Building Assessment Survey 2017-2018 Asset: R. F. WAGNER SEC SCL ARTS & TECH-Q, 47-07 30TH PLACE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-16 9:00 AM 2018-04-18 12:25 PM AA : Architectural - Associate 2018-04-16 7:57 AM 2018-04-19 2:56 PM Asset Data Was the building fully accessible for inspection Principal(s) Information Custodian Fireman Principal Name Organization Did you meet with this Principal? Did this Principal provide feedback? Answer Building Square Footage 75000 Comments on the Area Stephania Goel R. F. Wagner, Jr., Secondary School for Arts and Technology - Queens Was not present Mike O'Hara ne Comments on the Stories (Floors) plus Basements 10+B Comments on the Number of Classrooms 29 Comments on the Year Built 1910 Student Population 656 Staff Population 52 Weather Facade Photo Heavy Rain Corner of 30th Place and 48th Avenue - East view PB/A&W Page 1 of 18
Main Entrance Photo NYC Department of Education Building Assessment Survey 2017-2018 Facade A - 30th Place Roof Photo Have any Systems/Major Building Components been upgraded? Nil Systems: Window replacement; Window Guards replacement; Exterior Wall repointing and Lintel repairs; Partial Floor structure repairs - Room 254 and corridor adjacent to the classroom Year: 2015 Systems: Limited floor structure repairs; Limited foundation flood elimination; crack monitor installation in the cafeteria Year: 2014 Systems: New Weight Room, Yoga Room, Staff Lounge and Library Year: 2013 Systems: Interior upgrade; Windows replacement; Guards replacement Year: 1995 Have there been any New Building Additions? Tandem Schools? Leased Space? Year Leased 1995 Inspection Partial Inspection Priority Priority Exist Last Year? Priority Category Description Component Affected Location Description Person(s) tified Person(s) Title PhotoImage condition recorded Structural Engineer Required Structural Type Description Component Affected Location Description Person(s) tified Person(s) Title PhotoImage condition recorded Accessibility Accessibility Status Is the primary or secondary entrance on an accessible route? Is the building a multi-story building? Are all floors of the building accessible through compliant means? Accessible classrooms exists on each floor? PB/A&W Page 2 of 18
Accessibility Status Building Assessment Survey 2017-2018 Boys and Girls or Unisex accessible toilets exist on at least every other floor? If the following spaces exist, are they ALL accessible? Art Room, Auditorium, Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, Science Labs Physical Breakdown Structure Exists Complies Required FUNCTIONAL ACCESSIBILITY Exterior Routes Exterior Entrances & Exits Exterior H/C Lifts Exterior Ramps and Railings Interior Routes Corridor and Lobby H/C Lifts Interior Corridor Doors and Hardware Interior Corridors and Lobbies Interior Elevators Interior Lobby Doors and Hardware Interior Ramps Rooms & Spaces Art Rooms Room 251 Auditorium Cafeteria 1st Floor - Students, 1st Floor Staff Classrooms 1st - 2nd Floor Computer Rooms Room 268 Gymnasium 2nd Floor Library 2nd Floor Main Office Room 206 Multi-purpose Room Nurse's Room Room 116 Pool Science Lab Room 233, 235 Toilet Rooms (Boys) 1st - 2nd Floor Toilet Rooms (Girls) 1st - 2nd Floor Toilet Rooms (Staff) 1st - 2nd Floor PB/A&W Page 3 of 18
Building Template NYC Department of Education Building Assessment Survey 2017-2018 Inspection Architectural EXTERIOR AREAWAY AWNINGS AND CANOPIES CHIMNEY COPING CORNICE DOORS DOORS AND FRAMES DOOR HARDWARE LINTELS TRANSOM/SIDE LIGHT EXTERIOR WALLS Material Type(s) t Required t Required 3 - Fair Masonry Replacement Quantity 13,000 Replacement Uom Instance on All Facades Instance Instance Quantity 13,000 Instance EXTERIOR SOFFITS PB/A&W Page 4 of 18
Building Assessment Survey 2017-2018 EXTERIOR EXTERIOR SOFFITS LOADING DOCK t Required LOUVER PARAPETS t Required PLAZA DECK ROOF t Required STAIRS/RAMPS: EXTERIOR BUILDING CHEEK/FLANK WALLS RAILINGS STAIRS/RAMPS WINDOWS Replacement Quantity 2,000 Replacement Uom EXTERIOR GUARDS LINTELS WINDOWS Material Type(s) Aluminum Instance on Aluminum - Double Hung: Facade A, B, D Instance 1 - Good Instance Quantity 2,000 Instance Installation Year 2015 Source of Installation Custodial Staff POOLS STRUCTURAL COLUMNS/BEAMS/BEARING WALLS FLOOR STRUCTURE Location/Instance 3 - Fair METAL DECK AND CONCRETE: DETERIORATED Boiler Room PB/A&W Page 5 of 18
Building Assessment Survey 2017-2018 STRUCTURAL FLOOR STRUCTURE Quantity 10 REPAIR Purpose of Action LEVEL 5 Photo1 Boiler Room CONCRETE SLAB ON GRADE: MINOR CRACKS Location/Instance Electric Panel Room Quantity 50 REPAIR Purpose of Action LEVEL 5 Photo1 FOUNDATION WALLS Material Type(s) ROOF STRUCTURE VAULTS-BUNKERS AUDITORIUM CAFETERIA Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Instance on 1st Floor - Staff (500 SF) Electric Motor Room, Boiler Room similar Concrete t Required PB/A&W Page 6 of 18
Building Assessment Survey 2017-2018 CAFETERIA Instance on 1st Floor - Students Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Fixed Equipment Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Instance on 1st Floor - Students VINYL TILES: BROKEN/DETERIORATED/MISSING TILES Location/Instance Along the perimeter by the Staff Cafeteria Quantity 10 Photo1 Along the perimeter by the Staff Cafeteria Sliding-folding Partition Stage Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Window Curtains/Shades/Blinds Instance on 1st Floor - Students PB/A&W Page 7 of 18
CAFETERIA Window Curtains/Shades/Blinds Instance on 1st Floor - Staff (500 SF) CLASSROOMS/CORRIDORS/ADMIN SPACES Location/Instance Quantity 50 VINYL TILES: DETERIORATED SUBSTRATE Corridor near Rooms 121, 215, 249, by 2nd Floor Girls Toilet, Stair H/1, and others Photo1 NYC Department of Education Building Assessment Survey 2017-2018 Corridor near Stair H/1 Location/Instance Quantity 20 GLASS BLOCK: DAMAGED/MISSING Corridor near Room 206 (main office), by 2nd Floor main corridor stair, near the Library Photo1 PB/A&W Page 8 of 18
Building Assessment Survey 2017-2018 CLASSROOMS/CORRIDORS/ADMIN SPACES Corridor near Room 206 Location/Instance Quantity 100 GYPSUM BOARD: DETERIORATED Room 235 (rear entrance), corridor near Rooms 202, 217, 235, 1st Floor Boys Toilet, and others Photo1 Corridor near Room 278 Specialties Classroom Locker(s) Fixed Seating GYMNASIUM Fixed Equipment Location/Instance Quantity 50 WOOD: DAMAGED/DETERIORATED Toward the rear by the windows, near the Boys Locker Room (Damaged and minor warping) PB/A&W Page 9 of 18
Building Assessment Survey 2017-2018 GYMNASIUM Photo1 Seating Sliding-folding Partition Stage Window Curtains/Shades/Blinds DOOR HARDWARE GUARDS KITCHEN Instance on 1st Floor Instance on 1st Floor Instance on 1st Floor Instance on 1st Floor Instance on 1st Floor Near the Boys Locker Room 3 - Fair PB/A&W Page 10 of 18
Building Assessment Survey 2017-2018 KITCHEN LIBRARY Built-in Furnishing ACOUSTIC TILES: DAMAGED/MISSING Location/Instance At the rear by the window Quantity 25 Photo1 At the rear by the window GYPSUM BOARD: DETERIORATED Location/Instance At the rear by the room next to the window Quantity 10 PB/A&W Page 11 of 18
LIBRARY Photo1 NYC Department of Education Building Assessment Survey 2017-2018 At the rear by the room next to the window LOCKER ROOM - Boys (75 Lockers) Alternative use - Girls (75 Lockers) Alternative use - Boys (75 Lockers) - Girls (75 Lockers) - Boys (75 Lockers) - Girls (75 Lockers) - Boys (75 Lockers) - Girls (75 Lockers) Locker Room Lockers - Boys (75 Lockers) DAMAGED UNITS Location/Instance Near locker 22 Quantity 1 EACH PB/A&W Page 12 of 18
LOCKER ROOM Locker Room Lockers Photo1 NYC Department of Education Building Assessment Survey 2017-2018 Near locker 22 - Boys (75 Lockers) - Girls (75 Lockers) MULTI-PURPOSE ROOM SCIENCE DEMO ROOM SCIENCE LAB Instance on Rooms 233, 235 Alternative use Fixed Equipment Instance on Rooms 233, 235 SCIENCE PREP ROOM Instance on Room 234 Alternative use Fixed Equipment Instance on Room 234 CABINETRY: MISSING/DAMAGED Location/Instance Room 234 Quantity 2 L.F. PB/A&W Page 13 of 18
SCIENCE PREP ROOM Fixed Equipment Photo1 NYC Department of Education Building Assessment Survey 2017-2018 Room 234 SHOWER ROOM - Boys Alternative use - Girls Alternative use - Boys - Girls - Girls - Boys - Boys - Girls - Boys CERAMIC TILE: BROKEN/ MISSING Location/Instance Near the entrance Quantity 5 PB/A&W Page 14 of 18
SHOWER ROOM Photo1 NYC Department of Education Building Assessment Survey 2017-2018 Near the entrance STAIRS/RAMPS: Do Letter Stair Signs Exist? 5 - Poor METAL CLAD WOOD: DETERIORATED DOOR Location/Instance Stars D/2, E/2 Quantity 2 EACH MAINTENANCE Photo1 Stair E/2 Partition Railings Stairs and Landings Location/Instance Stair H/2 Quantity 10 GYPSUM BOARD: DETERIORATED PB/A&W Page 15 of 18
Building Assessment Survey 2017-2018 STAIRS/RAMPS: Photo1 TOILET ROOMS - STAFF Stalls TOILET ROOMS - STUDENTS Stalls Location/Instance Stair H/2 CERAMIC TILE: BROKEN/ MISSING 1st Floor Boys, Girls PB/A&W Page 16 of 18
Building Assessment Survey 2017-2018 TOILET ROOMS - STUDENTS Quantity 10 Photo1 1st Floor Boys LIFE SAFETY F.D. HOLDING AREA STEEL STAIRS SITE CONTAINERIZATION Drainage System for Asphalt Drainage System for Concrete Drainage System for Soil DRINKING FOUNTAINS FENCES IRRIGATION SYSTEM PAVING Student n-use Student Use Site Sidewalks & Walkways DOT Sidewalk Asphalt Concrete 3 - Fair DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance 48th Avenue Quantity 50 PB/A&W Page 17 of 18
SITE PAVING DOT Sidewalk Concrete Photo1 NYC Department of Education Building Assessment Survey 2017-2018 48th Avenue Pavers PLAYGROUNDS PLAYING SURFACE RETAINING WALLS SEATING SITE WALLS (NOT RETAINING WALLS) STAIRS/RAMPS: EXTERIOR PB/A&W Page 18 of 18