New Hope-Solebury School District Campus Revitalization Plan

Similar documents
CUMBERLAND SCHOOLS WORK PROPOSED 2018

RGM Architects. Eduardo Mata Elementary School

PROGRAM AREAS - MIDDLE SCHOOL

Michigan State University Barrier-Free/Accessibility Project Status Summary December 2017

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update

GREAT FALLS HIGH SCHOOL MASTER PLAN. GFHS Master Plan Task Force

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE

Tisbury Elementary School

Corvallis School District 2002 Long Range Facilities Master Plan Projects Update

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures

NYC Department of Education

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

Charles Kozminski Elementary Community Academy

FREEHOLD BOROUGH SCHOOL DISTRICT. Proposed Referendum Schematic Designs & Preliminary Costs

Facilities Construction

2019 SUMMER CONSTRUCTION PROGRAM 4/16/19

ProgID Title Description FY18 FY19 MOF

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT

Americans with Disabilities Act Transition Plan Barrier Removal Database Project Listed by Type

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017

BRIEFING SUMMER What is RLI? Overview of On-Campus Housing: Facts at a Glance. Why is RLI important? The challenge. Planning


Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Facilities Construction

CITY OF NORTH MANKATO CAPITAL ASSET POLICY ADOPTED: JANUARY 1, 2003 REVISED EFFECTIVE: _JANUARY 1, 2016

CONSTRUCTION COST ESTIMATE AND ANALYSIS

Local Ballot Measure: E. Enterprise Elementary School District Bond Measure

Design Phase Award Structural Steel (Early Package) Award Final GMP for Remaining Project Construction Phase

PLUMBING SYSTEMS CHAPTER 29

Athletics AT-SR. Storage 181E. 272 Auditorium 182F. Storage. 182D Nurse. 181K Workroom. 182G Cot Room 182E. Office. Restroom. Restroom.

William Howard Taft High School

POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY PTA PRESENTATION MAY 15, 2013

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

320 Bay Street TORONTO ONTARIO. Tracy Macdonald Vice President,

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

EXISTING EDUCATIONAL & ANCILLARY PLANT

No Surprises: What You Need to Know About the TPRs and Cost Segregation. Trent Baeckl, CPA Tax Senior Manager

Architectural Renderings. The following is intended to provide a preview of renovations and additions planned for McKinney High School.

Eastgate Office Park BELLEVUE, WASHINGTON

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

Facilities Construction

Final RRISD Bond 2018/19 Project List 3 Yr Sale

EASTGATE OFFICE PARK

Facilities Construction

Agenda. 28 Sep 2015 SPRC #4. Pg 1

32,610 RSF CLASS A INNOVATIVE WORKSPACE

53,500 RSF CLASS A INNOVATIVE WORKSPACE INNOVATION PARK OAKPOINT REAL ESTATE 1

M E E T I N G NOT E S

Waverley Elementary School Feasibility Study

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

F A C I L I T I E S P L A N N I N G & C O N S T R U C T I O N

STUDENT HOUSING BUSINESS AWARDS BEST RENOVATION OF AN EXISTING PROJECT

Element Z General Design Requirements Owner Standards and Other Requirements

CONVERTING TO MEET THE NEED MAY 2015

EASTGATE OFFICE PARK

THE NEMOURS BUILDING FOR LEASE THE NEMOURS BUILDING 1007 N. ORANGE STREET. Wilmington, DE N.

THE NEMOURS BUILDING FOR LEASE THE NEMOURS BUILDING 1007 N. ORANGE STREET. Wilmington, DE N.

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619

STATE UNIVERSITY of NEW YORK PROJECT CAPITALIZATION FORM (PCF) INSTRUCTIONS

Facilities Construction

NYC Department of Education

1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System

Facilities. A Brief Overview: How to Secure a Facility for Your. Charter School

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

Facilities Construction

Technical Specifications

Shoreview Corporate Center

WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes

Equality and Access Plan The Abbey School, Reading

2016 Governor's Infrastructure Financing Conference. Eastham House A Center for Community Philanthropy

Florida A&M University Facts and Statistics

Facilities Construction

Pocatello High School New Building Addition Board Interview

Building Re-use Presentation. A look at City Hall, the Police Station and the Briscoe Building. December 6, 2016

DOMUS, INC. P:

MOUNT GRAVATT- CAPALABA ROAD

SHAWNEE MISSION HEALTH - OVERLAND PARK, KANSAS

EASTGATE OFFICE PARK

Request for Letters of Interest Lease of the Preschool Building at Bloedel Donovan Park

STUDENT HOUSING BUSINESS AWARDS BEST RENOVATION OF AN EXISTING PROJECT

FORMER EDUCATIONAL FACILITY HOAGLAND RD., HOAGLAND, IN FOR SALE PROPERTY HIGHLIGHTS FOR SALE: $275,000

(Chapter Flood Damage Prevention)

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016

OFFERING MEMORANDUM. 415 Washington Street. Waukegan, IL PRESENTED BY: COLLIERS INTERNATIONAL

Facility Acquisition- Beyond Compliance

CENTURY OFFICE CAMPUS. 4, 5 & 6 Century Drive, Parsippany, N.J.

SHARPSVILLE AREA SCHOOL DISTRICT

NEW OFFERING. 1,385-6,037± Square Feet of High Exposure Retail/Restaurant/Office

Smith Property Holdings Buchanan House, LLC. Nan Terpak, Agent/Attorney 2200 Clarendon Boulevard, 13th Floor Arlington, Virginia 22201

FIXED ASSET PROCEDURES

10. BUILDINGS. PREDICTED TOTAL AREA (THECB), 2006 e&g sf 810,794. ACTUAL (THECB), 2006 e&g sf 551,516. DEFICIT (THECB), 2006 e&g sf [259,278]

TENANT DESIGN MANUAL UPDATED AUGUST 2015

FOR LEASE N. WEST STREET Wilmington, DE N. WEST STREET Wilmington, DE

SCOTIA PLAZA Building Specifications

Entertainment Venue. Dennis Breske CCIM, MBA, SIOR

Design Development Presentation New North Richland Middle School // Birdville ISD

WORKSHEET FOR ACCESSIBILITY UPGRADE REQUIREMENTS FOR EXISTING NON-RESIDENTIAL BUILDINGS

Transcription:

Campus Revitalization Plan 20 January 2016 GODSHALL KANE O ROURKE ARCHITECTS, LLC 12 East Butler Avenue, Suite 205, Ambler, PA 19002 T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com

Site Rendering Overall Site Plan: Create Drop off Loop for High School. Re-crown athletic Field No. 2 Provide perimeter drainage around inside of track. Resurface existing track. Adds several Additions to High School as shown in blue. Eliminates the traffic back-ups on Bridge Street associated with the High School Dropoff by relocating the High School Entrance. Adds an Access Drive to connect the Stadium Parking Lot with Campus Drive. Create West Drive to provide second means of access to Bridge Street. Miscellaneous Site Improvements as noted. Provide Campus wide signage. Create Accessible Pathways to Athletic Field No. 9 and Basketball courts. Page: 2

Overview of Project Overall Project: Included: Relocates HS Administration for improved security. Relocates MS Administration for improved security. Creates an enclosed link between the High School and Middle School. New Fitness Center in Building New Science Lab. One additional Room Expanded Auxiliary Gym connected to MS Gym. New Graphic Arts Lab near science wing. Reconstruct Senior Corridor and provide new Classrooms. Rooms remain in current location. Risers removed. Budget: Infrastructure = $10,664,150 Additions = $13,177,850 Soft Costs = $ 4,708,000 Approx. Total $28,550,000 Partial Second Floor Plan First Floor Plan Page: 3

First Floor Plan Changes First Floor Plan: HS Parent Drop Off SGI HS Admin Fitness HS Guid. Fac Library SGI Graphic Cafeteria Art HS GYM Ceramics Cafeteria Choral Nurse Enclosed Walkway LGI FCS MP Room MS GYM Security Improvements: Tech MS Admin Relocates HS Administration Relocates MS Administration Creates an enclosed link between the High School and Middle School. New Fitness Center in Building Bus Drop Off MS Parent Drop Off Extends main corridor between Entrances. Page: 4

First Floor Plan Changes First Floor Plan: HS Parent Drop Off SGI HS Admin Fitness HS Guid. Fac Library SGI Graphic Cafeteria Art HS GYM Ceramics Cafeteria Choral Nurse Enclosed Walkway LGI FCS MP Room MS GYM Program Improvements: Tech MS Admin New Large Group Instruction Room New Science Lab Two new Classrooms One additional Room One additional Art Room Bus Drop Off MS Parent Drop Off Expanded Auxiliary Gym Page: 5

First Floor Plan Changes First Floor Plan: HS Parent Drop Off SGI HS Admin Fitness HS Guid. Fac Library SGI Graphic Cafeteria Art HS GYM Ceramics Cafeteria Choral Nurse Enclosed Walkway LGI FCS Condition Improvements: MP Room MS GYM Tech MS Admin Reconstruct Senior Corridor and provide new Classrooms. Renovate MS & HS Locker Rooms MS Parent Drop Off ADA Improvements throughout; toilet rooms, music rooms risers, etc. Bus Drop Off Page: 6

Second Floor Plan Changes Second Floor Plan: Sci Sci Sci Sci Sci Sci Science DAO Page: 7

Exterior Rendering Page: 8

Exterior Rendering Page: 9

Exterior Rendering Page: 10

Exterior Rendering Page: 11

Exterior Rendering Page: 12

Building Phase 1 June, 2016 Dec., 2016 Construction of H.S. Admin. & Fitness Center Construction of M.S. Gym & Locker Rooms Connection between addition & 2-story building Renovations of Art & F&CS Renovations to I.T. area & Classroom Page: 13

Building Phase 2A Jan., 2017 June, 2017 Construction temporary covered walkway Construction of connection between H.S. & M.S. Construction of Senior Corridor Classrooms & Library Modifications Access from 2-story bldg. through new Art Corridor Page: 14

Building Phase 2B June, 2017 Aug., 2017 Complete H.S./M.S. connection Renovate 2-story building Complete connection at 2-story bldg. & Addition Renovate S.D. Admin. Area Renovate H.S. Guidance area Page: 15

Building Phase 3A June, 2017 Aug., 2017 Construction of F&CS in M.S. Renovate Cafeteria & Kitchen area Begin renovation s in Rooms Renovate H.S. Gym Begin construction of H.S. Locker Rooms Perform work in Corridors Page: 16

Building Phase 3B Sept., 2017 Dec., 2017 Complete H.S. Gym & Locker Rooms Complete Band Room renovations Page: 17

Building Phase 4 Jan., 2018 Aug., 2018 LGI construction & courtyard modifications Renovations to Tech Wing HVAC & lighting work in M.S. Complete Auditorium, Lobby & Corridors in H.S. Renovate Nurse s area Page: 18

Design Option Infrastructure Upgrades Architectural Features: Weather Protection repair to Exterior Walls at Gymnasiums New Finishes; Flooring, Ceilings and Wall Paint in public areas and replace older Doors New Corridor Lockers New Casework in 38 Building and balance of Science Rooms Accessibility Upgrades to Public spaces and Locker Rooms Accessibility access to all Teaching Spaces, Locker Rooms and Toilet Rooms. Plumbing Features: Replace older Drinking Fountains Replace older Plumbing Fixtures and to address ADA issues Mechanical Features: New High Efficiency Boiler Plant Central Chiller for High School Replace Air Handling Units / Eliminate R-22 Refrigerant Eliminate older Unit Ventilators Provide 4 Pipe Air Conditioning System for Middle School New HVAC Controls Energy Efficiency and Energy Management Electrical Features: New Generator capable of handling additional loads Replace older Electric Panels in 38 building New Fire Alarm System for both the High School and Middle School Additional Security System including Door Access Control and Camera Locations Upgrade to Data System Distribution Cable. Energy Efficient LED Lighting throughout High School and Middle School Provide Daylight Harvesting for Lighting and Energy Savings New Integrated Clock System and Public Address System for High School and Middle School New Sound Systems for Gym and Auditorium (Summer of 2015) Page: 19

Discussion Thank you for your Time: Page: 20