EUROPAALLEE CONSTRUCTION SITE G

Similar documents
FIFA WORLD FOOTBALL MUSEUM

PEAKS PLACE NEW APARTMENT HOTEL WITH A SPA AND RESTAURANT LAAX GR LOCATION / HISTORY

510 MAIN STREET WINNIPEG CITY HALL Green Blankstein Russell and Associates (Bernard Brown and David Thordarson, principal designers),

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

Welcome to Medienpark. The impressive entrance hall elegantly incorporates the spacious look of the exterior.

RedStone Private Country Estate architectural guidelines

From space to scope. Scope for your business.

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

Machine for Living. A live-work complex in Zurich, designed by Müller Sigrist Architekten, is a city in itself.

Residenz-Turm, 2½-Zimmer-Wohnung. 2½-room apartment

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Appendix 2: Mt Victoria

Les Saisons Sai Wan Ho Building Journal, June 2002

Ambassador House, Opfikon Renovation and reconstruction. Binzstrasse 18, 8045 Zürich Telefon

Potential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch

BREDA.Projects 4. Kroeteneiland Breda, Netherlands. 4 Breda, Netherlands OMA - Rem Koolhaas. Carré

VIEW VISION OVERVIEW HEILBRONNER STR. 190 STUTTGART

18. Appendix H Urban Design Panel Presentation

Damascus

WALNUT CREEK DESIGN REVIEW COMMISSION STAFF REPORT. AGENDA: July 6, 2016 ITEM 4b.

Register of Significant Twentieth Century Architecture

Checker Building Architectural Design and Details

Architectural Projects Multi-Residential Developments

Hotel and Multi Storey Cycle Park Two The Square, Station Square, Cambridge

Attachment E: Architecture and Design: Bill Gregory, Warren and Mahoney

VIEW VISION OVERVIEW HEILBRONNER STR. 190 STUTTGART

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

ACCESSIBLE BUILDING (F1) HOUSING DESIGN (G1)

A By-law to amend Zoning and Development By-law No regarding Laneway Houses

5.1 Site Planning & Building Form

3.1 Existing Built Form

KAROLINE HERFURTH. 50th PLUS GERMAN ARCHITECTURE DESIGN OF SWITZERLAND AUSTRIAN WINE SPECIAL 2017 CULTURE, TRAVEL & MORE. Issue 50 May 2017 THE

STYLE AND ARCHITECTURAL PHILOSOPHY

Location. Public transport. Location

Residential Design Guide Appendices

Composition of traditional residential corridors.

stanchions apparent. The level is raised and reached by a long flight of steps (Fig. 2).

Historic Property Report

Design and Access Statement and Planning Statement. Application for Planning Approval. New Shopfront. 58 High Street West Glossop

H4. Residential Mixed Housing Suburban Zone

Future Generation The Elite. Student Accommodation

There is no Communal Open Space (COS) requirement for condominium developments.

600 W. St. Germain Street, St. Cloud, MN

Sotheron Place, Fulham

MILL ROAD DEPOT, CAMBRIDGE Design and Access Statement December

Hastings CBD Heritage Inventory Project

Arena Boulevard construction scheme

ARCHITECTURAL DESIGN - WINNER

NOW, THEREFORE, THE COUNCIL OF THE CITY OF CALGARY ENACTS AS FOLLOWS:

M O D E R N L I V I N G A T A F F O R D A B L E P R I C E S

A mix of uses. Housing:

von Gerkan, Marg and Partners Architects

[BUILDING STATISTICS PART I]

Signed Sealed Delivered

SAIIER sir aurobindo institute for intgral education and research

66 Isabella Street Rezoning Application - Preliminary Report

Located at 63 Seymour Road in Mid-

BUILDING SPECIFICATIONS

Sample Space Report of Select Relocation Alternatives

stein am rhein.projects 5

Missing connection from to the waterside and a securityrisk because of the FDR-tunnel

Property condition survey for the Ewa Silo building located in the premises of the Port of Szczecin

The new Tamedia building

Acting Director, Community Planning, Toronto and East York District

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Response to Urban Design Panel Comments

Oberoi Exquisite. by Oberoi Realty at Goregaon-East

Task Force on Kai Tak Harbourfront Development. Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site)

Middle East.Projects 8

national ballet School of Canada/radio City

Jasper 115 Street DC2 Urban Design Brief

HOUSE ARCHER, STELLENBOSCH HOUSE WHITFIELD, SOMERSET WEST HOUSE PLOUGHMANN, SOMERSET WEST

Property Name Haxton-Griffin Farm Location Athens vic., Greene County, New York NATIONAL REGISTER OF HISTORIC PLACES CONTINUATION SHEET

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION

40 Donaldson Street, Greenslopes QLD. Proudly Developed by Mosaic Property Group

1 WAY STREET. Private Residence

DEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1

w a t e r t o w e r D o r t e M a n d r u p A r c h i t e c t s A p S. C l i e n t, G e n t o f t e M u n i c i p a l i t y a n d D o m e a

KURFÜRSTENDAMM

Nio Prenzlauer Berg development project: 190 condominiums and four townhouses in the Scandinavian Quarter go on sale

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

Land & Property Experts MOAT FARM BARN Stone Stile Road, Headcorn, Ashford, Kent TN27 9RL

Construction scheme "Am Kaiserforum", 1010

REASONS FOR LISTING: 306 AND 308 LONSDALE ROAD. #306 Lonsdale #308 Lonsdale. 306 and 308 Lonsdale Road Apartments

Storytellers # Stories of EXCELLENCE PROJECTS. The Fuksas Cloud, Rome.

ULTIMATE LUXURY LIVING ON MARBELLA S GOLDEN MILE

Ku-ring-gai Local Environmental Plan No 194

Demolition of Three Heritage Properties in the South Rosedale Heritage Conservation District - 5, 7, and 9 Dale Avenue

Enrique Norten VISIoNARY MASTER

T A white metal skin and roof coating was chosen for maximum heat reflectance with blue tinted glazing.

I.S.T. Austria Institute of Science and Technology Austria

ONE SEAPORT SQUARE. Boston Civic Design Commission

Article 2. Rules of Interpretation

Multi-unit residential uses code

VILLAGE CHIC. Traditional longhouses serve as the unusual inspiration for this suburban family home. Projects. words Zoey Moo. Images Sanjay Kewlani

CASTLES OF CALEDON URBAN DESIGN REPORT

BUILDING QUALITIES Santa Pola Bahia Arena GROUNDING WORKS STRUCTURE

H5. Residential Mixed Housing Urban Zone

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado),

LAS TERRENAS - DOMINICAN REPUBLIC LAS TERRENAS - DOMINICAN REPUBLIC IN THE HEART OF LAS TERRENAS 26 APARTMENTS FROM USD

Transcription:

Online version on the platform www.architectes.ch EUROPAALLEE CONSTRUCTION SITE G APARTMENTS, OFFICES, RETAIL OUTLETS, GASTRONOMY, GUSTAV RESIDENCE Zurich ZH Nº 12032E Owner Swiss Federal Railways SBB Hilfikerstrasse 1 3014 Berne Project developer Swiss Federal Railways SBB Immobilien Development Europaallee Hohlstrasse 532 8048 Zurich General contractor HRS Real Estate AG Siewerdtstrasse 8 8050 Zurich Architects Graber Pulver AG Sihlquai 75 8005 Zurich Masswerk AG Brünigstrasse 25a 6005 Lucerne Structural engineer WaltGalmarini AG Drahtzugstrasse 18 8008 Zurich MEP engineering Facade planners: Atelier P3 AG Hardturmstrasse 175 8005 Zurich Electrical engineers: CH - Ingenieure GmbH Lägernstrasse 6 8037 Zurich HVARS engineer: Advens AG / ALPIQ InTec Gruppe Hohlstrasse 188 8004 Zurich Construction physics/acoustic engineer: Bakus Bauphysik & Akustik GmbH Grubenstrasse 12 8045 Zurich Fire safety: Gruner Wepf AG, Zurich Thurgauerstrasse 56 8050 Zurich Gastronomy planning Schmocker AG Dammweg 15 3800 Interlaken Location of the construction project Gustav-Gull-Platz 8004 Zurich Planning 2007 2011 Construction 2013 2015 LOCATION / HISTORY The Europaallee planning area extends southwest of Zurich s main railway station along the tracks. It extends as far as Langstrasse that passes underneath. To the south, the level terrain is bordered by the Lagerstrasse. Until the beginning of this century, it formed part of the station area and, among other things, served as a transfer point for the postal service. Projects for a new building next to, and also above the tracks, were developed for about 30 years. In 2004, landowner SBB (Swiss Federal Railways) finally submitted a design that was approved by Zurich voters in 2006 and subsequently implemented. The layout divides the 600-meter-long strip of land, into eight block-shaped building plots, which narrows towards the northwest. These form narrow alleys and Published in Switzerland

sightlines that link up transversely with existing neighbourhood streets. In the longitudinal direction, Europaallee, which lends its name to the development, crosses the eastern, wider half of the new urban district. It begins with a funnel-like narrowing by the road along the bank of the River Sihl and ends at the Gustav-Gull-Platz, where the new city axis meets the Lagerstrasse. Polygonal Construction Site G borders this car-free space, into which a ground-level geometric pond is integrated. On the other side of the plot, the construction site is adjacent to the listed, reinforced concrete signal box that welcomes train passengers as they approach Zurich. DESIGN / ARCHITECTURE The architecture for the development of Construction Site G resulted from a project competition with prior prequalification. The

building to be planned had to comply with the principal s overall objective for the entire district: the creation of an urban space of high social, urbanistic and architectural, economic and environmental quality, identity and functionality. Therefore, in terms of volumetrics and shape, it reveals similarities to the buildings on adjacent construction sites: a base building following the contours of the construction site, surrounding a small courtyard that is partly at street level and partly at first-floor level. Towers rise from this base, at two of the corners, each with an irregular pentagonal footprint. The 17-storey Gull Tower in the southeast corner, at about 61 meters the tallest in Europaallee, forms a cluster with the two towers on adjacent building plots. This high-rise group also makes the central point of the planning area and the Gustav- Gull-Platz recognisable even at a distance. The second, 13-storey tower of the building complex is located diagonally opposite, in

the northwest corner. The height of the base construction varies between these towers. To the south, it has five storeys, but only three to the north. Construction Site G has no fewer than twelve house numbers on Tellstrasse, Robert-Stephenson- Weg, Lagerstrasse and Gustav-Gull-Platz. The high-ceilinged ground floor is located above a two-storey underground carparking garage and has a public character. It includes shops and restaurants. The façade is partially set back into the building to create a colonnade. In one section on Gustav-Gull-Platz, this extends over two floors. Offices, condominiums and residential rental properties are located on the upper floors. The base mainly houses office space, but also the care facilities for the residence and some of its apartments. The Gull Tower offers 46 condominiums of varying sizes, which are serviced via a central core and feature corner areas designed as loggias. The somewhat smaller Residence Tower is located opposite. As the name suggests, it consists of the residential accommodation. Access and the design of the corners are similar, but the Residence Tower units are smaller. The sloping roofs of the towers are a landmark of Construction Site G. From a distance, they look like traditional hip roofs. Due to the irregular contours of the highrise buildings, the slopes do not end in a ridge, but surround a flat roof edge. The Gull Tower has two two-storey penthouses each with private elevator, higher ceilings and integral terrace. In the Residence Tower, this space is used as a spa area. Roof flaps can be opened hydraulically/electrically in these sloping sections to give access for cleaning the façade. The cleaning platform on the roof deck can thus travel around the entire tower. The façade has the appearance of a regular, horizontally oriented grid of ledges and vertical ribs. It defines the storey-high surfaces, divided into a balustrade and a window part, on all sides. The

corners are accentuated as continuously recessed profiles. The façade has a uniformly bronze-coloured finish. Specially perforated, corrugated and anodized aluminium sheets serve as parapet cladding and sun protection elements. Drainage for the building envelope is concealed. SPECIAL FEATURES HRS Real Estate AG Zurich managed the project as general contractor with full warranty for cost, quality and schedule and punctual handover. The company was honoured with the SBB Supplier Award 2015 for outstanding service. Construction Site G is now a prestigious building finished to a high standard. It was built in concrete frame construction, some parapets are prestressed. Slender, highly reinforced columns were used with the towers raised as shell constructions without scaffolding. High ceilings and the production of movable ceiling connections on all walls required technically and aesthetically precise work. The roof greening on the base building was both unusual and challenging. The flat roofs are organised into numerous triangles sloping towards each other. This gives the impression of an abstract work of art when viewed from the towers. The greening aimed to reinforce this with colours and textures that stand out from each other. The complex is certified to Minergie ECO Standard. Heating and hot water requirements are covered 100 per cent by district heating. The roofs of both towers are equipped on their south sides with photovoltaic systems.

Project data Total cost budget 1-9: about CHF 140m Building volume/ SIA volume 416: 152,039 m 3 Building base area: 3,422 m 2 Floor space: 41,657 m 2 Service space: 9,000 m 2 Residential space: 12,000 m 2 Apartments Gull Tower: 46 Residence Tower: 77 Storeys Above ground level Base structure: 3 and 5 Gull Tower: 17 Residence Tower: 13 Below ground level: 2 Parking spaces: 77 Architekturbau CRP Sàrl 1020 Renens P. Guillemin November 2016 8077 / MP Printed on FSC-certified paper from sustainable forest management Photos: Adrien Barakat