NOTICE OF INTENT FOR DISCHARGES OF STORM WATER ASSOCIATED WITH MEDIUM OR LARGE CONSTRUCTION ACTIVITY AUTHORIZED UNDER NPDES GENERAL PERMIT ARR150000

Similar documents
Chuck Capps 1009 Liberty Drive DeWitt, AR Fax

NOTICE OF INTENT TO USE NPDES GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES (RULE (4), F.A.C.

Storm Water Coordinator Department of Natural Resources 502 E. 9th Street Des Moines, Iowa

Notice of Intent (NOI)

NOTICE OF INTENT FORMS NOTICE OF TERMINATION FORMS

NOTICE OF INTENT VERSION State of Georgia Department of Natural Resources Environmental Protection Division

Regulatory Requirement: This form serves to fulfill the obligations referenced in 25 Pa. Code (related to Permit Termination).

Regulatory Requirement: This form serves to fulfill the obligations referenced in 25 PA Code (related to Permit Termination).

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER

Our Staff Member are committed to helping you during this process.

Action Plan. State of Arkansas B-11-DN Funding Sources. Narratives. No Funding Sources Found. Grant Amount: $ 5,000,000.

The City of MIDWEST CITY 100 N. Midwest Blvd * Midwest City, Oklahoma (405) *TDD (405) * FAX (405)

2018 Illinois and Western Indiana Health Alliance Group Medicare

NON-PRIORITY WATER QUALITY MANAGEMENT PLAN (WQMP)

BUILDING PERMIT SUBMITTAL REQUIREMENTS

PRINT NAMES OF BUYERS AS ARE THEY ARE TO APPEAR ON DEED (WITH MIDDLE INITIALS, ETC.)

2019 Illinois and Western Indiana Health Alliance Group Medicare

JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: Date: December 9, 2016 Comments Due: January 3, 2017

City of McMinnville Community Development Department

2012 Indiana Tax Credit Rental Housing Survey

Chapter 102 Permit Amendments. Frequently Asked Questions (FAQ) Final, October 19, 2018

Establishment of Field Rules; Creation of Drilling Units. Amendment of Order No Establishment of Field Rules; Creation of Drilling Units

3.1 PERMITTEE SITE INSPECTION RESPONSIBILITIES

MOBILEHOME PARK RENT STABILIZATION PROGRAM

TPDES Construction Site Inspector Training

Health Alliance Plus Group Plan Description of Coverage Worksheet Maximums/Deductibles/Limitations Description of Coverage

SIMPLIFIED APPROACH PERMIT PROCEDURES

Legally Described as: Lot(s) - in BROOKHAVEN ESTATES PLAT 1, pursuant to the Plat thereof (the, Property ).

BRISTOL CONSERVATION COMMISSION INLAND WETLANDS AGENCY FORM IW-1 (Application for a Wetlands Permit)

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY COMPLIANCE DIVISION INDUSTRIAL PRETREATMENT PROGRAM ENFORCEMENT RESPONSE PLAN

GENERAL PLAN DESIGNATIONS (Exhibit A): MDR (Medium Density Residential) Designation. SURROUNDING: MDR (Medium Density Residential) Designation

Honolulu District U.S. Army Corps of Engineers

Administrative Penalty Order (APO) Plan for Buffer Law Implementation

PROTOCOL FOR ZONING PERMIT SUBMITTAL

Board of Adjustment Variance Process Guide

ARTICLE I. IN GENERAL

APPLICATION FOR PERMIT: (Pursuant to Ord & Reso ) 4d Habitat Loss Permit Vegetation Removal Tree Removal. Address:

DAUPHIN COUNTY CONSERVATION DISTRICT NPDES PERMIT AND EROSION AND SEDIMENT POLLUTION CONTROL PLAN REVIEW APPLICATION INFORMATION

COLUMBIA COUNTY SURFACE MINING ORDINANCE

Q Q Q Q Q Q Q Q Q1-2016

Q Q Q Q Q Q Q Q Q Q1-2017

RD INSTRUCTION 1980-D, EXHIBIT C PAGE 49 GUARANTEED HOUSING PROGRAM INCOME LIMITS

Grand Rapids, MN Stormwater Utility Best Management Practices Credit Policy (As per Section (b) of Ordinance No )

SEWAGE FACILITIES PLANNING MODULE

ADAMS COUNTY CONSERVATION DISTRICT S

U.S. DEPARTMENT OF HUD 04/11/2017 STATE: TENNESSEE ADJUSTED HOME INCOME LIMITS

Alternative plans review and inspection.-- (1) As used in this section, the term:

Construction & Earthwork Request Form (CERF)

Do you get Extra Help from Medicare?

NASSAU COUNTY SIDING PERMIT APPLICATION

SEWAGE FACILITIES PLANNING MODULE

ZONING BOARD OF APPEALS APPLICATION

JURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

MILLE LACS COUNTY BUFFER ORDINANCE

CONDITIONAL USE AMENDMENT PERMIT APPLICATION LEVY COUNTY, FLORIDA

COMMERCIAL BUILDING PERMIT APPLICATION

INFORMATION REQUIRED FOR OBTAINING A BUILDING PERMIT

Irrigation Permit Requirements FOR OWNER/BUILDER

DAUPHIN COUNTY CONSERVATION DISTRICT NPDES PERMIT AND EROSION AND SEDIMENT POLLUTION CONTROL PLAN REVIEW APPLICATION INFORMATION

ADDrESS federal ID (fein) 12/31/18

FLCC RENTAL PROPERTY LISTING APPLICATION

ONTARIO RENOVATES PROGRAM Application Form for Landlords

This decision is made under sections 130( 1 ) and 133 of the Environment Protection and Biodiversity Conservation Act 1999.

CHAPTER 12 GENERAL CONSTRUCTION PERMIT

9. Public (Federal, State, or local

Buffer and Soil Loss Statutes, as amended in 2017 by Laws of Minnesota 2017, Chapter 93 (S.F. 844)

APPLICATION FOR RAZE PERMIT AND/OR SUPPLEMENTAL RAZING OPERATIONS PERMIT

Mesa County Engineering Division Stormwater Construction Permit

APPLICATION FOR FILING SUBDIVISION and/or DEVELOPMENT PLANS

BYRON TOWNSHIP ZONING APPLICATION

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units) Address. Address.

APPENDIX NO. 11 VERIFICATION. (If no Improvement Construction Plan has been approved)

DOWNPAYMENT ASSISTANCE APPLICANT:

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

APPLICATION FOR CLEARANCE OF SHORELINE VEGETATION AND

Superintendent Application Form

APPLICATION FOR RENTAL (Archstone Van Ness)

Upstate New York Real Estate Information Services LLC (UNYREIS) NYSAMLS S MULTIPLE LISTING RULES and REGULATIONS SUMMARY

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST

EIV Use Policy. Management is able to use the EIV system to determine if:

MINNESOTA POLLUTION CONTROL AGENCY GENERAL PERMIT FOR DISPOSAL OF UNCOMTAMINATED CONCRETE

2017 LIHTC Rent and Income Limits for 50% and 60%

Complete Package Requirements Operating Cost Adjustment Factor

WASHINGTON COUNTY CUP SUBMITTAL CHECKLIST

Sussex County Municipal Utilities Authority 34 South Route 94 Lafayette, NJ /F:

BYRON TOWNSHIP 8085 BYRON CENTER AVENUE, SW BYRON CENTER, MI PHONE: FAX: STORMWATER APPLICATION AND PERMIT

APPLICATION TO CONSTRUCT A DOCK

ARTICLE XXIII ADMINISTRATION

Zoning/Building Permit Application

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

NASSAU COUNTY MECHANICAL PERMIT APPLICATION

SEWAGE FACILITIES PLANNING MODULE APPLICATION MAILER

Dear Sir/Madam. RE: Billboard Sign Control Program

Ingham County Housing Commission Mainstream Disabled Housing Choice Voucher (HCV) Program Application

Program vs. Award FY18 per District as of May 18, 2018 Letting (June 6, 2018 Awards)

APPLICATION WILL NOT BE ACCEPTED IF ANY DATA IS MISSING--COMPLETE BOTH SIDES. (Mailing Address)

Eaton County Stormwater Management Maintenance Covenant for Private Storm Drain Systems

The Dallas City Code ARTICLE XI. HISTORIC PRESERVATION TAX EXEMPTIONS AND ECONOMIC DEVELOPMENT INCENTIVES FOR HISTORIC PROPERTIES.

Transcription:

NOTICE OF INTENT FOR DISCHARGES OF STORM WATER ASSOCIATED WITH MEDIUM OR LARGE CONSTRUCTION ACTIVITY AUTHORIZED UNDER NPDES GENERAL PERMIT ARR150000 The enclosed form may be used to obtain coverage under NPDES general permit ARR150000 for discharges of storm water associated with construction activity at any site or common plan of development or sale that will result in the disturbance of five (5) or more acres of total land area. Return the completed form to: The following facilities are required to submit the Notice of Intent: (1) Except as provided in paragraphs (2) and (3) below, individuals who intend to obtain coverage for storm water discharges from a medium or large construction site shall submit a Notice of Intent at least two weeks prior to commencement of construction; (2) Upon a pending transfer of ownership of a construction operation with a storm water discharge covered by this general permit, the new owner/operator must submit a Notice of Intent at least two weeks prior to the new owner/operator beginning work at the site; (3) A discharger is not precluded from submitting a Notice of Intent at a later date as provided above. In such instances, the Director may bring an enforcement action for failure to submit a Notice of Intent in a timely manner or for any unauthorized discharge of storm water that have occurred on or after the dates specified in paragraphs (1) or (2) above. The following definitions should be used to determine if the construction activity is a medium or large construction site: Large Construction Sites mean any construction activity that meets one of the following two definitions: (i) Construction sites that will result in the disturbance of ten (10) or more acres of total land area or less than ten (10) acres of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb ten (10) acres or more located in the following counties: Baxter Garland Newton Sharp Benton Hot Spring Perry Stone Boone Howard Pike Van Buren Carroll Independence Polk Washington Clark Izard Pope White Cleburne Johnson Pulaski Yell Conway Lawrence Randolph Crawford Logan Saline Faulkner Madison Scott Franklin Marion Searcy Fulton Montgomery Sebastian

(ii) Construction sites that will result in the disturbance of twenty (20) or more acres of total land area or less than twenty (20) acres of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb twenty (20) acres or more located in the following counties: Arkansas Crittenden Jefferson Nevada Ashley Cross Lafayette Ouachita Bradley Dallas Lee Phillips Calhoun Desha Lincoln Poinsett Chicot Drew Little River Prairie Clay Grant Lonoke Sevier Cleveland Greene Miller St. Francis Columbia Hempstead Mississippi Union Craighead Jackson Monroe Woodruff Medium Construction Sites mean any construction activity that meets one of the following two definitions: (i) Construction sites that will result in the disturbance of greater than five (5) acres and less than ten (10) acres of total land area or less than five (5) acres of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb five (5) acres or more located in one of the counties identified in Part (i) of the Large Construction Site definition above. (ii) Construction sites that will result in the disturbance of greater than five (5) acres and less than twenty (20) acres of total land area or less than five (5) acres of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb five (5) acres or more located in one of the counties identified in Part (ii) of the Large Construction Site definition above. Unless notified by the Director to the contrary, dischargers who submit a complete Notice of Intent in accordance with the requirements of this permit are authorized to discharge storm water from construction sites under the terms and conditions of this permit two weeks after the date the NOI is postmarked. As required by ADEQ Regulation No. 9, an initial permit fee of $200.00 must be submitted with this NOI. Subsequent annual fees of $200.00 per year will be billed by the Department. Failure to remit the required permit fee may be grounds for the Director to deny coverage under this general permit, and to require the owner or operator to apply for an individual NPDES permit. NOTE: A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE PREPARED PRIOR TO SUBMITTAL OF THIS NOI PER PART II.A OF THE GENERAL PERMIT. THE SWPPP MUST BE SUBMITTED FOR APPROVAL ALONG WITH THIS NOI FOR LARGE CONSTRUCTION SITES PER PART I.B.6.a OF THE GENERAL PERMIT. For additional information please contact: Storm Water Runoff Engineer Ph.: (501) 682-0623 Fax: (501) 682-0910 Email: adeq@state.ar.us

How to Determine Latitude and Longitude: 1. If a physical address is known go to www.terraserver-usa.com. 2. Select Advanced Find 3. Select Address 4. Input address 5. Click on Aerial Photo 6. Click on the Info link at the top of the page 7. Note the Latitude and Longitude are in Decimal Coordinates. 8. Go to www.geology.enr.state.nc.us/gis/latlon.html to convert coordinates to Degrees, Minutes, and Seconds. NOTE: If a physical address does not exist you may find the coordinates in the Legal Description of the property. How to Determine your Ultimate Receiving Waters: 1. Locate the county of your project. 2. Find the numbered segment overlaying the county. For example 2C overlays most of Saline County. 3. Match the number from the segment to the one of the numbered Ultimate Receiving Waters. For example: A project located in Western Saline County is in segment 2C. The 2" determines that the Ultimate Receiving Water for the project is the Ouachita River. 6C 6B Ultimate Receiving Waters 1. Red River 2. Ouachita River 3. Arkansas River 4. White River 5. St. Francis River 6. Mississippi River 6A

(501) 682-0623 NOTICE OF INTENT FOR DISCHARGERS OF STORM WATER RUNOFF ASSOCIATED WITH MEDIUM OR LARGE CONSTRUCTION ACTIVITY AUTHORIZED UNDER NPDES GENERAL PERMIT ARR150000 Application Type: New Renewal I. PERMITTEE INFORMATION Permittee Name: Permittee Type: Permittee Mailing Address: PRIVATE STATE City: FEDERAL CORPORATION State: Zip: PUBLIC OTHER Permittee Telephone Number: Permittee Fax Number: II. INVOICE MAILING INFORMATION (If different from Permittee Mailing Address above.) Invoice Contact Person: City: Invoice Mailing Company: State: Zip: Invoice Mailing Address: Telephone: III. CONTRACTOR, IF DIFFERENT FROM PERMITTEE (Operator with day to day operational control) Name: State: Zip: Address: Telephone: City: IV. CONSTRUCTION SITE INFORMATION Project Name: Project County: Project Contact Person: Project Physical Address: Directions to the Project: Project City: Zip: Telephone Number: Project Start Date: Total amount of soil to be disturbed (estimate in acres): Project End Date: Project Latitude: degrees minutes seconds Project Longitude: degrees minutes seconds

(501) 682-0623 V. DISCHARGE INFORMATION Name of Receiving Stream (i.e. an unnamed tributary of Mill Creek, thence into Mill Creek; thence into Arkansas River): Choose Your Ultimate Receiving Stream: Red River Ouachita River Arkansas River White River St. Francis River Mississippi River VI. FACILITY/SITE PERMIT INFORMATION NPDES Individual Permit Number (If Applicable): NPDES General Permit Number (If Applicable): NPDES General Industrial Storm Water Permit Number (If Applicable): NPDES General Construction Storm Water Permit Number (If Applicable): AR00 ARG ARR00 ARR15 NOTE: A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE PREPARED PRIOR TO SUBMITTAL OF THIS NOI PER PART II.A OF THE GENERAL PERMIT. THE SWPPP MUST BE SUBMITTED FOR APPROVAL ALONG WITH THIS NOI FOR LARGE CONSTRUCTION SITES PER PART I.B.6.a OF THE GENERAL PERMIT. VII. CERTIFICATION OF PERMITTEE (See Part II.B.10, page 29 of the general permit) I certify that, if this facility is a corporation, it is registered with the Secretary of State of Arkansas. I certify that a storm water pollution prevention plan has been prepared for this facility in accordance with Part II.A of this permit, which provides for, or will provide for, compliance with approved state or local sediment and erosion plans, local storm water permits or storm water management plans, in accordance with Part II.A.4.c of this permit. I certify that the cognizant official designated in Part VIII of this Notice of Intent is qualified to act as a dully authorized representative under the provisions of 40 CFR 122.22(b). If no cognizant official has been designated, I understand that the Department will accept reports signed by the applicant. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Also, I certify that as a whole the storm water discharge(s), and the construction and implementation of Best Management Practices (BMP s) to control storm water runoff, are not likely to adversely affect species of critical habitat for a listed species. Typed or Printed Name: Signature: Title: Date:

(501) 682-0623 VIII. COGNIZANT OFFICIAL (Person having responsibility for overall operation of project, see Part II.B.9 page 28 of the permit.) Name: Title: Telephone: IX. PERMIT REQUIREMENT VERIFICATION Please check the following to verify completion of permit requirements. Submittal of Complete NOI? Submittal of Required Permit Fee? Check Number: Development of a Construction Site Map? Development of Storm Water Pollution Prevention Plan (SWPPP)? Yes No