Project Description: Consider site plan approval for the construction of a new car wash in the Gateway Center subdivision.

Similar documents
PLANNING COMMISSION STAFF REPORT

Minor Revision to Amend an Existing PD (Rezoning) RLF Kingsland Properties, LLC R-4 Tract Golden Isles Gateway Planned Development

5970 Golden Isles Parkway (Bergen Woods) Property Address. Planned Development (PD) Golden Isles Gateway Tract (GC-16-00) Existing Land Use

TO: Glynn County Islands Planning Commission. Karl W. Bursa, AICP, Planner II. PP3105 Stillwater Phase III. DATE: November 10, 2015

APPLICANT: Brunswick & Glynn County Development Authority, owner.

GLYNN COUNTY BOARD OF COMMISSIONERS OFFICE OF COMMUNITY DEVELOPMENT

TO: Glynn County Mainland Planning Commission. Eric Lee Johnson, Planning Division Manager. PP2944 McKenzie Gardens. DATE: November 20, 2014

TO: Glynn County Board of Commissioners. Eric Landon, Planner II. ZM2773 Peppertree Crossing Phase II

COMMUNITY DEVELOPMENT DEPARTMENT

TO: Glynn County Islands Planning Commission. Eric Landon, Planner II. PP2754 Stones Throw Cottages. DATE: February 6, 2014

Residential Major Subdivision Review Checklist

M E M O R A N D U M. Meeting Date: October 23, Item No. F-1. Planning and Zoning Commission. Daniel Turner, Planner I

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

Planning Department Oconee County, Georgia

McGowin Park, LLC. B-3, Community Business District

Department of Planning & Development Services

Residential Minor Subdivision Review Checklist

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

Final Plat Mapping Requirements

Township of Collier 2418 Hilltop Road Presto, PA 15142

Township of Little Egg Harbor Planning Board 665 Radio Road Little Egg Harbor, New Jersey Phone: ext. 221 Fax:

PLANNED DEVELOPMENT DISTRICT STANDARDS. Cadence Site

TO: Glynn County Mainland Planning Commission. Iris M Thielen Johnston, AICP, Planner III. ZM2459 Planting Hammock. DATE: September 24, 2012

MINOR SUBDIVISION PLAT CHECKLIST

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

Subdivision of existing two lots into three lots.

CONSTRUCTION PLANS for HALCYON A RESIDENTIAL SUBDIVISION 6100 MIDNIGHT PASS ROAD, SARASOTA, FL 34242

SUBDIVISION APPLICATION

ABBREVIATION LEGEND SITE INFORMATION:

ARTICLE XVI SUBDIVISION DEVELOPMENT

Applications will be received on business days between 9:00 AM and 3:00 PM

PLANNED UNIT DEVELOPMENT (East), PLANNED UNIT DEVELOPMENT (West) STAFF REPORT Date: September 18, 2014

Site Plan Application

MIDWAY CITY Planning Office 75 North 100 West Phone: x105 Midway, Utah Fax:

WESTMINSTER PARK SUBDIVISION

TOWN OF LEWISTON PLANNING BOARD APPLICATION

The Filing Fee for a Minor Plat is $ PLUS $20.00 per lot created

PRELMINARY PLAT CHECKLIST

701 G Street Brunswick, Georgia Phone: (912) Fax: (912)

FINAL PLAT CHECKLIST

Glynn County Mainland Planning Commission. Karl Bursa, AICP, Planner II. DATE: August 26, CURRENT ZONING: PD Planned Development

Application For Development Review (Subdivisions and Site Plan Review)

PLANNING & ZONING DEPARTMENT 401 South Rogers Street Waxahachie, Texas (469)

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013

REPORT TO THE PLANNING COMMISSION

FINAL PLAT APPLICATION

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item PRD TO RM15; ACRES; 2101 EXCHANGE CT (KES)

Secondary Plat 2018 Bargersville Plan Commission Application Kit

Planning & Zoning Commission

STONE HEDGE SUBDIVISION, UNIT 1, RESUBDIVISION OF LOT 40 & WEST COMMON AREA

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

SECTION 6 - APPROVAL OF PLATS. Whenever any subdivision of land is proposed, and before any permit for the

SUBJECT PARCEL(S) Property Owner(s) TMS Number Approximate Acreage Carolina Park Development, LLC

PLAT OF SURVEY VICINITY MAP (NOT TO SCALE) N N W E SITE BENCHMARK # 2 W E N&D ON BACK OF CURB NAVD 88 S S 0' 10' 20' 40' 60' 1" = 20' TOP=106.7

PLANNING COMMISSION. Agenda Item # 8.

Section Preliminary Plat Checklist and Application Forms

Cover Letter with Narrative Statement

Waseca County Planning and Zoning Office

ARTICLE IV: DEVELOPMENT STANDARDS

CITY OF LEE S SUMMIT MINOR PLAT PROCESS. Purpose of Minor Plats

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

Residential Subdivision Preliminary Plat Application

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements.

PRELIMINARY PLAT CHECK LIST

LAND USE APPLICATION

CHAPTER 22 SUBDIVISION AND LAND DEVELOPMENT

ELIZA JORDAN CORNER SUBDIVISION

Use permitted by: Right Special Exemption

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

Application for Preliminary Plat Checklist

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

APPLICATION for MINOR SUBDIVISION REVIEW for CONCEPT and FINAL PLAT within COALVILLE CITY. Project Name: Project Address or Area: Name of Owner:

PORT CITY COMMERCE PARK SUBDIVISION

Planning and Zoning Commission STAFF REPORT

PRIMUS TRACT MOUNT PLEASANT, SOUTH CAROLINA

CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Recreational Vehicle (RV) Park Development Standards

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016

QUEBEC STREET EAST 130TH AVENUE ONEIDA STREET E. 130TH AVE. VALENTIA ST TAMARAC ST EAST 128TH AVENUE MONACO STREET BACHMAN DR. SITE QUINCE ST.

QUEBEC STREET EAST 130TH AVENUE ONEIDA STREET E. 130TH AVE. VALENTIA ST TAMARAC ST EAST 128TH AVENUE MOACO STREET BACHMAN DR. SITE QUINCE ST.

Department of Development Services Engineering; Survey Plat Review Group SPRG

LYON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT

RIVERDALE CITY PLANNING COMMISSION APPLICATION FOR RESIDENTIAL SUBDIVISION SITE PLAN APPROVAL

Time Extension Staff Report

CERTIFIED SURVEY MAP

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

DALLAS WATER UTILITIES WATER/WASTEWATER COVENANT

APPENDIX B. SUBMISSION REQUIREMENTS

CARROLL COUNTY BUREAU OF DEVELOPMENT REVIEW OFF-CONVEYANCE SUBMITTAL CHECKLIST AND REVIEW FEE SHEET NOTICE: INCOMPLETE SUBMITTALS WILL BE RETURNED

GeoPoint 1403 E. 5th Avenue Tampa, Florida

STAFF REPORT. City of Ormond Beach Department of Planning. Exception for Outdoor Activity

ROYAL VIEW DEVELOPMENT

Community Development

Town of Cary, North Carolina Rezoning Staff Report 14-REZ-31 Cary Park PDD Amendment (Waterford II) Town Council Meeting January 15, 2015

APPENDIX 7 SPECIAL NOTES FOR PLATS AND CONSTRUCTION PLANS

Transcription:

COMMUNITY DEVELOPMENT DEPARTMENT Planning and Zoning Division 1725 Reynolds Street, Suite 200, Brunswick, GA 31520 Phone: 912-554-7428/Fax: 1-888-252-3726 MAINLAND PLANNING COMMISSION STAFF REPORT August 7, 2018 Application Type Site Plan Case Number SP3836 Applicant Joe Fendig, GTI Express, LLC Name of Project Shine N Go Property Address 515 Gateway Center Blvd Parcel ID 03-27197 Area of Property 1.74 acres Existing Zoning PDG, Gateway-Alpine PD (ZM3579) Existing Land Use Vacant and undeveloped Proposed Land Use Car wash Proposed Building(s) Size 5,662 SF CONTEXT: Project Description: Consider site plan approval for the construction of a new car wash in the Gateway Center subdivision. Background / Additional Information: The widening of Canal Road is an upcoming Glynn County project. The county will need to obtain the property s current 15 drainage easement from the owner for the project. Noticing Requirements: A public notice sign was posted on the property on July 24, 2018. Zoning District Standards: Min. Lot Size 6,000 SF Min. Lot Width 60 Setbacks From Gateway Center ROW 20 From Canal Road ROW 35 From Glass Circle ROW 20

FINDINGS: In conformance with the Glynn County Zoning Ordinance Section 619.4 (a), the Planning Commission shall be guided by the following standards and criteria (staff comments in bold): 1. The application, site plan and other submitted information contain all the items required under this Section. This requirement has been met. 2. The proposed uses, buildings and structures are in accordance with the requirements of this Ordinance and other ordinances of Glynn County. The proposed use of a car wash is consistent with the permitted uses within the Gateway-Alpine PD. 3. Adequate provisions are made for ingress and egress, off-street parking, loading and the flow of traffic, which may reasonably be anticipated. Ingress/Egress Point(s): Parking Spaces Loading Spaces Required: 4 Required: 0 Provided: 7 Provided: 0 This requirement has been met. The applicant is providing an additional 3 parking spaces. 4. Adequate provisions are made to control the flow of storm water from and across the site. Proposed stormwater system: Flows for this site are accounted for in a downstream system. Water quality will be addressed with inlet filters, dry detention and other methods. Runoff will be directed to the Canal Road ditch. Site Coverage allowed (ZM3579): 80% Site Coverage proposed: 48.8% 5. Adequate provisions are made to protect trees that are selected to remain as depicted on the site plan. Trees to Remain: N/A Tree Credits Required: N/A Tree Credits Provided: N/A This requirement is not applicable. SP3836 Shine N Go 2 August 7, 2018 MPC Meeting

6. Adequate provisions are made to buffer intensive uses and to screen all service areas from view of the adjacent properties and streets. Buffer(s) Required: Section 613.3(2)(a) requires a type E buffer for commercial development located along streets where the public has access. A type E buffer is a vegetative buffer of not less than 10 feet. A type E buffer is required along Gateway Center Boulevard, Canal Road and Glass Circle. Section 613.3(3)(a) requires a type D buffer where trash collection and storage areas, dumpsters, and compactors are in view of a street where the public has access. A type D buffer consists of a landscape wall high enough to visually conceal the equipment. Buffers(s) Provided: A type E buffer will be provided along Gateway Center Boulevard, Canal Road and Glass Circle. A type D buffer concealing the dumpster area will be provided. 7. Adequate provisions are made to control the location, intensity and direction of all outdoor lighting so that it will not have an adverse effect upon adjoining properties. Staff comment: The applicant will comply with Section 622 (Exterior Lighting) of the zoning ordinance. 8. Open space, as required, has been provided and appropriate means are proposed to assure maintenance of common areas and facilities. Open Space Required: NA Open Space Provided: NA Proposed maintenance of common areas and facilities: None. Staff comment: This requirement is not applicable. 9. Adequate provisions are made for water supply, fire protection and sewage collection and treatment. Current/proposed water: JWSC Current/proposed sewer: JWSC Fire protection: Glynn County Staff comment: This requirement has been met. SP3836 Shine N Go 3 August 7, 2018 MPC Meeting

ACTIONS: Pursuant to Section 619.4(b) of the Glynn County Zoning Ordinance, the Planning Commission shall take one of the following actions: (i) Approve the site plan as presented; (ii) Approve the site plan with conditions. In approving a site plan the Planning Commission may impose conditions and restrictions so long as the intent of the Zoning Ordinance is carried out and the zoning district regulations established herein are not varied so as to make them less restrictive. If the Planning Commission so acts, then it shall specifically state those requirements which must be met before an applicant may be granted final site plan approval and a building permit. The applicant shall submit a site plan revised in accordance with the decision of the Planning Commission to the Community Development Department for approval before a building permit can be granted. The Community Development Director may elect to resubmit the plan to the Planning Commission for final approval; (iii) Defer action. When there are concerns about approval of a site plan, action may be deferred; (iv) Deny Approval; Approval of the site plan may be denied based upon findings that the proposed plan fails to comply with the requirements for approval. There shall be no waiting period required for submittal of a new site plan after a site plan has been denied, however it shall be considered a new application and shall be submitted with all required information and fees. RECOMMENDED MOTION: I move to approve application SP3836. AGENDA ITEM ATTACHMENTS: 1. Staff Report 2. Zoning / Aerial Map 3. Site Plan 4. Elevations 5. Review History SP3836 Shine N Go 4 August 7, 2018 MPC Meeting

15" RCP G E O R G I A SITE PLAN P E T E R No. 30623 R EGI STER ED PROFESSIONAL E N GI N EE R S C H O E N A U E R LOCATION MAP NTS SITE SHINE N GO LOT 110 GATEWAY CENTER BRUNSWICK, GA OWNER / DEVELOPER: GTI EXPRESS, LLC 100 CART DRIVE ST. SIMONS ISLAND, GA (912) 222-2086 jfendig@gmail.com TIDEWATER ENGINEERING, INC. 7-30-18 200 PLANTATION CHASE, SUITE 14 ST. SIMONS ISLAND, GEORGIA 31522 PHONE (912) 268-2164 FAX (912) 289-0361 4. Signs: Signs shall meet the provisions of the Zoning Ordinance for signs located in Highway Commercial zoning districts with the following exceptions: Monument sign: One monument sign identifying the District and the major tenants within the District is allowed. The sign is permitted within the District adjacent to the intersection of Canal Road and Gateway Center Boulevard. The monument sign may be two sided with a maximum height of 35 feet, a maximum profile area of 600 square feet, and the maximum sign area of 400 square feet on each side. Free standing directory signs: One freestanding directory sign with the names of the tenants located on the parcel shall be allowed on each parcel with multiple tenants. These signs shall have a maximum height of 14 feet, a maximum profile area of 180 square feet and a maximum sign area of 80 square feet on each side. 16 8''W SS SS S SS SS SS OUTLOT C FM FM FM CURB INLET TOP = 15.00 THROAT = 14.22 INV. = 10.75(NE) INV. = 10.28(SW) INV. = 10.12(BOX) FM X X 8''W8''W FM FM FM FM FM FM 8" UNK SS SS SS SS SS SS SS SS FM FM FM X FM FM FM FM FM FM 8''W 18" RCP SD FM FM FM FM FM 8" UNK D FM FM FM FM 6" UNK CURB INLET TOP = 15.23 FM FM FM FM FM FM FM NOW OR FORMERLY EXCHANGE ACCOMMODATION TITLEHOLDER V, LLC, EQUITY TRUST COMPANY CUSTODIAN FBO 2127128 IRA, EQUITY TRUST COMPANY CUSTODIAN FBO 2127129 IRA & EQUITY TRUST COMPANY CUSTODIAN FBO 2127140 IRA 18" RCP THROAT = 14.35 INV. = 11.41(SW) 6" UNK INV. = 11.08(BOX) STORM DRAIN MANHOLE 8''W8''W SD SD SD TOP = 15.97 INV. = 9.92(SW) INV. = 10.05(SE) INV. = 9.77(NE) D 6" UNK 8''W FM FM 24" RCP SD SD INV.= 11.89 LINE BEARING DISTANCE L1 S 81 46'46" W 28.77' CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING C1 292.61' 133.11' 131.97' N 69 12'31" W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 18" PN D SD SD SD SD NAIL IN PINE TREE SD SD 24" RCP FM FM 18.00' (NAVD-88) FM INV.= 10.02 FM SURVEY REFERENCE: A. PLAT BY ROBERT N. SHUPE, GA. R.L.S. # 2224, TITLED "FINAL PLAT OF: GATEWAY CENTER BOULEVARD", DATED 8/28/95 AND RECORDED AT P.B. 23, PG. 134. B. PLAT BY ROBERT N. SHUPE, GA. R.L.S. # 2224, TITLED "PARCEL 'B', GATEWAY CENTER, GOLDEN ISLES GATEWAY TRACT", DATED 10/14/11. C. PLAT BY ROBERT N. SHUPE, GA. R.L.S. # 2224, TITLED "EXPEDITED PLAT OF: OUTLOT A & OUTLOT C, CANAL CROSSING", DATED 4/25/16, REVISED LAST ON 6/16/16, RECORDED AT P.B. 33, PG. 204. VERTICAL DATUM IS NAVD-88 AND WAS ESTABLISHED BY RTK-GPS TECHNOLOGY USING A TRIMBLE 5800 RECEIVER AND EGPS SOLUTIONS. INV.= 12.23 15" RCP SD SD SD SD SCALE: 1" = 30' INV.= 13.10 SHINE N GO 1 7-25-18 REVISED PER COUNTY COMMENTS PSS DESCRIPTION REV. DATE: DRAWN: APPROVED: DATE: 2 7-30-18 MOVE LS BUFFER OUT OF DRAINAGE EASEMENT ALONG CANAL PSS RD. PROJ#: SCALE: GATEWAY CENTER BLVD. 7-3-18 pss 18-036 AS SHOWN SHEET pss 1 OF 1 SITE PLAN

GLYNN COUNTY COMMUNITY DEVELOPMENT REVIEW HISTORY- Last Review Only per ReviewType for SP3836 Shine-N-Go as of 07/30/2018 2:27 pm Review # Assigned To Result Result By Completed 19376 Planners Pre-Review 1 Keller Compliant Keller 07/09/2018 19482 Resubmit 1 Keller Compliant Postal 07/25/2018 19485 Drainage 2 Vicent Compliant Vicent 07/30/2018 19490 Engineering 3 Culbreath Compliant Culbreath 07/30/2018 19380 Fire Department 1 Johnson Compliant Johnson 07/10/2018 19384 19385 19378 GIS Address 1 Newton Compliant With Comments Newton 07/09/2018 Based on the access shown, the address for this site will be 515 Gateway Center Blvd. Please include the address on the site plan. GIS Mapping 1 Proper Compliant With Comments Proper 07/10/2018 This project will be compliant when the current FEMA Firm panel suffix is shown on the plat. The information submitted on 07-06-18 has been entered into the data base. JWSC 1 Cornely Compliant Cornely 07/10/2018 Site Plan Review updated to 'OK.' Details: 1. Submit construction drawings for review 2. Submit oil/water/sand separator design & capacity criteria and shop drawings for review by Pretreatment Coordinator 3. Use of a private well to supply water for the facilty - water must be metered for billing purposes 4. Pay Site Plan Review fee (mailed 7/10/18) 19484 Planning and Zoning 2 Leif Compliant Postal 07/25/2018 19382 Traffic 1 Vicent Compliant With Comments Vicent 07/23/2018 Glynn County is currently planning the widening of Canal Road and would like to discuss acquiring the 15' drainage easement for right-of-way purposes. Print Date: 7/30/2018 Page 1 of 1