DAWES SWITCHING STATION SUBDIVISION

Similar documents
PENNY LAKES SUBDIVISION

KRONER S MOBILE WEST COMMERCIAL BUSINESS PARK SUBDIVISION

TERRY POIROUX FAMILY DIVISION SUBDIVISION

BAY FOREST PARK SUBDIVISION, RESUBDIVISION OF LOTS 6 & 7 AND BAY FOREST PARK SUBDIVISION LOT 10, OF THE RESUBDIVISON OF LOTS 9 & 10

AMELIA LAKE SUBDIVISON, PHASES 1-2

STONE HEDGE SUBDIVISION, UNIT 1, RESUBDIVISION OF LOT 40 & WEST COMMON AREA

KLUGE PLACE SUBDIVISION

DEER RIVER COMMERCIAL PARK SUBDIVISION

PORT CITY COMMERCE PARK SUBDIVISION

ALBA BEACH SUBDIVISION, RESUBDIVISION OF LOT 17

PALMER WOODS SUBDIVISION, PHASE III

NOBLE DRIVE EAST SUBDIVISION

TURTLE CREEK SUBDIVISION, PHASE THREE

PROVISION POINTE SUBDIVISION

COCHRAN FAMILY RIVERSIDE ESTATE SUBDIVISION

# 6 Case #SUB LEGACY SUBDIVISION. Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance.

MAGNOLIA SPRINGS SUBDIVISION, PHASE ONE

# 14 SUB CANAL SUBDIVISION

DAWES OAK SUBDIVISION

MCGOWIN PARK EAST OF SATCHEL PAIGE SUBDIVISION, RESUBDIVISION OF

ELIZA JORDAN CORNER SUBDIVISION

DINKINS ESTATE FAMILY SUBDIVISION

BETTA STOR-IT SUBDIVISION

# 1 HOLDOVER Revised SUB CANAL SUBDIVISION

SOUTHERN INDUSTRIAL PARK SUBDIVISION, LOT A, RESUBDIVISION OF LOTS 7 & 8

THE BLUFFS AT CYPRESS CREEK SUBDIVISION, PHASE ONE

MOBILE TOWERS SUBDIVISION

VIKING PLACE SUBDIVISION, PHASE II

PARK PLACE SUBDIVISION

TULSA PARK ESTATES SUBDIVISION, RESUBDIVISION OF LOT 6

AUTUMNDALE SUBDIVISION, RESUBDIVISION OF LOTS

PLANNED UNIT DEVELOPMENT, SIDEWALK WAIVER, & SUBDIVISION STAFF REPORT Date: November 6, 2008

HERON LANDING SUBDIVISION

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016

JOHNNY S RV PARK SUBDIVISION

WESTMINSTER PARK SUBDIVISION

DAUPHIN CREEK ESTATES SUBDIVISION

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013

OAK HILL SUBDIVISION

BROADWAY THREE NOTCH ROAD SUBDIVISION

WESTMINSTER PARK PLACE SUBDIVISION

SILVER PINES SUBDIVISION

THE WHEELER BUILDING SUBDIVISION

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: July 9, 2015

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: July 3, 2014

THE CITY OF MOBILE, ALABAMA

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016

HAWTHORNE PLACE SUBDIVISON, RESUBDIVISION OF LOT 15 REVISED

SUBDIVISION & PLANNING APPROVAL STAFF REPORT Date: December 1, 2016

THE CITY OF MOBILE, ALABAMA

SUBDIVISION, PLANNED UNIT DEVELOPMENT, & PLANNING APPROVAL STAFF REPORT Date: February 1, 2007

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: November 3, 2016

McGowin Park, LLC. B-3, Community Business District

MTC ALABAMA SUBDIVISION

MAGNOLIA SPRINGS SUBDIVISION, PHASE II

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: June 18, 2015

THE CI FY OF MOBILE, ALABAMA

THE BLUFFS AT CYPRESS CREEK SUBDIVISION

PLANNED UNIT DEVELOPMENT & ZONING AMENDMENT STAFF REPORT Date: December 21, 2017

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: March 7, 2013

SUBDIVISION, PLANNED UNIT DEVELOPMENT, ZONING AMENDMENT, & SIDEWALK WAIVER STAFF REPORT Date: July 19, 2018

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 5, 2009

SUBDIVISION, PLANNING APPROVAL, & REZONING STAFF REPORT Date: June 4, 2015

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2007

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: March 1, 2018

APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION. CITY COUNCIL DISTRICT Council District 4 PRESENT ZONING PROPOSED ZONING

SUBDIVISION, PLANNED UNIT DEVELOPMENT, & REZONING STAFF REPORT Date: September 17, 2015

THE CITY OF MOBILE, ALABAMA

AMENDMENT TO REGULATING PLAN & SUBDIVISION STAFF REPORT Date: December 15, 2016

ZONING AMENDMENT, SUBDIVISION & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 16, 2006

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, ZONING AMENDMENT, & SIDEWALK WAIVER REQUEST STAFF REPORT Date: February 17, 2010

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. June 3, 2011

ZONING AMENDMENT, & SUBDIVISION STAFF REPORT Date: May 17, 2007

SUBDIVISION, PLANNED UNIT DEVELOPMENT, & REZONING STAFF REPORT Date: March 23, 2017

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

PLANNED UNIT DEVELOPMENT (East), PLANNED UNIT DEVELOPMENT (West) STAFF REPORT Date: September 18, 2014

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. August 19, 2011

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 6, 2004

ZONING AMENDMENT, & SUBDIVISION STAFF REPORT Date: July 24, 2008

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 7, 2012

MOBILE CITY PLANNING COMMISSION MINUTES MEETING OF JANUARY 3, :00 P.M. AUDITORIUM, MOBILE GOVERNMENT PLAZA

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: July 5, 2012

I. Requirements for All Applications. C D W

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: June 7, 2007

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: October 19, 2017

Sterling Meadow Subdivision

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

BEFORE THE HEARINGS EXAMINER FOR THE CITY OF BREMERTON

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

APPLICATION PROCEDURE

A. Appropriate agency responsible for transportation review for the subject property.

Preliminary Subdivision Application (Major) (Four (4) lots or more)

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: August 20, 2015

Transcription:

DAWES SWITCHING STATION SUBDIVISION Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm water detention and drainage facility requirements of the City of Mobile storm water and flood control ordinances, and requiring submission of certification from a licensed engineer certifying that the design complies with the storm water detention and drainage facility requirements of the City of Mobile storm water and flood control ordinances prior to the issuance of any permits. Fire-Rescue Department Comments: All projects within the City Limits of Mobile shall comply with the requirements of the City of Mobile Fire Code Ordinance (2012 International Fire Code). MAWWS Comments: No comments. The preliminary plat illustrates the proposed 2-lot, 190± Acre subdivision located at the South side of Snow Road South, 216 ± North of Autumn Leaf Drive North, extending to the North terminus of Taylor Point Boulevard and the East terminus of Alderway, within the Planning Jurisdiction. The applicant states that sanitary facilities are not applicable to the subject site. The purpose of this application is to create two (2) legal lots of record from one (1) metes-andbounds parcel. Both lots have frontage along Snow Road South, a major street requiring a 100 right-of-way width. Lot 2 is irregularly shaped and has two (2) frontages along Snow Road South: 403 ± to the North of the site, and 144 ± to the South of the site. Lot 2 also has frontage on Taylor Point Boulevard, Alderway Street, and Nadine Lane. Lot 1 also irregularly shaped, but has only one (1) frontage along Snow Road South. A varying right-of-way is illustrated on the preliminary plat, but previous subdivisions along Snow Road South required dedication. As such, revision of the plat illustrating dedication sufficient to provide at least 50 from the centerline of Snow Road South should be required, if approved. Both frontages of Lot 2 on Snow Road are large enough to be potentially re-subdivided and, in accordance with Section V.D.3. of the Subdivision Regulations are not exclusive of unusable land, thus each frontage contributes to lot depths more than 3.5 times their widths at their potential building setbacks. Also, as mentioned, both lots are irregularly shaped with designs that are inconsistent with Section V.D.3. of the Subdivision Regulations. It should be noted, however, that the Planning Commission has approved other lots in the vicinity that also have irregular designs. As such, approval of the lots may be appropriate with a waiver of Section V.D.3. of the Subdivision Regulations. Regarding access management, a note should be placed on the Final Plat, if approved, stating Lot 1 should be limited to three (3) curb cuts, and Lot 2 should be limited to two (2) curb cuts along its Northern Frontage, and one (1) curb cut along its Southern frontage, with any changes in their sizes, locations, or designs to be approved by Mobile County Engineering and conform to AASHTO standards. Lot 2 should be denied direct access to Taylor Point Boulevard, Alderway Street, and Nadine Lane.

Both lots satisfy the minimum size requirements of the Subdivision Regulations for lots without sanitary facilities, and are appropriately labeled in square feet and acres on the preliminary plat. This information should be retained on the Final Plat, if approved; or, provision of a table on the Final Plat providing the same information may suffice. The 25 minimum building setback line along Snow Road South is illustrated, but not along Taylor Point Boulevard, Alderway Street, or Nadine Lane. If approved, the 25 minimum building setback line should be illustrated along all frontages, adjusted for any required dedication. This site is located in the County; therefore, any lots that are developed commercially and adjoin residentially-developed property must provide a buffer in compliance with Section V.A.8. of the Subdivision Regulations. A note stating as much should be provided on the Final Plat, if approved. Portions of both lots are located within the flood plain. As such, wetlands may occur on the site and may therefore be environmentally sensitive. Approval of applicable federal, state and local agencies may be required prior to development of the site. A 100 foot wide Alabama Power easement crosses the site. A note should be placed on the Final Plat stating that only structures related to the easement may be placed within the easement. Finally, the site will have to comply with the City of Mobile storm water and flood control ordinances. A note stating Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm water detention and drainage facility requirements of the City of Mobile storm water and flood control ordinances, and requiring submission of certification from a licensed engineer certifying that the design complies with the storm water detention and drainage facility requirements of the City of Mobile storm water and flood control ordinances prior to the issuance of any permits. should be placed on the Final Plat, if approved. Based on the preceding, with a waiver of Section V.D.3., the plat meets the minimum requirements of the Subdivision Regulations and is recommended for Tentative Approval, subject to the following conditions: 1) revision of the plat to illustrate dedication sufficient to provide at least 50 from the centerline of Snow Road South; 2) placement of a note on the Final Plat stating Lot 1 should be limited to three (3) curb cuts, and Lot 2 should be limited to two (2) curb cuts along its Northern Frontage, and one (1) curb cut along its Southern frontage, with any changes in their sizes, locations, or designs to be approved by Mobile County Engineering and conform to AASHTO standards; 3) placement of a note stating that Lot 2 is denied direct access to Taylor Point Boulevard, Alderway Street, and Nadine Lane; - 2 -

4) retention of the lot sizes in both square feet and acres on the Final Plat, or provision of a table on the Final Plat providing the same information; 5) depiction of the 25 minimum building setback line along all frontages; 6) placement of a note on the Final Plat stating that only structures related to the 100 foot Alabama Power easement may be placed within the easement; 7) placement of a note on the Final Plat stating any lots that are developed commercially and adjoin residentially-developed property must provide a buffer in compliance with Section V.A.8. of the Subdivision Regulations; 8) placement of a note on the Final Plat to comply with the Mobile County storm water and flood control ordinances: Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm water detention and drainage facility requirements of the City of Mobile storm water and flood control ordinances, and requiring submission of certification from a licensed engineer certifying that the design complies with the storm water detention and drainage facility requirements of the City of Mobile storm water and flood control ordinances prior to the issuance of any permits. ; and, 9) compliance with Fire Department comments: Projects outside the City Limits of Mobile, yet within the Planning Commission Jurisdiction fall under the State or County Fire Code (2012 IFC.) - 3 -

- 4 -

- 5 -

- 6 -

- 7 -

- 8 -

- 9 -

- 10 -