Explain in writing if the address of the building is different than the address on this form:

Similar documents
If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

Explain in writing if the address of the building is different than the address on this form:

If the address on this form is different than the address of the building, submit a written explanation.

Explain in writing if the address of the building is different than the address on this form:

If the address on this form is different than the address of the building, submit a written explanation.

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

MES Project Number: Asbestos Six-Month Periodic Survey October 2010 Washington Elementary School Lyndhurst, NJ Prepared For: Lyndhurst Board

SETX Environmental, Inc. Environmental Consulting & Testing Asbestos - Mold Lead ESA s

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Enclosed please find the inspection report for the above-referenced location.

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

ASBESTOS PERIODIC SURVEILLANCE CHECK LIST

Millcreek Garden Apartments 395 East 3045 South South Salt Lake, Utah. April 29, Prepared for:


ASBESTOS/HAZARDOUS MATERIALS SURVEY AGREEMENT

Analysis Report prepared for County City Property Management

Clearance Examination Report Form As Required by Ohio Administrative Code and

U.S. Environmental Protection Agency Applicability Determination Index

Purchase and Development of City-Owned Property st Street Fulton, IL 61252

Application of the TAHPR and NESHAP to the Demolition of a Public Building

HSG 264. SGS BECL feb10

Update on Building Conditions at Hilton Anchorage: August 2018

NYC Department of Education

CUMBERLAND SCHOOLS WORK PROPOSED 2018

FINDING OF SUITABILITY TO TRANSFER NAVAL RESERVE CENTER DULUTH, MINNESOTA

Highland Park. Under construction 945 Rollingview. 232 Mill Valley Pkwy Sq.Ft. 2-Car 4/2.5 $466, Mill Valley Pkwy.

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

The Impact of Using. Market-Value to Replacement-Cost. Ratios on Housing Insurance in Toledo Neighborhoods

SOLD 84,995. LW Wyndham Street Tynywedd CF42 5BS

Schedule your repairs today...

1976 Fargo, ND City Directory - R.L. Polk & Co.

TITLE 318 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

Adaptive Reuse. Governor s Conference on Affordable Housing February 27, 2019 WORN JERABEK WILTSE ARCHITECTS, P.C.

1. Question: In regards to the facilities are they all Monday thru Friday cleaning? Any facilities Saturday and or Sunday cleaning?

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

LEWIS COUNTY BUILDING & CODES DEPARTMENT LEWIS COUNTY COURT HOUSE LOWVILLE, NY Phone: (315) Fax: (315)

Facility Assessment. Municipal Facilities 1245 and 1885 North Hacienda Road La Habra Heights, California 90631

Review Fee Receipt No. Total Amount Rec d Credit Card Authorization FLORIDA BUILDING AND ACCESSIBILITY CODE, 2010 EDITION APPLIES

Dispute Resolution Services Residential Tenancy Branch Ministry of Housing and Social Development

ARTICLE 38. INSPECTION AND CLEANUP OF PROPERTY CONTAMINATED WITH CHEMICALS USED IN THE ILLEGAL MANUFACTURE OF A CONTROLLED SUBSTANCE

APPLICATION FOR HOUSING

2 Bedroom Floor Plan

FUMC Research Task Force Site Visit Report Westminster Presbyterian Church, Alexandria April 14, 2015

Application Date: Estimated Value of Work: Building Permit Applicant: (Name of Person or Company Responsible for Work)

Financial Statement Instructions 324

Salmon P Chase Elementary School 2021 N Point St Chicago, IL 60647

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619

TOWN OF HAVERHILL, NH

PROPOSAL JANITORIAL SERVICES LAKELAND ELEMENTARY SCHOOL OAKSEED LN LAKELAND, TN FEBRUARY 11, 2015

PROPERTY INSPECTION REPORT

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Lead Poisoning Prevention Program

William Howard Taft High School

Who Needs an Asbestos Survey & Why?

USEPA Brownfield Assessment Grant Application for Financial Assistance

A Landlord s Guide to the Lead Poisoning Prevention and Lead Hazard Control Law ( 182)

Environmental Audit Standards

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

Village of Villa Park

Example for a Single Family Home Annual Application fee: $50.00 Inspection fee $ (required once every four years) Total fee: $185.

-Presents Jefferson Park Avenue

COOK COUNTY ASSESSOR S OFFICE 2015 CLASS 9 AFFIDAVIT. Control Number: Application Address:

The Lead-Based Paint Disclosure Manual. Your key to working with Federal HUD/EPA Disclosure Regulations

VERMONT REAL ESTATE COMMISSION REAL ESTATE BROKERAGE INSPECTION REPORT

RIGHT OF WAY DATA SHEET (Form #)

DESIGN PRIORITIES. Avenues for Homeless Youth. Charrette Goals AVENUES FOR HOMELESS YOUTH

Rock Island County Courthouse History & Significance

HEALTH AND SAFETY CODE SECTION

Chapter 8. LEASING AND INSPECTIONS [24 CFR 5, Subpart G; 24 CFR 966, Subpart A]

Database Verification for Water Lines Assessment in Banyan Village, Port LaBelle

GCS Giles P O Box Professional Service, Construction Fernandina Beach, FL Professionally Delivered Services, LLC Telephone:

NYC Department of Education

Lawrence Township. Mercer County, New Jersey. Working with our Planning and Zoning Boards & A Guide to our Permit Process

APPENDIX I GLOSSARY OF FACILITIES TERMS

ACCESSORY DWELLING UNITS

Residential Square Footage Guidelines

Charles Kozminski Elementary Community Academy

Element Z General Design Requirements Owner Standards and Other Requirements

CLASS L ELIGIBILITY BULLETIN. Real estate is eligible for Class L status under the following conditions:

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236


Chapter 8. LEASING AND INSPECTIONS [24 CFR 5, Subpart G; 24 CFR 966, Subpart A]

'""'"""""""":;;f)j. D WATER(Hot&Cold) D TOILET SUPPLIES D CARPET CLEANING Space every 5 years stalls.

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

Using HEROS as a RAD Partner

PROPERTY FOR SALE 4 HERITAGE MEWS, GRIMSBY PURCHASE PRICE 95,000 FREEHOLD

Section 23.0 HOUSING QUALITY STANDARDS (HQS) INSPECTION POLICIES

HUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design:

Cook County Assessor s Office: 2019 North Triad Assessment. Elk Grove Residential Assessment Narrative April 16th, 2019

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

Apartment # Real Estate Lease

Renovations Information

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE

APPLICATION PACKET for a VARIANCE to ZONING REGULATIONS

RIVER NORTH 1 st & 2 nd Floor Restaurant Space 540 North LaSalle Street Chicago, IL

Athletics AT-SR. Storage 181E. 272 Auditorium 182F. Storage. 182D Nurse. 181K Workroom. 182G Cot Room 182E. Office. Restroom. Restroom.

4. Building plans should include top of foundation elevation

USER COORDINATED SIGN TEXT

GENERAL INFORMATION * EXISTING UNITS IMMEDIATELY AVAILABLE AND MEETING THE MINIMUM REQUIREMENTS, OR

Transcription:

ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST 299 14-16-299-17 Chicago, IL, 6636 DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 3/13/213 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLLOWING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 3/28/216 IDPH INSPECTOR LICENSE NUMBER: 1-249 IDPH LICENSED INSPECTOR NAME (Please Print): John Feely IDPH MP LICENSE NUMBER: 1-987 IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): DESIGNATED PERSON (Please Print): Robert Christlieb ENROLLMENT 161 Todd Huffer PHONE: (773) 553-3197 3/28/216 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLLOWING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL-482-126 Revised 1.3

THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 Chicago, IL, 6636 Unit: Building ID: 136 IDPH ID Number: 14-16-299-17 REPORT DATE: Monday, March 28, 216 Prepared for: 125 S. Clark Street Chicago, IL 663 Prepared by: 6 West Van Buren St., Ste 5 Phone (312) 762-29 Fax (312) 782-5145 DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

February 26, 216 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois 62761 Re: - 216 Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: School: Region: 5 IDPH ID: 14-16-299-17 Building ID: 136 Address: Chicago, IL, 6636 Building Contact: Meridith, David Contact Phone: 312-771-3948 Current Building Owners: Review 3/28/216 Inspector: John Feely Management Planner: Todd Huffer Inspector IDPH License: 1-249 Management Planner IDPH License: 1-987 If you have any questions or comments, please contact us at (312) 762-29 Sincerely, Todd Huffer 1-987

Environmental tification to Occupants To: Faculty, Staff and Parents From: February 26, 216 RE:, Unit Chicago, IL, 6636 Dear Faculty, Staff and Parents, This letter is to notify you that the 216 asbestos three year re-inspection has been completed at, following the Federal Asbestos Hazard Emergency Response Act (AHERA), 4 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at, there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773) 5533197.

Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms

SCHOOL AND INSPECTION INFORMATION 1. School Information School: Address: IDPH ID: Contact: 2. 14-16-299-17 Meridith, David Unit: Chicago, IL, 6636 Building ID: 136 Phone: 312-771-3948 Description of Facility Original Construction: 197 Total Square Footage: 45965 Current Occupancy: 161 3. Additional Construction: of Floors: 2 Phone: (773) 553-3197 Managing Environmental Consultant MEC: Contact: Dan Juneau Address 6 West Van Buren St., Ste 5 Phone: (312) 762-29 5. Fax: (312) 782-5145 Inspector Inspector Name: John Feely Signature: 2/26/216 Inspector IDPH license # 1-249 6. 1911 LEA Designated Person Contact: Robert Christlieb Address: 125 South Clark Street, 17th Floor Chicago, IL 663 4. Region: 5 Management Planner Management Planner Name: Todd Huffer Management Planner IDPH license # 1-987 7. Review 3/28/216 8. LEA Designated Person's Acknowledgement Signature: 3/28/216 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 3/28/216 Name: Robert Christlieb Unit : Building: 136

II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the. This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part 763.92 (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections 763.85 and 763.88. The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. te: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building 136: Unit: 14 12x12 beige w/brown streaks VAT BB Black baseboard Building: 136

B. The following new homogenous areas have been identified for Building 136: Unit: Building: 136

C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as Assumed: 9 13 14 15 16 17 18 19 11 111 112 113 114 115 116 117 118 119 12 121 122 123 124 126 129 22 24 AA BB HA-1 HA-11 HA-12 T-4 Beige Linoleum 12x12 white w/brown specks 12x12 white floor tile mastic Light purple multicolor carpet lt purple multicolor mastic blue linoleum blue linoleum mastic tan/brown linoleum tan/brown linoleum mastic lt. gray linoleum lt grey mastic dark gray linoleum dark gray mastic dark purple multicolor carpet dark purple multicolor mastic blue carpet blue mastic blue multicolor carpet blue multicolor mastic 12x12 blue tile 12x12 blue mastic 9x9 tan floor tile 9x9 green floor tile 9x9 green floor tile mastic 2'x4' Smooth Ceiling Tile Linoleum mastic RM. 14 Stairway centering black Plaster Black baseboard 1'x1' Ceiling Tiles Hard packed fittings on fiberglass pipe lines 2'x4' Ceiling Tile Tan and Red Terrazzo The following areas were deemed to be inaccessible: 14 16 18 11 Unit: 12x12 white floor tile mastic lt purple multicolor mastic blue linoleum mastic tan/brown linoleum mastic Building: 136

112 114 116 118 12 122 126 127 128 19 lt grey mastic dark gray mastic dark purple multicolor mastic blue mastic blue multicolor mastic 12x12 blue mastic 9x9 green floor tile mastic 12x12 tan (old) 12x12 tan mastic (old) 12x12 beige w/brown streaks VAT mastic Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by John Feely, IDPH License # 1-249. The Management Plan was updated by Todd Huffer, IDPH License # 1-987. Inspector and Management Planner Licenses are included in Appendix B. Unit: Building: 136

III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or Assumed ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (3) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The Building 136 Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: Building: 136

Table I Inspector's Reinspection Findings

School Unit Building ID 136 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA Material Description 9 1 Beige Linoleum 9x9 black VAT RED /BLACK ABATED 13 12x12 white w/brown specks 42,17 14 12x12 white floor tile mastic 15 Light purple multicolor carpet 16 lt purple multicolor mastic 17 blue linoleum 18 blue linoleum mastic 19 tan/brown linoleum 1A 11 11 9x9 red VAT ABATED 12x12 tan w/brown & white marble VAT ABATED tan/brown linoleum mastic 4,252 111 lt. gray linoleum 3,2 112 lt grey mastic 3,2 113 dark gray linoleum 3,2 114 dark gray mastic 3,2 115 dark purple multicolor carpet 391 116 dark purple multicolor mastic 117 blue carpet 118 blue mastic 119 blue multicolor carpet 11A-FT3 12x12 beige w/brown specks VAT 12 9x9 black VAT ABATED Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type ASSUMED ABATED 1928 building Main hall 2nd floor (199) throughout building ASSUMED N NONE 42,17 throughout building 1, teacher's lounge ASSUMED N ASSUMED N 1, 55 teacher's lounge ASSUMED room 321 ASSUMED 55 4,252 room 321 ASSUMED rooms 31, 323, 324, 423, 421 Main hall (199) Hallway 3rd floor ASSUMED ABATED ABATED ASSUMED ASSUMED room 31, 323, 324, 423 and 421 room 42, 44 and 423 room 42, 44 and 423 room 42, 44 and 423 room 42, 44 and 423 room 18 391 1,28 1,28 1,2 Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential LOW NONE NONE N NONE N NONE N NONE N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage N NONE N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE room 18 ASSUMED N NONE principal's office ASSUMED N NONE principal's office ASSUMED N NONE library and room 26 4th floor hall, room 26A,25,29, 1st floor hall (199) Main hall (1928) ASSUMED N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage LOW ABATED ABATED LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW

School Unit Building ID 136 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA Material Description 12 blue multicolor mastic 121 12x12 blue tile 122 123 Material Units Material Location Asbestos Type Material Category Friable Damage Type 1,2 ASSUMED N NONE 9 library and room 26 room 214 Change in Assessment Category ASSUMED N NONE 12x12 blue mastic 9 room 214 ASSUMED N NONE 9x9 tan floor tile 21 ASSUMED N NONE 124 9x9 green floor tile 315 ASSUMED N NONE 125 9x9 green floor tile 315 CHR N NONE 126 9x9 green floor tile mastic 315 ASSUMED N NONE 127 12x12 tan (old) 1,558 CHR N NONE 128 12x12 tan mastic (old) 1,558 CHR N NONE 129 2'x4' Smooth Ceiling Tile 2 front desk back room assistant engineer's office assistant engineer's office assistant engineer's office security office, main office, kitchen office security office, kitchen office, main office 1st Floor Hall By Gymnasium ASSUMED Y NONE 12B 12C 9x9 red VAT ABATED 9x9 beige w/ brown streaks VAT ABATED 12x12 beige w/brown specks VAT ABATED 12x12 beige w/brown streaks VAT ABATED 12x12 beige w/brown streaks VAT Main hall (1928) Room 415 (1928)/RM.415A rooms 423,42,4, 321, ABATED ABATED ABATED 13 13C 14 15 15B 15C 16 16A 17 17A-FT3M 9x9 black VAT mastic ABATED 9x9 red VAT mastic ABATED 9x9 beige w/ brown streaks VAT mastic ABATED 9x9 black VAT mastic Abated 9x9 red VAT mastic ABATED 12x12 tan w/brown & white marble VAT ABATED 12x12 beige w/brown specks VAT mastic ABATED Material Quantity 8,276 ABATED Lunch room, Computer lab, gym office Main Hall (1928) Main Hall (1928) Room 415 CHR ABATED ABATED ABATED Main hall 2nd floor (199) Main hall (199) Hallway 3rd floor ABATED ABATED ABATED 4th floor hall, room 26A,25,29, 1st floor hall (199) ABATED Damage Quantity Damage Units Damage Category Damage Reason Disturbance Potential ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage LOW Any remaining friable ACBM or friable suspect ACBM LOW Yes Any remaining friable ACBM or friable suspect ACBM LOW LOW LOW LOW LOW LOW LOW LOW LOW ne N NONE

School Unit Building ID 136 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA Material Description 18 18C 12x12 beige w/brown specks VAT mastic ABATED 12x12 beige w/brown streaks VAT mastic 19 12x12 beige w/brown streaks VAT mastic 22 Linoleum mastic RM. 14 23 9x9 brown w/white specks VAT ABATED 23A 24 9x9 brown w/white specks VAT mastic ABATED Stairway centering black 31 Green table top 32 Brown table top 33 Black counter top 48 Duct gasket AA Plaster BB Black baseboard BB1 Black baseboard mastic CM1 Maque carpet mastic CM2 Blue carpet mastic CM3 Green carpet mastic CT-1 Pink & white ceramic tile grout Material Quantity Material Units Material Location Asbestos Type Material Category Rooms 423,42 ABATED ABATED CHR ASSUMED ABATED ABATED ASSUMED CHR 1,2 Rooms 321,323,221,219 & attendence office (1928) Lunch room, Computer lab, gym office Old print shop (199) Main hall & Central hall (197) Main & Central halls (197) Balconey stairs (199) Rooms 323,423,421 8,276 Friable Damage Type N NONE N Damage Quantity Damage Units Change in Assessment Category Damage Category ACBM with the potential for damage LOW NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage LOW 5 Room 423 CHR N NONE 1,9 CHR N NONE 7 CHR Y NONE 8, Rooms 323,31,423,421 Boiler room, fan room, electrical vault Auditorium ASSUMED SURFACE Y NONE 12 LF 1st floor corridor (199) 1st floor corridor (199) Rooms 211, 21, 25, principals conference room, weight room Principal's & assistant principal's office Room 214,216, library Locker & WR pool area (197) ASSUMED N NONE Yes NO_ACBM NO_ACBM NO_ACBM NO_ACBM NO_ACBM Damage Reason Disturbance Potential LOW LOW LOW LOW LOW

School Unit Building ID 136 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA Material Description CT-2 FT-1 FT-1M FT-2 FT-2M HA-1 Gray ceramic tile grout 12x12 red VAT 12x12 red VAT mastic 9x9 brown w/white specks VAT ABATED 9x9 brown w/white specks VAT ABATED 1'x1' Ceiling Tiles 45, HA-11 Hard packed fittings on fiberglass pipe lines HA-12 2'x4' Ceiling Tile T-1 T-2 T-3 T-4 Pink terrazzo Dark gray terrazzo Light gray terrazzo Tan and Red Terrazzo WH-1 WH-2 Water heater lining (south) Water heater lining (north) Material Quantity Material Location Asbestos Type Material Category Wash rooms (199) Lunch room Lunch room 2nd floor hall (1928) 2nd floor hall (1928) NO_ACBM ABATED ABATED ABATED ABATED throughout ASSUMED 1 LF Tunnel throughout 15, 25 Material Units Friable Damage Type Y NONE ASSUMED TSI Y Throughout ASSUMED Kitchen area (197) Boarder halls (1928) Halls (1928) South Entry NO_ACBM NO_ACBM NO_ACBM ASSUMED Boiler room Boiler room NO_ACBM NO_ACBM Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential LOW NONE Y NONE Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM N NONE ACBM with the potential for damage LOW LOW LOW

School Unit Building ID 136 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report Reinspection Date 2/26/216 Inspector Name Inspector's Comments John Feely 1-249 5/15/216 Inspector's IDPH License Number / Expiration Date HA Number: 9 1 13 14 15 16 17 18 19 1A 11 11 111 112 113 114 115 116 117 118 119 11A-FT-3 12 12 Inspector Comments: t observed 216

School Unit Building ID 136 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA Number: 121 122 123 124 125 126 127 128 129 12B 12C 13 13C 14 15 15B 15C 16 16A 17 17A-FT-3M 18 18C 19 22 23 23A 24 31 Inspector Comments: t observed 216 t observed 216

School Unit Building ID 136 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA Number: 32 33 48 AA BB BB1 CM1 CM2 CM3 CT-1 CT-2 FT-1 FT-1M FT-2 FT-2M HA-1 HA-11 HA-12 T-1 T-2 T-3 T-4 WH-1 WH-2 Inspector Comments:

School Unit Building ID 136 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report

Table II Management Planner's Review

School Address Unit Building ID Chicago, IL, 6636 136 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Num Material Description 9 1 13 14 15 16 17 18 19 1A 11 11 111 112 113 114 115 116 117 118 119 11AFT-3 12 12 121 122 123 124 125 126 127 Beige Linoleum 9x9 black VAT RED /BLACK ABATED 12x12 white w/brown specks 12x12 white floor tile mastic Light purple multicolor carpet lt purple multicolor mastic blue linoleum blue linoleum mastic tan/brown linoleum 9x9 red VAT ABATED 12x12 tan w/brown & white marble VAT ABATED tan/brown linoleum mastic lt. gray linoleum lt grey mastic dark gray linoleum dark gray mastic dark purple multicolor carpet dark purple multicolor mastic blue carpet blue mastic blue multicolor carpet 12x12 beige w/brown specks VAT 128 Material Quantity Material Units 42,17 42,17 1, 1, 55 55 4,252 4,252 3,2 3,2 3,2 3,2 391 391 1,28 1,28 1,2 9x9 black VAT ABATED blue multicolor mastic 12x12 blue tile 12x12 blue mastic 9x9 tan floor tile 9x9 green floor tile 9x9 green floor tile 9x9 green floor tile mastic 12x12 tan (old) 1,2 9 9 21 315 315 315 1,558 12x12 tan mastic (old) 1,558 Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 1928 building Main hall 2nd floor (199) throughout building throughout building teacher's lounge teacher's lounge room 321 room 321 rooms 31, 323, 324, 423, 421 Main hall (199) Hallway 3rd floor room 31, 323, 324, 423 and 421 room 42, 44 and 423 room 42, 44 and 423 room 42, 44 and 423 room 42, 44 and 423 room 18 room 18 principal's office principal's office library and room 26 4th floor hall, room 26A,25,29, 1st floor hall (199) Main hall (1928) library and room 26 room 214 room 214 front desk back room assistant engineer's office assistant engineer's office assistant engineer's office security office, main office, kitchen office security office, kitchen office, main office Assumed Abated Assumed Assumed Assumed Assumed Assumed Assumed Assumed Abated Abated Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Abated 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Abated Assumed Assumed Assumed Assumed Assumed Chrysotile Assumed Chrysotile 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage

School Address Unit Building ID Chicago, IL, 6636 136 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 129 2'x4' Smooth Ceiling Tile 2 1st Floor Hall By Gymnasium Assumed Yes 7 Any remaining friable ACBM or friable suspect ACBM 12B 12C 13 13C 14 9x9 red VAT ABATED 9x9 beige w/ brown streaks VAT ABATED 12x12 beige w/brown specks VAT ABATED 12x12 beige w/brown streaks VAT ABATED 12x12 beige w/brown streaks VAT Main hall (1928) Room 415 (1928)/RM.415A rooms 423,42,4, 321, Abated Abated Abated Abated Chrysotile 7 Any remaining friable ACBM or friable suspect ACBM 15 15B 15C 16 16A 17 17AFT-3M 18 18C 9x9 black VAT mastic ABATED 9x9 red VAT mastic ABATED 9x9 beige w/ brown streaks VAT mastic ABATED 9x9 black VAT mastic Abated 9x9 red VAT mastic ABATED 12x12 tan w/brown & white marble VAT ABATED 12x12 beige w/brown specks VAT mastic ABATED Abated Abated Abated Abated Abated Abated Abated Abated Abated 19 22 23 23A 24 31 32 33 48 12x12 beige w/brown streaks VAT mastic Linoleum mastic RM. 14 9x9 brown w/white specks VAT ABATED 9x9 brown w/white specks VAT mastic ABATED Stairway centering black Green table top Brown table top Black counter top Duct gasket 8,276 6 ACBM with the potential for damage Chrysotile Assumed Abated Abated Assumed Chrysotile Chrysotile Chrysotile Chrysotile 1,2 5 1,9 7 Main Hall (1928) Main Hall (1928) Room 415 Main hall 2nd floor (199) Main hall (199) Hallway 3rd floor 4th floor hall, room 26A,25,29, 1st floor hall (199) Rooms 423,42 Rooms 321,323,221,219 & attendence office (1928) Lunch room, Computer lab, gym office Old print shop (199) Main hall & Central hall (197) Main & Central halls (197) Balconey stairs (199) Rooms 323,423,421 Room 423 Rooms 323,31,423,421 Boiler room, fan room, electrical vault Yes AA Plaster 8, Auditorium Assumed SURFACE Yes BB BB1 CM1 Black baseboard Black baseboard mastic Maque carpet mastic 12 LF 1st floor corridor (199) 1st floor corridor (199) Rooms 211, 21, 25, principals conference room, weight room Assumed ACBM ACBM LF 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 6 ACBM with the potential for damage 8,276 12x12 beige w/brown specks VAT mastic ABATED 12x12 beige w/brown streaks VAT mastic Lunch room, Computer lab, gym office

School Address Unit Building ID Chicago, IL, 6636 136 Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity CM2 CM3 CT-1 CT-2 FT-1 FT-1M FT-2 FT-2M HA-1 Blue carpet mastic Green carpet mastic Pink & white ceramic tile grout Gray ceramic tile grout 12x12 red VAT 12x12 red VAT mastic 9x9 brown w/white specks VAT ABATED 9x9 brown w/white specks VAT ABATED 1'x1' Ceiling Tiles 45, HA-11 Hard packed fittings on fiberglass pipe lines HA-12 2'x4' Ceiling Tile T-1 T-2 T-3 T-4 WH-1 WH-2 Pink terrazzo Dark gray terrazzo Light gray terrazzo Tan and Red Terrazzo Water heater lining (south) Water heater lining (north) Material Location Asbestos Type Material Category Principal's & assistant principal's office Room 214,216, library Locker & WR pool area (197) Wash rooms (199) Lunch room Lunch room 2nd floor hall (1928) 2nd floor hall (1928) throughout ACBM ACBM ACBM ACBM Abated Abated Abated Abated Assumed 1 LF Tunnel throughout 15, 25 Material Units Friable Damage Quantity Damage Units Damage Category Response Yes Assumed TSI Yes LF Throughout Assumed Yes 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM Kitchen area (197) Boarder halls (1928) Halls (1928) South Entry Boiler room Boiler room ACBM ACBM ACBM Assumed ACBM ACBM 6 ACBM with the potential for damage

School Address Unit Building ID Chicago, IL, 6636 Region 136 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report 3/28/216 Review Date Manager Planner Name Todd Huffer 1-987 5/15/216 Manager IDPH License /Expiration HA Number Management Comments 9 1 13 14 15 16 17 18 19 1A 11 11 111 112 113 114 115 116 Material t Observed in 216 abated abated abated

School Address Unit Building ID Chicago, IL, 6636 Region 136 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Number 117 118 119 11A-FT-3 12 12 121 122 123 124 125 126 127 128 129 12B 12C 13 13C 14 15 15B 15C 16 16A 17 17A-FT-3M Management Comments abated abated abated abated abated abated abated abated abated abated abated abated abated

School Address Unit Building ID Chicago, IL, 6636 Region 136 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Number Management Comments 18 18C 19 22 23 23A 24 31 32 33 48 AA BB BB1 CM1 CM2 CM3 CT-1 CT-2 FT-1 FT-1M FT-2 FT-2M HA-1 HA-11 HA-12 T-1 abated abated Material t Observed in 216 abated abated Material t Observed in 216 abated abated abated abated

School Address Unit Building ID Chicago, IL, 6636 Region 136 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) 762-29 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Number T-2 T-3 T-4 WH-1 WH-2 Management Comments

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 9 Beige Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1928 building COMMENTS: t observed 216 Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 9 Beige Linoleum 1928 building 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Material t Observed in 216 Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 1 9x9 black VAT RED /BLACK ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main hall 2nd floor (199) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 1 9x9 black VAT RED /BLACK ABATED Main hall 2nd floor (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 13 12x12 white w/brown specks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW throughout building 4217 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 13 12x12 white w/brown specks throughout building 4217 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 14 12x12 white floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW throughout building 4217 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 14 12x12 white floor tile mastic throughout building 4217 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 15 Light purple multicolor carpet HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW teacher's lounge 1 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 15 Light purple multicolor carpet teacher's lounge 1 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 16 lt purple multicolor mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW teacher's lounge 1 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 16 lt purple multicolor mastic teacher's lounge 1 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 17 blue linoleum HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 321 55 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 17 blue linoleum room 321 55 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 18 blue linoleum mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 321 55 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 18 blue linoleum mastic room 321 55 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 19 tan/brown linoleum HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW rooms 31, 323, 324, 423, 421 4252 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 19 tan/brown linoleum rooms 31, 323, 324, 423, 421 4252 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 1A 9x9 red VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main hall (199) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 1A 9x9 red VAT ABATED Main hall (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 11 12x12 tan w/brown & white marble VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Hallway 3rd floor COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 11 12x12 tan w/brown & white marble VAT ABATED Hallway 3rd floor 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 11 tan/brown linoleum mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 31, 323, 324, 423 and 421 4252 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 11 tan/brown linoleum mastic room 31, 323, 324, 423 and 421 4252 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 111 lt. gray linoleum HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 42, 44 and 423 32 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 111 lt. gray linoleum room 42, 44 and 423 32 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 112 lt grey mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 42, 44 and 423 32 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 112 lt grey mastic room 42, 44 and 423 32 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 113 dark gray linoleum HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 42, 44 and 423 32 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 113 dark gray linoleum room 42, 44 and 423 32 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 114 dark gray mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 42, 44 and 423 32 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 114 dark gray mastic room 42, 44 and 423 32 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 115 dark purple multicolor carpet HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 18 391 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 115 dark purple multicolor carpet room 18 391 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 116 dark purple multicolor mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 18 391 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 116 dark purple multicolor mastic room 18 391 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 117 blue carpet HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW principal's office 128 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 117 blue carpet principal's office 128 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 118 blue mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW principal's office 128 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 118 blue mastic principal's office 128 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 119 blue multicolor carpet HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW library and room 26 12 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 119 blue multicolor carpet library and room 26 12 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 11A-FT-3 12x12 beige w/brown specks VAT HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 4th floor hall, room 26A,25,29, 1st floor hall (199) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 11A-FT-3 12x12 beige w/brown specks VAT 4th floor hall, room 26A,25,29, 1st floor hall (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 12 9x9 black VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main hall (1928) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 12 9x9 black VAT ABATED Main hall (1928) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 12 blue multicolor mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW library and room 26 12 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 12 blue multicolor mastic library and room 26 12 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 121 12x12 blue tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 214 9 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 121 12x12 blue tile room 214 9 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 122 12x12 blue mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW room 214 9 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 122 12x12 blue mastic room 214 9 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 123 9x9 tan floor tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW front desk back room 21 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 123 9x9 tan floor tile front desk back room 21 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 124 9x9 green floor tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW assistant engineer's office 315 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 124 9x9 green floor tile assistant engineer's office 315 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 125 9x9 green floor tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW assistant engineer's office 315 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 125 9x9 green floor tile assistant engineer's office 315 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 126 9x9 green floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW assistant engineer's office 315 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 126 9x9 green floor tile mastic assistant engineer's office 315 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 127 12x12 tan (old) HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW security office, main office, kitchen office 1558 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 127 12x12 tan (old) security office, main office, kitchen office 1558 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 128 12x12 tan mastic (old) HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW security office, kitchen office, main office 1558 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 128 12x12 tan mastic (old) security office, kitchen office, main office 1558 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 129 2'x4' Smooth Ceiling Tile HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Hall By Gymnasium 2 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 129 2'x4' Smooth Ceiling Tile 1st Floor Hall By Gymnasium 2 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 12B 9x9 red VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main hall (1928) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 12B 9x9 red VAT ABATED Main hall (1928) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 12C 9x9 beige w/ brown streaks VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 415 (1928)/RM.415A COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 12C 9x9 beige w/ brown streaks VAT ABATED Room 415 (1928)/RM.415A 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 13 12x12 beige w/brown specks VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: rooms 423,42,4, 321, COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 13 12x12 beige w/brown specks VAT ABATED rooms 423,42,4, 321, 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 13C 12x12 beige w/brown streaks VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 13C 12x12 beige w/brown streaks VAT ABATED 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 14 12x12 beige w/brown streaks VAT HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Lunch room, Computer lab, gym office 8276 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 14 12x12 beige w/brown streaks VAT Lunch room, Computer lab, gym office 8276 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 15 9x9 black VAT mastic ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Hall (1928) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 15 9x9 black VAT mastic ABATED Main Hall (1928) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 15B 9x9 red VAT mastic ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Hall (1928) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 15B 9x9 red VAT mastic ABATED Main Hall (1928) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 15C 9x9 beige w/ brown streaks VAT mastic ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 415 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 15C 9x9 beige w/ brown streaks VAT mastic ABATED Room 415 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 16 9x9 black VAT mastic Abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main hall 2nd floor (199) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 16 9x9 black VAT mastic Abated Main hall 2nd floor (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 16A 9x9 red VAT mastic ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main hall (199) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 16A 9x9 red VAT mastic ABATED Main hall (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 17 12x12 tan w/brown & white marble VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Hallway 3rd floor COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 17 12x12 tan w/brown & white marble VAT ABATED Hallway 3rd floor 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 17A-FT-3M 12x12 beige w/brown specks VAT mastic ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 4th floor hall, room 26A,25,29, 1st floor hall (199) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 17A-FT-3M 12x12 beige w/brown specks VAT mastic ABATED 4th floor hall, room 26A,25,29, 1st floor hall (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 18 12x12 beige w/brown specks VAT mastic ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 423,42 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 18 12x12 beige w/brown specks VAT mastic ABATED Rooms 423,42 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 18C 12x12 beige w/brown streaks VAT mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 321,323,221,219 & attendence office (1928) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 18C 12x12 beige w/brown streaks VAT mastic Rooms 321,323,221,219 & attendence office (1928) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 19 12x12 beige w/brown streaks VAT mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Lunch room, Computer lab, gym office 8276 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 19 12x12 beige w/brown streaks VAT mastic Lunch room, Computer lab, gym office 8276 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 22 Linoleum mastic RM. 14 HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Old print shop (199) COMMENTS: t observed 216 Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 22 Linoleum mastic RM. 14 Old print shop (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Material t Observed in 216 Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 23 9x9 brown w/white specks VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main hall & Central hall (197) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 23 9x9 brown w/white specks VAT ABATED Main hall & Central hall (197) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 23A 9x9 brown w/white specks VAT mastic ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main & Central halls (197) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 23A 9x9 brown w/white specks VAT mastic ABATED Main & Central halls (197) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 24 Stairway centering black HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Balconey stairs (199) COMMENTS: t observed 216 Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 24 Stairway centering black Balconey stairs (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Material t Observed in 216 Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 31 Green table top HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 323,423,421 12 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 31 Green table top Rooms 323,423,421 12 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 32 Brown table top HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 423 5 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 32 Brown table top Room 423 5 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 33 Black counter top HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 323,31,423,421 19 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 33 Black counter top Rooms 323,31,423,421 19 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION 48 Duct gasket HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Boiler room, fan room, electrical vault 7 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 48 Duct gasket Boiler room, fan room, electrical vault 7 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION AA Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Auditorium 8 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 AA Plaster Auditorium 8 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION BB Black baseboard HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st floor corridor (199) 12 LF LF COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 BB Black baseboard 1st floor corridor (199) 12 LF LF In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION BB1 Black baseboard mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st floor corridor (199) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 BB1 Black baseboard mastic 1st floor corridor (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION CM1 Maque carpet mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 211, 21, 25, principals conference room, weight room COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 CM1 Maque carpet mastic Rooms 211, 21, 25, principals conference room, weight room 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION CM2 Blue carpet mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Principal's & assistant principal's office COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 CM2 Blue carpet mastic Principal's & assistant principal's office 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION CM3 Green carpet mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 214,216, library COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 CM3 Green carpet mastic Room 214,216, library 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION CT-1 Pink & white ceramic tile grout HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Locker & WR pool area (197) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 CT-1 Pink & white ceramic tile grout Locker & WR pool area (197) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION CT-2 Gray ceramic tile grout HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Wash rooms (199) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 CT-2 Gray ceramic tile grout Wash rooms (199) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION FT-1 12x12 red VAT HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Lunch room COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 FT-1 12x12 red VAT Lunch room 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION FT-1M 12x12 red VAT mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Lunch room COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 FT-1M 12x12 red VAT mastic Lunch room 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION FT-2 9x9 brown w/white specks VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd floor hall (1928) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 FT-2 9x9 brown w/white specks VAT ABATED 2nd floor hall (1928) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION FT-2M 9x9 brown w/white specks VAT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd floor hall (1928) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 FT-2M 9x9 brown w/white specks VAT ABATED 2nd floor hall (1928) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: abated Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION HA-1 1'x1' Ceiling Tiles HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW throughout 45 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 HA-1 1'x1' Ceiling Tiles throughout 45 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION HA-11 Hard packed fittings on fiberglass pipe lines HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Tunnel throughout 1 LF LF COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 HA-11 Hard packed fittings on fiberglass pipe lines Tunnel throughout 1 LF LF In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION HA-12 2'x4' Ceiling Tile HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout 15 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 HA-12 2'x4' Ceiling Tile Throughout 15 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION T-1 Pink terrazzo HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Kitchen area (197) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 T-1 Pink terrazzo Kitchen area (197) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION T-2 Dark gray terrazzo HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boarder halls (1928) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 T-2 Dark gray terrazzo Boarder halls (1928) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION T-3 Light gray terrazzo HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Halls (1928) COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 T-3 Light gray terrazzo Halls (1928) 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION T-4 Tan and Red Terrazzo HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW South Entry 25 COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 136 T-4 Tan and Red Terrazzo South Entry 25 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION WH-1 Water heater lining (south) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler room COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 WH-1 Water heater lining (south) Boiler room 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely INSPECTION DATE: 2/26/216 1-249 136 INFORMATION FROM PREVIOUS INSPECTION WH-2 Water heater lining (north) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler room COMMENTS: Inspector's Signature: 2/26/216

216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 3/28/216 1-249 WH-2 Water heater lining (north) Boiler room 136 In accordance with Sections 763.88 and 763.9 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.9 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 3/28/216

216 AHERA REINSPECTION