FUMC Research Task Force Site Visit Report Westminster Presbyterian Church, Alexandria April 14, 2015

Similar documents
17 N Centre Ave Leesport, PA 19533

Waverley Elementary School Feasibility Study

CUMBERLAND SCHOOLS WORK PROPOSED 2018

Renovation Progress. July 21 Aug 3, Week 42 & 43

Fairlington Presbyterian Church Proposed Affordable Housing. Neighborhood Presentation May 23, 2017

ASBESTOS PERIODIC SURVEILLANCE CHECK LIST

New Owner Guide THE DEVELOPMENT

RFQ # Award of MTW Local Housing Assistance Program Funding to Existing Units. Addendum #1 Date issued and released, August 25, 2016

Renovation Progress. Apr , Week 29

If the address on this form is different than the address of the building, submit a written explanation.

Renovation Progress. June 2-15, Weeks 35 & 36

New Hope-Solebury School District Campus Revitalization Plan

Tenant Involvement in Governance. Workshop Notes. Ballymena Workshop notes 19/10/2016. Attendance

FOR SALE 3520 and 3533 Watson Rd, St. Louis, MO 63139

N.C. Housing Finance Agency

2019 Committees. *BOARD LEADERSHIP FORUM Encourages the exchange of ideas and information among leadership from local boards/associations.

Urban Redevelopment Through Adaptive Reuse: From Blight to Bright

If the address on this form is different than the address of the building, submit a written explanation.

September 11, Radnor Township Board of Commissioners Presentation. The Willows Mansion

SAMER NESSIEM P O T F O L I O SAMER NESSIEM P O R T F O L I O. Architecture is creation of balanced environment for human ARCHIECT

How To Organize a Tenants' Association

Accelerated ROW Process for Sidewalks FAQ s

Explain in writing if the address of the building is different than the address on this form:

VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN

July 10, Mayor Lisa Helps & Council City of Victoria 1 Centennial Square Victoria BC V8W 1P6

Prime Northwest gainesville parcel

HIGHTSTOWN MUNICIPAL COMPLEX

FREEHOLD BOROUGH SCHOOL DISTRICT. Proposed Referendum Schematic Designs & Preliminary Costs

ISSUES MOBILIZATION GUIDANCE DOCUMENT

Chapter 5: Testing the Vision. Where is residential growth most likely to occur in the District? Chapter 5: Testing the Vision

VV&W Home Selling Guide

4 Questions to ask before you hire Dave Steinberg!

Aesthetic value This modern building is typical design for its date and has low aesthetic value.

CORDOVAN PARK W I-20, Arlington PROPERTY REPOSITIONING Case Study

Kitchen and Guild Hall Rental Request Form

203k U N D E R S T A N D I N G A G U I D E T O H O M E O W N E R S H I P

PROPERTY ADDRESS COMMERCIAL OFFICES BEAVER HILL CONDOMINIUMS SOUTH BUILDING 100 WEST AVENUE JENKINTOWN, PA 19046

CONSIDERATIONS. Public Process. Project Advisory Committee Meetings: Other Opportunities: Comment Period: Project Website, Public Displays, E-Blasts

General Statement Regarding Assessment Analysis Recommendations

Architectural Process & Standard for Parish Construction Project Canons of the Episcopal Church in the Diocese of Alabama: Canon 6 Section 6

3-200 R-2 RESIDENTIAL DISTRICT, TWO DWELLING UNITS/ACRE

SETX Environmental, Inc. Environmental Consulting & Testing Asbestos - Mold Lead ESA s

GLENN SQUARE. Direct (907) akcommercialproperties.com

Site & Architectural Design Study for the Conversion of Parking Lots

DESCRIPTION OF IMPROVEMENTS

State and Metropolitan Administration of Section 8: Current Models and Potential Resources. Final Report. Executive Summary

Internal Audit Report

Chapter 24 Saskatchewan Housing Corporation Housing Maintenance 1.0 MAIN POINTS

Church Renovation, Remodeling, Master Planning, Real Estate Transactions, & Construction

SMALL CLAIMS COURT OF NOVA SCOTIA Cite: Nova Scotia Ltd. v. MacNeil, 2018 NSSM Nova Scotia Limited Appellant

CUDAHY MUNICIPAL CODE

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning

NAVAL AIR STATION (NAS) PATUXENT RIVER Potential EUL Project Proposed Modernized Work Campus

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

Housing Commission Report

PROGRAM AREAS - MIDDLE SCHOOL

PLANNED AND RESPONSIVE MAINTENANCE POLICY

Terms of Reference for the Regional Housing Affordability Strategy

Grand Clifton Masterpiece Mayfield Building for Sale

Neighborhood Stabilization Program Public Meeting Flagler County Government Services Building, Board Chambers February 25, :00 p.m.

THE CONSUMERS GUIDE TO REAL ESTATE STAGING

DATE: July 11, Ron Davis, City Manager/Executive Director

Top Leasing Tips for Corporate Space Tenants

HERSHEY COMMUNITY CENTER

Commercial Real Estate Loan Application CHURCH LOANS

WORK PROJECTS NAVAJO BIC MISSION 240 HWY 57 * BLOOMFIELD NM Phone: Website: navajobic.

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013

I became responsible for the management of the Plaza on DeWitt Condominium Association

2,955 SF Upstairs Office Available

Affordable Rental Housing Design Guidelines

CHANGE IN VALUE ALTERATIONS MADE OCCUPANCY CHANGES

Walking First-Time Homebuyers through the Building Process

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE

PROPERTY management. Case Studies

LEASE OF CHURCH REAL PROPERTY In the Episcopal Diocese of Long Island. Policies, Procedures and Practices

Approval of Takoma Amended Joint Development Agreement

THANK YOU FOR VIEWING!

ARLINGTON COUNTY, VIRGINIA

ARTICLE II: CELLULAR ANTENNA TOWERS

Resident Directed Positive Vision for Redevelopment

HERSHEY COMMUNITY CENTER

TITLE 5 ISSUES THAT DON T GO AWAY (no matter how hard you try!)

5 Keys. To Increase Your Wealth in 2012 COACHING

KERN COUNTY COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATION

M E E T I N G NOT E S

TOWN OF PALM BEACH LANDMARKS PRESERVATION COMMISSION 360 South County Road, Palm Beach, FL APPLICATION FOR CERTIFICATE OF APPROPRIATENESS

With projections for Strategic Plan

Minnesota Housing Capital Investment Overview

Alan D. Sugarman Attorney At Law. June 10,

Item 7.1, June 29, 2004 ACQUISITION OF THE GLOBAL PHOTON PROPERTY FOR THE GUADALUPE RIVER PARK

UNIFORM APPRAISAL DATASET

THOMAS CENTER PHYSICAL IMPROVEMENTS

The City of Boise Building Excellence Awards

City and Grant Funding Sources for Affordable Housing Activities

Renovation Progress. Nov. 4 9, Week 57

ULI MN Regional Council of Mayors Housing Initiative 2017 Work Plan

GREATER SYRACUSE PROPERTY DEVELOPMENT CORPORATION DISPOSITION OF REAL AND PERSONAL PROPERTY POLICY

Shoreview Corporate Center

Urban Planning and Land Use

Transcription:

FUMC Research Task Force Site Visit Report Westminster Presbyterian Church, Alexandria April 14, 2015 General Westminster Presbyterian Church was built in three phases, like Fairlington UMC: original sanctuary in 1942; new sanctuary in 1952; and Education wing in 1965. In addition, a new lobby and elevator were added in 1995. Tour included a walk-through of the entire facility, except for the preschool which was in session. General Observation (see design section for more details): HVAC system and asbestos removal throughout facility were major drivers of their renovation. Sanctuary was key part of renovation. Hardly any changes made to fellowship hall or the kitchen. Footprint for the Sunday school classrooms and most other meeting spaces was not changed during their renovation modifications to these areas were more minor in scope. No additional entranceway changes were made. Westminster never considered leveling the existing structure. Would note that other than main hall entrance to sanctuary, little was done to open up other classroom and meeting room hallways just like our facility, the space is sprawling and a bit fragmented, with numerous floors (3 in one wing, 4 in another). Questions Mission & Values How did your missions and values influence the need for physical renovation/expansion? Main driver of their renovation was the old HVAC system, due to deferred maintenance. No missions or community groups were mentioned as main drivers of the renovation. What steps did you take to achieve congregational consensus about a renovation plan? Showing them the plans and drawings for the project. In what way(s) did you design your facility to further your missions and values? Maintained a space on 4 th floor for Boy Scout troop that had met in facility since 1942. What past or current partnerships influenced your need to redevelop and design your facility? How are these partnerships faring today? 1

How has your renovation/expansion furthered your missions and values and strengthened your partnerships? Main groups that use space were there before, e.g., Boy Scouts, AA meetings, garden club. Have you forged new partnerships due to your expansion/renovation and how have they furthered your missions and values? None mentioned. Design Please walk us through the major renovations made to your facility. What has changed to achieve your current and long term vision? Asbestos: Renovation included complete asbestos abatement throughout the facility, including tearing up the floors. HVAC: New central air system that circulates to sanctuary, classrooms, and main meeting areas. They no longer have any portable air conditioning units in the facility. Sanctuary: Was a major focus area of the renovation, including ripping out the ceiling, enlarging the chancel area, angling the pews, and adding lighting and sound features. This involved taking apart the organ and rebuilding into smaller pipe chest areas due to the chancel redesign, and removing about 4 rows of pews to make room for the larger chancel. Pews were stored during project. Sound acoustics were also important; had an acoustician come in and due testing, and the ceiling redesign was done with acoustics in mind. Custom cabinets built to store bell cases. Windows: Entire facility got new windows. Entrance: One main entrance off parking lot just like Fairlington, and it does not go right into sanctuary. They considered a new entrance way nearer the sanctuary, but instead kept the current configuration. Instead, Westminster created a wider hallway to the sanctuary, a portion of which includes an updated library with open glass. Reception staff was moved into what used to be the old library. Staff Offices: On third floor. Used to be one open area, but during the renovation they created walled offices for staff, including one swing space for volunteers. Fellowship Hall: Only work done was asbestos removal. Kitchen: Only minor changes done. 2

Conference Rooms: Already had two conference rooms (one on top of other on adjoining floors) prior to renovation. During renovation, the spaces had floors carpeted, new paint, and some new acoustic wiring, though the wiring still needs additional updating. Classrooms: No structural changes were made to classrooms, i.e., no walls taken down, nor were hallways changed. All classrooms had asbestos treatment, painting (sometimes by Eagle Scouts or other volunteers), new tile or carpet, new lighting, and storage (some builtins into walls and some custom cabinetry). How did you preserve historic or traditional space while also integrating new, modern spaces that help with special services, meetings, & events? Chapel was maintained, with new carpeting and lighting. Note that Chapel and parlor constitute their original sanctuary. The parlor is large, and has wall built-ins to store tables and chairs. Did you implement or replace outdated systems with modern mechanical or electrical systems? Added new boiler and kept one old boiler; new HVAC system. What AV and communications technology have you implemented in your space? In sanctuary, there is new lighting in the ceiling throughout the nave and chancel, as well as an upgraded speaker system and electric, retractable screen. Speaker system can be heard in the Fellowship Hall and nursery. What special features were included in your design to accommodate community and outside groups? New ramp in main hallway from parking lot to sanctuary. Was parking a consideration for your redevelopment? Parking lot already existed but it had to be resurfaced. What architectural design firms did you interview for your renovation? Who did you select and why? Used Michael T. Foster as architect. They were hired 4-6 years prior to the renovation. What special considerations did you give for accessibility to and within your space beyond what code dictates? Added ramp along central hallway from main parking lot to sanctuary. Financing How did you finance your renovation/expansion? Nearly the entire renovation was financed by members only through a two phase capital campaign. Project cost $5-6 million total. 3

Did you conduct a capital fundraising feasibility study? If so, please explain. Hired two consultants: a) a building use study that involved interviewing many members to determine goals for the renovation; and b) a fundraising consultant to determine the fund raising strategy, which included two capital campaigns one in 2004-2005, and a second one after the renovation to help pay off the loans. The first campaign started before any contracts were signed. Are there any special aspects of your fundraising that you would be willing to share? Westminster has three phone companies that rent space on the property: Sprint (prior to 2005), and AT&T and T-Mobile who entered into discussions about renting space prior to their renovation and began renting in 2010. The City of Alexandria does not allow permits for high structures, so these companies rent space to take advantage of the steeple area to provide cell tower space. AT&T has a large 3-foot pit on a side of the facility for their extensive equipment; the architect designed the enclosure and AT&T paid the cost during the renovation. Income from the rent these phone companies pay goes to a) maintenance reserve fund; b) missions; and c) landscaping. None goes to the operating budget. Did you leverage grant or other funding from local, state, private or other sources? None. Did you encounter any greater economic changes that impacted your timeline? No. Construction What was the projected timeline for construction? Did your project meet this timeline? Were there any unexpected delays? Project lasted from June 2006 until Palm Sunday in 2007. Did you perform your project in stages or all at once? Completed preschool section (including asbestos work) during first 3 months to have it ready for the fall school season in 2006. Also set up a temporary trailer for a staff office that included a ramp, electrical hook up, and portable potty. Were you displaced from your space? If so, did you have temporary facilities or utilize a nearby facility for programming/worship? During project, the church moved out and met either at Agudas Achim synagogue or George Mason Elementary s gymnasium. Did you hire a representative to attend regular construction meetings, monitor progress, review change orders, etc? Three members had authority to sign contract changes of $5,000 or less. Any contract modifications greater than $5,000 had to be approved by Capital Campaign Committee. 4

How did you communicate with your congregation about the status of the project and any significant changes? Members were shown the plans and drawings for the renovation, which helped spur their fundraising efforts. Post-Construction How did you celebrate the opening of your new space with your congregation? Palm Sunday service. Did you develop a master building plan to both ensure upkeep of your facility and plan for future renovations? Yes now have a capital maintenance reserve fund. 5

WIDENED HALLWAY FROM PARKING TO SANCTUARY (library on left): LIBRARY: 6

SANCTUARY CHANCEL: SANCTUARY (note pews were angles during renovation): 7

SANCTUARY CEILING: BELL STORAGE HAND CRAFTED STORAGE UNITS: 8

FELLOWSHIP HALL (only floor redone to remove asbestos): PARLOR: 9

RECEPTIONIST AREA (used to be library/other staff on separate floor): COURTYARD: 10

SWING OFFICE SPACE: BOY SCOUT ROOM: 11

CONFERENCE ROOM: CLASSROOM WITH CABINETRY: 12

CLASSROOM: YOUTH ROOM: 13

YOUTH ROOM #2 14