Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

Similar documents
New Hope-Solebury School District Campus Revitalization Plan

McCLATCHY FACILITY SUMMARIES

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

BYLAW NO. 15/026 A BYLAW OF THE REGIONAL MUNICIPALITY OF WOOD BUFFALO TO AMEND THE LAND USE BYLAW NO. 99/059

Proposed Mendon Public Library. Reuse of St. Michael s Church

D U L L E S AT DULLES CORNER. Smart Business DULLES CORNER BOULEVARD. dullesmetrocntr.com

OPTION 1 MAX RENOVATION/ADDITION

NYC Department of Education

353 W. Grand June 18, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of May 14, 2011

PROGRAM AREAS - MIDDLE SCHOOL

Buffalo, New York April 9, 2018 SENECA ONE

UNIQUE CONVERSION OPPORTUNITY SHADYSIDE FULL BUILDING 5428 Walunut Street Pittsburgh, PA Between Copeland & Bellefont Streets

The Miramar Santa Monica

Smith Property Holdings Buchanan House, LLC. Nan Terpak, Agent/Attorney 2200 Clarendon Boulevard, 13th Floor Arlington, Virginia 22201

ARLINGTON COUNTY, VIRGINIA

Section 1. Appendix A, "Zoning" of the Code of the City of Charlotte is hereby amended as follows:

D U L L E S AT DULLES CORNER. Smart Business DULLES CORNER BOULEVARD. dullesmetrocntr.com

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Ford Tower th Avenue SW

FOR LEASE AVAILABLE NOW! RENTS STARTING AT $12/SF* OFFICE & RETAIL Street, Edmonton, AB

FACT SHEET. Office: 820,000 sf. Number of Floors. 25 floors. Optimum leasing depth - 43 ft. Sustainability. Efficiency 70% Parking.

Plan Dutch Village Road

Coding For Places People Love Main Street Corridor District

VERTICAL MIXED USE DEVELOPMENT (Urban Village)

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

COMMUNITY OF CHRIST FACILITY NEEDS ASSESSMENT

Parking Challenges and Trade-Offs

518 3 rd Avenue South St. Petersburg, Florida

RIVER NORTH 1 st & 2 nd Floor Restaurant Space 540 North LaSalle Street Chicago, IL

THREE LOGAN SQUARE 1717 ARCH STREET PHILADELPHIA, PA

12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential

Welcome to ford tower

PARAGON TH Avenue, Long Island City, NY BLANCHARD ST Avenue, Long Island City, NY

WESTPORT CUPERTINO GENERAL PLAN AMENDMENT APP STEVENS CREEK BLVD, CUPERTINO, CA. KT Urban PRELIMINARY PLANTING PLAN 1" = 40'-0" 0' 10' 25'

Model of Camino Crossroads: (a) Looking north and (b) looking south.

NEW LIFE & MODERN VISION

Town Center Joint Commission Public Hearing #1: January 20, 2016

Agenda. 28 Sep 2015 SPRC #4. Pg 1

For Lease THE SEACOAST BANK TOWER. 250 N. Orange Avenue, Ste Orlando, Florida Highlights

Waverley Elementary School Feasibility Study

Metropolitan Park - Phase 4/5 VORNADO CHARLES E. SM I T H

AT BELLEFIELD TH AVENUE SE BELLEVUE, WASHINGTON Full Building Renovation Underway Soon at Mercer Pointe

EAST WEST PARTNERS SCOTT MURRAY LAND PLANNING, INC.

TOWNSHIP OF CAVAN MONAGHAN NEW COMMUNITY CENTRE

RIVERSDALE FEASIBILITY STUDY. prepared by

Level 1 Submission: Parcels 2,5,6

Appendix C Built Form Guidelines

RR Building Area: (sf) 19,800 SF. Cost per Square Foot: $207. Construction Cost $4,100,000. Date of Completion: February 2014

FOR SALE 3520 and 3533 Watson Rd, St. Louis, MO 63139

ADAPTABLE DESIGN GUIDELINES

Luxury urban living CityLights

DESIGN PRIORITIES. Avenues for Homeless Youth. Charrette Goals AVENUES FOR HOMELESS YOUTH

PARAGON TH Avenue, Long Island City, NY BLANCHARD ST Avenue, Long Island City, NY

M001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE

CUMBERLAND SCHOOLS WORK PROPOSED 2018

LEGACY TOWER OFFICE SPACE AVAILABLE. $11 Million in Capital Improvements Underway in West Chapel Hill Street Durham, NC 27701

L U X U R Y H O M E S

PLANS 1-3

FULL BUILDING AVAILABLE

III. PROJECT DESCRIPTION

NEW OFFERING. 1,385-6,037± Square Feet of High Exposure Retail/Restaurant/Office

A Brief Overview of the New BOMA Measurement Standards for Lawyers Jan. 20, 2011 By William B. Tracy, MBA, NCARB

THE TOWER AT MUTUAL PLAZA

3.1 Existing Built Form

CLINTON 42ND STREET PORT AUTHORITY ELEVENTH AVENUE TENTH AVENUE NINTH AVENUE MIDTOWN WEST 34TH STREET MANHATTAN WEST EMPIRE STATION COMPLEX CHELSEA

UPTOWN RACINE BUILDING REDEVELOPMENT CONCEPTS 1322, 1418, 1511 Washington Ave Racine, Wisconsin

48 MALVERN WALK (LOT 12) GreenBuilt and EnergyStar Home by JAG Construction

GENERAL ZONING CODE DESIGN CRITERIA FOR MULTIPLE- DWELLING DEVELOPMENT

ROOM NUMBERING STANDARDS

LINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P JENSON, K P CLARKE, T P

SAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010

September 11, Radnor Township Board of Commissioners Presentation. The Willows Mansion

A Quiet Campus... In a High-Powered Community

Inspira Medical Center Woodbury Development Options Report

8350 Broad Street, Tysons

Chapter DOWNTOWN ZONING DISTRICTS

RSA Coffee House Fellows Evening 04 August 2016

Special Meeting Genosha Development Project Accessibility Plan. Committee Meeting Room City Hall - 2nd Floor

TEN LIGHT MIXED USE 10 Light Street Baltimore, MD

Table of Contents ARTICLE 5A CHARACTER-BASED ZONING 1

8350 Broad Street, Tysons

Project: Address: MAJOR CERTIFICATE OF APPROPRIATENESS FOR THE BOARD OF ARCHITECTURAL REVIEW

DEVELOPMENT DEPARTMENT STAFF REPORT STAFF REPORT EASTSIDE CHAMBLEE LINK DCI

TULSA DEVELOPMENT AUTHORITY STAFF REPORT

POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013

BOROUGH OF HOPATCONG ORDINANCE No

At the same time, this very simple strategy imposed maybe one of the most radical impacts on the structure of the building. By expanding the square

AIR RIGHTS TOWER FOURTH YEAR

THOMAS CENTER PHYSICAL IMPROVEMENTS

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update

8350 Broad Street, Tysons

Fig. 16 & 17 Left: Carved limestone detail. Right: Carved limestone and metal screen at main entrance on west elevation.

Sky Sk l y in l e in e To T w o e w r

Paul VI Redevelopment

The building received the coveted America s Property Award in association with Bloomberg Television in the Best Mixed Use Development USA category.

CREATIVE OFFICE/SHOWROOM SPACE DTLA LEASE OPPORTUNITY Adjacent to Fashion District & Arts District

3510 Plan Two Story Approx. 2,382 Sq. Ft. 3 Bedrooms 2.5 Baths Kitchen with Island Great Room Loft Covered Loggia 2 Bay Garage

FAIRFIELD INN & SUITES

Transcription:

Master Plan Presentation for: 520 Virginia Drive May 22, 2018

Design Presentation Agenda Master Plan Design for 520 Virginia Drive Existing Conditions & Opportunities Project Goals Site Plan & Floor Plans Concept Renderings Mike O Rourke, GKO Architects Master Plan Cost and Information for Adaptive Reuse/Renovation of 520 Virginia Drive Arif Fazil, D Huy Engineering Questions and Discussions Page: 2

Existing Conditions & Opportunities Great Hall Entry Lobby Grand Stair Page: 3

Existing Conditions & Opportunities Cafe Auditorium Offices Classroom Open Space Page: 4

Existing Conditions & Opportunities Entry Facade Site Bridge Portico Virginia Drive Facade Page: 5

Project Goals Master Plan - Site Considerations Drive-up Service / bookdrop window Consider movement of patrons from parking lot to building Consider traffic flows Create vehicular and pedestrian connections to Highland avenue Avoid cut-through traffic patterns Add landscaping to parking lot Page: 6

Master Plan Proposed Site Plan Highland Avenue Access Realign Entry from Virginia Drive Landscaped Pathways from Parking Lot to Main Entrance Drive-up Book Drop Café Outdoor Eating Terrace Children s Library Outdoor Play Area Enhanced Site Lighting Improved Traffic Flows Barrier-Free Site Access from Parking to Building Page: 7

Existing Floor Plans Entry & Lobby Cafe Auditorium Classroom Overlook Skylights Great Room Elev Elev Toilets Toilets Open Office Spaces LOWER LEVEL PLAN Perimeter Offices UPPER LEVEL PLAN Page: 8

Project Goals Master Plan Building Considerations Existing Lower Level Existing Upper Level Capitalize on many resources that existing building provides Use of Auditorium and Café for Library & Community Programs Use of Great Hall on Upper Level as the heart of the Library Enhance the already impressive Lobby to orient users to the new 2-story Library Layout Open up the floor plates by strategically removing partitions while also utilizing existing offices where possible for Library program spaces (i.e. conference rooms, etc.) Provide Natural Light and Monitoring Sight Lines for Staff Page: 9

Master Plan Proposed Lower Level Floor Plan Concept Plan Children s Library, UDPL Express, Café, Auditorium, and Collections Mgmt. on Lower Level Test Fit - Furniture & Stacks not Completely Finalized Convenient Express Feature: books holds & book drop Activity on Lower Level upon entry Afterhours Use of Public Areas Including the Auditorium, Café, and other Program areas Master Plan Includes a Canopy over the Exterior Ramp Outdoor Areas include Dining Terrace and Play Area for Children Drive-up Book Drop Page: 10

Proposed Renderings Lower Level Entry to Children s Library Page: 11

Proposed Renderings Children s Library on Lower Level Page: 12

Proposed Renderings Upper Level Atrium (Transition Space to Upper Level) Page: 13

Master Plan Proposed Upper Level Floor Plan Concept Plan General Collection, Creation Suite, and Learning Commons on Upper Level Convenience Sky light areas Maker Space Creation Suite Learning Commons Skylights over Corner Study Areas Soft Furniture Browsing Area with View to Pond Great Hall with Natural Light Enhanced Elevator to Upper Level Multiple Conference/ Meeting Rooms Classroom with Kitchen Prep Area Page: 14

Proposed Renderings Upper Level Overlook Page: 15

Proposed Renderings Upper Level Reading/ Stack Area Page: 16

Master Plan Building Exterior (Future Phase) PROPOSED ENTRY ELEVATION PROPOSED PARKING LOT ELEVATION Page: 17

Master Plan Cost and Information for Adaptive Reuse / Renovation Architectural Master Plan Lower Level Upper Level Square Footage Data Draft Conceptual Budget Color-Coded Plans for Draft Conceptual Budget Lower Level Upper Level Site Plan Furniture and Technology Allowances Detail Page: 18

Master Plan Cost and Information for Adaptive Reuse / Renovation Architectural Master Plan LOWER LEVEL PLAN UPPER LEVEL PLAN Page: 19

Square Footage Data Existing Library at 805 Loch Alsh Drive Existing Library (Lower Level Floor) Library (Lower Level Floor): 15,327 SF (this includes Mech. Rm. # 152, and corridor area closets outside of your office. It does not include Mech/Elec Rm. # 143) Existing Program Space used by Library (Upper Level Floor) Upper Level Floor Meeting Rooms: 4,552 SF Meeting Rooms A, B, C and D (and the adjacent access corridor and storage rooms) Connecting Stair Tower: 420 SF (210 SF on each floor) Caucus Rm Meeting 278 308 SF Lobby / Seating (outside Meeting Rms.): 1,000 SF Commissioner s Meeting Rm # 271 2,564 SF Partial Allocation of Upper Level Side Lobby 829 SF Total Square Footage 25,000 SF currently used by the library program Page: 20

Square Footage Data Proposed Library at 520 Virginia Drive Lower Level Available Space 29,200 SF (+/-) Upper Level Available Space 28,000 SF (+/-) Available Space in Entire Building 57,200 SF (+/-) Library Master Plan Proposed Library Square Footage Lower Level 8,100 SF (+/-) Children s Library UDPL Express Collections Management Upper Level 28,000 SF (+/-) General Collection Meeting Rooms Creation Suite Learning Commons Total Library Square Footage 36,100 SF (+/-) Page: 21

Square Footage Data Proposed Library at 520 Virginia Drive, continued Library Building Program Areas Children s Library (Lower Level) 7,275 SF UDPL Express (Lower Level) 575 SF 300 seat Auditorium and support spaces (Lower Level) 6,000 SF First Floor General Future Use Spaces (Leasable) (3300 + 900) 4,200 SF (+/-) First Floor Program and Reception Space 1,030 SF (+/-) First Floor Café and Vending Area 1,800 SF (+/-) First Floor Collection Management Office 1,000 SF Second Floor Creation Suite (incl. Teen Lounge) 2,400 SF Second floor Classroom 700 SF Great Hall (Upper Level) 3,700 SF Exploration Wing (Upper Level) 7,000 SF Learning Commons (Upper Level) 2,300 SF Other Data Number of Small Meeting Rooms in Children s Library (Lower Level) 1 Number of Small Meeting Rooms on Second Floor 9 Number of Large Assembly Rooms in Children s Library (Upper Level) 2 (w/divider) Number of Large Meeting/Conference Rooms on Second Floor 2 + 1CR = 3 Page: 22

Master Plan Cost and Information for Adaptive Reuse / Renovation Draft Conceptual Budget, page 1 of 2 Renovation Package Priority Level MEP Improvements 1 Primary Renovations Required for Library 2 Operations, No MEP Work Structural 3 Improvements Boiler Replacement 4 Description of Work and Areas MEP Improvements to the entire building. See Note #3. Includes selective demolition, new partitions, and fit-out of Primary Spaces. See Note #1 and #1A. Allowance to perform structural improvements to accommodate increased loads on second floor spaces Replace electric boilers with gas fired hiefficiency boilers. Includes replacing hydronic pumps. Square Footage Cost per Square Foot Competitive Bid Energy Contract Total Estimated Cost Site Work Estimated Cost Running Total Estimated Cost Running Total Estimated Cost Running Total 57,200 $ 73.19 $ 650,700 $ 650,700 $ 3,535,845 $ 3,535,845 $ 4,186,545 $ 4,186,545 36,100 $ 70.85 $ 2,557,686 $ 3,208,386 $ 3,535,845 $ 2,557,686 $ 6,744,231 $ 79,500 $ 3,287,886 $ 3,535,845 $ 79,500 $ 6,823,731 $ 3,287,886 $ 460,000 $ 3,995,845 $ 460,000 $ 7,283,731 Roof Repairs 5 Allowance for any required roof repairs. $ 175,000 $ 3,462,886 $ 3,995,845 $ 175,000 $ 7,458,731 Parking Lot Improvements Phase 1 Improvements to Existing Elevator Small Meeting/Conference Rooms Renovations Staff Offices and Work Spaces 6 7 8 9 New driveway connecting the existing parking lots directly to Highland Ave., walking trail and sidewalks from Highland Ave. to the Library, and modifications to allow for a driveway to the new book drop-off location. Allowance to renovate the existing elevator equipment, install a new cab, and enlarge the elevator. Does not include a new piston. Includes new flooring and painting and revise/upgrade of electrical systems of small meeting and conference rooms. Contains allowances for visual display surfaces and casework and countertops. See Notes #1 and #2. Includes new flooring and painting and revise/upgrade of electrical systems of staff offices and work spaces. Contains an allowance for casework and countertops. See Notes #1 and #2. Page: 23 Material & Equip. Costs $ 265,571 $ 3,728,457 $ 3,995,845 $ 265,571 $ 7,724,302 $ 126,316 $ 200,000 $ 3,928,457 $ 3,995,845 $ 200,000 $ 7,924,302 3,520 $ 39.79 $ 100,625 $ 4,029,082 $ 39,420 $ 4,035,265 $ 140,045 $ 8,064,347 2,070 $ 33.24 $ 45,645 $ 4,074,727 $ 23,165 $ 4,058,430 $ 68,810 $ 8,133,157

Master Plan Cost and Information for Adaptive Reuse / Renovation Draft Conceptual Budget, page 2 of 2 Renovation Package Priority Level Secondary Stair Tower Renovations Storage Room Renovations Remaining Master Plan Parking Lot Improvements 10 11 12 Description of Work and Areas New flooring and painting and minimal upgrades of electrical systems in the secondary stair towers. See Notes #1 and #2. New flooring and painting and minimal upgrades of electrical systems in the existing storage rooms. See Note #1 and #2. Improvements to Existing Parking Lots including replacing the helipad and adjacent site wall with additional parking, mill and overlay and line striping of existing lots, replacing existing site lighting with LED fixtures, three new site lights, and new lighting controls. Square Footage Cost per Square Foot Competitive Bid Estimated Cost Running Total Energy Contract Total Estimated Cost Site Work Estimated Cost Running Total Estimated Cost Running Total 840 $ 18.19 $ 12,345 $ 4,087,072 $ 2,935 $ 4,061,365 $ 15,280 $ 8,148,437 630 $ 14.51 $ 6,950 $ 4,094,022 $ 2,190 $ 4,063,555 $ 9,140 $ 8,157,577 Page: 24 Material & Equip. Costs $ 675,619 $ 4,769,641 $ 174,650 $ 4,238,205 $ 850,269 $ 9,007,846 $ 335,583 Entrance Canopy 13 Allowance for new entrance canopy. $ 200,000 $ 4,969,641 $ 4,238,205 $ 200,000 $ 9,207,846 Café and Vending/Food Prep Renovations Auditorium and Program/Reception Space Renovations Future Use Space Renovations Furnishings and Technology 14 15 16 Includes new flooring, ceilings, painting and revise/upgrade of electrical systems of café and vending/food prep spaces. Contains a $150,000 allowance for food service equipment and $40,000 allowance for casework and countertops. See Note #1. Includes new flooring, ceilings, and painting, new LED lighting, and revise/upgrade of electrical systems of the auditorium and related spaces. See Note #1. Includes new flooring, ceilings, and painting, new LED lighting, and revise/upgrade of electrical systems of the future use spaces. See Note #1. Allowance for Library Furnishings and Technology. See Notes #1A, #4, and #5. 1,800 $198.84 $ 315,590 $ 5,285,231 $ 42,325 $ 4,280,530 $ 357,915 $ 9,565,761 7,030 $ 48.33 $ 136,356 $ 5,421,587 $ 203,380 $ 4,483,910 $ 339,736 $ 9,905,497 4,200 $ 47.32 $ 105,225 $ 5,526,812 $ 93,510 $ 4,577,420 $ 198,735 $ 10,104,232 $ 5,526,812 $ 4,577,420 $ 1,500,000 $ 11,604,232

Master Plan Cost and Information for Adaptive Reuse / Renovation Color Coded Plan Diagrams for Draft Concept Budget Lower Level Page: 25

Master Plan Cost and Information for Adaptive Reuse / Renovation Color Coded Plan Diagrams for Draft Concept Budget Upper Level Page: 26

Master Plan Cost and Information for Adaptive Reuse / Renovation Color Coded Plan Diagrams for Draft Concept Budget Site Plan Page: 27

Master Plan Cost and Information for Adaptive Reuse / Renovation Furniture and Technology Allowances Detail $75,000. Auditorium Tech A/V System upgrade allowance $50,000. Public address system for building allowance $353,250. Children s Library / Express Library furniture (7850 SF x $45/SF ) $78,500. Children s Library Technology (computers / servers and other equipment (7850 SF x $10/SF) (Note: the backbone wiring, data racks, and security (card access, intrusion detection, cameras, etc.) are already in the base construction costs). $0. Collections Management Staff Furniture (Reuse existing furniture) $10,500. Collections Management Tech (1050 x $10/SF) $108,000. Creation Suite Furniture (2400 SF x $45/SF ) $24,000. Creation Suite Tech (2400 SF x $10/SF) $642,645. General Upper Floor Level Library Furniture (14,281 SF x $45/SF) $142,810. Upper Floor Level Library Technology (computers / servers and other equipment (14,281 SF x $10/SF) (Note: the backbone wiring, data racks, and security (card access, intrusion detection, cameras, etc.), are already in the base construction costs). $0. Staff Office / Lounge Furniture (Reuse Existing) Circulation / Welcome Desk and on-floor staff stations (Included in Upper Floor Level Furniture) Automatic book sorting or other automated equipment (Future Phase) $1,484,705. Total Furnishings and Technology Budget Page: 28

Master Plan Cost and Information for Adaptive Reuse / Renovation Furniture and Technology Allowances Detail Summary for 35,000 SF Library at 520 Virginia Drive $1,125,000. 25,000 SF of Library area where new furniture is required = 25,000SF x $45/SF Note: Two-thirds of existing furniture to be reused across the square footage = 10,000 SF covered (25,000SF + 10,000 SF = 35,000SF) $250,000. Allowance of $10/SF for Library Technology items ($10/SF across 25,000 SF of the Library area) $75,000. Allowance of $75,000 for Auditorium A/V upgrade $50,000. Allowance of for PA system upgrade to the building $1,500,000. Total Budget Page: 29

Questions/ Discussion Page: 30

One-Story Library Test Fit Concept Pros Potentially less expensive construction cost (in Phase One) Potentially less expensive to operate building Potentially fewer staff may be required Cons A denser Upper Level floor plan necessitates the use of tall stack shelving which may require re-enforcement of existing floor structure Additional costs may be incurred if Children s Library is moved to the Lower Level in the future Fewer small and large conference rooms are possible as compared to a two-story concept Master Plan programming calls for 36,000 SF of floor space (Upper Level has 28,000 SF) Children s Library should comprise between 30-40% of the total Library square footage (11% shown in this test-fit) Intensifies need for vertical circulation to access collection & program spaces (may be challenging for families with strollers) No presence / activity related to Library on lower level entry floor Reduced large open floor space for Children s Library programming ALTERNATE UPPER LEVEL PLAN Page: 32

Master Plan Cost and Information for Adaptive Reuse / Renovation Draft Conceptual Budget (overview) Renovation Package Priority Level Description of Work and Areas Square Footage Cost per Square Foot Competitive Bid Energy Contract Total Estimated Cost Estimated Cost Running Total Estimated Cost Running Total Estimated Cost Running Total MEP Improvements 1 MEP Improvements to the entire building. See Note #3. 57,200 $ 73.19 $ 650,700 $ 650,700 $ 3,535,845 $ 3,535,845 $ 4,186,545 $ 4,186,545 Primary Renovations Required for Library Operations, No MEP Work 2 Structural Improvements 3 Includes selective demolition, new partitions, and fit-out of Primary Spaces. See Note #1 and #1A. Allowance to perform structural improvements to accommodate increased loads on second floor spaces Replace electric boilers with gas fired hi-efficiency boilers. Includes replacing hydronic pumps. 36,100 $ 70.85 $ 2,557,686 $ 3,208,386 $ 3,535,845 $ 2,557,686 $ 6,744,231 $ 79,500 $ 3,287,886 $ 3,535,845 $ 79,500 $ 6,823,731 Boiler Replacement 4 $ 3,287,886 $ 460,000 $ 3,995,845 $ 460,000 $ 7,283,731 Roof Repairs 5 Allowance for any required roof repairs. $ 175,000 $ 3,462,886 $ 3,995,845 $ 175,000 $ 7,458,731 Parking Lot Improvements Phase 1 6 Improvements to Existing Elevator 7 Small Meeting/Conference Rooms Renovations Staff Offices and Work Spaces 9 Secondary Stair Tower Renovations Storage Room Renovations Remaining Master Plan Parking Lot Improvements 8 10 11 12 New driveway connecting the existing parking lots directly to Highland Ave., walking trail and sidewalks from Highland Ave. to the Library, and modifications to allow for a driveway to the new book drop-off location. Allowance to renovate the existing elevator equipment, install a new cab, and enlarge the elevator. Does not include a new piston. Includes new flooring and painting and revise/upgrade of electrical systems of small meeting and conference rooms. Contains allowances for visual display surfaces and casework and countertops. See Notes #1 and #2. Includes new flooring and painting and revise/upgrade of electrical systems of staff offices and work spaces. Contains an allowance for casework and countertops. See Notes #1 and #2. New flooring and painting and minimal upgrades of electrical systems in the secondary stair towers. See Notes #1 and #2. New flooring and painting and minimal upgrades of electrical systems in the existing storage rooms. See Note #1 and #2. Improvements to Existing Parking Lots including replacing the helipad and adjacent site wall with additional parking, mill and overlay and line striping of existing lots, replacing existing site lighting with LED fixtures, three new site lights, and new lighting controls. 4,200 $ 47.32 $ 105,225 $ 5,526,812 $ 93,510 $ 4,577,420 $ 198,735 $ 10,104,232 Page: 33 $ 5,526,812 $ 4,577,420 $ 1,500,000 $ 11,604,232 Site Work Material & Equip. Costs $ 265,571 $ 3,728,457 $ 3,995,845 $ 265,571 $ 7,724,302 $ 126,316 $ 200,000 $ 3,928,457 $ 3,995,845 $ 200,000 $ 7,924,302 3,520 $ 39.79 $ 100,625 $ 4,029,082 $ 39,420 $ 4,035,265 $ 140,045 $ 8,064,347 2,070 $ 33.24 $ 45,645 $ 4,074,727 $ 23,165 $ 4,058,430 $ 68,810 $ 8,133,157 840 $ 18.19 $ 12,345 $ 4,087,072 $ 2,935 $ 4,061,365 $ 15,280 $ 8,148,437 630 $ 14.51 $ 6,950 $ 4,094,022 $ 2,190 $ 4,063,555 $ 9,140 $ 8,157,577 $ 675,619 $ 4,769,641 $ 174,650 $ 4,238,205 $ 850,269 $ 9,007,846 $ 335,583 Entrance Canopy 13 Allowance for new entrance canopy. $ 200,000 $ 4,969,641 $ 4,238,205 $ 200,000 $ 9,207,846 Café and Vending/Food Prep Renovations Auditorium and Program/Reception Space Renovations Future Use Space Renovations Furnishings and Technology 14 15 16 Includes new flooring, ceilings, painting and revise/upgrade of electrical systems of café and vending/food prep spaces. Contains a $150,000 allowance for food service equipment and $40,000 allowance for casework and countertops. See Note #1. Includes new flooring, ceilings, and painting, new LED lighting, and revise/upgrade of electrical systems of the auditorium and related spaces. See Note #1. Includes new flooring, ceilings, and painting, new LED lighting, and revise/upgrade of electrical systems of the future use spaces. See Note #1. Allowance for Library Furnishings and Technology. See Notes #1A, #4, and #5. 1,800 $198.84 $ 315,590 $ 5,285,231 $ 42,325 $ 4,280,530 $ 357,915 $ 9,565,761 7,030 $ 48.33 $ 136,356 $ 5,421,587 $ 203,380 $ 4,483,910 $ 339,736 $ 9,905,497

Master Plan Cost and Information for Adaptive Reuse / Renovation Draft Conceptual Budget (summary) Renovation Package Square Footage Cost per Square Foot Total Estimated Cost MEP Improvements 57,200 $ 73.19 $ 4,186,545 Primary Renovations Required for Library Operations, No MEP Work 36,100 $ 70.85 $ 2,557,686 Structural Improvements $ 79,500 Boiler Replacement $ 460,000 Roof Repairs $ 175,000 Site Work Material & Equip. Costs Parking Lot Improvements Phase 1 $ 265,571 $ 126,316 Improvements to Existing Elevator $ 200,000 Small Meeting/Conference Rooms Renovations 3,520 $ 39.79 $ 140,045 Staff Offices and Work Spaces 2,070 $ 33.24 $ 68,810 Secondary Stair Tower Renovations 840 $ 18.19 $ 15,280 Storage Room Renovations 630 $ 14.51 $ 9,140 Remaining Master Plan Parking Lot Improvements $ 850,269 $ 335,583 Entrance Canopy $ 200,000 Café and Vending/Food Prep Renovations 1,800 $198.84 $ 357,915 Auditorium and Program/Reception Space Renovations 7,030 $ 48.33 $ 339,736 Future Use Space Renovations 4,200 $ 47.32 $ 198,735 Furnishings and Technology $ 1,500,000 Page: 34