Measure A and EE Progress Update July 2015

Similar documents
New Hope-Solebury School District Campus Revitalization Plan

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update

Recreation and Park Commission Capital Committee. Angelo J. Rossi Playground Restroom Replacement Conceptual Plan Approval

PROGRAM AREAS - MIDDLE SCHOOL

RGM Architects. Eduardo Mata Elementary School

CUMBERLAND SCHOOLS WORK PROPOSED 2018

Waverley Elementary School Feasibility Study

Introduc*on of the Team. Planning Considera*ons. Site Selec*on Considera*ons. Due Diligence Considera*ons. Next Steps and Ques*ons / Answers

OFFICE DIVISION Rick Kleiner's Listings SALE. SIZE (Sq Ft / Ac) RATE /SQ. FT. $19.00 Full Service 1,728 N/A

SCHOOL BOARD ACTION REPORT

Budget, Facilities and Audit Committee May 22, 2014

The Class of Medical Student Housing Survey Class of Hello and welcome to UCR School of Medicine, Class of 2017!

Christopher J. Blunk, Deputy Public Works Director/ City Engineer

CLGE Working for a Profession

Fisher House II Apartments Final Draft Relocation Plan

38 th & Blake Height Amendments: Public Meeting #5 Building Design Comments July 13 th, 2016

Welcome. Date: May 26, 2016 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

2.2 72ND STREET STATION ENTRANCE ALTERNATIVES

Multidisciplinary Research Building 1 Professional Information Session. September 18, 2015

Guidance on Amendment Procedures Updated April 3, 2014

COUNTY OF SANTA BARBARA

111 Lowell Street, Lexington $530,000

MARCH GUIDE TO BUILDING CONDITION ASSESSMENTS and RESERVE FUND STUDIES

Rule of corner may need to be flexible i.e. context school, park. With a clustered approach. Should row housing go where fourplexes are?

CONTAMINATED LAND WORKSHOP 2014: SCOPING PSIs AND DSIs. P A T TLE DELAMORE P A RTNERS LTD solutions for your environment

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures

Tenant Involvement in Governance. Workshop Notes. Ballymena Workshop notes 19/10/2016. Attendance

Barry Farm Phase 1 Design Workshop Excel Academy Public Charter School June 20, 2017

Task Force Kickoff Meeting January 10, 2016

GREAT FALLS HIGH SCHOOL MASTER PLAN. GFHS Master Plan Task Force

Facilities Construction

Progress on the government estate strategy

EXHIBIT 1 PROJECT DESCRIPTION AND DESCRIPTION OF REQUESTED AREA VARIANCES REDEVELOPMENT OF 201 ELLICOTT STREET

Request for Information (RFI)

Proposal. Model of building in site from the street

Facilities Construction

GDPM DEVELOPMENT UPDATES

Facilities Construction

TENANT DESIGN CRITERIA Section s Signage Updated: March 2018

APARTMENT HOMES 7501 MONTGOMERY BLVD NE ALBUQUERQUE, NM A 210-UNIT MULTIFAMILY OPPORTUNITY

PROPOSED $100 MILLION FOR FAMILY AFFORDABLE HOUSING

Outdoor Events Venue Opportunities and Constraints Matrix Venue Opportunities Constraints Land Options/ Acreage

REGULAR MEETING BUFFALO GROVE PLAN COMMISSION. April 17, 2013

How Do We Live Skender Kosumi

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017

MISSOULA COUNTY PUBLIC SCHOOLS STRATEGIC FACILITIES PLAN DRAFT ASSESS/EXPLORE REPORT December 3, 2013

Hammock Dunes Owners Association, Inc Board of Administrators Meeting April 15, 2013

Robert Street Gateway, West St. Paul, Minnesota. A Premier Development Opportunity at the Gateway to West St. Paul and Dakota County

REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA

Cambridge Planning Board Zoning Submission Overview 7/25/2017

Lone Tree Landing Hillcrest Ave & Lone Tree Way Antioch, CA

Facilities Construction

SCHOOL IMPACT FEE ADVISORY COMMITTEE MEETING #11 APRIL 17, 2017 BENEFIT DISTRICT 1

City of O Fallon Project Management

Truax Park Apartments

REQUEST FOR ALTERATION REVIEW VERANDA GARDENS HOMEOWNERS ASSOCIATION, INC.

Building Sustainability Assessment Systems Corresponding to the Needs of Users

FM 1626 Public Hearing - January 14, 2016

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

ROOM FACILITY RENTAL w/ ALCOHOL

Proposed Mendon Public Library. Reuse of St. Michael s Church

What is the current problem(s) that we are hoping to solve with an SRO?

CITY OF SIGNAL HILL SUBJECT: PUBLIC HEARING THE COURTYARD RESIDENTIAL DEVELOPMENT OF 10 CONDOMINIUMS AND A NEW SPECIFIC PLAN

Facilities Construction

10,100 sf medical/office development opportunity

Tenants Rights and Things You Should Know

Interstate 35 Community School District Board of Education January 29, (pictures as of )

Beachmere. Allow yourself to imagine the lifestyle you ve. always wanted, in the home you deserve! 303 Urban facade.

BUILDING CODE COMMISSION

RELOCATION LET US BE YOUR FIRST IMPRESSION. BONDNEWYORK.COM

Page 1 of 5 Retrieval Number: 90,046

SAN MATEO UNION HIGH SCHOOL DISTRICT. Site Recommendation Alternative High School Program December 13, 2017

Newlands Planning Application - Public Consultation Frequently Asked Questions

Thermo-renovation: Opportunities & Barriers Experience of Latvia

Accessory Dwelling Regulations Update. County Board Work Session. July 11, 2017

Facilities Construction

ZOCO CHAIRMAN S PROPOSED DISCUSSION ISSUES PROPOSED ZONING ORDINANCE AMENDMENT ON SIGNS (SECTION 34)

Tenant Improvement Program (TIP) Design Review

Housing Credit Modernization Becomes Law

SUMMIT POINTE CHESAPEAKE, VA 23320

EMERGING ALTERNATE DELIVERY LEASE LEASEBACK FOR COMMUNITY COLLEGES CCFC 21 ST ANNUAL CONFERENCE SEPT 9 TH, TUESDAY 10:25 AM 11:40 AM WORKSHOP #1 (CC

INDIAN INSTITUTE OF TECHNOLOGY BOMBAY OFFICE OF DEAN (INFRASTRUCTURE PLANNING SUPPORT)

F A C I L I T I E S P L A N N I N G & C O N S T R U C T I O N

Accessory Dwelling Unit Permit

Wednesday, December 6, 2017 Central Office Board Room 6:00 PM

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers

ROOM FACILITY RENTAL/ NO ALCOHOL

A Modern Move-In Space for a Preschool or Day Care. 285 Lyons Plain Road Weston, Connecticut Fairfield County

NORTH ATLANTA S PREMIER RETAIL & OFFICE MIXED-USE DEVELOPMENT OFFERING SUMMARY

Former Havertys 45,540 SF Retail Center 1911 Crestwood Boulevard Irondale, AL

Meeting Agenda State College Borough Planning Commission. June 6, Room 304 / 12 p.m.

Functional Adequacy: Taking Decision-Making Beyond Condition Data. Ron Fraser CPM Director, Capital Planning Infrastructure Ontario

FOR LEASE OFFICE, FLEX & RETAIL SPACE. Hoen Lithograph Building. Delivery: 12 months from signed lease E. Biddle Street Baltimore, MD 21213

WALNUT CREEK DESIGN REVIEW COMMISSION STUDY SESSION STAFF REPORT

PLANNING COMMISSION AGENDA REPORT SUMMARY

Purpose of Workshop. Scope project to be included in a Design Build RFP Review Program Needs Site Analysis Concept Plans

b) A Home Occupation is allowed only in single family dwelling units in the AG-1, AG-2, R-1, R-2, R-3 Zones, MH, and PUD Zones.

ARTICLE 143. PD 143.

HOUSING ELEMENT GOALS, OBJECTIVES, AND POLICIES

Wednesday, October 10, :00 AM Department of Family & Children Services 761 Wheaton Street. 11:30 AM Horace Stillwell Towers 5100 Waters Avenue

Transcription:

Measure A and EE Progress Update July 2015

Agenda 1. Programming Process 2. Innova?on and Science Lab Room Selec?on 3. Architect Contracts and Project Assignment 4. Next Steps

Programming Process

Programming Process

Programming Process Group Input Response to sample images: Mix of design and building space is good with technology integrated Large Tables on wheels Access to many forms of whiteboards Paper rolls a@ached to tables Color on the walls, white got a blah response Beware of dumping ground and clu@er

Criteria for Room Selec?on No Impact to student housing Access to outdoor space Visibility and centralized locahon Room features create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) No possible disturbance to other classes No displacement of other program adjacencies In a building/area that will remain in the master plan Adjacent to science classrooms and storage/workroom (if Science Lab) Criteria Ranking 3 = OpHmally meets criteria 2 = Minimally meets criteria 1 = ParHally meets criteria 0 = Does not meet criteria

Site Plan and Budget Disclaimer CONCEPTUAL SITE PLANS The following graphics are conceptual in nature and are intended to communicate basic design ideas and possible soluhons. The final room placement on each campus may have a different locahon once the architectural teams start the detailed site inveshgahon efforts and they develop detailed designs. PLANNING BUDGETS The planning budgets are established. Overall scope of each project will vary, based on exishng condihons, to maintain project cost at the planning budget.

Innova?on Lab Birney ES

Innova?on Lab Birney ES Loca?on Criteria Birney Room 16 & 17 No Impact to Student Housing 3 Access to outdoor space 3 Visibility and Centralized LocaHon 3 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 3 No possible disturbance to other classes 3 No displacement of other program adjacencies In a building/area that will remain in the master plan Total 21 3 3

Innova?on Lab Birney ES Room 16 and 17 LocaHon adjacent to library creahng a resource wing Outdoor area is not adjacent to any classroom and is visible from the office InnovaHon Lab is visible from front entry and parking area One and a half rooms (if budget allows)

Innova?on Lab Durfee ES

Innova?on Lab Durfee ES Loca?on Criteria Durfee Room 13 & 14 No Impact to Student Housing 3 Access to outdoor space 2 Visibility and Centralized LocaHon 3 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 3 No possible disturbance to other classes 2 No displacement of other program adjacencies In a building/area that will remain in the master plan Total 19 3 3

Innova?on Lab Durfee ES Room 13 and 14 Off of major circulahon spine SHll Visible but set off enough not to disturb other classes Two or one and half rooms (if budget allows)

Innova?on Lab Magee ES

Innova?on Lab Magee ES Loca?on Criteria Magee Room 15&16 Room 11 Room K1A No Impact to Student Housing 3 3 3 Access to outdoor space 3 3 3 Visibility and Centralized LocaHon 2 2 3 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 3 3 3 No possible disturbance to other classes 2 2 3 No displacement of other program adjacencies In a building/area that will remain in the master plan 3 3 1 0 3 3 Total 16 19 19

Innova?on Lab Magee ES Room 11 Displacement of Kindergarten (ophon k1a), is not recommended Room 11 is adjacent to a storage area, which could be used by the lab

Innova?on Lab North Ranchito ES

Innova?on Lab North Ranchito ES Loca?on Criteria North Ranchito Room 14 Room 23 Room 33 No Impact to Student Housing 3 3 3 Access to outdoor space 3 3 3 Visibility and Centralized LocaHon 0 2 2 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 2 2 3 No possible disturbance to other classes 3 2 2 No displacement of other program adjacencies In a building/area that will remain in the master plan 3 3 1 0 3 3 Total 14 18 17

Innova?on Lab North Ranchito ES Room 23 Room 33 interferes with future plans for the Kindergarten relocahon and with current Kindergarten hard court area Room 23 is visible especially when the new drop- off is established

Innova?on Lab Rio Vista ES

Innova?on Lab Rio Vista ES Loca?on Criteria Rio Visa Room 7-8 Room 12 Room 17 No Impact to Student Housing 3 3 3 Access to outdoor space 3 1 3 Visibility and Centralized LocaHon 1 2 3 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) No possible disturbance to other classes No displacement of other program adjacencies In a building/area that will remain in the master plan 3 2 2 3 1 2 3 2 1 3 0 0 Total 19 11 17

Innova?on Lab Rio Vista ES Room 7 and 8 While rooms 7 and 8 are in the back of the school, the school currently hosts presentahons on the southeast side of the campus This locahon also provides 2 rooms (if budget allows) while not upsefng the special educahon program adjacencies

Innova?on Lab Rivera ES

Innova?on Lab Rivera ES Loca?on Criteria Rivera Room 4 Room 5 No Impact to Student Housing 2 2 Access to outdoor space 1 3 Visibility and Centralized LocaHon 2 3 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 2 2 No possible disturbance to other classes 3 3 No displacement of other program adjacencies In a building/area that will remain in the master plan 3 3 3 3 Total 16 19

Innova?on Lab Rivera ES Room 5 Room 5 is near the front of the school while shll having a protected space for the exterior funchons While room 6 is next to the garden, the garden makes supervision of the outdoor space difficult

Innova?on Lab South Ranchito ES

Innova?on Lab South Ranchito ES Loca?on Criteria South Ranchito Room 5 & 6 No Impact to Student Housing 2 Access to outdoor space 3 Visibility and Centralized LocaHon 3 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 3 No possible disturbance to other classes 3 No displacement of other program adjacencies In a building/area that will remain in the master plan Total 16 2 0

Innova?on Lab South Ranchito ES Room 5 and 6 Outdoor area located in the larger outdoor space which would not interfere with circulahon Next to the main gate Would allow one and a half classrooms (if budget allows)

Innova?on Lab Valencia ES

Innova?on Lab Valencia ES Loca?on Criteria Valencia Room 11 Room 5 No Impact to Student Housing 3 3 Access to outdoor space 3 3 Visibility and Centralized LocaHon 3 1 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 2 2 No possible disturbance to other classes 3 3 No displacement of other program adjacencies In a building/area that will remain in the master plan 3 3 3 3 Total 20 18

Innova?on Lab Valencia ES Room 11 Room 11 would allow the outdoor area to enhance the curb appeal of the school

Science Lab STEAM Academy @ Burke

Science Lab STEAM Academy @ Burke Loca?on Criteria STEAM Academy @ Burke Room 14 Room 15 Room 21 No Impact to Student Housing 3 3 3 Access to outdoor space 3 3 3 Visibility and Centralized LocaHon 2 2 3 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 3 3 3 Adjacent to science classrooms and storage/workroom No displacement of other program adjacencies In a building/area that will remain in the master plan 3 3 1 3 3 2 0 0 3 Total 17 17 18

Science Lab STEAM Academy @ Burke Room 21 Central campus, locahon is in a building scheduled to remain Room 21 is has no funchonal cabinets, by choosing this room the cabinets can be replaced with funchonal storage Workroom can be transformed into covered exterior learning space

Science Lab North Park MS

Science Lab North Park MS Loca?on Criteria North Park Middle Room 303 Room 305 Room 306 No Impact to Student Housing 3 3 3 Access to outdoor space 3 1 1 Visibility and Centralized LocaHon 2 1 2 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 3 2 3 Adjacent to science classrooms and storage/workroom No displacement of other program adjacencies In a building/area that will remain in the master plan 3 3 3 3 3 3 3 3 3 Total 20 15 18

Science Lab North Park MS Room 303 Outdoor space next to 303 has less circulahon so the outdoor learning area would be less disruphve to other classes and the circulahon system Room 303 is the only room with not funchonal cabinets, by choosing this room the cabinets can be replaced with funchonal storage

Science Lab Rivera MS

Science Lab Rivera MS Loca?on Criteria Rivera Middle Room 21 Room 25 B Room 27 No Impact to Student Housing 3 3 3 Access to outdoor space 2 3 3 Visibility and Centralized LocaHon 3 1 2 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 1 1 2 Adjacent to science classrooms and storage/workroom No displacement of other program adjacencies In a building/area that will remain in the master plan 0 3 2 1 3 3 0 0 0 Total 10 14 18

Science Lab Rivera MS Room 27 Room 27 is the old band room. There is no program and room is not useable for other purposes Creates a new useable classroom on the crowed campus Outdoor area would be visible from the street SHll near science wing without creahng single ownership of the room

Science Lab Salazar HS

Science Lab Salazar HS Loca?on Criteria Salazar HS Room 19 Room 25 No Impact to Student Housing 2 3 Access to outdoor space 3 3 Visibility and Centralized LocaHon 2 3 Room Features Create an easier transihon (i.e. larger room, higher ceilings, access to water, gas, data, etc.) 2 3 Adjacent to science classrooms and storage/workroom No displacement of other program adjacencies In a building/area that will remain in the master plan 3 1 3 3 3 3 Total 18 19

Science Lab Salazar HS Room 25 Room 25 is larger and offers more flexibility than room 19 Room currently used by Rio Hondo CCD, but program can be relocated to adjacent building Science Lab would be visible from the street while being located in close proximity to uhlihes services

Room Selec?on Recommenda?ons School Innova?on Lab Science Lab Birney ES 16 Durfee ES 13 & 14 Magee ES 11 North Ranchito ES 23 Rio Vista ES 7 & 8 Rivera ES 5 South Ranchito ES 5 & 6 Valencia ES 11 STEAM Academy @ Burke 21 North Park MS 303 Rivera MS 27 Salazar HS 25

Architect Contracts and Project Assignments Project HMC D+D Band Building - NPMS 3,978,000 Traffic MiHgaHon 4 Schools Sites Considered 2,100,000 InnovaHon Labs 8 Schools 4,208,000 Science Labs 4 Schools 2,200,000 Total Project Budgets 6,078,000 6,408,000

Next 30 Days Design Charre@es for all Applicable Projects Programming Document for InnovaHon and Science Labs SchemaHc Design for Band Building Project Program Schedule Development Delivery Method Discussions Detailed Budget Development Budget to Scope Review Program Management Sonware RecommendaHon Website and Newsle@er Development Program Management Plan Development