1 TPDES Construction Site Inspector Training Matthew A. Apaez Environmental Protection Specialist II Hunter Washburn Environmental Protection Specialist II 2016
2 Municipal Separate Storm Sewer System (MS4) Co Permittees of the MS4 of San Antonio San Antonio Water System (SAWS) City of San Antonio Texas Department of Transportation TPDES General Permit No. TXR requires all operators submit copy of permit coverage to the MS4 operator. Notice submissions should be made to SAWS. Page 2
3 Large Construction Site Notice Primary Operator Page 3
4 Large Construction Site Notice Primary Operator TRX ABC Contracting LLC Billy Bob Jones Southwest corner of Rock Gabion Way & Road runner Blvd Onsite in SWPPP box Page 4
5 MS4 Operator Notification Large Construction: Primary and Secondary Operators Forward a copy NOI application, Large CSN Prior to commencing construction activities at least 2 days Certificate of Coverage (when received) Forward a copy NOT After stabilization requirements have been met and all temporary BMPs have been removed. Page 5
6 Small Construction Site Notice Page 6
7 Small Construction Site Notice ABC Contracting LLC Billy Bob Jones Southwest corner of Rock Gabion Way & Road Runner Blvd Onsite in SWPPP box Page 7
8 MS4 Operator Notification Small Construction Forward a copy Small Construction Site Notice Prior to commencing construction activities at least 2 days Forward a copy Completed Small Construction Site Notice After stabilization requirements have been met and all temporary BMPs have been removed. Page 8
9 Storm Water Pollution Prevention Plan (SWPPP) Must be prepared prior to obtaining permit coverage. Must be readily available for review. Must accurately represent BMPs and conditions of site. It is a working, dynamic document. Page 9
10 SWPPP Inspection Reports All sites greater than 1 acre must perform site inspections! Reports must include the following: Name of site Frequency of inspection schedule Date of inspection Major Observation of Site Conditions Corrective Actions Signatory Statement Page 10
11 SWPPP Inspection Reports Frequency of inspection schedule At least every 14 days and within 24 hours following a 0.5 inch or greater rainfall event or At least every 7 days on a specifically defined day, regardless of whether or not there has been a rainfall event since the previous inspection. Over the Edwards Recharge Zone: 7 days inspection schedule is required. Page 11
12 SWPPP Inspection Reports Major Observations: Areas of inspection Location of discharges Location of BMPs that require maintenance Location of BMPs that failed Location where additional BMPs are needed Page 12
13 SWPPP Inspection Reporting Inspection reports must: Summarize the scope of the inspection Include the minimum required information Meet signatory requirements in the manner required by 30 TAC Action taken as a result of the inspection Page 13
14 Inspector Qualifications John Doe has worked with ABC General Contracting for 10 years and has installed and maintained storm water controls for 5 years. He has attended several storm water workshops and will be implementing the SWPPP for this project. He has read the SWPPP and is familiar with the TPDES Construction General Permit TXR and its requirements. Page 14
15 SWPPP Inspection Reports Signatory Statement The following statement must be included on every inspection report and signed by delegated I certify that the facility or site is in compliance with the storm water pollution prevention plan and this permit. I further certify that I am authorized to sign this report under TCEQ rules at 30 TAC (relating to Signatories to Reports) Name/Title: Date: Page 15
16 Completed Inspection Report Page 16
17 City of San Antonio ORDINANCE STORM WATER COMPLIANCE FOR CONSTRUCTION ACTIVITY To reduce pollutants entering into the MS4 as mandated by TPDES Construction General Permit TXR Page 17
18 Ordinance SAWS designated as enforcement staff SAWS has authority to enforce within City Limits and 5,000 feet beyond No limit on size of construction activity Requires SWPPPs to be available on site for inspection Requires submitting of ALL postings Provides penalties Page 18
19 Ordinance Field Correction Notice (FCN) Page 19
20 Ordinance (34-805) Obtain Permit Coverage (34-805) Make SWPPP available for inspection (34-805) Implement the SWPPP (34-805) Post required Notices CSN, NOI, Contact Information Notice (34-805) Modify BMP s to control pollutants in runoff (34-805) SWPPP Inspections conducted and Signed by Registered or Certified Professional (34-805) Install or maintain BMP s correctly (34-805) SWPPP signed / sealed by Registered or Certified Professional (34-805) Remove sediment/pollutant from the MS4 (34-805) Maintain applicable WPAP on site (34-805) Forward accurate copy of NOI CSN to MS4 operator Page 20
21 Ordinance Enforcement A violation may result in a Field Corrective Notice 1st 24 hour period to remove and remediate offending material or comply with compliance action 2nd 24 hour period to install or repair corrective BMPs or ensure action If no action is taken Page 21
22 Ordinance Enforcement Stop Work Order Results when FCN corrections are not made in a timely manner ALL WORK STOPS Page 22
23 April 18, 2016 Inspector Areas/Contact Information Page 23
24 Inspector Contact Information Alberto Vargas (North Central) Office: Johnny Avina (Southwest) Office: Cell: Matthew A. Apaez (Southeast Central) Office: Cell: Roberto Morales (Northwest) Office: Cell: Amber Lovell (Northeast) Office: Page 24
25 Inspection Observations To Consider Page 25
26 Compliance Issues Page 26
27 Compliance Issues Page 27
28 Compliance Issues Page 28
29 Compliance Issues Page 29
30 Compliance Issues Page 30
31 Compliance Issues Page 31
32 Compliance Issues Page 32
33 Compliance Issues Page 33
34 Compliance Issues Page 34
35 Compliance Issues Page 35
36 Compliance Issues Page 36
37 Compliance Issues Page 37
38 Compliance Issues Page 38
39 Compliance Issues Page 39
40 Compliance Issues Page 40
41 Compliance Issues Page 41
42 Compliance Issues Page 42
43 Compliance Issues Page 43
44 Proposed Changes Chapter 34 Page 44
45 Page 45
46 Chapter 34, Article VI, Division 5 B Chapter 34, Article VI, Division 5 B Purpose (TCEQ TPDES and EPA NPDES Permits) Construction Activity/Grading/Land Disturbance Definitions Final TPDES/NPDES Inspections Qualified Inspector (Certifications) Storm Water Pollution Prevention Plan (SWPPP) Seal & signed by Registered or Certified Professional Proposed Ordinance Changes Enforcement of the Ordinance Page 46
47 TPDES Construction Site Inspector Training Matthew A. Apaez Environmental Protection Specialist II Hunter Washburn Environmental Protection Specialist II 2016
NOTICE OF INTENT TO USE NPDES GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES (RULE (4), F.A.C.
NOTICE OF INTENT TO USE NPDES GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES (RULE 62-621.300(4), F.A.C.) You must submit this completed Notice of Intent (NOI) form
More informationNotice of Intent (NOI)
This section for official use only City of Columbia Permit Approval Notice of Intent (NOI) NPDES Coverage (DHEC) Land Disturbance Permit (LD) # Land Disturbance Plan (LDP) # City File (CF) # State File
More information3.1 PERMITTEE SITE INSPECTION RESPONSIBILITIES
3. Section 3 THREE Each Permittee will seek to achieve compliance by developers with minimum water quality protection requirements (Table 2-1) and applicable BMPs through site inspections, review of self-audits
More informationENFORCEMENT POLICY INCLUDING INDUSTRIAL AND COMMERCIAL ACTIVITIES DISCHARGE MANAGEMENT
ENFORCEMENT POLICY INCLUDING INDUSTRIAL AND COMMERCIAL ACTIVITIES DISCHARGE MANAGEMENT 1.0 Re: NPDES Permit Requirements Permit No. HI S000001 Under the requirements of the Oahu Municipal Separate Storm
More informationCHAPTER 12 GENERAL CONSTRUCTION PERMIT
CHAPTER 12 12.1 INTRODUCTION Stormwater discharges from construction activities (such as clearing, grading, excavating, and stockpiling) that result in an acre or more of land disturbance or smaller sites
More informationRegulatory Requirement: This form serves to fulfill the obligations referenced in 25 Pa. Code (related to Permit Termination).
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS OFFICIAL USE ONLY PA NOTICE OF TERMINATION FOR A GENERAL OR INDIVIDUAL NATIONAL POLLUTANT
More informationStatewide Storm Water Management Program Industrial and Commercial Facilities Inspection Training Plan June 20, 2006 DRAFT
Statewide Storm Water Management Program Industrial and Commercial Facilities Inspection Training Plan June 20, 2006 DRAFT Under the revisions and requirements of the Oahu MS4 NPDES permit (Permit), which
More informationNON-PRIORITY WATER QUALITY MANAGEMENT PLAN (WQMP)
NON-PRIORITY WATER QUALITY MANAGEMENT PLAN (WQMP) For: () (Insert Site Address or tract/ lot number) Prepared for: (Insert Owner/ Developer Name) (Insert Address) (Insert City, State, ZIP) (Insert Telephone)
More informationCOMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER
3800-FM-BCW0229b 7/2017 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER OFFICIAL USE ONLY PA NOTICE OF TERMINATION FOR A GENERAL (PAG-02) OR INDIVIDUAL NPDES PERMIT,
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Virginia Stormwater Management Program SPECIFIC SUBJECT: Virginia Pollutant
More informationNOTICE OF INTENT FOR DISCHARGES OF STORM WATER ASSOCIATED WITH MEDIUM OR LARGE CONSTRUCTION ACTIVITY AUTHORIZED UNDER NPDES GENERAL PERMIT ARR150000
NOTICE OF INTENT FOR DISCHARGES OF STORM WATER ASSOCIATED WITH MEDIUM OR LARGE CONSTRUCTION ACTIVITY AUTHORIZED UNDER NPDES GENERAL PERMIT ARR150000 The enclosed form may be used to obtain coverage under
More informationOhio EPA Division of Surface Water Inspections and Enforcement Program
Ohio EPA Division of Surface Water Inspections and Enforcement Program What will we review today? Recent developments Inspection types Inspection selection How to prepare for an inspection Compliance Evaluation
More informationGrand Rapids, MN Stormwater Utility Best Management Practices Credit Policy (As per Section (b) of Ordinance No )
Grand Rapids, MN Stormwater Utility Best Management Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater
More informationRegulatory Requirement: This form serves to fulfill the obligations referenced in 25 PA Code (related to Permit Termination).
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS OFFICIAL USE ONLY PA NOTICE OF TERMINATION FOR A GENERAL OR INDIVIDUAL NATIONAL POLLUTANT
More informationSARASOTA COUNTY UDC PROJECT CALVIN GIORDANO & ASSOCIATES, INC MONTHLY PROGRESS REPORT THROUGH AUGUST, 2018 APPENDIX N. UDC Survey Results (11 pages)
MONTHLY PROGRESS REPORT THROUGH AUGUST, 2018 APPENDIX N UDC Survey Results (11 pages) Comment has been addressed Comment required modification to be addressed Comment requires deliberation ARTICLE 3 (6/22/18
More informationStorm Water Coordinator Department of Natural Resources 502 E. 9th Street Des Moines, Iowa
"HOW TO FILE A COMPLETE NOTICE OF INTENT" F NPDES General Permit No.1 f "Stm Water Discharge Associated With Industrial Activity" NPDES General Permit No.2 f " Stm Water Discharge Associated with Industrial
More informationJURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN
CITY OF ESCONDIDO JURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN June 2015 Utilities Department Environmental Programs Division 201 N. Broadway Escondido, CA 92025 760-839-4668 TABLE
More informationPART 1 JURISDICTION, ZONING DISTRICTS, AND LAND USES
PART 1 JURISDICTION, ZONING DISTRICTS, AND LAND USES ARTICLE 1 TITLE, PURPOSE, JURISDICTION, AND APPLICABILITY Division 1-1.1 Title and Reference Sec. 1-1.1.1 Title This Ordinance shall be known as "The
More informationMesa County Engineering Division Stormwater Construction Permit
Mesa County Engineering Division Stormwater Construction Permit Please print or type. All items must be completed accurately and in their entirety or the application will be deemed incomplete and the application
More informationConstruction & Earthwork Request Form (CERF)
ShoreLand Traditions Construction & Earthwork Request Form (CERF) SECTION 1 SECTION 2 SECTION 3 Definitions and Points to Remember Requirements and Process Site Sketch Requirements and Sample If you have
More informationFREQUENTLY ASKED QUESTIONS. Permanente Quarry and Lehigh Southwest Cement Plant
FREQUENTLY ASKED QUESTIONS Permanente Quarry and Lehigh Southwest Cement Plant Cement Plant and Quarry - What land use approvals do they have? The Lehigh Cement Plant operation is an authorized use operating
More informationChapter 102 Permit Amendments. Frequently Asked Questions (FAQ) Final, October 19, 2018
Bureau of Clean Water Chapter 102 Permit Amendments Frequently Asked Questions (FAQ) Final, October 19, 2018 Background Erosion and Sediment Control (E&S) Plans and Post Construction Stormwater Management
More informationCHAPTER 5 ENVIRONMENTAL COMPLIANCE PLAN REQUIREMENTS
CHAPTER 5 5.1 INTRODUCTION As previously discussed, land-disturbing activities in Henrico County are subject to the requirements of numerous environmental programs as a result of mandates imposed by various
More informationBUILDING PERMIT SUBMITTAL REQUIREMENTS
BUILDING PERMIT SUBMITTAL REQUIREMENTS 1. All applications must include two (2) sets of both site plans and construction documents as outlined below. Minimum fees will be collected at time of application.
More informationPROTOCOL FOR ZONING PERMIT SUBMITTAL
CALN TOWNSHIP Department of Code Enforcement Andrew F. Reczek, Director of Code Enforcement & Zoning Officer Raymond Stackhouse, Code Official &Fire Marshal Joseph Arvay, Property Main./Housing Inspector
More informationALLEN COUNTY CODE TITLE 19 ALLEN COUNTY STORMWATER MANAGEMENT ARTICLE 1 STORMWATER MANAGEMENT
ALLEN COUNTY CODE TITLE 19 ALLEN COUNTY STORMWATER MANAGEMENT ARTICLE 1 STORMWATER MANAGEMENT 19-1-1 Chapter 1: General Information 19-1-1-1 Abbreviations and Definitions For the purpose of this Ordinance,
More informationAdministrative Penalty Order (APO) Plan for Buffer Law Implementation
Administrative Penalty Order (APO) Plan for Buffer Law Implementation June 28, 2017 This document was adopted by the Board of Water and Soil Resources (BWSR) pursuant to Minn. Stat. 103B.101, subd. 12(a)
More informationYCCD EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PROGRAM SERVICES FEE SCHEDULE, RULES, & GUIDELINES
YCCD EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PROGRAM SERVICES FEE SCHEDULE, RULES, & GUIDELINES Adopted by the YCCD Board of Directors on December 14, 2018 Effective January 1, 2019. I. Authority
More informationADAMS COUNTY CONSERVATION DISTRICT S
Approved by District Board on 12-15-2016 I. Authority & Applicability of Fees for Services A. Authority - The Adams County Conservation District is delegated with the responsibility to administer the Commonwealth
More informationDepartment of Planning & Development Services
Department of Planning & Development Services S T A F F R E P O R T February 9, 2015 CASE NO: PROJECT: EXECUTIVE SUMMARY: ZA14-154 Plat Revision for Lots 25R-1A, 25R-1B and 25R-1C, Block 1, Woodland Heights
More informationORDINANCE CITY OF DUNDAS RICE COUNTY STATE OF MINNESOTA
ORDINANCE 2014 01 CITY OF DUNDAS RICE COUNTY STATE OF MINNESOTA An Ordinance Amending Dundas City Code Title 5, Public Works, to Add Chapter 504 Storm Water Utility RECITALS There is hereby established
More informationST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT
revised Completed Permit Application REQUIREMENTS FOR RESIDENTIAL PLAN REVIEW Swimming Pools Assessment # / Parcel #(10 digit number from Assessor s Office 985-809-8180 www.stpao.org) Legal Description
More informationARTICLE I. IN GENERAL
Adopted by City Council on December 7, 2009 AN ORDINANCE TO AMEND AND REORDAIN CHAPTER 10 (WATER PROTECTION) OF THE CODE OF THE CITY OF CHARLOTTESVILLE, 1990, AS AMENDED, BY DELETING SECTIONS 10-51 AND
More information*MS4 permittee name: City of Proctor *County: St. Louis (city, county, municipality, government agency or other entity)
MS4 SWPPP Application for Reauthorization for the NPDES/SDS General Small Municipal Separate Storm Sewer System (MS4) Permit MNR040000 reissued with an effective date of August 1, 2013 Stormwater Pollution
More informationMAINTENANCE AGREEMENT FOR MISSION VIEJO, CALIFORNIA
RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: CITY OF MISSION VIEJO DEPARTMENT OF PUBLIC SERVICES ATTN: W. KEITH RATTAY 200 CIVIC CENTER MISSION VIEJO, CALIFORNIA 92691 Recording Fee: Exempt (Government
More informationNotice of Termination Document and Instrument Filing. Westmoreland County Engineering Workshop Latrobe, PA March 20 & 21, 2014
Notice of Termination Document and Instrument Filing Westmoreland County Engineering Workshop Latrobe, PA March 20 & 21, 2014 Agenda 1. Review of Notice of Termination Document and Revisions 2. Notice
More informationArticle III. Erosion and Sedimentation Control
Article III. Erosion and Sedimentation Control Section 9.6 Erosion and Sedimentation Control Plan Requirements Section 9.6.1 Plan Submission A plan shall be prepared for all land-disturbing activities
More informationSECTION 23 SUBSURFACE SEWAGE TREATMENT SYSTEM ORDINANCE (SSTS)
SECTION 23 SUBSURFACE SEWAGE TREATMENT SYSTEM ORDINANCE (SSTS) A. Section One - Purpose The purpose of the Subsurface Sewage Treatment System Ordinance shall be to provide minimum standards for and regulation
More informationMS4 General contact (with Stormwater Pollution Prevention Program [SWPPP] implementation responsibility)
MS4 SWPPP Application for Reauthorization for the NPDES/SDS General Small Municipal Separate Storm Sewer System (MS4) Permit MNR040000 reissued with an effective date of August 1, 2013 Stormwater Pollution
More informationWASECA PLANNING COMMISSION TUESDAY, FEBRUARY 14, :00 P.M. CITY COUNCIL CHAMBERS 508 SOUTH STATE STREET
WASECA PLANNING COMMISSION TUESDAY, FEBRUARY 14, 2017 7:00 P.M. CITY COUNCIL CHAMBERS 508 SOUTH STATE STREET Any person speaking to the Commission shall first give to the Recording Secretary of the Commission
More informationSTORMWATER BEST MANAGEMENT PRACTICES OPERATION, MAINTENANCE, AND INSPECTION PLAN AND AGREEMENT
STORMWATER BEST MANAGEMENT PRACTICES OPERATION, MAINTENANCE, AND INSPECTION PLAN AND AGREEMENT THIS AGREEMENT, made and entered into this day of, 20, by and between Township, Chester County, Pennsylvania,
More informationES Tenant Relocation or Closeout
ES-301-3.05 Tenant Relocation or Closeout Document Identification Number ES-301-3.05 Date: April 4, 2018 Document Owner: Craig Schillinger 1) Activity Description The closure of tenant activities at any
More informationAGGREGATE PRODUCTION OPERATIONS
AGGREGATE PRODUCTION OPERATIONS Laurie Fleet, Office of Water Michael Gould, P.E., Office of Air Permits Texas Commission on Environmental Quality February 28, 2012 What We Will Talk About House Bill 571
More informationAN ORDINANCE TO ESTABLISH REGULATIONS FOR THE PURPOSE OF CONTROLLING AND MANAGING STORM WATER RUNOFF
AN ORDINANCE TO ESTABLISH REGULATIONS FOR THE PURPOSE OF CONTROLLING AND MANAGING STORM WATER RUNOFF WHEREAS, North Carolina General Statue 160A-174 provides that a municipality may exercise certain powers
More informationPRINT NAMES OF BUYERS AS ARE THEY ARE TO APPEAR ON DEED (WITH MIDDLE INITIALS, ETC.)
Diamond Development, LLC 309 E. 1st Street Ankeny, IA 50021 LOT PURCHASE AGREEMENT FOR PINE VIEW ESTATES PLAT 3 SUBDIVISION Buyer(s) First, Middle, Last or Full Company Name Social Security #/Federal ID#
More informationSTAFF REPORT. Director Planning, Zoning and Building Department. Longboat Key, Florida
STAFF REPORT DATE: October 12, 2015 TO: FROM: THROUGH: Planning and Zoning Board Maika Arnold, Planner Planning, Zoning and Building Department Alaina Ray, AICP Director Planning, Zoning and Building Department
More informationHOUSING INSPECTION PROGRAM APPLICATION INSTRUCTIONS
HOUSING INSPECTION PROGRAM APPLICATION INSTRUCTIONS Community Services 405-670-7314 3701 SE 15th Street Del City OK 73115 www.cityofdelcity.com Fax: 405-670-7368 All applications must be completed in full.
More informationLORAIN COUNTY GENERAL HEALTH DISTRICT SEWAGE TREATMENT SYSTEM RULES
LORAIN COUNTY GENERAL HEALTH DISTRICT SEWAGE TREATMENT SYSTEM RULES SUPPLEMENT TO THE OHIO DEPARTMENT OF HEALTH SEWAGE TREATMENT SYSTEM RULES OHIO ADMINISTRATIVE CODE CHAPTER 3701-29 2015 Effective: May
More informationCOLLIN COUNTY SUBDIVISION REGULATIONS. Department of Engineering
COLLIN COUNTY SUBDIVISION REGULATIONS Department of Engineering Updated: November 5, 2012 1 TABLE OF CONTENTS DEFINITIONS... 4 SECTION I - PRELIMINARY PLAT... 7 A. SUBDIVISION NAME AND STREET NAMES...
More informationLegally Described as: Lot(s) - in BROOKHAVEN ESTATES PLAT 1, pursuant to the Plat thereof (the, Property ).
LOT PURCHASE AGREEMENT FOR BROOKHAVEN ESTATES PLAT 1 SUBDIVISION Buyer(s) First, Middle, Last or Full Company Name Current Address PRINT NAMES OF BUYERS AS THEY ARE TO APPEAR ON DEED (WITH MIDDLE INITIALS,
More informationUPPER ALLEN TOWNSHIP PLANNING COMMISSION REGULAR MEETING August 27, :00 P.M.
UPPER ALLEN TOWNSHIP PLANNING COMMISSION REGULAR MEETING August 27, 2018 7:00 P.M. PC MEMBERS TOWNSHIP OFFICIALS - PRESENT R. Wayne Willey, Chairperson Jennifer Boyer, Comm. Dev. Director Philip Cerveny,
More informationStandard Operating Procedure: Implementation of the Inspection and Maintenance Program Under the Long Creek Watershed Management Plan
Standard Operating Procedure: Implementation of the Inspection and Maintenance Program Under the Long Creek Watershed Management Plan 1. PURPOSE: The Long Creek Watershed Management District ( LCWMD )
More informationBLACKWELL ENVIRONMENTAL, LLC
BLACKWELL ENVIRONMENTAL, LLC PO Box1570 Marble Falls, Texas 78654 (888) 830-7555 (888) 830-3488 FAX Texas Registered Engineering Firm F-10908 Steve Odil, P.E. Municipal Solid Waste Permits Section, MC
More informationBuffer and Soil Loss Statutes, as amended in 2017 by Laws of Minnesota 2017, Chapter 93 (S.F. 844)
Buffer and Soil Loss Statutes, as amended in 2017 by Laws of Minnesota 2017, Chapter 93 (S.F. 844) May 30, 2017 103B.101 BOARD OF WATER AND SOIL RESOURCES Subd. 12. Authority to issue penalty orders. (a)
More information(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.
ARTICLE XIX SITE PLAN Sec. 20-1900 Site Plan Review Procedure - Intent The site plan review procedures are instituted to provide an opportunity for the Township Planning Commission to review the proposed
More informationDEVELOPMENT AND PERMIT RELATED SERVICES
DEVELOPMENT AND PERMIT RELATED SERVICES Permits & Processing Fees 1 Encroachment Permit Processing 315.00 2 NOT USED 3 Driveway Encroachment Permit Processing 135.00 4 Building Permit Processing 80.00
More informationThe City of MIDWEST CITY 100 N. Midwest Blvd * Midwest City, Oklahoma (405) *TDD (405) * FAX (405)
The City of MIDWEST CITY 100 N. Midwest Blvd * Midwest City, Oklahoma 73110 (405) 739-1210 *TDD (405) 739-1286 * FAX (405) 739-1399 Receipt # Date Inspection Date: PROPOSED OCCUPANCY Application for Certificate
More informationSPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units) Address. Address.
Case No. SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION Name of Subdivision Tax Parcel Number(s) Subdivision Location Total Acreage Number of Lots (Units) Average Lot Size Current
More informationAppendix J: Stormwater Utility Ordinance Guidance
Appendix J: Stormwater Utility Ordinance Guidance 1. City of Marquette (MI) Stormwater Utility Ordinance 2. Guidance on Establishing Stormwater Utility Fees 169 City of Marquette (MI) Stormwater Utility
More informationSIMPLIFIED APPROACH PERMIT PROCEDURES
SIMPLIFIED APPROACH PERMIT PROCEDURES UPPER ALLEN TOWNSHIP Community Development Department 100 Gettysburg Pike, Mechanicsburg, PA 17055 Phone: 717-766-0756 Fax: 717-796-983 Office Hours: M-F 8:00 AM 4:30
More informationTOWNSHIP OF NEPTUNE COUNTY OF MONMOUTH STATE OF NEW JERSEY REQUESTS FOR QUALIFICATIONS FOR COASTAL ENGINEER BID/PROPOSAL # PS
TOWNSHIP OF NEPTUNE COUNTY OF MONMOUTH STATE OF NEW JERSEY REQUESTS FOR QUALIFICATIONS FOR COASTAL ENGINEER BID/PROPOSAL # PS-2019-28 Sealed proposals will be received by the Township Clerk of the Township
More informationSTORMWATER MANAGEMENT SYSTEM AND FACILITIES
152.01 Purpose 152.09 Nonresidential Unit 152.02 Findings 152.10 Rate Determinations; Compliance with Bond 152.03 Scope and Responsibility for Stormwater Utility Covenants 152.04 Definitions 152.11 Billing,
More informationChapter 18. Kewaunee County Animal Waste Storage Facility Ordinance
Kewaunee County Animal Waste Storage Facility Ordinance 18.01 Authority 18.02 Purpose 18.03 Intent 18.04 Interpretation 18.05 Severability 18.06 Definitions 18.07 Jurisdiction 18.08 Authority and Duties
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016 DEVELOPMENT NAME SUBDIVISION NAME Mullinax Ford Subdivision Mullinax Ford Subdivision LOCATION CITY COUNCIL DISTRICT District 6 Southeast
More informationOVERVIEW OF LAWS RELATING TO MINERAL EXPLORATION, DEVELOPMENT & MINING IN COLORADO. by Mark T. Nesbitt Nesbitt & Associates LLC
OVERVIEW OF LAWS RELATING TO MINERAL EXPLORATION, DEVELOPMENT & MINING IN COLORADO by Mark T. Nesbitt Nesbitt & Associates LLC This is a brief summary of information regarding applicable laws, permit requirements,
More informationOTTER TAIL COUNTY SANITATION CODE for SUBSURFACE SEWAGE TREATMENT SYSTEMS
OTTER TAIL COUNTY SANITATION CODE for SUBSURFACE SEWAGE TREATMENT SYSTEMS Incorporating By Reference MINNESOTA RULES CHAPTERS 7080, 7081, AND 7082 With Some Local Modifications Effective Date: April 26,
More informationCITY AND BOROUGH OF JUNEAU
CITY AND BOROUGH OF JUNEAU Over-the-Counter Land Sale Brochure Renninger Subdivision Lots 4 & 5 Lands Manager Greg Chaney and Deputy Lands Manager Dan Bleidorn mark Lot 4 in the Renninger Subdivision.
More informationConservation and Development Plan Muddy Acres Subdivision March 21, 2018 General This narrative will detail the Conservation and Development Plan for Muddy Acres Subdivision located on Tulls Creek Road
More informationAPPLICATION PROCEDURE
ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION
More informationTOWNSHIP OF INDIANA PLANNING COMMISSION MARCH 22, 2017
TOWNSHIP OF INDIANA PLANNING COMMISSION MARCH 22, 2017 A regular meeting of the Indiana Township Planning Commission was called to order at 6:00 p.m. by Chairman Cecil Tranquill with the Pledge of Allegiance.
More informationCity of Leavenworth REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL
City of Leavenworth RESIDENTIAL BUILDING PERMIT REQUIREMENTS REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL THIS HANDOUT IS NOT INTENDED FOR CONSTRUCTION OF NEW STRUCTURES BEFORE YOU FILL OUT THE
More informationBuilding Permit & Plan Check Fees
Building Permit & Plan Check Fees Fee Changes Effective 10/01/16 Last Updated: 09/30/16 Fee & Description Fee Plan Check Fees Standard Plan check of building or structure reviewed by staff within the established
More informationThe Boeing Company On-Site Environment, Health and Safety Supplemental Provisions (SP4)
THE CONTRACT WITH THE BOEING COMPANY is supplemented by the following additional clauses: 1.0 General. 1.1 In the event Seller or Seller s subcontractors or suppliers perform any On-Site Work, these additional
More information5.0 Permit Applications
5.0 Permit Applications A primary objective of the Toronto and Region Conservation Authority () is to prevent the loss of life and property due to flooding and erosion. Accordingly, administers a natural
More informationTHE REGULATIONS GOVERNING SOIL DISPLACEMENT AND DISPOSAL IN THE EAST HELENA SUPERFUND AREA IN LEWIS AND CLARK COUNTY, MONTANA.
THE REGULATIONS GOVERNING SOIL DISPLACEMENT AND DISPOSAL IN THE EAST HELENA SUPERFUND AREA IN LEWIS AND CLARK COUNTY, MONTANA. 2013 Lewis & Clark City-County Health Department Lead Education and Abatement
More informationBUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)
PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect) Listed below are the basic permit submittal requirements. Additional information may be required based on project type. Permit applications
More informationEXHIBIT F RESOLUTION NO.
RESOLUTION NO. A RESOLUTION OF THE PLANNING BOARD OF THE CITY OF BURBANK TO APPROVE PROJECT NO. 17-0001385 FOR A CONDITIONAL USE PERMIT AMENDMENT AND AMENDING PROJECT NUMBER 2005-112 APPROVED UNDER RESOLUTION
More informationTown of Lisbon, Maine SUBDIVISION REVIEW APPLICATION
Date Received: Fee Paid (amount): Applicant: Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Subdivision Name/Title: This application must be received at the Town Office by close of business on the
More informationPreliminary Analysis
City of Manhattan Beach May 21, 2014 Rate Analysis Feasibility Report APPENDIX A DRAFT Preliminary Analysis for the For the City of Manhattan Beach June 18, 2014 Preliminary Analysis Introduction The City
More informationNOTICE OF INTENT VERSION State of Georgia Department of Natural Resources Environmental Protection Division
NOTICE OF INTENT For Official Use Only VERSION 2013 State of Georgia Department of Natural Resources Environmental Protection Division For Coverage Under the 2013 Re-Issuance of the NPDES General Permits
More informationReceiving Water Body:
62-330 ENVIRONMENTAL RESOURCE PERMIT INDIVIDUAL - TECHNICAL STAFF REPORT 23-Nov-2016 APPLICATION #: IND-005-9658-2 Applicant: Agent: Charles Commander CCSH, LLC 2708 Highway 77 Lynn Haven, FL 32444 850-819-5850
More informationZoning Permit Application
Zoning Permit Application FOR OFFICE USE ONLY Date Payment Form Amount Receipt # Clerk Required Submittals (circle if presented with application) Incomplete applications may be returned and/or delayed.
More informationSPECIFICATIONS AND PROPOSAL FOR GENERAL BANKING SERVICES FOR THE TOWNSHIP OF DEERFIELD September 1, 2013 August 31, 2016
SPECIFICATIONS AND PROPOSAL FOR GENERAL BANKING SERVICES FOR THE TOWNSHIP OF DEERFIELD September 1, 2013 August 31, 2016 The Township of Deerfield is issuing a Request for Proposals (RFP) to financial
More informationSUBDIVISION / RESUBDIVISION APPLICATION
Instructions and Fee Schedule for: SUBDIVISION / RESUBDIVISION APPLICATION Attached, please find the Planning & Zoning Commission s application for a Subdivision and/or Resubdivision. Your submitted application,
More informationCHAPTER 18 SEWERS AND SEWAGE DISPOSAL
CHAPTER 18 SEWERS AND SEWAGE DISPOSAL A. Administration. 101. Purposes 102. Rules and Regulations 103. Rates and Charges PART 1 USE AND MAINTENANCE OF ON-LOT SYSTEM B. Duties of the SEO and/or Sanitary
More informationAPPLICATION MONROE COUNTY PLANNING & ENVIRONMENTAL RESOURCES DEPARTMENT
MONROE COUNTY PLANNING & ENVIRONMENTAL RESOURCES DEPARTMENT Request for a Development Agreement or an Amendment to a Development Agreement An application must be deemed complete and in compliance with
More informationCity Council Agenda Item #10A Meeting of January 23, Adopt the resolution approving the preliminary and final plat
City Council Agenda Item #10A Meeting of January 23, 2017 Brief Description Recommendation Resolution approving preliminary and final plat of TONY S ADDITION at 9597 Sandra Lane Adopt the resolution approving
More informationC HAPTER 11: W ATERSHED P ROTECTION
SECTION 11.1: GENERAL PROVISIONS 11.1.1: Authority The Legislature of the State of North Carolina has, in Chapter 160A, Article 8, Section 174, General Ordinance Authority; and in Chapter 143, Article
More informationEAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012
EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012 BUILDING PERMITS: Please be reminded that building and/or zoning permits are required for all construction
More informationR4 (SUBURBAN APARTMENT)
Planning and Building Agency Planning Division 20 Civic Center Plaza P.O. Box 1988 (M-20) Santa Ana, CA 92702 (714) 647-5804 R4 (SUBURBAN APARTMENT) Sec. 41-290. Sec. 41-291. Sec. 41-292. Applicability
More informationMETRO BROKERS Checklist for Commercial Real Estate Professionals
METRO BROKERS Checklist for Commercial Real Estate Professionals 2017 Metro Brokers, Inc. All Rights Reserved 1 WHAT DUE DILIGENCE IS DUE? The scope, intensity and focus of any due diligence investigation
More informationCITY OF STURGIS Title 2-1
CITY OF STURGIS Title 2-1 TITLE 2 CONTRACTORS LICENSING AND CONSTRUCTION REGULATIONS (This Title revised with Ordinance 2016-10, effective 12-28-2016) Chapters: 2.01: General Provisions 2.02: Building
More informationZONING CHANGE/SUP APPLICATION
ZONING CHANGE/SUP APPLICATION Zoning Change Specific Use Permit Applicant Name: Company: Address: City, State, Zip Phone: Fax: Email: Owner (if different from applicant) Name: Company: Address: City, State,
More informationCity of McMinnville Community Development Department
City of McMinnville Community Development Department 101 East Main St. McMinnville, TN 37110 (931) 473-1204 PERMIT APPLICATION SINGLE-FAMILY DWELLING Date: 01/02/2014 PERMITTEE: 1. DESCRIPTION OF THE WORK
More informationChapter 136. SOIL EROSION
1 of 8 12/19/2011 4:17 PM Township of Andover, NJ Monday, December 19, 2011 Chapter 136. SOIL EROSION [HISTORY: Adopted by the Township Committee of the Township of Andover by Ord. No. 77-11 (Ch. XVII
More informationCITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA (760) Fax: (760)
CITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA 92025-2798 (760) 839-4671 Fax: (760) 839-4313 SECOND DWELLING UNIT PERMIT FOR INTERNAL USE ONLY Case No: Date Submitted: Fees Submitted:
More informationAGENDA. 7:00-7:05 p.m. Call to Order & Approval of Minutes of April 4, 2016 Zoning Commission Meeting
AGENDA PUBLIC MEETING: Zoning Commission Meeting City of University Heights, Iowa Tuesday, May 3, 2016 7:00-8:15 p.m. LOCATION: City Office 1004 Melrose Ave Iowa City, IA 52246 Called by: Pat Bauer, Zoning
More informationSTORMWATER BEST MANAGEMENT PRACTICES OPERATIONS AND MAINTENANCE AGREEMENT
STORMWATER BEST MANAGEMENT PRACTICES OPERATIONS AND MAINTENANCE AGREEMENT THIS AGREEMENT, made and entered into this day of, 20, by and between, (hereinafter the Landowner ), and the TOWNSHIP OF HEMPFIELD,
More informationAGREEMENT. Private Stormwater Management Facilities Operation and Maintenance And Right of Entry
RECORDING REQUESTED BY: City of Arroyo Grande WHEN RECORDED, PLEASE RETURN TO (SYSTEM OWNER ADDRESS) AGREEMENT Private Stormwater Management Facilities Operation and Maintenance And Right of Entry SWP
More informationIrrigation Permit Requirements FOR OWNER/BUILDER
GROWTH MANAGEMENT 1769 East Moody Blvd, Bldg #2 Bunnell, Florida 32110 Phone 386-313-4002/Fax 386-313-4103 CENTRALPERMITTING@FLAGLERCOUNTY.ORG Irrigation Permit Requirements FOR OWNER/BUILDER Permit Application
More information