SITE PLAN Scale 1 =100

Similar documents
SPRINGBANK SIX CORNERS, LLC

57th Avenue. High Street Commons. Urban Farm. City Park. 59th Avenue

DEVELOPMENT STANDARDS 8.1 PURPOSE 8.2 DEVELOPMENT STANDARDS BY BUILDING TYPE DEVELOPMENT STANDARDS 7-1

Level 1 Submission: Parcels 2,5,6

320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015

1. Set the location of building envelope requirements at the minimum setback line versus at the façade plane.

HUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design:

River North (RiNo) Overlays.

PROTOTYPE HANDBOOK WEST BEND PROPERTY COMPANY LLC FEBRUARY 2015

T3 Main Street (T3MS) [New Zone]

Five Building Office Complex is Clean, Quiet and Convenient to Downtown and Expressway

KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018

RODE. Article 80 Small Project Review Application. 232 Old Colony Avenue Mixed Use Development 232 Old Colony Avenue South Boston, MA 02127

12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential

1 & 2. REZONING - REZ AND SPECIAL USE PERMIT - SUP Vicinity of the southeast corner of College Boulevard and Nieman Road

Article 4. Corridor and Node Districts

DOT BLOCK 22 SEP 2015 RODE ARCHITECTS INC

PRICE REDUCED FOR SALE

Memo to the Planning Commission HEARING DATE: JUNE 30, 2016

256 W 88th Street New York, NY

COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS

Find allowable use on the Harris Ranch Allowed Uses chart. (e.g. NW26) Refer to Page 52. Note specific 4 requirements in Block Prototype

COLLEGETOWN AREA FORM DISTRICTS ITHACA, NEW YORK

Metropolitan Park Phase 4/5

LAKE JONATHAN FLATS 1 1/14/2017

ENCORE RIVERWALK SAN ANTONIO, TX

CANAL STREET APARTMENTS DDRC DEVELOPMENT INCENTIVE AND WAIVER SUBMISSION

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 12SN0117. Smith Iron and Metal Co., Inc. Bermuda Magisterial District North line of Bellwood Road

THE CITY OF DRIGGS IDAHO

Concept Presentation - SB Mundelein (former U.S. Music Property, 444 East Courtland)

SALVATION ARMY: HARBOR LIGHT CENTER EXISTING PROPOSED SALVATION ARMY: HARBOR LIGHT CENTER

FIREHOUSE ROW WH / CIN / OH

Code Update Process For: Downtown Neighborhood Conservation Buffer (NCB)

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 12SN0117. Smith Iron and Metal Co., Inc. Bermuda Magisterial District North line of Bellwood Road

SAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010

Article 6. Employment Districts

SCANDINAVIAN DESIGNS - CORTE MADERA

Boston East. Fort Point Associates, Inc. Urban Planning Environmental Consulting Project Permitting. May 31, 2013

Metropolitan Park - Phase 4/5 VORNADO CHARLES E. SM I T H

ARTIST WALK Fremont, California #

WASHINGTON, DC. Maxwell MacKenzie

YURCHESHEN RESIDENCE BZA APPLICATION

DEVELOPMENT OPPORTUNITY INLAND EMPIRE

DESIGN CRITERIA Ridegedale Center-Outparcel Restaurant, Minnetonka, MN

AT HOME IN ENCINITAS ZONE

Section 1. Appendix A, "Zoning" of the Code of the City of Charlotte is hereby amended as follows:

Uniform Sign Plan (USP) Harrison Pointe 01-USP-002

Bulletin - Site Access

HIGHLANDS AT DULUTH 46 Developed Lots City of Duluth, GA

University Mall Davis, California

EARLY CONCEPT IMAGE OF PLAZA

Proposed Ground Floor Plan

D1-A concept plan. l a u r i e r. option d. all saints. massing concept. ground floor plan - setbacks. 315 chapel street, ottawa, on.

EN Project Total Square Footage: 4,035 SF. Cost per Square Foot: $200. Construction Cost: $800,000. Date of Substantial Completion: March 2017

7,368, 13,338 OR 20,706 AVAILABLE SF WITH TRUCKWELL! FOR LEASE (POSSIBLE SALE) WILLIAM K SMITH DRIVE, LYON TWP., MI

Full Building Currently Under Renovation Ready Spring ,852 SF OAKLAND LOFT STYLE OFFICE SPACE 555 Gold Way Pittsburgh, PA 15213

Design Review Board (DRB) Staff Report. Exterior Building Renovation. 400 Monroe Ave. Memphis, TN Hwy. 64 Memphis, TN 38123

Planning Commission June 25, Lincoln Boulevard

Spider Site th Street SW. north-east corner

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

Penny Flats North 323 N Mason

Sign Type Copy Area Max. Height Max. Size Max. Number Material Lighting Additional Standards. Brick, decorative block, stone, Indirect

RM- 59 CATEGORY RM- 20 MU- DC MU-NB MU-SB. A (Airport) MU-D MU-SA MU-SC MU-N IA IL IH IP NR GCI LC P PK OS

ARTICLE 5. COMMERCIAL AND OFFICE DISTRICTS 5.1 PURPOSE STATEMENTS 5.2 USES 5.3 DIMENSIONAL STANDARDS 5.4 DESIGN STANDARDS 5.5 DK DISTRICT STANDARDS 5

Text Amendment July 29, Charlotte - Mecklenburg Planning Department

ARTICLE 6. GREER ZONES

Community Development Department City of Pismo Beach 760 Mattie Road Pismo Beach, CA Telephone: (805) / Fax: (805)

4 DEVELOPMENT STANDARDS FOR

8 Delanson Circle Wellesley, MA PROJECT NARRATIVE

West Hills Townhomes

353 W. Grand June 18, 2018

APARTMENT BUILDING A FLOOR PLANS

33-39 Ward Street Condominiums Ward Street South Boston, MA

FOR SALE OR LEASE PROPERTY FEATURES:

Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

Sodded Area. 8.5 m Storm Easement Typ. R12000 FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE

Site & Architectural Design Study for the Conversion of Parking Lots

Architect: Lucio Trabucco Nunes Trabucco Architects 109 Highland Avenue Needham, MA Tel: Fax:

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Article XVI. Downtown Malta. Form-Based Code. prepared by. for. the Town of Malta, New York

SPEAR S RANCH ON SALADO CREEK ARCHITECTURAL CONTROL COMMITTEE IMPROVEMENT GUIDELINES

KNOXVILLE/KNOX COUNTY METROPOLITAN PLANNING COMMISSION SUBDIVISION REPORT - CONCEPT/USE ON REVIEW

334 East Ojai Avenue. Ojai California. Property Management. Real Estate InvestmentsRENDERING Real Estate Investments Property Management

Outdoor spaces often consist of manicured front lawns and covered patios

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT

WASHINGTON SQUARE 1ST LEVEL RETAIL. $20/SF NNN $40.00/SF TIA Usable Square Feet +/-

Comprehensive Sign Package

Old Town Keller Façade Improvement Matching Grant Program

The concept of living above your workplace isn t new; historical examples

Director, Community Planning, Etobicoke York District

ZONING SUMMARY 3023 IMPERIAL AVENUE, SAN DIEGO, CALIFORNIA T F W - A. C O M

THIRD & SIDNEY MIXED USE + COMMERCIAL

DRAFT STANDARDS PUBLIC DRAFT

SPAR SUBMITTAL COMMENT RESPONSES - NOVEMBER 3, 2016

Broadway Corridor Woodcliff Lake, NJ

ARTICLE 3: RESIDENTIAL DISTRICTS

Transcription:

SEIL LND USE REQUEST Second Stocking venue Gas Shared Parking for Portion of uilding & for Rockford onstruction Potential Parking Deck FINL PRD PPROVL Rockford onstruction ompany Ramp Seward venue First Park Stocking venue T 5-Story Max. Height T 4-Story Max. Height urrent Zoning: T and T Proposed Zoning: PRD Seward venue Property rea: 146,769 SF - 3.37 cres 196,690 SF - 4.52 cres (including 1/2 of adjacent street rights-of-way) Harmony Hall ONEPTUL PRD PPROVL LIMITS OF PRD ZONING REQUEST llowed Density (current zoning): 262 Dwelling Units at 750 SF/DU (Zoning Ordinance Table 5.6.07.) NORTH SITE PLN Scale 1 =100 Lexington venue 1 of 10

Stocking venue Surface Parking Second Harmony Hall Service rea Gas Rockford onstruction ompany Lexington venue Surface Parking First Park Seward venue 2 of 10

Stocking venue Surface Parking Second Lexington venue Harmony Hall Ground Floor Retail Ground Floor Retail, Grocery and Entrance Lobby Gas Surface Parking Rockford onstruction ompany First Park Seward venue 3 of 10

Proposed transit station on ridge Ground floor retail on Stocking venue and 4-floors of residential above Parking Structure Stocking venue Surface Parking & Potential Parking Deck Second Harmony Hall Rockford onstruction ompany Lexington venue First Park Seward venue Ground floor retail, on Seward venue with professional offices above Ground floor retail, grocery and residential lobby with residential above. 4 of 10

Surface Parking & Potential Parking Deck apartments above ground floor retail (on Stocking venue) and community facilities. Second Gas Rockford onstruction ompany Parking Structure Ground floor retail, on Seward venue with professional offices above Proposed transit station on ridge Seward venue First Park Ground floor retail, grocery and residential lobby with residential above. Stocking venue Harmony Hall Lexington venue Entrance Lobby 5 of 10

Gas ONEPTUL PRD PPROVL Stocking venue FINL PRD PPROVL ONEPTUL PRD PPROVL Ramp Shared Parking Seward venue Service rea ONEPTUL PRD PPROVL NORTH SITE PLN Scale 1 =50 6 of 10

3 Entrance 10 Gas ONEPTUL PRD PPROVL Stocking venue 6 FINL PRD PPROVL ONEPTUL PRD PPROVL Ramp Parking Structure Seward venue Service rea Entrance from Parking Structure ONEPTUL PRD PPROVL 10 4 NORTH SITE PLN Scale 1 =50 Entrance from Level Proposed Transit 8 7 of 10

Rockford onstruction ompany Professional Office uilding Ramp Parking Structure Ground floor retail, grocery and residential lobby with residential above. rchitectural Step-ack on 5 Section Looking East 4 3 2 1 4 3 2 1 Parking nalysis of oncept Plan (Including Rockford onstruction) ( in ldg. Parks North of ) Gas Stocking venue Seward venue uilding Heights uilding (Phase 1) 5-Stories 1st Floor Retail Upper 17-6 Floor Height 11 Floor Height uilding 5-Stories 1st Floor Retail 26 Floor Height Upper Levels Office/ 10-12 Floor Height 10-12 min. Step-back at 2nd Floor on uilding 4-Stories 1st Floor Retail/Office Upper Floor Office 14 Floor Height 10-12 Floor Height PRKING Retail Office Totals ars per 1000 SF or per Unit 1.25 3.50 3.00 169 51,000 93,300 Max. Parking Max. Parking Needed 211 179 280 670 Shared Parking nalysis WEEKDYS 12am-8am 100% 0% 5% Spaces 211-14 225 8am-6pm 60% 75% 100% Shared Parking Spaces 127 134 280 541 6pm-12am 100% 100% 10% Spaces 211 179 28 418 WEEKENDS 12am-8am 100% 0% 5% Spaces 211-14 225 8am-6pm 80% 90% 10% Spaces 169 161 28 358 6pm-12am 95% 100% 5% Spaces 201 179 14 393 Key Plan Not to Scale uilding Square Feet Total Retail Total Office Total 30,000-60,000 SF 45,000-70,000 SF 120,000-200,000 SF Parking Provided On-Site North of On- Total Parking Needed 309 Spaces (surface and two-level deck) 110 Spaces (surface only) 97 Spaces 516 Spaces 541 Spaces dditional parking levels could be added if square footages were increased in uildings and, not to exceed limits indicated at left. Parking Deck could also be built North of ) 8 of 10

Gas On- Parking Stocking venue FINL PRD PPROVL Temporary Green Space & Walks Lexington venue (Vacated) Stocking Elevation 17' 6" 11' 0" 11' 0" 11' 0" 13' 8" 4' 10" 69' 0" Stockbridge Housing 52746029 June 16, 2016 NORTH SITE PLN Scale 1 =50 East Elevation 17' 6" 11' 0" 11' 0" 11' 0" 13' 8" 4' 10" 69' 0" 9 of 10 FINL PRD PPROVL

Unit ounts Typical Floors (2-5) studio units per floor 2 x4 8 one bedroom units per floor 9 x4 36 two bedroom units per floor 3 x4 12 three bedroom units per floor 2 x4 8 64 total units 1 2 edroom edroom 2 edroom 1 2 3 1 edroom 1 edroom 4 16 13 12 14 15 3 edroom studio uilding Support ommon Space Ground Floor Retail Parking North of Retail Service Entrance rchitecture The proposed mixed-use housing project will be a mix of approximately 10,000sf of street level retail/commercial space and sixty four residential units on four levels. The living units are a mix of studio, one bed, two bed and three bedroom apartments. street level residential lobby and community space is also planned. Exterior materials will be traditional brick masonry at street level and a balance of brick and metal or hardi panel for the residential levels above. ll glazing will meet or exceed transparency requirements and will be scaled to match neighborhood proportions. The exact brick and panel colors are still to be determined, but will be selected to work with the overall development and neighborhood pallette. 5 6 Studio 7 11 10 3 edroom Studio 2 edroom 9 1 bedroom 2 bedroom 3 bedroom common space commercial building support circulation Retail Storefronts rea alculations Ground Level: ommercial: ommon: uilding Support: irculation: Total: 11,000 sf 3,860 sf 1,460 sf 518 sf 16,830 sf Floors 2-4: living space: 12,866 sf irculation: 1,314 sf 14,180 sf x4 Total residential area: 56,720 sf 8 typical residential floor plan scale 1"=30'-0" ground floor plan scale 1"=30'-0" Total gross floor area: 70,550 sf FINL PRD PPROVL UILDING FLOOR PLNS 10 of 10