Sudler Annex 092/3725 Various Accessibility Improvements 04/2012 Included accessible ramp to entrance and accessible restroom.

Similar documents
Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type

Existing Building Accessibility Quick Checklist (CBC 11B) Job Address Permit

WORKSHEET FOR ACCESSIBILITY UPGRADE REQUIREMENTS FOR EXISTING NON-RESIDENTIAL BUILDINGS

12/18/2017. Objective. Accessibility Code MN 1341 Frequent Questions and Key Criteria. Agenda. Code Documents

LIVING at KU. A look inside KU Student Housing

Equality and Access Plan The Abbey School, Reading

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS

Muhlenberg College- Campus Accessibility

Accessibility facts and tips for key locations in Kingston & Area

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING JANUARY 12, 2017 TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

CONSTRUCTION COST ESTIMATE AND ANALYSIS

DESIGN PUBLIC HEARING FEBRUARY 28, 2018 KENNEDY MIDDLE SCHOOL, AUDITORIUM SPRINGFIELD, MASSACHUSETTS 6:30 PM FOR THE PROPOSED

ADA/TAS Plan Review & Inspection Worksheet Texas Access

2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC.

THIS CHECKLIST HAS BEEN AMENDED TO INCLUDE ONLY LEVEL ONE CRITERIA AS REQUESTED BY TIR REAL PROPERTY. As such it does not form a complete Checklist.

THE DISTRICT OF COLUMBIA LOTTERY AND CHARITABLE GAMES CONTROL BOARD NOTICE OF FINAL RULEMAKING

RGM Architects. Eduardo Mata Elementary School

3. Miscellaneous Instructions and Definitions.

Committed to Service

2700 J STREET SACRAMENTO MIDTOWN BUILDING FOR SALE $4,300,000 (±$287.00/RSF) SACRAMENTO

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

Recreation and Park Commission Capital Committee. Angelo J. Rossi Playground Restroom Replacement Conceptual Plan Approval

2700 J STREET SACRAMENTO SACRAMENTO MIDTOWN BUILDING FOR LEASE OR SALE

CUMBERLAND SCHOOLS WORK PROPOSED 2018

Technical Requirements North Site

EAST CAMPUS DEVELOPMENT UPDATE Board of Trustees January 20, 2011

Community Development Department Council Chambers, 7:30 PM, June 7, 2018

2.2 72ND STREET STATION ENTRANCE ALTERNATIVES

Discuss the history of fires that resulted in much of the development of codes related to means of egress. Review mean of egress terminology

2.1 INTRODUCTION 2.2 BACKGROUND

THEATER EVACUATION AND EMERGENCY SITUATION GUIDELINES THEATER EVACUATION

Accessible drinking fountain does not have a clear 30 wide floor space centered on the drinking fountain (centerline to the counter edge is 12 ).

Report to the Plan Commission August 20, 2012

ADAAG specifically defines requirements for shopping center handicapped parking and signage, sidewalk size, building access and interior layout.

DESIGN PUBLIC HEARING NOVEMBER 15, 2017 CARLTON M. VIVEIROS ELEMENTARY SCHOOL COMMUNITY ROOM 525 SLADE STREET FALL RIVER, MA :00 PM

NEW ACCESSIBILITY CHANGES

Corvallis School District 2002 Long Range Facilities Master Plan Projects Update

Greater Cleveland Regional Transit Authority

APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO

General Information. Location Information. Location Use. Colorado VSPC/Drop-off/Drop-box Accessibility Survey Form. For SOS office use only

SUB /CAR /PUD

DRAFT CITY OF LONGVIEW PARKS & RECREATION COMPREHENSIVE PLAN Facilities. 62 P age

Ontario s 2012 Building Code Barrier-Free Design Amendments Ontario Regulation 332/12 Amended by O. Regs. 368/13 and 191/14

Renovation Progress. June 2-15, Weeks 35 & 36

New Hope-Solebury School District Campus Revitalization Plan

Special Meeting Genosha Development Project Accessibility Plan. Committee Meeting Room City Hall - 2nd Floor

Village of Glenview Plan Commission

ROOM NUMBERING STANDARDS

2019 SUMMER CONSTRUCTION PROGRAM 4/16/19

Ithaca College Accessibility Guide

MSC Guidelines for Review of Means of Escape (Subchapter H)

Committed to Service

E1-12: Final Decision AS

P: Site Plan Approval

Arlington County. Smart Choice Homes. Arlington County. Homes for all of us. Homes for a lifetime. Home

M-43 CORRIDOR OVERLAY ZONE

The New NYC Building Code Chapter 10 Means of Egress. New York City Department of Buildings. Technical Affairs. Fatma M. Amer, P.E.

THOMAS CENTER PHYSICAL IMPROVEMENTS

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009

th Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting

Delano Central Business District Parking Study and River Street Reconfiguration Concept

Presentation By. Chris Poujol. Jeffery Rodriguez. James Rigley

Section 1. Appendix A, "Zoning" of the Code of the City of Charlotte is hereby amended as follows:

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016

Section 3: Primary Function, Employee Work Areas, & Kitchens

Response to Community Questions Regarding Hunter College-68th Street ADA Project

ORANGE TOWNSHIP SIDEWALK CONSTRUCTION, REPAIR AND MAINTENANCE POLICY

Accessibility and ADA: Facility Standards Update. Technical Specifications: Chapters 8-10

5.1 Site Planning & Building Form

MOUNTAIN BROOK CITY COUNCIL PRE-MEETING AGENDA

Tanglewood Condominium Corporation ( )

McGowin Park, LLC. B-3, Community Business District

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019

The New NYC Building Code Chapter 11 Accessibility. New York City Department of Buildings. Technical Affairs. Keith Wen, R.A. Copyright Materials


CITY OF TORONTO. BY-LAW No (OMB)

Agenda. 28 Sep 2015 SPRC #4. Pg 1

Arriving and Getting In

SITE PLAN REVIEW COMMITTEE MEETING AGENDA Clarendon Boulevard Conference Rooms C & D Arlington, VA 22201

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

Executive Summary: This is a preliminary plat to construct 8 residential lots and 2 commons lots with a private road on 3.87-acres in Meridian, Idaho.

ORDINANCE NO An ordinance amending Section of the Los Angeles Municipal Code by amending the zoning map.

FLEX/CREATIVE OFFICE SPACE FOR LEASE Adjacent to Fashion District & Arts District

BOI / DRH Albertsons grocery market and fueling center & pad sites

Memorandum City of Lawrence Planning & Development Services

RECOMMENDATION. TO: CITY COUNCIL Date: APRIL 10, 2006

PROCEDURES FOR ROOM NUMBERING STANDARDS

DESIGN PUBLIC HEARING MAY 18, 2017 GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED

DEPARTMENT OF DEVELOPMENT SERVICES ACCESSIBILITY CHECK LIST FOR MULTI-FAMILY RESIDENTIAL BUILDINGS

PLANNING COMMISSION REPORT Regular Agenda -Public Hearing Item

SHORE DRIVE CORRIDOR: PAST, PRESENT, & FUTURE APRIL 19, 2018 BAYFRONT ADVISORY COMMISSION

2012 Texas Accessibility Standards Reference Guide for changes to the code

1511 S. REYNOLDS ROAD MAUMEE, OH 43537

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016

HANDICAPPED ACCESSIBILITY TOOLKIT

ATTACHMENT NO Growth and Staging of Development Report

Existing Property Accessibility Checklist

DEVELOPMENT DEPARTMENT STAFF REPORT

Transcription:

KU TRANSITION PLAN 1 ACADEMIC ACCESSIBILITY PROJECTS 2 June 29, 2017 LOCATION PROJ # PROJECT TOPIC / NAME COMPLETION COMMENTS 2012 Strong Hall Fire Alarm Strobe Upgrades 12/2012 Strong Hall Add Handrails to Central Main Entrance 2012 Lippincott Hall 008/9023 New Elevator and Accessible Entrance 08/2012 Murphy Hall 076/9550 Fire Alarm Strobes Installed in Courtyard 09/2012 Watson Library 022/9241 Accessible Ramp Replacement 08/2012 Sudler Annex 092/3725 Various Accessibility Improvements 04/2012 Included accessible ramp to entrance and accessible restroom. 2013 Sunnyside Avenue to Jayhawk Boulevard Lz_u/8715 Signage for Hawk Route from Sunnyside to Jayhawk Blvd 01/2013 Lippincott Hall 008/9006 Add Handrails to Interior Stairs 02/2013 Murphy Hall 076/10038 Add Ramp in Crafton-Preyer Theater Lobby 06/2013 Carruth-O'Leary Hall 077/9787 Renovate IOA Office to be Compliant with 2010 ADA 06/2013 Murphy Hall Lz_f2/9969 Circle Drive at Naismith Drive Entrance 09/2013 Included new accessible parking stalls. Reworked circle drive to coordinate with Parking Lot 54 reconstruction. Parking Lot 54 Lz_g2/8997 Parking Lot Reconstruction 09/2013 Included accessible parking count increase and relocation as well as new ramp to Naismith Drive. Not all costs are attributable to Hill Engineering 233/9886 New Building 06/2013 Fully compliant site work and building. Not all costs are attributable Jayhawk Boulevard Lz_u/9780 Jayhawk Boulevard Reconstruction Phase 1 09/2013 Included new sidewalks, ramps and crosswalks. Not all costs are 1 Contact Catherine Johnson, Director of the ADA Resource Center for Equity and Accessibility regarding implementation of KU s Transition Plan. Catherine Johnson may be contacted at accessibility@ku.edu or 785-864-4946 2 Completion dates shown in italics are estimates. Projects requiring new construction, alterations or additions will comply with applicable Federal and State accessibility law.

2014 Murphy Hall 076/9880 Add Elevator that Serves Level 2 and 3 08/2014 Structural Testing & Student Project Facility 088/8941 New Building 09/2014 Fully compliant site work and building. Not all costs are attributable Costs included in LEEP2 below. LEEP2 088/9841 New Building 06/2015 Fully compliant site work and building. Not all costs are attributable Pearson Scholarship Hall 071/10080 Major Renovation 08/2014 Cost listed includes total project cost. Not all costs are attributable to Sellards Scholarship Hall 072/10081 Major Renovation 08/2014 Cost listed includes total project cost. Not all costs are attributable to Stephenson Scholarship Hall 070/10082 Major Renovation 08/2014 Cost listed includes total project cost. Not all costs are attributable to Parking Lot 8 Lz_h/10252 Relocate Accessible Stall and Curb Cut 08/2014 Parking Lot 129 Lz_g1/10269 Add Accessible Parking Stall 08/2014 Jayhawk Boulevard Lz_u/9781 Jayhawk Boulevard Reconstruction Phase 2 09/2014 Included new sidewalks, ramps and crosswalks. Not all costs are Twente Hall Add Automatic Door Operator and Curb Cut Spring 2014 2015 DeBruce Center 240/9808 New Building 04/2016 Fully compliant site work and building. Not all costs are attributable Capitol Federal Hall 234/8585 New Building 04/2016 Fully compliant site work and building. Not all costs are attributable Self & Oswald Residence Halls; Daisy Hill Commons 235/8245 New Buildings 07/2015 Fully compliant site work and building. Not all costs are attributable Jayhawk Boulevard Lz_u/9782 Jayhawk Boulevard Reconstruction Phase 3 09/2015 Included new sidewalks, ramps and crosswalks. Not all costs are Douthart Scholarship Hall Major Renovation 08/2015 Cost includes ADA modifications to meet Path of Travel Strong Hall 037/5638 Add Accessible Ramp to Front of Building 04/2015 2016 Green Hall 150/11179 Add Automatic Door Operators to North Entrance and Restrooms 09/2016 Miller Scholarship Hall Major Renovation 08/2016 Cost includes ADA modifications to meet Path of Travel

Watkins Scholarship Hall Major Renovation Cost includes ADA modifications to meet Path of Travel Memorial Drive Lz_u/10715 Memorial Drive Reconstruction Phase 1 08/2016 Included new sidewalks, ramps and crosswalks. Also relocated accessible parking closer to Snow as well as increasing number of accessible stalls. Not all costs are 2017 Malott Hall Lz_e2/11220 Replace Ramp & Stair at NW Corner to be ADA Compliant Summer 2017 Grace Pearson Scholarship Hall Major Renovation Summer 2017 Cost includes ADA modifications to meet Path of Travel Memorial Drive Lz_u/10716 Memorial Drive Reconstruction Phase 2 Summer 2017 Will include new sidewalks, ramps and crosswalks. Not all costs are Watson Library 022/11310 Modify Restrooms on Levels 3, 4 & 5 to be 2010 ADA Compliant Summer 2017 Adds 2 single-occupant accessible restrooms on level 3. Modifies restrooms on levels 4 and 5 to be 2010 ADA compliant. 2018 Corbin Residence Hall 001/10417 Major Renovation Summer 2018 Cost includes ADA modifications to meet Path of Travel Battenfeld Scholarship Hall Major Renovation Summer 2018 Cost includes ADA modifications to meet Path of Travel Jayhawk Boulevard Lz_u/9783 Jayhawk Boulevard Reconstruction Phase 4 Summer 2018 Will include new sidewalks, ramps and crosswalks. Not all costs are Memorial Drive Lz_u/10717 Memorial Drive Reconstruction Phase 3 Summer 2018 Will include new sidewalks, ramps and crosswalks. This will complete an accessible path from Mississippi St. to West Campus Road. Not all costs are FUTURE PROJECTS 3 (FUNDING NEEDED, PROJECT DATES ESTIMATED) LOCATION PROJECT # PROJECT TOPIC / NAME COMPLETION COMMENTS PRIORITY Haworth Hall Repair Elevators B and C 2018 By majority vote on 1/10/2018, AAIC amended the priority of future projects. Smith Hall redesignated from priority number one to priority two. AAIC designated the repair of Elevators B/C in Haworth Hall as the top priority for future projects. The Committee based its decision upon the large number of students, staff, faculty served by the building and the elevators necessity for full access to the Hawk Route. 4 AAIC also factored into this decision, the possibility of 1 3 Approved by Architectural Accessibility & Inclusion Committee 7/25/2017. Contact Catherine Johnson, Director of ADA RCEA, at accessibility@ku.edu to request AAIC consider placing additional accessibility projects on the Transition Plan. 4 See 1/10/2018 Letter from Campus Operations (Campus Improvement Board)

relocation of orientation services from Smith Hall until the elevator installation occurs. AAIC remains committed to the installation of an elevator in Smith Hall as soon as funding permits. By majority vote, AAIC determined it appropriate and necessary to submit a recommendation to the Provost that additional non-r&r funding be explored for installation of Smith Hall elevator in 2018 fiscal cycle. Smith Hall 021/10345 Add Elevator 2018 Project design is underway. 2 Wescoe Hall 132/11469 Add Automatic Door Operators at 2 Locations 2018 Project design is underway. 3 Murphy Hall 076/10195 Modify Restrooms on Level 3 West Wing to be 2010 ADA Compliant Single-occupant restroom study recommended adding 2 singleoccupant restrooms to the former "lounge" outside the women's restroom adjacent to the theater lobby. 4 Parking Lot 16 Lz_c2/10337 Analysis of Accessibility This may or may not be an accessibility issue. Phase 4 of Jayhawk Blvd Reconstruction will reexamine the issue. 5 Parking Lot 37 Watkins Memorial Health Center Schwegler Drive to Sunnyside Avenue Add Accessible Aisle from Parking Stalls Across Drive to Dole Center Upgrade One Elevator to be 2010 ADA Compliant and Programmed as an Exit Elevator Add Accessible Route from Sunnyside Avenue to Parking Lot 90 and Ambler Student Recreation Center Estimated cost includes 6' wide striped aisle behind all parked cars, striped aisle to entrance, removing 6' of existing planter and patch of sidewalk at removed planter. Exit elevator function is not permissible because the building does not have fire sprinklers. Estimated cost includes only ADA upgrades (braille, signals, etc.) Includes minor modifications to replace non-compliant sidewalks along with a short ramp near the NW corner of Robinson Center. Spooner Hall Correct Non-Compliant Exterior Ramp Ramp on average is compliant. Portions slope more than 1:12. Portions slope less than 1:12. Haworth Hall 104/10310 Modify Restrooms on Level 3 Stewart Wing to be 2010 ADA Compliant Dyche Hall Accessibility Upgrades: Ramp to main entrance, accessible path to Upper Panorama, accessible restrooms, single-occupant restrooms Items are being included as part of what will likely be a 2-phase renovation project. Lindley Hall 042/9844 Add Automatic Door Operator to West Basement Entrance FP&D will investigate adding this work to the current EEEC construction project. 6 7 8 9 10 11 12

ASSESSMENTS 5 LOCATION PROJECT # PROJECT TOPIC / NAME COMPLETION COMMENTS PRIORITY All Campus Buildings Directional Signage for Restrooms Goal is to add directional signage at all non-accessible restrooms to the accessible restrooms within the same building. Engel Road to Jayhawk Boulevard North & East Housing Bldgs to Jayhawk Boulevard Campus-Wide Curb Ramps Robinson Center & Price Computing Center Lz_u/9716 Accessible Route from Engel Road to Jayhawk Boulevard Estimated cost includes new 5' walk along full route and curb ramps at each driveway. No regrading, landscaping, utilities, etc. are included. The future progress of this project is dependent on support from the City of Lawrence. Lz_u/9717 Accessible Route from North and East to Jayhawk Boulevard Due to changes in elevation from eastern-most scholarship halls, this work would be prohibitively expensive and would require construction of ramp runs of unacceptable length along with potentially an elevator tower building. AAIC voted to remove from Transition Plan on 7/25/2017 and to conduct a formal assessment. Add Accessible Path from Robinson Center to Price Computing Center This would extend the sidewalk that currently runs between the tennis and volleyball courts to complete the accessible path. Doing so would take the sidewalk through a heavily used activity field. AAIC voted to remove from Transition Plan on 7/25/2017 and to conduct a formal assessment. Dole Institute Add Automatic Door Operators to Level 1 Restrooms Dole Institute staff has reported this has not been an issue. AAIC voted to remove on from Transition Plan on 7/25/2017 and to conduct a formal assessment. Dole Institute Widen sidewalk and add site lighting Dole Institute staff has reported numerous complaints about the sidewalk width when multiple wheelchair users visit for events and a lack of adequate lighting from the accessible parking spaces to the building. Robinson Center Provide Additional Pool Lift The movable lift can serve both pools. AAIC voted to remove from the Transition Plan on 7/25/2017 and to conduct a formal assessment. Murphy Hall Accessible Seating Numbers in Crafton-Preyer Theater 11 accessible spaces are required when counting total amount of seating in the theater. When counting seating on only the Orchestra level, 6 accessible spaces would be required. Theatre currently has 5 accessible spaces. Future plan for Theatre includes possibility of decreasing the number of seats on the Orchestra level and removing the balcony seating entirely. Will reassess seating requirements as part of that project. Military Science 046/5874 Add Elevator AAIC review determined further assessment needed for proper evaluation of building. Initial assessment is that vertical integration may not be possible and would not meet State and Federal Standards. Concern raised that installation of elevator would likely only serve Levels 1 and 2. The basement level has constraints that limit the accessibility improvements that are possible such that an elevator extending down to this level would serve little purpose. 5 Architectural Accessibility & Inclusion Committee to discuss and vote on order of assessment priority in 2018.

AAIC determined the following steps are necessary: 1) Complete a detailed assessment of building to identify accessibility and compliance elements; 2) Final determination from leaders on feasibility of relocation and demo of current building; 3) Relocate Military Science public programs and events to other accessible buildings.