TOWER SEATTLE, WASHINGTON

Similar documents
VOLUME 25 NUMBER 20 OCTOBER-DECEMBER 1995 OFFICE BOSTON, MASSACHUSETTS PROJECT TYPE

VOLUME 24 NUMBER 18 OCTOBER-DECEMBER 1994 OFFICE 225 HIGH RIDGE ROAD STAMFORD, CONNECTICUT PROJECT TYPE

Memo to the Planning Commission HEARING DATE: JULY 6, 2017

VOLUME 27 NUMBER 2 JANUARY-MARCH 1997 RESIDENTIAL NEW YORK CITY, NEW YORK PROJECT TYPE

ONE SEAPORT SQUARE. Boston Civic Design Commission

Sky Sk l y in l e in e To T w o e w r

Oriental Warehouse. San Francisco, California. Project Type: Residential. Case No: C Year: 2000

Appendix 1 OAS Real Estate Asset Location (GSB and Constitution Avenue Complex)

Clayton Lane. Denver, Colorado. Project Type: Mixed-Use/Multi-Use. Case No: C Year: 2006

MEDICAL OFFICE PORTFOLIO SALE

DAW PLAZA ALEXANDRIA, VIRGINIA

Class A Office For Lease 8 West Third Street Winston-Salem, NC 27101

Comerica Tower. Detroit, Michigan. Project Type: Commercial/Industrial. Case No: C Year: 1998

THE ANDOVER COMPANY, INC.

1201 Third Avenue. An Award Winning Landmark

Project Overview. Washington s Exciting Destination for Office & Retail. For More Information, Visit CapitolCrossingDC.com PROPERTY GROUP PARTNERS

The tower has helped manage urban density, but it often fails to honor qualities of life on the street. Now we have the opportunity to change that.

Multifamily Offering

PRESENTS AN EXCLUSIVE ADDRESS FOR BUSINESS AT THE BURJ DISTRICT THE BINARY

Jasper 115 Street DC2 Urban Design Brief

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

Parking Challenges and Trade-Offs

Buzzard Point / Reeves Building Swap

GATEWAY OFFICE PLAZA. Welcome to Gateway Office Plaza. 350 Burnsville Parkway Burnsville, MN 55337

MULTIPLE CHALLENGES REAL ESTATE APPRAISAL INDUSTRY FACES QUALITY CONTROL. Issues. Solution. By, James Molloy MAI, FRICS, CRE

STATEMENT OF SIGNIFICANCE

24-story, Class A Office Building Climate Control LEED Gold Certified Fire Life Safety Large, Efficient Floor Plates Elevators Ample Ceiling Height

ONE CAPITAL CENTER 999 MAIN STREET BOISE, ID ICONIC OFFICE & RETAIL SPACE FOR LEASE IN THE DOWNTOWN CORE

How Does the City Grow?

density framework ILLUSTRATION 3: DENSITY (4:1 FSR) EXPRESSED THROUGH BUILT FORM Example 1

CENTRE 205 FOR SALE - $6,136, SE 98TH AVE. PORTLAND, OR THOMAS MCDOWELL

VOLUME 24 NUMBER 2 JANUARY-MARCH 1994 RESIDENTIAL WILDWOOD GABLES ATLANTA, GEORGIA PROJECT TYPE

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Goal 1 - Retain and enhance Cherry Creek North s unique physical character.

600 W. St. Germain Street, St. Cloud, MN

For Lease THE SEACOAST BANK TOWER. 250 N. Orange Avenue, Ste Orlando, Florida Highlights

PLANNING COMMISSION REPORT Regular Agenda - Public Hearing Item

8730 King George Drive, Dallas, Texas OFFERING MEMORANDUM

Georgia Planning Association

Modern Tower Blocks and Apartment Neighbourhoods: Toronto s Urban Asset

66 Isabella Street Rezoning Application - Preliminary Report

Marina 89 Proforma (HUD loan)

Proposal to the City of Walnut Creek November 17, 2015 Riviera Family Apartments

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

ALPEN ADRIA CENTER - High Potential near Lake Wörthersee

property introduction

TORONTO COMMUNITY HOUSING - DEVELOPMENT PROGRAM Development and Redevelopment Projects Under Construction

MABRY MANOR - PROPERTY REPORT NOVEMBER Mabry Manor Tampa, FL

LeaseCalcs: The Great Wall

A 290-UNIT RESIDENTIAL DEVELOPMENT IN DOWNTOWN SAN JOSE

Proposed Acquisition of an Indirect Interest in One Raffles Place. 10 June 2015

CREEK ROAD PLACE - OFFICE BUILDING SALE

The Seagram Building, designed by Mies van der Rohe, continues to receive acclaim as New York s most prestigious office building and the finest

Housing and Economic Development Strategic Plan for Takoma Park OCTOBER 18, 2017

4.2.8 Westwood/VA Hospital Station Area

Chapter 10: Implementation

The Oasis at Druid Lake. Jeremiah Battle Fall 2016

For Sale. 931 Canal Street New Orleans, Louisiana ,000sf on 8 Floors $7,850,000

CREATIVE OFFICE/SHOWROOM SPACE DTLA LEASE OPPORTUNITY Adjacent to Fashion District & Arts District

2.2 72ND STREET STATION ENTRANCE ALTERNATIVES

PRESENCE. prominent k street frontage & 30th street entrance K Street commands attention. The trophy mixed-use development

601 NE 36TH STREET OFFICE CONDO FOR SALE MIAMI, FL

Department of Planning & Zoning

521 SW 11TH AVENUE PORTLAND, OREGON

H Street, NW Washington, DC

ARLINGTON COUNTY, VIRGINIA

United Nations Building Le Corbusier NYC 1952

Subway station improvements in Downtown Brooklyn and in commercial zones of 10 FAR and above in Manhattan (6/28/04)

The 12.1-net acre property is the premier development site in the western United States, sitting at the gateway of San Diego s Broadway office

Evolution of the Vision for NE 181st Street Study Area

Marina City Project Overview

OWN IN THE HEART OF MIDTOWN

Offering Memorandum. The Former P. Buckley Moss Museum and 10 Acres Development Site. Waynesboro, VA

Rents Up, Occupancy Steady

Date: May 8, Chair and Members Planning and Housing Standing Committee

PREMIER CLASS A PORTFOLIO

The building received the coveted America s Property Award in association with Bloomberg Television in the Best Mixed Use Development USA category.

The Carlyle Building. 521 SW 11th Avenue Portland, OR HISTORIC OFFICE BUILDING LOCATED IN PORTLAND S WEST END DISTRICT

DALLAS, TX 10,000 SF AMENITY FLOOR PANORAMIC DOWNTOWN VIEWS PRIME LOCATION LOBBY RESTAURANTS. World Cl ass property company

Director of Planning in consultation with the Director of Legal Services

REPORT. DATE ISSUED: December 19, 2014 REPORT NO: HCR Chair and Members of the San Diego Housing Commission For the Agenda of January 16, 2015

The Miramar Santa Monica

DALLAS, TX 10,000 SF AMENITY FLOOR PANORAMIC DOWNTOWN VIEWS PRIME LOCATION LOBBY RESTAURANTS. World Cl ass property company

1237 W. 7 th Street. DLANC: Planning and Land Use Committee Meeting. November 21, 2017 DIR DB-SPP ENV EAF

Infill Housing Analysis

MECKLENBURG MANOR APARTMENTSs A 51 UNIT MULTI-FAMILY INVESTMENT OPPORTUNITY 719 EAST FERRELL STREET, SOUTH HILL, VIRGINIA 23970

510 MAIN STREET WINNIPEG CITY HALL Green Blankstein Russell and Associates (Bernard Brown and David Thordarson, principal designers),

CAPITOL VIEWS FOR LESS CAPITAL

the truth about relifing assets

250 N. ORANGE AVE ORLANDO, FL FOR LEASE. Prime Downtown Orlando Office Space ORLANDO S NEWEST HOT SPOT FOR DOWNTOWN OFFICE TENANTS!

Nord Copenhagen.Projects 7

Dubai.Projects. The Fairmont Dubai. The Gate Dubai Dubai, United Arab Emirates Gensler office. Iris Bay Dubai International Financial Centre

SCOTIA PLAZA Building Specifications

Ashland City Hall Feasibility Study City Council Presentation Monday, October 17, 2016

White Paper of Manuel Jahn, Head of Real Estate Consulting GfK GeoMarketing. Hamburg, March page 1 of 6

UNION STABLES FIRST FLOOR RETAIL/RESTAURANT FOR LEASE

Les Saisons Sai Wan Ho Building Journal, June 2002

PROPERTY management. Case Studies

Date: May 8, Chair and Members Planning and Housing Standing Committee

CONSTRUCTION UPDATE. June 2012

Transcription:

VOLUME 25 NUMBER 15 JULY-SEPTEMBER 1995 OFFICE WASHINGTON MUTUAL TOWER SEATTLE, WASHINGTON PROJECT TYPE A 55-story, 1.5 million-square-foot office tower, developed on a steeply sloping, full city block in downtown Seattle. The project incorporates a historic building into its base and also has direct links to a bus tunnel under an adjacent street. The building, which is 98 percent leased, was completed in April 1988. SPECIAL FEATURES Public plaza and atrium Direct access to transit tunnel Views of Elliott Bay Inclusion of historic structure Skyscraper DEVELOPER Wright Runstad & Company 1191 Second Avenue, Suite 2000 Seattle, Washington 98101-2933 206-447-9000 ARCHITECTS Kohn Pederson Fox Associates, P.C. 111 West 57th Street New York, New York 10019 213-977-6500 Mahlum & Nordfors McKinley Gordon 2505 Third Street, Suite 219 Seattle, Washington 206-441-4151 STRUCTURAL ENGINEER KPFF Consulting Engineers, Inc. 1201 Third Avenue, Suite 900 Seattle, Washington 98101 206-622-5822

GENERAL DESCRIPTION Washington Mutual Tower, a 55-story stone and emerald-glass office tower, sits on a full city block in downtown Seattle's financial district. While not the tallest building in Seattle, it is certainly the most distinctive, having been enthusiastically received by the community when it opened. Washington Mutual Tower features 1,098,536 gross square feet of office space (1,012,620 net rentable area), 129,096 gross square feet of retail/atrium space, and 264,481 gross square feet of underground parking for 810 cars, sufficient for office tenants by day and the nearby Seattle Art Museum and other attractions on evenings and weekends. The developer and the local transit authority, Metro, worked together to create access to a transit station at the building for the mile-long bus tunnel running beneath Third Avenue. Despite a market downturn, the office tower achieved 95 percent occupancy within the first three years. THE SITE AND DEVELOPMENT PROCESS The 895-foot office tower at 1201 Third Avenue sits on a steeply sloping, full-block site. The Second Avenue side of the building is actually 35 feet lower than the main address on Third Avenue. With 55 stories and a six story rooftop structure, Washington Mutual Tower is Seattle's second tallest building; Columbia Seafirst Center, at 76 stories, is the tallest. Located in the financial core of downtown and three blocks from the waterfront, the site offers both a strategically attractive location and commanding views. To the south and east of the site are several smaller office buildings. To the north is an entrance to the Seattle Metro transit tunnel and the future home for the Seattle Symphony. To the west is the new Seattle Art Museum and two low-rise buildings. Under a 23-year ground lease with the estate of the former owner, Wright Runstad renovated the latter two buildings, filling them with office and ground level retail tenants. This was done, in part, to upgrade the neighborhood and also to preserve the views of Elliott Bay for tenants of Washington Mutual Tower. The building site was acquired over an eight-year period from 1978 to 1985. Planning and leasing started in 1985, with construction starting in October 1986. The project was completed in just 18 months, by April 1988. The development concept for Washington Mutual Tower arose from three objectives: to create a new landmark for Seattle that would make a positive contribution to the skyline; to develop an office building that would command a premium in the market and outperform its competitors; and to meet the office space needs of the city's large, prestigious tenants. At the time that Washington Mutual Tower was constructed, development controls for office development in the downtown area involved a density bonus system. The developer was permitted, as of right, to build 27 stories. It then was able to add 13 floors because of a $2.5 million donation to build low- and moderate-income housing units, one additional floor for the on-site entrance to the transit tunnel, 3.5 floors for the public plaza and public atrium, two extra floors to compensate for nonrentable mechanical space, one floor for providing the daycare center, two additional stories that were lost to the sculptured rooftop, two floors for providing retail space within the building, and three stories for providing an outdoor public escalator to help pedestrians climb Seattle's hills and a garden terrace open to the public. A CAP (Citizens' Alternative Plan for Downtown Development) Initiative has subsequently restricted new downtown buildings to approximately 500,000 square feet, or one third the size of Washington Mutual Tower. Washington Mutual Tower is owned by Wright Runstad & Company, the developer; Perkins Coie, the largest law firm in Seattle and the lead tenant; and a subsidiary of Deutsche Bank of Germany. The financing structure includes a significant amount of equity. Long-term debt, provided by Deutsche Bank Capital Group, is in place to the year 2003 at very favorable interest rates. PLANNING AND DESIGN

Washington Mutual Tower, a modern building with classical references, was the first northwest building for New York architects Kohn Pederson Fox. The tripartite organization of the tower suggests a classical column with a base, a shaft, and a capital. A major challenge in designing the three-level base was to create a space that was open and inviting; the base features a formal entry on the east side of the building, followed by a series of transitions to the public atrium level, eventually arriving at the outdoor plaza on the west side of the building. The historic 1910-vintage Brooklyn Building, with its Romanesque arches, is incorporated into this base structure and frames one side of the plaza. The tower itself was placed six feet south of center to allow the Brooklyn Building to retain its integrity and still be a part of the public space; this solution also was in deference to the owner of the Seattle Tower office building on Third Avenue, which was concerned with view blockage. During construction, the north and west facades of the Brooklyn Building were held up by an elaborate steel truss while the rest of the building was demolished. A south facade was created to be a replica of the two remaining facades, and a foundation was poured underneath all the facades. The basement walls of the tower are shotcrete, which involves spraying a dense mixture of concrete at high pressure to adhere to the vertical wall of the excavation. In this way, the 2.5-foot-thick walls were constructed in a substantially shorter period of time than the traditional method, which involves constructing timber forms beforehand. The square base of the tower serves as a pedestal from which emerges a smaller square tower, which contains a cylindrical shaft. Toward the top of the building, the cylindrical shape and the corners are eliminated, revealing a cruciform shape, which is topped by a pyramid crown. The granite siding for Washington Mutual Tower was quarried in Brazil, cut into slabs in Italy, and fabricated in Tacoma, Washington. Floor plates range from 17,000 square feet to over 29,000 square feet. In the years since the building was constructed, floor plates in Seattle buildings are being reduced in size to accommodate a somewhat smaller tenant on a full floor. The 22 elevators at Washington Mutual Tower serve four vertical zones within the tower, and a separate elevator system connects the plaza levels with the garage. A trip from the ground level to the 55th floor takes approximately 24 seconds. Seattle's transit authority, Metro, had been developing its mile-long bus tunnel beneath Third Avenue as Washington Mutual Tower was being constructed. The tunnel abuts the tower's foundation and has a station connected to the street level in the tower. Significant coordination was needed because of the adjacency of the construction; in fact, the developer provided an easement to the transit authority. LEASING AND MARKETING Washington Mutual Tower was 35 percent preleased prior to construction, 65 percent leased at opening, and achieved 95 percent occupancy approximately three years after opening. Currently the tower is 98 percent leased and has experienced a high rate of renewals. Originally called 1201 Third Avenue, the building was renamed Washington Mutual Tower when Washington Mutual Bank leased over 160,000 square feet in the tower. At that time, the entire building already had been 65 percent leased. Since there were three other office buildings under construction in Seattle at the time Washington Mutual Tower was being built, and since the developers realized that the Seattle office market was deteriorating, an aggressive marketing program was employed to get the building leased quickly. The primary challenge was to gain market advantage by opening first. The developer was able to accelerate the entire development schedule, including construction; the tower was built in 18.5 months and opened a year earlier than any of its competitors. Two competitors, which opened in 1989, have only recently achieved 85 to 90 percent occupancy. The third competitor, which opened in 1990, remains at 65 percent occupancy. It is estimated

that Washington Mutual Tower commands a $2 to $4 premium per square foot over its competitors, largely due to the timing of its opening and its overall design quality. The tenant roster has been very stable since initial leaseup because of initial long-term leases and a high percentage of lease renewals. The few tenant losses that have occurred since the five-year mark primarily have been caused by the lack of available space for tenant growth needs. Retail and service tenants include a 7,627-square-foot restaurant, a 2,046-square-foot art gallery, an antique shop, a fitness center, and a child care center. The developer contributed space and all construction costs for the YWCA child care center. The center provides services on a sliding scale to make it available to the full income range of employees in the building. The building also sponsors annual festivals and frequent lunchtime concerts in the plaza, and the atrium is often booked in the evenings with a variety of public and private events. The building has won numerous awards, including a 1994 ULI Award for Excellence. In addition, in March 1993 the tower was named number one in a "best buildings" poll of Seattle Post-Intelligencer readers. EXPERIENCE GAINED Since the developer has planned to hold the property in its own portfolio, it did not offer any significant rent concessions to tenants, even though the building was competing with three other buildings coming on the market at about the same time. The lack of concessions did not put the project at a disadvantage. Although there are approximately 3,500 employees at Washington Mutual Tower, the developer did not anticipate fully the amount of pass-through traffic in the building, estimated at 17,000 foot-trips daily. The foot traffic results from a combination of Seattle's hilly terrain and its rainy weather, which encourages people to take escalators and elevators under cover rather than walking the hill. The result has been higher than expected maintenance costs.

PROJECT DATA LAND USE INFORMATION Site Area: 1.3 acres Gross Building Area (GBA): Office 1,098,536 Retail/Lobby/Common Area 129,096 Parking 264,481 Penthouse (mechanical) 17,862 Total 1,509,975 Net Rentable Area (NRA): Office 1,012,620 Retail 35,810 Total 1,048,430 Floor Area Ratio: 19.7 Typical Floor Size: 17,146 to 29,947 square feet Total Parking Spaces: 810 OFFICE TENANT INFORMATION Percent of NRA Occupied: 98 percent Average Annual Rents: $21.77 per square foot Average Length of Lease: 5 to 10 years Typical Terms: Base rents subject to increases in operating expenses and taxes. MAJOR OFFICE TENANTS SquareFeet Perkins Coie (legal) 175,466 Washington Mutual (bank) 166,000 Simpson Investment 47,000 Dain Bosworth (brokerage) 39,000 Stewart Title 30,000 Prudential Bache (brokerage) 21,000 RETAIL TENANT INFORMATION Percent of GLA Occupied: 100 percent Number of Tenants: 11 Average Tenant Size: 300 to 8,500 square feet Annual Rents: $16 to $32 per square foot Average Length of Lease: 5 years Typical Terms of Lease: Base rent subject to increases in operating expenses and taxes plus percentage rent.

DEVELOPMENT COST INFORMATION Site Acquisition Cost: $ 21,520,000 Construction Cost: 94,633,000 Tenant Improvements: 41,084,000 Soft Costs: 25,875,000 Total Development Cost: $185,690,000 Total Development Cost per Gross Square Foot: $122.98 ANNUAL OPERATING EXPENSES (Estimate For 1995) Energy $ 712,642 Cleaning 1,280,795 Electrical 67,550 HVAC 124,690 Plumbing 13,300 Other utilities 116,910 Elevators 311,915 General building 908,072 Administration (includes management fee) 1,252,839 Common area alterations 229,250 Other repairs 107,100 Insurance 151,979 Other taxes 220 Lighting retrofit amortization 190,592 Real estate taxes 1,757,632 Total $7,225,487 DEVELOPMENT SCHEDULE Planning Started: 1985 Site Purchased: 1978 to 1985 Construction Started: October 1986 Leasing Started: 1985 Project Completed: April 1988 DIRECTIONS From Seattle-Tacoma International Airport: Take Interstate 5 north to Seneca Street (left exit 165). Follow Seneca Street to Third Avenue. Building is on the northwest corner of Seneca Street and Third Avenue. DrivingTime: 20 minutes in non-peak-hour

The Project Reference File is intended as a resource tool for use by the subscribers in improving the quality of future projects. Data contained herein were made available by the Development team and constitute a report on, not an endorsement of, the project by ULI - The Urban Land Institute. Copyright 1995, 1997, by ULI - the Urban Land Institute 1025 Thomas Jefferson Street, N.W. Ste. 500w, Washington, D. C. 20007-5201

DOCUMENT IMAGES