NYC Department of Education

Similar documents
NYC Department of Education

Charles Kozminski Elementary Community Academy

CUMBERLAND SCHOOLS WORK PROPOSED 2018

PROGRAM AREAS - MIDDLE SCHOOL

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

William Howard Taft High School

New Hope-Solebury School District Campus Revitalization Plan

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619

Salmon P Chase Elementary School 2021 N Point St Chicago, IL 60647


John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

LOCATION RFM ROAD, CABUYAO, LAGUNA

Sky Sk l y in l e in e To T w o e w r

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

Equality and Access Plan The Abbey School, Reading

RIDDLE RIDDLE ASSOCIATES, INC.

SAMMAMISH COMMUNITY CENTER FEASIBILITY STUDY

Property Line. Unit #426 Unit #428 Unit #430 Unit #432 Unit #434

Liberty-Valley Elementary School

FOR SALE OR LEASE. Manufacturing / Distribution Facility 85,262± Square Feet (Divisible) Acres

SAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010

Rénovation. municipal

1100, 1110 & th Avenue NE Bellevue, Washington

DHR Resource Number: AVON STREET

Multi-Family Properties Available

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE

Sodded Area. 8.5 m Storm Easement Typ. R12000 FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE

Section 3: Primary Function, Employee Work Areas, & Kitchens

FOR LEASE. Capitol Hill Corner Cafe/Restaurant Space th Avenue, Seattle, WA Please call brokers for more information:

353 W. Grand June 18, 2018

ReNOVATION à la carte Program

518 3 rd Avenue South St. Petersburg, Florida

Emma Grand Mixed-use Building 100, 108 & 114 Emma St. South Grand Valley, Ontario

RR Building Area: (sf) 19,800 SF. Cost per Square Foot: $207. Construction Cost $4,100,000. Date of Completion: February 2014

LANCASTER AVENUE WARREN STREET N. 33RD STREET N. 34TH STREET FILBERT STREET SITE PLAN ACC-DREXEL UNIVERSITY LANCASTER TOWER HALL CALHOUN HALL

Saint Cloud Business Center

Secondary Suites Design Standards & Guidelines for houses built after July 1998

flexible spaces all the right places... fogg.com ...Euclid Corridor Industrial Mall 1100 East 222nd St., Euclid, Ohio I-90 E. 222 St.

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

17 N Centre Ave Leesport, PA 19533

HUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design:

Long Bay Village Apartments: Outline Specification for Sale & Purchase

The MALBEC 50 SINGLES. Elevation A 5,263 sq.ft. l

OFFERING MEMORANDUM. 415 Washington Street. Waukegan, IL PRESENTED BY: COLLIERS INTERNATIONAL

CLOSE. PROPERTY OF DMCI HOMES

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

GRAPPA 60 SINGLES. The PLACE RENDERING HERE. Elevation C 8,270 sq.ft. l

Athletics AT-SR. Storage 181E. 272 Auditorium 182F. Storage. 182D Nurse. 181K Workroom. 182G Cot Room 182E. Office. Restroom. Restroom.

Column 1 Column 2 Column 3 USE OR USE CATEGORY SPACES REQUIRED PER BASIC ADDITIONAL MEASURING UNIT. 2 per dwelling unit

Investigation Reference No. Investigation Status. Investigation Description

CONSTRUCTION COST ESTIMATE AND ANALYSIS

3 Alexandra Road, Newquay, Cornwall TR7 3ND

Location Map. Project: French Academie (The) Address: Whitewater Dr ± Subject Property W N D A R 62 T O NB I 494

The Peaks Features List

ORDINANCE NO NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FARMERS BRANCH, TEXAS, THAT:

PLANS 1-3

SINGPOLI BD DEVELOPMENT, LLC PROPOSED MIXED-USE PROJECT 83 N. LAKE AVE. PASADENA, CA 91101

GLENN SQUARE. Direct (907) akcommercialproperties.com

Solicitation for Offers: 135 Allen Brook Lane Williston, Vermont

1950 ADDISON. Berkeley, CA December 17, Design Reivew. Westwood BayRock Addison, L.P. c/o BayRock Multifamily, LLC

Mudrovich PRELIMINARY PROGRESS DRAWING NOT FOR CONSTRUCTION THIRD AND SHORT ST. BROWNSTONE TOWNHOUSES WAUSAU, WI

Authority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL CITY OF TORONTO

24-story, Class A Office Building Climate Control LEED Gold Certified Fire Life Safety Large, Efficient Floor Plates Elevators Ample Ceiling Height

1. Only items to which the Village has title to and meet the definition of the following will be recorded a tangible capital asset.

GREAT FALLS HIGH SCHOOL MASTER PLAN. GFHS Master Plan Task Force

Harmony Row Dublin 2. Dublin 2

Residencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)

1 EAST ELEVATION 2 NORTH ELEVATION 3 COURTYARD ELEVATION

CITY OF TORONTO BY-LAW NO. ~-20~

Etobicoke York Community Council Item [#], as adopted by City of Toronto Council on [date] Draft Zoning By-law Amendment (March 20, 2019)

luxury residences at The palm drive

The Peaks Features List

PROJECT DESCRIPTION STATION 1300

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

YOUR VERY OWN SPACE AT WISH TOWN _Kensington-Brochure_April, 2011.indd 1

OPTION 1 MAX RENOVATION/ADDITION

EMERYVILLE PLANNING COMMISSION STAFF REPORT. Study Session II: Marketplace Redevelopment Project, Theater Site (FDP14-003)

Project overview. Golden Sand Hotel DOHA QATAR

20-Year Property Improvement Plan ( )

325,262 RSF AVAILABLE FOR LEASE

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

Mil Palmeras BUILDING SPECIFICATIONS. FOUNDATION: Foundation and armed concrete beams.

If the address on this form is different than the address of the building, submit a written explanation.

Insurance Appraisal of the River Shores Condominium Association, Inc. As of: February 8, 2016

CORPORATE HQ NEW GAME ROOM + BREAK/ ALL-HANDS AREA NEW 7,500 SF OUTDOOR PAVILION NEW FITNESS CENTER NEW 2,800 SF ROOF DECK

Residential RM Medium Density Residential. Residential Zones: Minimum Setback: Average of front setbacks on the adjacent lots.

Home Style Kitchen Bath Room Dimensions Other Dimensions Cleaning Closet Foundation Flooring...

2700 J STREET SACRAMENTO MIDTOWN BUILDING FOR SALE $4,300,000 (±$287.00/RSF) SACRAMENTO

L1.01 LEE HIGHWAY SHREVE APARTMENTS ENLARGEMENT 2 SEE SHEET - L COURTYARD HARDSCAPE PLAN SEE SHEET - L COURTYARD LANDSCAPE PLAN

DESCRIPTION OF IMPROVEMENTS

2.0 EXISTING SITE CONDITIONS ALASKAN WAY WESTERN AVE POST ALLEY ANALYSIS

Washington Municipal Building- Feasibility Study

BUILDING SPECIFICATIONS

Existing Building Accessibility Quick Checklist (CBC 11B) Job Address Permit

2700 J STREET SACRAMENTO SACRAMENTO MIDTOWN BUILDING FOR LEASE OR SALE

Transcription:

Building Assessment Survey 2017-2018 Asset: R. F. WAGNER SEC SCL ARTS & TECH-Q, 47-07 30TH PLACE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-16 9:00 AM 2018-04-18 12:25 PM AA : Architectural - Associate 2018-04-16 7:57 AM 2018-04-19 2:56 PM Asset Data Was the building fully accessible for inspection Principal(s) Information Custodian Fireman Principal Name Organization Did you meet with this Principal? Did this Principal provide feedback? Answer Building Square Footage 75000 Comments on the Area Stephania Goel R. F. Wagner, Jr., Secondary School for Arts and Technology - Queens Was not present Mike O'Hara ne Comments on the Stories (Floors) plus Basements 10+B Comments on the Number of Classrooms 29 Comments on the Year Built 1910 Student Population 656 Staff Population 52 Weather Facade Photo Heavy Rain Corner of 30th Place and 48th Avenue - East view PB/A&W Page 1 of 18

Main Entrance Photo NYC Department of Education Building Assessment Survey 2017-2018 Facade A - 30th Place Roof Photo Have any Systems/Major Building Components been upgraded? Nil Systems: Window replacement; Window Guards replacement; Exterior Wall repointing and Lintel repairs; Partial Floor structure repairs - Room 254 and corridor adjacent to the classroom Year: 2015 Systems: Limited floor structure repairs; Limited foundation flood elimination; crack monitor installation in the cafeteria Year: 2014 Systems: New Weight Room, Yoga Room, Staff Lounge and Library Year: 2013 Systems: Interior upgrade; Windows replacement; Guards replacement Year: 1995 Have there been any New Building Additions? Tandem Schools? Leased Space? Year Leased 1995 Inspection Partial Inspection Priority Priority Exist Last Year? Priority Category Description Component Affected Location Description Person(s) tified Person(s) Title PhotoImage condition recorded Structural Engineer Required Structural Type Description Component Affected Location Description Person(s) tified Person(s) Title PhotoImage condition recorded Accessibility Accessibility Status Is the primary or secondary entrance on an accessible route? Is the building a multi-story building? Are all floors of the building accessible through compliant means? Accessible classrooms exists on each floor? PB/A&W Page 2 of 18

Accessibility Status Building Assessment Survey 2017-2018 Boys and Girls or Unisex accessible toilets exist on at least every other floor? If the following spaces exist, are they ALL accessible? Art Room, Auditorium, Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, Science Labs Physical Breakdown Structure Exists Complies Required FUNCTIONAL ACCESSIBILITY Exterior Routes Exterior Entrances & Exits Exterior H/C Lifts Exterior Ramps and Railings Interior Routes Corridor and Lobby H/C Lifts Interior Corridor Doors and Hardware Interior Corridors and Lobbies Interior Elevators Interior Lobby Doors and Hardware Interior Ramps Rooms & Spaces Art Rooms Room 251 Auditorium Cafeteria 1st Floor - Students, 1st Floor Staff Classrooms 1st - 2nd Floor Computer Rooms Room 268 Gymnasium 2nd Floor Library 2nd Floor Main Office Room 206 Multi-purpose Room Nurse's Room Room 116 Pool Science Lab Room 233, 235 Toilet Rooms (Boys) 1st - 2nd Floor Toilet Rooms (Girls) 1st - 2nd Floor Toilet Rooms (Staff) 1st - 2nd Floor PB/A&W Page 3 of 18

Building Template NYC Department of Education Building Assessment Survey 2017-2018 Inspection Architectural EXTERIOR AREAWAY AWNINGS AND CANOPIES CHIMNEY COPING CORNICE DOORS DOORS AND FRAMES DOOR HARDWARE LINTELS TRANSOM/SIDE LIGHT EXTERIOR WALLS Material Type(s) t Required t Required 3 - Fair Masonry Replacement Quantity 13,000 Replacement Uom Instance on All Facades Instance Instance Quantity 13,000 Instance EXTERIOR SOFFITS PB/A&W Page 4 of 18

Building Assessment Survey 2017-2018 EXTERIOR EXTERIOR SOFFITS LOADING DOCK t Required LOUVER PARAPETS t Required PLAZA DECK ROOF t Required STAIRS/RAMPS: EXTERIOR BUILDING CHEEK/FLANK WALLS RAILINGS STAIRS/RAMPS WINDOWS Replacement Quantity 2,000 Replacement Uom EXTERIOR GUARDS LINTELS WINDOWS Material Type(s) Aluminum Instance on Aluminum - Double Hung: Facade A, B, D Instance 1 - Good Instance Quantity 2,000 Instance Installation Year 2015 Source of Installation Custodial Staff POOLS STRUCTURAL COLUMNS/BEAMS/BEARING WALLS FLOOR STRUCTURE Location/Instance 3 - Fair METAL DECK AND CONCRETE: DETERIORATED Boiler Room PB/A&W Page 5 of 18

Building Assessment Survey 2017-2018 STRUCTURAL FLOOR STRUCTURE Quantity 10 REPAIR Purpose of Action LEVEL 5 Photo1 Boiler Room CONCRETE SLAB ON GRADE: MINOR CRACKS Location/Instance Electric Panel Room Quantity 50 REPAIR Purpose of Action LEVEL 5 Photo1 FOUNDATION WALLS Material Type(s) ROOF STRUCTURE VAULTS-BUNKERS AUDITORIUM CAFETERIA Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Instance on 1st Floor - Staff (500 SF) Electric Motor Room, Boiler Room similar Concrete t Required PB/A&W Page 6 of 18

Building Assessment Survey 2017-2018 CAFETERIA Instance on 1st Floor - Students Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Fixed Equipment Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Instance on 1st Floor - Students VINYL TILES: BROKEN/DETERIORATED/MISSING TILES Location/Instance Along the perimeter by the Staff Cafeteria Quantity 10 Photo1 Along the perimeter by the Staff Cafeteria Sliding-folding Partition Stage Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Instance on 1st Floor - Students Instance on 1st Floor - Staff (500 SF) Window Curtains/Shades/Blinds Instance on 1st Floor - Students PB/A&W Page 7 of 18

CAFETERIA Window Curtains/Shades/Blinds Instance on 1st Floor - Staff (500 SF) CLASSROOMS/CORRIDORS/ADMIN SPACES Location/Instance Quantity 50 VINYL TILES: DETERIORATED SUBSTRATE Corridor near Rooms 121, 215, 249, by 2nd Floor Girls Toilet, Stair H/1, and others Photo1 NYC Department of Education Building Assessment Survey 2017-2018 Corridor near Stair H/1 Location/Instance Quantity 20 GLASS BLOCK: DAMAGED/MISSING Corridor near Room 206 (main office), by 2nd Floor main corridor stair, near the Library Photo1 PB/A&W Page 8 of 18

Building Assessment Survey 2017-2018 CLASSROOMS/CORRIDORS/ADMIN SPACES Corridor near Room 206 Location/Instance Quantity 100 GYPSUM BOARD: DETERIORATED Room 235 (rear entrance), corridor near Rooms 202, 217, 235, 1st Floor Boys Toilet, and others Photo1 Corridor near Room 278 Specialties Classroom Locker(s) Fixed Seating GYMNASIUM Fixed Equipment Location/Instance Quantity 50 WOOD: DAMAGED/DETERIORATED Toward the rear by the windows, near the Boys Locker Room (Damaged and minor warping) PB/A&W Page 9 of 18

Building Assessment Survey 2017-2018 GYMNASIUM Photo1 Seating Sliding-folding Partition Stage Window Curtains/Shades/Blinds DOOR HARDWARE GUARDS KITCHEN Instance on 1st Floor Instance on 1st Floor Instance on 1st Floor Instance on 1st Floor Instance on 1st Floor Near the Boys Locker Room 3 - Fair PB/A&W Page 10 of 18

Building Assessment Survey 2017-2018 KITCHEN LIBRARY Built-in Furnishing ACOUSTIC TILES: DAMAGED/MISSING Location/Instance At the rear by the window Quantity 25 Photo1 At the rear by the window GYPSUM BOARD: DETERIORATED Location/Instance At the rear by the room next to the window Quantity 10 PB/A&W Page 11 of 18

LIBRARY Photo1 NYC Department of Education Building Assessment Survey 2017-2018 At the rear by the room next to the window LOCKER ROOM - Boys (75 Lockers) Alternative use - Girls (75 Lockers) Alternative use - Boys (75 Lockers) - Girls (75 Lockers) - Boys (75 Lockers) - Girls (75 Lockers) - Boys (75 Lockers) - Girls (75 Lockers) Locker Room Lockers - Boys (75 Lockers) DAMAGED UNITS Location/Instance Near locker 22 Quantity 1 EACH PB/A&W Page 12 of 18

LOCKER ROOM Locker Room Lockers Photo1 NYC Department of Education Building Assessment Survey 2017-2018 Near locker 22 - Boys (75 Lockers) - Girls (75 Lockers) MULTI-PURPOSE ROOM SCIENCE DEMO ROOM SCIENCE LAB Instance on Rooms 233, 235 Alternative use Fixed Equipment Instance on Rooms 233, 235 SCIENCE PREP ROOM Instance on Room 234 Alternative use Fixed Equipment Instance on Room 234 CABINETRY: MISSING/DAMAGED Location/Instance Room 234 Quantity 2 L.F. PB/A&W Page 13 of 18

SCIENCE PREP ROOM Fixed Equipment Photo1 NYC Department of Education Building Assessment Survey 2017-2018 Room 234 SHOWER ROOM - Boys Alternative use - Girls Alternative use - Boys - Girls - Girls - Boys - Boys - Girls - Boys CERAMIC TILE: BROKEN/ MISSING Location/Instance Near the entrance Quantity 5 PB/A&W Page 14 of 18

SHOWER ROOM Photo1 NYC Department of Education Building Assessment Survey 2017-2018 Near the entrance STAIRS/RAMPS: Do Letter Stair Signs Exist? 5 - Poor METAL CLAD WOOD: DETERIORATED DOOR Location/Instance Stars D/2, E/2 Quantity 2 EACH MAINTENANCE Photo1 Stair E/2 Partition Railings Stairs and Landings Location/Instance Stair H/2 Quantity 10 GYPSUM BOARD: DETERIORATED PB/A&W Page 15 of 18

Building Assessment Survey 2017-2018 STAIRS/RAMPS: Photo1 TOILET ROOMS - STAFF Stalls TOILET ROOMS - STUDENTS Stalls Location/Instance Stair H/2 CERAMIC TILE: BROKEN/ MISSING 1st Floor Boys, Girls PB/A&W Page 16 of 18

Building Assessment Survey 2017-2018 TOILET ROOMS - STUDENTS Quantity 10 Photo1 1st Floor Boys LIFE SAFETY F.D. HOLDING AREA STEEL STAIRS SITE CONTAINERIZATION Drainage System for Asphalt Drainage System for Concrete Drainage System for Soil DRINKING FOUNTAINS FENCES IRRIGATION SYSTEM PAVING Student n-use Student Use Site Sidewalks & Walkways DOT Sidewalk Asphalt Concrete 3 - Fair DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance 48th Avenue Quantity 50 PB/A&W Page 17 of 18

SITE PAVING DOT Sidewalk Concrete Photo1 NYC Department of Education Building Assessment Survey 2017-2018 48th Avenue Pavers PLAYGROUNDS PLAYING SURFACE RETAINING WALLS SEATING SITE WALLS (NOT RETAINING WALLS) STAIRS/RAMPS: EXTERIOR PB/A&W Page 18 of 18