2nd & Pike Tower Design Review Board Olson Kundig Architects Urban Visions LLC Gustafson Guthrie Nichol Ltd

Similar documents
900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

Composition of traditional residential corridors.

th Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting

Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch

3.1 Existing Built Form

Goal 1 - Retain and enhance Cherry Creek North s unique physical character.

DRAFT -- PROPOSED EXPANSION AND REVISIONS TO DIVISION 24. SPECIAL DISTRICT--COLLEGE AND UNIVERSITY NEIGHBORHOODS DISTRICT

320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525

Chapter DOWNTOWN ZONING DISTRICTS

219 1ST AVE N DPD PROJECT #

ARTICLE 5. COMMERCIAL AND OFFICE DISTRICTS 5.1 PURPOSE STATEMENTS 5.2 USES 5.3 DIMENSIONAL STANDARDS 5.4 DESIGN STANDARDS 5.5 DK DISTRICT STANDARDS 5

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

SPRINGBANK SIX CORNERS, LLC

2. The modification is consistent with the objectives of this chapter.

DEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT

City of Reno October 30, 2012 Draft Midtown Zoning Text Amendments 1

4 DEVELOPMENT STANDARDS FOR

Jasper 115 Street DC2 Urban Design Brief

MEMORANDUM. B4S-2 Downtown Service District DP Downtown Parking Overlay District 42,390 square feet / 0.97 acres. DMNA; adjacent to North Loop

MEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean

These design guidelines were adopted by: Knoxville-Knox County Metropolitan Planning Commission on August 10, 2000 Knoxville Historic Zoning

DAVIDSON PLANNING ORDINANCE AMENDMENTS AFTER SEPTEMBER 2009 SECTION 9

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

Introduction. General Development Standards

MARKET & OCTAVIA AREA PLAN FUNDAMENTAL DESIGN PRINCIPLES

DESIGN CRITERIA Ridegedale Center-Outparcel Restaurant, Minnetonka, MN

353 W. Grand June 18, 2018

Appendix C Built Form Guidelines

LANCASTER AVENUE WARREN STREET N. 33RD STREET N. 34TH STREET FILBERT STREET SITE PLAN ACC-DREXEL UNIVERSITY LANCASTER TOWER HALL CALHOUN HALL

Table of Contents ARTICLE 5A CHARACTER-BASED ZONING 1

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

We contacted all RNOs in the area to come to their meetings and personally explain the draft, and take questions. Four RNOs took us up on the offer,

Table of Contents ARTICLE 5A CHARACTER-BASED ZONING 1

Advisory Design Panel Report For the Meeting of February 27, 2019

8.5.1 R1, Single Detached Residential District

Chapter CC COMMUNITY COMMERCIAL ZONES REGULATIONS

Sedro woolley, WA 720 MURDOCK ST. FOR sale. 14,500 +/- sf office building with 8,500 +/- sf unfinished basement space on 0.

Accessory Coach House

Multi-unit residential uses code

The Philadelphia Code

Urban Design Brief. Italian Seniors Project 1090, 1092, 1096 Hamilton Road City of London

Potential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch

SCHEDULE 31 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

Chapter CN NEIGHBORHOOD CENTER COMMERCIAL ZONES REGULATIONS

12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential

Anacortes, WA. 718 commercial ave. FOR lease. 2,320 +/- sf retail space in a 10,820 +/- sf building. Located in historic downtown Anacortes

Accessory Dwelling Unit Permit

COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS

SCHEDULE 32 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

Hathaway Building th Ave S Seattle, WA Bruce Kahn, CCIM, CPM

Compatible-Scale Infill Housing (R-2 Zones) Project

Montreal Road District Secondary Plan [Amendment #127, October 9, 2013]

New Zoning Ordinance Program

RODE. Article 80 Small Project Review Application. 232 Old Colony Avenue Mixed Use Development 232 Old Colony Avenue South Boston, MA 02127

66 Isabella Street Rezoning Application - Preliminary Report

Puyallup Downtown Planned Action & Code Changes. January 10, 2017

ONE SEAPORT SQUARE. Boston Civic Design Commission

PLANNING RATIONALE REPORT CODEAU BUILDING LTD RIDEAU STREET OTTAWA DECEMBER 2013

TRANSIT-ORIENTED DEVELOPMENT PLAN EXISTING CONDITIONS REPORT LAWRENCE TO BRYN MAWR MODERNIZATION

Development Plan DP13-3 (Arlington Lofts) Planning and Zoning Meeting Date: Document Being Considered: Ordinance

Coding For Places People Love Main Street Corridor District

27-37 Yorkville Avenue and 26-32, 50 Cumberland Street Official Plan and Zoning Amendment - Final Report

Rezoning Petition Pre-Hearing Staff Analysis April 17, 2017

Legislative Department Seattle City Council Memorandum

CITY OF MERCED SMALL LOT SINGLE-FAMILY HOME DESIGN GUIDELINES

Part 4.0 DEVELOPMENT REGULATIONS

LAKE MERRITT STATION AREA PLAN

City of Vancouver Planning By-law Administration Bulletins

PLANNING COMMISSION MAY 3, 2018 PUBLIC HEARING

Text Amendment July 29, Charlotte - Mecklenburg Planning Department

ACCESSORY DWELLING UNITS IN THE SOUTHEAST SECTOR

ARTICLE 4: SCHEDULE OF DISTRICT, USE AND SETBACK REGULATIONS

Plan Dutch Village Road

Urban Design Brief. Proposed Medical / Dental Office 1444 Adelaide Street North. Vireo Health Facility Ltd.

Appearance Review Board Staff Report

Public Review of the Slot Home Text Amendment

5.1 Site Planning & Building Form

City of Coral Gables Planning and Zoning Staff Report

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report

ARTICLE IV: DEVELOPMENT STANDARDS

A APPENDIX A: FORM-BASED BUILDING PROTOTYPES

40-58 Widmer Street - Zoning Amendment Application - Preliminary Report

COMMERCIAL/INDUSTRIAL DEVELOPMENT GUIDELINES

PLANNING COMMISSION STAFF REPORT

SAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010

Fountain District Urban Village

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

The Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017

Sky Sk l y in l e in e To T w o e w r

Chapter 17-2 Residential Districts

SECTION 7. RESIDENTIAL DISTRICTS

Transcription:

2nd & Pike Tower Design Review Board Olson Kundig Architects Urban Visions LLC Gustafson Guthrie Nichol Ltd 1430 2nd Avenue DPD# 3009156 December 14, 2010

TABLE OF CONTENTS OWNER ARCHITECT LANDSCAPE ARCHITECT Urban Visions LLC 542 1st Avenue South Suite 500 Seattle, WA 98104, USA Phone: 206.262.2880 Fax: 206.262.2889 Olson Kundig Architects 159 South Jackson St., Suite 600 Seattle, WA 98104, USA Phone: 206.624.5670 Fax: 206.624.3730 Gustafson Guthrie Nichol Ltd 1101 Alaskan Way, Pier 55, # 3 Seattle, WA 98101 Phone: 206.903.6802 Fax: 206.903.6804 1 CONTEXT 1.0 PROJECT HISTORY & VISION STATEMENT 4-5 DOWNTOWN GUIDELINES A,B,C,D,E 6-10 1.1 SITE OVERVIEW 12 1.2 SITE CONCEPTS 13 1.3 BUILDING IN CONTEXT 14 1.4 APPROACHING VIEWS 15 1.5 BUILDING ELEVATION ON 2ND AVENUE 16 1.6 BUILDING CONCEPT 18-19 1.7 ADJACENT BUILDINGS 20 1. 8 NEIGHBORHOOD COURTYARD TYPOLOGIES 21 2 DRAWINGS 2.1 STREETSCAPE 22,25 2.2 GROUND FLOOR LANDSCAPE PLAN 23 2.3 GROUND FLOOR PLAN/SITE PLAN 26 2.4 MEZZANINE FLOOR PLAN 27 2.5 COURTYARD 28 2.6 LEVEL 3-7 FLOOR PLANS 29 2.7 COURTYARD ELEVATIONS 30 2.8 LEVEL 8 SKYBAR AND RESIDENT EXT. AMENITY 32 2.9 LEVEL 8 FLOOR PLAN 33 2.10 LEVEL 9 FLOOR PLAN 34 2.11 LEVEL 10-21 FLOOR PLANS 35 2.12 TOWER AMENITY 36 2.13 LEVEL 22-25 FLOOR PLANS 37 2.14 TOWER LANDSCAPING 38 2.15 ROOF LEVEL LANDSCAPE PLAN 39 2.16 BASEMENT LEVELS 1-8 FLOOR PLANS 40-43 2.21 BUILDING SECTIONS 45 3 CHARACTER & MATERIALS 3.1 BUILDING MATERIALS 46 3.2 BUILDING CLADDING DETAILS 47 3.3 SHADOW STUDIES OF COURTYARDS 49 6 APPENIDIX 6.1 BUILDING SCALE COMPARISON 50 6.2 ENHANCING SKYLINE 53 6.3 ZONING GUIDELINES & MAPS 54 6.4 LIGHTING PLAN 57

1.0 PROJECT HISTORY The 2nd and Pike project started the Design Review process with an Early Design Guidance (EDG) meeting and presentation on July 15, 2004. In April of 2006, the city council enacted major revisions to the downtown zoning code which resulted in a re-consideration of the development proposal. The design team presented a revised EDG packet on July 20, 2006. The Design Review Board (DRB) provided valuable feedback and recommendations. In July of 2007, an opportunity was presented to the 2nd and Pike project with the addition of Candela Hotels to the project team. The design team underwent a formal adn thorough revision to the program in response to this partnership. The DRB provided additional feedback in response to a revised EDG presentation on May 27, 2008. In 2009, the project trajectory was adjusted again with the removal of the Candela Hotel program. An EDG meeting to review the new program for the 2nd & Pike Tower took place on February 10,2010. Illustrated in this DRB booklet, are additional residential units to replace the hotel program, ground level retail spaces part of a landscaped and public ground floor, new public amenity spaces on upper levels, additional parking and storage for residents in the tower s below grade levels, as well as responses to the EDG meetings design recommendations. 4

VISION STATEMENT The 2nd & Pike Tower will provide the missing link in the pedestrian intensive Pike/Pine corridor. The project will restore this once significant corner to its place as an iconic landmark and extension of the region s ambition. It will respond to its unique location and history with a multifaceted building which is both transparent and dynamic. The southeast corner of 2nd Avenue and Pike Street was the home to the MacDougall Southwick Department Store from the turn of the 20th century until 1964. Once the center of the Seattle Retail Core and across the street from the Bon Marche, the area began to experience a downturn once the core began to move East. The area eventually became neglected and urban renewal resulted in the destruction of many of the adjacent historic buildings. The 2nd and Pike intersection has since been relegated to serving the retail core by providing surface and garage parking. The goal of this project is to inject the site with a vitality and humanity it has not seen for decades. Urban Visions has established itself as a leading force in large sustainable designed projects. The 2nd & Pike Tower will be the culmination of this commitment. The building will achieve LEED Certification. A large street level restaurant and upper level Skybar with roof decks will further ensure the building s engagement with its neighborhood and contribute to the richness of the Pike/Pine Corridor. 5

DOWNTOWN GUIDELINES A Site Planning & Massing Responding to the Larger Context A1 Respond to the physical environment - Develop an architectural concept and compose the building s massing in response to geographic conditions and patterns of urban form found beyond the immediate context of the building site: A2 Enhance the skyline - Design the upper porion of the building to promote visual interest and variety in the downtown skyline. 2ND AND PIKE TOWER - TRANSITION ZONE 6

DOWNTOWN GUIDELINES B Architectural Expression Relating to the Neighborhood Context B1 Respond to the neighborhood context. The lantern concept and the overall composition of the major building elements reinforce desirable urban features existing in the surrounding neighborhood. B2 Create a transition in bulk and scale - Two zoning departures are proposed to respond to the intent of this design guidline. Both departures better suite the intent of this guidline by transitioning to the new height limits to the east. B3 Reinforce the positive urban form & architectural attributes of the immediate area - The courtyard apartment is a prevalent building type in Belltown which creates usable open space and also breaks down building mass. The courtyard is key design feature that composes the building program and mass. B4 Design a well proportioned & unified building - A zoning departure is proposed to respond to the intent of this design guidline. The departure better suites the intent of this guidline by proposing a well proportioned building that responds to the hinge of the neighborhood context. - The program and mass has been composed and organize such that the publicly accessible interior and exterior spaces create a well-proportioned building that exhibits a coherent architectural concept. EDG Board Comment: The Board commended the applicant for analyzing the nearby context of Pike Place Market and the downtown development near the site. The proposed courtyard concept relates well to nearby context, and the Board encouraged the applicant to continue developing the courtyard design, with consideration of the challenges described in Hot Button 2. Additional study demonstrating the effect of the metal mesh material will be required. The Board expressed some concern that the metal mesh could create a blank wall effect, or the operability of the lower panels could create visual chaos. 7

DOWNTOWN GUIDELINES C The Streetscape Creating the Pedestrian Environment C1 Promote pedestrian interaction - Spaces for street level uses are designed to engage pedestrians with the activities occurring within them. Sidewalk-related spaces should be open to the general public and appear safe and welcoming. C2 Design facades of many scales - Design architectural features, fenestration patterns, and material compositions that refer to the scale of human activities contained within. Building facades should be composed of elements scaled to promote pedestrian comfort, safety, and orientation. C4 Reinforce building Entries - building s entries are reinforced by the design by addressing pedestrian comfort, safety and orientation. - Distinctive doorways with projected and recessed entry bays are distinct design features to the building. C5 Encourage overhead weather protection. - Encourage project applicants to provide continuous, well lit, overhead weather protection to improve pedestrian comfort and safety along major pedestrian routes. C6 Develop alley facade. - To increase pedestrian safety, comfort, and interest, devolop portions of the alley facade in response to the unique conditions of the site or project. 2ND AND PIKE TOWER - VIEW EAST TO CONVENTION CENTER 8

DOWNTOWN GUIDELINES C EDG Board Comment: The Board reinforced the earlier guidance, and noted that more detail of the Pike Street facade should be provided at the design recommendation stage. The Pike Street facade should respond to the high level of pedestrian traffic, the Pike and Pine Streetscape Conceptual Design Plan, and the concerns for adequate lighting and site lines for safety. The Board expressed support for the location of the Skybar restaurant entry near the alley at Pike Street. As noted earlier, the guidance in response to C-2 is to create a cohesive design between the tower and base. Additional sense of scale isn t necessarily required to meet this guideline. The metal mesh screens at the base and the tower should achieve the desired veil affect and not add to the appearance of building mass or blank walls. GLASS CANOPY EXTENDS INTO ENTRY NOTCH POTENTIAL WALL FOR ART COMMISSION OR SKYBAR SIGNAGE The building entries require further design development to meet C-4. Comments found in the Hot Button 2 suggest the entry might be more visually connected to the courtyard. The residential entry should be distinguished from the retail entries. One technique would be to recess the residential entry. EXTEND METAL CLADDING INTO ALLEY FOR TWO BAYS 2ND AND PIKE TOWER - SKYBAR ENTRANCE ON PIKE ST. 9

DOWNTOWN GUIDELINES E Vehicular Access and Parking Minimizing the Adverse Impacts E1 Minimize Curb Cut Impacts Minimize adverse impacts of curb cuts on the safety and comfort of pedestrians E3 Minimize the Presence of Service Areas - unsightly service areas for trash dumpsters, loading docks, mechanical equipment and the like are to be located in the alley away from pedestrian experience. EDG Board Comment The Board felt that the design guidelines could be adequately met as well as the program met with no street access. 10

3.3 PARKING RAMP ACCESS AND ENCLOSURE LOFT STYLE APARTMENTS ABOVE WITH PERFORATED ROLL DOWN DOORS. ROLL-DOWN PERFORATED GARAGE DOOR ABOVE PEDESTRIAN CANOPY. GLASS CANOPY SPANS GARAGE ENTRY. VIEW OF COURTYARD THRU LARGE CLEAR GLASS WINDOWS WITH ROLL DOWN DOORS FOR EVENING SCREENING. METAL BAR GRATE FENCE AND GATE FOR BREEZEWAY. RAMP DOWN TO PARKING. RETAIL BICYCLE PARKING ADJACENT TO SIDEWALK. DETECTABLE PAVING AT EDGES OF GARAGE ENTRY. 11

1.1 SITE OVERVIEW EXISTING SITE CONDITIONS: CENTURY SQUARE COMMERCIAL TOWER, 36 STORIES, 380-0 TALL Site Dimensions approx.: Site Area approx.: Existing Parking: Curbcuts: Alley Access: Alley Width: Grade Change: 108 x 176 19,062 SF 74 stalls 2 1 driveway 16 +10 across site THIRD AVENUE NUMBER OF FLOORS: 35 Floors above grade, including partial Mezzanine above Ground Floor, semi-private garden courtyard at Ground Floor and B1 level, semi-private resident roof garden amenity space at 8th floor, Skybar, private resident amenity spaces at 9th floor and Roof and 40 Mechanical penthouse above roof level. MELBOURNE TOWER COMMERCIAL TOWER, 11 STORIES, 165-0 TALL KRESS BUILDING COMMERCIAL BUILDING, 3 STORIES WILD GINGER RESTAURANT, 2 STORIES BUILDING HEIGHT: 440 Maximum height above grade at midpoint of 2nd Avenue property line to include: 400 Maximum proposed Residential height plus 40 Maximum Mechanical penthouse above roof level. POSSIBLE DEPARTURES: PARKING GARAGE MIXED-USE COMMERCIAL, 7 STORIES, 100-0 TALL PIKE STREET SETBACK FOR ALLEY IMPROVEMENT (SMC 23.53.030) 106-0 2 SERVICE ALLEY 123.8 118.8 BUILDING SITE 1430 2ND AVENUE SEATTLE, WA 98101 SORREANO PARKING GARAGE MIXED USE COMMERCIAL, 9 STORIES, 95-0 TALL UNION STREET Belltown Blanchard St. Lenora St. Virginia St. Pine St. Denny Triangle 121.7 117.5 113.8 2nd Ave. 1st Ave. Western Ave. Pike St. Union St. University St. Seneca St. Spring St. 6th Ave. 176-0 SECOND AVENUE Pioneer Square 12 International District 1521 2ND AVENUE MIXED-USE RES./COMM., 36 STORIES, 440-0 TALL NEWMARK TOWER MIXED-USE RES./COMM., 24 STORIES, 230-0 TALL

1.2 SITE CONCEPTS The site is located at the conversion of four distinct Seattle neighborhoods: Belltown, Downtown Shopping Center, Pike Place and Pioneer Square. As an addition to this unique intersection at 2nd and Pike Streets, the architectural massing takes into account the desire to connect to adjacent neighborhoods as well as facilitate a positive experience for the multiples users of the area. The 2nd and Pike tower models its living environments and designed spaces off of palpable Northwest landscape qualities: peaks of prospect, view and clarity, zones of verdant texture and filtered light and deep, earthy refuges. HOME TO MARKET 13

1.3 THE BUILDING IN CONTEXT Located on the southeast corner of two contrasting streets, 2nd Avenue and Pike Street, the site becomes topographically distinct and visually priominent within the relatively flat terrain of this area. 2nd Avenue is characterized by a diversity of architectural styles and building scales linking distinct neighborhoods from Lower Queen Anne and Belltown to Downtown, Pike Place Market, Pioneer Square and the International District. As a primary North-South transit route for city and regional buses, 2nd Avenue s image as an urban main street is reinforced by one s perceptions of movement, light and activity at street level. Pike Street runs East-West from the edge of the waterfront across Interstate 5 to reach Capitol Hill. Beginning at Pike Place Market, Pike Street is historically a main route to the Market for residents and visitors. With a smaller scale than 2nd Avenue, Pike Street is characterized by wide pedestrian filled sidewalks, animated storefronts and slower vehicular traffic. 2ND & PIKE TOWER 400 1201 THIRD AVE 770 RUSSELL INVESTMENTS CENTER 600 The streetscape design for the 2nd Avenue and Pike Street site will achieve the following design goals: - Acknowledge the role of the streets as public space; a continuation of Seattle s network of public spaces. - Create a streetscape of usable and meaningful amenities for the occupants, guests and pedestrians. - Emphasize the intersection as a crossroads - of the city and Market, and as a threshold from the city to the Market area. - Present a streetscape and landscape design that complements the activity and transparency of the building ground floor architecture and programs. - Present a streetscape and landscape design that responds to the prominence of the corner location and provides a distinct character for 2nd Avenue and Pike Street. - Implement elements of the Pike/Pine Conceptual Streetscape Plan to contribute to the continuity of the corridor while emphasizing the unique identity of the project. PARKING GARAGE 83 BANK OF AMERICA TOWER 932 SOREONO GARAGE 95 1000 SECOND AVE 492 SMITH TOWER 488 14 PROPOSED VIEW FROM 2ND AVENUE & PINE STREET WITH 2ND AND PIKE TOWER EXISTING VIEW FROM 2ND AVENUE & PINE STREET WITHOUT 2ND & PIKE TOWER

1.4 APPROACHING VIEWS 1 3 2 3. 3rd Ave & Pike Street 2. 4th Ave & Pike Street 1. 7th Ave & Pike Street 5 5 4 6. 2nd Ave & Seneca Street 5. 2nd Ave & Madison Street 4. 2nd Ave & Jackson Street 15

1.5 Building Elevation on Second Avenue FENESTRATION The facade of the building has been designed to transition from the parking garage structure to the south as it continues to Pike St. The large metal panels and large, industrial style windows serve to provide a varied facade with scales shifts similar to the multiple adjacent buildings. The project fenestration relates to the predominant parking garage typology, as well as utilizes its two material typologies to blend stylistically to the area s variation. There are three distinct proportions in the existing adjacent buildings that have informed the fenestration. 16

17

1.6 BUILDING CONCEPT The building is conceived as separate volumes oriented around a multi-level courtyard. Each part attains a distinct presence on the site: The lower tower levels include apartments, loft residences and retail spaces. This volume holds the corner of 2nd Avenue & Pike Street, acknowledging it as a key city intersection. The loft wing along 2nd Avenue creates a transitional buffer between public street and private courtyard. The courtyard features lightwells that provide natural light and ventilation for the parking and storage levels. Additional recreational spaces will be provided on rooftops creating a layered canopy of vegetation for the building. Apartment units will feature distant views of Pike Place Market and Puget Sound, while the loft units capture more local views of the urban streetscape and central courtyard with southern light. Although the ground level retail spaces are fully glazed to allow visual connections between pedestrians and retail activity, the residential levels up to the Skybar level are equiped with roll-down screens for privacy when needed. At nighttime, these spaces glow from within, creating an intricate layered reading from the street to the courtyard. The upper tower apartment levels will be about experiencing light and sky. The apartments feature inset balconies and white opaque glass framing views between neighboring buildings. Metal mesh screens strategically provide privacy and windbreaks at the balcony edges, with sections peeled back to frame key views. 18 WASHINGTON MUTUAL PLAZA

SECTION THRU COURTYARD AT RETAIL ON 2ND AVE 19

PINE ST. PIKE ST. UNION ST. 20 1.7 ADJACENT BUILDINGS 1. PIKE PLACE MARKET 2. PARKING GARAGE (FACING) 3. KRESS BUILDING (FUTURE IGA GROCERY STORE) 8 9 2 3 UNIVERSITY ST. (GREEN STEET IMPLEMENT- ED & PROPOSED) 1 4 5 SENECA ST. 7 6 4. THE NEWMARK FOURTH AVE. THIRD AVE. SECOND AVE. FIRST AVE. WESTERN AVE. 5. PARKING GARAGE (ADJACENT) 6. BENAROYA HALL 7. RUSSELL INVESTMENTS CENTER 8. CENTURY SQUARE 9. 1521 SECOND AVENUE

1.8 NEIGHBORHOOD COURTYARD TYPOLOGIES RAINIER SQUARE COURTYARD INN AT THE MARKET COURTYARD HILLCLIMB COURT WASHINGTON MUTUAL PLAZA COURTYARD IN PIKE PLACE MARKET PIKE PLACE MARKET 21

2.1 STREETSCAPE/LANDSCAPE Pedestrian Environment SECOND AVENUE LANDSCAPING Acer Platanoides Big Leaf Maple (native) Native Woody Shrubs & groundcovers Permeable Concrete Unit pavers at tree pits; Trench Drains to collect Canopy run-off for plant watering. PIKE STREET LANDSCAPING Raywood Ash Oregon Ash (Native) Native Shrubs Dark Concrete pavers or Stone at tree pits. 22

SKYBAR ENTRY 2.2 GROUND FLOOR PLAN with Landscape plan Scale: 1 =20-0 APARTMENT ENTRY GARAGE ENTRY 23

24

2.1 SIDEWALK SECTION & PIKE & PINE CONCEPTUAL DESIGN CHART 2ND AVENUE SECTION PIKE STREET SECTION Pike & Pine Streetscape Conceptual Design Element Guideline Following Guideline? Alternate Proposal to Meet Intent Sidewalk Paving 2x2 scored concrete Yes Paving in Landscape Zone Permeable Paving is preferred Yes- Permeable paving will be installed in the landscape zone Paving in Landscape Zone Paving darker than the sidewalks should Yes- paving will be dark concrete be used Landscape Provide large at-grade plant beds Yes- 5 6 wide x 22 long planting strips on Pike Landscape Landscape Provide a curb around the edge of the plant bed Provide a fence around the plant bed to protect the plants No- The curbs would block stormwater runoff from the sidewalks from getting into the planters Yes, but the fence design will be unique to this project Landscape Provide plantings that offer variety Yes- A variety of native shrubs and groundcover will be used Lighting Retain ornamental lighting Yes- Ornamental lighting will be retained 1-6 wide fl ush paving strips sorround the plant area so that sidewalk run-off can get to plant beds A specifi c fence design is called out in the Design Guidelines. A fence will be installed to meet this intent, but it will be designed to promote the unique identity of this building and block. 25

26 2.3 SITE PLAN SCALE: 1/16 = 1-0

2.4 MEZZANINE LEVEL PLAN SCALE: 1/16 = 1-0 27

2.5 COURTYARD BUILDING-SCAPE Interior Pedestrian Environment COURTYARD LIGHTING 28

2.6 LEVEL 3-7 FLOOR PLANS SCALE: 1/16 = 1-0 29

2.7 COURTYARD ELEVATIONS with Landscape Palette East Elevation 1/16 = 1-0 30

2.7 COURTYARD ELEVATIONS South Elevation 1/16 = 1-0 West Elevation 1/16 = 1-0 31

2.8 PODIUM EXTERIOR SPACES- SKYBAR AND RESIDENT EXTERIOR AMENITY SPACE RESIDENT EXTERIOR AMENITY SPACE SKYBAR 32

2.9 LEVEL 8 FLOOR PLAN SCALE: 1/8 = 1-0 33

2.10 LEVEL 9 FLOOR PLAN RESIDENT AMENITY SPACE SCALE: 1/16 = 1-0 34

2.11 LEVEL 10-21 FLOOR PLANS SCALE: 1/16 = 1-0 35

36 2.12 TOWER LIVING & ROOF AMENITIES

2.13 LEVEL 22-35 FLOOR PLAN SCALE: 1/16 = 1-0 37

38 2.14 ROOF-TOP RESIDENT RECREATION AND AMENITY SPACE

2.15 ROOF LEVEL PLAN with Landscape plan SCALE: 1/16 = 1-0 39

40 2.16 BASEMENT LEVEL 1 STORAGE PLAN SCALE: 1/16 = 1-0

2.17 BASEMENT LEVEL 2 PARKING PLAN SCALE: 1/16 = 1-0 L L M S S L M L M S S S L M L M L M M M M M S S S M M M M M M M M 41

42 2.18 BASEMENT LEVEL 3-7 PARKING PLAN SCALE: 1/16 = 1-0 M M S S S S S S M M M M M M M M M S S M M M L L L L L L L S S S S M M M M M M S S S S M M M M S S S S S S

2.19 BASEMENT LEVEL 8 PARKING AND MECHANICAL PLAN SCALE:1/16 = 1-0 M M S S S S S S M M S S S S M M M M M M M M M M 43

44

2.21 BUILDING SECTIONS RECREATION AREA: DMC 240/290-400 ZONING ENVELOP SHOWN DASHED IN RED GROUND FLOOR: FLOOR 8 SKYBAR: ROOFTOP: 2,685 SF 3,780 + 4,060 SF = 4,060 SF 1,910 + 7,550 = 9,460 SF 16,205 SF TOWER RESIDENCE GREEN AMENITY SPACE PIKE ST 2nd AVE ALLEY EXTERIOR DECK SHARED INTERIOR SPACE LOFT RESIDENCE RETAIL BUILDING SECTION LOOKING EAST BUILDING SECTION LOOKING NORTH SERVICE 45

3.1 BUILDING MATERIALS TOWER CURTAIN WALL ABOVE 85 PERFORATED METAL PANEL TOWER VISION GLASS SALVAGED HICKORY DECKING ACID ETCHED, POURED IN PLACE CONCRETE TOWER CURTAIN WALL BELOW 85 PAINTED STEEL STEEL WINDOWS AT LOFT UNITS ANONDIZED ALUMIN. ROLL DOWN PERFORAT- ED SCREENS AT LOFT STEEL BAR GRATE 46 2ND AND PIKE TOWER ENTRY

ASPIRA PROJECT - NORTH ELEV. ASPIRA PROJECT - SOUTH ELEV. ASPIRA PROJECT - WEST ELEV. ASPIRA PROJECT - EAST ELEV. DETAIL SCREENED BALCONIES PERFORATED ROLLER SCREEN - INTERIOR VIEW - SANTA BARBARA PERFORATED ROLLER SCREEN - EXTERIOR VIEW - SANTA BARBARA 47

48 3.2 ENVIRONMENTAL SITE CONDITIONS

3.2 SHADOW STUDIES OF INTERNAL COURTYARD Summer Solstice - June 21 Equinox - March 23, September 23 Winter Solstice - December 21 9AM NOON 3PM 49

6.1 APPENDIX Building Scale Comparison 50

6.1 APPENDIX Building Scale Comparison 51

6.2 APPENDIX Enhancing the skyline with rooftop design. 52

2ND AND PIKE TOWER FROM ELLIOTT BAY 53

6.3 APPENDIX Zoning Guidelines & Code Diagram 120-0 MAXIMUM TOWER WIDTH Property Address 1430 2nd Avenue King County Assessor Parcel # 1975700480 Zoning DMC 240/290-400 Applicable Code Section 23.49 Downtown Zoning Design Review (SMC 23.41) General Info, Application Instructions, and Submittal Requirements Structure Height (SMC 23.49.008) Maximum Height Limit 400 Roof Features 40 above the applicable height limit Stair penthouses and Mechanical equipment permitted 15 above the applicable height limit. Street-level use requirements (SMC 23.49.009) 75% of each street frontage must be occupied by applicable commercial uses. 25% of the street frontage may contain other permitted uses and/or pedestrian or vehicular entrances. Parking Quantity (SMC 23.49.019-A.1) No parking, either long-term or short-term, is required for uses on lots in Downtown zones Max Allowed: Retail 6,000sf 6 stalls (1 per 1,000 sf non-res.) Total: 6 stalls non-residential Existing surface: 74 stalls Proposed: Retail 6,000sf 006 stalls (below grade) 290 Apartments 378 stalls Total 389 stalls Bicycle Parking (Chart 23.49.019 A) Residential 1 space for every 2 dwelling units (for the fi rst 50 spaces of a use) 1 space for every 4 dwelling units (1/2 the ratio after fi rst 50 spaces) 288 apts 100 apts/2=50 stalls 188 apts/4=47 stalls Retail 1 space per 5,000 square feet. 14,725 sq ft of retail 03 bicycle parking stalls required for retail 440-0 400-0 40-0 RESIDENTIAL HT. LIMIT MECH PENTHOUSE HT. LIMIT General requirements for residential uses (SMC 23.49.010.B) Common recreation area (5) percent of the total gross floor area in residential use (50) percent maybe enclosed open space at street level counted twice Total Required: 101 bicycle stalls Curb Cut Location (SMC 23.49.019.H.1.a) When a lot abuts an alley, alley access shall be required 240-0 COMMERCIAL HT. LIMIT Residential 373,776 Required 373,776 x.05 = 18,689 sf Provided 21,978 sf Base and Maximum Floor Area Ratios (FARs) (SMC-Chart 23.49.011.A1) Required: none Existing: 2 curb cuts on 2nd Avenue 0 curb cuts on Pike Street 1 driveway in alley Proposed: 1 curb cut on 2nd Avenue 1 driveway in alley 85-0 HT. AT WHICH TOWER BEGINS 35-0 MIN. FACADE HT. DMC 240/290-400 Base 5 Max 7 Mechanical equipment allowance 3 1/2 percent Minimum sidewalk and alley width (SMC 23.49.022-A) Minimum sidewalk widths are established by Map 1C.1 176-6 N-S PROPERTY LINE 108-0 E-W PROPERTY LINE Residential exempt > 20,000 sf (SMC 23.49.011.B.1.c.3.f) Open space (SMC 23.49.016.5) < 85,000 sf of new offi ce Exempt Required: Pike Street 18, 2nd Avenue 15 Existing: Pike Street 18, 2nd Avenue 18 Proposed: Maintain minimum sidewalk widths throughout with incorporated sidewalk improvements as described elsewhere. Overhead Weather Protection and Lighting (SMC 23.49.018) Required along the entire street frontage except facade located 5 from street property line or widened sidewalk on private property 54

PEDESTRIAN STREET CLASSIFICATIONS Pine Street Pike Street Union Street PROPERTY LINE FACADES Pine Street Pike Street Union Street VIEW CORRIDORS Pine Street Pike Street Union Street STREET CLASSIFICATIONS Pine Street Pike Street Union Street 6.1 APPENDIX Zoning Maps View corridor requirements (SMC 23.49.024) Not required per Map 1D ELLIOT BAY Class I Class II Green Street Pedestrian Street Classifications regulated by Special Review or Historic District REgulations, except that Green Street setbacks in the International District Residential zone are regulated by Section 23.49.248 2nd & Pike Tower 1430 2nd Avenue Seattle, WA 98101 1st Ave SEATTLE ZONING MAP EXCERPT 2nd Ave 3rd Ave ELLIOT BAY ELLIOT BAY ELLIOT BAY Property Line Facades Required Street Facades regulated by Special Review or Historic Distric Regulations 2nd & Pike Tower 1430 2nd Avenue Seattle, WA 98101 PUBLIC AMENITY 1st Ave 2nd Ave 3rd Ave Pine Street Pike Street Union Street View Corridors established in Downtown View Corridor Map, Exhibit 3.5.C of Resolution 30297 (line indicates extent of View Corridor) Arrow indicates direction of View Portions of View Corridor requiring View Corridor setbacks according to Section 23.49.024 2nd & Pike Tower 1430 2nd Avenue Seattle, WA 98101 SIDEWALK WIDTHS 1st Ave 2nd Ave 3rd Ave Pine Street Pike Street Union Street Principal Transit Street Minor Arterial (other than Principal Transit Street) Principal Arterial (other than Principal Transit Street) 2nd & Pike Tower 1430 2nd Avenue Seattle, WA 98101 1st Ave 2nd Ave 3rd Ave Pine Street Pike Street Union Street Odor, noise, light/glare, and solid waste recyclable materials storage space standards (SMC 23.49.025) Venting 10 above fi nished sidewalk grade, and directed away from residential uses within 50 feet of the vent. DMC street facade and street setback requirements (SMC 23.49.056) Minimum Facade Height Class I Pedestrian Streets DMC: 25 feet Facade Setback Limits Between the elevations of 15 and 35 feet above sidewalk grade, the facade shall be located within 2 of the street property line, except that: maximum setback 10 maximum area setback 40% of facade area between the elevations of 15 and 35 maximum setback width 20 Facade Transparency Class I pedestrian streets 60% street level transparent Blank Facade Limit 15 wide DMC upper-level development standards (SMC 23.49.058) Facade Modulation 2nd Ave 15 setback above 85 Pike Street N/A per SMC Chart 23.49.058A Alley improvements in all zones (SMC 23.53.030) Required: 20 Existing: 16 Proposed: 18 (2 dedication) Loading Berth Requirements and Standards (SMC 23.54.035) Min. Number Required (Per Table A): 1 ELLIOT BAY ELLIOT BAY ELLIOT BAY Proposed 2 2nd & Pike Tower 1430 2nd Avenue Seattle, WA 98101 Major Retail Store and Shopping Atrium (FAR Exemption Only - No Bonus) Shopping Corridor Bonus 2nd & Pike Tower 1430 2nd Avenue Seattle, WA 98101 1st Ave 2nd Ave 3rd Ave 1st Ave 2nd Ave Variable 12 applies to all unmarked streets 15 18 (when on a one-way street, only the side with transit stops shall be 18 ; the other side shall be 15.) Sidewalk widths addressed by Special Review or Historic District regulations 3rd Ave Street-Level Uses Required Street Level Use Regulated by Special Overlay District 2nd & Pike Tower 1430 2nd Avenue Seattle, WA 98101 1st Ave 2nd Ave 3rd Ave Min. Length Required 35 Proposed 29-6 55 2nd & Pike Tower 1430 2nd Avenue Seattle, WA 98101

56 6.4 APPENDIX - LIGHTING PLAN

57