SSU LEAD (PB) INSPECTION SUMMARY BY BUILDING as of April 1, 2015 Room(s) ART BUILDING Seq. ID Substrate Sample Location Lab Results Courtyard Courtyard 9/4/2012 AF-02 Metal GE Refrigerator 5.7 % 145 145 8/6/2012 Art-145-1 S Wall W corner.04 % 136 136 6/22/2009 A-136-W Wood W Corner LT 0.006 % Gallery Gallery 6/22/2009 AGF-NW Wood NW Corner LT.006 % Corridor Corridor 2/28/2007 AC-2 Ceiling Tile SW Art N 109 LT.006 % Parking Lot Parking Lot 7/5/2005 A-1 asphalt A-Lot 7 ppm Kiln Electric Kiln 2/3/2004 EK-20 Metal Kiln exterior wall at door.51 % Kiln Electric Kiln 2/3/2004 EK-24 Kiln interior floor 69 ppm Kiln Large Gas Kiln 2/3/2004 LK-35 Metal Kiln exterior wall at door LT 0.006 % Kiln Small Gas Kiln 2/3/2004 AK-06 Kiln interior floor 29 ppm BOILER PLANT 011205E Room #14, east exterior LT 25 ppm 011205E Room #14, east exterior 238 ppm 011205E Room #20, Ellen LT 25 ppm 011205E Room 44D, north exterior LT 25 ppm 020319H Hallway corridor, LT 25 ppm 020319H Room #110, south wall LT 25 ppm 020319H Room #110, east & north LT 25 ppm 020321P-1 Exterior corner, near LT 25 ppm 020321P-2 Room #113, shop area 142 ppm 020321P-3 Room #116, ceiling LT 25 ppm 8/2/2012 BP-FH-1 BP White Hydrants 0.36 % Mezzanine 11/16/2009 BPM-10 Sheetrock N Room, W Wall, W of LT 0.006 % Mezzanine 11/16/2009 BPM-12 Sheetrock SW Room, E Wall LT 0.007 % Mezzanine 11/16/2009 BPM-9 Sheetrock SE Room, W Wall LT 0.006 % Exterior W Exterior W 1/13/2009 BP-EXT- Metal BP W Ext Door Frame 1.1 % Exterior Roll Up Door 1/13/2009 BP-EXT- Metal W Roll Up Door Casing 1.1 % Floor Floor 10/24/2007 BP-CH-3 Metal BP Floor S of Driveway 8 ppm Main Floor Boiler Room 4/24/2007 BPF-G Concrete SW corner of central sink.39 % Main Floor Boiler Room 4/24/2007 BPF-GY Concrete SE corner of water.43 % Cooling Cooling Tower 10/3/2005 CT-01 Metal Center Aisle, NW.038 % CARSON HALL Mens RR Mens RR 1/14/2005 CMRRW Ceramic Tile NE corner LT 7 ppm Mens RR Mens RR 1/14/2005 CMRRW Sheetrock E wall under sink LT.006 % Hallway Exterior Hallway 6/16/2004 C-HC-1 Plaster north side mechanical LT 0.006 % 5 5 2/27/2003 C-5-20 Sheetrock NW Corner, N Wall @ 7' LT 0.006 % 5 5 2/27/2003 C-5-21 Sheetrock NE Corner, N Wall @ 4' LT 0.006 % 5 5 2/27/2003 C-5-22 Sheetrock SE Corner, E Wall @ 4' LT 0.006 % 5 5 2/27/2003 C-5-23 Sheetrock SE Corner, E Wall @ 4' LT 0.006 % 5 5 2/27/2003 C-5-24 Wood SE Corner, E Wall @ 4' LT 0.006 % 20 5/16/2002 RCH-Pb Metal interior, northwest door 637 ppm Regulation(s) 1
20 5/16/2002 RCH-Pb Metal interior, SW door frame 2813 ppm 20 5/16/2002 RCH-Pb Metal interior, east/south door 3563 ppm Exterior Exterior Soffit 1/31/2001 RCH- Stucco East hallway above men's LT 600 ppm CHILDREN'S SCHOOL Survey 5/11/2013 CS-N-511 South Floor LT.006 % Flashing Flashing 2/5/2013 CS-RF-1 Metal S side above office LT.006 % 8/18/2009 CS-316 E Wall Center LT 0.006 % 8/18/2009 CS-317 N Wall LT 0.006 % 8/18/2009 CS-318 NE Wall LT.007 % 8/18/2009 CS-319 E Wall LT.007 % 8/18/2009 CS-320 SE Corner Wall LT.006 % 8/18/2009 CS-323 S Center Wall LT.006 % 8/18/2009 CS-325 NW Corner Wall LT.006 % 8/18/2009 CS-327 NW Corner Wall LT.007 % 8/18/2009 CS-335A E Center LT.007 % 8/18/2009 CS-335B E Center LT 0.0048 % Entry Entry 8/3/2009 CS-304 Sheetrock A1 W Ext Corner LT.006 % Entry Entry 8/3/2009 CS-306 Sheetrock B2 NW Corner Behind LT.007 % Entry Entry 8/3/2009 CS-309 Wood B2 NW door frame LT 0.006 % Entry Entry 8/3/2009 CS-314A Sheetrock J N W wall NW LT 0.006 % Entry Entry 8/3/2009 CS-314B Sheetrock J N W wall NW LT 36 ppm NE Room NE Room 12/1/2006 CS-W15 Sheetrock NE Corner Ceiling LT 0.007 % Main Play Main Play Room 11/3/2005 CSC-01 Sheetrock N wall W of door LT 0.006 % Kitchen Kitchen 7/17/2002 CSL-KC Sheetrock south section near header LT 103.7 ppm Kitchen Kitchen 7/17/2002 CSL-KC Sheetrock north section near header LT 101.9 ppm Kitchen Kitchen 7/17/2002 CSL-KW Sheetrock south section west wall LT 82.6 ppm Kitchen Kitchen 7/17/2002 CSL-KW Sheetrock south section south wall LT 94.4 ppm COMMONS 7/17/2013 CR-40 Metal SE.047 % 7/17/2013 CR-41 Metal W center.16 % 7/17/2013 CR-42 Metal NE LT.007 skylight skylight 3/3/2011 CR-20 Metal S side 2nd from E.082 % skylight skylight 3/3/2011 CR-30 Metal S side 2nd from E 20 % Cafeteria Cafeteria 4/30/2003 C-DF-07 Sheetrock cafeteria, east wall at LT 0.006 % Cafeteria Cafeteria 2/20/2003 History Concrete None LT ND DARWIN HALL 33 Electron 1/14/2005 D33CC Concrete east center.29 % 15 Machine Shop 1/14/2005 D15C Concrete E center 1.8 % 5 Storage Room 1/14/2005 D5C Concrete N center.62 % 133 133 11/29/2004 D133-10 Sheetrock west wall, 4' up, between LT 0.006 % 133 133 11/29/2004 D133-11 Sheetrock west wall, 4' up, between LT 0.006 % 134 134 11/29/2004 D134-05 Sheetrock west wall, 3' up LT 0.006 % 134 134 11/29/2004 D134-06 Sheetrock west wall, 3' up LT 0.006 % Basement Basement @ 19 7/16/2004 D19W-04 Vinyl Tile NE corner of 19 (post) LT 20 ug/ft Basement Basement @ 19 7/16/2004 D19W-2 Vinyl Tile NE corner of 19 (pre) LT 20 ug/ft Basement Basement @ 40 7/16/2004 D40W-05 Vinyl Tile NE corner of 40 (post) LT 60 ug/ft 2
Basement Basement @ 5 7/16/2004 D5W-1 Vinyl Tile basement at Room 5 (pre) 20 ug/ft Basement Basement @ 5 7/16/2004 D5W-3 Vinyl Tile basement at Room 5 LT 60 ug/ft Greenhouse Greenhouse 6/2/2004 GH-01 Wood North room cabinet.016 % Greenhouse Greenhouse 6/2/2004 GH-03 Wood S greenhouse N door.008 % 309 309 4/9/2004 D-309-C-3 Wood Center cabinets; door on LT.03 % 308 308 9/10/2003 D-308-1 Concrete south table LT.03 % 17 2/7/2002 DL-17-01 Concrete center of north wall 879.3 ppm 17 2/7/2002 DL-17-02 Sheetrock center of north wall LT 110 ppm 20 2/7/2002 DL-20 Sheetrock West of west storage LT 367 ppm 20 2/7/2002 DL-20 Sheetrock center of east wall LT 219 ppm 20 2/7/2002 DL-20 Concrete hallway west wall LT 152 ppm 31 31 8/2/2001 D-31-L Sheetrock west wall.17 % 3rd Floor Men's RR (exterior) 3/5/2001 DL-100 Sheetrock hallway; south wall, west 340 ppm 225 225 11/24/1999 D-225-L- Sheetrock west wall in room LT.022 % 225 225 11/24/1999 D-225-L- Sheetrock north wall in room LT.023 % 225 225 11/24/1999 D-225-L- Sheetrock south wall in room LT.022 % FACILITIES SERVICES Old Repro Old Repro Area 7/16/2014 REP-20 Sheetrock S Office N Wall 0.007 % Old Repro Old Repro Area 7/16/2014 REP-21 Sheetrock S Office W Wall LT 0.006 % Old Repro Old Repro Area 7/16/2014 REP-36 Sheetrock C Office E Wall LT 0.006 % Old Repro Old Repro Area 7/16/2014 REP-37 Sheetrock C Office N Wall LT 0.006 % Old Repro Old Repro Area 7/16/2014 REP-38 Sheetrock N Office S Wall 0.007 % Old Repro Old Repro Area 7/16/2014 REP-39 Sheetrock N Office E Wall LT 0.006 % DW Tank East 5/7/2014 E-DWT- E DW Tank Composite at 87 ppm DW Tank E DW Tank E 4/28/2014 E-DWT- E DW Tank Dripline 160 ppm DW Tank E DW Tank E 4/28/2014 E-DWT- E DW Tank Composite at 150 ppm DW Tank DW Tank W 4/28/2014 W-DWT- W DW Tank Dripline 290 ppm DW Tank DW Tank W 4/28/2014 W-DWT- W DW Tank Composite 120 ppm Hydropneumatic 4/17/2014 HPT-2 Metal SW DW Pressure Tank 0.11 % W Water 4/14/2014 W-DW- Concrete W DW Water Tank 0.67 % Repro/Recei Repro/Receiving 2/5/2013 FACR-NE N/A NE Yard Inside Corner 75 ppm Repro/Recei Repro/Receiving 2/5/2013 FACR- N/A NE Yard Inside Corner 14 ppm Repro/Recei Repro/Receiving 1/16/2013 FDS-E-1 Metal FAC E 40 ppm Repro/Recei Repro/Receiving 1/16/2013 FDS-E-2 Metal FAC E 55 ppm Repro/Recei Repro/Receiving 1/16/2013 FDS-E-3 Metal FAC E 37 ppm Repro Roof Repro Roof 1/8/2013 FR-1 Metal Above Repro French 28 ug/ft Repro Roof Repro Roof 1/8/2013 FR-2 Metal Above Repro French 95 ug/ft Repro Repro North 11/2/2009 REP-24 Sheetrock NE Section, S Wall at.031 % Repro Repro North 10/28/2009 REP-3 Sheetrock NE Section, W Wall LT 0.006 % Repro Repro North 10/28/2009 REP-4 Sheetrock NW Section, E Wall LT 0.007 % 5/26/2005 BOL-1 Metal Yellow Bollard.016 % Office Kitchen 12/16/2004 FLR-3 Plastic Facilities kitchen LT 20 ug/ft Storage Storage Room 12/16/2004 FSTW-1 Cardboard Facilities office storage E LT 20 ug/ft V. Irey V. Irey Office 12/16/2004 FVO-2 Wood Vicki Irey Office S LT 20 ug/ft Office Hallway 12/13/2004 FAC-ST-2 Sheetrock east hallway, north wall, 0.084 % Office Hallway 12/13/2004 FAC-ST-3 Sheetrock east hallway, south wall, 0.007 % 3
Paint Shop Canopy 5/13/2004 WC-01 Metal cart seat 110 ug/ft Paint Shop Canopy 5/13/2004 WC-03 Asphalt ground at canopy 870 ug/ft Paint Shop cart 5/13/2004 WC-02 Metal cart.6 % Paint Shop Paint Shop 5/13/2004 PB-04 Concrete Paint booth floor SE LT 20 ug/ft Yard Yard 5/13/2004 C37-05 Metal cart 9.6 % Yard Yard 5/13/2004 EHSC-06 Metal cart 14 % FOOD SERVICES 020521E CDDC, southeast corner, LT 25 ppm Zin Exterior Zin Exterior Fence 3/12/2015 Zin-XF Wood Exterior Fence E side E LT 0.006 Kitchen Kitchen 11/14/2008 33406 Metal Food Prep Center E Wall LT 8 ug/ft Kitchen Kitchen 11/5/2008 CK-50 Metal table E of dishwasher 0.3 % Kitchen 5/19/2006 ZCW-1 plaster Edge.014 % N Wash North Wash Closet 6/2/2004 FSC-01 Concrete Wash Down Rack LT 20 ug/ft Loading Loading Dock/Mat 2/13/2004 FS-70 Stucco south wall, 5' W of door LT.006 % Loading Loading Dock/Mat 2/13/2004 FS-72 Plaster north wall, 1' W of door.035 % Locker/Pot Mens' Locker/Pot 12/18/2003 FS-W-01 Ceramic Tile pot wash hallway LT 20 ug/ft Locker/Pot Mens' Locker/Pot 12/18/2003 FS-W-02 Concrete center floor near door LT 20 ug/ft Locker/Pot Mens' Locker/Pot 12/18/2003 FS-W-03 Metal corner of pot wash sink LT 20 ug/ft Mens RR Mens RR Small 11/10/2003 FS-P-06 Sheetrock west wall.044 % Pot Wash Pot Wash 11/10/2003 FS-P-05 Tile Pot Wash SE Corner at LT 10 ug/ft Pot Wash Pot Wash Area 11/10/2003 FS-P-07 Plaster East Wall, SE corner, 2'.023 % Kitchen Kitchen 3/25/2003 FSH-01 Metal hoods above main ovens 0.42 % GROUNDS Main Nazca sculpture at 4/12/2000 NZ-10 Soil Soil at Nazca sculpture. LT 58 ppm Main Nazca sculpture at 4/12/2000 NZ-20 Soil Soil at Nazca sculpture. LT 54 ppm Main Nazca sculpture at 4/12/2000 NZ-30 Soil Soil at Nazca sculpture. LT 55 ppm Main Nazca sculpture at 4/12/2000 NZ-40 Soil Soil at Nazca sculpture. LT 54 ppm Main Nazca sculpture at 4/12/2000 NZ-50 Soil Soil at Nazca sculpture. LT 62 ppm Main Nazca sculpture at 4/12/2000 NZ-60 Soil Soil at Nazca sculpture. LT 58 ppm Main Nazca sculpture at 4/21/1999 NZ-1 Soil Soil at Nazca sculpture. LT 66.7 ppm Main Nazca sculpture at 4/21/1999 NZ-2 Soil Soil at Nazca sculpture. LT 67.4 ppm Main Nazca sculpture at 4/21/1999 NZ-3 Soil Soil at Nazca sculpture. LT 64.5 ppm Main Nazca sculpture at 4/21/1999 NZ-4 Soil Soil at Nazca sculpture. LT 70.9 ppm Main Nazca sculpture at 4/21/1999 NZ-5 Soil Soil at Nazca sculpture. LT 68.7 ppm Main Nazca sculpture at 4/21/1999 NZ-6 Soil Soil at Nazca sculpture. LT 64.2 ppm Nazca 2/12/1998 LME-1 Metal east side 47 ppm Nazca 2/12/1998 LME-2 Metal east side 71800 ppm Nazca 2/12/1998 LME-3 Metal east side 1500 ppm Nazca 2/12/1998 LME-4 Metal east side 2400 ppm HAZARDOUS WASTE SHED HAZMAT SHED/CHEMISTRY STORAGE 11/3/2004 HWS-1 Metal North side, center door LT.006 % Roof Roof 6/12/2012 HMS-1 Metal Roof LT 0.007 % IVES HALL Storage 1st Floor Storage 5/28/2014 I-SR-C Wood Storage Room Center LT 8 ug/ft Storage 1st Floor Storage 5/28/2014 I-SR-NE Wood N Corridor NE 100 sq cm LT 8 ug/ft 4
Storage 1st Floor Storage 5/28/2014 I-SR-NW Wood N Corridor NW 100 sq LT 8 ug/ft Storage 1st Floor Storage 5/28/2014 I-SR-SC Wood S Corridor Center 100 sq LT 8 ug/ft Storage 1st Floor Storage 5/28/2014 I-SR-SE Wood S Corridor SE 100 sq cm LT 8 ug/ft Storage 1st Floor Storage 5/28/2014 I-SR-SW Wood S Corridor SW 100 sq cm LT 8 ug/ft 110 Storage Room 9/27/2013 I-SR Wood S room.022 % 32 Waldor Studio 9/27/2013 I-32-5 S Wall W LT.006 % 32 Waldor Studio 9/27/2013 I-32-9 S Wall E LT.007 % 33 Waldor Studio 9/27/2013 I-33-13 N Wall E LT.006 % 33 Waldor Studio 9/27/2013 I-33-14 N Wall Center W LT.006 % 7 4/22/2013 I-11-21 concrete N Wall LT 0.006 % 7 4/22/2013 I-7-21 concrete S Wall 0.017 % 206 5/19/2011 I-206-31 Sheetrock S Wall Left of Door.35 % 44 2/12/2010 I-44-3 Concrete S Wall, SW Corner LT.007 % Stage Stage 1/8/2007 IFC-3 Plaster Inside E Stage Column 0.015 % Outdoor Outdoor Patio 2/23/2006 IP-03 Concrete Patio SW 7 ppm Patio Patio 2/23/2006 IP-04 Concrete Ives Outdoor Patio SW at LT.006 % Penthouse Penthouse 10/7/2005 IP-10 Metal S Wall High.27 % Mechanical Penthouse 9/28/2005 IP-05 Metal NE Unit.31 % Warren Warren Auditorium 6/10/2003 I-LW-05 Ceramic Tile west hallway @ south LT 10 ug/ft Warren Warren Auditorium 6/10/2003 I-LW-06 Concrete floor at west stage 22 ug/ft Warren Warren Auditorium 6/10/2003 I-LW-07 Vinyl Tile west door at lowest LT 10 ug/ft Warren Warren Auditorium 6/10/2003 I-LW-08 Vinyl Tile northeast stair audience LT 10 ug/ft Warren Warren Auditorium 6/9/2003 I-LW-01 Vinyl Tile south stage door @ east LT 20 ug/ft Warren Warren Auditorium 6/9/2003 I-LW-02 Concrete southwest corner LT 20 ug/ft Warren Warren Auditorium 6/9/2003 I-LW-03 Concrete stage front and center 60 ug/ft Warren Warren Auditorium 6/9/2003 I-LW-04 Vinyl Tile stage front and center on 90 ug/ft Hallway 1st Floor Hallway 4/30/2003 I-DF-01 Wood west central corridor; by 0.09 % 102 Warren Auditorium 4/17/2003 WA-01 Wood damage at center stage LT 0.006 % 102 Warren Auditorium 4/17/2003 WA-02 Wood damage at center stage 0.030 % 102 Warren Auditorium 4/17/2003 WA-04 Wood damage at center stage 0.17 % 102 Warren Auditorium 4/17/2003 WA-09 Metal east column, fire ext. cab 0.26 % 1st floor Men's RR west 3/5/2001 IL-300 Concrete south of door 4' up 1900 ppm Room #101, stage LT 25 ppm Room #205, north wall, LT 25 ppm Room #117, south, 323 ppm Ticket room, 1st floor, LT 25 ppm Auditorium, north LT 25 ppm Auditorium, north 2315 ppm Auditorium, south 3237.5 ppm Auditorium, south 62 ppm Room #219, northeast LT 25 ppm South hall, southwest 28.5 ppm Woman's lounge, south 27.5 ppm Room #207, northeast 28 ppm Room #210, south 49.25 ppm Room #209, southwest LT 25 ppm 5
Room #209, northwest LT 25 ppm Room #205, west wall, LT 25 ppm Backstage Backstage Concrete Auditorium, south wall, 16125 ppm NICHOLS HALL 1st Floor 1st Floor Men's 3/1/2007 N1MR-34 Concrete S Wall LT 6 ppm 1st Floor 1st Floor Men's 3/1/2007 N1MR-35 Concrete S Wall LT 6 ppm 1st Floor 1st Floor Men's 3/1/2007 N1MR-37 Sheetrock N Wall LT.006 % 1st Floor 1st Floor Men's 3/1/2007 N1WR-38 Sheetrock N Wall LT.006 % 1st Floor 1st Floor Men's 1/29/2007 N1MR-03 Sheetrock E Wall at Sink LT.006 % 1st Floor 1st Floor Men's 1/29/2007 N1MR-06 tile S Wall at W Stall LT 6 ppm 1st Floor 1st Floor Men's 1/29/2007 N1MR-08 Sheetrock S Wall at W Stall LT.006 % 1st Floor 1st Floor Men's 1/29/2007 N1MR-09 Metal E Stall Wall LT.006 % 1st Floor 1st Floor Women's 1/29/2007 N1WR-23 Sheetrock E Wall at Entry.007 % 1st Floor 1st Floor Women's 1/29/2007 N1WR-26 tile E Wall at Entry 18 ppm 1st Floor 1st Floor Women's 1/29/2007 N1WR-28 Sheetrock E Wall at Entry LT.006 % stairwell center stairwell 2/13/2004 N-CSW-1 Metal Bend at first landing 2.2 % Hallway @ Hallway @ 171 4/30/2003 N-DF-01 Sheetrock drinking fountain wall LT 0.006 % Hallway @ Hallway @ 232 4/30/2003 N-DF-03 Sheetrock drinking fountain wall LT 0.006 % Hallway @ Hallway @ 359 4/30/2003 N-DF-05 Sheetrock drinking fountain wall LT 0.006 % P.E./KINESIOLOGY Main Hall Main Hall W end N 2/19/2015 PE-W-24 Plaster Main Hallway N Wall.04 % Main Gym Main Gym Roof 11/7/2014 1107COM Metal Roof 40 ppm Main Gym Main Gym Roof 11/7/2014 1107NE Metal NE gutter 10 ppm Main Gym Main Gym Roof 11/7/2014 1107NW Metal NW gutter 16 ppm Main Gym Main Gym Roof 11/7/2014 1107ROO Metal Roof 29 ppm Main Gym Main Gym Roof 11/7/2014 1107SE Metal SE gutter 11 ppm Main Gym Main Gym Roof 11/7/2014 1107SW Metal SW gutter 47 ppm SE Field SE Field House 10/14/2014 TH-3 Concrete NW Corner of SE Locker 0.19 % Women s Water Polo locker 8/7/2013 W-WP-1 E Wall of NE Room 740 ppm 1 Dance Studio 4/23/2013 PE-1-25 Concrete SE corner 0.02 % 4/16/2013 PE-FH-1 West Wall 0.078 % PE-1 Dance Studio 4/15/2013 PE-1F Wood Floor LT 0.007 % E Courtyard E Courtyard 9/19/2012 Blank Blank LT 0 E Courtyard E Courtyard 9/19/2012 Blank Blank LT 0 E Courtyard E Courtyard 9/19/2012 PE-EC E Courtyard Breezeway LT 8 ug E Courtyard E Courtyard 9/19/2012 PE-EC E Courtyard Breezeway LT 8 ug E Courtyard E Courtyard 9/19/2012 PE-EC E Courtyard Mower LT 8 ug E Courtyard E Courtyard 9/19/2012 PE-EC E Courtyard Breezeway LT 30 ug/ E Courtyard E Courtyard 9/19/2012 PE-EC E Courtyard Breezeway LT 300 ug/ E Courtyard E Courtyard 9/19/2012 PE-EC E Courtyard Breezeway LT 30 ug/ 8/1/2012 PE-EAST PE E Courtyard Grass@E 160 ppm 8/1/2012 PE-EAST PE E Courtyard E Ivy 98 ppm 8/1/2012 PE-EAST PE E Courtyard 29 ppm 8/1/2012 PE-EAST PE E Courtyard N Ivy 7 ppm 8/1/2012 PE-EAST PE E Courtyard S 29 ppm 8/1/2012 PE-EAST PE E Courtyard S Ivy LT 7 ppm 6
7/31/2012 PE-WEST PE W Grass at W edge of LT 7 ppm 7/31/2012 PE-WEST PE W Grass at W edge of 10 ppm 7/31/2012 PE-WEST PE W Ivy 100 ppm 7/31/2012 PE-WEST PE W Ivy 220 ppm PE 7/31/2012 PE-W-70 PE Roof N 480 ug/ft PE 7/31/2012 PE-W-71 PE Roof S 610 ug/ft PE 7/31/2012 PE-W-72 PE Roof E 150 ug/ft PE 7/31/2012 PE-W-73 PE Roof W 70 ug/ft 7/23/2012 PE-2000 W Entry Base of Stairs 16 ug/ft 7/23/2012 PE-2001 W Entry N Center Stair 19 ug/ft 7/23/2012 PE-2002 W Entry N Top of Stairs 39 ug/ft 7/20/2012 HW-East East Air Handler Filters 23 ppm 7/20/2012 HW-West West Air Handler Filters 23 ppm 7/20/2012 PE-300 W Entry S Base of Stairs 12 ug/ft 7/20/2012 PE-301 W Entry S Center Stair LT 8 ug/ft 7/20/2012 PE-302 W Entry S Top of Stairs 28 ug/ft 7/20/2012 PE-320 Main Gym E Unit E Side LT 8 ug/ft 7/20/2012 PE-321 Main Gym W Unit NW LT 8 ug/ft 7/20/2012 PE-E-100 E Filter Dust Composite LT 32 ug 7/20/2012 PE-W-101 W Filter Dust Composite 74 ug 7/19/2012 PE-100 E Courtyard W Edge of 82 ppm 7/19/2012 PE-20 E Courtyard Hall Top LT 8 ug/ft 7/19/2012 PE-21 S Corridor E between LT 8 ug/ft 7/19/2012 PE-22 E Courtyard Bottom of 15 ug/ft 7/19/2012 PE-23 Leaf Surfaces Pre- 13 ug/ft 7/19/2012 PE-24 N Corridor E at Entrance LT 8 ug/ft 7/19/2012 PE-40 E Corridor Center Post- LT 8 ug/ft 7/19/2012 PE-41 E Corridor N Post- LT 8 ug/ft 7/19/2012 PE-42 E Corridor S Post- LT 8 ug/ft E Courtyard E Courtyard 7/19/2012 PE-90 Air Sample 37mm LT 20 ug/ E Courtyard E Courtyard 7/19/2012 PE-91 Air Sample 37mm LT 20 ug/ E Courtyard E Courtyard 7/19/2012 PE-92 Blank LT 5 ppm E Courtyard E Courtyard 7/19/2012 PE-93 Blank LT 5 ppm Main Office Admin Office 7/16/2012 1-PE-14 Vinyl Tile Under Admin Desk 8 ug/ft Main Office Admin Office 7/16/2012 10-PENC Vinyl Tile N Corridor W Post LT 8 ug/ft Main Office Admin Office 7/16/2012 11-PENC Vinyl Tile N Corridor Center Post LT 8 ug/ft Main Office Admin Office 7/16/2012 12-PENC Vinyl Tile N Corridor E Post LT 8 ug/ft Main Office Admin Office 7/16/2012 13-PEG-7 Vinyl Tile Main Gym SW at Door LT 8 ug/ft Main Office Admin Office 7/16/2012 14-PEG-8 Vinyl Tile Main Gym Center Court LT 8 ug/ft Main Office Admin Office 7/16/2012 15-PEG-9 Vinyl Tile Main Gym SE at Door LT 8 ug/ft Main Office Admin Office 7/16/2012 2-PE-W Vinyl Tile W Entry S of Door 9 ug/ft Main Office Admin Office 7/16/2012 3-PE-EB Vinyl Tile E Courtyard Bench 9400 ppm Main Office Admin Office 7/16/2012 4-PE-CY Vinyl Tile E Courtyard at Outer 28 ppm Main Office Admin Office 7/16/2012 5-PE- Main Gym Center Pre LT 8 ug/ft Main Office Admin Office 7/16/2012 6-PE-SC Vinyl Tile Main Gym S Corridor LT 8 ug/ft Main Office Admin Office 7/16/2012 7-PESC-1 Vinyl Tile S Corridor W Post LT 8 ug/ft 7
Main Office Admin Office 7/16/2012 8-PESC-2 Vinyl Tile S Corridor Center Post LT 8 ug/ft Main Office Admin Office 7/16/2012 9-PESC-3 Vinyl Tile S Corridor E Post LT 8 ug/ft 7/12/2012 PER-W1 N Roof 1300 ug/ft 7/12/2012 PER-W2 W Roof 150 ug/ft 34 7/12/2012 PE-33-4 Plaster S Wall 0.032 % 34 7/12/2012 PE-34-1 Plaster N Wall LT 0.006 % Ground Ground at W Main 7/11/2012 PE-W1 W Main Entrance w/ 730 ppm Ground Ground at W Main 7/11/2012 PE-W2 W Main Entrance w/ 7200 ppm Main Gym Main Gym Roof 5/16/2012 PER-1 Metal Panel Composite 0.66 % Main Gym Main Gym Roof 5/16/2012 PER-2 Metal Center Peak Air Vent 0.045 % Baseball Baseball Field 2/15/2011 PEC-3-S Soil 1st Baseline N of fence 22 ppm Baseball Baseball Field 2/9/2011 PEC-1-S Soil BB Shed at 1st Baseline 10 ppm Baseball Baseball Field 2/9/2011 PEC-2-L Forest Litter BB Shed at 1st Baseline 8 ppm Baseball Baseball Field 1/12/2011 PE-C-F Metal BB Field NW Base line 4.7 % Main Gym Main Gym 1/13/2010 PE-WB Wood NW Outlet at NW Door LT 8 ug/ft Main Gym Main Gym 1/13/2010 PE-WB Wood Bleacher Surface Low LT 8 ug/ft Main Gym Main Gym 1/13/2010 PE-WB Wood N NW Logo @ Middle LT 8 ug/ft Main Gym Main Gym 1/13/2010 PE-WB Metal Rail at Lower S Section, 410 ug/ft Main Gym Main Gym 1/13/2010 PE-WB Metal W end Wheel Rail 410 ug/ft Main Gym Main Gym 1/13/2010 PE-WB Wood Paint at 2/3 from S.21 % Main Gym Main Gym 1/13/2010 PE-WB Wood NW Corner, N of Metal 130 ug/ft Main Gym Main Gym 1/13/2010 PE-WB Wood SW Corner Plywood @ 51 ug/ft Main Gym Main Gym 1/13/2010 PE-WB Wood 1st Light from S Wall.23 % Main Gym Main Gym 1/13/2010 PE-WB Wood Lowest Bleacher Stair LT 8 ug/ft Main Gym Main Gym 1/5/2010 PE-EB- Wood 2nd Stair from N Low 24 ug/ft Main Gym Main Gym 1/5/2010 PE-EB- Wood 2nd Stair from N Mid E LT 8 ug/ft Main Gym Main Gym 1/5/2010 PE-EB- Wood 2nd Stair from N Mid W LT 8 ug/ft Main Gym Main Gym 1/5/2010 PE-EB- Wood 2nd Stair from N Top LT 8 ug/ft Main Gym Main Gym 1/5/2010 PE-EB-V1 Wood Top NE Corner Seat LT 20ppm Main Gym Main Gym 1/4/2010 PE-EB-C1 Wood E Wall Floor Center N 28 ug/ft Main Gym Main Gym 1/4/2010 PE-EB-C2 Wood E Wall Floor Center S 43 ug/ft Main Gym Main Gym 1/4/2010 PE-EB-E1 Concrete E Wall @ Center.25 % Main Gym Main Gym 1/4/2010 PE-EB- Concrete NE Corner Floor 290 ug/ft Main Gym Main Gym 1/4/2010 PE-N-NE Concrete N Wall @ NE Corner.17 % 9/30/2009 PE-SB-11 S wall Center LT 0.006 % Main Track Main Track SE 7/3/2008 T-1 Rubber Main Track at NW Entry LT 2 ppm Pool Pool Mechanical 12/7/2004 PEPMR-1 Concrete east wall.056 % Pool Pool Mechanical 12/7/2004 PEPMR-2 Concrete south wall.061 % Pool Pool Mechanical 12/7/2004 PEPMR-3 Concrete ceiling at stack.086 % 114 10/7/2004 PE-114-4 Sheetrock K-Wall west side LT 0.006 % 114 10/7/2004 PE-114-5 Sheetrock K-Wall east side LT 0.006 % BB Field Baseball Field Area 4/9/2004 PE-CS-1 Soil Composite random over 25 ppm NMR North Mechanical 11/26/2003 PE-NMR Concrete N Wall, W lower 2'.46 % NMR North Mechanical 11/26/2003 PE-NMR Plaster W Wall, N lower 2'.18 % NMR North Mechanical 11/26/2003 PE-NMR Plaster S Wall, W lower 2'.22 % NMR North Mechanical 11/26/2003 PE-NMR Plaster S Wall, W lower 2'.24 % 8
Outdoor BB Field Area 11/21/2003 PE-CHRS Metal Composite chairs (4) 4.5 % Central Central Corridor 7/8/2003 PE-40 Vinyl Asbestos Women's Locker 0.034 % Central Central Corridor 7/8/2003 PE-LW-22 Vinyl Asbestos Lead Wipe Below East LT 20 ug/ft Central Central Corridor 7/8/2003 PE-LW-23 Vinyl Asbestos Lead Wipe Below West LT 20 ug/ft Central Central Corridor 7/8/2003 PE-LW-24 Vinyl Asbestos Lead Wipe Below West LT 20 ug/ft Central Central Corridor 7/8/2003 PE-LW-25 Vinyl Asbestos Men's Locker Corridor, LT 20 ug/ft Central Central Corridor 7/8/2003 PE-LW-26 Vinyl Asbestos Women's Locker LT 20 ug/ft Men's Men's Locker Room 7/8/2003 PE-42 Plaster West of fountain 0.007 % Central Central Corridor 7/7/2003 PE-LW-21 Vinyl Asbestos Lead Wipe Below LT 20 ug/ft Hallway @ Hallway @ 4 4/30/2003 PE-DF-09 Concrete drinking fountain, LT 0.006 % Hallway @ Hallway @ main 4/30/2003 PE-DF 12 Sheetrock west drinking fountain, 1 % Hallway @ Hallway @ South 4/30/2003 PE-DF-10 Sheetrock drinking fountain,.93 % Mens Mens' Locker, Field 4/30/2003 FH-DF-14 Plaster SW corner, mens locker LT 0.006 % 38 38 3/11/2003 PE-38 Plaster southernmost column on LT.006 % SW Locker SW Men's Locker 1/31/2003 PE-LR-01 Concrete E Wall @ 5' 0.010 % Main Gym Main Gym 11/25/2002 PE-G-01 Concrete south wall LT 152.9 ppm Main Gym 6/26/2001 BB-20 Wood south wall; east entrance.026 % Main Gym 6/26/2001 GD-30 Wood center door and trim.07 % Main Gym 6/26/2001 GF-10 Wood southeast initial break LT.02 % Main Gym 6/26/2001 GF-11 Wood southeast initial break LT.006 % 011212D Room #31, above entry, LT 25 ppm PE-1 Dance Studio 011212D Wood Room #27, above entry, LT 25 ppm PE RESIDENCE HALLS Room #51, west wall 114.5 ppm Room #53, north wall 164 ppm Room #53, north ceiling 5975 ppm Room #53, northwest 1720 ppm Room #58, east wall 132 ppm Room #38, southwest 95.5 ppm Room #34A, west wall 77.5 ppm 011115M Room #6, south wall, at LT 25 ppm 011115M 011115M 011115M 011116N 011116N 011116N 011116N 020604D 020604D Room #1, south wall, 91 ppm Room #5, south wall, 194.5 ppm Room #140, east wall 282 ppm Room #26, north wall 535.5 ppm Room #24, north wall 2345 ppm Room #22, west wall 123.5 ppm Room #15, east wall 103.5 ppm Mechanical room, 380.5 ppm Mechanical room, 130.5 ppm Cabernet 121 9/19/2013 CAB-121 Sheetrock Kitchen Behind FE S LT 0.006 % Cabernet 124 9/19/2013 CAB-124 Sheetrock Kitchen LV E Wall LT 0.006 % Cabernet 211 9/19/2013 CAB-211 Sheetrock Kitchen N Wall Behind LT 0.006 % Cabernet 213 9/19/2013 CAB-213 Sheetrock Kitchen E Wall LT 0.006 % Cabernet 311 9/19/2013 CAB-311 Sheetrock Bath W Toilet E Wall LT 0.006 % 9
Cabernet 315 9/19/2013 CAB-315 Sheetrock Kitchen S Wall LT 0.006 % Cabernet 316 9/19/2013 CAB-316 Sheetrock Bath S Wall at Vanity LT 0.006 % Cabernet 317 9/19/2013 CAB-317 Sheetrock Kitchen Behind Fridge W LT 0.006 % Cabernet 321 9/19/2013 CAB-321 Sheetrock Bath E Wall at Sink LT 0.006 % Cabernet 322 9/19/2013 CAB-322 Sheetrock Kitchen S Wall LT 0.006 % Cabernet 332 9/19/2013 CAB-332 Sheetrock Bath Toilet W Wall LT 0.006 % Cabernet 335 9/19/2013 CAB-335 Sheetrock Kitchen W Wall Behind LT 0.006 % Cabernet 412 9/19/2013 CAB-412 Sheetrock Kitchen W Wall Behind LT 0.006 % Cabernet 421 9/19/2013 CAB-413 Sheetrock Bath Toilet E Wall LT 0.006 % Cabernet 421 9/19/2013 CAB-421 Sheetrock Kitchen S Wall at FE LT 0.006 % Cabernet 514 9/19/2013 CAB-514 Sheetrock Kitchcn W Wall LT 0.006 % Cabernet 515 9/19/2013 CAB-515 Sheetrock Bath E Wall Toilet LT 0.006 % Cabernet 516 9/19/2013 CAB-516 Sheetrock Kitchen W Wall at Fridge LT 0.006 % Cabernet 523 9/19/2013 CAB-523 Sheetrock Bath Toilet W Wall LT 0.006 % Zin Market Zin Market 7/29/2013 SU-Tech NE Closet LT 0.007 % Zin Market Zin Market 7/29/2013 ZM-09 NE Room SE Corner LT 0.006 % Zin Market Zin Market 7/29/2013 ZM-10 S main wall LT 0.007 % Barbera 6/5/2013 B-150 tan paint steel walk LT.007 % Barbera 6/5/2013 B-151 Metal tan paint steel walk LT 0.008 % Tokay 123 7/30/2012 T-123-4 shower W LT.006 ppm Traminer Traminer 6/23/2010 ZTG-1 Metal Waste Determination 62000 ppm 10/8/2009 CAB-500 Cold Water Line 15 % R 7 Riesling 7 6/2/2008 R7-E1 N Entry LT 0.006 % Zinfandel Zinfandel 1/9/2006 ZCR-02 Sheetrock S Wall W of kitchen door LT 0.006 % RLC RLC Apartment 10/13/2005 RLC-05 W Bathroom Wall.062 % RLC RLC Apartment 10/13/2005 RLC-07 S Living Room Window 0.027 % RLC RLC Apartments 10/13/2005 RLC-08 E Kitchen Wall.007 % Barbera Balcony 4/26/2004 B-B-01 Wood Ground floor 0.008 % Barbera Balcony 4/26/2004 B-B-02 Wood Ground floor; east 0.015 % Barbera Balcony 4/26/2004 B-B-03 Wood 3rd Floor platform LT 0.006 % Barbera Balcony 4/26/2004 B-B-04 Sheetrock 3rd Floor platform LT 0.006 % Barbera Balcony 4/26/2004 B-B-07 Wood 2nd Floor column 0.023 % Barbera Balcony 4/26/2004 B-B-08 Wood Top deck 1/3 to west 70 ppm Traminer Balcony 4/26/2004 T-B-01 Wood Ground floor LT 0.006 % Traminer Balcony 4/26/2004 T-B-02 Wood Ground floor outer 80 ppm Traminer Balcony 4/26/2004 T-B-03 Wood 2nd Floor column at LT 0.006 % Traminer 1 3/11/2003 ZE-07 Wood east @ 1.008 % Traminer 13a 3/11/2003 ZE-08 Metal corner at 13a.020 % Barbera 18 3/11/2003 ZE-13 Wood south door frame 0.013 % Traminer 2 3/11/2003 ZE-09 Wood door at west 2 LT 0.006 % Traminer 4 3/11/2003 ZE-10 Metal staircase rail north of 4 0.042 % Traminer 7b 3/11/2003 ZE-06 Stucco south wall @ 7b LT 0.006 % Barbera 9b 3/11/2003 ZE-11 Stucco east wall of 9b LT 0.02 % Barbera 9b 3/11/2003 ZE-12 Metal east wall of 9b @ 7' LT 0.006 % Chardonnay 1 3/10/2003 ZE-01 Stucco Easternmost exterior wall LT 0.006 % Chardonnay 1 3/10/2003 ZE-02 Wood North exterior window 0.043 % 10
Chardonnay 1 3/10/2003 ZE-03 Wood Exterior door 0.037 % Flora 7a 3/10/2003 ZE-05 Metal Rail west of 7a 0.380 % Flora 9a 3/10/2003 ZE-04 Stucco North side wall of Flora LT 0.006 % Barbera 9 Barbera 9 1/23/2003 1-B9-W- Sheetrock interior living room west 0.004 % Barbera 9 Barbera 9 1/23/2003 2-B9-W-H Sheetrock interior hallway west.008 % Barbera 9 Barbera 9 1/23/2003 3-B9-W- Wood interior west bedroom,.01 % Barbera 9 Barbera 9 1/23/2003 4-B9-E- Wood interior east bedroom,.007 % Barbera 9 Barbera 9 1/23/2003 5-B9-N- Sheetrock interior east bathroom,.013 % Barbera 9 Barbera 9 1/23/2003 6-B9-N- Sheetrock interior west bathroom,.041 % Barbera 9 Barbera 9 1/23/2003 7-B9-S- Wood interior living room, LT.007 % Merlot 328 Merlot 328 8/20/2002 M-328-Pb Sheetrock corner 3' up LT 92.76 ppm Traminer 1 8/28/2001 T-1-SL Stucco exterior to room 1 LT 94 ppm Semillon 9 8/28/2001 S-9-SL Stucco exterior to room 9 LT 98 ppm Riesling 10 8/7/2001 R-1001 Sheetrock south wall.015 % Riesling 8 8/7/2001 R-801 Sheetrock west wall; interior NE LT.007 % Riesling 8 8/7/2001 R-802 Sheetrock east wall; north section LT.006 % Riesling 7 8/2/2001 R-701 Sheetrock north restroom; east wall.036 % Traminer 10/7/1996 T10LW2 Sheetrock west bedroom wall 220 ppm Barbera 10/2/1996 B7LD1 Wood Door frame 2nd bedroom 580 ppm Barbera 10/2/1996 B7LD2 east door frame LT ND Barbera 10/2/1996 B7LD3 south closet HW frame LT ND Barbera 10/2/1996 B7LW1 Sheetrock east bedroom wall 1300 ppm Barbera 10/2/1996 B7LW2 Sheetrock west bedroom wall LT ND Barbera 10/2/1996 B7LW3 Sheetrock west bedroom wall 3300 ppm STEVENSON HALL penthouse penthouse 3/3/2011 STR-10 Metal S side center 4.6 % 1066 1066 3/29/2010 S-1066-2 Sheetrock West Wall at Door 0.12 % 1st Floor Media Lab 2/12/2010 SML-01 Concrete E Wall at Ground Level.29 % 1002 5/29/2008 S-1002-70 N Entry 0.21 % West West Entrance 2/14/2005 S-WE-01 Concrete W wall, N of door 0.091 % West West Entrance 2/14/2005 S-WE-06 Concrete N wall at stairs 0.085 % West West Entrance 2/14/2005 S-WE-08 Metal lower outside staircase 37 % West West Entrance 2/14/2005 S-WE-09 Concrete S wall near exterior door 0.086 % West West Entrance 2/14/2005 S-WE-10 Concrete W wall under stairwell 0.066 % West West Entrance 2/14/2005 S-WE-11 Concrete Loading dock.96 % 2036 Business & 8/25/2004 S-2036-3 Sheetrock south wall 0.08 % 1050 Hallway Door near 7/20/2004 1050-LW Vinyl Tile hallway door near LT 20 ug/ft 1050 Media Lab 7/20/2004 1050-LW Vinyl Tile central interior under LT 20 ug/ft 1050 Anteroom 3/29/2004 S-1050 Plaster north wall center 0.59 % 1050 Classroom 3/29/2004 S-1050 Plaster north wall @ east corner 0.36 % 1050 Classroom 3/29/2004 S-1050 Concrete west wall @ south corner 0.25 % 1053 Media Services 9/11/2003 S-1053-01 Plaster east wall at main LT.006 % 1053 Media Services 9/11/2003 S-1053-03 Vinyl Floor floor at main entrance LT 20 ug/ft 1050 Media Services 8/28/2003 S-1050-01 Sheetrock west section, west wall; 0.35 % Loading Loading Dock 8/22/2003 S-LDC-01 Concrete closet back (east) wall.22 % 3004 Education Office 5/21/2003 S-3004-01 Sheetrock east wall outside of "C" LT <0.006 % 11
3004 A Education Office 5/21/2003 S-3004-08 Sheetrock center north wall 3' up LT <0.006 % 3004 B Education Office 5/21/2003 S-3004-03 Sheetrock east wall outside of "C" LT <0.006 % 3004 B Education Office 5/21/2003 S-3004-05 Concrete center west wall at 4', 0.18 % 3004 C Education Office 5/21/2003 S-3004-07 Sheetrock center north wall 3' up LT <0.006 % 3007 Education Office 5/21/2003 S-3007-10 Sheetrock Wall at corner, 4' up LT <0.006 % Hallway @ Education Office 5/21/2003 S-3007-09 Sheetrock Wall 4' up 0.23 % 1078 1078 10/23/2002 S-1078-32 Concrete south perimeter wall 903.5 ppm 1078C 1078C 10/23/2002 S-1078C Concrete north wall 942 ppm 1088 1088 10/23/2002 S-1088-12 Plaster wall just east of main (S) 1608.7 ppm 1088 1088 10/23/2002 S-1088-15 Concrete wall just east of main (S) 204.5 ppm 1088B 1088B 10/23/2002 S-1088B Concrete perimeter wall 1207.9 ppm 1088D 1088D 10/23/2002 S-1088D Concrete perimeter wall, north side 842.8 ppm 1088D 1088D 10/23/2002 S-1088D Concrete interior concrete wall 139.9 ppm 1088D 1088D 10/23/2002 S-1088D Metal door frame 14958.9 ppm 1088D 1088D 10/23/2002 S-1088D Sheetrock perimeter wall 709.1 ppm 1088D 1088D 10/23/2002 S-1088E Concrete perimeter wall 2055.4 ppm 1096 1096 10/23/2002 S-1096-01 Concrete 1096 north perimeter 3723.3 ppm 1096 1096 10/23/2002 S-1096-02 Metal 1096 entrance 61584 ppm 1096 1096 10/23/2002 S-1096-03 Tile wall edge, inside door LT 97.7 ppm 1096 1096 10/23/2002 S-1096-04 Grout wall edge, inside door LT 100.7 ppm 1096 1096 10/23/2002 S-1096-05 Concrete wall edge, inside door LT 96.3 ppm 1096 1096 10/23/2002 S-1096-06 Concrete below wall edge, inside LT 99.4 ppm 1096 1096 10/23/2002 S-1096-07 Grout below wall edge, inside LT 99.2 ppm 1038 Old DRC 9/10/2002 S-1038-Pb Sheetrock SE area quadrant; west LT 91.4 ppm 1038 Old DRC 9/10/2002 S-1038-Pb Sheetrock NE area quadrant; east LT 98.2 ppm 2048 7/10/2001 S-2048-05 Sheetrock inside LT 151 ppm 2054 7/10/2001 S-2054-10 Sheetrock north side of wall 784 ppm 2084-K 7/10/2001 S-2084-K Sheetrock outside 1433.6 ppm 3043 7/10/2001 S-3043-01 Sheetrock south wall LT 581.4 ppm 3043 7/10/2001 S-3043-02 Concrete floor elevation at 17,630 ppm 2049 6/26/2001 S-2049- Wood exterior of door; outside.14 % 3076 6/26/2001 S-3076-C1 Wood inside cabinet door LT.02 % 3076 6/26/2001 S-3076- Wood inside lower edge.06 % 2049 2049 6/5/2001 S-2049-L Sheetrock west wall center 0.038 % 3030 3030 6/5/2001 S-3030-L1 Sheetrock west wall center 0.10 % 3030 3030 6/5/2001 S-3030-L2 Sheetrock east wall center 0.14 % 3036 3036 6/5/2001 S-3036-L Sheetrock north wall center 0.091 % 3072 3072 6/5/2001 S-3072-L Sheetrock north wall center 0.13 % 3076 3076 6/5/2001 S-3076-L Sheetrock south wall center 0.098 % 3rd Floor Men's RR 3/5/2001 SL-200 Sheetrock 4' up west of door 500 ppm 3rd Floor Men's RR 2/28/2001 SB-62-L Sheetrock lower east floor LT.025 % 2nd Floor 2nd Floor NE 1/31/2001 S-2L Sheetrock North corner 6' up LT 600 ppm 2nd Floor 2nd Floor NE 1/31/2001 S2-L010 Sheetrock South corner 6' up 1000 ppm 3rd Floor 3rd Floor NE 1/31/2001 S-3L Sheetrock North corner 6' up 1200 ppm 020530R 020530R 2nd floor, northeast, IDF 342 ppm 2nd floor, northeast, 337.5 ppm 12
STUDENT HEALTH CENTER 020710F-1 2nd floor, Room #2006, 129.5 ppm 020710F-2 2nd floor, Room #2006, 268.5 ppm 020710F-3 2nd floor, Room #2006, 196 ppm Pharmacy 5/15/2014 PH-20 Inside Pharmacy, E of 0.007 % Pharmacy 5/15/2014 PH-22 Inside Pharmacy, W of LT 0.006 % 152 152 8/29/2012 SHC-152 sheetrock E room N switch LT.006 % 152 152 8/29/2012 SHC-171 sheetrock switch.015 % 174 174 8/29/2012 SHC-123 sheetrock N door N switch LT.006 % 174 174 8/29/2012 SHC-174 sheetrock switch LT.006 % W W Mechanical 11/2/2011 MR-40 Metal 2 pipe at corner 0.038 % West West Mechanical 10/13/2008 SHC-MR- Metal W Mech Room E.031 % 151A X-Ray room 11/27/2002 SHC-151- Sheetrock northwest corner at LT 97.6 ppm 151C X-Ray room 11/27/2002 SHC-151- Sheetrock northwest corner at LT 99.8 ppm 151C X-Ray room 11/27/2002 SHC-151- Sheetrock northwest corner at LT 132.8 ppm 101 101 10/23/2002 SHC-101 Sheetrock K-Wall, south of LT 65.2 ppm STUDENT UNION Center N Center N Patio 2/12/2010 SU-P1 Floor at W Wall Edge LT.006 ppm Center Patio, N Side 2/12/2010 SU-P2 Wood N Wall at Base LTnon-haz Campus Campus Life Office 11/3/2005 SUC-03 Sheetrock S wall 10' E of W main LT 0.006 % Staircase Exterior Staircase 7/6/2004 SU-W Wood S exterior staircase LT.006 % SE Wall SE Wall 7/6/2004 SU-E Wood Lower third W side LT.006 % SE Wall SE Wall 7/6/2004 SU-E2 Wood Lower third W side LT 0.02 % TRACK NA Track Scoreboard 3/12/2009 SB-01 Metal East girder at Service.073 % NA Track Scoreboard 3/12/2009 SB-02 Metal Back Panel SE LT.007 % 13