000 Oct-09 Oct-10 Mussett Nicholas & Associates Lockfield Village - Space Planning for Occupants of Union Building L. Lucas Completed OC386X / 20106385 15,800 GSF $4,000,000 Jul-11 Sep-11 Mitsch Design / Barb Eden Design Medical Research & Library - Renovation of Rooms 200/300 R. Thompson Completed IN038 / 20074316 22,000 ASF $3,500,000 May-09 Dec-09 OMS (Odle McGuire Shook) School of Nursing - 4th Floor Renovation J. Stuff Completed IN023 / 20084823 28,000 GSF $5,600,000 Feb-11 TBD Synthesis Research III R. Thompson Completed IN015 / 20041246 238,371 GSF $83,300,000 Dec-05 May-09 BSA LifeStructures / A2SO4 School of Nursing - 3rd Floor Renovation C. Stephens Completed IN023 / 20063417 10,000 GSF $1,681,343 Oct-07 Jun-08 Synthesis Sports Complex Parking Garage Expansion (1,300 spaces) L. Lucas Completed IN124 / 20106381 407,268 GSF $18,000,000 Mar-11 Jan-12 Cripe / Ratio Architects Taylor Hall - Multicultural Center Renovation J. Stuff Completed 20085320 / IN085 15,300 GSF $1,000,000 Jan-10 Aug-10 Blackburn Associates Architects Tunnel Repair J. Stuff Completed 20063336 N/A $1,110,000 Jul-07 Jul-08 FRP University Place Hotel and Conference Center - Food Court Redevelopment J. Stuff Completed IN047 / 20074451 14,000 ASF $2,912,000 Sep-08 Dec-08 Rowland Design Utility Tunnel Repairs - North J. Stuff Completed INsite / 20074423 N/A $943,935 Mar-09 Sep-09 FRP VanNuys Medical Science Bldg. - Renovation for Biochemistry R. Thompson Completed IN024 / 20051865 7,440 GSF $1,443,000 May-07 Feb-08 BSA LifeStructures VanNuys Med Science Lab Renovations - Phase 1 R. Thompson Completed IN024 / 20096115 48,600 GSF $489,860 Aug-10 Feb-11 BSA LifeStructures VanNuys Medical Science Bldg. - AHU 1 & 4 K. Hopper Completed IN024 / 20074428 N/A $1,053,762 Jan-10 Mar-11 BSA LifeStructures Wilson Street Parking Garage - Structural Repairs J. Stuff Completed IN007 / 20085370 194,909 GSF $1,811,000 Jun-09 Jun-10 FRP $281,399,300 Indiana University Kokomo Phase Health & Wellness Center J. Stuff KO / 20084874 48,000 ASF $5,000,000 Aug-12 Aug-12 MSKTD $5,000,000 Business Incubator D. Walter Completed KO885 / 20051828 18685 GSF $1,016,598 Dec-06 Jun-07 arcdesign / Loftus Engineering Campus Landuse Masterplan J. Lewis Completed 20106893 N/A Nov-10 Dec-12 Rundell Ernstberger Associates, LLC Qualified Energy Savings Projects J. Kaden / C. Matson Completed 20038107 N/A $2,000,000 Jan-06 Mar-08 Siemens $3,016,598 Indiana University Northwest - Gary, IN Dunes Façade Repair D. Walter Design/Development N/A $1,250,000 TBD TBD Tamarack Hall Replacement and Ivy Tech Community College J. Stuff Pending State of Indiana release 20085488 103,563 GSF $33,000,000 TBD TBD Blackburn Associates Architects / BSA LifeStructures $33,000,000 Phase

Major Projects (over $1 million) In Planning, Design, and 6 Dunes Medical / Professional Building - Phases 1&2 P. Luzadder Completed NW817 / 20005108 136,175 GSF $25,612,410 Sep-02 May-06 Blackburn Associates Architects Moraine HVAC Modifications J. Kaden Completed NW824 / 20074250 N/A $1,027,500 Jun-09 Oct-09 Superior Engineering, LLC Qualified Energy Savings Project J. Kaden / C. Matson Completed 20026999 N/A $783,308 Mar-05 ESG/JCI/Siemens $27,423,218 Indiana University South Bend Northside Hall - Recital Hall J. Stuff Design Development 20106749 N/A $1,500,000 TBD TBD CSO Adminstration Building Renovation - 1st and 2nd Floors - Phase III J. Stuff Design Development SB860 /20128020 16377 GSF $2,800,000 TBD TBD DO/Rowland $4,300,000 Phase Qualified Energy Savings Project J. Kaden / C. Matson 20074404 N/A $7,000,000 Feb-11 Feb-12 Chevron Education / Arts Building Renovation (formally called Associates Bldg.) J. Stuff SB866 / 20037605 128,966 GSF $22,000,000 May-11 Mar-13 ADG (Architecture Design Group) $29,000,000 Adminstration Building Renovation - 1st and 2nd Floors - Phase I. J. Stuff Completed SB860 / 20027161 28,635 GSF $2,793,646 Mar-08 Nov-08 ADG (Architecture Design Group) Adminstration Building Renovation - 1st and 2nd Floors - Phase II. J. Stuff Completed SB860 / 20074179 74,200 GSF $1,500,000 Dec-09 Feb-09 ADG (Architecture Design Group) IU School of Medicine - South Bend / Ernestine Raclin and O.C. Carmichael HP. Luzadder Completed SB871 / 20016441 67,800 GSF $18,963,500 Jul-03 Sep-05 BSA Design Harper Hall - IUSB Cancer Center J. Stuff Completed SB872 / 20074069 61,000 GSF $20,000,000 Mar-09 Jan-11 BSA LifeStructures Pedestrian Bridge over St. Joseph River (U.S. Army Corps. of Engrs.) M. Williams Completed 20016543 710 LF x 10' Wide $1,750,000 Oct-05 Jul-06 DLZ Student Housing - Phase I J. Stuff Completed SB885 / 20041013 401 Beds / 143,504 GSF $18,000,000 May-07 Aug-08 Troyer Group University Center - Dining Facility J. Stuff Completed SB862 / 20106697 13,560 GSF $2,000,000 Aug-12 Aug-11 Design Collaborative / Baker Group $65,007,146 Indiana University Southeast Education Technology Building L. Lucas Pending State of Indiana release 20052080 54,000 ASF $22,000,000 TBD TBD Luckett & Farley Student Housing - Phase 2 L. Lucas Design Development $5,300,000 Jun-13 Aug-14 Luckett & Farley $27,300,000 Phase A new Library and Chilled Water Plant Upgrade P. Luzadder Completed SE874 / 20005109 77,000 GSF $21,000,000 May-03 Jan-05 MSKTD Associates / Shepley Bullfinch Richardson New Student Housing - Phase I. D. Walter Completed SE878A-G / 20063436 403 BEDS / 153,418 GSF $18,081,000 May-07 Aug-08 Luckett & Farley Qualified Energy Savings Project J. Kaden / C. Matson Completed 20038120 N/A $1,142,222 Oct-06 Mar-08 ESG/JCI / Siemens University Center North & South Renovation T. Williams Completed SE884 / 20037691 121,898 GSF $8,874,789 Apr-06 Mar-08 MSKTD Associates $49,098,011