Appearance Review Board Staff Report

Similar documents
Appearance Review Board Staff Report

ARB AGENDA APPEARANCE REVIEW BOARD

Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch

DEVELOPMENT DEPARTMENT STAFF REPORT THE PARK AT 5 TH

Composition of traditional residential corridors.

CITY OF MERCED SMALL LOT SINGLE-FAMILY HOME DESIGN GUIDELINES

ACCESSORY DWELLING UNITS IN THE SOUTHEAST SECTOR

MAUDLIN INTERNATIONAL ROOF SIGN 2200 S. DIVISION AVE.

Chapter DOWNTOWN ZONING DISTRICTS

SCHEDULE B. Comprehensive Mixed Use Sign and Awning Package Replacing Section VI.P.3 of the Redevelopment Plan As amended January 22, 2013

Plan Dutch Village Road

MEMORANDUM. TO: Plan Commission. FROM: Jeff Ryckaert, Principal Planner and Dan Nakahara, Planner. DATE: October 5, 2017

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

353 W. Grand June 18, 2018

REQUEST FOR ALTERATION REVIEW VERANDA GARDENS HOMEOWNERS ASSOCIATION, INC.

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT

Multi-unit residential uses code

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

ARTICLE 887. PD 887. Valley View - Galleria Area Special Purpose District

ARTICLE 909. PD 909. PD 909 was established by Ordinance No , passed by the Dallas City Council on April 23, (Ord.

STANDARDS FOR OUTDOOR DINING AREAS ON 8 th STREET

722 WILLIAMSON STREET

Section 1. Appendix A, "Zoning" of the Code of the City of Charlotte is hereby amended as follows:

DRIVEWAY REQUIREMENTS

Development Plan DP13-3 (Arlington Lofts) Planning and Zoning Meeting Date: Document Being Considered: Ordinance

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Cover Letter with Narrative Statement

Committed to Service. License Agreement Application Form

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Coding For Places People Love Main Street Corridor District

SAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010

PLANNED DEVELOPMENT DISTRICT STANDARDS. Cadence Site

RED LOBSTER GROUND SIGN 450 S. ORANGE AVE.

COMMERCIAL/INDUSTRIAL DEVELOPMENT GUIDELINES

MEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

BYLAW NO. 15/026 A BYLAW OF THE REGIONAL MUNICIPALITY OF WOOD BUFFALO TO AMEND THE LAND USE BYLAW NO. 99/059

3.1 Existing Built Form

2. The modification is consistent with the objectives of this chapter.

2 OVERVIEW & GUIDE. 2.1 ZONING ATLAS OVERVIEW...9 Zoning Districts 9 Transit Areas 10 Pedestrian Streets 10

PLANNING COMMISSION REPORT Regular Agenda -Public Hearing Item

ARTICLE 9 GENOA TOWN CENTER OVERLAY DISTRICT

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

Planning Commission recommends APPROVAL of the amendment to Article 4, Article 7, and Article 14 as presented by Staff on 6/19/17.

DEVELOPMENT DEPARTMENT STAFF REPORT DRESDEN HEIGHTS PHASE II DCI

5.1 Site Planning & Building Form

Duplex and Tandem Development Community Workshop. Presented by: Elisabeth Dang, AICP

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018

WALNUT CREEK DESIGN REVIEW COMMISSION STAFF REPORT. AGENDA: July 6, 2016 ITEM 4b.

M-43 CORRIDOR OVERLAY ZONE

. \. structure. portion of a. yard setback. in height. for that. above 45 ft. structure above. 20-ft. front. 2, additional.

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

Residence-3. Residence-2. Residence-2. Residence-2. Residence-2. Residence-2. Residence-2/Patio Home. Residence-2

4 DEVELOPMENT STANDARDS FOR

DAUPHIN CREEK ESTATES SUBDIVISION

Re: Case # ZP Preplanning Application for 8 townhomes at 1526 Ingalls Street in Lakewood, CO.

Accessory Dwelling Unit Permit

CITY OF BELLE GLADE. 110 Dr. Martin Luther King Jr. Blvd., West Belle Glade, FL Telephone (561) Fax (561)

DEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1

320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525

33-39 Ward Street Condominiums Ward Street South Boston, MA

City of Reno October 30, 2012 Draft Midtown Zoning Text Amendments 1

ORDINANCE NO NOW, THEREFORE, BE IT ENACTED BY THE CITY OF WINTER GARDEN, FLORIDA, AS FOLLOWS:

NOW, THEREFORE BE IT ORDAINED,

MASTER SIGN PROGRAM SERRA CENTER COLMA, CALIFORNIA. Approved by the Town of Colma City Council on March 22, 2017

Lone Tree Landing Hillcrest Ave & Lone Tree Way Antioch, CA

Report to the Plan Commission August 20, 2012

SALT LAKE CITY ORDINANCE No. of 2016

PLANNING AND DEVELOPMENT DEPARTMENT STAFF REPORT STAFF REPORT PREMIER AUTO SERVICES, INC. VARIANCES

ORDINANCE NO

MEMORANDUM. B4S-2 Downtown Service District DP Downtown Parking Overlay District 42,390 square feet / 0.97 acres. DMNA; adjacent to North Loop

ARTICLE IV: DEVELOPMENT STANDARDS

PREPARED FOR THE URBAN DESIGN COMMISSION AND PLAN COMMISSION

REXFORD ROAD (100' PUBLIC R/W) EXISTING RIGHT-IN/RIGHT-OUT ACCESS CONNECTION TO REMAIN EXISTING CURB TO REMAIN 50' SETBACK FROM BACK OF CURB PARKING

PUD Zoning Framework

Article 2. Rules of Interpretation

AGENDA MEMORANDUM. Honorable Mayor and City Council Members. Bryan Cobb, City Manager FROM: DATE: September 21, 2015

ANDERSON HALL PUD TEXT AMENDMENT PRESENTED BY STEVEN D. HARDIN, ESQ.

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

STAFF DESIGN REVIEW RESIDENTIAL BUILDING APPLICATION SUPPLEMENT

ARTICLE III ZONING DISTRICTS AND GENERAL REGULATIONS

BOROUGH OF HOPATCONG ORDINANCE No

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016

Text Amendment July 29, Charlotte - Mecklenburg Planning Department

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM

St. James Catholic Church USPS. St. Luke Episcopal. O.C. Regional History. Heritage Square

SHOOTER S WORLD 4850 LAWING LN.

From Policy to Reality

PD No. 15 Authorized Hearing

ARTICLE 5. COMMERCIAL AND OFFICE DISTRICTS 5.1 PURPOSE STATEMENTS 5.2 USES 5.3 DIMENSIONAL STANDARDS 5.4 DESIGN STANDARDS 5.5 DK DISTRICT STANDARDS 5

DEVELOPMENT DEPARTMENT STAFF REPORT STAFF REPORT DRESDEN DRIVE TOWNHOMES DCI

Town of Siler City - Unified Development Ordinance ARTICLE XII - Density and Dimensional Regulations

SITE PLAN REVIEW COMMITTEE MEETING AGENDA Clarendon Boulevard Conference Rooms C & D Arlington, VA 22201

Infill & Other Residential Design Review

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016

4 June 11, 2014 Public Hearing

LDC AMENDMENT TOWNHOMES

Rezoning Petition Pre-Hearing Staff Analysis April 17, 2017

1615 EDGEWATER DRIVE, SUITE 180 ORLANDO, FL T: /F: Memorandum

Transcription:

Appearance Review Board Staff Report November 15, 2018 ARB2018-10035 Agenda Item 2 30 W. Livingston Street Zoi House Orlando Courtesy Review Applicant RJ de Varona MEC Equity Partners, LLC W. Amelia St. Owner Avi Weintraub, Manager Mazal Holdings Group, LLC & Living Orlando, LLC Requested Action N. Orange Ave. N. Magnolia Ave. The applicant is requesting a Courtesy Review for a 42-story tower with 10,000 s.f. of retail, 130,000 s.f. of office, 300 residential units and 697 parking spaces in an integrated podium garage. W. Livingston St. Subject Site Recommendation Courtesy Review, No Action Required Project Planner Doug Metzger, AICP, LMT Updated: November 8, 2018 Aerial Photograph Summary Project Description The subject site is bounded on the north by W. Livingston Street, on the east by surface parking lots, on the south by an existing 2-story building and on the west by N. Orange Ave. This is a Courtesy Review for a 42-story tower with 10,000 s.f. of retail, 130,000 s.f. of office, 300 residential units and 697 parking spaces in an integrated podium garage. Project History Previous Actions: 1896 The smaller parcel is platted as parts and pieces in the Cooper & Martin Subdivision. 1950 Existing 10,811 gross sq. ft. building at 367 N. Orange Ave. constructed. 1970 Existing 2,488 gross sq. ft. building at 30 E. Livingston Ave. constructed. 07/2006: MPL2006-00021 Request for Master Plan was approved by the MPB for a 385-foot, 25-story mixed-use building consisting of 12,000 sq. ft. of retail, 93,800 sq. ft. of office, 118 residential units. MPL2018-10066 Zoi House Orlando master plan request for a mixed-use development with 300 multi-family units and 140,000 sq. ft. of commer-cial/ office uses (bonus of +/- 5,400 sq. ft.). The request includes a modification for a rear yard setback. The case will be presented to the MPB on November 20, 2018 for approval. Public Notice A placard was posted on the subject site by November, 8th, advertising this ARB meeting.

Page 2 Project Overview The +1.03 acre subject property, located within the Central Business District neighborhood, is north of E. Robinson St., west of N. Magnolia Ave., east of S. Orange Ave. and south of W. Livingston St. The applicant is requesting a Courtesy Review for a mixed-use development comprised of 300 multi-family units, 10,000 sq. ft. of commercial and 130,000 sq.ft. of office. The proposed building is 42 floors tall with a 33-story office and residential tower on top of a 9-story parking podium with ground floor retail. The proposed building is 475-feet tall, or approximately 47-feet taller than the 428-foot Suntrust Tower, which would make Zoi House Orlando, if constructed as submitted, the tallest building in Orlando. The site has a Future Land Use designation of Downtown Activity Center and a zoning designation of AC-3A/T (Downtown Activity Center/Traditional City Overlay). on the Official Zoning Map. This zoning district is intended for development which strengthens Downtown as the economic, governmental and cultural hub of the Central Florida region. It provides for concentrated residential, commercial, office, recreational and cultural facilities. It also serves the entire metropolitan area at the highest intensities available within the region. The site is currently developed with two buildings, operating as multi-tenant spaces, consisting of office, nightclub and eating and drinking uses. Adjacent uses include the Bank of America office building at 28 floors to the west, The Orange County Courthouse to the north at 24 floors, a City National Bank branch office to the south and surface parking for an office building fronting on N. Magnolia Ave. ARB Staff Review The N. Orange Avenue and E. Livingston St. intersection, if the Zoi House Orlando and the X Orlando/Golden Sparrow projects are developed, could become the architectural center of downtown Orlando. The four intersection corners would be filled with two generations of Orlando high-rises that could become the peak of the downtown Orlando skyline. And, the Zoi House Orlando building, as designed for this Courtesy Review, would become the tallest building in Central Florida, let alone downtown. But size isn't everything. The design team is off to a good start but there are still areas of the building that need further design refinement and detailing, starting at the base of the building, and for purposes of this discussion, the base will be the 9-story parking garage podium, The ground floor storefront along Orange Avenue with 20-feet of floor to ceiling glass will be very inviting and should activate the N. Orange Ave. and E. Livingston St. corner. Staff recommends continuing the storefront system farther down Livingston St. frontage. The parking garage area of the podium, floors two through nine, along Orange Avenue and a portion of Livingston have an interesting, Mondrian, pattern of what appears to be several different types of panels that are also a mix of different materials and colors. It should be noted, based on the rendering views that a 36 opaque barrier is required at the edge of all the parking garage levels to block headlight glare at night. The greatest concern of staff in the entire project is the east and south facades of the parking podium. Because of fire safety requirements these facades have no windows and no significant delineation. ARB staff is very concerned about the treatment of the east and south podium facades because the facades are 9-stories tall on a downtown block where the tallest surrounding building is only 3-stories tall and most are only a single story. The 9-story blank walls are going to be highly visible and are definitely going to need some significant or unique and creative treatment to make them an asset to the area and not a visual eyesore. The eastern portion of the parking garage podium along E. Livingston St. needs additional attention as well. The body, or middle, of the building, as it rises from the top of the podium to the sky has a very interesting, asymmetrical Orange Ave. [west] façade. Balconies on the north and south sides of the west facade create two curves that ascend up and towards each other creating asymmetrical arcs that are visually interesting and unique. Unfortunately, in the four-sided, architectural world of high-rise towers the other three facades of the tower, do not share any of the interesting asymmetry of the west façade. The east façade of the tower should emulate the west façade and incorporate asymmetrical elements in order to give it the same visual interest as the west façade. The wing, or eyebrow feature on the west façade of the building should be designed to be more visually interesting. The wing feature should also be incorporated into the design of the east façade as well.

Page 3 ARB Staff Review [cont.] Finally, the design of the top, or skyline of the building, includes a light cube on the top of the building. The light cube helps create and define an enviable roof top amenity space. However, staff has seen an influx of this treatment lately. The Golden Sparrow project across the street has three light boxes. The Student Housing building and Parcel M building at Creative Village, also have light boxes on top. ARB staff is not opposed to the light boxes, or to roof top amenity decks, but staff also believes the proposed tallest building in the city should have a more distinctive and unique skyline appearance. Staff also believes the applicant team already has the bones in their design to deliver something more. The best design feature of the building, the rising asymmetrical balcony curves of the west façade, stop at the top of the tower, at the flat parapet line. Staff recommends the design team use the arcs of the west façade balconies to inform the design and shape the skyline light box. Incorporating the arcs into a skyline feature will create a unique and integrated design feature to what could be the future summit of the Orlando skyline. ARB Courtesy Review Comments ARB Staff has reviewed the Zoi House Orlando project at 30 E. Livingston and has the following Courtesy Review comments: 1. ARB Final Review Prior to submittal of building permits for vertical construction the project must be submitted for an ARB Major Certificate of Appearance Apprvoal. The final ARB submittal must include a comprehensive overview of the project including dimensioned site plans, landscape, hardscape, utilities, signage and lighting plans. Architectural floor plans, color elevations and color perspective renderings. 2. Streetscape A. Streetscape Design Guidelines: i. All streetscape design and construction is required to comply with the design and construction requirements of the Downtown Orlando Streetscape Design Guidelines and the conditions in this staff report. ii. Maintenance Agreement The applicant must enter into a maintenance agreement with the City to define maintenance responsibilities for the streetscape zone and any proposed outdoor dining areas inside of the right-of-way. iii. City Services Easement A city services easement must be provided by the applicant for any portion of the required 15-foot streetscape zone outside of the right-of-way. B. General Streetscape Requirements: i. Structural Soil To minimize root damage to adjacent pavement areas structural soil, or a Planning Official approved equivalent, must be installed around all canopy street trees consistent with Detail 3.4-O and 3.4-P of the Downtown Orlando Streetscape Guidelines. ii. Street Lights Double acorn LED streetlights consistent with the Downtown Streetscape Design Guidelines must be used on N. Orange Ave. and E Livingston St. They should include banner arms and a 110 volt power outlet. iii. Corner Treatments Intersection corner treatments at N. Orange Ave. and E. Livingston St. must be Lawrenceville brick and installed with a 6-inch thick concrete sub-base for the first 6-feet from back of curb transitioning to 4- inches to the outward edge of the 15-foot streetscape zone. Corner treatments must provide two directional pedestrian ramps at each corner perpendicular to the centerline of the roadway they are crossing. iv. Corner Clip A 10-foot corner clip may be required at the intersection of N. Orange Ave. and E. Livingston St. in order to move the existing traffic signal pole outside of the pedestrian clear zone. v. Materials Materials in the streetscape must be those approved in the Downtown Streetscape Design Guidelines. Specialty pavers and furniture other than those in the streetscape design guidelines are not permitted in the required streetscape zone. vi. Valve and Junction Boxes All at grade junction, valve and control boxes in the required streetscape zone must be traffic bearing grade boxes and lids. vii. Building Entries Doorways must not swing open into the required streetscape zone. Building entries should be recessed into the façade so that ingress, egress and entry doors do not conflict or open directly into the pedestrian clear zone. viii. Curbing and Curb Cuts All existing curb cuts must be removed. The streetscape and the curbing along the entire project frontage must be restored during construction. All curbing in the ROW must be Type A curb and gutter per the LDC and ESM. ix. Landscape and Hardscape Plans Detailed landscape and hardscape plans must be submitted with the ARB Final Review application and must be approved prior to issuance of foundation permits.

Page 4 ARB Courtesy Review Comments [cont.] C. Streetscape Treatment 2: i. Width The minimum streetscape width on N. Orange Ave. and E. Livingston St. must be a minimum of 15-feet from back-of-curb. The furniture zone must be a minimum of 6-feet along the entire project frontage. The concrete sub-base in the furniture zone must be 6-inches thick. The pedestrian clear zone must be a minimum of 9- feet in width. ii. Treatment 2 The streetscape treatment on E. Livingston St. must match Treatment 2 of the Streetscape Design Guidelines. The furniture zone must be 6-feet wide with hex pavers. The pedestrian clear zone must be a minimum of 9-feet wide and must have a Lawrenceville brick window pane with concrete sidewalk cells. The sidewalk calls must have a 2-inch troweled edge with a medium broom finish, The broom finish must be perpendicular to the centerline of the street. iii. Pedestrian Crossing The pedestrian crossing at the garage entry must be raised to be at the same grade as the sidewalk adjacent to the driveway with a continuous Lawrenceville brick crosswalk. The grade transition from street grade to sidewalk grade must occur in the 6-foot furniture zone. The driveway ramp may be concrete. iv. Street Trees Street tree wells must be 6-feet by 10-feet, the use of tree grates is optional. The street trees on E. Livingston St. must be high rise live oak trees. D. Sidewalk Café A Sidewalk cafe may be be permitted to extend into the 15-foot streetscape zone in front of the N. Orange Ave. and/or E. Livingstons St. retail/restaurant space. The sidewalk café must meet the requirements in the Land Development Code. E. Fencing Any fencing on the site must be an open, CPTED-approved fence, such as aluminum picket or welded wire. Except for construction fencing, chain link fencing is prohibited. 3. Architecture A. Design Intent ARB staff supports the development of the Zoi House project even though staff believes the project design, at this Courtesy Review level, still needs some significant refinement. ARB staff will continue to collaborate with the development team in order to advance the building design and to help deliver a distinctive project that will enhance both the Orlando skyline and life at the street level. B. Skyline Architecture At 40+ stories this building would be the tallest building in Orlando. Additional attention needs to be paid to the skyline architecture so the Zoi House Orlando building is unique and easily identifiable in the downtown skyline during the day and night. C. East Façade The design of the east façade needs to embrace the asymmetry of the west façade without needing to duplicate the west facade design. The skyline wing at the top of the west façade should also be incorporated into the design of the east façade. E. The Parking Podium The nine-story blank walls of the east and south parking podium facades will loom over the much lower existing development on the same block. Therefore the exterior treatment of those facades needs to provide visual interest with a design that integrates the tower design with the podium design. F. Transparency i. The ground floor building walls facing all streets must contain a minimum of 30% transparent materials. A minimum of 15% transparency must be provided on all floors facing the street above the ground level. ii. All glass at the ground level must be clear with a minimum light transmittance of 80%. High performance or low-e glass may be considered as an alternative with a minimum transmittance of 60%. iii. No windows must be dry-walled, or have permanent partitions installed on the interior to block natural surveillance. iv. Tinted, reflective, or spandrel glass does not count towards meeting the transparency requirements. 4. Lighting A. A lighting plan that complies the requirements of the City s lighting codes [Chapter 63 2M.], including photometrics and all proposed exterior lighting fixtures, must be submitted for ARB Final Review and approval prior to submittal of vertical building permits. B. It is encouraged that the top of the building be appropriately lit in order to make the building distinct in the night time skyline. C. Night time building elevations must be submitted for ARB Final Review prior to submittal of building permits.

Page 5 ARB Courtesy Review Comments [cont.] 5. Mechanical Equipment A. Rooftop Mechanical Equipment Rooftop mechanical equipment must be screened to the height of the mechanical equipment with parapets, louvered panels and/or perforated metal screen walls. The color of the rooftop mechanical equipment should also match the roof color as closely as is feasible. B. Venting & Exhaust All potential restaurant venting and exhaust must be directed to the roof of the building or parking garage and must not be visible from the public right-of-way. Restaurant venting is not permitted on any façade of the building nor is it permitted to vent over or towards pedestrian areas. All other venting and exhaust for mechanical and other utilities must be integrated with the building design so as to be seamless with the overall architecture of the building. Venting and louver panels must be painted to match the surrounding façade area. C. Transformer Transformers be screened with decorative, opaque walls and gates up to 6-feet in height or they should be located inside of the parking garage. D. Backflow Preventer The proposed backflow preventer [BFP] must be located so as to not be directly visible from the right-of-way and should be screened from view where necessary. ARB Staff s preferred location is inside of the parking garage. The BFP must be clearly identified on the final utilities plan in the Final ARB submittal. E. Fencing Any fencing on the site must be an open, CPTED-approved fence, such as aluminum picket or welded wire. Except for construction fencing, chain link fencing is prohibited. F. Final Elevations The location and configuration of all exterior venting and mechanical equipment must be depicted on the building elevations in the Final ARB submittal. The ARB final submittal must also include a rooftop plans that depcts any proposed rooftop equipment and proposed screening equipment. 6. Signage A. Master Sign Plan A Master Sign Plan [MSP] for the building, including both low-rise and high-rise signage must be submitted for a separate ARB Major approval prior to the issuance of a Certificate of Occupancy. The MSP shall clearly show how signage will be allocated throughout the project including the type, style, location, and sign area. B. The project site is in the Mid-Town section od the Downtown Special Sign District [Sec. 64.400]. C. High-Rise signs Two high rise are allowed per Sec. 64.246, If the design of the two high-rise signs are different than they must be located so that they are not visible together from the same vantage point. 7. Telecommunications Equipment Screening Buildings should be designed to accommodate future placement of telecommunications equipment. Screening areas should be built into rooftop areas so that the placement and screening of the equipment does not become an afterthought. 8. Model Prior to permitting, a physical 1"= 100' scale model of the project should be provided for the DDB/CRA model located in the Downtown Information Center.

Page 6 Site Photos

Page 7 Site Photos

Page 8 Survey

Page 9 Ground Floor Plan

Page 10 Podium Floors 2 thru 9

Page 11 Level 10

Page 12 Floor Plan Level 11 thru 15

Page 13 Floor Plan Levels 16 thru 40

Page 14 E. Livingston Street Section

Page 15 N. Orange Avenue Section

Page 16 Inspirational Architecture

Page 17 North and West Elevations

Page 18 East and South Elevtion

Page 19 Northwest and Northeast Corners

Page 20 Southwest and Southeast Corners

Page 21 Orange and Livingston Corner

Page 22 N. Orange Avenue Looking North

Page 23 E. Livingston Street Looking West

Page 24 Northeast Corner Looking West

Page 25 Northwest Corner Looking South

Page 26 Southeast Corner Looking North

Page 27 Southwest Corner Looking North

Page 28 West Façade Skyline Influence

Page 29 East Façade Skyline Onfluence