STRATFORD MINING COMPLEX Blast Management Plan

Size: px
Start display at page:

Download "STRATFORD MINING COMPLEX Blast Management Plan"

Transcription

1 STRATFORD MINING COMPLEX Blast Management Plan

2 STRATFORD MINING COMPLEX BLAST MANAGEMENT PLAN Revision Status Register Section/Page/ Annexure Revision Number Amendment/Addition Distribution DP&E Approval Date All Version A BRNOC Blasting and Vibration Management Plan All Version B May 2011 BRNOC Blasting and Vibration Management Plan All Version C (June 2011) Stratford Mining Complex Blast Management Plan All Version D (April 2017) Review and Approval DPE comments addressed DP&I October 2002 EPA, DP&I - EPA, DP&E - DPE 22 September 2017 APRIL 2017 Project No. GCL Document No

3 TABLE OF CONTENTS Section Page 1 INTRODUCTION STRATFORD MINING COMPLEX PURPOSE AND SCOPE STRUCTURE OF THE BLMP 4 2 STATUTORY REQUIREMENTS EP&A ACT DEVELOPMENT CONSENTS Blast Management Plan Management Plan Requirements LICENCES, PERMITS AND LEASES OTHER LEGISLATION COMPLIANCE STANDARDS AND GUIDELINES 8 3 BLASTING CRITERIA AND PERFORMANCE INDICATORS NSW DEVELOPMENT CONSENT CONDITIONS Blasting Criteria Blasting Hours and Frequency Property Inspections and Investigations Operating Conditions EPL CONDITIONS PERFORMANCE INDICATORS 12 4 MANAGEMENT MEASURES BLAST TIMING AND FREQUENCY BLASTING AND LOCAL RESIDENCES Notification of Blasting and/or Road Closure Property Inspections Property Investigations Change of Ownership ROAD CLOSURE PROTOCOL FUME MANAGEMENT INTERACTION WITH SURROUNDING INFRASTRUCTURE 15 5 MONITORING MONITORING METHODS AND PROGRAM VIDEO MONITORING OF BLASTS MONITORING OF FUME MONITORING PROGRAM FOR FLYROCK DISTRIBUTION 18 6 BLASTING PROTOCOLS & CONTINGENCY PLAN 19 BLAST MANAGEMENT PLAN SMC - E i Stratford Coal Pty Ltd

4 6.1 CONTINGENCY PLAN Blast Fume POTENTIAL CONTINGENCY MEASURES 20 7 ANNUAL REVIEW AND IMPROVEMENT OF BLMP ANNUAL REVIEW BLMP REVIEW AND UPDATE 21 8 REPORTING AND MANAGEMENT PROTOCOLS 22 9 REFERENCES 23 LIST OF TABLES Table 1 Table 2 Table 3 NSW Development Consent Requirements Relevant to this BLMP Management Plan Requirements EPL Conditions Relevant to Blasting LIST OF FIGURES Figure 1 Figure 2 Figure 3 Regional Location General Arrangement Blast Monitoring Sites BLAST MANAGEMENT PLAN SMC - E ii Stratford Coal Pty Ltd

5 1 INTRODUCTION 1.1 STRATFORD MINING COMPLEX Stratford Coal Pty Ltd (SCPL), a wholly owned subsidiary of Yancoal Australia Limited (Yancoal), owns and operates the Stratford Coal Mine (SCM), which is located approximately 100 kilometres (km) north of Newcastle, New South Wales (NSW) (Figure 1). SCPL also owns and operates the Bowens Road North Open Cut (BRNOC), located to the immediate north of the SCM. Collectively, these mines, and the associated coal processing and handling facilities, are referred to as the Stratford Mining Complex (SMC). Yancoal also owns the Duralie Coal Mine (DCM), which is located approximately 20 km south of the SMC (Figure 1). Run-of-mine (ROM) coal from the DCM is transported by rail to the SMC, where it is processed along with ROM coal from the SCM and BRNOC. The SCM commenced in 1995 and is operated in accordance with Development Consent (DA 23-98/99) (the SCM Development Consent). The BRNOC commenced in 2003 and is operated under a separate Development Consent (DA ) (the BRNOC Development Consent). The general arrangement of the SMC approved under the SCM and BRNOC Development Consents is provided in Figure 2. At the time of writing (April 2017), construction and mining activities approved under the SCM Development Consent and the BRNOC Development Consent are suspended. However, the SMC continues to process ROM coal from DCM and transport ROM coal from the SMC by rail under the SCM Development Consent. On 29 May 2015, the NSW Planning Assessment Commission approved the Stratford Extension Project (SEP) (Development Consent SSD-4966) under the State Significant Development provisions (Division 4.1) of Part 4 of the NSW Environmental Planning and Assessment Act, 1979 (EP&A Act). The SEP involves the extension and continuation of mine operations at the SMC. SCPL has not commenced the SEP under Development Consent SSD PURPOSE AND SCOPE This SMC Blast Management Plan (BLMP) has been prepared in accordance with the requirements of: Condition 15, Schedule 3 (Environmental Performance Conditions) of the SCM Development Consent; and Condition 6.3, Schedule 2 of the BRNOC Development Consent. SCM and BRNOC operations are covered collectively in this BLMP. The overall objectives of the BLMP are to: ensure the safety of members of the public during blasting; ensure the protection of livestock and animals during blasting; prevent damage to private or public property as a result of blasting; and minimise any nuisance to the public as a result of blasting. BLAST MANAGEMENT PLAN SMC - E 1 Stratford Coal Pty Ltd

6

7 v Do Wheatleys MLA1 ROSEVILLE WEST PIT ML1733 v Lane BOWENS ROAD NORTH OPEN CUT Northern Waste Emplacement v Cr eek Creek STRATFORD ML1577 Trap ML1528 AVON RIVER g v Road ale Cox on d Av Wenham v ML1409 Road d Roa v WAY THE BUCKETTS ML1447 ens Bow Roseville Pit (Backfilled) Western Co-Disposal Area Workshops and Administration cce Main A " STRATFORD MAIN PIT (Co-Disposal Area) v MLA2 Return Water Dam d ss Roa " Road Parkers/Bowens Road West Pit Void ROM Pad and Stockpiles " " Parkers Product Stockpile STRATFORD WASTE EMPLACEMENT " " Rail Loop ML1538 Upper Avon Ro ad ML1360 Roseville Extended Pit (Partially Backfilled) v Bowens Stratford East Dam CHPP and Infrastructure ML1521 Avondale NO R TH COA S T Cre ek WAY R A IL CRAVEN " ETL Realignment GCL MPCF_201A Glen v Roa d ± 1 Kilometres GDA 1994 MGA Zone v 0 LEGEND Mining Lease Boundary Mining Lease Application Boundary Electricity Transmission Line STRATFORD MINING COMPLEX General Arrangement Source: LPI (2016); Geoscience Australia (2006); NSW Department of Industry (2016); SCPL (2016) Figure 2

8 1.3 STRUCTURE OF THE BLMP The remainder of the BLMP is structured as follows: Section 2: Section 3: Section 4: Section 5: Section 6: Section 7: Outlines the statutory requirements applicable to the BLMP. Details the blasting criteria and performance indicators that will be used to assess blasting impacts at the SMC. Describes blasting management measures. Describes blasting monitoring program. Provides a Contingency Plan to manage any unpredicted impacts and their consequences. Describes the annual review and improvement of environmental performance process. Section 8: Describes the management and reporting of incidents, complaints and non-compliances. Section 9: List of references cited. BLAST MANAGEMENT PLAN SMC - E 4 Stratford Coal Pty Ltd

9 2 STATUTORY REQUIREMENTS SCPL s statutory obligations relevant to the SMC are contained in: (i) (ii) (iii) the conditions of the SCM and BRNOC Development Consents; relevant licences and permits, including conditions attached to mining leases; and other relevant legislation. These are described below. 2.1 EP&A ACT DEVELOPMENT CONSENTS The conditions of the SCM and BRNOC Development Consents relevant to blast management are described below Blast Management Plan Condition 15, Schedule 3 (Environmental Performance Conditions) of the SCM Development Consent and Condition 6.3, Schedule 2 of the BRNOC Development Consent require the preparation of a BLMP and blast management for the SMC. Table 1 presents these requirements and indicates where they are addressed within this BLMP. Table 1 NSW Development Consent Requirements Relevant to this BLMP NSW Development Consent Conditions SCM Development Consent DA 23-98/ The Applicant shall prepare and implement a Blast Management Plan for the development to the satisfaction of the Director-General. This plan must: (a) (b) (c) be prepared in consultation with the DECCW, and submitted to the Director-General for approval by the end of May 2011; describe the blast mitigation measures that would be implemented to ensure compliance with the relevant conditions of this consent; describe the measures that would be implemented to ensure the public can get up-to-date information on proposed blasting schedule on site; and BLMP Section This Document Section 4 Section 4.2 (d) include a blast monitoring program to evaluate the performance of the development. Section 5 BRNOC Development Consent DA (f) The Applicant shall prepare and implement a Blasting/Vibration Management Plan to the satisfaction of the Director-General, prior to the commencement of any blasting. The Plan must include, but not be limited to, the following matters: This Document (i) compliance standards; Section 3 (ii) mitigation standards; Section 4 (iii) remedial action; Section 6 (iv) monitoring methods and program; Section 5.1 (v) monitoring program for flyrock distribution; Section 5.4 (vi) measures to be undertaken to demonstrate that the Bowens Road North mine is achieving best practice in minimising air blast overpressure, ground vibration levels, fumes and odours from blasting activities. This shall include specific reference to best practice measures employed to meet the blasting criteria under subclauses 6.3(a) and 6.3(b) at the Ellis, Atkins and Clarke residences; Sections 4 & 5 BLAST MANAGEMENT PLAN SMC - E 5 Stratford Coal Pty Ltd

10 Table 1 (continued) NSW Development Consent Requirements Relevant to this BLMP (vii) BRNOC Development Consent DA measures to protect underground utilities (eg: rising mains, subsurface telecommunication and electric cables) and livestock on non-mine owned land; (viii) measures to consider the blasting activities from the Stratford mine. This shall include details of the proposed measures to ensure that cumulative blast related impacts are managed; (ix) (x) (xi) procedures for the notification of occupiers of buildings and residents prior to detonation of each blast; measures to ensure no damage by flyrock to people, property, livestock and powerlines; and details of the inter-relationship of this plan with the blast requirements of the development consent for Stratford Coal Mine. 6.3(g) The applicant shall, as a minimum, advise occupiers of buildings and residents within two (2) kilometres of blasting locations of future blasting events on at least a monthly basis, and of any changes to the proposed blast schedules. 6.3(h) Upon written request of the owner of any dwelling located within two (2) kilometres of the blasting locations, the Applicant shall arrange at its own costs, for the inspection by a technically qualified person agreed to by both parties, to record the material condition of any structure on such property within 14 days of receipt of the request. The Applicant shall supply a copy of any inspection report, certified by the person who undertook the inspection, to the relevant property owner within fourteen (14) days of the receipt of the report. Section 4 Section 4.6 Section 4 Section 5.4 This Document Section 4.2 Section Blasting criteria and blasting condition requirements under the SCM Development Consent and BRNOC Development Consent are described in Section Management Plan Requirements Condition 2, Schedule 5 of the SCM Development Consent outlines the management plan requirements that are applicable to the preparation of the BLMP. Table 2 presents these requirements and indicates where they are addressed within this BLMP. Table 2 Management Plan Requirements Development Consent Condition Condition 2 of Schedule 5 2. The Applicant shall ensure that the management plans required under this consent are prepared in accordance with any relevant guidelines, and include: BLMP Section (a) detailed baseline data; N/A (b) (c) (d) (e) a description of: the relevant statutory requirements (including any relevant consent, licence or lease conditions); Section 2 any relevant limits or performance measures/criteria; Sections 3 and 4 the specific performance indicators that are proposed to be used to judge the performance of, or guide the implementation of, the development or any management measures; a description of the measures that would be implemented to comply with the relevant statutory requirements, limits, or performance measures/criteria; a program to monitor and report on the: impacts and environmental performance of the development; effectiveness of any management measures (see c above); a contingency plan to manage any unpredicted impacts and their consequences; Sections 3 and 4 Section 4 Section 5 Section 6 BLAST MANAGEMENT PLAN SMC - E 6 Stratford Coal Pty Ltd

11 Table 2 (continued) Management Plan Requirements (f) (g) Development Consent Condition a program to investigate and implement ways to improve the environmental performance of the development over time; a protocol for managing and reporting any; incidents; complaints; non-compliances with statutory requirements; and BLMP Section Section 5 Section 8 exceedances of the impact assessment criteria and/or performance criteria; and (h) a protocol for periodic review of the plan. Section LICENCES, PERMITS AND LEASES In addition to the Development Consents, all activities at or in association with the SMC will be conducted in accordance with a number of licences, permits and leases which have been issued. Key licences, permits and leases pertaining to the SMC include: The conditions of Environment Protection Licences (EPLs) No (SCM) and No (BRNOC) issued under the NSW Protection of the Environment Operations Act, The conditions of the following Mining Leases (MLs) issued under the NSW Mining Act, 1992: - MLs 1360, 1409, 1447, 1538, 1521 and 1733 (SCM); and - MLs 1528 and 1577 (BRNOC). The SMC Mining Operations Plan (MOP). Mining and occupational health and safety related approvals granted by NSW Department of Industry, Skills and Regional Development Division of Resources and Energy and SafeWork NSW. 2.3 OTHER LEGISLATION SCPL will ensure that the SMC is consistent with the SMC and BRNOC Development Consents and any other legislation that is applicable to an approved Project under Part 4 of the EP&A Act. In addition to those Acts referred to in Section 2.2, the following NSW Acts may be applicable to the conduct of the SMC: Contaminated Land Management Act, 1997; Dangerous Goods (Road and Rail Transport) Act, 2008; National Parks and Wildlife Act, 1974; Noxious Weeds Act, 1993; Roads Act, 1993; Threatened Species Conservation Act, 1995; Work Health and Safety (Mines and Petroleum Sites) Act, 2013; BLAST MANAGEMENT PLAN SMC - E 7 Stratford Coal Pty Ltd

12 Crown Lands Act, 1989; Dams Safety Act, 2015; Fisheries Management Act, 1994; and Petroleum (Onshore) Act, COMPLIANCE STANDARDS AND GUIDELINES Blasting will be conducted in accordance with the following: Australian Standard (AS) 2187:2006 Explosives Storage Transport and Use. Australian and New Zealand Environment Conservation Council (1990) Technical Basis for Guidelines to Minimise Annoyance Due to Blasting Overpressure and Ground Vibration. Australian Explosives Industry and Safety Group Inc. (2011) Code of Practice: Prevention and Management of Blast Generated NOx Gases in Surface Blasting. These technical standards and guidelines are considered to be best practice. BLAST MANAGEMENT PLAN SMC - E 8 Stratford Coal Pty Ltd

13 3 BLASTING CRITERIA AND PERFORMANCE INDICATORS 3.1 NSW DEVELOPMENT CONSENT CONDITIONS Blasting Criteria Blasting criteria is provided in Condition 9, Schedule 3 (Environmental Performance Conditions) of the SCM Development Consent, viz.: Blasting Criteria 9. The Applicant shall ensure that blasting on site does not cause any exceedances of the criteria in Table 4. Table 4: Blasting criteria Location Residence on privately owned land Airblast overpressure (db(lin Peak)) Ground vibration (mm/s) Allowable exceedance % of the total number of blasts over a period of 12 months % However, these criteria do not apply if the Applicant has a written agreement with the relevant landowner to exceed the Criteria, and the Applicant has advised the Department in writing of the terms of this agreement. Blasting criteria is also provided in Condition 6.3, Schedule 2 of the BRNOC Development Consent, viz.: Overpressure (a) The overpressure level from blasting operations on the premises must not: (i) Exceed 115dB (Linear Peak) for more than 5% of the total number of blasts over a period of 12 months; and (ii) Exceed 120dB (Linear Peak) at any time, The airblast overpressure values stated above apply when measurements are performed with equipment having a lower cut-off frequency of 2Hz or less. If the instrumentation has a higher cut off frequency then a correction of 5dB should be added to the measured value. Equipment with a lower cut-off frequency exceeding 10Hz should not be used for the purpose of measuring airblast overpressure. Ground vibration (ppv) (b) Ground vibration peak particle velocity from the blasting operations at noise sensitive receivers must not: (i) Exceed 5mm/s for more than 5% of the total number of blasts over a period of 12 months; (ii) Exceed 10mm/s at anytime, when measured at any point within one (1) metre of any affected residence or other noise sensitive location such as a school or hospital.... Blast Monitoring (k) The applicant must monitor ground vibration and overpressure of all blasts. (l) Ground vibration or the overpressure must be measured at all noise sensitive sites (e.g. residences, hospitals, schools etc), selected in consultation with the EPA. BLAST MANAGEMENT PLAN SMC - E 9 Stratford Coal Pty Ltd

14 3.1.2 Blasting Hours and Frequency Conditions 10 and 11 of Schedule 3 (Environmental Performance Conditions) of the SCM Development Consent prescribe the blasting hours and frequency of blasting permitted at the SCM viz.: Blasting Hours 10. The Applicant shall only carry out blasting on the site between 9am and 5pm Monday to Saturday inclusive. No blasting is allowed on Sundays, public holidays, or at any other time without the written approval of the Director-General. Blasting Frequency 11. The Applicant shall not carry out more than: (a) 1 blast a day on site unless an additional blast is required following a misfire; and (b) 3 blasts a week, averaged over any 12 month period. Condition 6.3 of Schedule 2 of the BRNOC Development Consent prescribes the blasting hours and frequency of blasting permitted at the BRNOC viz.: Time of blasting (c) Blasting operations on the premises may only take place between 9.00am and 5.00pm Mondays to Saturdays inclusive. (d) The hours of operation for blasting operations specified in this condition may be varied if the EPA, having regard to the effect that the proposed variation would have on the amenity of the residents in the locality, gives written consent to the variation. Frequency of blasting (e) Blasting at the premises is limited to one (1) blast each day on which blasting is permitted unless under extenuating circumstances as determined by the Mine Manager. In such cases when an additional blast is deemed necessary the EPA shall be notified in writing within twenty four hours of the additional blast occurring Property Inspections and Investigations Conditions 12 and 13, Schedule 3 (Environmental Performance Conditions) of the SCM Development Consent describe the procedures to be implemented by SCPL regarding the inspection and investigation of buildings and/or structures on privately-owned land for blasting impacts viz. Property Inspections 12. If the Applicant receives a written request for the owner of any privately-owned land within 2 kilometres of the approved open cut mining pit on site, for a property inspection to establish the baseline condition of any buildings and/or structures on their land, or to have a previous property inspection report updated, then within 2 months of receiving this request the Applicant shall: (a) (b) commission a suitably qualified, experienced and independent person, whose appointment has been approved by the Director-General, to: establish the baseline condition of any buildings and/or structures on the land, or update the previous property inspection; inspect the condition of any building or structure on the land, and recommend measures to minimise the potential blasting impacts of the development on these buildings and/or structures; and give the landowner a copy of the new or updated property inspection report. BLAST MANAGEMENT PLAN SMC - E 10 Stratford Coal Pty Ltd

15 Property Investigations 13. If the owner of privately-owned land claims in writing that the buildings and/or structures on his/her land have been damaged as a result of blasting on site, then within 2 months of receiving this claim, the Applicant shall: (a) commission a suitably qualified, experienced and independent person, whose appointment has been approved by the Director-General, to investigate the claim; and (b) give the landowner a copy of the property investigation report. If this independent property investigation confirms the landowner s claim, and both parties agree with these findings, then the Applicant shall repair the damages to the satisfaction of the Director-General. If the Applicant or landowner disagrees with the findings of the independent property investigation, either party may refer the matter to the Director-General for resolution Operating Conditions The operating conditions relating to blasting required under the SCM Development Consent are detailed in Condition 14 of Schedule 3 (Environmental Performance Conditions) viz.: 14. During mining operations on site, the Applicant shall: (a) implement best practice blasting practice to: protect the safety of people and livestock in surrounding area; protect public or private property in the surrounding area; and minimise the dust and fume emissions of any blasting on site; and (b) operate a suitable system to enable the public to get up-to-date information on the proposed blasting schedule on site, to the satisfaction of the Director-General. 3.2 EPL CONDITIONS The conditions in EPL No and EPL No relevant to blasting are provided in Table 3. Table 3 EPL Conditions Relevant to Blasting Licence Condition Condition Requirement EPL No L3.1 The overpressure level from blasting operations carried out in or on the premises must not: a) exceed 115 db(l) for more than 5% of the total number of blasts carried out on the premises within the 12 months annual reporting period; and b) exceed 120 db(l) at any time at any residence or noise sensitive location (such as a school or hospital) that is not owned by the licensee or subject of a private agreement between the owner of the residence or noise sensitive location and the licensee as to an alternative overpressure level. L3.2 The ground vibration peak particle velocity from blasting operations carried out in or on the premises must not: a) exceed 5mm/second for more than 5% of the total number of blasts carried out on the premises within the 12 months annual reporting period; and b) exceed 10mm/second at any time at any residence or noise sensitive location (such as a school or hospital) that is not owned by the licensee or subject of a private agreement between the owner of the residence or noise sensitive location and the licensee as to an alternative ground vibration level. BLAST MANAGEMENT PLAN SMC - E 11 Stratford Coal Pty Ltd

16 Table 3 (Continued) EPL Conditions Relevant to Blasting Licence Condition Condition Requirement EPL No (continued) EPL No L3.3 The Licensee must not carry out more than: a) 1 blast on each day unless an additional blast is required due to a misfire; and b) 3 blasts a week, averaged over any 12 month period. L3.4 Blasting operations at the premises may only take place between 9am and 5pm Monday to Saturday inclusive. Where compelling reasons exist the EPA may approve in writing a blast to occur outside the abovementioned hours. M7.1 The licensee must monitor all blasts carried out in or on the premises at or near the nearest residence or noise sensitive location (such as a school or hospital) that is likely to be most affected by the blast and that is not owned by the licensee or subject of a private agreement between the owner of the residence or noise sensitive location and the licensee relating to alternative blasting limits. M7.2 All blasting shots on the premises must be recorded on video from a position allowing the collars of the shot, and where possible, any face, or toe, to be seen. R4.1 The licensee must report any exceedence of the licence blasting limits to the regional office of the EPA as soon as practicable after the exceedence becomes known to the licensee or to one of the licensee s employees or agents. L3.1 Blasting in or on the premises must only be carried out between 9:00 hours and 17:00 hours, Monday to Saturday. Blasting in or on the premises must not take place on Sundays or Public Holidays without the prior approval of the EPA. L3.2 The hours of operation for blasting operations specified in this condition may be varied if the EPA, having regard to the effect that the proposed variation would have on the amenity of residents in the locality, gives written consent to the variation. L3.3 The airblast overpressure level from blasting operations carried out in or on the premises must not exceed: a) 115 db (Lin Peak) for more than 5% of the total number of blasts during each reporting period; and b) 120 db (Lin Peak) at any time. At any residence or noise sensitive location (such as a school or hospital) that is not owned by the licensee or subject of a private agreement between the owner of the residence or noise sensitive location and the licensee as to an alternative overpressure level. L3.4 The ground vibration peak particle velocity from blasting operations carried out in or on the premises must not exceed: a) 5mm/second for more than 5% of the total number of blasts carried out on the premises during each reporting period; and b) 10mm/second at any time At any residence or noise sensitive location (such as a school or hospital) that is not owned by the licensee or subject of a private agreement between the owner of the residence or noise sensitive location and the licensee as to an alternative ground vibration level. M7.1 All blasting shots on the premises must be recorded on video from a position allowing the collars of the shot, and where possible, any face, or toe, to be seen. 3.3 PERFORMANCE INDICATORS The extent to which this BLMP complies with the SCM Development Consent, BRNOC Development Consent, EPL 5161 and EPL requirements will be measured by the following performance indicators: 1. Compliance with relevant blasting criteria at monitoring locations, in particular those representative of sensitive receptor locations. 2. Compliance with blast restrictions associated with frequency and blast hours. 3. The frequency and extent of complaints reported to SCPL in relation to blasting. 4. Compliance with this BLMP, as indicated by internal and statutory review, reporting and auditing (Sections 7 and 8). BLAST MANAGEMENT PLAN SMC - E 12 Stratford Coal Pty Ltd

17 4 MANAGEMENT MEASURES Mining activities at the SMC are currently suspended including drill and blasting activities (Section 1.1). Notwithstanding the above, in addition to the blast design and implementation methodologies, the following activities shall be undertaken to minimise any potential impacts of blasting at the SMC (when operating): Development and ongoing review of site laws (i.e. site based prediction equations) for ground vibration and airblast. A commitment to notify the occupants of residences within 2 km of blasting activities that they are entitled to a structural inspection by a suitably qualified, experienced and independent person. Extension of the blast notification list to include any new landowners within 2 km of blasting areas, including properties within 2 km that do not have residences within 2 km. Safety control measures and notification procedures for property managers regarding livestock in proximity to blasting activities. These mitigation measures will be recorded, and assessed if required, allowing for refinement of blasting practices. The blast engineer in conjunction with the Environment & Community Superintendent (or delegate) will keep records and undertake required assessments. All management measures provided in this section have been developed in accordance with the best practice technical standards and guidelines outlined in Section BLAST TIMING AND FREQUENCY Blasting will only occur between 9.00 am and 5.00 pm, Monday to Saturday, inclusive. No blasting will occur on Sundays, public holidays or any other time without the written approval of the Secretary of the DP&E in accordance with Condition 10, Schedule 3 (Environmental Performance Conditions) of the SCM Development Consent, Condition 6.3(c), Schedule 2 of the BRNOC Development Consent, EPL 5161 and EPL There will be no more than three blasts per week on site, averaged over a calendar year. Only one blast is to occur each day on site BLASTING AND LOCAL RESIDENCES Notification of Blasting and/or Road Closure A Blasting Information Line ( ) has been established to provide the public with up-todate information on the blasting schedule and road closures at the mine. The existence of the Blasting Information Line is promoted by advertising within the Dungog Chronicle and the Gloucester Advocate on two occasions each year. The Blasting Information Line is also featured within the Pink Pages local telephone directory issued by each local newspaper as well as in the Sensis White Pages Directory (Newcastle and Kempsey Directory areas). 1 A blast refers to a single blast event, which may involve a number of individual blasts fired in quick succession in a discrete area of the mine. BLAST MANAGEMENT PLAN SMC - E 13 Stratford Coal Pty Ltd

18 4.2.2 Property Inspections If SCPL receives a written request from the owner of any privately-owned land within 2 km of an approved open cut mining pit at the SMC for a property inspection to establish the baseline condition of any buildings and/or structures on his/her land, or to have a previous property inspection report updated, then within 2 months of receiving this request, SCPL will: (a) commission a suitably qualified, experienced and independent person, whose appointment is acceptable to both parties, to: establish the baseline condition of any buildings and/or structures on the land, or update the previous property inspection report; identify any measures that should be implemented to minimise the potential blasting impacts of the SMC on these buildings and/or structures; and (b) give the landowner a copy of the new or updated property inspection report. If there is a dispute over the selection of the suitably qualified, experienced and independent person, or SCPL or the landowner disagrees with the findings of the independent property investigation, either party may refer the matter to the Secretary of the DP&E for resolution Property Investigations If the owner of any privately-owned land claims that the buildings and/or structures on his/her land have been damaged as a result of blasting at the SMC, then within 2 months of receiving this claim in writing from the landowner, SCPL will: (a) commission a suitably qualified, experienced and independent person, whose appointment is acceptable to both parties, to investigate the claim; and (b) give the landowner a copy of the property investigation report. If this independent property investigation confirms the landowner s claim, and both parties agree with these findings, then SCPL will repair the damages to the satisfaction of the Secretary of the DP&E. If there is a dispute over the selection of the suitably qualified, experienced and independent person, or SCPL or the landowner disagrees with the findings of the independent property investigation, then either party may refer the matter to the Secretary of the DP&E for resolution Change of Ownership SCPL will conduct regular checks of the ownership of properties within 2 km of the SMC using current land tenure records. In the event that non-scpl owned land is under new ownership, the notification and inspection procedure described in Sections will be enacted with the new owner. 4.3 ROAD CLOSURE PROTOCOL A Road Closure Management Plan was prepared to address issues relating to blasting near a public road, in accordance with the BRNOC Development Consent Condition 6.3(i), Schedule 2. The road closure management measures in the Road Closure Management Plan would be implemented if road closures are required during blasting. BLAST MANAGEMENT PLAN SMC - E 14 Stratford Coal Pty Ltd

19 4.4 FUME MANAGEMENT Blasting activities have the potential to result in fugitive fume and particulate matter emissions. Imperfect blasts (e.g. when the explosive product is incorrectly formulated) may result in nitrogen oxide (NOx) fumes (Australian Explosives Industry and Safety Group Inc., 2011). The management of blast fume is described in the SMC Blast Fume Management Procedure (SCPL, 2016). Measures to minimise or avoid imperfect blasts would be implemented in accordance with the Code of Practice: Prevention and Management of Blast Generated NOx Gases in Surface Blasting (Australian Explosives Industry and Safety Group Inc., 2011) and would include: Conduct of a risk assessment prior to blasting which will review factors such as: - geological conditions; - ground conditions (e.g. presence of clay or loose/broken ground of heavily rain affected ground); - location of the blast relative to previous blasts which may have triggered fume events; - blasting product selection; and - presence of groundwater. Based on outcomes of the risk assessment, the blasting method will be altered including consideration of the following: - minimising the time between drilling and loading, and loading and shooting of the blast; - formulation of explosive products to an appropriate oxygen balance to reduce the likelihood of fumes; and - meteorological conditions in blast scheduling. Risk Assessment factors outlined above are assigned a score which corresponds to the likelihood of fume generation (1=rare to 5=almost certain). The score assigned to each of the parameters is then multiplied by the full time weighting of each parameter. The sum of the resulting scores then determines the overall likelihood of fume generation. The outcome of the risk assessment determines the guidelines for product selection and sleep time (i.e. the amount of time a charge is located within the blast hole prior to detonation). Where particular circumstances are known to increase the likelihood of a blast producing unacceptable fumes and/or odours (i.e. prevailing wind direction indicates that any potentially generated fume will be carried to a potential receiver), control measures will be implemented to avoid those operational circumstances where practicable. In the interest of the minimisation of fume generation to the greatest extent possible, the type of explosive approved for use at the SMC has been limited to heavy ammonium nitrate fuel oil (HANFO), Fortran Eclipse 12, Fortran Eclipse 13 and Fortis Eclipse. The exact explosive type used in each circumstance is determined by the risk assessment process outlined above. 4.5 INTERACTION WITH SURROUNDING INFRASTRUCTURE SCPL will establish a co-operation agreement with any surrounding infrastructure owners that will be impacted by blasting. The co-operation agreement will address any interaction issues between the two operations, along with relevant measures to minimise any incompatibility between the project and the SMC. BLAST MANAGEMENT PLAN SMC - E 15 Stratford Coal Pty Ltd

20 5 MONITORING 5.1 MONITORING METHODS AND PROGRAM Monitoring will be conducted to confirm compliance with the blasting limits/criteria defined in Section 3 and will use a blasting seismograph which meets the standards specified in the Australian Standard Explosive Code (AS ). SCPL currently has an existing blast monitoring network as shown in Figure 3. Note that all EPL licensed monitoring locations: are subject to permission to monitor being given by the property owner; and may be altered or supplemented on the basis of blasting results over time and/or community feedback. Any alteration to an EPL designated monitoring location will first require a relevant EPL variation. Monitoring data is included within the Annual Review which is made available on the Stratford Coal website ( Blasting results will be recorded and monitoring data provided to the Community Consultative Committee (CCC) established for the SMC. In the event that upper limits of either blast overpressure or ground vibration limits are exceeded, the DP&E and Environment Protection Authority (EPA) will be informed within 24 hours of the blast and the EPA notified in accordance with the EPL requirements. 5.2 VIDEO MONITORING OF BLASTS SCPL monitors blasting using video and audio recording so that blasts can be reviewed after the event. In accordance with Condition M7.1 of EPLs 5161 and 11745, all blast shots will be recorded on video from a position allowing the collars of the shot, and where possible, any face, and/or toe, to be seen on the video. SCPL will retain a copy of each video for at least 12 months after the blast is initiated. 5.3 MONITORING OF FUME The level and rating of blast fume generation will be monitored for each blast by the shotfirer as described in the Blast Fume Management Procedure. In situations where fume has been generated and where practicable, a visual assessment will be made of the extent to which the fume has travelled as well as its dispersion time. As described above, blasting at the SMC is monitored using video and audio recording, so where necessary, blast fume can be reviewed after an event. BLAST MANAGEMENT PLAN SMC - E 16 Stratford Coal Pty Ltd

21

22 5.4 MONITORING PROGRAM FOR FLYROCK DISTRIBUTION Following each blast the shotfirer will inspect the blast site to determine whether all explosive has satisfactorily detonated and whether it is safe for work to resume in the area. During this inspection, a visual assessment will be made of flyrock distribution in the immediate area. Similarly, where blasting occurs in a location where there is a potential for flyrock to reach a public road or private property, an inspection of the road or private property will be undertaken post-blast to ascertain whether flyrock has reached the road or private property. Should flyrock be present on the road or private property, it will be removed in order to make the trafficable surface safe for vehicle and pedestrian use. Additionally, any damage to a public road or privately-owned property caused by flyrock will be repaired by SCPL. BLAST MANAGEMENT PLAN SMC - E 18 Stratford Coal Pty Ltd

23 6 BLASTING PROTOCOLS & CONTINGENCY PLAN An incident investigation (i.e. remedial action) will be required when any one of the following incidents arises following blasting: monitoring indicates an exceedance of the blasting limits stated within the SMC Development Consent, BRNOC Development Consent, EPL 5161 and EPL 11745; breach of any other Licence, Lease or Development Consent condition relating to blasting; receipt of a complaint from a member of the public or a public authority following blasting; and evidence of structural damage to nearby privately or publicly-owned structures attributable to blasting. 6.1 CONTINGENCY PLAN In the event of any of the above incidents or exceedances SCPL will implement the following Contingency Plan (i.e. remedial actions): The exceedance of the blasting criteria will be reported to the Operations Manager and Environment & Community Superintendent (or delegate) within 24 hours of assessment completion. SCPL will report the exceedance of the blasting criteria to the EPA and the DP&E as soon as practicable (i.e. within 24 hours of assessment completion). SCPL will identify an appropriate course of action with respect to the identified impact(s), in consultation with specialists and EPA, as necessary. For example contingency measures, such as, but not limited to, those described in Section 6.2 of this BLMP. SCPL will, on request, submit the proposed course of action to the DP&E for approval. SCPL will implement the approved course of action to the satisfaction of the DP&E Blast Fume SCPL is required to notify the relevant regulatory authorities including the EPA and DP&E of any blast producing post blast fume that rates 3 at its highest extent and leaves the site, and any blast that rates 4 and 5. In the event that monitoring records Scale 3 or above blast fumes blown towards nearby receivers without significant dispersion before exiting the relevant EPLs, the Pollution Incident Response Management Plan (PIRMP) (SCPL, 2017) will be implemented and an investigation process will be undertaken to identify any possible mitigation measures which will be implemented to minimise the potential for ongoing fume generation as a result of blasting. The investigation process will be undertaken in accordance with Sections 5 and 6 of the Australian Explosives Industry and Safety Group Inc. Code of Practice, Prevention and Management of Blast Generated NOx Gases in Surface Blasting (Australian Explosives Industry and Safety Group Inc., 2011). BLAST MANAGEMENT PLAN SMC - E 19 Stratford Coal Pty Ltd

24 6.2 POTENTIAL CONTINGENCY MEASURES Potential contingency measures will be reviewed during revisions of this BLMP. Key potential contingency measures to be implemented following the exceedance of blast criteria identified in Section 3 shall include the following: SCPL will notify affected landholder and tenants of the exceedance and provide them with blast monitoring results, and will not continue blasting at SMC until it is deemed compliant. SCPL will acquire affected properties on request in accordance with Conditions 5, Schedule 4 of the SCM Development Consent. BLAST MANAGEMENT PLAN SMC - E 20 Stratford Coal Pty Ltd

25 7 ANNUAL REVIEW AND IMPROVEMENT OF BLMP 7.1 ANNUAL REVIEW In accordance with Condition 3, Schedule 5 of the SCM Development Consent, SCPL will conduct an Annual Review of the environmental performance of the SMC by the end of December each year. The Annual Review meets the requirement for the Annual Environmental Management Report required by Condition 9.2 Schedule 2 of BRNOC Development Consent. The Annual Review will be made publicly available on the Stratford Coal website, in accordance with Condition 10, Schedule 5 of the SCM Development Consent. The Annual Review will specifically address the following aspects of Condition 3, Schedule 5, which are directly relevant to blast management: include a comprehensive review of the monitoring results and complaints records for the SMC over the previous calendar year, including a comparison of these results against the: relevant statutory requirements, limits or performance measures/criteria; monitoring results of previous years; and relevant predictions in the EA; identify any non-compliance over the past year, and describe what actions were (or are being) taken to ensure compliance; identify any trends in the monitoring data over the life of the SMC; identify any discrepancies between the predicted and actual impacts of the SMC, and analyse the potential cause of any significant discrepancies; and describe what measures will be implemented over the next year to improve the environmental performance of the SMC. This BLMP will be reviewed within three months of the submission of an Annual Review, and revised where appropriate, as described in Section BLMP REVIEW AND UPDATE In accordance with Condition 4, Schedule 5 of the SCM Development Consent, this BLMP will be reviewed, and if necessary revised to the satisfaction of the Secretary of the DP&E within three months of the submission of: an Annual Review, in accordance with Condition 3, Schedule 5; an incident report, in accordance with Condition 6, Schedule 5; an audit, in accordance with Condition 8, Schedule 5; or any modification to the conditions of SCM Development Consent. Where this review leads to revisions of the BLMP, the revised BLMP will be submitted for the approval of the Secretary of the DP&E. The revision status of this BLMP is indicated on the title page of each copy. This BLMP will be made publicly available on the Stratford Coal website, in accordance with Condition 10, Schedule 5 of the SCM Development Consent. A hard-copy will also be kept at the SMC. BLAST MANAGEMENT PLAN SMC - E 21 Stratford Coal Pty Ltd

26 8 REPORTING AND MANAGEMENT PROTOCOLS In accordance with Condition 2(g), Schedule 5 of the SCM Development Consent, SCPL has developed protocols for managing and reporting the following: incidents; complaints; non-compliances with statutory requirements; and exceedances of the impact assessment criteria and/or performance criteria. The management of incidents is described in detail in the PIRMP (SCPL, 2017). The management of complaints and non-compliances is described in detail in the Environmental Management Strategy. The management of exceedances of performance criteria is detailed in Sections 5 and 6 of this BLMP. BLAST MANAGEMENT PLAN SMC - E 22 Stratford Coal Pty Ltd

27 9 REFERENCES Australian and New Zealand Environment Council (1990) Technical Basis for Guidelines to Minimise Annoyance Due to Blasting Overpressure and Ground Vibration. Australian Explosives Industry and Safety Group Inc. (2011) Code of Practice: Prevention and Management of Blast Generated NOx Gases in Surface Blasting. Stratford Coal Pty Ltd (2017) Stratford Coal Mine Pollution Incident Response Management Plan. Stratford Coal Pty Ltd (2016) Stratford Mining Complex Blast Fume Management Procedure. BLAST MANAGEMENT PLAN SMC - E 23 Stratford Coal Pty Ltd

Blast Management. Plan for

Blast Management. Plan for for Document Table of Contents 1 Introduction... 4 1.1 Purpose and Scope... 4 1.2 Objectives... 9 1.3 Roles and Responsibilities... 9 1.4 Definitions... 11 2 Commitments... 12 3 Blast Impact Assessment

More information

Management Plan. Blast

Management Plan. Blast Management Plan Blast Doc ID No. Version No. Owner Next Review Date 3-8448 No.1 HSEF Manager 1 May 15 Management Plan Blast Risk Statement: High This document will be reviewed on a yearly basis, unless

More information

Section 80 of the Environmental Planning and Assessment Act 1979

Section 80 of the Environmental Planning and Assessment Act 1979 Development Consent Section 80 of the Environmental Planning and Assessment Act 1979 I, the Minister Assisting the Minister for Infrastructure and Planning (Planning Administration), approve the Development

More information

Voluntary Land Acquisition and Mitigation Policy For State Significant Mining, Petroleum and Extractive Industry Developments 15 DECEMBER 2014

Voluntary Land Acquisition and Mitigation Policy For State Significant Mining, Petroleum and Extractive Industry Developments 15 DECEMBER 2014 Voluntary Land Acquisition and Mitigation Policy For State Significant Mining, Petroleum and Extractive Industry Developments 15 DECEMBER 2014 CONTENTS PRELIMINARY... 1 Purpose... 1 Application... 1 Commencement...

More information

This decision is made under sections 130( 1 ) and 133 of the Environment Protection and Biodiversity Conservation Act 1999.

This decision is made under sections 130( 1 ) and 133 of the Environment Protection and Biodiversity Conservation Act 1999. Australian Government Department of the Environment and Energy Approval Mt Arthur Coal open cut modification, Muswellbrook, NSW, (EPBC 2014/7377). This decision is made under sections 130( 1 ) and 133

More information

PORT PHILLIP PLANNING SCHEME. Condition

PORT PHILLIP PLANNING SCHEME. Condition SCHEDULE 1 TO THE CAPITAL CITY ZONE Shown on the planning scheme map as CCZ1. FISHERMANS BEND URBAN RENEWAL AREA Purpose To use and develop the Fishermans Bend Urban Renewal Area generally in accordance

More information

MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY. 1. This Act shall be called the Mines and Minerals Management Act 1995.

MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY. 1. This Act shall be called the Mines and Minerals Management Act 1995. MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY 1. This Act shall be called the Mines and Minerals Management Act 1995. 2. The Act shall come into force on the First Day of September 1995.

More information

SECTION B - GUIDELINES

SECTION B - GUIDELINES SECTION B - GUIDELINES APPLICATION KIT FOR SUBDIVISION RESOURCE CONSENT UNDER SECTION 88 OF THE RESOURCE MANAGEMENT ACT 1991 CONTENTS: PLEASE READ AND COMPLETE 1. Making an Application for a Subdivision

More information

OUTLINE PLANNING PERMISSION

OUTLINE PLANNING PERMISSION Correspondence Address: G L Hearn Mr Phil Robinson 1 St James' Square Manchester M2 6DN Applicant: Telereal Trillium 140 London Wall London EC2Y 5DN OUTLINE PLANNING PERMISSION Town and Country Planning

More information

SCHEDULE 12 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ12. Kororoit Precinct Structure Plan

SCHEDULE 12 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ12. Kororoit Precinct Structure Plan SCHEDULE 12 TO THE URBAN GROWTH ZONE Shown on the planning scheme map as UGZ12. Kororoit Precinct Structure Plan 1.0 The plan Map 1 below shows the future urban structure proposed in the Kororoit Precinct

More information

COGCC Staff s First Draft Proposed Rules Implementing Governor s Oil and Gas Task Force Recommendation Nos. 17 and 20 October 6, 2015

COGCC Staff s First Draft Proposed Rules Implementing Governor s Oil and Gas Task Force Recommendation Nos. 17 and 20 October 6, 2015 COGCC Staff s First Draft Proposed Rules Implementing Governor s Oil and Gas Task Force Recommendation Nos. 17 and 20 Effective Date: Following adoption by the Commission, these proposed new and amended

More information

Draft Voluntary Land Acquisition and Mitigation Policy

Draft Voluntary Land Acquisition and Mitigation Policy Draft Voluntary Land Acquisition and Mitigation Policy NSWMC Submission - 16 February 2018 1. Introduction NSWMC supports the updating of the Voluntary Land Acquisition and Mitigation Policy to reflect

More information

This program has been made possible by the New South Wales Government through the EPAs Contaminated Land Management Program under funding provided by

This program has been made possible by the New South Wales Government through the EPAs Contaminated Land Management Program under funding provided by This program has been made possible by the New South Wales Government through the EPAs Contaminated Land Management Program under funding provided by the NSW Environmental Trust SEPP55 introduced in 1998

More information

Community Occupancy Guidelines

Community Occupancy Guidelines Community Occupancy Guidelines Auckland Council July 2012 Find out more: phone 09 301 0101 or visit www.aucklandcouncil.govt.nz Contents Introduction 4 Scope 5 In scope 5 Out of scope 5 Criteria 6 Eligibility

More information

Public Hearing Published 8/21/2017 Public Hearing 9/21/2017 Approved 10/5/2017 RESOLUTION NO

Public Hearing Published 8/21/2017 Public Hearing 9/21/2017 Approved 10/5/2017 RESOLUTION NO Public Hearing Published 8/21/2017 Public Hearing 9/21/2017 Approved 10/5/2017 RESOLUTION NO. 17-009 A RESOLUTION OF THE CITY OF FLOWERY BRANCH CITY COUNCIL APPROVING A CONDITIONAL USE PERMIT (CUP) TO

More information

City of Brandon Brownfield Strategy

City of Brandon Brownfield Strategy City of Brandon Brownfield Strategy 2017 Executive Summary A brownfield is a property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous

More information

Information contained

Information contained Cadastral Integrity Unit Audit Survey Procedures August 2012 Table of Contents Introduction... 2 2. Objectives... 3 3. Roles, responsibilities and delegations... 4 3.1 Ethical conduct... 4 3.2 Workplace

More information

DAM SAFETY RISK MANAGEMENT WORKSHOP DAM SAFETY INSPECTION SYSTEM

DAM SAFETY RISK MANAGEMENT WORKSHOP DAM SAFETY INSPECTION SYSTEM DAM SAFETY RISK MANAGEMENT WORKSHOP DAM SAFETY INSPECTION SYSTEM 1. ROLES AND RESPONSIBILITIES OF DAM OWNER 2. ROLES AND RESPONSIBILITIES OF THE NSW OFFICE OF WATER (NOW) DAM SAFETY UNIT 3. DAM INSPECTION

More information

Standard for the acquisition of land under the Public Works Act 1981 LINZS15005

Standard for the acquisition of land under the Public Works Act 1981 LINZS15005 Standard for the acquisition of land under the Public Works Act 1981 LINZS15005 Version date: 20 February 2014 Table of contents Terms and definitions... 5 Foreword... 6 Introduction... 6 Purpose... 6

More information

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report.

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report. STAFF REPORT Planning and Development Department Subject: Application by RYC Property to rezone a portion of lands on John Murray Dr. and Megan Lynn Dr. from R2 to R3 and to enter into a Development Agreement

More information

Mining and the law: what you need to know

Mining and the law: what you need to know Mining and the law: what you need to know Gundaroo 18 September 2013 Belinda Rayment Solicitor Emily Ryan Outreach Solicitor Information, not advice The information contained in this workshop is a guide

More information

CONTAMINATED LAND IN WESTERN AUSTRALIA

CONTAMINATED LAND IN WESTERN AUSTRALIA Contaminated land is a critical issue for all businesses that use or impact on land, or operate environmentally sensitive operations. Land holders, land purchasers and sellers and business operators need

More information

Form 10 APPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDITION. Section 127, Resource Management Act 1991

Form 10 APPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDITION. Section 127, Resource Management Act 1991 Form 10 APPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDITION To Far North District Council : Section 127, Resource Management Act 1991 We, Bruce Robin Ansley and Justine Anne Marra, apply

More information

Domestic Energy Assessor Quality Assurance Requirements England & Wales and Northern Ireland Regions Effective Date 1 st August 2012

Domestic Energy Assessor Quality Assurance Requirements England & Wales and Northern Ireland Regions Effective Date 1 st August 2012 Domestic Energy Assessor Quality Assurance Requirements England & Wales and Northern Ireland Regions Effective Date 1 st August 2012 Sampling Approach Random Sampling Overall, a minimum of 2% of lodged

More information

P420 PROCUREMENT, & DISPOSAL OF LAND AND ASSETS

P420 PROCUREMENT, & DISPOSAL OF LAND AND ASSETS 1. INTRODUCTION Section 49 of the Local Government Act 1999 requires Council to prepare and adopt policies on the contracting out of services, competitive tendering and the use of other measures to ensure

More information

Share the. Sunshine. Your Solar Energy Agreement (VIC) Premium Feed-in Terms and Conditions

Share the. Sunshine. Your Solar Energy Agreement (VIC) Premium Feed-in Terms and Conditions Share the Sunshine Your Solar Energy Agreement (VIC) Premium Feed-in Terms and Conditions Contents 1 Sale and purchase of Feed-in Electricity 3 2 Qualifying conditions 3 3 Commencement, term and termination

More information

SCHEDULE 3 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ3 QUARRY HILLS PRECINCT STRUCTURE PLAN. 1.0 The Plan

SCHEDULE 3 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ3 QUARRY HILLS PRECINCT STRUCTURE PLAN. 1.0 The Plan SCHEDULE 3 TO THE URBAN GROWTH ZONE 1.0 The Plan Shown on the planning scheme map as UGZ3 QUARRY HILLS PRECINCT STRUCTURE PLAN Map 1 to Schedule 3 to Clause 37.07 shows the Future Urban Structure for Quarry

More information

Strata Plan Phoenix Gardens Dora Street, Hurstville

Strata Plan Phoenix Gardens Dora Street, Hurstville Annexure A By-Laws Strata Schemes Management Act 1996 Page 1 Strata Plan 64498 Phoenix Gardens 12-22 Dora Street, Hurstville Attention all non-resident owners: Section 46(1) of the Strata Schemes Management

More information

ALBERTA GRAZING LEASE 2005 IN-KIND COST SURVEY RESULTS

ALBERTA GRAZING LEASE 2005 IN-KIND COST SURVEY RESULTS ALBERTA GRAZING LEASE 2005 IN-KIND COST SURVEY RESULTS NOVEMBER 15, 2007 2007 Redstone Management Consulting Ltd. 1 INTRODUCTION ALBERTA GRAZING LEASE 2005 IN-KIND COST SURVEY RESULTS Redstone Management

More information

The Application Process

The Application Process The Application Process This document is intended as a guide and does not constitute a legal document. For further and more detailed information, please refer to the following Acts and Regulations: The

More information

Appendix 5 - Track Changed Ordinance

Appendix 5 - Track Changed Ordinance SCHEDULE 1 TO THE URBAN GROWTH ZONE Shown on the planning scheme map as UGZ1 1.0 The Plan Shepparton North East Plan 1 shows the future urban structure proposed in the Shepparton North East Precinct Structure

More information

Section 23.0 HOUSING QUALITY STANDARDS (HQS) INSPECTION POLICIES

Section 23.0 HOUSING QUALITY STANDARDS (HQS) INSPECTION POLICIES Section 23.0 HOUSING QUALITY STANDARDS (HQS) INSPECTION POLICIES Housing Quality Standards (HQS) are minimum standards for tenant-based programs and are required both at initial occupancy and during the

More information

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM Davina McNickel 1, Helen Davies 2, Vincent Salomon 2 1 Environment Canterbury, PO Box 345, Christchurch. Telephone: 03 365

More information

HEATING SERVICES PROCEDURES SOLID FUEL SERVICING

HEATING SERVICES PROCEDURES SOLID FUEL SERVICING HEATING SERVICES PROCEDURES SOLID FUEL SERVICING 13 th October, 2016 CUSTOMER CONSULTATION Introduction The consultation processes with regard to the service and safety check of the solid fuel appliances

More information

Published by: Alberta Agriculture and Rural Development Street Edmonton, Alberta T6H 5T6. Printed in Canada

Published by: Alberta Agriculture and Rural Development Street Edmonton, Alberta T6H 5T6. Printed in Canada Published by: Alberta Agriculture and Rural Development 7000-113 Street Edmonton, Alberta T6H 5T6 Printed in Canada Copies of this publication are available from: Publications Office Alberta Agriculture

More information

Planning for Licensed Premises

Planning for Licensed Premises Planning for Licensed Premises Legislation, provisions and guidelines Con Tsotsoros Department of Planning and Community Development Some context Current legislation Planning and Environment Act 1987 Victoria

More information

Note: these sessions provide an overview of information and should not be used in lieu of legal and other professional advice.

Note: these sessions provide an overview of information and should not be used in lieu of legal and other professional advice. Topics CSG activities across QLD and CQ region Make Good framework - what it means in the Surat and Bowen Basins Landholder rights under Make Good framework Difference between Make Good under CSG vs mining

More information

PROGRAM PRINCIPLES. Page 1 of 20

PROGRAM PRINCIPLES. Page 1 of 20 PROGRAM PRINCIPLES Page 1 of 20 DEVELOPMENT OF THE PROGRAM PRINCIPLES The Program Development Project The Program Principles have been developed as part of the Planning Our Future Program Development Project

More information

Standard Information / Document Request List. Application for the Authority s Consent to the Merger of MPF Schemes

Standard Information / Document Request List. Application for the Authority s Consent to the Merger of MPF Schemes The applicant should note that a person who in any document given to the Authority makes a statement that the person knows to be false or misleading in a material respect, or recklessly makes a statement

More information

Native Title Explained

Native Title Explained Native Title Explained Understanding native title is an important part of establishing positive community relationships. This fact sheet provides answers to common questions about native title and is designed

More information

LICENCE. for. Click on the red box above to activate the Licence Agreement scroll bar. WEB LINKS

LICENCE. for. Click on the red box above to activate the Licence Agreement scroll bar. WEB LINKS LICENCE for Licensee: Date: Click on the red box above to activate the Licence Agreement scroll bar. WEB LINKS Check if this document is current Find similar documents Visit our website International Standards

More information

Wagerup Refinery Land Management Report for the period 10 December September 2015

Wagerup Refinery Land Management Report for the period 10 December September 2015 Wagerup Refinery Land Management Report for the period 10 December 2013 9 September 2015 1. Introduction This report has been prepared to meet the land management reporting and auditing requirements under

More information

Recognition of Prior Learning (RPL) Application NSW

Recognition of Prior Learning (RPL) Application NSW NSW Real Estate Training College PO Box 601, Hornsby NSW 2077 Phone: 02 9987 2322 Fax 02 9479 9720 rpl@realestatetraining.com.au www.realestatetraining.com.au Recognition of Prior Learning (RPL) Application

More information

FURTHER ACTION AAAAAAAAAAAAAAA CLICK TO VIEW THE MAP IDENTIFIED AAAAAAAAAAAAAAA

FURTHER ACTION AAAAAAAAAAAAAAA CLICK TO VIEW THE MAP IDENTIFIED AAAAAAAAAAAAAAA RiskView Residential Contaminated Land FURTHER ACTION AAAAAAAAAAAAAAA CLICK TO VIEW THE MAP We have identified a potential risk of contaminated land at or close to the property. Please turn the page for

More information

PLANNING PROPOSAL. Reclassification of Community Land to Operational Land at. 2C T C Frith Avenue BOOLAROO. (Part Lot 2 DP )

PLANNING PROPOSAL. Reclassification of Community Land to Operational Land at. 2C T C Frith Avenue BOOLAROO. (Part Lot 2 DP ) PLANNING PROPOSAL Version for Final Report to DoPE Reclassification of Community Land to Operational Land at 2C T C Frith Avenue BOOLAROO (Part Lot 2 DP 1183441) Amendment to Lake Macquarie Local Environmental

More information

RESOLUTION NO ORDINANCE NO. 02-1

RESOLUTION NO ORDINANCE NO. 02-1 RESOLUTION NO. 020828-1 ORDINANCE NO. 02-1 CHISAGO COUNTY, MINNESOTA AN ORDINANCE AMENDING SECTION 7.27 OF THE CHISAGO COUNTY ZONING ORDINANCE CONCERNING MINERAL EXTRACTION THE BOARD OF COUNTY COMMISSIONERS

More information

From: Gerard Reiter, EGM/Asset Management Date: 14 April 2015 Peter McIntyre, Managing Director

From: Gerard Reiter, EGM/Asset Management Date: 14 April 2015 Peter McIntyre, Managing Director TO THE BOARD Item: 6 From: Gerard Reiter, EGM/Asset Management Date: 14 April 2015 Peter McIntyre, Managing Director Category: FOR APPROVAL SECOND SUPPLY TO THE ACT STOCKDILL DRIVE 330kV SWITCHING STATION

More information

ORANGE COUNTY VOLUNTARY FARMLAND PRESERVATION PROGRAM ORDINANCE

ORANGE COUNTY VOLUNTARY FARMLAND PRESERVATION PROGRAM ORDINANCE 4/18/00 1 ORANGE COUNTY VOLUNTARY FARMLAND PRESERVATION PROGRAM ORDINANCE Section I - ENACTMENT Pursuant to the authority conferred by the Farmland Preservation Enabling Act, Article 61 of Chapter 106

More information

Number Same. This document provides procedural direction to implement Policy PL Onshore Windpower Development on Crown Land.

Number Same. This document provides procedural direction to implement Policy PL Onshore Windpower Development on Crown Land. Ministry of Natural Resources Subject ONSHORE WINDPOWER DEVELOPMENT ON CROWN LAND NON-COMPETITIVE APPLICATION Procedure PL 4.10.04 Compiled by Renewable Energy Program Replaces Directive Title Same Number

More information

2016 No. 790 ENTERPRISE, ENGLAND AND WALES. The Pubs Code etc. Regulations 2016

2016 No. 790 ENTERPRISE, ENGLAND AND WALES. The Pubs Code etc. Regulations 2016 S T A T U T O R Y I N S T R U M E N T S 2016 No. 790 ENTERPRISE, ENGLAND AND WALES The Pubs Code etc. Regulations 2016 Made - - - - 20th July 2016 Coming into force in accordance with regulation 1(b) CONTENTS

More information

Ministry of Environment and Climate Change Strategy and Ministry of Forests, Lands, Natural Resource Operations and Rural Development

Ministry of Environment and Climate Change Strategy and Ministry of Forests, Lands, Natural Resource Operations and Rural Development Ministry of Environment and Climate Change Strategy and Ministry of Forests, Lands, Natural Resource Operations and Rural Development NAME OF POLICY: APPLICATION: ISSUANCE: IMPLEMENTATION: LEGISLATIVE

More information

Starter Tenancy Policy

Starter Tenancy Policy Starter Tenancy Policy Originator: Executive Management Team Approval Date: Policy and Strategy Team 12 September 2017 Review date: September 2018 1 Introduction 1.1 1.2 1.3 One Vision Housing (OVH) uses

More information

Neighbourhood Management

Neighbourhood Management Neighbourhood Management Circle Housing offers greater opportunities for independent, affordable and secure living to people in housing need. 1 Scope 1.1 This policy applies to Circle Housing. For the

More information

FACT SHEET Brownfields Cleanup Program (BCP) KEY DEFINITIONS (see also ECL )

FACT SHEET Brownfields Cleanup Program (BCP) KEY DEFINITIONS (see also ECL ) KEY DEFINITIONS (see also ECL 27-1405) Brownfield A Brownfield is any real property where redevelopment or re-use may be complicated by the presence or potential presence of a hazardous waste, petroleum,

More information

APPLICATION FORM FOR COMPLYING DEVELOPMENT CERTIFICATE

APPLICATION FORM FOR COMPLYING DEVELOPMENT CERTIFICATE APPLICATION FORM FOR COMPLYING DEVELOPMENT CERTIFICATE SECTION A. Details of the applicant *An application may only be made by a person who has the benefit of the development consent. An application may

More information

SALESPERSON & BROKER COURSE SUPPLEMENT

SALESPERSON & BROKER COURSE SUPPLEMENT SALESPERSON & BROKER COURSE SUPPLEMENT IMPORTANT! Course updates and other resources are always available at www.moseley.org. Please review and familiarize yourself with the following information, as it

More information

Real Property Assets Policy and Procedures

Real Property Assets Policy and Procedures Real Property Assets Policy and Procedures Summary: Due Diligence process Prior to the execution of a binding contract to purchase a property by a DomaCom sub-fund, a review of the Real Property Asset

More information

18 Sale and Other Disposition of Regional Lands Policy

18 Sale and Other Disposition of Regional Lands Policy Clause 18 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 19, 2018. 18 Sale and Other Disposition

More information

A Guide to the Municipal Planning Process in Saskatchewan

A Guide to the Municipal Planning Process in Saskatchewan A Guide to the Municipal Planning Process in Saskatchewan A look at the municipal development permit and the subdivision approval process in Saskatchewan May 2008 Prepared By: Community Planning Branch

More information

Lotsearch Pty Ltd ABN

Lotsearch Pty Ltd ABN E M PL EPA Register & Data Search Lotsearch Reference: Client Id: Report Date: 16:12:29 Address: Lot & Plans: Lot 130, DP1100149 SA Disclaimer: The purpose of this report is to provide an overview of some

More information

CHAPTER 68 GEOPHYSICAL/SEISMIC TESTING

CHAPTER 68 GEOPHYSICAL/SEISMIC TESTING 68.1 Definitions 68.2 Permit Required CHAPTER 68 GEOPHYSICAL/SEISMIC TESTING 68.3 Permit Application; Fee Procedure 68.4 Term of Permit 68.5 Operations in General 68.6 Notice Required 68.7 Energy Level

More information

CITY OF VAUGHAN POLICY AND PROCEDURES FOR DEALING WITH CONTAMINATED OR POTENTIALLY CONTAMINATED SITES

CITY OF VAUGHAN POLICY AND PROCEDURES FOR DEALING WITH CONTAMINATED OR POTENTIALLY CONTAMINATED SITES CITY OF VAUGHAN POLICY AND PROCEDURES FOR DEALING WITH CONTAMINATED OR POTENTIALLY CONTAMINATED SITES MAY 2001 This Report should be read in conjunction with the City of Vaughan BACKGROUND REPORT ON POLICY

More information

MEMORANDUM OF UNDERSTANDING. between XXXX. And. The XXXX People

MEMORANDUM OF UNDERSTANDING. between XXXX. And. The XXXX People MEMORANDUM OF UNDERSTANDING between XXXX And The XXXX People 1 MEMORANDUM OF UNDERSTANDING between XXXXX and The XXXX People i. XXXX is the named lessee for XXXX on XXXX known as XXXXX Station. ii. iii.

More information

Premier Strata Management Address: 6/175 Briens Road, Northmead NSW Postal Address: PO Box 3030, Parramatta NSW 2124

Premier Strata Management Address: 6/175 Briens Road, Northmead NSW Postal Address: PO Box 3030, Parramatta NSW 2124 Privacy Policy At Premier Strata Management we are committed to offering the best service that we can, and this means ensuring that all of your personal information is used and supplied only when and where

More information

Conditions. For the purpose of licensing conditions attached to a licence:

Conditions. For the purpose of licensing conditions attached to a licence: Conditions For the purpose of licensing conditions attached to a licence: (i) (ii) Liverpool City Council will be referred to as the Authority acting in its capacity as the Local Housing Authority. tenancy

More information

BioBanking agreement ID number: 159. Under the Threatened Species Conservation Act For E N. xxxxxxxxxxxx for xxxxxxxxxxxxxxx

BioBanking agreement ID number: 159. Under the Threatened Species Conservation Act For E N. xxxxxxxxxxxx for xxxxxxxxxxxxxxx BioBanking agreement ID number: 159 Under the Threatened Species Conservation Act 1995 For 296998 E 6237198 N xxxxxxxxxxxx for xxxxxxxxxxxxxxx BioBanking agreement under Part 7A Division 2 of the Threatened

More information

A Minor Land Excavation Operating Permit is used to:

A Minor Land Excavation Operating Permit is used to: CHAPTER 400. SECTION 404. PERMIT TYPES AND APPLICATIONS OPERATING PERMITS 404.1. Minor Land Excavation A. Intent and Purpose The intent and purpose of this section is to protect the public health, safety,

More information

Preston Valley Irrigation Co-operative Ltd. Customer Service Charter. For. Preston Valley Irrigation Scheme

Preston Valley Irrigation Co-operative Ltd. Customer Service Charter. For. Preston Valley Irrigation Scheme Preston Valley Irrigation Co-operative Ltd Customer Service Charter For Preston Valley Irrigation Scheme 2010 Note: This Charter Is To Be Read In Conjunction With The Bylaws Revised 23-11-2010 EMERGENCY

More information

Goodwill Industries of Northern Michigan G.W. Homeless Services of Northern Michigan\ Gift Acceptance Policy Adopted 8/2009

Goodwill Industries of Northern Michigan G.W. Homeless Services of Northern Michigan\ Gift Acceptance Policy Adopted 8/2009 Goodwill Industries of Northern Michigan G.W. Homeless Services of Northern Michigan\ Gift Acceptance Policy Adopted 8/2009 Goodwill Industries of Northern Michigan and G.W. Homeless Services of Northern

More information

DRAFT PROPOSED CHAPTER 21 SPECIFIC PURPOSE - FLAT LAND RECOVERY ZONE

DRAFT PROPOSED CHAPTER 21 SPECIFIC PURPOSE - FLAT LAND RECOVERY ZONE DRAFT PROPOSED CHAPTER 21 SPECIFIC PURPOSE - FLAT LAND RECOVERY ZONE Note: The Specific Purpose (Flat Land Recovery) Zone is a "holding" zone that will be subject to a later plan change to confirm the

More information

Recognition of Prior Learning (RPL) Application NSW. Surname: Given Names: Company: Address: Phone Work: Phone Home: Mobile:

Recognition of Prior Learning (RPL) Application NSW. Surname: Given Names: Company: Address: Phone Work: Phone Home: Mobile: Create your future NSW Real Estate Training College realestatetraining.com.au Recognition of Prior Learning (RPL) Application NSW PO Box 601, HORNSBY NSW 2077 Real Estate Agents Licence Applicant Details

More information

PLANNED AND RESPONSIVE MAINTENANCE POLICY

PLANNED AND RESPONSIVE MAINTENANCE POLICY PLANNED AND RESPONSIVE MAINTENANCE POLICY 1. Purpose 3. Policy Statement This Policy explains how Evolve Housing (Evolve) will provide repairs and maintenance services to its Tenants. Evolve believes that

More information

Propertymark Qualifications: Level 2 Award in Introduction to Residential Property Management Practice (England & Wales) Qualification Specification

Propertymark Qualifications: Level 2 Award in Introduction to Residential Property Management Practice (England & Wales) Qualification Specification Propertymark Qualifications: Level 2 Award in Introduction to Residential Property Management Practice (England & Wales) Qualification Specification Propertymark Qualifications Live from January 2017 ABOUT

More information

Introduction: Model Cows Lease Agreement for Dairy Stock

Introduction: Model Cows Lease Agreement for Dairy Stock Introduction: Model Cows Lease Agreement for Dairy Stock The model Cows Lease Agreement has been prepared as a template which can be modified to suit individual circumstances. It has been drafted so that

More information

Renovations Information

Renovations Information Renovations Information Renovations to a Lot When proposing to undertake renovations to a lot, the lot owners should review this factsheet and we suggest you complete an application form and checklist.

More information

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY I. Introduction In accordance with the requirements of Title 5-A of Article 9 and Section

More information

JJJJ PROCEDURES: ICE FUTURES WHITE SUGAR FUTURES CONTRACT SECTION JJJJ - PROCEDURES: ICE FUTURES WHITE SUGAR FUTURES CONTRACT. ICE Futures Europe 1

JJJJ PROCEDURES: ICE FUTURES WHITE SUGAR FUTURES CONTRACT SECTION JJJJ - PROCEDURES: ICE FUTURES WHITE SUGAR FUTURES CONTRACT. ICE Futures Europe 1 PROCEDURES: ICE FUTURES WHITE SUGAR FUTURES CONTRACT JJJJ SECTION JJJJ - PROCEDURES: ICE FUTURES WHITE SUGAR FUTURES CONTRACT JJJJ.1 JJJJ.2 JJJJ.3 Interpretation Timetable Delivery ICE Futures Europe 1

More information

NFU Consultation Response

NFU Consultation Response Page 1 Title: Underground Drilling Access Date: 12th August 2014 Ref: UndergroundDrilling_NFU.doc Circulation: underground.access@decc.gsi.gov.uk Contact: Dr. Jonathan Scurlock, Chief Adviser, Renewable

More information

Voluntary Land Acquisition and Mitigation Policy NSW Minerals Council Submission

Voluntary Land Acquisition and Mitigation Policy NSW Minerals Council Submission Voluntary Land Acquisition and Mitigation Policy NSW Minerals Council Submission December 2014 ME_113107794_1 (W2003x) 0 Executive summary The NSW Minerals Council (NSWMC) welcomes the opportunity to comment

More information

Explanatory Notes. for. The Planning and Development Act, 2007

Explanatory Notes. for. The Planning and Development Act, 2007 Explanatory Notes for The Planning and Development Act, 2007 Introduction The purpose of these notes is to explain the provisions of The Planning and Development Act, 2007 (the Act). The explanatory notes

More information

LOCATION: LAND ADJOINING 10 BEDWELL CRESCENT CROSS LANES WREXHAM LL13 0TT

LOCATION: LAND ADJOINING 10 BEDWELL CRESCENT CROSS LANES WREXHAM LL13 0TT APPLICATION NO: P/2014 /0708 COMMUNITY: Sesswick WARD: Marchwiel LOCATION: LAND ADJOINING 10 BEDWELL CRESCENT CROSS LANES WREXHAM LL13 0TT DESCRIPTION: OUTLINE PLANNING APPLICATION FOR RESIDENTIAL DEVELOPMENT

More information

General Contracting Terms and Conditions of Willenbrock Fördertechnik GmbH & Co. KG for Leasing and Associated Servicing

General Contracting Terms and Conditions of Willenbrock Fördertechnik GmbH & Co. KG for Leasing and Associated Servicing Postfach 140114 28088 Bremen General Contracting Terms and Conditions of for Leasing and Associated Servicing 1. Scope (1) These General Contracting Terms and Conditions apply to all contracts for leasing

More information

Andrew Cormie s comments on Policies from the BPNDP Draft of May 2015

Andrew Cormie s comments on Policies from the BPNDP Draft of May 2015 Read in conjunction with AC_BPNDP_Comment.doc / pdf Policy as in the BPNDP Draft May 2015 As amended by Andrew Cormie. AC PROPOSED POLICY - This Bray Parish Neighbourhood Development Plan excludes from

More information

Seqwater Network Consent Guidelines. For the Queensland Bulk Water Supply Authority trading as Seqwater

Seqwater Network Consent Guidelines. For the Queensland Bulk Water Supply Authority trading as Seqwater Seqwater Network Consent Guidelines For the Queensland Bulk Water Supply Authority trading as Seqwater June 2014 Consent Guidelines, June 2014 Page i Contents 1. Who is Seqwater?... 1 2. Purpose, Operation

More information

Best Practice Guideline: MAJOR CAPITAL WORKS

Best Practice Guideline: MAJOR CAPITAL WORKS Best Practice Guideline: MAJOR CAPITAL WORKS 1. PURPOSE This Guideline aims to assist ClubsNSW Members dealing with major capital works projects by: setting out the main steps that should be followed in

More information

Listed below are some of the important pieces of legislation that govern mining operations.

Listed below are some of the important pieces of legislation that govern mining operations. Mining Law Zimbabwe Listed below are some of the important pieces of legislation that govern mining operations. Anyone involved in mining in Zimbabwe should be familiar with the provisions of these pieces

More information

Contract for Contestable Asset Relocations

Contract for Contestable Asset Relocations Contract for Contestable Asset Relocations SCOPE This contract is between Ausgrid and a customer who has obtained a certified design and will retain an accredited service provider Level 1 (ASP/1) to carry

More information

LOCAL AUTHORITY WORKS PART 8 - PROCEDURE

LOCAL AUTHORITY WORKS PART 8 - PROCEDURE LOCAL AUTHORITY WORKS PART 8 - PROCEDURE Planning & Property Development Department December 2017 INDEX Introduction Page 2 Local Authority Works to which Part 8 applies Page 3 Local Authority Works to

More information

Environmental Planning and Assessment Act 1979

Environmental Planning and Assessment Act 1979 New South Wales State Environmental Planning Policy (Major Development) Amendment (State Significant Sites South Wallarah Peninsula) 2010 under the Environmental Planning and Assessment Act 1979 His Excellency

More information

PROCEDURE (Essex) / Linked SOP (Kent) Estate Management. Number: U Date Published: 22 July 2015

PROCEDURE (Essex) / Linked SOP (Kent) Estate Management. Number: U Date Published: 22 July 2015 1.0 Summary of Changes 1.1 This is a new joint procedure/sop for Essex Police and Kent Police. 2.0 What this Procedure/SOP is about 2.1 The Estate Services Department at Headquarters is responsible for

More information

Service Level Agreement

Service Level Agreement The Commission for Ethical Standards in Public Life in Scotland Service Level Agreement between «Title» «Forename» «Surname» (A Public Appointments Assessor for the Commission for Ethical Standards in

More information

PART 2.7 DEPARTMENT OF GOVERNMENT SERVICES REAL ESTATE REGULATION

PART 2.7 DEPARTMENT OF GOVERNMENT SERVICES REAL ESTATE REGULATION PART 2.7 DEPARTMENT OF GOVERNMENT SERVICES REAL ESTATE REGULATION Executive Summary The Financial Services Regulation Division (the Division) within the Consumer and Commercial Affairs Branch of the Department

More information

General Business Terms and Conditions. I. General provisions

General Business Terms and Conditions. I. General provisions General Business Terms and Conditions I. General provisions 1.1. Contractual relationships between Styrotrade, a.s. or Styroprofile, a.s. (hereinafter jointly or each individually referred to as the Seller)

More information

LOUTH COUNTY COUNCIL

LOUTH COUNTY COUNCIL LOUTH COUNTY COUNCIL TAKING IN CHARGE POLICY/ RELEASE OF BOND FOR COMPLETED PRIVATE HOUSING DEVELOPMENTS 2 TAKING IN CHARGE POLICY: OVERVIEW & BACKGROUND LEGISLATION Section 180 (see below) of the Planning

More information

Groundsure HS2 and Crossrail

Groundsure HS2 and Crossrail Groundsure HS2 and Crossrail Address: Specimen Address Date: Report Date Groundsure Reference: HS2 & Crossrail Specimen Your Reference: HS2 & Crossrail Specimen Grid Reference:123456,123456 HS2*: The property

More information

GUIDELINES FOR LEASING UNDER SLO RULE 5

GUIDELINES FOR LEASING UNDER SLO RULE 5 New Mexico State Land Office Oil, Gas, and Minerals Division Patrick H. Lyons, Commissioner of Public Lands GUIDELINES FOR LEASING UNDER SLO RULE 5 SECTION I - INTRODUCTION AND PURPOSE We are pleased to

More information

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) ARRANGEMENT OF REGULATIONS Regulations 1. Claims for compensation 2. Assessment of compensation 3. Compensation principles

More information

Controls over HMOs. Legislative Controls

Controls over HMOs. Legislative Controls Controls over HMOs Legislative Controls There are a number of approaches that can be taken to address issues caused by Houses in Multiple Occupations (HMOs) some of which are informal in nature and others

More information

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services. Conditions Relating to Draft Plan of Subdivision Approval East Fonthill 26T 01014 (Draft Plan dated December 1, 2013, and revised August 28, 2014), the Town of Pelham 1. This approval applies to the Draft

More information

Discretionary Use Application Form

Discretionary Use Application Form Discretionary Use Application Form The zoning bylaws enforced within Corman Park provides for discretionary land use and development which are deemed by Council to have one or more features or potential

More information