Permitting Guidebook City of Pittsfield

Size: px
Start display at page:

Download "Permitting Guidebook City of Pittsfield"

Transcription

1 Permitting Guidebook City of Pittsfield April 2016

2 Table of Contents I. Purpose II. City Departments and Functions III. Determining what Permits are required IV. Pittsfield Permitting Procedures-Step-by-step V. Site Plan Review VI. Special Permits VII. Subdivisions VIII. Variances IX. Zone Changes X. Wetlands Protection Act XI. Building Permits XII. Sign Permits XIII. Related Permits 2

3 Purpose The purpose of this guidebook is to present the concepts behind Pittsfield s permitting procedures in a manner that is understandable and user-friendly. It is our hope that through this document the permitting process can become easier to navigate in a manner that will continue to protect public health and safety while resulting in quality development. II. City Departments and Functions Permitting Coordinator (413) The Permitting Coordinator is the first point of contact when developing a project proposal or applying for a permit. This position acts as a single point of reference and contact for all development related permit information. Throughout the development, the Permitting Coordinator acts as a liaison between an applicant and the City permit granting authorities. The Permitting Coordinator helps applicants track where an application is in the process as well as when a decision can be expected. Department of Community Development (413) The Department of Community Development is responsible for all community and economic development, planning, and housing activities for the City of Pittsfield. The Community Development Board, who is represented by the City Planner, approves Site Plans and issues Special Permits, approves Subdivisions, and reviews and makes recommendations on Zone changes. Questions regarding these issues can be directed to the City Planner through this office. Conservation Commission (413) The Conservation Commission approves site plans, as well as issues permits for work in or near wetlands, rivers, and wetland buffer zones. The Commission also works to preserve other resource areas protected by the state. Zoning Board of Appeals The Zoning Board of Appeals issues special permits and variances. It also hears petitions for administrative appeals from decisions made by the Building Inspector and Planning Board. Building Commissioner (413) The Building Commissioner, with support from the Building Inspectors, serves as the Zoning Enforcement Officer, and reviews site plans for compliance with the City s Zoning Ordinance, Massachusetts Building Codes, and State handicapped access standards. To construct, reconstruct, alter, repair, or remove 3

4 a Structure or Building, or to change the Use or Occupancy of a Structure or Building, or to install or alter any equipment for which provision is made or the installation of which is regulated by 780 CMR, a written application must be filed with the building official and the required permit obtained. Please note that all fire detection systems, including smoke and carbon monoxide detectors, fire suppression systems, and fire alarm systems require building permits. Tents, fences, and signs require building permits as well. Department of Public Works (413) The DPW reviews applications and advises City boards on engineering and site design matters such as Stormwater Management, roadway design, traffic, water/sewer and other utilities. The DPW also issues permits for access/entrances and utility hook ups. Health Department (413) The Board of Health, assisted by the Health Inspectors, issue permits under local and state health and sanitary codes. This includes permits for tobacco (restrictions apply), septic systems, wells, food services, special events, swimming pools, etc. (see page 24) The Health Inspector also coordinates with the Planning Board and Conservation Commission on placement of septic systems and wells in new subdivisions and near wetlands. Fire Department (413) The Fire Department reviews site plans for adequate roadway emergency access requirements, public safety and fire protection. The Fire Department issues permits for a variety of things including underground storage tanks and storage of flammable/hazardous materials. City Council The City Council issues special permits for shopping centers, malls, plazas, etc.; and issues permits for Zone changes. 4

5 III. Determining what Permits are required The number of permits required for any given project depends upon the specifics of that project. These specifics will include the site, the Use category, the location, the scale, and the proximity to wetlands or other regulated resource areas. It is important to contact the Permits coordinator early in the design process to determine which permits will be needed. Knowing this specific information as early as possibly will keep your project moving smoothly. These issues should be discussed with the permits coordinator: 1) Which sections of the Zoning Ordinance apply? In which Zoning District is the project located? Is the project allowed By-right or does it require a Site Plan Review or a Special Permit? Is the project located within the Arts Overlay District? Zoning Map What site design criteria apply to the project (landscaping, heights, signage, etc.) Is the project located within the Floodplain District? 2) Does the Wetlands Protection Act apply? Is the project located in or within 100 feet of a stream bank, wetlands vegetation, land under water, water body, or land subject to flooding? Is the project located within 200 feet of any stream, river, creek, or brook that runs year round? 3) Do the Pittsfield Subdivision Regulations apply? Are any new lots or roads being created? Are any existing property boundaries being changed? Pittsfield Subdivision Regulations 4) Are related development permits needed? Is the project on City sewer and water or will a septic system or well be needed? Is the project located on a state highway or will it have access onto a state highway? Will hazardous materials be stored or used on the site? Will the property be logged? Will the project trigger any of the Massachusetts Environmental Protection Act (MEPA) thresholds? 5

6 IV. Pittsfield s Permitting Procedures - Step by Step 1) Contact the Permits coordinator for a preliminary consultation Explain project to identify local, state, and federal permits that will be required -This will include identifying the project s use group and type of construction, potential wetlands issues, and zoning and subdivision requirements. Determine if the project s scope is large enough to schedule a Pre- Development Meeting with Community Development. 2) If there are conservation issues surrounding the project, submit conservation applications first. Once approval is granted, submit Community Development applications to the Permits Coordinator for determination of completeness prior to submission to City Clerk for certification (this can eliminate Re-Application). Completed Application Form Appropriate filing fee(s) Correct number of copies of all Plans and necessary Documentation 3) Attend public hearing or administrative review to present the proposed Project (any of the following, most likely only one) Community Development Board Zoning Board of Appeals Conservation Commission Building Inspector Board of Health 4) A decision is made by the Community Development Board, Zoning Board of Appeals, Conservation Commission and Building Inspector/Commissioner on zoning, wetlands, subdivision, and building permits. Note that all decisions will not be made simultaneously. 5) The below listed approvals must be recorded at the Registry of Deeds after a specified appeal period of 20 days. Once the appeal period has expired, they must then be registered to become valid before building permits for the requested use can be issued. Required for: Special Permits and Variances ANR s and Definitive Subdivision Plans Order of Conditions 6

7 6) At this point other development permits and licenses become applicable, and will need to be pursued. The Permitting Coordinator will have information available. Department of Public Works (water, sewer connections) Health Inspector (abatement, swimming pools) Fire Department (storage tanks/alarm systems) 7) Upon receiving necessary permits, approvals, licenses etc., apply to the Building Inspector for a Building Permit for the desired construction of Use of the property. 8) Schedule the required inspections during construction. Inspection information will be made available when the various permits are distributed. Electric Gas Construction Plumbing Elevators Wetlands 9) Upon completion of construction: Apply to the Conservation Commission for a Certificate of Compliance for projects involving wetlands. Apply to Community Development Board for a Certificate of Completion for subdivision roads and utilities. Apply to the Building Inspector/Commissioner for an Occupancy Permit 7

8 V. Site Plan Review Purpose: The purpose of Site Plan Review is to ensure that new development meets the requirements of the Zoning Ordinance and is designed in a way that reasonably protects the physical, environmental, and aesthetic qualities of the neighborhood and the City. What Projects Require Site Plans: Single-family homes do not require site plan approval. Most other uses require site plans including the creation, expansion, substantial alteration, or change in use of: All uses requiring a Special Permit Any business, commercial, industrial, or institutional use (except home occupation not requiring a special permit) Any residential use of more than two (2) units including subdivisions Sections list the various Uses subject to Site Plan Review. Consult Use Table for Conditional Uses Requiring Site Plan Review Site Plan Review Application - CDB What are the Contents of Plan? Reviewing Authorities: The Site Plan Review and Permit Granting Authority may differ. Community Development Board reviews all Site Plan applications. Community Development Board: A public hearing is not required if the use is By Right. All other uses require either a Site Plan review or a Special Permit. The maximum review period for site plan approval is 45 days. Site plans for projects requiring a special permit are submitted and acted upon as part of the special permit application. Special Permit applications are reviewed in 65 days and require a public hearing. Zoning Board of Appeals: Approves all uses that require a special permit from the ZBA. The site plan is submitted to the Community Development Board and acted upon in addition to the Special Permit application. Review Process: Once received, site plans are transmitted to various departments for an inter-departmental review and comment period of up to 35 days. When a use requires a Special Permit from the ZBA or the CDB a public hearing is required (within 65 days) and the site plan is submitted and acted upon as part of the Special Permit application. A decision must be made within 90 days of the public hearing. 8

9 Fees: Application Fee: $200 VI. Special Permits Purpose: The purpose of Special Permits is to ensure that new development meets the requirements of the Zoning Ordinance and is designed in a way that reasonably protects the physical, environmental, and aesthetic qualities of the neighborhood and the City. Sections through contain the various Uses subject to Special Permit. Consult Use Table for Conditional Uses Requiring a Special Permit Section 6 explains the delineation, regulations, and restrictions of the Flood Plain District. Development of any kind within the Flood Plain District will require a Flood Plain Special Permit from the Community Development Board. Review: Special Permit applications shall be determined complete by the Permitting Coordinator, and submitted to Community Development Department for a 35-day interdepartmental review period. The application will appear at a public hearing of the Community Development Board within 65-days. Upon acceptance, a Special Permit will be voted on within 90-days. Fees: Application fees should be paid by check and made out to the City of Pittsfield, and must be attached to the application. Advertising cost for the Public Hearing is the applicant s responsibility, and payment will be accepted by the Department of Community Development. Application Fee: $200 Advertising Fee: ZBA - $111.50, CDB (price will vary) Special Permit with Site Plan Review - CDB Special Permit Application CDB Special Permit Application - ZBA 9

10 VII. Subdivisions Purpose: The Community Development Board must approve any division of land into two or more lots. All plans showing the creation of new lots must be endorsed by the Community Development Board before they can be recorded in the Registry of Deeds. Plans stamped by a registered Land Surveyor certifying that no new lots or changes in existing boundaries are shown on the plan may be recorded without Community Development Board endorsement. There are two types of subdivisions: 1) Approval Not Required, and 2) Plans Requiring Subdivision Approval Approval Not Required Plans (ANR s) ANR plans show the creation of lots with frontage on existing roads. The Community Development Board will determine if there is adequate frontage, and adequate access (as determined by the City s Zoning Ordinance). Frontage must be on one of the following: A public way or a way which the City certifies is maintained and used as a public way A way shown on a subdivision plan which has been previously approved and endorsed by the Community Development Board, or A way which was in existence when the Subdivision Control Law took effect in Pittsfield and which the Community Development Board has determined is suitable for the proposed use of the lots. Endorsement of an ANR plan does not certify that the lots shown on the plan qualify as building lots. This determination is made by the Inspector of Buildings. Community Development Board endorsement only indicates that the plan shows a division of land that does not require approval under the Subdivision Control Law and City of Pittsfield Subdivision Regulations. Review and Submission Requirements Plans shall be determined complete by the Permits Coordinator, submitted to the City Clerk and forwarded to the Community Development Department. The Board has 21 days to review the plan and provide a decision. A complete application includes 2 copies of the application, filing fee, 7 copies of the Plan (one for each Board member) and 1 Mylar. Filing Fees: $75 ANR Application 10

11 Plans Requiring Subdivision Approval Plans that show a division of land into 2 or more lots with frontage on a proposed new road requires subdivision approval. There is a two step review process of subdivision plans: 1) Preliminary Plans, and 2) Definitive Plans. Preliminary Plans The preliminary plan serves as a conceptual design. It includes the proposed street layout, lot boundaries, drainage system and topography. Preliminary Plans are required for all non-residential subdivisions and optional for residential subdivisions. However, it is recommended that a preliminary plan be submitted for all subdivisions. A preliminary plan cannot be recorded with the Registry of Deeds. Consult Subdivision Regulations for Contents of a Preliminary Plan Definitive Plans A definitive plan is the final design plan complete with engineering specifications. This plan must be prepared by a registered Land Surveyor or Civil Engineer. The plan must contain information regarding width and length or every street, lot lines, topography, centerline profiles of streets, layout and design of sewerage, storm drainage, water supply and wetland resource areas as defined by the Massachusetts Wetland Protection Act. Consult Subdivision Regulations for Contents of a Definitive Plan Review Process and Submittal Requirements Preliminary Plans Applications will be determined complete by the Permits Coordinator, and submitted to Community Development. The form shall be filed with the City Clerk. Sets of plans will be distributed to the necessary departments. Each department will notify the Community Development Board within 30 days as to their approval or disapproval. The Health Department has 45 days to notify. An informational meeting with the applicant may be scheduled to make necessary changes. The plans will go in front of the Community Development Board, and receive an approval or disapproval, and be recorded with the City Clerk. This will happen within 60 days of acceptance of the application. Definitive Plans Plans will be submitted to the Community Development Department. After review to determine completeness, the applicant will be given a Form C to submit with the required fees for the public hearing and application for review of 11

12 the Definitive plan. Form C will be filed with the City Clerk. The plan will be distributed to the necessary departments. Each department will notify the Community Development Board within 30 days as to their approval or disapproval. The Health Department gets 45 days to notify. A public hearing will be held at which an approval, a modification and approval, or disapproval will be issued for the definitive plan. There will be a 20-day appeal period, after which a certificate of approval will be issued, not more than 90 days from the hearing date. Fees: Preliminary Subdivision Plan: $100, Definitive Subdivision Plan: $500 (plus $25 per lot) 12

13 VIII. Variances Purpose The Zoning Board of Appeals (ZBA) hears and acts upon petitions for Variances under the Zoning Ordinance for land or structures that do not meet the requirements of the Zoning Ordinance. A dimensional variance applies to zoning requirements such as lot area, lot frontage, open space, building height and property line setbacks. A use variance applies to a land use that is not allowed in a particular zoning district under the Zoning Ordinance. Grounds for Approval In order to grant a variance, the Zoning Board of Appeals must make all three of the following findings. A literal enforcement of the Zoning Ordinance would involve a substantial hardship, financial or otherwise, to the petitioner or appellant; The hardship is owing to circumstances relating to the soil conditions, shape or topography of such land or structures, but not affecting generally the zoning district in which it is located; And that desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent or purpose of the Pittsfield Zoning Ordinance. Review Process Applications are determined complete by the Permitting Coordinator prior to submission to the City Clerk for certification then forwarded to the ZBA. Variance applications are transmitted for a 35 day interdepartmental review and comment period. Variances require a public hearing within 65 days of receipt. The ZBA may impose conditions, safeguards and limitations of time and use, if the Variance is granted. The ZBA is under no legal obligation to grant the Variance, and in absolutely no circumstances can a variance be granted to allow a prohibited use. Fees Application Fee: $200, Advertising Fee: $ Variance Application 13

14 IX. Zone Changes What is a Zone Change? A Zone change is applied for when a proposed use of a particular parcel of land is not allowed in the City s Zoning District in which it is located. Who may initiate a Zone Change? -City Council -Zoning Board of Appeals -Community Development Board -A landowner to be affected by a zoning change It is important to contact the City Planner before any Zone Change petitions are filed Review Process and Submittal Requirements A petition must be submitted to City Council. City Council then refers the petition to the Community Development Board for a public hearing. The Community Development Board submits recommendations on the petition to City Council at which time City Council must hold a public hearing within 90 days of receiving the Community Development Board s recommendations. City Council must complete a 2 readings of the petition upon which it is immediately effective. A petition for a zoning change must include a completed petition form, a property map indicating the lots to be included in the zone change and a completed site plan application if the request is to permit a new use of the property. Filling Fee: $400 Please Contact Permitting Coordinator for Zone Change Application 14

15 X. Massachusetts Wetlands Protection Act Reviewing Authority The Pittsfield Conservation Commission is responsible for administering the Massachusetts Wetlands Protection Act. The MWPA includes provision of the Massachusetts Rivers Protection Act. Proposed projects are reviewed based upon the proximity to a resource area and the ability to minimize potential impacts. Projects Requiring Approval Any proposed activity or project, that will remove, fill dredge, or alter the wetland resource area, the 200-foot riverfront protection area, or the 100-foot buffer zone associated with a wetland resource area must obtain a permit from the Conservation Commission. The term alter includes but is not limited to any development, construction, destruction of vegetation, any change in drainage characteristics or flow patterns, and any change in the groundwater. A wetland resource area includes any stream, river, creek, pond, lake and the banks associated with them; any meadows, marshes, swamps, bogs, any land under water, land subject to flooding, and any riverfront area. Applications and Permits Abbreviated Notice of Resource Area Delineation: The ANRAD serves two purposes. 1) Provides a procedure for an applicant to confirm the delineation of a Bordering Vegetated Wetlands (BVW). 2) It serves as the application for Simplified Review for projects in the Buffer Zone. Request for Determination of Applicability: This application requests the Commission to determine if the proposed work or property is subject to the MWPA. For smaller projects, the Commission may also determine if the work can be done in a manner that will not negatively impact the resource area. In response to an RDA, the Commission may issue one of the following decisions: 1) Positive Determination- this means the proposed work or property is subject to the MWPA and requires the filing of a Notice of Intent 2) Negative Determination this means the proposed work is not subject to the MWPA. 3) Negative Determination with Conditions- this means the proposed work is within the 100-foot buffer zone and will not adversely impact the resource area if proposed precautions are adhered to. 15

16 Notice of Intent (NOI): This application provides the Commission with a detailed description of the proposed work that is located in a resource area, riverfront area or buffer zone that may impact a nearby wetland resource area. In response to a NOI, the Commission may issue an Order of Conditions permitting the proposed work with conditions consistent with the standards in the Wetlands Protection Act Regulations, which prevent significant adverse impacts to a wetland resource area, or deny the project because it cannot be performed in a manner that prevents negative impacts to a wetland resource area. Review Process Request for Determination: Within 21 days of receipt, the Commission will conduct a site visit and make a decision at a public meeting that has been advertise in the local newspaper. Notice of Intent: Within 21 days of receipt, the Commission will conduct a site visit and hold a public hearing that has been advertised in the local newspaper. Within 21 days of the public hearing, the Commission will issue an Order of Conditions approving or denying the request. Filing Fees Filing fee is based on the project type. Contact the Conservation Agent to determine the total applicable fees ( ). 16

17 XI. Building Permits Purpose Permits are issued by the Building Department for a multitude of activities including but not limited to: construction, reconstruction, alteration, repairs, removal or demolition of a building or structure, the change of a building or structure s Use or Occupancy, and the installation or alteration of any equipment regulated by 780 CMR. For your convenience, effective July 13, 2015, the City of Pittsfield has adopted online permitting for the submittal of applications for residential and commercial building permits, sheet metal permits, plumbing and gas permits and electrical permits. Paper permit applications will no longer be accepted as of October 1, If you do not own a computer or if you need assistance using a computer, both are available. A computer station terminal is located on the mezzanine level of 100 North Street, immediately to the right upon entering the Health Department. Assistance can be obtained in the office or by contacting the Building Inspectors office at (413) during normal business hours. Office hours are Monday Friday 7:30am-3:00pm. Applicants will no longer have to obtain signatures from other departments when submitting a permit application, however, should plans require review by the City of Pittsfield Fire Department, Health Department, Planning Department, Conservation Commission or Water & Sewer Department and cannot be uploaded with the online application, they must physically be brought to the Building Inspectors, who will distribute said plans to those applicable departments. Applicants can mail a check payable to: City of Pittsfield Building Inspectors Department, 100 North Street Mezzanine Level, Pittsfield, MA 0120, or walk into our office utilizing the 10 Fenn Street entrance. For Plumbing and Gas Permits ONLY - Applicants will have the option of paying for their permit online with Master Card and Discover Card or debit from a checking account. APPLICANTS WHO REGISTER, (this takes less than 5 minutes) will benefit by the following: Much of the information will auto-fill on the permit application after your original registration. 17

18 Have an ability to view the status of their application and comments from other departments, including whether additional information is required. Edit an application before the permit is issued. Add attachments (plans, pictures, specs, license(s), certificates of insurance, etc.) to the application. The capability of chatting online directly with the Building Inspectors staff. View inspection results. Track all permitting history including which permits remain open requiring final inspections or completed. STEPS TO FOLLOW Step 1) Pop up blockers: Pop up blockers in windows must be shutoff. Microsoft Internet Explorer or Mozilla Firefox are the preferable internet browser s to use with this permit software. Step 2) If you will be a registered user - Register with Full Circle Technologies, Inc. Note: If you are already registered with Full Circle Technologies, Inc. for another city or town in Berkshire County, you do not have to create a new user id. You may log on using your existing id. Step 3) Apply for a permit as a Registered User or a New User FILLING OUT A BUILDING PERMIT APPLICATION, (after you have logged onto the online permitting website). Click on New Application located at the upper left hand side of the home page form. Choose your street from the drop down menu. Choose your street number from the pulldown menu. Select the appropriate permit application from the dropdown menu. Residential permit applications are for one and two family dwellings, town houses and accessory uses (swimming pool, utility shed, gazebo, fence etc.). Commercial permit applications are for all other residential work, (multi-family dwelling, lodging facilities, hotels, motels etc.) and for all commercial work. The Use Group for 1 & 2 Family Dwellings is currently; R 3 and almost always, the Construction Type is: V B. For certain types of permit applications you will be prompted to submit an attachment. If for some reason you cannot complete the attachment, submit the attachment even if incomplete. 18

19 Please mail or hand deliver a check payable to; City of Pittsfield Building Inspectors, 100 North Street, Mezzanine Level, Pittsfield, MA ADDING ATTACHMENTS TO A PERMIT APPLICATION: After you submit your application, a page appears notifying you that your New Preliminary Application has been received. Click on the exit button at the bottom of the page, and it will return to the home page. Select your permit by clicking in circle in the column heading A on the far left side of the home page. On the far right of the page under the heading, My Options, click on the dropdown menu. Click on add attachments and follow the prompts to add site plans, drawings and documents etc. INSPECTIONS FOR RESIDENTIAL BUILDING PERMITS: Construction or work, for which a permit is required, shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. Preliminary inspection: Before issuing a permit, the building official is authorized to examine all buildings, structures and sites for which an application has been filed. Required inspections: Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place and any required reinforcing steel prior to the inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job. Foundation Drainage Inspection. A foundation drainage system inspection and approval shall be made prior to backfilling the foundation to ensure compliance with IRC 2009 section R

20 Foundation Waterproofing and or Damp proofing Inspection. A foundation waterproofing and or damp proofing inspection and approval shall be made prior to backfilling the foundation to ensure compliance with IRC 2009 section R406. Concrete slab and under-floor inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor. Lowest floor elevation. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification shall be submitted to the building official. Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking, fire caulking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved. Lath and gypsum board inspection. Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum board joints and fasteners are taped and finished. Exception: Gypsum board that is not part of a fire-resistance-rated assembly or a shear assembly. Energy efficiency inspections. Inspections shall be made to determine compliance with IEBC 2009 with Mass. Amendments. In Stretch Code communities, compliance with 780 CMR Appendix AA shall include, but not be limited to, inspections for: envelope insulation R- and U-values, fenestration U-value, duct system R-value, and HVAC and water-heating equipment efficiency. Other inspections. In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the department of building safety. Final inspection. The final inspection shall be made after all work required by the permit is completed and approved. 20

21 New Buildings or Dwellings & Additions & Change of Use A. A water supply, (where applicable) must be installed prior to the issuance of a building permit. B. A Disposal Works Permit (where applicable) from the Health Department. C. The Department of Public Works must review all plans for new construction and when bedrooms are added to existing dwellings, or when a building changes use. D. When an application for a permit must comply with the provisions of 780 CMR 4 or 780 CMR (7 th edition) 9 or 780 CMR 34, one set of construction documents shall be transmitted to the head of the fire department for their review and approval. E. Affidavit form must be submitted, stating where rubbish or debris will be brought for disposal. Required Inspections The Building Official will inform the applicant of the required inspections for each type of project. Certificate of Occupancy 1. Final inspections completed and approved by all of the required departments. 2. Certificate of Compliance (septic system), where applicable, from Health Dept. 3. Building or House Street numbers in place, (4) four inch minimum numbers and a contrasting color. 4. Copy of Business Certificate (where applicable), apply to the City Clerk. Fees Fees can be found in Chapter 24, Section 1 of the City Code Click here 21

22 XII. Sign Permits On June 28, 2005, the City Council enacted certain amendments to the City s Sign Ordinance, including designating the Zoning Board of Appeals (the Board) as the Sign Appeals Board. Any person seeking to install a sign not in conformity with the City s Sign Ordinance may request an exception by completing the Zoning Board of Appeals Application. Applicants are encouraged to work with the planning staff in the Department of Community Development to complete an application. The application must be accompanied by: 1) A copy of the building inspector s decision of denial 2) A drawing of the proposed sign, with sufficient detail to allow the Board to fully understand the nature of the sign and how it would deviate from the Sign Ordinance regulations. 3) Four (4) copies of the application 4) An application fee in the amount of $50.00 addressed to the City of Pittsfield, and a legal advertisement fee in the amount of $ addressed to The Berkshire Eagle. Once the application is received, the public hearing must be scheduled at least sixty five (65) days from the date of filing. At least fourteen (14) days in advance for the hearing, the Board will publish a notice stating the date time and location of the hearing, and will notify in writing the applicant and abutters of the location of the proposed sign. The Board may, within its discretion, grant exception in cases that involve practical difficulties or unnecessary hardships when the Board finds: 1) That the alleged hardships and /or practical difficulties are peculiar to the premises, the business, or the person requesting the exception, and result from conditions which do not exist generally throughout the City; and 2) That allowing the exception will result in a balance of the competing interests, considering the public benefits intended to be secured by this Chapter, the individual hardships that will be suffered by the failure of the Board to grant an exception, the compatibility of the proposed exception with its surroundings, and the rights of others whose property would be affected by the allowance of the exception. It is suggested that these factors be taken into consideration when preparing the application. 22

23 XIII. Related Permits The majority of projects will require additional permits outside the realm of Zoning, Wetlands, and Subdivision laws. These permits will be called Related Permits. Related permits may be within the City, state, or federal jurisdictions. The following is a summary of the most common related permits. City Permits Department of Public Works New or altered driveways on any City or State road require the filing, review, and approval of an Application; a mark out by the Water Department, and a Driveway Inspection by the Engineering Department. If any excavation work will be done within any City Right-of-ways, an excavation permit will also be necessary. Excavation Permit Any subsurface work within the City of Pittsfield that is within a Right-of-Way will need an excavation permit. This is meant to make sure that all City utilities are located before any work commences. Sewer Permit A sewer permit is required for all construction, alteration, or disruption of any new or existing residential or non-residential connection to any public sanitary sewer. Water Permit A Water permit is required for all construction, alteration, or disruption of any new or existing residential or non-residential connection to any public water main. Building Inspections Department Demolition Permit A demolition permit is required prior to any proposed demolition work to an existing structure. Building Permit A building permit is required prior to any residential or non-residential construction and associated activities and after completing a Site Plan Review. Occupancy Permit An occupancy permit is required prior to any residential or non-residential structure being occupied. The Building Inspector will verify that all permits and conditions have been obtained and complied with prior issuance. Building Inspections during Construction During construction the following utility and safety inspections shall be scheduled as required: Electric Gas Construction 23

24 Plumbing Elevators Health Department and Inspections Food Permits A food permit is required for numerous food establishments, permanent and non-permanent: Temporary Food Establishments Non-profit Food Establishments Food-service Mobile Food Vendor Residential Kitchen Catering Food Retail Farmer s Market Swimming Pools Public, Semi-Public, or Special Purpose Tobacco Sales - (Restrictions Apply) Mobile Home Parks Body Art Funeral Director Tanning Establishment Hotel/Motel Well Construction Permit A Well Construction permit is required for a new well or the destruction of an existing well. Camp A Camp permit is required in order to receive a license to operate a recreational camp for children. Plan Renew Applications are required for: Swimming Pools Food Establishments Title V A title V permit is required for any construction of a new septic system or alteration of an existing septic system. Inspection Witnessing Applications are required for: Perc Tests Septic Systems Fire Department The Fire Department issues a multitude of permits for Uses such as storage of hazardous materials/flammables, gasoline stations, paint spray booths, above and underground storage tanks, etc. For a complete list of permits and fees contact the Fire Department at

25 City Council City Council issues permits and licenses such as: Junk Dealers and Waste Collectors licenses, Taxi Cab licenses, Special Permits for Shopping Plazas, Malls, Drive-thrus etc., and permits of the Storage of Flammable or Hazardous Materials. Licensing Board Under the guidance of City Council, the Licensing Board issues a variety of licenses including but not limited to; Special Liquor licenses, Transient Vendors, Hawkers and Peddler Vendor licenses, Second-hand articles, Lunch Wagons, Bowling Alleys, and Fortune Tellers. State Curb Cut Permit A curb cut permit is required by the Massachusetts Highway Department for new or altered driveways on any State roadway. Massachusetts Environmental Policy Act (MEPA) MEPA requires the submission of an Environmental Impact Report (EIR) for works, projects and activities undertaken, funded or requiring a permit from state agencies if the project exceeds specified thresholds. 401 Water Quality Certification This is required by the Massachusetts Department of Environmental Protection for any project that will alter over 5,000 square feet of wetlands and/or the dredging of more than 100 cubic yards of Land under Water as defined in the Massachusetts Wetlands Protection Act. Forest Cutting Permit The Massachusetts Forest Cutting Act requires landowners to file a Forest Cutting Plan with the Department of Environmental Management for the harvesting of forest products that exceeds specified thresholds (MGL Chapter 132). Federal (Section 404 of the Federal Clean Water Act) Required by the Army Corps of Engineers (Corps) for work affecting the course, location, condition or capacity of navigable rivers and tidal areas. 25

APPLICATION PROCEDURE

APPLICATION PROCEDURE ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION

More information

Lawrence Township. Mercer County, New Jersey. Working with our Planning and Zoning Boards & A Guide to our Permit Process

Lawrence Township. Mercer County, New Jersey. Working with our Planning and Zoning Boards & A Guide to our Permit Process Lawrence Township Mercer County, New Jersey Working with our Planning and Zoning Boards & A Guide to our Permit Process www.lawrencetwp.com Revised January 2019 About This Guide This booklet was developed

More information

MOBILE HOME PARK ORDINANCE OF THE TOWN OF LIVERMORE FALLS

MOBILE HOME PARK ORDINANCE OF THE TOWN OF LIVERMORE FALLS 1 Section I. TITLE MOBILE HOME PARK ORDINANCE OF THE TOWN OF LIVERMORE FALLS This ordinance shall be known and cited as the Mobile Home Park Ordinance of the Town of Livermore Falls, Maine. Section II.

More information

CITY OF SALEM, MASSACHUSETTS BOARD OF APPEALS NOTICE TO APPLICANTS

CITY OF SALEM, MASSACHUSETTS BOARD OF APPEALS NOTICE TO APPLICANTS NOTICE TO APPLICANTS Dear Petitioner: The Board of Appeals meets monthly on the third Wednesday of the month. Applications for a Variance, Special Permit, Appeals of the decision of the Building Commissioner,

More information

ZONING BOARD OF APPEALS CHECKLIST

ZONING BOARD OF APPEALS CHECKLIST ZONING BOARD OF APPEALS CHECKLIST CHECK CONTENTS OF A PETITION FOR A VARIANCE/APPEAL AND/OR SPECIAL PERMIT 1. An ORIGINAL & FOURTEEN (14) copies of the Petition Packet which contains the following: A COMPLETED

More information

Guide to Permitting Town of Groton, MA

Guide to Permitting Town of Groton, MA Guide to Permitting Town of Groton, MA Introduction The purpose of this guidebook is to assist homeowners, property and business owners, developers, brokers and contractors who want to develop land within

More information

Zoning Permit Application

Zoning Permit Application Zoning Permit Application FOR OFFICE USE ONLY Date Payment Form Amount Receipt # Clerk Required Submittals (circle if presented with application) Incomplete applications may be returned and/or delayed.

More information

City of New Bedford ZBA VARIANCE APPLICATION INSTRUCTIONS

City of New Bedford ZBA VARIANCE APPLICATION INSTRUCTIONS City of New Bedford ZBA VARIANCE APPLICATION INSTRUCTIONS GETTING STARTED Anyone who has been denied a building permit can apply for a Variance, Special Permit or Finding. A building permit application

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

AN ORDINANCE TO AMEND SECTION OF THE RAPID CITY MUNICIPAL CODE TO ALLOW FOR ADMINISTRATIVE DISSOLUTION OF PLANNED DEVELOPMENTS

AN ORDINANCE TO AMEND SECTION OF THE RAPID CITY MUNICIPAL CODE TO ALLOW FOR ADMINISTRATIVE DISSOLUTION OF PLANNED DEVELOPMENTS Ordinance No. 6231 AN ORDINANCE TO AMEND SECTION 17.50.050 OF THE RAPID CITY MUNICIPAL CODE TO ALLOW FOR ADMINISTRATIVE DISSOLUTION OF PLANNED DEVELOPMENTS WHEREAS, the City of Rapid City has adopted a

More information

TOWN OF HOLLISTON ECONOMIC DEVELOPMENT COMMITTEE 703 Washington Street Holliston, MA 01746

TOWN OF HOLLISTON ECONOMIC DEVELOPMENT COMMITTEE 703 Washington Street Holliston, MA 01746 TOWN OF HOLLISTON ECONOMIC DEVELOPMENT COMMITTEE 703 Washington Street Holliston, MA 01746 WELCOME! Jeff Ritter Town Administrator Peter Barbieri, Esq. Economic Development Committee Chairman Holliston

More information

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST COMPLETE: Applicant Information: Type of Proposal: OFFICE USE ONLY: New Residential Case #: Date: New Accessory

More information

Town of Middleborough Conservation Commission 2014 Policy

Town of Middleborough Conservation Commission 2014 Policy Approved February 20, 2014 Town of Middleborough Conservation Commission 2014 Policy The Wetland Protection Act under M.G.L. c. 131, sec. 40 and regulations 310 CMR 10.02(1)(a-f) & 310 CMR 10.02 (2)(a)

More information

NOTES ON SUBMITTING BUILDING PERMIT APPLICATIONS:

NOTES ON SUBMITTING BUILDING PERMIT APPLICATIONS: NOTES ON SUBMITTING BUILDING PERMIT APPLICATIONS: New Homes: See Permit Fee Schedule for appropriate permit fee Lot Release: If the lot is part of a subdivision (private way), the lot must have been released

More information

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions 201 Definitions Private Right of Way; Private way A strip of land at least fifty feet wide, meeting the minimum standards for the construction of a gravel base for a public road, over which abutters may

More information

I. Requirements for All Applications. C D W

I. Requirements for All Applications. C D W 108-16.1. Application checklists. Checklist for Required Submissions to the Planning Board or Zoning Board of Adjustment of Monroe Township All required submissions are to be made to the Administrative

More information

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit. To Whom It May Concern: Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit. The fee for the permit application is $75.00, which shall be made payable to

More information

Town of Mansfield RDA Instructions: -Fill out WPA Form 1 as noted. -Submit a site sketch* showing:

Town of Mansfield RDA Instructions: -Fill out WPA Form 1 as noted. -Submit a site sketch* showing: Town of Mansfield RDA Instructions: -Fill out WPA Form 1 as noted -Submit a site sketch* showing: subject property area of the work proposed footprint of any new structures approximate location of the

More information

ARTICLE 24 SITE PLAN REVIEW

ARTICLE 24 SITE PLAN REVIEW ARTICLE 24 SITE PLAN REVIEW 24.1 PURPOSE: The intent of these Ordinance provisions is to provide for consultation and cooperation between the land developer and the Township Planning Commission in order

More information

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Date Received: Fee Paid (amount): Applicant: Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Subdivision Name/Title: This application must be received at the Town Office by close of business on the

More information

13-2 SUBDIVISION PLANS AND PLATS REQUIRED EXCEPTIONS Subdivision Plats Required To be Recorded

13-2 SUBDIVISION PLANS AND PLATS REQUIRED EXCEPTIONS Subdivision Plats Required To be Recorded ARTICLE XIII SUBDIVISIONS 13-1 INTENT AND PURPOSE 13-1-1 Intent: It is the intent of the County Commission through the adoption of this Article to more fully avail itself of the power granted under 17-27-601

More information

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other. ARTICLE XIX SITE PLAN Sec. 20-1900 Site Plan Review Procedure - Intent The site plan review procedures are instituted to provide an opportunity for the Township Planning Commission to review the proposed

More information

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715) TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI 54457 (715) 325-8012 For obtaining a Permit for SHEDS AND DECKS the following must be done before the Inspector can issue the permit: 1. County Zoning Permit -

More information

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB ARTICLE VI: LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS VI-21 610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB 610-1 Property Line Adjustments (Property Line Relocation) A property line

More information

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE Effective date March 17, 1981 Revised March 16, 1982 Revised March 13, 1986 Revised March 10, 1987 Revised March 14, 2013 Revised March 8, 2016 TOWN OF WATERVILLE

More information

An Introduction to the Permitting. Process in Essex

An Introduction to the Permitting. Process in Essex An Introduction to the Permitting Process in Essex To determine exactly what path your project will be required to follow you will want to consult the Building Inspector at the beginning of your planning

More information

BY THE CITY COMMISSION ORDINANCE NO.:

BY THE CITY COMMISSION ORDINANCE NO.: BY THE CITY COMMISSION ORDINANCE NO.: 2005-0868 AN ORDINANCE BY THE CITY COMMISSION OF THE CITY OF DADE CITY, FLORIDA CREATING A DEVELOPMENT REVIEW PROCEDURES ORDINANCE; PROVIDING FOR INTENT, PURPOSE,

More information

ARTICLE 13 CONDOMINIUM REGULATIONS

ARTICLE 13 CONDOMINIUM REGULATIONS ARTICLE 13 CONDOMINIUM REGULATIONS Section 13.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

Greenbrier County Building Code Administrative Policy Manual

Greenbrier County Building Code Administrative Policy Manual Greenbrier County Building Code Administrative Policy Manual ARTICLE I STATE BUILDING CODE The State Building Code has been adopted as The Greenbrier County Building Code ( Code ) with all discretionary

More information

SUBDIVISION APPLICATION

SUBDIVISION APPLICATION SUBDIVISION APPLICATION Community Planning and Economic Development Development Services Division 250 South 4 th Street, Room 300 Minneapolis MN 55415-1316 612-673-3000 This application packet is used

More information

PETITION FOR VARIANCE. Village Hall Glen Carbon, IL (Do not write in this space-for Office Use Only) Notice Published On: Parcel I.D. No.

PETITION FOR VARIANCE. Village Hall Glen Carbon, IL (Do not write in this space-for Office Use Only) Notice Published On: Parcel I.D. No. (Execute in Duplicate) PETITION FOR VARIANCE Zoning Board of Appeals Village Hall Glen Carbon, IL 62034 Variance Request No. Date:, 20 (Do not write in this space-for Office Use Only) Date Set for Hearing:

More information

GENERAL CONDITIONS APPLYING TO SUBDIVISIONS APPROVED BY THE PLANNING BOARD OF THE TOWN OF BETHLEHEM ALBANY COUNTY - NEW YORK

GENERAL CONDITIONS APPLYING TO SUBDIVISIONS APPROVED BY THE PLANNING BOARD OF THE TOWN OF BETHLEHEM ALBANY COUNTY - NEW YORK GENERAL CONDITIONS APPLYING TO SUBDIVISIONS APPROVED BY THE PLANNING BOARD OF THE TOWN OF BETHLEHEM ALBANY COUNTY - NEW YORK February 1976 Revised September 1978 GENERAL CONDITIONS PERTAINING TO SUBDIVISION

More information

CHAPTER 10 Planned Unit Development Zoning Districts

CHAPTER 10 Planned Unit Development Zoning Districts CHAPTER 10 Planned Unit Development Zoning Districts Section 10.1 Intent and Purpose The Planned Unit Development (PUD) districts are intended to offer design flexibility for projects that further the

More information

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS Lawrence-Douglas County MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS Preliminary Plats The applicant shall schedule a Pre-Application meeting with Planning Staff at least seven (7) working days prior

More information

Application for Sketch Plan Review

Application for Sketch Plan Review Town of Standish 175 Northeast Road Standish, ME - 04084 Phone: (207)642-3461 Fax: (207) 642-5181 Application for Sketch Plan Review Applicant & Owner Information 1) Name of Applicant: Address: Phone:

More information

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE 15 - PLANNED UNIT DEVELOPMENT Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned

More information

RESIDENTIAL CLUSTER DEVELOPMENT DISTRICT SPECIAL PERMIT RULES AND REGULATIONS OF THE PLANNING BOARD OF THE TOWN OF COHASSET, MASSACHUSETTS

RESIDENTIAL CLUSTER DEVELOPMENT DISTRICT SPECIAL PERMIT RULES AND REGULATIONS OF THE PLANNING BOARD OF THE TOWN OF COHASSET, MASSACHUSETTS RESIDENTIAL CLUSTER DEVELOPMENT DISTRICT SPECIAL PERMIT RULES AND REGULATIONS OF THE PLANNING BOARD OF THE TOWN OF COHASSET, MASSACHUSETTS Attached: Residential Cluster Development District Special Permit

More information

CHAPTER XVIII SITE PLAN REVIEW

CHAPTER XVIII SITE PLAN REVIEW CHAPTER XVIII SITE PLAN REVIEW Section 18.1 Section 18.2 Description and Purpose. The purpose of this chapter is to provide standards and procedures under which applicants would submit, and the Township

More information

Town of Bristol Rhode Island

Town of Bristol Rhode Island Town of Bristol Rhode Island Subdivision & Development Review Regulations Adopted by the Planning Board September 27, 1995 (March 2017) Formatted: Highlight Formatted: Font: 12 pt Table of Contents TABLE

More information

4. Building plans should include top of foundation elevation

4. Building plans should include top of foundation elevation BUILDING DEPARTMENT Inc. Village of Sagaponack PO Box 600, 3175 Montauk Highway Sagaponack, NY 11962 631-537-0017 (Phone) 631-537-0612 (Fax) INSTRUCTIONS FOR FILING A BUILDING PERMIT General Information:

More information

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES INSTRUCTIONS FOR APPLICATION Get Zoning and Watershed Permits or the Site Evaluation form (if applicable) and a Map of the property from the County Office building, second floor, room 214 (Planning, and

More information

LAURENS COUNTY MOBILE HOME PARK ORDINANCE ARTICLE 1 GENERAL

LAURENS COUNTY MOBILE HOME PARK ORDINANCE ARTICLE 1 GENERAL LAURENS COUNTY MOBILE HOME PARK ORDINANCE ARTICLE 1 GENERAL 1.1 AUTHORITY AND JURISDICTION. The 1983 Georgia Constitution grants authority to the governing authority of the county to regulate land development

More information

VARIANCE PROCEDURE The City Council will consider the request and either grant or deny the variance.

VARIANCE PROCEDURE The City Council will consider the request and either grant or deny the variance. VARIANCE PROCEDURE 1 The Minnetrista City Code was established to protect both current and future residents from the negative impacts of improper development and to ensure a positive future for the city.

More information

LAND USE APPLICATION

LAND USE APPLICATION Lincoln County Department of Planning & Development 210 SW 2nd Street, Newport, OR 97365 Phone (541) 265-4192 Fax (541) 265-6945 LAND USE APPLICATION TO BE COMPLETED BY STAFF Conditional Use Non-Conforming

More information

Memorandum: October 13, 2008 REVISED To: Trowbridge Township Planning Commission From: P. Hudson, AICP Re: Suggested New Ordinance

Memorandum: October 13, 2008 REVISED To: Trowbridge Township Planning Commission From: P. Hudson, AICP Re: Suggested New Ordinance 1 Memorandum: October 13, 2008 REVISED 2-11-09 To: Trowbridge Township Planning Commission From: P. Hudson, AICP Re: Suggested New Ordinance Because of changes in both the Michigan Planning Enabling Act

More information

(Chapter Flood Damage Prevention)

(Chapter Flood Damage Prevention) Chapter 13.10 Flood Damage Prevention Section: 13.10.010 Purpose and Policy 13.10.020 Definitions 13.10.030 Applicability and Areas of Special Flood Hazard 13.10.040 Administration 13.10.050 Provisions

More information

Item No Harbour East - Marine Drive Community Council May 4, 2017

Item No Harbour East - Marine Drive Community Council May 4, 2017 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 13.1.1 Harbour East - Marine Drive Community Council May 4, 2017 TO: Chair and Members of Harbour East Marine Drive Community Council SUBMITTED

More information

Carlisle Planning Board. Rules and Regulations. Application Procedures for Accessory Apartment Special Permits May, 1996

Carlisle Planning Board. Rules and Regulations. Application Procedures for Accessory Apartment Special Permits May, 1996 Rules and Regulations for Application Procedures for Accessory Apartment Special Permits May, 1996 Prepare the following documents: Summary of Application Procedure Plot plan of principal residence & proposed

More information

ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO

ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO. 3-2011 AN ORDINANCE TO REPLACE THE SUBDIVISION CONTROL ORDINANCE WITH A NEW SUBDIVISION DEVELOPMENT ORDINANCE, IN ACCORD WITH THE LAND DIVISION

More information

ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES

ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES 301. Prior to Submission a. Copies of this Ordinance shall be available on request, at cost, for the use of any person who desires information

More information

COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY

COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY GENERAL INFORMATION: This brochure is to be used as a guide and is not intended to amend or supersede the corresponding County ordinances

More information

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA. Fee: (see fee schedule) Validation No.

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA. Fee: (see fee schedule) Validation No. Filing Date Petition No. SE Fee: (see fee schedule) Validation No. TO THE LEVY COUNTY PLANNING COMMISSION: Special exceptions are intended to provide for land uses and activities not permitted by right

More information

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL Please PRINT; all information MUST be filled out completely Date: Name of Subdivision or Land Development: Location:

More information

INFORMATION REQUIRED FOR OBTAINING A BUILDING PERMIT

INFORMATION REQUIRED FOR OBTAINING A BUILDING PERMIT INCORPORATED VILLAGE OF PORT JEFFERSON INFORMATION REQUIRED FOR OBTAINING A BUILDING PERMIT 1. Four (4) sets of the Building Permit application signed and notarized. 2. Four (4) sets of construction plans

More information

CONDOMINIUM REGULATIONS

CONDOMINIUM REGULATIONS ARTICLE 37 CONDOMINIUM REGULATIONS SECTION 37.01. Purpose The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

Gates County Planning and Zoning

Gates County Planning and Zoning Gates County Planning and Zoning PO Box 411, 200 Court Street, Gatesville, NC 27938 phone: 252-357-2411 fax: 252-357-0073 Application for Technical Review Committee For Staff Use Only: Date: Application

More information

ZONING BOARD OF APPEALS APPLICATION

ZONING BOARD OF APPEALS APPLICATION ZONING BOARD OF APPEALS APPLICATION Town of Westbrook ZBA Appeal No. Land Use Department Mulvey Municipal Center, 866 Boston Post Road, Connecticut 06498 (860)-399-3047 Fax (860)-399-2084 ZBA App. Fee

More information

ZONING HEARING BOARD APPLICANTS

ZONING HEARING BOARD APPLICANTS ZONING HEARING BOARD APPLICANTS All applications to the Manheim Township Zoning Hearing Board shall include all of the following information. 1. One (1) application form (no copies needed), signed by the

More information

TOWN OF HAVERHILL, NH

TOWN OF HAVERHILL, NH TOWN OF HAVERHILL, NH Building Permit Application Completed application must be returned to the Town Selectmen s Office for processing. The base fee for a Building Permit is $25. The application must be

More information

Burnett County, WI SUBDIVISION VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS PROCESS (NOTE: PLEASE READ ENTIRE APPLICATION BEFORE PROCEEDING)

Burnett County, WI SUBDIVISION VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS PROCESS (NOTE: PLEASE READ ENTIRE APPLICATION BEFORE PROCEEDING) Burnett County, WI SUBDIVISION VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS A variance is a relaxation of a standard in a land use ordinance. Subdivision variances are decided by the Land Use and

More information

HOW TO APPLY FOR A USE PERMIT

HOW TO APPLY FOR A USE PERMIT HOW TO APPLY FOR A USE PERMIT MENDOCINO COUNTY PLANNING AND BUILDING SERVICES What is the purpose of a use permit? Throughout the County, people use their properties in many different ways. They build

More information

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA JOINDER DEED / LOT CONSOLIDATION TOWNSHIP REVIEW PROCESS When accepting proposed Joinder Deeds / Lot Consolidations, review the Joinder Deed

More information

CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Recreational Vehicle (RV) Park Development Standards

CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Recreational Vehicle (RV) Park Development Standards CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Section 26-VII-1. Section 26-VII-2. Section 26-VII-3. Section 26-VII-4. Section 26-VII-5. Purpose Permitted

More information

Your Homeowners Association Property Improvement Handbook

Your Homeowners Association Property Improvement Handbook Your Homeowners Association Property Improvement Handbook Table of Contents INTRO PIM-1 PIM-2 PIM-3 PIM-4 PIM-5 PIM-6 PIM-7 PIM-8 PIM-9 PIM-10 PIM-11 PIM-12 PIM-13 PIM-14 PIM-15 What You Should Know About

More information

Grass Lake Charter Township 373 Lakeside Drive, P.O. Box 216 Grass Lake, Michigan 49240

Grass Lake Charter Township 373 Lakeside Drive, P.O. Box 216 Grass Lake, Michigan 49240 Grass Lake Charter Township 373 Lakeside Drive, P.O. Box 216 Grass Lake, Michigan 49240 FEE SCHEDULE RELATING TO LAND USE DEVELOPMENT AND BUILDING PERMITS The following fees are an amendment to the resolution

More information

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

BUILDING PERMIT / ZONING USE PERMIT APPLICATION Date Received Zoning District: UPPER MILFORD TOWNSHIP ~ LEHIGH COUNTY, PA Permit No. Pin No. BUILDING PERMIT / ZONING USE PERMIT APPLICATION CONTACT INFORMATION: Check who is responsible for permit. Site

More information

Planned Residential Development ( PRD ) Application

Planned Residential Development ( PRD ) Application FOR PLANNING USE ONLY Application # PRD Application Fee $ Receipt No. Filing Date Completeness Date Planned Residential Development ( PRD ) Application A. PROJECT INFORMATION 1. Project Name: 2. Address

More information

City of Harrisburg Variance and Special Exception Application

City of Harrisburg Variance and Special Exception Application City of Harrisburg Variance and Special Exception Application Note: The Planning Bureau will review all applications for completeness; incomplete applications may cause a delay in processing. Contact Ben

More information

Commercial Requirements Packet Sheridan, Indiana Hamilton County

Commercial Requirements Packet Sheridan, Indiana Hamilton County Commercial Requirements Packet Sheridan, Indiana Hamilton County Town of Sheridan 506 S. Main Street Sheridan, IN 46069 317 758 5293 FAX: 317 758 2505 Needed Information For All Commercial (Office, Retail,

More information

Burnett County, WI LAND USE VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS

Burnett County, WI LAND USE VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS Burnett County, WI LAND USE VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS A variance is a relaxation of a standard in a land use ordinance. Variances are decided by the Board of Adjustment/Appeals

More information

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW Section 7.0 - Purpose The purpose of this article is to specify the documents and/or drawings required for a Site Plan Review or a Plot Plan

More information

Instructions to the Applicant

Instructions to the Applicant CONDITIONAL USE PERMIT APPLICATION Lake of the Woods County Land and Water Planning Office 206 8 th Avenue Southeast, Suite #290 Baudette MN 56623-2867 www.co.lake-of-the-woods.mn.us Phone: (218) 634-1945

More information

ARTICLE XI MANUFACTURED AND MOBILE HOME PARKS

ARTICLE XI MANUFACTURED AND MOBILE HOME PARKS ARTICLE XI MANUFACTURED AND MOBILE HOME PARKS 11.01 General Description Manufactured/Mobile Homes are becoming an increasingly popular form of housing. However, because of their limited size, relative

More information

Castle Danger Subordinate Service District Phase I Land Use Ordinance #1

Castle Danger Subordinate Service District Phase I Land Use Ordinance #1 Castle Danger Subordinate Service District Phase I Land Use Ordinance #1 Effective February 2, 2010 Castle Danger Subordinate Service District Phase I Land Use Ordinance SECTION I PURPOSE The purpose of

More information

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS ARTICLE 28.00 SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS Section 28.01 PURPOSE The purpose of this Article is to recognize that conventional single family developments, traditionally developed

More information

Department of Planning and Development

Department of Planning and Development COUNTY OF KENOSHA Department of Planning and Development December 2012 VARIANCE APPLICATION Owner: Mailing Address: Phone Number(s): To the Kenosha County Board of Adjustment: Please take notice that the

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

CHAPTER 22 SUBDIVISION AND LAND DEVELOPMENT

CHAPTER 22 SUBDIVISION AND LAND DEVELOPMENT CHAPTER 22 SUBDIVISION AND LAND DEVELOPMENT 22-101. Title 22-102. Legislative Intent Part 1 General Provisions 22-201. Development Permits Part 2 Administration 22-301. Fee Schedule Part 3 Fee Schedule

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT) 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT) *** IMPORTANT INFORMATION ~ Please

More information

ORDINANCE NO. 41. PRIVATE ROAD ORDINANCE As Amended Through April 10, 2008

ORDINANCE NO. 41. PRIVATE ROAD ORDINANCE As Amended Through April 10, 2008 ORDINANCE NO. 41 PRIVATE ROAD ORDINANCE As Amended Through April 10, 2008 An Ordinance to protect the health, safety, and general welfare of the inhabitants of Port Sheldon Township. The Township of Port

More information

MINOR & MAJOR SUBDIVISION APPLICATION

MINOR & MAJOR SUBDIVISION APPLICATION TOW OF HOOKSETT APPLICATIO # DATE MIOR & MAJOR SUBDIVISIO APPLICATIO Application for: Completeness Map and Lot o. Public Hearing o. of Lots LOCATIO: (Specify Street Address) OWER: APPLICAT: ADDRESS: ADDRESS:

More information

SECTION 4: PRELIMINARY PLAT

SECTION 4: PRELIMINARY PLAT SECTION 4: PRELIMINARY PLAT After the completion of the sketch plan process, if submitted, the owner or developer shall file with the City an application for preliminary plat. The preliminary plat stage

More information

TOWN OF MANCHESTER BY THE SEA WETLANDS REGULATIONS GENERAL BY LAW ARTICLE XVII APPENDIX A APPLICATION SUBMITTAL REQUIREMENTS 2/26/13

TOWN OF MANCHESTER BY THE SEA WETLANDS REGULATIONS GENERAL BY LAW ARTICLE XVII APPENDIX A APPLICATION SUBMITTAL REQUIREMENTS 2/26/13 TOWN OF MANCHESTER BY THE SEA WETLANDS REGULATIONS FOR ADMINISTERING GENERAL BY LAW ARTICLE XVII APPENDIX A APPLICATION SUBMITTAL REQUIREMENTS 2/26/13 1. Applications 1.1. Request for Letter Permit. 1.1.1.

More information

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW Application Number: Date Plat Submitted: Name of Subdivision: Name of Owner: Owner Address: (Street or P.O. Box) Telephone #: (City) (State) (Zip) E-mail:

More information

FALMOUTH ZONING BOARD OF APPEALS FINDINGS AND DECISION. APPLICANT/OWNER: MICHAEL A. FARIA and DONNA J. FARIA of E. Taunton, MA

FALMOUTH ZONING BOARD OF APPEALS FINDINGS AND DECISION. APPLICANT/OWNER: MICHAEL A. FARIA and DONNA J. FARIA of E. Taunton, MA APPEAL NO: 008-17 FALMOUTH ZONING BOARD OF APPEALS FINDINGS AND DECISION APPLICANT/OWNER: MICHAEL A. FARIA and DONNA J. FARIA of E. Taunton, MA SUBJECT PROPERTY: 111 Lake Shore Drive, Hatchville, Massachusetts

More information

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

BUILDING PERMIT INSTRUCTIONS CONTRACTOR DEVELOPMENT SERVICES DIVISION 3521 NW 43 rd Avenue Lauderdale Lakes, FL 33319 (954) 535-2480 Fax (954) 731-5309 www.lauderdalelakes.org BUILDING PERMIT INSTRUCTIONS CONTRACTOR WHEN DO I NEED A BUILDING

More information

Chapter 22 PLANNED UNIT DEVELOPMENT.

Chapter 22 PLANNED UNIT DEVELOPMENT. Chapter 22 PLANNED UNIT DEVELOPMENT. Sec. 22.1 INTENT. The use of land and the construction and use of buildings and other structures as Planned Unit Developments in Georgetown Township may be established

More information

Town of Alexandria. Floodplain Management Ordinance

Town of Alexandria. Floodplain Management Ordinance 1 of 7 8/8/2009 4:56 PM Town of Alexandria Floodplain Management Ordinance SECTION 1 PURPOSE Certain areas of the Town of Alexandria, New Hampshire are subject to periodic flooding, causing serious damages

More information

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist The following list includes all of the items you must submit for a complete application. Some specific types of information

More information

SWIMMING POOL PERMIT APPLICATION PACKET

SWIMMING POOL PERMIT APPLICATION PACKET SWIMMING POOL PERMIT APPLICATION PACKET Please read the attached material. Page #2 of the permit application to be CHECKED, SIGNED and RETURNED with the required documents for permit. The following documents

More information

DRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS

DRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS Formatting: Changes recommended by the Board and accepted by the County Commission are formatted in RED: Changes made by the Park County Commission are formatted in YELLOW highlight: and changes made by

More information

FLOODPLAIN MANAGEMENT ORDINANCE

FLOODPLAIN MANAGEMENT ORDINANCE FLOODPLAIN MANAGEMENT ORDINANCE ARTICLE I - PURPOSE AND ESTABLISHMENT Certain areas of the Town of North Berwick, Maine are subject to periodic flooding, causing serious damages to properties within these

More information

ROAD APPROACH ORDINANCE #44 TILLAMOOK COUNTY OREGON. ADOPTED September 18, UPDATED June 23, UPDATED June 28, UPDATED July 24, 1996

ROAD APPROACH ORDINANCE #44 TILLAMOOK COUNTY OREGON. ADOPTED September 18, UPDATED June 23, UPDATED June 28, UPDATED July 24, 1996 ROAD APPROACH ORDINANCE #44 TILLAMOOK COUNTY OREGON ADOPTED September 18, 1991 UPDATED June 23, 1993 UPDATED June 28, 1995 UPDATED July 24, 1996 UPDATED June 23, 1999 UPDATED January 1, 2009 UPDATED November

More information

Septic Tank / Drainfield / Holding Tank Permit Application

Septic Tank / Drainfield / Holding Tank Permit Application Septic Tank / Drainfield / Holding Tank Permit Application : Permit # : PID #: Septic Fee $: Soil Verification Fee $: Investigative/Other Fee $: PLEASE PRINT CLEARLY Total Permit Fee $: The Applicant Is:

More information

STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE

STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE Adopted: August 8 th, 2008 Effective: August 28 th, 2008 Sec.100. Title ARTICLE I GENERAL

More information

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

BRIDGETON SUBDIVISION APPLICATION CHECKLIST APPLICATION NAME AND # CHECKLIST COMPLETED BY: DATE: Signature and printed name BRIDGETON SUBDIVISION APPLICATION CHECKLIST TO SUBDIVISION APPLICANTS: The attached checklist is to assist you in the submission

More information

JOINT PLANNING BOARD APPLICATION FORM

JOINT PLANNING BOARD APPLICATION FORM JOINT PLANNING BOARD APPLICATION FORM TOWNSHIP OF RIVER VALE 406 RIVERVALE ROAD RIVER VALE, NJ 07675 The application, with supporting documentation, must be filed with the Administrative Officer to the

More information

Waseca County Planning and Zoning Office

Waseca County Planning and Zoning Office Waseca County Planning and Zoning Office 300 North State Street Waseca, Minnesota 56093 Phone: 507-835-0650 Fax: 507-837-5310 Form no. PZ 081009 Web Site: www.co.waseca.mn.us FEES: 1) CUP FEE- $400.00

More information

ZONING HEARING BOARD APPEAL APPLICATON REQUIREMENTS

ZONING HEARING BOARD APPEAL APPLICATON REQUIREMENTS ZONING HEARING BOARD APPEAL APPLICATON REQUIREMENTS The following items together must be submitted to the Bureau of Permits, Planning and Zoning to make up a complete application to the Zoning Hearing

More information