Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

Similar documents
Design and Access Statement Volume III Part 4 of 9 Plot A1. May 2018 Allies and Morrison

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

DESIGN, ACCESS & PLANNING STATEMENT

Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies.

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

Harmony Row Dublin 2. Dublin 2

Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch

Multi-unit residential uses code

Design and Access Statement and Planning Statement. Application for Planning Approval. New Shopfront. 58 High Street West Glossop

Design and Access Statement Volume VI Addendum Plot K1. Morris + Company

Berkenkamp Enschede, The Netherlands, 1988.

RedStone Private Country Estate architectural guidelines

MILL ROAD DEPOT, CAMBRIDGE Design and Access Statement December

3.1 Existing Built Form

Appendix 2: Mt Victoria

5 Canada Square is a world-class address in the prime core of Canary Wharf, Europe s financial capital.

The Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017

MOUNT GRAVATT- CAPALABA ROAD

UNION 2-10 ALBERT SQUARE MANCHESTER M60 8AD

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Grosvenor House, Drury Lane, London, WC2. October 2003

FACT SHEET. Office: 820,000 sf. Number of Floors. 25 floors. Optimum leasing depth - 43 ft. Sustainability. Efficiency 70% Parking.

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

SCHEDULE 32 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

8 MINT WALK CROYDON CR0 1EA BERNARD WEATHERILL HOUSE

Residential Design Guide Appendices

3 Shortlands is changing. CGI from Hammersmith Road

18. Appendix H Urban Design Panel Presentation

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

Potential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch

8.5.1 R1, Single Detached Residential District

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen.

Composition of traditional residential corridors.

Obz Square PROJECTS. A bold concept and design for the University of Cape Town s new 880 bedroom student residence. OBZ SQUARE Observatory

LRC Parking parking building in city centre

Kassner Goodspeed Architects Ltd.

SPECTRUM LIGHT & CHOICE Every floor is unique, sub-divisible and characterful. Whether you require optionality, variety or flexibility the choice is

Future Generation The Elite. Student Accommodation

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

Les Saisons Sai Wan Ho Building Journal, June 2002

APPENDIX E PAGE 1 of 25 NOTE: ITALICS INDICATE ADDITIONS OR ALTERATIONS RM-9, RM-9A, RM-9N AND RM-9AN GUIDELINES DRAFT

PROVIDENCE (BOLLARD BULRUSH SOUTH) LOCAL DEVELOPMENT PLAN. 2263Rep146E

100 Barbirolli Sq. 100barbirollisq.com

Sky Sk l y in l e in e To T w o e w r

Memo to the Planning Commission HEARING DATE: JUNE 30, 2016

Fifth 50,500 4,

UNION 2-10 ALBERT SQUARE MANCHESTER M2 6LW

RODE. Article 80 Small Project Review Application. 232 Old Colony Avenue Mixed Use Development 232 Old Colony Avenue South Boston, MA 02127

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

The Terrace, Lincoln, by Bauman Lyons Architects

ARTICLE 5. COMMERCIAL AND OFFICE DISTRICTS 5.1 PURPOSE STATEMENTS 5.2 USES 5.3 DIMENSIONAL STANDARDS 5.4 DESIGN STANDARDS 5.5 DK DISTRICT STANDARDS 5

148,000 sq ft. Net area of Grade A Office Accommodation

College Avenue. Sowers Street. Calder Way. Beaver Avenue

Apartment Lifts There are individual lifts dedicated to the Building. Security lifts to all levels including car park.

City of Edinburgh Council - Rising School Rolls Phase 3 James Gillespies Primary School. Stakeholder Meeting 1 Thursday 05 June 2014

DAYLIGHTING / COURTYARD

Infill & Other Residential Design Review

THE SILVER FIN BUILDING ABERDEEN

MARKET & OCTAVIA AREA PLAN FUNDAMENTAL DESIGN PRINCIPLES

Durant Ave., Berkeley

City of Reno October 30, 2012 Draft Midtown Zoning Text Amendments 1

DAVIDSON PLANNING ORDINANCE AMENDMENTS AFTER SEPTEMBER 2009 SECTION 9

A TRANSFORMATION: A MAJOR CHANGE IN SOMETHING S APPEARANCE OR FORM

SCHEDULE 31 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

CASTLES OF CALEDON URBAN DESIGN REPORT

VIEW FROM CAMBIE STREET

BYLAW NO. 15/026 A BYLAW OF THE REGIONAL MUNICIPALITY OF WOOD BUFFALO TO AMEND THE LAND USE BYLAW NO. 99/059

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

Hotel and Multi Storey Cycle Park Two The Square, Station Square, Cambridge

RM-7, RM-7N and RM-7AN Districts Schedules

STAFF DESIGN REVIEW RESIDENTIAL BUILDING APPLICATION SUPPLEMENT

Response to Urban Design Panel Comments

Offices. Abidjan, Cote d Ivoire

42 FOUNTAIN STREET BELFAST

FORMER SHAUGHNESSY HOSPITAL

ONE SEAPORT SQUARE. Boston Civic Design Commission

RT-11 and RT-11N Districts Schedules

paddington house words by Tom Rubenach

Advisory Design Panel Report For the Meeting of February 27, 2019

Attachment E: Architecture and Design: Bill Gregory, Warren and Mahoney

LINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P JENSON, K P CLARKE, T P

STAR STREET NEIGHBORHOOD A slice of Hong Kong

NOW, THEREFORE, THE COUNCIL OF THE CITY OF CALGARY ENACTS AS FOLLOWS:

St Johns Road, Isleworth

THE REST NATURE ESTATE PHASE 2 ALBIZIA CLUSTER HOUSING DEVELOPMENT PROPOSAL

Purpose. Scope. Stairway Identification Signs. Emergency Evacuation and Stairwell Signage Requirements

COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS

WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS

CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING

International Village By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

VERTICAL MIXED USE DEVELOPMENT (Urban Village)

T H E Q U A N T B U I L D I N G

DeVono Cresa Weekly Leasehold List West End

RM-8 and RM-8N Districts Schedule

Cressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015

KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018

Dr Sun Yat-sen Museum, Mid-Levels

A 135,000 sq ft BREEAM Excellent Office Building. The premier professional services office location in the centre of CARDIFF

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS

Transcription:

Design and Access Statement Volume III Part 6 of 9 Plot A1 May 2018 Allies and Morrison

6 OFFICE 135 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.1 Introduction The office development is organised into three volumes and follows the design principle of a family of buildings to create distinct spaces of different size and shape. This creates a mix of three key lettable areas, with an appropriate degree of richness and identity rather than one large single space. The connective tissue between these three key lettable areas contains the main lift lobby, a central internal atrium and an additional lettable space that can be assigned to any of the three main office areas as work/ meeting space, or as an extension of the lift lobby. A family of buildings 136 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.2 Use The office occupies floors 1 to 5 of the development comprising office use (class B1) above ground level. The ground floor provides an entrance area, a reception and a flexible open lobby space for the floors above. As noted in the previous section, the main entrance hall at ground level is linked to two retail units. It is envisaged that these units will enhance the space with additional seating and tables to provide a casual meeting/work space, acting as an extension to the office waiting area. Cluster of elements 137 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.3 Amount The proposed building is comprised of 16,937 m2 (GIA) of office use. This area includes all dedicated facilities and a portion of the shared plant/ servicing areas located at ground floor and basement. The building is designed to maximise the amount of lettable workspace, while responding to a series of key parameters, such as providing flexible layouts, maximise access to daylight and external break-out spaces and best-practice design that follows the BCO guide, all within a massing approach that ensures the building is scaled appropriately to its surrounding context. OFFICE (M 2 ) Floor GEA GIA 06 186 167 05 2,511 2,376 04 2,739 2,588 03 2,897 2,742 02 2,897 2,742 01 2,901 2,742 00 1,657 1,589 B1 2,205 1,991 Total 17,993 16,937 138 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.4 Scale The office buildings occupy the five levels above ground. With a typical floor-to-floor height of 3675mm, a generous ground floor height of 5100mm and an overall height from ground to the main roof parapet of approximately 23,850m. Its scale picks up the main datum of the Masterplan and responds to its existing neighbours with setbacks. These setbacks create a sense of cohesion and provide external breakout spaces that are directly linked to the office floors. East/ West section looking north through the office buildings A and B 139 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.5 Layout 6.5.1 GROUND FLOOR The ground floor is a generous space organised around a central internal lightwell. From here, visual and physical connections are possible in multiple directions. The space is semi-public with informal working/ meeting areas and potential for adjacent retail units to spill into this space. The space allows a direct connection between the Dock and the former Dock Offices through the building. The office lift lobby is located adjacent and is accessed via a reception area and security barriers. The area north of the lift lobby connects visually with a small garden. Ground floor entrance lobby arrival 140 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6 Office Ground floor plan 141 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.5.2 TYPICAL OFFICE FLOOR The core of the office comprises of a side core arrangement. The main services are located towards the northern end of the building, including the main passenger lifts (linked with the loading bay at ground) and most of the WCs, organised around the residential core adjacent. A small secondary office core shared between buildings A and B is located towards the southern end. This arrangement creates a clear spatial layout of the main office areas, allowing for flexible future use and clear sightlines for improved visual connectivity within the building. The building has been designed to be fully sprinklered and caters for two fire fighting cores at the north and south ends. Escape stairs are allocated to each core, satisfying the fire strategy as refined with the fire engineer and presented to Building Control. The southern stair is articulated as an external stair. Both stairs have access to natural daylight. While the main office areas will have exposed concrete soffits, the connective tissue in-between the main buildings has been designed using a Cross Laminated Timber (CLT) construction. This creates a distinct character that contrasts with the main office areas and allows flexibility post completion to create internal stairs or visual connections between floors. 24m 32m 23m 22.5m 18m 36m Core arrangement principles Floorplate depths 142 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Key Office tenancies Shared spaces Lift lobby and arrival Building core Residential units Residential core Typical floor plan - indicative multi tenancy arrangement 143 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.5.3 TERRACES All office floors, with the exception of the second, have access to external terraces. Some are small balconies, and others, which are more generous, have been created by stepping back the upper floors of buildings. Floor 05 04 03 02 01 Area (m 2 ) 190 135 40 0 130 First floor plan Third floor plan North-West facing terrace West facing balconies 144 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Fourth floor plan Fifth floor plan West facing terrace East facing setback 145 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.5.4 FLOOR TENANCY SPLIT The three buildings offer different floor areas, which can be combined to let a whole floor to a single tenant, or multiple floors can be combined into individual buildings. This allows considerable flexibility regarding current and future market fluctuations. A single let would be the most efficient scenario allowing the central spaces to be lettable area. A lobby will be required to become landlord area if a typical floor is subdivided into several tenancies, to allow access to each tenancy independent access. Single tenant indicative layout Example of typical upper floor arrival with a single tenant 146 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6 Office Two tenants indicative layout Three tenants indicative layout Example of typical upper floor arrival with multiple tenants 147 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.6 Appearance 6.6.1 ORDER AND ARTICULATION The office buildings pick up the local vernacular, referencing the brick warehouse typology of Rotherhithe and in particular the neighbouring former Dock Offices building. With Plot A1 located at the prominent corner of Surrey Quays Road and Deal Porters Way, it carries the role of mediating between the small grain of the existing context and the larger blocks of the emerging development. This is achieved by breaking down the mass of the plot as described in earlier passages of this report. It is further refined in the setbacks of top floors and the treatment of elevations by picking up a facade grid that responds to the various orientations and adjacencies. The office order in context With the building frontage facing the emerging High Street, and the wide views across Canada Water, the facade grid responds with a double window bay articulation, resulting in a 6m grid. Taking this around the south-east corner, it also emphasizes the exposed corner of this building at the end of the High Street. From here the facades reduce to a smaller grid of 3m, still with a recessed spandrel panel. Once facing the former Dock Offices towards the west, the buildings are articulated by a simple punched opening facade with a single order. 148 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Office order fronting Deal Porters Way Office order fronting former Dock Offices 149 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Bay Study Office A facing east towards the dock 150 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Bay Study Office B facing south towards Plot A2 151 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Bay Study Office C facing west towards the former Dock Offices 152 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Bay Study Office Infill facing west towards the former Dock Offices 153 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

6.6.2 ELEMENTS AND DETAILS The proposed office buildings are rich in detail. Inspired by Victorian buildings in the area. Particular attention is drawn to the entrances, canopies, balconies, balustrades and window reveals. Metal profiles, patterned panels, brick inlays and mixes of differently coloured bricks add detail and depth to the design. Detail sketch of proposed design 154 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Details of nearby warehouse precedents 155 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Top floors The office buildings follow a tripartite order, comprising a retail base and a double order at the top. The latter is set back in areas and thus forms amenity space for office users. Model showing base and recessed top floors on offices 156 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Recessed gallery on the upper floor of the office 157 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Windows Reference is made through the use of Crittallstyle windows, historically used on large warehouse openings. These characteristic windows are used on both office buildings and the residential tower and help tie the different elements of the buildings together. Crittall-style windows on nearby warehouses 158 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

1:200 model showing Crittall-style windows 159 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Metalwork All metalwork on the office buildings, derived and redefined from local precedents, is designed consistent for all buildings, and adds detail to the overall appearance. This includes not only balustrades, gates and louvre covers, but also the fenestration. Metal panels in the window surrounds enlarge the openings externally to emphasise the brick columns and spandrels in equal sizes. Where metal panels are used, a common ornamental pattern will link these elements together. This will range from balustrades, plant screens, window screens and gates to perforated ventilations louvres. The pattern is designed to accommodate various required openings in the screens for its different purposes such as air flows and visibility. Metalwork sketches 160 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Metalwork of office building B 161 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Louvres and ventilation Several perforated panels have been placed throughout the buildings facades. Though some are purely aesthetic and provide richness to the facade, others incorporate a more practical role. Such as: Basement ventilation and smoke extract Smoke extract and exhaust air from the office Air Handling Units (AHUs) located at the basement will be discharged to the atmosphere via louvres in the facade at high level ground floor. Retail units air intake/extract General intake and exhaust provisions have been made available to the retail units, via high level louvres positioned around the perimeter facade at ground floor. Kitchen extract from these units will either be taken to roof via one of the allocated future tenant risers or, using ecology filtration, discharge via their own facade louvres. Retail ventilation: 1m strip above window shop Office fresh air intake Six supply and extract AHUs will be provided within the Basement. Outside air will be drawn in from the 6th floor and Ground floors facade. Consideration is given to separate intake and discharge locations (preferably >10m separation). Electrical sub station ventilation The electrical sub station room will be equipped with full height perforated doors that will allow for the required ventilation. Upper floor plant screens The 6th floor and top floor plant areas will be screened with perforated panels that allow for ventilation and screening. All these metallic panels will be perforated with a motive that can be varied to suit visual articulation, scale, perforation and function. uvers east elevation East elevation 162 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Basement ventilation: 1m strip high level Basement ventilation: high level strip above 2.20m or gates West elevation South elevation 163 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Canopies The main entrance to the office building is marked out by a generous, suspended canopy. Its design is inspired by historic canopies, with an expressed structure and refined connection details. From top to bottom: Waterstones Piccadilly, Selfridges Oxford Street, Kings Cross Station 164 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

Main office entrance with canopy (signage indicative - to be detailed at a later stage) Office canopy in context 165 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018

End of Part 6 of 9