FREEHOLD BOROUGH SCHOOL DISTRICT. Proposed Referendum Schematic Designs & Preliminary Costs

Similar documents
New Hope-Solebury School District Campus Revitalization Plan

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update

2016 Referendum. Board of Education Meeting! January 11, 2016!

CUMBERLAND SCHOOLS WORK PROPOSED 2018

Oxford Central School District Referendum Fact Sheet

Tisbury Elementary School

RGM Architects. Eduardo Mata Elementary School

FORMER EDUCATIONAL FACILITY HOAGLAND RD., HOAGLAND, IN FOR SALE PROPERTY HIGHLIGHTS FOR SALE: $275,000

Building Re-use Presentation. A look at City Hall, the Police Station and the Briscoe Building. December 6, 2016

F A C I L I T I E S P L A N N I N G & C O N S T R U C T I O N

Chattanooga, TN Chad Wamack, Broker

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

OPTION 1 MAX RENOVATION/ADDITION

POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013

SAMER NESSIEM P O T F O L I O SAMER NESSIEM P O R T F O L I O. Architecture is creation of balanced environment for human ARCHIECT

BB&T OFFICE TOWER, 7TH FLOOR SPACE FOR LEASE

HIGHTSTOWN MUNICIPAL COMPLEX

A COMPLETE REDEVELOPMENT - A NEW NORTH. Plaza North. 90th & Fort St. - Omaha,NE

Rental Rate: $2.00/SF + Utilities & Janitorial. Total building size: 8,243 SF (100% Leased)

INDUSTRIAL BUILDING AND LOT

2229 North Charles Street. Floors 2-4 currently occupied by owner. Owner will consider leasing back floors. Renovated in 2005 and 2014

NYC Department of Education

UNIT A. Floors 14, 16-19, 21-26* 2 Bedroom 2.5 Bath 2,440 Interior SF. A BEDROOM 2 18'-1" x 12'-0" 4'-6" x 10'-6"

Waverley Elementary School Feasibility Study

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers

September 11, Radnor Township Board of Commissioners Presentation. The Willows Mansion

Steven McCormack. Professional Portfolio

REQUEST FOR QUALIFICATIONS AND PROPOSAL NEW POLICE STATION, LEDYARD, CONNECTICUT Bid # (Due: 2:00pm on August 30, 2013)

PROGRAM AREAS - MIDDLE SCHOOL

MEDICAL SPACE FOR LEASE. Olympia Shopping Center Columbus Ave, Lebanon, OH Lease Brochure

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017

Office 5,732 SF. 110 North 26th Street Harrisburg, Pennsylvania For more information: Aaron Albright x190

PROPERTY ADDRESS COMMERCIAL OFFICES BEAVER HILL CONDOMINIUMS SOUTH BUILDING 100 WEST AVENUE JENKINTOWN, PA 19046

FOR LEASE OLD PORT OFFICES

Higley-University Apartments 5233 E UNIVERSITY DRIVE, MESA, AZ

100% LEASED OFFICE BUILDING FOR SALE 450 GRANT STREET AKRON, OHIO ADJACENT TO UNIVERSITY OF AKRON

NOBEL EXECUTIVE CENTER

NEW LIFE & MODERN VISION

Washington Municipal Building- Feasibility Study

NOBEL EXECUTIVE CENTER

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

2250 E. Victory Drive (Village Square)

FOR SALE/LEASE SOUTH DUKE STREET LANCASTER, PA Monster Real Estate.com, LLC. Industrial/Commercial Realtors

NYC Department of Education

NOTICE TO TAXPAYERS. Public Hearing Place: N State Road 159, Bicknell IN 47512

LEGACY TOWER OFFICE SPACE AVAILABLE. $11 Million in Capital Improvements Underway in West Chapel Hill Street Durham, NC 27701

FUMC Research Task Force Site Visit Report Westminster Presbyterian Church, Alexandria April 14, 2015

THE TOWER AT MUTUAL PLAZA

Facilities. A Brief Overview: How to Secure a Facility for Your. Charter School

FOR SALE/LEASE SOUTH DUKE STREET LANCASTER, PA Monster Real Estate.com, LLC. Industrial/Commercial Realtors

Athletics AT-SR. Storage 181E. 272 Auditorium 182F. Storage. 182D Nurse. 181K Workroom. 182G Cot Room 182E. Office. Restroom. Restroom.

PLAZA De TORRE 3634 E MONTE VISTA RD., PHOENIX, AZ

Executive Park Executive Park Dr Cincinnati, OH 45241

RENOVATIONS COMING SOON

12325 EMMET STREET. $9.50 psf NNN 17,754 SF OFFICE FOR LEASE Emmet Street Omaha, Nebraska * * CERTIFIED *

Pocatello High School New Building Addition Board Interview

Prime Northwest gainesville parcel

Facility Acquisition- Beyond Compliance

1450 TECHNOLOGY LANE 1450 Technology Lane, Petaluma, CA 94954

Corvallis School District 2002 Long Range Facilities Master Plan Projects Update

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016

Multi-family Asset - 84 Units $7,000,000

3461 Market Street. Office 999-1,858 SF. For more information: Nik Sgagias x154 Property Features.

LEGACY TOWER OFFICE SPACE AVAILABLE. $11 Million in Capital Improvements Underway in West Chapel Hill Street Durham, NC 27701

MEMORIAL UNION: PLANNING FOR THE FUTURE. WTW Architects November 30, 2016 presentation to the Steering Committee

GARFIELD POOL PROJECT PUBLIC ART PROJECT OUTLINE

San Elijo Hills TOWN CENTER ~ RESTAURANT OPPORTUNITIES ~ San Elijo Hills. Retail Center, LLC San Elijo Road San Marcos, California

M E E T I N G NOT E S

Old Port Moulton Block

ROOM NUMBERING STANDARDS

M001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE

Floor and Room Numbering Guidelines

For Sale Broadway Lemon Grove, CA. Owner User/Investor Value Add Opportunity

12325 EMMET STREET. $1,900, ($ psf) 17,754 SF OFFICE FOR SALE Emmet Street Omaha, Nebraska * * CERTIFIED *

SAMMAMISH COMMUNITY CENTER FEASIBILITY STUDY

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT

FOR SALE/LEASE SOUTH DUKE STREET LANCASTER, PA Monster Real Estate.com, LLC. Industrial/Commercial Realtors

A001 DEMOLITION SITE PLAN A001 1:300 ADDITION DICKINSON DRIVE INGLESIDE, ONTARIO CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO

SECTION F: Facilities Development

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

FAIRFIELD INN & SUITES

LEASE SPACES AVAILABLE OFFICE/RETAIL

property introduction

For more information, please contact: Michael Hagerty

APN ( acres) and APN (10.03 acres) FAQ s

1221 Hartzell Street New Haven, Indiana

Chapter 3. Planning Options

MIDTOWN RALEIGH OFFICE BUILDINGS FOR SALE 3948 BROWNING PL, 3900 MERTON DR

LEASE SPACES AVAILABLE OFFICE/RETAIL

PLANNING APPLICATION (REVISION 2.1)

FLAGLER-WHITEHALL PROFESSIONAL CENTER

LEASE SPACES AVAILABLE OFFICE/RETAIL

SPECIAL VALUATION APPLICATION JULY, 2015 JULY 2016

ROW DWELLINGS BLDG NO UNIT NO VALUE ( $1,000 ) UNITS DESCRIPTION HARVARD RD , HARVARD RD ,

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016

(Published in The Iola Register on February 26, 2019, and March 5, 2019)

Charles Kozminski Elementary Community Academy

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

THREE CENTRE PARK OFFICE / MEDICAL CONDOMINIUMS FOR SALE

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning

Transcription:

FREEHOLD BOROUGH SCHOOL DISTRICT Proposed Referendum Schematic Designs & Preliminary Costs

Introduction The foundation of every state is the education of its youth. - Diogenes Laertius Greek Philosopher Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 2

Demographic Study Performed by Whitehall Associates, Inc. on 7/3/2013 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 3

FREEHOLD BOROUGH SCHOOL DISTRICT Freehold Learning Center Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 4

Freehold Learning Center EXISTING STUDENT CAPACITY (Pre-K thru 2 ND Grade): Total Existing Building Area = 50,164 SF NJDOE Allowable Area Per Student = 125 SF Total Building Student Capacity = 50,164 SF / 125 SF = 400 Students PROJECTED UN-HOUSED STUDENTS 2017 / 2018 Demographics projects enrollment of 626 Students Total Un-housed Students = 626 400 = 226 Un-housed Students ALLOWABLE BUILDING AREA Total Additional Area Allowed = 226 x 125 = 28,250 SF Note: 125 is the NJDOE allowable square foot area per student Total Estimated Area Of Proposed Additions = 19,426 SF Total Proposed Area is Eligible for Funding by the NJDOE Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 5

Freehold Learning Center THREE ADDITIONS - ONE FLOOR EACH LARGE CLASSROOM WING DESIGNED FOR FUTURE SECOND FLOOR KINDERGARTEN EXPANSION WING NEW KITCHEN AND BUILDING RECEIVING FACILITY STUDENT CAPACITY: GRADE 2017 / 2018 DEMO. DESIGN PROVIDED STUDENTS NO. OF LEVEL STUDENT ENROLL. STUDENT CAPACITY PER ROOM ROOMS Pre-kind. 59 60 15 4 Kindergarten 185 189 21 9 1st grade 194 210 21 10 2nd grade 188 189 21 9 ESTIMATED AREA OF ADDITIONS & RENOVATIONS: - NEW ADDITIONS = 19,426 SQUARE FEET - MAJOR RENOVATIONS = 32,705 SQUARE FEET Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 6

Freehold Learning Center TOTAL A PROJECT COST: = $6,749,600.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 7

Freehold Learning Center Additional Work: Fire Alarm Repl. Public Address System Replacement Technology Upgrades Utility Upgrades Adding Gas Service TOTAL A PROJECT COST: = $6,749,600.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 8

Freehold Learning Center TOTAL A + B PROJECT COST: = $10,633,300.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 9

Freehold Learning Center Additional Work: Fire Alarm Repl. Public Address System Replacement Technology Upgrades Utility Upgrades Adding Gas Service TOTAL A + B PROJECT COST: = $10,633,300.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 10

Freehold Learning Center TOTAL A + B + C PROJECT COST: = $18,603,900.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 11

Freehold Learning Center Additional Work: Fire Alarm Repl. Public Address System Replacement Technology Upgrades Adding Sprinkler Sys. Utility Upgrades Plumbing, HVAC & Electrical Equipment Replacement Adding Gas Service TOTAL A + B + C PROJECT COST: = $18,603,900.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 12

FREEHOLD BOROUGH SCHOOL DISTRICT Park Avenue Elementary Freehold Intermediate Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 13

Park Avenue Elementary / Freehold Intermediate EXISTING STUDENT CAPACITY (3 RD Grade thru 8 TH Grade): Total Existing Building Area = 96,805 SF NJDOE Allowable Area Per Student = 129.5 SF Total Building Student Capacity = 96,805 SF / 129.5 SF = 748 Students PROJECTED UN-HOUSED STUDENTS 2017 / 2018 Demographics projects enrollment of 951 Students Total Un-housed Students = 951 748 = 203 Un-housed Students ALLOWABLE BUILDING AREA Total Additional Area Allowed = 203 x 129.5 = 26,288 SF Note: 125 is the NJDOE allowable square foot area per student Total Estimated Area Of Proposed Additions = 27,548 SF 95% of Proposed Area is Eligible for Funding by the NJDOE Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 14

District Administration Offices PROJECTED ENROLLMENT 2017 / 2018 Demographics project 1,575 Students for District ALLOWABLE BUILDING AREA Allowance of 2.17 SF per FTE Students per Title 6A:26 Total Area Allowed for District Offices = 2.17 X 1,575 = 3,418 SF Total Estimated Area Of Proposed Addition = 2,431 SF Total Proposed Area is Eligible for Funding by the NJDOE Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 15

Park Avenue Elementary / Freehold Intermediate SIX ADDITIONS - ONE FLOOR EACH LARGE ADDITION CLASSROOMS, NEW LIBRARY MEDIA CENTER, NEW GYMNASIUM / LOCKER RMS CAFETERIA ADDITION CAFETERIA EXPANSION, NEW KITCHEN AND RECEIVING PAE SECURED ENTRANCE NEW VESTIBULE, NEW MAIN OFFICE RECEPTION FIS SECURED ENTRANCE NEW VESTIBULE AND LOBBY TECHNOLOGY SERVICES EXPANSION TECHNOLOGY STORAGE, TECHNOLOGY REPAIR ADMINISTRATION ADDITION BOARD OF EDUCATION OFFICES, SPECIAL SERVICES OFFICES STUDENT CAPACITY: GRADE 2017 / 2018 DEMOGR. DESIGN PROVIDED STUDENTS NO. OF LEVEL STUDENT ENROLL. STUDENT CAPACITY PER ROOM ROOMS 3rd grade 183 189 21 9 4th grade 150 184 23 8 5th grade 158 184 23 8 6th grade 161 161 23 7 7th grade 147 161 23 7 8th grade 152 161 23 7 ESTIMATED AREA OF ADDITIONS AND RENOVATIONS: NEW ACADEMIC ADDITION NEW DISTRICT ADMIN. ADDITION MAJOR RENOVATIONS MINOR RENOVATIONS = 27,548 SF = 2,431 SF = 14,955 SF = 2,136 SF Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 16

Park Avenue Elementary / Freehold Intermediate TOTAL A PROJECT COST: = $10,756,200.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 17

Park Avenue Elementary / Freehold Intermediate Additional Work: Corridor Locker Replacement Partial A/C Installation(FIS) Fire Alarm Repl. Public Address System Repl. Technology Upgrades Utility Upgrades Adding Gas Service TOTAL A PROJECT COST: = $10,756,200.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 18

Park Avenue Elementary / Freehold Intermediate TOTAL A + B PROJECT COST: = $22,091,500.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 19

Park Avenue Elementary / Freehold Intermediate Additional Work: Corridor Locker Replacement Total A/C Installation Fire Alarm Repl. Public Address System Repl. Technology Upgrades Utility Upgrades Electric Service Upgrade Plumbing, HVAC & Electrical Systems Repl. Adding Gas Service TOTAL A + B PROJECT COST: = $22,091,500.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 20

Park Avenue Elementary / Freehold Intermediate TOTAL A + B + C PROJECT COST: = $25,285,800.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 21

Park Avenue Elementary / Freehold Intermediate Additional Work: Corridor Locker Replacement Total A/C Installation Fire Alarm Repl. Public Address System Repl. Technology Upgrades Adding Sprinkler Sys. Utility Upgrades Electric Service Upgrade Plumbing, HVAC & Electrical Systems Repl. Adding Gas Service TOTAL A + B + C PROJECT COST: = $25,285,800.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 22

Total Combined Preliminary Costs, by Option OPTION 'A' FREEHOLD LEARNING CENTER $6,749,600.00 PARK AVENUE ELEMENTARY / FREEHOLD INTERMEDIATE $10,756,200.00 TOTAL = $17,505,800.00 ALT. OPTION - PAE/FIS A and FLC A + B FREEHOLD LEARNING CENTER ( A + B ) $10,633,300.00 PARK AVENUE ELEMENTARY / FREEHOLD INTERMEDIATE ( A ) $10,756,200.00 TOTAL = $21,389,500.00 OPTION 'A'+'B' FREEHOLD LEARNING CENTER $10,633,300.00 PARK AVENUE ELEMENTARY / FREEHOLD INTERMEDIATE $22,091,500.00 TOTAL = $32,724,800.00 OPTION 'A'+'B'+'C' FREEHOLD LEARNING CENTER $18,603,900.00 PARK AVENUE ELEMENTARY / FREEHOLD INTERMEDIATE $25,285,800.00 TOTAL = $43,889,700.00 Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 23

THANK YOU / ANY QUESTIONS? Proposed Referendum Schematic Designs & Preliminary Costs 2/10/14 Slide 24