1 CITY OF CITRUS HEIGHTS PLANNING COMMISSION MEETING MINUTES 1. CALL MEETING TO ORDER Vice Chair Blair called the meeting to order at 7:00 PM. 2. OATH OF OFFICE ADMINISTERED TO MICHAEL LAGOMARSINO Planning Commission Secretary Ramsay administered the oath of office to new Planning Commissioner Michael Lagomarsino. 3. ROLL CALL Commission Present: Blair, Cox, Duncan, Lagomarsino, Schaefer, Weiland Absent: None Staff Present: Bermudez, Flores, Kempenaar, McDuffee, Norvell, Ramsay, Sherman 4. FLAG SALUTE Michael Lagomarsino led the flag salute. 5. PUBLIC COMMENT Albert Fox thanked the Planning Commission and staff for the time he worked with them while serving on the Planning Commission. 6. CONSENT CALENDAR The meeting minutes for May 24, 2017 were approved as submitted. M/S: Weiland/Duncan AYES: 5 (Blair, Cox, Duncan, Schaefer, Weiland) ABSTAIN: 1 (Lagomarsino) 7. PUBLIC HEARING A. QUANTUM CARE PLACE LLC 6550 GREENBACK LANE: Project Planner Kempenaar presented a request for approval of a Use Permit, Minor Use Permit, Design Review Permit and Tree Permit to allow development of a 32,000 square foot 63-bed senior care facility. This project is categorically exempt from further environmental review under the provisions of Section of the California Environmental Quality Act, relating to infill developments.

2 Commissioner Schaefer recused himself from the Dias due to a potential conflict of interest. There was Planning Commission and staff discussion. Commissioner Weiland asked if there is a bike lane or any other space where cars can slow down before entering the driveway. Mr. Kempenaar said that our Engineering Department determined that the driveway was designed well enough to accommodate the cars. Commissioner Weiland asked what the noise restrictions would be for deliveries. Mr. Kempenaar said that there would be a 6-foot wall noise barrier and deliveries would only take place during daytime hours. Commissioner Duncan asked if there was research done on the number of senior facilities there are in Citrus Heights. Mr. Kempenaar said he did not have an exact number. Commissioner Cox asked if the 27 parking spaces included guest parking and will it be enough? Mr. Kempenaar said that the Zoning Code establishes the standards based on the use. The applicant is requesting to exceed the parking as it is a concern. Vice Chair Blair opened the public hearing. Applicant, Jeremy Sutter, Architect for the project said he would answer any questions or concerns. They are very excited about the project. Dr. Shelton Duruisseau said he is part owner and they are committed to being a good neighbor and a community resource. He has worked in health care for the past 42 years and he is very familiar with this type of service. Bruce Hackbart voiced concerns with drainage and flooding issues. Nancy Hackbart voiced concerns regarding the height of the fence and said it should be 8-feet. Thomas Spencer spoke in opposition to this project and has concerns regarding traffic, parking and drainage. Teresa Mabry voiced concerns regarding drainage. Tim Hudson spoke in opposition to the project and has drainage concerns. Steve Simpson voiced concerns regarding drainage and parking. 2

3 Mickey spoke in opposition to the project with concerns about noise during deliveries. Principal Civil Engineer Chris Fallback said they are working with residents to address drainage concerns. Vice Chair Blair closed the public hearing. Commission Comments Commissioner Cox said that she feels the concerns are serious and valid and suggested that an 8-foot fence be proposed for privacy concerns. Commission Duncan said he has several concerns. Commissioner Weiland said he would like to see the drainage issues addressed and also feels that wall should be 8-feet. Commissioner Lagomarsino said that these concerns should have been brought to the City s attention. The Applicant addressed the Commission s concerns. Vice Chair Blair called for a motion. Motions: 1. Find that the project is Categorically Exempt from CEQA per Section of the California Environmental Quality Act, relating to Infill Developments; 2. Approve a Use Permit to allow for the operation of a 63-bed Senior Care Facility (Medical Services Extended Care) based on the findings and conditions of approval contained in the staff report; with an addition to require a parking management plan. 3. Approve a Design Review Permit to allow for the construction of a 32,000 square foot, 63-bed facility on an existing 1.85 acre site based on the findings and conditions of approval contained in the staff report; with an amendment to condition of approval #8. 4. Approve a Minor Use Permit to allow for the project to exceed the maximum parking allowed in the Zoning Code based on the findings and conditions of approval contained in the staff report; and 3

4 5. Approve a Tree Permit for the removal of numerous trees onsite based on the findings and conditions of approval contained in the staff report. M/S: Weiland/Duncan AYES: 5 (Blair, Cox, Duncan, Lagomarsino, Weiland) CONDITIONS OF APPROVAL FOR USE PERMIT (FILE # UP-17-01) 1. The applicant shall comply with all City of Citrus Heights Codes and Regulations, including but not limited to the Citrus Heights Municipal Code and Zoning Code, Uniform Building Code; Uniform Fire Code and Sacramento County Environmental Health Department standards. 2. The project is approved as described in this report and as shown in Exhibits A through L and described in the Applicant s project description (Exhibit A) and shall conform to all conditions of approval and exhibits included within this project for the construction of a 32,000 square foot 63-bed senior care facility. [Planning] 3. Minor modifications to the design of the project, including site layout, colors and materials, may be approved by the Community and Economic Development Director provided such changes are consistent with the overall design as approved herein. Major modifications will require Planning Commission approval. [Planning] 4. The Use Permit approval is valid for two years and shall expire and become void if not exercised or an extension of time has been granted in accordance with Zoning Code Section A. [Planning] 5. Construction access to the site shall be restricted to access from Greenback Lane. No access to the site shall be from Creek Haven Drive. [Planning] 6. The following operational restrictions shall be adhered to at all times: a. Services Deliveries Limited to 7AM to 5PM b. Solid Waste Removal Limited to 8AM to 7PM c. Emergency Generator Maintenance Limited to 10AM to 5PM [Planning] 7. The applicant shall develop a Parking Management Plan that addresses employee parking, shift changes, visiting medical professionals and visitors. Should parking issues arise, as determined by the Planning Division, the applicant shall modify its operations in order to ensure parking does not impact the surrounding neighborhood. The applicant is responsible for implementing any 4

5 measures determined necessary to ensure parking does not spill into the adjacent neighborhood. [Planning]. 8. Developer agrees to indemnify, defend, and hold harmless the City, its officials, officers, employees, agents and consultants from any and all administrative, legal or equitable actions or other proceedings instituted by any person not a party to this permit challenging the validity of the Agreement or any Project Approval or any Subsequent Project Approval, or otherwise arising out of or stemming from this Agreement. Developer may select its own legal counsel to represent Developer s interests at Developer s sole cost and expense. The parties shall cooperate in defending such action or proceeding. Developer shall pay for City's costs of defense, whether directly or by timely reimbursement on a monthly basis. Such costs shall include, but not be limited to, all court costs and attorneys' fees expended by City in defense of any such action or other proceeding, plus staff and City Attorney time spent in regard to defense of the action or proceeding. The parties shall use best efforts to select mutually agreeable defense counsel but, if the parties cannot reach agreement, City may select its own legal counsel and Developer agrees to pay directly or timely reimburse on a monthly basis City for all such court costs, attorney fees, and time referenced herein. [Planning] CONDITIONS OF APPROVAL FOR DESIGN REVIEW PERMIT (FILE # DRP ) General Conditions 1. The applicant shall comply with all City of Citrus Heights Codes and Regulations, including but not limited to the Citrus Heights Municipal Code and Zoning Code, Uniform Building Code; Sacramento Metropolitan Fire District fire and life safety codes, Sacramento County Environmental Health Department standards. 2. The project is approved as described in this report and as shown in Exhibits A through L and described in the Applicant s project description (Exhibit A) and shall conform to all conditions of approval and exhibits included within this project for the construction of a 32,000 square foot 63-bed senior care facility. [Planning] 3. Minor modifications to the design of the project, including site layout, colors and materials, may be approved by the Community and Economic Development Director provided such changes are consistent with the overall design as approved herein. Major modifications will require Planning Commission approval. [Planning] 4. The applicant shall submit construction plans to other permitting agencies as required by the project, including Sacramento Metropolitan Fire District, Citrus 5

6 Heights Water District, Sacramento County Environmental Health, Sacramento Area Sewer District, and Sacramento Municipal Utility District. 5. This Design Review Permit approval does not include any signs. All sign plans must receive separate review and approval by the Planning staff prior to installation of any new signs. [Planning] 6. All outdoor lighting including parking lot lighting shall be designed with full shields, and cut off flat lenses to ensure that all light from any fixture will not direct light skyward, and will minimize light pollution consistent with Section of the Zoning Code. Flood lights are strictly prohibited. [Planning] 7. Building plans shall demonstrate that the rooftop equipment will be screened from public view to the satisfaction of the Planning Division. [Planning] 8. The trash enclosure and masonry walls shall be coated with anti-graffiti coating. The masonry wall surrounding the site shall be a minimum of 8 in height along the east, south, and western property lines adjacent to existing residences subject to Planning Division Approval [Planning] 9. The project applicant shall develop a Construction Traffic Management Plan to the satisfaction of the City s General Services Department. The plan would include items such as: the number and size of trucks per day, expected arrival/departure times, truck circulation patterns, location of truck staging areas, employee parking, and the proposed use of traffic control/partial street closures on public streets. The overall goal of the Construction Traffic Management Plan would be to minimize traffic impacts to public streets and maintain a high level of safety for all roadway users. The Construction TMP shall adhere to the following performance standards throughout project construction: a) Delivery trucks do not idle/stage on Greenback Lane b) Any lane closures along the project s frontages are limited to a single lane during off-peak hours (8:30 AM to 3:30 PM). c) All construction employees shall park on-site or in designated lots owned or leased by the applicant. d) Roadways, sidewalks, crosswalks, and bicycle facilities shall be maintained clear of debris (e.g., rocks) that could otherwise impede travel and impact public safety. [Planning] 10. Provide bicycle parking facilities per City of Citrus Heights requirements near building entrances. [Planning] 6

7 11. Prior to installation of Landscaping, the project Landscape Architect shall submit documentation to the City that demonstrates: a) Soil has been tested and prepared as necessary based on the Soils Analysis. b) The Irrigation has been installed compliant with the Zoning Code and approved landscape plan. c) Tree planting sites comply with the minimum soil volume as identified in the Zoning Code and landscape plan. [Planning] 12. The site s stormwater discharge for post-development shall be limited to the flow exiting the site during pre-existing conditions. [Engineering] 13. The proposed 8-inch waterline on the west side of the site is located on City property. All landscaping and/or paved areas on the parcel (APN: ) shall be restored to the City s satisfaction. [Engineering] 14. Property owner shall acquire the proposed 20-ft wide water easement located on adjacent City owned parcel to the west. [Engineering] 15. Existing sidewalks and the proposed driveway along Greenback Lane shall comply with all state and federal accessibility (ADA) requirements. [Engineering] 16. Prior to Final of Building Permit the applicant shall abandon the existing onsite well according to Sacramento County standards. [Planning] 17. Construct a street barricade at the end of Creek Haven Way per City requirements. The barricade shall be located in front of the proposed masonry wall within the existing ROW for Creek Haven Way. [Engineering] 18. Any work within the City s Right-of-Way (ROW) requires an Encroachment Permit from the General Services Department. [Engineering] 19. All Engineering Development Impact Fees shall be paid prior to issuance of any building permits. Fees are calculated under the Care Facility use: a. Roadway Impact Fees ($ per room) b. Transit Impact Fees ($ per room) c. Administration Fees ($12.88 per room) i. Drainage Fees ($13,237 per acre Commercial Use) 20. To obtain sewer service for this proposed project, construction of onsite and offsite sewer infrastructure shall be required to the satisfaction of SASD. [SASD] 21. SASD Design Standards apply to any onsite and offsite sewer construction. Field modifications to new or existing precast manhole bases are not allowed. [SASD] 7

8 22. SASD requires their sewers to be located a minimum of 10 feet (measured horizontally from edge of pipe to edge of pipe) from all potable water lines. Separation of sewer line from other parallel utilities, such as storm drain and other dry utilities (electrical, telephone, cable, etc.) must be a minimum of 7 feet (measured horizontally from the center of pipe to the center of pipe). Any deviation from the above separation due to depth and roadway width must be approved by the SASD on a case by case basis. During the submission of the improvement plans, the applicant has to demonstrate this condition is met. [SASD] 23. SASD and Regional San may require additional sewer impact fee payments in accordance with each District s Ordinances. Fees are to be paid prior to the issuance of building permits. Applicant should contact Permit Services Unit at (916) for sewer impact fee information. [SASD] 24. Owner/ developer shall have all water related infrastructure shown on the Improvement Plans in compliance with SSWD's Regulations Governing Water Service (Regulations) as well as Improvement Standards and Technical Specifications (Standards). [SSWD] 25. Owner/ developer shall pay all applicable water related fees to SSWD per Regulations. [SSWD] 26. Owner/ developer shall grant easements to SSWD for both existing and proposed water related infrastructure located on the parcels. Easement widths shall be current Standards. The current standard easement width is 20-feet wide. [SSWD] 27. Any relocation of existing water related infrastructure shall be depicted on the plans and performed at owner/ developer's expense. [SSWD] 28. Dead-end fire access roads greater than 150 long, shall be provided with an approved fire apparatus turnaround conforming to SMFD Fire Prevention Standard 3. Turn-around shall be located within 50 feet of the end of the access roadway. [Fire] 29. Show the design for a fire access roadway of not less than 20-feet of unobstructed width, 13-feet, 6-inches of vertical clearance, and turning radii of 25 feet inside and 50 feet outside dimension on the improvement plans. The access roadway shall extend to within 150 feet of all portions of the exterior walls of the first story of any proposed building. The use of turf-block or grass-crete or similar alternate road surfaces is not approved for installation in fire apparatus access roadways. [Fire] 30. Show on the plans how Fire Lanes will be marked. Fire Lane identification shall be provided along the required fire access roadway. Fire Lane identification shall 8

9 be in accordance with the Sacramento Metro Fire Districts Fire Prevention Standard #3 and the California Vehicle Code. Vehicle parking is prohibited on any street less than 28 feet in width. Vehicle parking is permitted on both sides of streets 36 feet or more in width. Roadway widths shall be measured between the gutter-line or edge of pavement on opposite sides of the road. Identification of fire apparatus access roadways may be required on private roads. [Fire] 31. Provide a note on the plan that reads, Fire access roadways shall be built to bear a minimum of 80,000 pounds and meet the Sacramento County Public Works Standards for roadways. A report, prepared by a registered geotechnical engineer, verifying the ability of the road to bear the required minimum weight, shall be submitted with any plan indicating construction of roadway. Verification of constructed roadway shall be provided by a registered geotechnical engineer prior to final of the project. [Fire] 32. Show the location of the required fire hydrants for this project on the improvement plans. Approved fire hydrants capable of providing the required fire flow for the protection of any and all structures shall be located along the fire apparatus access roadway. The required fire hydrants shall be installed and operational prior to any construction or on-site storage of combustible materials. The minimum required fire flow for the protection of commercial developments is 1,500 gallons per minute (gpm) at a pressure of 20 pounds per square inch (psi) for a two-hour duration. 33. Show the location of the required fire department connection (FDC). The FDC shall be located on the address side of the building and within 40 feet of an approved fire hydrant. [Fire] Prior to Issuance of Building Permits 34. Final detailed landscaping and irrigation plans for the project site shall be submitted and approved by the Planning Division. [Planning] 35. The applicant shall obtain final approval and issuance of the Tree Permit associated with the project. [Planning] 36. Provide building height and area calculations in substantial conformance with 2016 CBC Chapter 5. [Building] 37. The applicant shall provide improvement plans that address post best management practices for storm water quality. [Engineering] 38. The applicant shall meet the following: Civil Site Plans and Architectural Plans shall be submitted and approved prior to Final Building Permit being issued. Fire Service Underground, Fire Sprinkler and Fire Alarm plans shall be submitted prior to Final Building Permit being issued. Please note: The Sacramento Metro 9

10 Fire District does not allow deferred submittals for Fire Sprinkler and/or Fire Alarm plans. [Fire] Prior to Final Occupancy 39. Prior to Final of Building Permit, the project Landscape Architect shall: a) Certify in writing that the landscaping has been installed in compliance with the Zoning Code and approved landscape plan. b) Demonstrate and certify in writing that the irrigation has been installed and is in compliance with the Zoning Code and landscape irrigation plans. The City may require an irrigation audit performed by a certified irrigation auditor. [Planning] 40. Prior to the Final of Building Permits, the applicant shall call for inspection by the Planning Department to verify compliance with the approved plans. [Planning] 41. All site improvements shall comply with all accessibility standards including the UBC and the American Disability Act (ADA) requirements. [Building] 42. Dedicate Right-of-Way (ROW) along Greenback Lane to the back of existing sidewalk. [Engineering] 43. Dedicate Public Utilities Easement (PUE) along Greenback Lane adjacent to the new ROW. Minimum width for easement is 12.5 feet. [Engineering] 44. Dedicate a 10-ft wide Drainage Easement for the existing storm drain line located in the NE corner of the parcel. Existing pipe shall be centered within the easement. [Engineering] 45. Site shall meet the pre and post Best Management Practices (BMP s) for Stormwater Mitigation per State of California requirements. Stormwater runoff must be filtered prior to exiting the site. [Engineering] 46. Property owner shall enter into a storm-water device access agreement for the proposed storm filters on the site. Access agreement shall allow periodic City inspections of the storm-water devices. Agreement shall be executed prior to issuance of any building permit. [Engineering] 47. Owner/ developer shall achieve Final Acceptance for all public/ SSWD water related infrastructure shown on the SSWD-approved improvement plans. [SSWD] 48. The owner/ developer shall install water related infrastructure for any new water services. The water improvements shall be installed at owner/ developer's expense and in compliance with SSWD' s Regulations and Standards. District Regulations require hospitals and commercial buildings to be served by a 12-inch 10

11 Class 350 ductile iron pipe water main. Any new service(s) for this property shall be from the new 12-inch water main. [SSWD] 49. All items identified on the Fire District Red Card shall be inspected, tested and approved. [Fire] 50. Approved numbers or addresses shall be placed on all new or existing buildings in such a position as to be easily read from the street or road fronting the property. The minimum size of the numbers shall not be less than twelve (12) inches and shall be mounted immediately adjacent to a light source and shall also contrast with their background. [Fire] 51. All structural setbacks shall be a minimum of 14-feet from the edge of the roadway right-of-way. Structural setbacks less than 14-feet shall require the Applicant to conduct a pre-engineering meeting with all utilities to ensure proper clearances are maintained. [SMUD] 52. In the event the Applicant requires the relocation or removal of existing SMUD facilities on or adjacent to the subject property, the Applicant shall coordinate with SMUD. The Applicant shall be responsible for the cost of relocation or removal. [SMUD] 53. SMUD reserves the right to use any portion of its easements on or adjacent to the subject property that it reasonably needs and shall not be responsible for any damages to the developed property within said easement that unreasonably interferes with those needs. [SMUD] 54. The Applicant shall not place any building foundations within 5-feet of any SMUD trench to maintain adequate trench integrity. The Applicant shall verify specific clearance requirements for other utilities (e.g., Gas, Telephone, etc.). [SMUD] 55. In the event the City requires an Irrevocable Offer of Dedication (IOD) for future roadway improvements, the Applicant shall dedicate a 12.5-foot public utility easement (PUE) for overhead and/or underground facilities and appurtenances adjacent to the City s IOD. [SMUD] 56. The Applicant shall dedicate any private drive, ingress and egress easement, or Irrevocable Offer of Dedication (and 10-feet adjacent thereto) as a public utility easement for (overhead and) underground facilities and appurtenances. All access roads shall meet minimum SMUD requirements for access roads. [SMUD] 57. Developer agrees to indemnify, defend, and hold harmless the City, its officials, officers, employees, agents and consultants from any and all administrative, legal or equitable actions or other proceedings instituted by any person not a party to this permit challenging the validity of the Agreement or any Project Approval or 11

12 any Subsequent Project Approval, or otherwise arising out of or stemming from this Agreement. Developer may select its own legal counsel to represent Developer s interests at Developer s sole cost and expense. The parties shall cooperate in defending such action or proceeding. Developer shall pay for City's costs of defense, whether directly or by timely reimbursement on a monthly basis. Such costs shall include, but not be limited to, all court costs and attorneys' fees expended by City in defense of any such action or other proceeding, plus staff and City Attorney time spent in regard to defense of the action or proceeding. The parties shall use best efforts to select mutually agreeable defense counsel but, if the parties cannot reach agreement, City may select its own legal counsel and Developer agrees to pay directly or timely reimburse on a monthly basis City for all such court costs, attorney fees, and time referenced herein. [Planning] CONDITIONS OF APPROVAL FOR MINOR USE PERMIT (FILE # MUP-17-03) 1. The Minor Use Permit allows the site plan to exceed the maximum parking requirement by providing 27 stalls. Within 6-months of the facility operating at full occupancy (or other time determined by the City), the City and the Property owner shall evaluate the parking demand for the site. If the evaluation determines additional parking is required, the applicant shall submit an updated parking plan for staff review and approval. The City may require an updated grading plan and/or building permit be obtained required prior [Planning] 2. Developer agrees to indemnify, defend, and hold harmless the City, its officials, officers, employees, agents and consultants from any and all administrative, legal or equitable actions or other proceedings instituted by any person not a party to this permit challenging the validity of the Agreement or any Project Approval or any Subsequent Project Approval, or otherwise arising out of or stemming from this Agreement. Developer may select its own legal counsel to represent Developer s interests at Developer s sole cost and expense. The parties shall cooperate in defending such action or proceeding. Developer shall pay for City's costs of defense, whether directly or by timely reimbursement on a monthly basis. Such costs shall include, but not be limited to, all court costs and attorneys' fees expended by City in defense of any such action or other proceeding, plus staff and City Attorney time spent in regard to defense of the action or proceeding. The parties shall use best efforts to select mutually agreeable defense counsel but, if the parties cannot reach agreement, City may select its own legal counsel and Developer agrees to pay directly or timely reimburse on a monthly basis City for all such court costs, attorney fees, and time referenced herein. [Planning] CONDITIONS OF APPROVAL FOR TREE PERMIT (FILE # TP-17-09) General Conditions 12

13 1. Trees 7971, 7985, 7986, and 7941 and any trees on adjacent properties shall be preserved and protected. No activity within the dripline of any tree beyond that identified within this report is permitted without approval from the Planning Department. Activity includes trenching, digging, or other similar activity that could occur during construction of the project and/or the installation of utilities. 2. Prior to issuance of a Building or Grading Permit, the applicant shall submit a final Tree Impact Assessment. The tree impact assessment report shall include all preservation measures, including details for modified curbs and paving that the applicant shall undertake during construction to ensure the long-term health and safety of the trees. The impact assessment report shall take into account improvement plans that show any encroachment into the drip-lines of any protected trees including utility trenching, retaining walls, etc. If avoiding construction within the dripline of protected trees is not feasible other mitigation measures offered by a certified arborist and accepted by the Planning Division must be made. [Planning] 3. All recommendations contained in the Arborist Report shall be incorporated as part of these conditions except as modified herein. This includes: a) Maintenance pruning to remove deadwood and excessive weight and minor clearance pruning; b) Regarding and mulching as indicated; c) Deep root fertilization; and d) Installation of cable system when called for. [Planning] 4. The conditions of approval shall be distributed to all contractors and subcontractors who have access to the site. It is the responsibility of the property owners and contractor to inform all subcontractors of the tree preservation requirements. [Planning] PRIOR TO ISSUANCE OF A BUILDING PERMIT 5. Payment of tree mitigation fees may be required. Mitigation for the loss of protected trees includes replanting other tree species acceptable by the City or the applicant could pay into a tree preservation fund ($298 per inch of diameter) managed by the City. Final mitigation fees will be determined prior to the issuance of the permit. 6. A fencing plan shall be shown on the approved site plan demonstrating the dripline for the affected trees. The fencing plan shall be reviewed and approved 13

14 by the Planning Department prior to the placement of the protective fencing. [Planning] 7. The applicant shall install a minimum of a five-foot high chain link fence (or acceptable alternative) at the outermost edge of the dripline of the trees. Signs must be installed by the applicant on the temporary fence at least two (2) equidistant locations to be clearly visible from the front of the lot. The size of each sign shall be a minimum of two feet (2 ) by two feet (2 ) and must contain the following language: WARNING THIS FENCE SHALL NOT BE REMOVED OR RELOCATED WITHOUT WRITTEN AUTHORIZATION FROM THE PLANNING DEPARTMENT (Planning) 8. The applicant shall contact the Planning Department to inspect and approve the temporary fencing and signs around the protected zones before beginning any construction. [Planning] 9. All pruning shall be completed prior to the beginning of construction. Pruning shall be done by an Arborist or under the direct supervision of a Certified Arborist, in conformance with International Society of Arboriculturalists (I.S.A.) standards. [Planning] 10. Any watering or deep root fertilization which the arborist deems necessary to protect the health of the trees due to the construction impacts shall be completed by the applicant, prior to occupancy. [Planning] 11. A utility trenching plan shall be submitted which demonstrates that the trenching-pathway for all utilities will be located outside the dripline of all retained trees, trees on adjacent properties and trees on the City owned open space. If this mitigation is not feasible other mitigation measures offered by a certified arborist and accepted by the Community Development Director must be made. [Planning] 12. Replacement planting of trees shall be completed so that for each inch of protected tree removed, a replacement 15-gallon size tree shall be planted in its place within a subject property. The applicants must submit a planting plan to the City to the satisfaction of the Community Development Director or pay into the City s tree preservation fund ($298 per inch of diameter). [Planning] DURING CONSTRUCTION AND PRIOR TO ISSUANCE OF AN OCCUPANCY PERMIT 13. The following information must be located on-site during construction activities: 14

15 A. Arborist s report B. Approved site plan including fencing plan C. Conditions of approval for the Tree Permit D. To avoid root injury, any excavation within the dripline shall be conducted with hand tools. [Planning] 14. A certified arborist shall monitor any excavation within the dripline of any tree. [Planning] 15. All finished grading shall ensure that no water will collect within the dripline of any native oak tree. [Planning] 16. Submit and receive approval of a Landscape and Irrigation Plan for any landscaping within the dripline of any oak tree. Only low-water usage plantings may be planted under the dripline of any oak tree. [Planning] 17. If any native ground surface fabric within the dripline must be removed for any reason, it shall be replaced within forty-eight (48) hours. [Planning] 18. Storage of materials, equipment and vehicles is not permitted within the dripline of any oak tree. Vehicles and other heavy equipment shall not be operated within the dripline of any oak tree. [Planning] 19. The certified arborist shall immediately treat any severed or damaged roots (NOTE: Without exception, all digging shall be done using hand tools, no machine trenching shall be allowed in the dripline of any oak tree). Minor roots less than one (1) inch in diameter may be cut, but damaged roots shall be traced back and cleanly cut behind any split, cracked or damaged area. Major roots over one (1) inch in diameter may not be cut without approval of an arborist and any arborist recommendations shall be implemented. [Planning] 20. The temporary fencing shall remain in place throughout the entire construction period and shall not be removed without obtaining written authorization from the Planning Department. In no event shall the fencing be removed before the written authorization is received from the Planning Department. [Planning] 21. Within 5 days of the completion of the construction, a Certification Letter from a certified arborist shall be submitted to and approved by the Planning Department. The certification letter shall attest to all of the work (regulated activity) which was conducted in the dripline of the trees, either being in conformance with this permit or of the required mitigation still needing to be performed. [Planning] 22. Developer agrees to indemnify, defend, and hold harmless the City, its officials, officers, employees, agents and consultants from any and all administrative, legal or equitable actions or other proceedings instituted by any person not a 15

16 party to this permit challenging the validity of the Agreement or any Project Approval or any Subsequent Project Approval, or otherwise arising out of or stemming from this Agreement. Developer may select its own legal counsel to represent Developer s interests at Developer s sole cost and expense. The parties shall cooperate in defending such action or proceeding. Developer shall pay for City's costs of defense, whether directly or by timely reimbursement on a monthly basis. Such costs shall include, but not be limited to, all court costs and attorneys' fees expended by City in defense of any such action or other proceeding, plus staff and City Attorney time spent in regard to defense of the action or proceeding. The parties shall use best efforts to select mutually agreeable defense counsel but, if the parties cannot reach agreement, City may select its own legal counsel and Developer agrees to pay directly or timely reimburse on a monthly basis City for all such court costs, attorney fees, and time referenced herein. [Planning] Commissioner Schaefer returned to the Dias. B. ZONING CODE REVISION FOR WIRELESS TELECOMMUNICATION FACILITY: Project Planner Bermudez presented a request to revise various Sections of the City s Zoning Code regarding the regulations of Wireless Telecommunication Facilities including the applicability of the regulations, the development standards for wireless facilities within the City s public right-of-way. A complete list of revisions will be posted to the City s website This item was continued from the May 24, 2017 meeting. There was Planning Commission and staff discussion. Vice Chair Blair opened the public hearing. David Griffith, Mobilitie, LLC) spoke in support of the project. Vice Chair Blair closed the public hearing. Vice Chair Blair called for a motion. Motions A. Recommend the City Council determine that the proposed project is exempt from CEQA under Section 15061(b)(3); and B. Recommend the City Council adopt the ordinance amending the Zoning Code in regards to wireless telecommunication facilities as provided in Exhibits A and B. 16

17 M/S: Weiland/Duncan AYES: 6 (Blair, Cox, Duncan, Lagomarsino, Schaefer, Weiland) 8. REGULAR CALENDAR A. PLANNING COMMISSION TRAINING FOR 2017/18 The Planning Commission expressed an interest in training for Planning Commission roles and training on drainage issues. B. ELECTION OF OFFICERS Russell Blair was nominated and appointed Planning Commission Chair. Michael Lagomarsino was nominated and appointed Planning Commission Vice-chair. 9. ADJOURNMENT There being no further business, the meeting was adjourned at 9:46 PM to the next meeting of September 13, Respectfully Submitted, Karen Ramsay Planning Commission Secretary 17

APPROVED CITY OF CITRUS HEIGHTS PLANNING COMMISSION MEETING MINUTES OCTOBER 25, 2017

APPROVED CITY OF CITRUS HEIGHTS PLANNING COMMISSION MEETING MINUTES OCTOBER 25, 2017 CITY OF CITRUS HEIGHTS PLANNING COMMISSION MEETING MINUTES OCTOBER 25, 2017 1. CALL MEETING TO ORDER Chair Blair called the meeting to order at 7:00 PM. 2. ROLL CALL Commission Present: Blair, Cox, Lagomarsino,

More information

CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA (916)

CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA (916) CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA 95621 (916) 725-2448 DATE: May 17, 2005 TO: Mike Evans Mike Williams 3111 Sunset Blvd. Suite One Baker-Williams

More information

APPROVED CITY OF CITRUS HEIGHTS. PLANNING COMMISSION MEETING MINUTES January 27, 2016

APPROVED CITY OF CITRUS HEIGHTS. PLANNING COMMISSION MEETING MINUTES January 27, 2016 CITY OF CITRUS HEIGHTS PLANNING COMMISSION MEETING MINUTES 1. CALL MEETING TO ORDER Chair Cox called the meeting to order at 7:00 PM. 2. ROLL CALL Commission Present: Blair, Cox, Dawson, DeCelle, Doyle,

More information

Prepared by: Nick Lagura, Associate Planner

Prepared by: Nick Lagura, Associate Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING May 25, 2016 Prepared by: Nick Lagura, Associate Planner REQUEST The applicant requests approval of a Tentative Parcel

More information

PC Agenda Packet. ROLL CALL Commission Members: Blair, Cox, Duncan, Lagomarsino, Middleton, Schaefer, Weiland

PC Agenda Packet. ROLL CALL Commission Members: Blair, Cox, Duncan, Lagomarsino, Middleton, Schaefer, Weiland AGENDA November 14, 2018-7:00 PM CITY OF CITRUS HEIGHTS PLANNING COMMISSION MEETING City Hall Council Chambers 6360 Fountain Square Drive, Citrus Heights, CA 1. 11-14-18 PC Agenda Packet Documents: 11-14-18

More information

Prepared by: Casey Kempenaar, Senior Planner

Prepared by: Casey Kempenaar, Senior Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING January 27, 2016 Prepared by: Casey Kempenaar, Senior Planner REQUEST The applicant requests approval of a Tentative Parcel

More information

Prepared by: Casey Kempenaar, Senior Planner

Prepared by: Casey Kempenaar, Senior Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING September 13, 2017 Prepared by: Casey Kempenaar, Senior Planner REQUEST The applicant requests approval of a Tentative

More information

PLANNING COMMISSION CITY OF SONORA SEPTEMBER 10, :30 P.M.

PLANNING COMMISSION CITY OF SONORA SEPTEMBER 10, :30 P.M. PLANNING COMMISSION CITY OF SONORA SEPTEMBER 10, 2018 5:30 P.M. A regular meeting of the Planning Commission of the City of Sonora was scheduled on this date at 5:30 p.m. in the Sonora City Hall Council

More information

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR MEMORANDUM TO: FROM: BY: PLANNING COMMISSION TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR MATTHEW DOWNING, ASSISTANT PLANNER SUBJECT: CONSIDERATION OF TENTATIVE PARCEL MAP CASE NO. 14-002; SUBDIVISION

More information

EFFECTIVE DATE JULY XX, 2016

EFFECTIVE DATE JULY XX, 2016 Attachment 2 WALNUT CREEK DESIGN REVIEW COMMISSION RESOLUTION NO. XXXX APPLICATION Y15-029 TRINITY HEIGHTS CONDOMINIUMS 1950 AND 1962 TRINITY AVENUE APNs 178-071-05 and 178-071-03 EFFECTIVE DATE JULY XX,

More information

This project is categorically exempt from the requirements of CEQA under Categorical Exemption, Section Existing Facilities.

This project is categorically exempt from the requirements of CEQA under Categorical Exemption, Section Existing Facilities. WALNUT CREEK PLANNING COMMISSION RESOLUTION NO. > CONDITIONAL USE PERMIT (TREE REMOVAL PERMIT) APPLICATION NO. Y14-133 2055 N. BROADWAY OFFICE EXTERIOR REMODEL 2055 N. Broadway, APN: 173-141-039 (EFFECTIVE

More information

AS AMENDED BY THE PLANNING COMMISSION MAY 19, 2005 CONDITIONS OF APPROVAL VESTING TENTATIVE PARCEL MAP APPLICATION NO. 2005-04 SUMMIT CORPORATE CENTER Department of Public Works 1. The recorded parcel

More information

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT)

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT) GENERAL DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT) ADDRESS: PERMIT #: DATE: 1. Plan is signed and sealed by an Illinois registered professional engineer including date signed and license

More information

COMMUNITY DEVELOPMENT AND RESOURCES COMMISSION OF THE CITY OF ATWATER

COMMUNITY DEVELOPMENT AND RESOURCES COMMISSION OF THE CITY OF ATWATER COMMUNITY DEVELOPMENT AND RESOURCES COMMISSION OF THE CITY OF ATWATER RESOLUTION NO. 033-17 A RESOLUTION OF THE COMMUNITY DEVELOPMENT AND RESOURCES COMMISSION OF THE CITY OF ATWATER RECOMMENDING APPROVAL

More information

PLANNING COMMISSION STAFF REPORT

PLANNING COMMISSION STAFF REPORT PLANNING COMMISSION STAFF REPORT TO: Honorable Chair and Planning Commission DATE: March 8, 2017 FROM: PREPARED BY: SUBJECT: Bruce Buckingham, Community Development Director Cassandra Mesa, Building/Planning

More information

Planning Commission Staff Report October 2, 2014

Planning Commission Staff Report October 2, 2014 Commission Staff Report October 2, 2014 Project: Stathos Cove Request: Rezone and Tentative Subdivision Map File: EG-14-001 Location: North side of Elk Grove Boulevard, approximately 1,800 feet west of

More information

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 www.cityofsacramento.org 9 PUBLIC HEARING December 10, 2015 To: Members of the Planning and Design Commission

More information

ARTICLE 7 UTILITIES AND EASEMENTS

ARTICLE 7 UTILITIES AND EASEMENTS 7.1 PLACEMENT OF UTILITIES ARTICLE 7 UTILITIES AND EASEMENTS 7.1.1 All authorized public underground utilities shall be located within the right-of-way of a public street or within an easement designated

More information

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DATE: TO: Hearing Officer SUBJECT: Minor Variance #11876 LOCATION: APPLICANT: ZONING DESIGNATION: GENERAL PLAN DESIGNATION: CASE PLANNER: STAFF

More information

TENTATIVE PARCEL MAP TIME EXTENSION

TENTATIVE PARCEL MAP TIME EXTENSION EL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT Agenda of: October 15, 2008 Item No.: Staff: 4.a. Mel Pabalinas TENTATIVE PARCEL MAP TIME EXTENSION APPLICATION FILE NO.: APPLICANT:

More information

3. Twelve additional letters of support submitted by the Applicant.

3. Twelve additional letters of support submitted by the Applicant. M E M O TO: CHAIR TRZESNIEWSKI, MEMBERS OF THE PLANNING COMMISSION FROM: KEN MACNAB, PLANNING MANAGER DATE: MAY 5, 2016 SUBJECT: ITEM 7.D. DJ s GROWING PLACE Please find enclosed the following documents:

More information

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT) Updated: 12/12/2017

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT) Updated: 12/12/2017 DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT) Updated: 12/12/2017 ADDRESS: PERMIT #: DATE: Sat. Not GENERAL 1. A disposition of comments should be included in all subsequent submittals. 2. Plan

More information

CHAPTER 154 RIGHTS OF WAY

CHAPTER 154 RIGHTS OF WAY CHAPTER 154 RIGHTS OF WAY 154.01 Purpose and Rule of Interpretation 154.09 City Construction and Paving 154.02 Franchise, License or Lease Required 154.10 Design Notice to City 154.03 Fees Required 154.11

More information

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL SECTION 22.01 PURPOSE ARTICLE XXII PROCEDURES The purpose of this Article is to establish uniform requirements of procedure for all developments in the Township. Certain specific types of minor development

More information

DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT

DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT CITY OF HAYS SUBJECT DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT ISSUED BY LAST REVISION DATE POLICY MANUAL REVISION DATE City Commission 3-13-08 10-22-09 POLICY STATEMENT: The City

More information

1. The reason provided for the opposing votes was that the two commissioners wanted something else to be developed on their parcel.

1. The reason provided for the opposing votes was that the two commissioners wanted something else to be developed on their parcel. Agenda Item #6.2 SUBJECT: PUBLIC HEARING - APPEAL OF PLANNING COMMISSION DECISION DENYING THE APPROVAL OF THE TENTATIVE PARCEL MAP, CONDITIONAL USE PERMIT, AND SITE AND ARCHITECTURAL REVIEW FOR THE CONSTRUCTION

More information

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811 CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811 ACTION OF THE ZONING ADMINISTRATOR On Thursday, September 14, 2017, the Zoning

More information

ARTICLE IV: DEVELOPMENT STANDARDS

ARTICLE IV: DEVELOPMENT STANDARDS ARTICLE IV: DEVELOPMENT STANDARDS IV-53 409 PRIVATE STREETS A private street means any way that provides ingress to, or egress from, property by means of vehicles or other means, or that provides travel

More information

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT August 30, 2007

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT August 30, 2007 SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT August 30, 2007 PROJECT: Detrana Entry Gates HEARING DATE: October 22, 2007 STAFF/PHONE: Sarah Clark, (805) 568-2059 GENERAL INFORMATION Case No.:

More information

Chapter Plat Design (LMC)

Chapter Plat Design (LMC) Chapter 18.14 Plat Design (LMC) Sections: 18.14.010 Lot width 18.14.020 Right-of-way requirements 18.14.030 Pipe stem lots 18.14.040 Division resulting in minimum lot sizes 18.14.050 Flood prone and bad

More information

M-43 CORRIDOR OVERLAY ZONE

M-43 CORRIDOR OVERLAY ZONE ARTICLE 26.00 M-43 CORRIDOR OVERLAY ZONE Section 26.01 Findings A primary function of the M-43 state highway is to move traffic through the Township and to points beyond. As the primary east-west arterial

More information

ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS

ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS SECTION 24.00 INTENT AND PURPOSE The standards of this Article provide for the design, construction and maintenance of private

More information

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW Section 7.0 - Purpose The purpose of this article is to specify the documents and/or drawings required for a Site Plan Review or a Plot Plan

More information

TENTATIVE MAP INFORMATION SHEET

TENTATIVE MAP INFORMATION SHEET TENTATIVE MAP INFORMATION SHEET GENERAL INFORMATION This information sheet explains how your Tentative Map application will be processed, what fees you must pay, and what plans you must submit. If you

More information

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS 2.1 Required Plan Sheets 2.2 Drawing Requirements 2.3 Graphic Standards 2.4 Easements 2.5 Utility Locations 2.6 Private Facility Locations

More information

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT DATE: October 20, 2016 TO: FROM: Zoning Hearing Officer Planning Staff SUBJECT: Consideration of a Non-Conforming Use Permit, pursuant to Sections 6135

More information

Approval of a conditional use to allow construction of a rehabilitation hospital at 5115 N. Biltmore Lane in the American Center.

Approval of a conditional use to allow construction of a rehabilitation hospital at 5115 N. Biltmore Lane in the American Center. Department of Planning & Community & Economic Development Planning Division Katherine Cornwell, Director Madison Municipal Building, Suite LL-100 215 Martin Luther King, Jr. Boulevard P.O. Box 2985 Madison,

More information

CITRUS HEIGHTS COMMUNITY SPECIAL PLANNING AREA

CITRUS HEIGHTS COMMUNITY SPECIAL PLANNING AREA CITRUS HEIGHTS COMMUNITY SPECIAL PLANNING AREA 501-90. INTENT. It is the intent of the Board of Supervisors in adopting this Special Planning Area Ordinance to allow development on the property described

More information

CITY COUNCIL STAFF REPORT

CITY COUNCIL STAFF REPORT CITY COUNCIL STAFF REPORT TO: Honorable Mayor and City Council DATE: May 7, 2018 FROM: PREPARED BY: SUBJECT: Matthew Bronson, City Manager A. Rafael Castillo, AICP, Senior Planner Cassandra Mesa, Building

More information

Community Development Department Staff Report. FILE NUMBER: GPA 06-01, ZC 06-01, SPR 06-03, TPM (Boundary Line Adjustment) John Wagener

Community Development Department Staff Report. FILE NUMBER: GPA 06-01, ZC 06-01, SPR 06-03, TPM (Boundary Line Adjustment) John Wagener Community Development Department Staff Report DATE: December 5, 2007 FILE NUMBER: GPA 06-01, ZC 06-01, SPR 06-03, TPM 06-06 (Boundary Line Adjustment) APPLICANT: TYPE OF APPLICATION: GENERAL LOCATION:

More information

MINOR SUBDIVISION COMMITTEE COUNTY OF MONTEREY, STATE OF CALIFORNIA

MINOR SUBDIVISION COMMITTEE COUNTY OF MONTEREY, STATE OF CALIFORNIA MINOR SUBDIVISION COMMITTEE COUNTY OF MONTEREY, STATE OF CALIFORNIA RESOLUTION NO. 05010 In the matter the application GIANNINI FAMILY LIMITED PARTNERSHIP (PLN040273) APN# 113-071-006-000 FINDINGS & DECISION

More information

PLANNING COMMISSION CITY OF SONORA OCTOBER 9, :30 P.M.

PLANNING COMMISSION CITY OF SONORA OCTOBER 9, :30 P.M. PLANNING COMMISSION CITY OF SONORA OCTOBER 9, 2018 5:30 P.M. A regular meeting of the Planning Commission of the City of Sonora was scheduled on this date at 5:30 p.m. in the Sonora City Hall Council Chambers.

More information

Planning Commission Staff Report August 6, 2015

Planning Commission Staff Report August 6, 2015 Commission Staff Report August 6, 2015 Project: Capital Reserve Map File: EG-14-008A Request: Tentative Parcel Map Location: 8423 Elk Grove Blvd. APN: 116-0070-014 Staff: Christopher Jordan, AICP Sarah

More information

Appendix 4 Agency Approval Letters

Appendix 4 Agency Approval Letters Appendix 4 Agency Approval Letters 55 Appendix4.a. Appendix 4.b. Appendix 4.c. Appendix 4.d. 3/10/2016 Clarksburg Mews, LLC c/o Michael Fisher 4938 Hampden Lane Bethesda, MD 20814 Re: Phase

More information

ORDINANCE NO The Town Council of the Town of Yucca Valley does ordain as follows:

ORDINANCE NO The Town Council of the Town of Yucca Valley does ordain as follows: ORDINANCE NO. 141 AN ORDINANCE OF THE TOWN COUNCIL OF THE TOWN OF YUCCA VALLEY, CALIFORNIA, AMENDING TITLE 8, DIVISION 12, CHAPTER 1 RELATING TO DEFINITIONS AND TITLE 8, DIVISION 8, CHAPTER 3, RELATING

More information

BYRON TOWNSHIP ZONING APPLICATION

BYRON TOWNSHIP ZONING APPLICATION BYRON TOWNSHIP ZONING APPLICATION Phone: (616) 878-9104 * Fax: (616) 878-3980 * Website: www.byrontownship.org This application will not be accepted if incomplete. APPLICATION FOR & REQUIRED COPIES Private

More information

Chapter 4 Utility Locations and City Utility Easements

Chapter 4 Utility Locations and City Utility Easements Chapter 4 Utility Locations and City Utility Easements U30004.docx 06/06/13 Chapter 4 Utility Locations and City Utility Easements Section Topic Page 4.1 Purpose of Standard Locations 4.1 4.2 Plans Required

More information

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011 ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011 NAME SUBDIVISION NAME LOCATION Stratford, L.L.C. Grelot Office Park Subdivision North side of Grelot Road,

More information

II. What Type of Development Requires Site Plan Review? There are five situations where a site plan review is required:

II. What Type of Development Requires Site Plan Review? There are five situations where a site plan review is required: I. What is a Site Plan Review? Site Plan Review is a process where the construction of new buildings, new additions, and certain types of canopies and/or tax-exempt institutions are reviewed by the City

More information

619. Planned Development District (PD)

619. Planned Development District (PD) 619. Planned Development District (PD) Intent. The purpose of the Planned Development District (sometimes hereinafter referred to as PD) is to provide opportunities to create more desirable environments

More information

FENCES BUILDING PERMIT APPLICATION

FENCES BUILDING PERMIT APPLICATION Community Development 17 Montrose Drive Romeoville, IL 60446-1329 (815) 886-7203 (815) 372-4039 Email: buildinginspections@romeoville.org FENCES BUILDING PERMIT APPLICATION Application Date / / Property

More information

MINOR SUBDIVISION PLAT CHECKLIST

MINOR SUBDIVISION PLAT CHECKLIST MINOR SUBDIVISION PLAT CHECKLIST Project Name: Tax ID #: Project Number: Date: _ Reviewed By: Telephone: NOTES: All lots on septic systems must comply with the Fulton County Health Department requirements

More information

CITY OF SONORA PLANNING COMMISSION SITE PLAN REVIEW APPLICATION

CITY OF SONORA PLANNING COMMISSION SITE PLAN REVIEW APPLICATION CITY OF SONORA PLANNING COMMISSION SITE PLAN REVIEW APPLICATION APPLICANT: MAILING ADDRESS: PHONE: CELL#: EMAIL: OWNER S NAME: MAILING ADDRESS: PHONE: CELL#: EMAIL: ADDRESS OF PROPERTY INVOLVED: ASSESSOR

More information

CITY OF MERCED Planning Commission MINUTES

CITY OF MERCED Planning Commission MINUTES CITY OF MERCED Planning Commission MINUTES Merced City Council Chambers Wednesday, December 4, 2013 Vice-Chairperson MACKIN called the meeting to order at 7:00 p.m., followed by a moment of silence and

More information

Sagamore Hills Township Valley View Rd. Sagamore Hills, OH (330) Phone (330) Fax

Sagamore Hills Township Valley View Rd. Sagamore Hills, OH (330) Phone (330) Fax Right-of-Way Excavation Rules & Regulations 1. PERMIT REQUIRED: A right-of-way excavation permit is required when placing, extending, or repairing any pipes, cables, wires, roadway structure or appurtenances,

More information

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the: EASEMENT AGREEMENT THIS EASEMENT AGREEMENT, made and entered into as of the day of,, by and between: hereinafter called Grantor, (whether grammatically singular or plural) and the: hereinafter called Distributor.

More information

ADMINISTRATIVE HEARING STAFF REPORT

ADMINISTRATIVE HEARING STAFF REPORT ADMINISTRATIVE HEARING STAFF REPORT Providence Place Apartments Utility Box No. 2 Conditional Use Petition PLNPCM2011-00426 309 East 100 South September 22, 2011 Planning and Zoning Division Department

More information

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707)

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707) Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA 94559-0660 (707) 257-9530 PLANNING COMMISSION STAFF REPORT AUGUST 6, 2015 AGENDA ITEM 6.A. 15-0109-UP; QVMC

More information

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name: TOWNSHIP OF UPPER ST. CLAIR FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST Date Filed Plan Name PLC Applicant's Name: Phone Filing Date for Final Application Final Plat 114.22. FINAL APPLICATION

More information

Cover Letter with Narrative Statement

Cover Letter with Narrative Statement Cover Letter with Narrative Statement March 31, 2017 rev July 27, 2017 RE: Rushton Pointe Residential Planned Unit Development Application for Public Hearing for RPUD Rezone PL2015 000 0306 Mr. Eric Johnson,

More information

BEFORE THE LAND USE HEARINGS OFFICER OF CLACKAMAS COUNTY, OREGON

BEFORE THE LAND USE HEARINGS OFFICER OF CLACKAMAS COUNTY, OREGON BEFORE THE LAND USE HEARINGS OFFICER OF CLACKAMAS COUNTY, OREGON Regarding an Application for a Conditional Use ) Case File No. Permit to Establish a New Headquarters and ) Demonstration Center. ) (Soils

More information

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist The following list includes all of the items you must submit for a complete application. Some specific types of information

More information

COUNTY OF SACRAMENTO CALIFORNIA ZONING ADMINISTRATOR REPORT

COUNTY OF SACRAMENTO CALIFORNIA ZONING ADMINISTRATOR REPORT COUNTY OF SACRAMENTO CALIFORNIA ZONING ADMINISTRATOR REPORT For the Agenda of: May 4, 2016 To: From: Subject: Supervisorial District(s): Zoning Administrator Department of Community Development PLNP2015-00222.

More information

CHAPTER 2 RELATED DOCUMENTS AND FORMS

CHAPTER 2 RELATED DOCUMENTS AND FORMS CHAPTER 2 RELATED DOCUMENTS AND FORMS TABLE OF CONTENTS CHAPTER 2 RELATED DOCUMENTS AND FORMS Resolution R00- Establishing Public Improvement Design Standards Page 1 Current Plans Review & Construction

More information

RESOLUTION R

RESOLUTION R RESOLUTION R2014-142 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NAPA, STATE OF CALIFORNIA, APPROVING A USE PERMIT TO AUTHORIZE THE USE OF SMALL LOT DEVELOPMENT STANDARDS AND FLAG LOT DEVELOPMENT STANDARDS;

More information

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services. Conditions Relating to Draft Plan of Subdivision Approval East Fonthill 26T 01014 (Draft Plan dated December 1, 2013, and revised August 28, 2014), the Town of Pelham 1. This approval applies to the Draft

More information

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR MEMORAND MEMORANDUM TO: FROM: BY: PLANNING COMMISSION TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR MATTHEW DOWNING, PLANNING MANAGER SUBJECT: CONSIDERATION OF LOT LINE ADJUSTMENT NO. 17-005; LOCATION

More information

EL DORADO COUNTY PLANNING AND BUILDING DEPARTMENT ZONING ADMINISTRATOR STAFF REPORT TENTATIVE PARCEL MAP TIME EXTENSION

EL DORADO COUNTY PLANNING AND BUILDING DEPARTMENT ZONING ADMINISTRATOR STAFF REPORT TENTATIVE PARCEL MAP TIME EXTENSION EL DORADO COUNTY PLANNING AND BUILDING DEPARTMENT ZONING ADMINISTRATOR STAFF REPORT Agenda of: June 21, 2017 Item No.: Staff: 5.a. Evan Mattes TENTATIVE PARCEL MAP TIME EXTENSION FILE NO.: APPLICANT: ENGINEER:

More information

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009 POLICY Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, 2009 February 2, 2009 Supersedes: May 2, 2005 Prepared by: PLANNING, BUILDING AND DEVELOPMENT SERVICES STATEMENT

More information

Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities)

Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities) Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities) ENCLOSURES: Site Plan Application Building Permit Application Grading and Drainage Approval Requirements

More information

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT September 15, 2009 Staff Contact: Peyman Behvand (707)

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT September 15, 2009 Staff Contact: Peyman Behvand (707) CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT September 15, 2009 Staff Contact: Peyman Behvand (707) 449-5140 TITLE: REQUEST: RECOMMENDED ACTION: SONIC DRIVE-IN APPROVE A MODIFICATION

More information

CHAPTER 14 SPECIAL DEVELOPMENTS

CHAPTER 14 SPECIAL DEVELOPMENTS 10-14-1 10-14-1 CHAPTER 14 SPECIAL DEVELOPMENTS SECTION: 10-14-1: Cluster and Inner Block Development 10-14-2: Planned Unit Development 10-14-1: CLUSTER AND INNER BLOCK DEVELOPMENT: A. Land Use: Cluster

More information

Committed to Service. License Agreement Application Form

Committed to Service. License Agreement Application Form Committed to Service License Agreement Application Form PLEASE NOTE: Effective February 16, 2010 - License Agreements within the downtown Boise area for public structures, objects and uses on ACHD sidewalks

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

EASEMENT AGREEMENT (Distributor Performance Non-Exclusive)

EASEMENT AGREEMENT (Distributor Performance Non-Exclusive) EASEMENT AGREEMENT (Distributor Performance Non-Exclusive) THIS EASEMENT AGREEMENT, effective the day of, 20, is made between WITNESSETH:, hereafter called Grantor, (whether grammatically singular or plural)

More information

BOROUGH OF GREEN TREE PLANNING COMMISSION MEETING APRIL 22, 2015

BOROUGH OF GREEN TREE PLANNING COMMISSION MEETING APRIL 22, 2015 BOROUGH OF GREEN TREE PLANNING COMMISSION MEETING APRIL 22, 2015 CALL TO ORDER Green Tree Planning Commission met on Wednesday, April 22, 2015 at 7:00 p.m. in the Sycamore Room of the Green Tree Municipal

More information

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record. 200 W. Oak Street, 3rd Floor Fort Collins, CO 80521 (970) 498-7683 / larimer.org/planning SITE PLAN REVIEW ADMINISTRATIVE REVIEW The submittal requirements listed in this packet are intended to collect

More information

A G E N D A CITY OF BUENA PARK ZONING ADMINISTRATOR

A G E N D A CITY OF BUENA PARK ZONING ADMINISTRATOR A G E N D A CITY OF BUENA PARK ZONING ADMINISTRATOR September 2, 2016 COMMUNITY DEVELOPMENT CONFERENCE ROOM 10:00 a.m. Members of the public who wish to discuss an item should fill out a speaker identification

More information

Staff Report to the North Ogden Planning Commission

Staff Report to the North Ogden Planning Commission Staff Report to the North Ogden Planning Commission SYNOPSIS / APPLICATION INFORMATION Application Request: Consideration and action on an administrative application for final approval for the Legacy North

More information

Frequently Asked Questions About 20A Undergrounding Updated on June 17, 2014

Frequently Asked Questions About 20A Undergrounding Updated on June 17, 2014 I) General Question 1. What are the advantages of 20A undergrounding? 2. What are the disadvantages of 20A undergrounding? 3. What is 20A undergrounding of the utility lines and who pays for it? 4. How

More information

ARTICLE 23 CONDOMINIUM STANDARDS

ARTICLE 23 CONDOMINIUM STANDARDS ARTICLE 23 CONDOMINIUM STANDARDS Section 23.01 Intent. The intent of this Article is to provide regulatory standards for condominiums and site condominiums similar to those required for projects developed

More information

City of Melissa, Texas Plat Dedication Language

City of Melissa, Texas Plat Dedication Language City of Melissa, Texas Plat Dedication Language [INCLUDE THE FOLLOWING DEDICATION LANGUAGE FOR INDIVIDUALS (MODIFY APPROPRIATELY TO REFLECT EXACTLY AS SHOWN ON PROPERTY DEED)]: NOW THEREFORE, KNOW ALL

More information

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

Preliminary Subdivision Application (Minor) (Three (3) lots or less) Gunnison City Offices www.gunnisoncity.org 38 West Center Gunnison, Utah 84634 (435) 528 7969 Date of Application: Preliminary Subdivision Application (Minor) (Three (3) lots or less) APPLICANT INFORMATION

More information

Community Development Department Council Chambers, 7:30 PM, June 7, 2018

Community Development Department Council Chambers, 7:30 PM, June 7, 2018 STAFF REPORT 2018-19P: Special Use Permit Community Development Department Council Chambers, 7:30 PM, June 7, 2018 To: From: Re: Paul Luke, Plan Commission Chairperson Carrie Haberstich, AICP, Planner/CDBG

More information

Accessory Dwelling Unit Permit

Accessory Dwelling Unit Permit PLANNING SERVICES DEPARTMENT 411 Main Street (530) 87-6800 P.O. Box 3420 Chico, CA 527 Application No. APPLICATION FOR Accessory Dwelling Unit Permit Applicant Information Applicant Street Address Daytime

More information

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R) Town of Richmond Hill

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R) Town of Richmond Hill The Corporation of The Town of Richmond Hill Development Planning Division Schedule of Conditions Draft Plan of Subdivision File 19T(R)-14009 Country Wide Homes (Jefferson) Inc. Lot 3, Plan 65M-2071 Town

More information

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570)

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570) PERMIT # - D SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA 18444 PHONE (570) 842-7028 FAX (570) 842-0633 Date: PART I APPLICATION DRIVEWAY INSTALLATION APPLICATION AND PERMIT Name:

More information

STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE

STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE Adopted: August 8 th, 2008 Effective: August 28 th, 2008 Sec.100. Title ARTICLE I GENERAL

More information

COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany OR 97321

COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany OR 97321 COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany OR 97321 NOTICE OF DECISION DATE OF NOTICE: August 16, 2016 FILE: TYPE OF APPLICATION: REVIEW BODY: SD-01-16 Ph: 541-917-7550

More information

PERMIT AND SUBMITTAL REQUIREMENTS (PR)

PERMIT AND SUBMITTAL REQUIREMENTS (PR) SECTION 2 PERMIT AND SUBMITTAL REQUIREMENTS (PR) 2-1 GENERAL - No work of any type shall be performed within the City right-of-way and easements without approved plans and an encroachment permit. No grading

More information

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No.

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No. BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN PRIVATE ROAD ORDINANCE Ordinance No. 11A-99 (to replace prior Private Road Ordinance No. 11-99) An Ordinance to protect the health, safety, and general welfare

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2002-166 A RESOLU"nON OF THE CITY COUNCIL OF THE CITY OF ELK GROVE APPROVING A TENTATIVE SUBDIVISION MAP FOR ASSESSOR PARCEL NUMBER 121-0910-029, SHADOWBROOK LOT A EG-02-276, SUBJECT TO

More information

EL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT TENTATIVE PARCEL MAP TIME EXTENSION

EL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT TENTATIVE PARCEL MAP TIME EXTENSION EL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT Agenda of: March 1, 2017 Item No.: Staff: 4.a. Rob Peters TENTATIVE PARCEL MAP TIME EXTENSION FILE NO.: APPLICANT: OWNER: ENGINEER:

More information

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

ARTICLE 900 PLAT AND PLAN REQUIREMENTS ARTICLE 900 PLAT AND PLAN REQUIREMENTS SEC. 900.1 ITEMS TO BE SHOWN ON PLAT OR PLAN General (1) Property lines of all property owners adjacent to the exterior boundaries of the project shall be located

More information

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013 ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013 NAME SUBDIVISION NAME PV-Magnolia, LLC Twelve Trees Subdivision LOCATION 2860, 2862 and 2866 Pleasant Valley Road

More information

SUBDIVISION DESIGN PRINCIPLES AND STANDARDS

SUBDIVISION DESIGN PRINCIPLES AND STANDARDS SECTION 15-200 SUBDIVISION DESIGN PRINCIPLES AND STANDARDS 15-201 STREET DESIGN PRINCIPLES 15-201.01 Streets shall generally conform to the collector and major street plan adopted by the Planning Commission

More information

ROOSEVELT IRRIGATION DISTRICT

ROOSEVELT IRRIGATION DISTRICT ROOSEVELT IRRIGATION DISTRICT 103 West Baseline Road Buckeye, AZ 85326 Phone (623) 386-2046 Fax (623) 386-4360 Board of Directors Superintendent W. Bruce Heiden, President Donovan L. Neese K. C. Gingg

More information

Site Plan Application

Site Plan Application Site Plan Application City of St. Pete Beach Community Development Department 155 Corey Avenue St. Pete Beach, Florida 33706 (727) 367-2735 www.stpetebeach.org Case Number: PROPERTY OWNER: Name: Address:

More information

13-2 SUBDIVISION PLANS AND PLATS REQUIRED EXCEPTIONS Subdivision Plats Required To be Recorded

13-2 SUBDIVISION PLANS AND PLATS REQUIRED EXCEPTIONS Subdivision Plats Required To be Recorded ARTICLE XIII SUBDIVISIONS 13-1 INTENT AND PURPOSE 13-1-1 Intent: It is the intent of the County Commission through the adoption of this Article to more fully avail itself of the power granted under 17-27-601

More information

CHAPTER SUBDIVISION MAPS

CHAPTER SUBDIVISION MAPS CHAPTER 19.66 SUBDIVISION MAPS SUBDIVISION MAPS 19.66 Section Page 19.66.010 Purpose... IV-56 19.66.020 Application... IV-57 19.66.030 Exclusions... IV-57 19.66.040 Effect of Annexation... IV-57 19.66.050