PLANNING BOARD Major Development Review DRAFT Findings of Fact January 24, 2017 REVISED JANUARY 24, 2017

Size: px
Start display at page:

Download "PLANNING BOARD Major Development Review DRAFT Findings of Fact January 24, 2017 REVISED JANUARY 24, 2017"

Transcription

1 PLANNING BOARD Major Development Review DRAFT Findings of Fact January 24, 2017 REVISED JANUARY 24, 2017 Project Location: Thomas Point Road Tax Map: Map 42, Lot 16 Zoning District: R6 (Cooks Corner Neighborhood) Case Number: Applicant: Ecopath Developers, LLC 17 Arrowhead Drive Brunswick, ME Authorized Representative: Tom Saucier, P.E. Site Design Associates 23 Whitney Way Topsham, ME Staff reviewed the application and has determined it is complete. PROJECT SUMMARY Staff review is based on the Major Development Review application for the, Beacon Ridge Open Space Subdivision as revised most recently on January 5, 2017; and the additional information in the project file that is included in the Planning Board packet. The Town of Brunswick s Staff Review Committee (SRC) reviewed the development proposal on January 4, The SRC meeting notes are included in the Planning Board packet. The proposed activity involves constructing a 1,223 linear foot road to be known as Beacon Drive to serve 23 new single family residential lots. The proposed development includes an existing single family residential lot at the end of Greenwood Road which represents the 24 th lot within the proposed development. As part of the development, the applicant submitted an application for a Stormwater Management Law Permit by Rule (PBR) to the Maine Department of Environmental Protection (DEP). The Stormwater Management Law PBR was approved by the DEP on January 3, The application includes a project narrative, and a set of plans including: existing conditions, proposed site plans, grading plans, and details. The plans for the proposed activity are listed below: 1. Drawing Sheet entitled, Boundary Survey For Beacon Ridge Subdivision prepared by Jeremiah Raitt, dated September 13, 2016, and revised on January 4, 2017; 1

2 2. Drawing Sheet entitled, Existing Conditions Plan For Beacon Ridge Subdivision by Jeremiah Raitt, dated October 13, 2016, and revised on January 4, 2017; 3. Drawing Sheet entitled, Existing Conditions Plan For Beacon Ridge Subdivision by Jeremiah Raitt, dated September 19, 2016, and revised on January 4, 2017; 4. Drawing C-200 entitled Overall Site Layout & Utility Plan prepared by Site Design Associates, dated October 2016, and revised on January 5, 2017; 5. Drawing C-201 entitled Plan & Profile Beacon Drive prepared by Site Design Associates, dated October 2017, and revised most recently January 5, 2017; 6. Drawing C-300 entitled Details prepared by Site Design Associates, dated October 2017, and revised most recently January 5, 2017; 7. Drawing C-301 entitled Details prepared by Site Design Associates, dated October 2017, and revised most recently January 5, 2017; 8. Drawing C-302 entitled Details prepared by Site Design Associates, dated October 2017, and revised most recently January 5, The applicant requests the following waiver in accordance with Section 410 of the Brunswick Zoning Ordinance: 1. Profile, cross section dimensions and curve radii of existing streets The application states that no changes are proposed to existing streets. Based on this supporting fact, the staff recommends approving the requested waiver in accordance with Section Location of trees >10 The application indicates that the parcel is entirely forested and locating all trees greater than 10-inches in diameter would be impractical and burdensome. The applicant further indicates that the open space that is proposed to be maintained as undeveloped land in perpetuity is forested land. The limit of proposed clearing is limited to thewithin the proposed right of way (ROW) for the road which includes an area designated for a signage at the entrance off Thomas Point Road. The proposed sewer easement for a new sewer line will be cleared of vegetation to extent necessary for the installation and maintenance of the proposed sewer line. Clearing along Thomas Point Road is proposed to improve stormwater drainage and to install a power line. With the exception of selective cutting of pine trees within the building window shown on each lot,lot [JW1]clearing is proposed to be at the discretion of individual lot owners. Based on these supporting facts, the staff recommends approving the requested waiver in accordance with Section 410. Review Standards from Section 411 of the Town of Brunswick Zoning Ordinance Ordinance Provisions 2

3 The property is located primarily within the R6 (Cooks Corner Neighborhood) and partially within the CC (Cooks Corner Center) Zoning District. The parcel contains the mapped Natural Resource Protection Zone (NRPZ). The applicant provided a natural resource report by Mark Cenci that the mapped NRPZ is incorrectly delineated. The areas mapped as NRPZ are freshwater wetlands that do not meet the criteria for Shoreland Area or Special Flood Hazard Area as described in Section of Brunswick s Zoning Ordinance. A Wildlife Habitat Block that is part of the Rural Brunswick Smart Growth Overlay District is mapped outside the subject parcel within abutting land to the north. The applicant proposes to reduce the frontage requirements by conserving 4.89 acres of the parcel as open space in perpetuity. The proposed development complies with all applicable provisions and requirements of the Zoning Ordinance. The Board finds that the provisions of Section are satisfied conditional upon evidence provided in the form of a final recorded Declaration of Restrictive Covenants and Easements dedicating the 4.89 acres of open space Preservation of Natural Features The project area is primarily an undeveloped forested parcel off Thomas Point Road. A portion of the project area for Lot 24, so-called, is undeveloped abutting land of the existing residential development known as, Sandy Ridge Subdivision. The applicant identified natural areas includes existing forested land, freshwater wetlands, and areas within the subject parcel that were surveyed and determined not to be significant vernal pool habitat per the Natural Resources Protection Act (NRPA). The proposed open space is primarily forested wetlands and with relatively small inclusions of upland forest. The proposed road, lot areas, and buildable lot windows are oriented to permanently avoid impacts to much of the existing forested land, and freshwater wetlands. The proposed development maximizes the preservation of natural features of the landscape, and does not occur within or cause harm to any land which is not suitable for development. The Board finds that the provisions of Section are satisfied Surface Waters, Wetlands and Marine Resources At the request of the staff, the applicant considered further minimizing proposed wetland impacts by avoiding wetland disturbance on Lot 5; and maintaining at least a 25-foot forested buffer from the edge of wetlands at the terminus of the proposed stormwater swale at the northeast end of the proposed road, and at the proposed culvert outfall at the center of the proposed road. Additionally, the staff advised the applicant to consider installing signage at the edge of all wetlands areas that are likely to be disturbed without the aid of a wetland expert in the field. In response, the applicant determined that the use of the Department of Environmental Protection s (DEP) approved Stormwater Best Management Practices (BMPs) for vegetated swales and the use of erosion and sedimentation controls during construction as required by the approved Stormwater PBR will provide sufficient wetland protection and ensure the required positive drainage from the proposed road without modifying the proposed stormwater management plan. Wetland impacts 3

4 anticipated on Lot 5 are proposed to remain to allow the future lot owner the option for uniform building frontage with other houses within the proposed subdivision. As requested by the staff, the applicant updated the site plan entitled, Recording Plan for Beacon Ridge Subdivision with wetland markers to be installed at the edge of all wetlands that are likely to be disturbed without the aid of a wetland expert. The proposed development will not adversely affect the water quality of Casco Bay or its estuaries. The Board finds that the provisions of Section are satisfied Flood Hazard Areas The proposed development activity does not occur within a flood hazard area and therefore minimizes the risk of flooding. The Board finds that the provisions of Section are satisfied Stormwater Management The proposed development includes more than one (1) acre of disturbed area associated with the proposed subdivision road and is therefore required to comply with the basic standards of Maine s Stormwater Management Law. The applicant provided a copy of their DEP approved Stormwater PBR for the proposed disturbed area. The proposed stormwater management plan includes grading, filling, and the use of three (3), 18-inch diameter HDPE culverts to direct stormwater away from the proposed road and into vegetated swales. Each of the proposed culverts will be stabilized with stone riprap aprons at the inlets and outlets. The proposed development will satisfy the recommended storm water quality standards described in Storm Water Management for Maine: Best Management Practices, published by the State of Maine Department of Environmental Protection, November, 1995 as amended. The Board finds that the provisions of Section are satisfied Groundwater Groundwater is proposed to be utilized by individual lot owners with the installation of private residential wells. In accordance with Section 505, a higher level review will be required if the project overlies a sand and gravel aquifer mapped by the Maine Geological Survey. Section 505 indicates that the applicant is required to demonstrate that there will be no significant adverse impact on groundwater quality resulting from the project, either during the development or over the long-term, in the areas of subsurface disposal of wastewater, use of fertilizers or pesticides other than for normal residential purposes, infiltration of stormwater runoff, and such other activities that pose a potential threat to groundwater quality. The staff reviewed the available maps from the Maine Geological Survey (MGS) and found the proposed development overlies a mapped sand and gravel aquifer; and the applicant was advised of the mapped aquifer. The application indicates that a single family residential subdivision is not considered an activity that poses a threat to groundwater quality, particularly since the development will connect to public sewer. Based on the available information, the proposed development will not, alone or in 4

5 conjunction with existing activities, adversely affect the quality or quantity of ground water. The Board finds that the provisions of Section are satisfied Erosion and Sedimentation Control The proposed development will be constructed in accordance with Best Management Practices for erosion and sedimentation control and will not cause unreasonable soil erosion or a reduction in the land's capacity to hold water so that a dangerous or unhealthy situation results. The Board finds that the provisions of Section are satisfied Sewage Disposal The proposed development will be served by municipal sewer except for Lot 24 which will be served by a new subsurface wastewater disposal system. Plans for a proposed public sewer extension were prepared by the applicant s representative and were approved by the Brunswick Sewer District. The plans for the public sewer extension and the subsurface wastewater disposal system on Lot 24 are included in the application. The Board finds that the provisions of Section are satisfied provided conditional upon receipt of proof that the sewer line is installed to the satisfaction of the Brusnwick Brunswick Sewer District Water Deputy Fire Chief, Jeff Emerson indicated in correspondence dated January 5, 2017 and in a letter dated January 9, 2017 that the proposed development lacks sufficient water for fire suppression; and advised that NFPA 1, 2006 Edition, as adopted by the State of Maine and the town of Brunswick states in section that an approved water supply capable of providing adequate water for fire suppression is required and subject to approval by the authority having jurisdiction. The information provided by Deputy Chief Emerson indicates that any water source that requires pumping (namely, a cistern or dry hydrant) is not sufficient to meet the needs of the subdivision. Based on the Town s GIS map records, the nearest public water line that is owned and maintained by the Brunswick and Topsham Water District is within Thomas Point Road approximately 3,000 feet from the subject parcel. Deputy Chief Emerson advised against accepting a cistern as an alternative to connecting to the public water system due to the close proximity of the project area to the public water line. Accordingly, Deputy Chief Emerson indicated the following two (2) options are most appropriate for the development: 1) extend the public water supply to serve the proposed subdivision; and 2) install residential sprinklers in every dwelling within the subdivision. Based on the information provided in the application, the private wells will have no adverse impact on existing water supplies. However, the proposed development lacks sufficient water for fire suppression and therefore does not have a water source that is adequate to serve the proposed development. The Board finds that the provisions of 5

6 Section are satisfied provided the applicant provides evidence of a water source that is adequate for fire suppression. This condition may be met by (1) connection to the public water line to allow placement of hydrant(s) within 1,000 feet of all dwelling units within the subdivision; or (2) installation of residential sprinkler systems in all units, in accordance with NFPA 13D Aesthetic, Cultural and Natural Values Based on the available information, the proposed development will not have an undue adverse effect on the scenic or natural beauty of the area, historic sites, significant wildlife habitats identified by the Maine Department of Environmental Protection or by the Town Of Brunswick, or rare and irreplaceable natural areas or any public rights for physical or visual access to the shoreline. The Board finds that the provisions of Section are satisfied Community Impact Municipal resources are available to service the project, and no on-site or off-site impacts associated with the development of the project were identified. The Board finds that the provisions of Section are satisfied Traffic The proposed development is estimated to result in an increase in 23 vehicle trips per day. The applicant advised that the proposed traffic increase is below the 100 trip threshold for the traffic movement permit requirement of the Maine Department of Transportation (MDOT). Town records from a traffic study in 2014 indicate Bath Road and Thomas Point Road are rated F which is the lowest Level of Service (LOS). The rating is indicated for excessive delays to traffic for the left turn from Thomas Point Road at Bath Road during peak hours (PM) and with Saturday traffic (AM and PM). The Town Engineer and Public Works Director advised that the applicant must demonstrate the project will not result in unreasonable congestion as proposed or that the project will undertake certain actions to improve the intersection and mitigate the project s impacts on traffic. With the exception of the Bath Road and Thomas Point Road intersection during peak traffic hours, the proposed development will not cause unreasonable highway or public road congestion or unsafe conditions with respect to the use of the highways or public roads existing or proposed. The Board finds that the provisions of Section are satisfied provided the applicant demonstrates that the project will not result in unreasonable congestion as proposed or that the project will undertake certain actions to improve the Bath Road and Thomas Point Road intersection and mitigate the project s impacts on traffic Pedestrian and Bicycle Access and Safety The proposed development is designed in accordance with the street standards in Appendix II of the Brunswick Zoning Ordinance. The proposal is designed to accommodate bicyclists and pedestrians, and addresses issues of bicycle and pedestrian access, safety and circulation both within the site and to points outside of the site. The Board finds that the provisions of Section are satisfied. 6

7 Development Patterns During the SRC meeting the Public Works Director and Town Engineer advised installing lights for safety on the proposed Beacon Drive. The applicant revised the plans with three (3) lights along the proposed road. Further, the street light impact fee per light is $ (for 70 watt HPS cut-off luminaire on standard six (6) foot bracket arm, $12.86/mo x 12 mo./yr x10 yr x 30%) based on current pricing and the established methodology. The impact fee for the three (3) streets lights to be provided by the Town thru its rental program with CMP would be $1, (3 ea x $462.96). The proposed residential development will have no adverse impact on areas which are primarily residential. The Board finds that the provisions of Section are satisfied provided conditional upon payment of the street light impact fee, and the street lights are designed and installed to the satisfaction of the Town Engineer and Public Works Director Architectural Compatibility The proposed development is a residential development that will be compatible with its surroundings in terms of its size, scale, mass and design. The Board finds that the provisions of Section are satisfied Municipal Solid Waste Disposal The proposed development is required to pay an impact fee for each of the proposed lots. The Board finds that the provisions of Section are satisfied provided the solid waste impact fees are paid Recreation Needs The proposed development is residential and is required to demonstrate that it will not have an unreasonable burden on the municipality's ability to provide recreational services. On January 24, 2017, the Director of Parks and Recreation calculated the recreation impact fee in lieu of land is $8, The fee is based on the appraised land value of $10,000 per acre as determined by Brunswick s Assessor, Cathy Jamison. The recreation impact fee may be provided to satisfy Section However, Tthe proposed development must may be reviewed by the Department of Recreation and the Recreation Department Commission to determine an alternative method of satisfying the recreation needs for the proposed development at the request of the applicant. The Board finds that the provisions of Section are not applicablesatisfied conditional upon implementing an approved method of meeting recreational requirements of the Zoning Ordinance as determined by the Recreation Commission Access for Persons with Disabilities The application indicates that the project design is in compliance with the Americans With Disabilities Act, and no buildings are proposed. The Board finds that the provisions of Section are satisfied Financial Capacity and Maintenance 7

8 The application indicates that the applicant budgeted adequate funds were budgeted to complete and maintain the project through their normal operating budget. The applicant will provide a performance guarantee that ensures adequate financial and technical capacity to complete the project, and once it is completed, the project is expected to have adequate resources to maintain itself. The Town Engineer and Public Works Director recommends providing 2% of the construction value for construction inspection and administration services. The $350,000 performance security the escrow amount to be deposited before the start of any construction is $7,000. The Board finds that the provisions of Section are satisfied provide a performance guarantee is provided by the applicant that ensures adequate financial and technical capacity to complete the project, and once it is completed, that the project is expected to have adequate resources to maintain itself Noise and Dust The applicant indicates adverse impacts from noise and dust will be minimized during construction. The proposed development will not contribute to unreasonable noise and dust, both during construction and after the development has been completed. The Board finds that the provisions of Section are satisfied Right, Title and Interest A copy of the right, title and interest documentation is included in the application. The applicant has sufficient right, title and interest in the subject property. The Board finds that the provisions of Section are satisfied Payment of Application Fees The applicant has paid applicable development review application fees for Major Development Review. The Board finds that the provisions of Section are satisfied. 8

9 DRAFT MOTIONS CASE # Motion 1: Motion 2: Motion 3: That the requested waiver for profiles and curve radii of existing streets, and for locating trees over 10 inches is approved. That the Final Plan is deemed complete. That the Final Plan is approved with the following conditions: 1. That the Board s review and approval does hereby refer to these findings of fact, the plans and materials submitted by the applicant and the written and oral comments of the applicant, his representatives, reviewing officials, and members of the public as reflected in the public record. Any changes to the approved plan not called for in these conditions of approval or otherwise approved by the Director of Planning and Development as a minor modification shall require a review and approval in accordance with the Brunswick Zoning Ordinance. 2. That prior to the sale of the first lot on Beacon Drivestart of construction, proof that the project will not result in unreasonable congestion as proposed or that the project will undertake certain actions to improve the Bath Road and Thomas Point Road intersection and mitigate the project s impacts on traffic is provided to the satisfaction of the Town Engineer and Public Works Director. 3. That prior to the sale of the first a lot on Beacon Drive, the proposed outdoor lights for Beacon Drive are shall be designed and, installed, and the street light impact fee shall be paid all to the satisfaction of the Town Engineer and Public Works Director. 4. That prior to the sale of the firsta lot on Beacon Drive, the applicant shall provide evidence of a water source that is adequate for fire suppression. This condition may be met by (1) connection to the public water line to allow placement of hydrant(s) within 1,000 feet of all dwelling units within the subdivision; or (2) installation of residential sprinkler systems in all units, in accordance with NFPA 13D to the satisfaction of the Fire Chief or his designee. 5. That prior to the start of construction, a performance guarantee and escrow fee shall be provided that ensures adequate financial and technical capacity to complete the project, and once it is completed, that the project is expected to have adequate resources to maintain itself to the satisfaction of the Town Engineer and Public Works Director. 9

10 6. That prior to the sale of a lot on Beacon Drive, proof that the sewer line is installed to the satisfaction of the Brunswick Sewer District shall be provided to the satisfaction of the Director of Planning and Development. 7. That prior to the start of construction, an approved method of meeting recreational requirements in Section 519 of the Zoning Ordinance as determined by the Recreation Commission shall be implemented to the satisfaction of the Director of Parks and Recreation. 8. That prior to the issuance of a building permit, solid waste impact fees shall be paid to the satisfaction of the Town Engineer and Public Works Director. 9. That prior to the sale of a lot, evidence is provided in the form of a final recorded Declaration of Restrictive Covenants and Easements dedicating the 4.89 acres of open space to the satisfaction of the Director of Planning and Development. 10

11 ete EATON TRAFFIC ENGINEERING 67 Winter Street Suite1TopshamMaine04086 Tel Cell To: Fm: Thomas Saucier, PE, Site Design Associates William C. Eaton, PE, Eaton Traffic Engineering Dt: January 23, 2017 Re: 23 Lot Subdivision, Thomas Point Road, Brunswick I have evaluated the trip generation and associated impacts associated with the above noted project, including the memoranda between you and the Town of Brunswick staff, and the additional information you have obtained from MDOT regarding accident history at the intersection of Thomas Point Bath Road. The trip generation associated with a 23 unit single family residential subdivision (per data from the ITE publication Trip Generation, 8 th Edition is estimated to be 230 trips per day (weekday half enter, half exit), with 23 vehicle trips during the PM peak hour (15 enter, 8 exit), 17 trips during the AM peak hour (4 enter, 13 exit) and 22 trips during the Saturday peak hour (12 enter, 10 exit). Town staff has indicated in one memorandum that the Level of Service (LOS) for vehicles exiting Thomas Point Road onto Bath Road (presumably the left turn movement) is rated as F during the weekday PM and Saturday peak hours. I do not have any traffic volume information by which to confirm this, but I have general knowledge of the volumes in the vicinity and would concur that the LOS would be low and delays to the left turn exit would be high. The intersection of Thomas Point Bath Road is located at the end of a median island on the east approach to Cook s Corner. This effectively provides a storage or refuge area for left turn vehicles from Thomas Point Road and allows them to enter the storage area when traffic from the west is clear (such as when the dual left turn or the lead-lag phases are in effect on Bath Road at the Cook s Corner intersection some 300 feet away), and merge into westbound Bath Road when the opportunity presents itself. I do not know if the LOS analysis in the previous studies referred to in staff comments accounted for this condition.

12 In any event, the proposed new subdivision will generate, on average, 8 exiting trips during the PM peak hour, and it is likely that a majority of these trips will be westbound on Bath Road (i.e. left turns). It is likely that as soon as the new residents of the subdivision become familiar with traffic conditions in the vicinity of Cook s Corner, they will learn that to avoid making a left turn from Thomas Point Road to Bath Road they can simply take a route through the cinema complex located on New Gurnet Road across from Cook s Corner Shopping Mall (which connects New Gurnet Road to Thomas Point Road) and avoid the problem completely. This is not a public right of way, but it is undoubtedly used by anyone familiar with the area to avoid making a left turn off Thomas Point Bath Road. Finally, the Town ordinance regarding traffic ( Traffic) noted in your states that a traffic engineer must make a statement or report that the proposed development will not create or further contribute to unsafe traffic conditions. While a poor LOS is not a desirable condition, it does not, in and of itself, constitute unsafe traffic conditions. You have indicated to me that Brunswick Police Department records indicate that for the last three years of available traffic accident data ( ) that the intersection of Thomas Point Bath Road has had a total of 5 reportable accidents and therefore would not be listed as a High Crash Location (HCL). In my opinion the addition of a few new vehicle trips to the intersection, which admittedly will involve long delays to vehicles making a left turn from Thomas Point Road, will not create or contribute to unsafe traffic conditions, since no such condition appears to exist now. I trust that the above addresses your current needs in this matter. Should you have any questions or require additional assistance, please contact me. 2

13

14

15

DRAFT Findings of Fact Major Development Review Final Subdivision Plan September 10, 2015

DRAFT Findings of Fact Major Development Review Final Subdivision Plan September 10, 2015 DRAFT Findings of Fact Major Development Review Final Subdivision Plan September 10, 2015 Project Name: Meadow Rose Farm Subdivision Case Number: 15-015 Tax Map: Map 17, Lot 126 Applicant: Two Clarks,

More information

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Date Received: Fee Paid (amount): Applicant: Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Subdivision Name/Title: This application must be received at the Town Office by close of business on the

More information

MULTI-FAMILY DWELLING UNIT SUBDIVISION ORDINANCE TOWN OF SIDNEY, MAINE

MULTI-FAMILY DWELLING UNIT SUBDIVISION ORDINANCE TOWN OF SIDNEY, MAINE MULTI-FAMILY DWELLING UNIT SUBDIVISION ORDINANCE TOWN OF SIDNEY, MAINE I. GENERAL A. Title B. Purpose C. Administration D. Scope II. DEFINITIONS A. Building Height B. Dwelling Unit C. Family D. Multi-Unit

More information

CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF. George R. Aube 1450 Dorset Street

CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF. George R. Aube 1450 Dorset Street CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF George R. Aube 1450 Dorset Street Final Plan Review For A Two-Lot Subdivision Application # PC-13-19 Background The Planning

More information

CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF

CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF Background CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF Henrietta Ober 2296 Greenbush Road and Stephen and Margaret Foster 1259 Lime Kiln Road Final Plan Review For

More information

Town of Shelburne, Vermont

Town of Shelburne, Vermont Town of Shelburne, Vermont CHARTERED 1763 P.O. BOX 88 5420 SHELBURNE ROAD SHELBURNE, VT 05482 www.shelburnevt.org 802-985-5118 * * Also available in alternate formats in accordance with the Americans With

More information

Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018.

Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018. Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018. No changes were made at the 1st Public Hearing. Proposed wording for the 1 st Public Hearing in red, eliminated text in

More information

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST Completed DRC Application for Review Required for Application Process DRC Processing Fee 1 Commercial $2,500.00 Fire Department Review Fee 150.00 Total $2,650.00

More information

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS - Larimer County Planning Dept. Procedural Guide for 1041 PERMITS PLEASE NOTE: A PRE-APPLICATION CONFERENCE IS REQUIRED PRIOR TO SUBMITTING THIS APPLICATION. PURPOSE: State Statutes allow local governments

More information

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist Prior to filing any application for SUBDIVISION approval, the applicant shall request in writing that the zoning administrator schedule a pre-submission conference. APPLICATION TO THE PLANNING BOARD TOWN

More information

Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division

Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division Portland s Planning and Urban Development Department

More information

APPLICATION PROCEDURE

APPLICATION PROCEDURE ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION

More information

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS 105.11. Permit requirements. 105.12. Waiver of permit requirements. Title 25 Environmental Protection Part I. Department of Environmental Protection Subpart C. Protection of Natural Resources Article I.

More information

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions 201 Definitions Private Right of Way; Private way A strip of land at least fifty feet wide, meeting the minimum standards for the construction of a gravel base for a public road, over which abutters may

More information

Guide to Combined Preliminary and Final Plats

Guide to Combined Preliminary and Final Plats Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested

More information

MINOR & MAJOR SUBDIVISION APPLICATION

MINOR & MAJOR SUBDIVISION APPLICATION TOW OF HOOKSETT APPLICATIO # DATE MIOR & MAJOR SUBDIVISIO APPLICATIO Application for: Completeness Map and Lot o. Public Hearing o. of Lots LOCATIO: (Specify Street Address) OWER: APPLICAT: ADDRESS: ADDRESS:

More information

SECTION 4: PRELIMINARY PLAT

SECTION 4: PRELIMINARY PLAT SECTION 4: PRELIMINARY PLAT After the completion of the sketch plan process, if submitted, the owner or developer shall file with the City an application for preliminary plat. The preliminary plat stage

More information

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT RECEIVED STAMP SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT A checklist of background information and submission requirements for processing of a sketch plan, preliminary plat

More information

Conditional Use Permit / Standard Subdivision Application

Conditional Use Permit / Standard Subdivision Application Conditional Use Permit / Standard Subdivision Application Name of Proposed Subdivision: Total Area (Acres) Is Proposed Subdivision to be built in phases? Number of Lots If yes, how many phases? Applicant/Owner

More information

Chapter 18 Subdivisions. Approved by City Council August 4, 2008

Chapter 18 Subdivisions. Approved by City Council August 4, 2008 Chapter 18 Subdivisions Approved by City Council August 4, 2008 1 Sec 18 Table of Contents Article I Purpose Sec. 18-1 Purpose and Statutory Review Criteria Article II Authority and Administration Sec.

More information

Use permitted by: Right Special Exemption

Use permitted by: Right Special Exemption CENTER TOWNSHIP 150 Henricks Road Butler, PA 16001-8472 Phone (724) 282-7805 Fax (724) 282-6550 Application Number: FEE COLLECTED: Application for: Preliminary Final Land Development Location: Map and

More information

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013 2491 Community Drive, Bath, Pennsylvania Telephone: 610-759-9449 FAX: 610-759-9448 Rev:12/23/2013 APPLICATION FORM FOR A SITE PLAN PER MOORE TOWNSHIP ZONING ORDINANCE SECTION 200-58.1 NORTHAMPTON COUNTY,

More information

Chapter 136. SOIL EROSION

Chapter 136. SOIL EROSION 1 of 8 12/19/2011 4:17 PM Township of Andover, NJ Monday, December 19, 2011 Chapter 136. SOIL EROSION [HISTORY: Adopted by the Township Committee of the Township of Andover by Ord. No. 77-11 (Ch. XVII

More information

Application for Sketch Plan Review

Application for Sketch Plan Review Town of Standish 175 Northeast Road Standish, ME - 04084 Phone: (207)642-3461 Fax: (207) 642-5181 Application for Sketch Plan Review Applicant & Owner Information 1) Name of Applicant: Address: Phone:

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application

More information

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps CITY OF EL CERRITO Community Development Department Planning and Building Division 10890 San Pablo Avenue, El Cerrito, CA 94530 (510) 215-4330 FA (510) 233-5401 planning@ci.el-cerrito.ca.us APPLICATION

More information

Spirit Lake North, LLC

Spirit Lake North, LLC BONNER COUNTY PLANNING DEPARTMENT PLANNING AND ZONING COMMISSION STAFF REPORT FOR March 1, 2018 Project Name: Amendment & Zone Change: Spirit Lake North, LLC File Number,Type: AM 162-18/ZC365-18 Request:

More information

TENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS

TENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS TENTATIVE PARCEL MAP APPLICATION GUIDE SISKIYOU COUNTY PLANNING DIVISION 806 South Main Street, Yreka CA 96097 Phone: (530) 841-2100 / Fax: (530) 841-4076 TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS

More information

MINUTE ORDER BONNER COUNTY COMMISSIONERS PUBLIC HEARING MINUTES AUGUST 6, 2015

MINUTE ORDER BONNER COUNTY COMMISSIONERS PUBLIC HEARING MINUTES AUGUST 6, 2015 MINUTE ORDER BONNER COUNTY COMMISSIONERS PUBLIC HEARING MINUTES AUGUST 6, 2015 CALL TO ORDER: Chair Cary Kelly called the Bonner County Commissioners hearing to order at 1:00 p.m. in the 3rd floor meeting

More information

CHELSEA SUBDIVISION ORDINANCE

CHELSEA SUBDIVISION ORDINANCE June 11, 2015 CHELSEA SUBDIVISION ORDINANCE I. Purpose and Authority A. This ordinance will pertain to all land within the boundaries of the Town of Chelsea. The purpose of this ordinance is to protect

More information

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015 ARTICLE 4 PRELIMINARY PLAN 401 Intent An in-depth analysis of the proposed subdivision, including a review of the design considering the ability to obtain water and sanitation, identified geologic hazards,

More information

Medical Marijuana Special Exception Use Information

Medical Marijuana Special Exception Use Information Medical Marijuana Special Exception Use Information The Special Exception Use information below is a modified version of the Unified Development Code. It clarifies the current section 5:104 Special Exceptions

More information

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST Summary This checklist is intended to assist applicants and design professionals in the preparation of minor subdivision applications for

More information

MINUTE ORDER. BONNER COUNTY PLANNING and ZONING COMMISSION PUBLIC HEARING MINUTES APRIL 7, 2016

MINUTE ORDER. BONNER COUNTY PLANNING and ZONING COMMISSION PUBLIC HEARING MINUTES APRIL 7, 2016 MINUTE ORDER BONNER COUNTY PLANNING and ZONING COMMISSION PUBLIC HEARING MINUTES APRIL 7, 2016 CALL TO ORDER: Acting Chair Hall called the Bonner County Planning and Zoning Commission hearing to order

More information

Town of Windham Land Use Ordinance Sec. 900 Subdivision Review SECTION 900 SUBDIVISION REVIEW

Town of Windham Land Use Ordinance Sec. 900 Subdivision Review SECTION 900 SUBDIVISION REVIEW Sections SECTION 900 SUBDIVISION REVIEW 901 Purpose 9-2 902 Statutory Review Criteria 9-2 903 Authority and Administration 9-5 904 Joint Application and Hearing 9-6 905 Classification of Subdivision 9-6

More information

TOWN OF BRISTOL. Ontario County, New York APPLICATION FOR LOT LINE ADJUSTMENT

TOWN OF BRISTOL. Ontario County, New York APPLICATION FOR LOT LINE ADJUSTMENT TOWN OF BRISTOL Ontario County, New York APPLICATION FOR LOT LINE ADJUSTMENT Lot Line Adjustment: The adjusting of common property line(s) or boundaries between adjacent lots, tracts, or parcels for the

More information

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax:

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax: City of Westbrook DEPARTMENT OF PLANNING & CODE ENFORCEMENT 2 York Street Westbrook, Maine 04092 (207) 854-0638 Fax: 1-866-559-0642 WESTBROOK PLANNING BOARD TUESDAY, AUGUST 21, 2018, 7:00 P.M. WESTBROOK

More information

BONNER COUNTY PLANNING DEPARTMENT PLANNING & ZONING COMMISION STAFF REPORT APRIL 19, 2018

BONNER COUNTY PLANNING DEPARTMENT PLANNING & ZONING COMMISION STAFF REPORT APRIL 19, 2018 BONNER COUNTY PLANNING DEPARTMENT PLANNING & ZONING COMMISION STAFF REPORT APRIL 19, 2018 Project Name: File Number,Type: Request: Legal Description: Location: Parcel Size: Parcel # Applicant: Project

More information

ARTICLE 4 MAJOR SUBDIVISION/LAND DEVELOPMENT PLAN REQUIREMENTS

ARTICLE 4 MAJOR SUBDIVISION/LAND DEVELOPMENT PLAN REQUIREMENTS ARTICLE 4 MAJOR SUBDIVISION/LAND DEVELOPMENT PLAN REQUIREMENTS SECTION 401 LAND SKETCH PLANS FOR MAJOR SUBDIVISIONS AND DEVELOPMENTS 401.1 Sketch Plan Information The following process and procedures shall

More information

Guide to Preliminary Plans

Guide to Preliminary Plans Guide to Preliminary Plans Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures

More information

CHAPTER XVIII SITE PLAN REVIEW

CHAPTER XVIII SITE PLAN REVIEW CHAPTER XVIII SITE PLAN REVIEW Section 18.1 Section 18.2 Description and Purpose. The purpose of this chapter is to provide standards and procedures under which applicants would submit, and the Township

More information

City Of Attleboro Conservation Commission

City Of Attleboro Conservation Commission City Of Attleboro Conservation Commission GOVERNMENT CENTER, 77 PARK STREET ATTLEBORO, MASSACHUSETTS 02703 (508) 223 2222 FAX 222 3046 GENERAL INSTRUCTIONS AND CHECKLIST FOR COMPLETING STORMWATER MANAGEMENT

More information

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW Section 7.0 - Purpose The purpose of this article is to specify the documents and/or drawings required for a Site Plan Review or a Plot Plan

More information

TOWNSHIP OF ALGOMA COUNTY OF KENT, MICHIGAN. Minutes of a regular meeting of the Township Board of the Township of Algoma, Kent

TOWNSHIP OF ALGOMA COUNTY OF KENT, MICHIGAN. Minutes of a regular meeting of the Township Board of the Township of Algoma, Kent Site Plan No. 0410 --- TOWNSHIP OF ALGOMA COUNTY OF KENT, MICHIGAN Minutes of a regular meeting of the Township Board of the Township of Algoma, Kent County, Michigan, held in the Algoma Township Hall,

More information

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585) géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY 14424 Phone: (585) 394-1120 / Fax: (585) 394-9476 NOTICE TO ALL PLANNING BOARD APPLICANTS FOR PRELIMINARY SUBDIVISION PHASED PROJECTS The applicant

More information

BOUNDARY LINE ADJUSTMENT

BOUNDARY LINE ADJUSTMENT DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us BOUNDARY

More information

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE 15 - PLANNED UNIT DEVELOPMENT Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned

More information

TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION

TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION This application shall conform in all respects to the Land Subdivision Standards of Chapter 41 of the Planning Board of the Town of Eliot code of ordinances.

More information

File Name: Conditional Use Application_2017

File Name: Conditional Use Application_2017 Office Use Only Recv d: By: App #: #: Meeting Date: Conditional Use Application 2017 FEE: $2,500.00. The fee is payable upon application submittal. *Any additional meeting with mailed & published notice

More information

PLANNING BOARD REPORT PORTLAND, MAINE

PLANNING BOARD REPORT PORTLAND, MAINE PLANNING BOARD REPORT PORTLAND, MAINE India Newbury Residences Subdivision & Conditional Use Review 2016-096 India Newbury Residences, LLC Submitted to: Portland Planning Board Date: May 20, 2016 Public

More information

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST TOWNSHIP OF EGG HARBOR PLANNING BOARD/ZONING BOARD OF ADJUSTMENT 3515 BARGAINTOWN ROAD EGG HARBOR TOWNSHIP, NJ 08234 MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST The following checklist is designed to

More information

MAJOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE

MAJOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE MAJOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE Clear Creek County Planning Department P.O. Box 2000 Georgetown, Colorado 80444 (303) 679-2436 - phone (303) 569-1103 - fax PURPOSE To establish criteria and

More information

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585) géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY 14424 Phone: (585) 394-1120 / Fax: (585) 394-9476 APPLICATION FOR LOT-LINE ADJUSTMENT The applicant is responsible for the completeness of all

More information

APPLICATION FOR CONDITIONAL USE PERMIT

APPLICATION FOR CONDITIONAL USE PERMIT Receipt No. Fee Date Date Permit Issued: Certificate of Compliance: Date DOOR COUNTY LAND USE SERVICES 421 Nebraska Street Door County Government Center Sturgeon Bay, Wisconsin 54235 (920) 746-2323 - FAX

More information

1. The owner of the property is Richmond Contract Manufacturing. 2. The property is located at 307 Front Street.

1. The owner of the property is Richmond Contract Manufacturing. 2. The property is located at 307 Front Street. RICHMOND PLANNING BOARD TUESDAY, FEBRUARY 24, 2015 TOWN OFFICE MEETING ROOM 6:00P.M. MINUTES 1.0 CALL TO ORDER Present: Russ Hughes, Jeff Severance, Larry Srock, Jessica Alexander and Tom Nugent. Others

More information

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT SECTION 501 ONLY FINAL PLAN REQUIRED The classification of a proposed subdivision as a "Minor Subdivision" shall only require the submission, review and approval

More information

PRELIMINARY SUBDIVISION PLAN APPLICATION INSTRUCTIONS

PRELIMINARY SUBDIVISION PLAN APPLICATION INSTRUCTIONS City of Chesapeake Department of Planning Post Office Box 15225 Chesapeake, Virginia 23328-5225 (757) 382-6176 FAX (757) 382-6406 PRELIMINARY SUBDIVISION PLAN APPLICATION INSTRUCTIONS PURPOSE A preliminary

More information

Township of Collier 2418 Hilltop Road Presto, PA 15142

Township of Collier 2418 Hilltop Road Presto, PA 15142 Township of Collier 2418 Hilltop Road Presto, PA 15142 Fees: Major: 2 checks $600 + $50 per lot & $1700 Escrow) APPLICATION FOR SUBDIVISION major FINAL only Plans must be folded Rolled plans will not be

More information

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION CASE # PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION The undersigned Applicant hereby submits to the Plymouth Planning Board a completed application for a proposed minor

More information

CHAPTER 3 PRELIMINARY PLAT

CHAPTER 3 PRELIMINARY PLAT 10-3-1 10-3-3 SECTION: CHAPTER 3 PRELIMINARY PLAT 10-3-1: Consultation 10-3-2: Filing 10-3-3: Requirements 10-3-4: Approval 10-3-5: Time Limitation 10-3-6: Grading Limitation 10-3-1: CONSULTATION: Each

More information

Initial Subdivision Applications Shall Include the Following:

Initial Subdivision Applications Shall Include the Following: Initial Subdivision Applications Shall Include the Following: 1) Subdivision Application Form: completely filled out (12 copies) 2) Plat: The Plat must adhere to the requirements set forth in the Town

More information

DEPARTMENT OF PLANNING SERVICES 1555 N 17 th Ave Greeley CO Phone (970) Fax (970)

DEPARTMENT OF PLANNING SERVICES 1555 N 17 th Ave Greeley CO Phone (970) Fax (970) DEPARTMENT OF PLANNING SERVICES 1555 N 17 th Ave Greeley CO 80631 Phone (970) 400-6100 Fax (970) 304-6498 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PROCEDURAL GUIDE SOLID WASTE DISPOSAL SITES

More information

M-43 CORRIDOR OVERLAY ZONE

M-43 CORRIDOR OVERLAY ZONE ARTICLE 26.00 M-43 CORRIDOR OVERLAY ZONE Section 26.01 Findings A primary function of the M-43 state highway is to move traffic through the Township and to points beyond. As the primary east-west arterial

More information

TOWN OF WELLS, MAINE PLANNING BOARD

TOWN OF WELLS, MAINE PLANNING BOARD 1 0 1 0 1 TOWN OF WELLS, MAINE PLANNING BOARD Meeting Minutes Monday, June,, :00 P.M. Littlefield Meeting Room, Town Hall Sanford Road CALL TO ORDER AND DETERMINATION OF QUORUM Chairman Chuck Millian called

More information

ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS

ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS SECTION 24.00 INTENT AND PURPOSE The standards of this Article provide for the design, construction and maintenance of private

More information

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist The following list includes all of the items you must submit for a complete application. Some specific types of information

More information

Town of Prospect. Site Plan Review Ordinance. Enacted

Town of Prospect. Site Plan Review Ordinance. Enacted Town of Prospect Site Plan Review Ordinance Enacted 1 TABLE OF CONTENTS TABLE OF CONTENTS page 2 ARTICLE I TITLE AND PURPOSE.. 3 ARTICLE II ARTICLE III ARTICLE IV ARTICLE V ADMINISTRATION AND APPLICABILITY.3

More information

Diamond Falls Subdivision PROPOSED YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT

Diamond Falls Subdivision PROPOSED YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT Diamond Falls Subdivision PROPOSED YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT The City/County Planning Staff has prepared the Findings of Fact for the Diamond Falls Subdivision. These findings

More information

19.12 CLUSTER RESIDENTIAL DISTRICT

19.12 CLUSTER RESIDENTIAL DISTRICT Chapter 19.12 CLUSTER RESIDENTIAL DISTRICT (Adopted 12/22/2003; Ordinance #0061970). Amended 7/3/17, Ordinance #079100. Section 19.12.010 - Declaration of Intent. The Cluster Residential District provides

More information

MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE

MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE Clear Creek County Planning Department P.O. Box 2000 Georgetown, Colorado 80444 (303) 679-2436 phone (303) 569-1103 fax 1 PURPOSE To establish criteria and

More information

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

BRIDGETON SUBDIVISION APPLICATION CHECKLIST APPLICATION NAME AND # CHECKLIST COMPLETED BY: DATE: Signature and printed name BRIDGETON SUBDIVISION APPLICATION CHECKLIST TO SUBDIVISION APPLICANTS: The attached checklist is to assist you in the submission

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

Waseca County Planning and Zoning Office

Waseca County Planning and Zoning Office Waseca County Planning and Zoning Office 300 North State Street Waseca, Minnesota 56093 Phone: 507-835-0650 Fax: 507-837-5310 Form no. PZ 081009 Web Site: www.co.waseca.mn.us FEES: 1) CUP FEE- $400.00

More information

WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION

WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION DETAILED SPECIFIC WRITTEN REQUEST File Number: SDV- Number of Proposed Lots & their Dimensions: PRELIMINARY SUBDIVISION PLAN REQUIREMENTS The approval of

More information

CHAPTER 10 Planned Unit Development Zoning Districts

CHAPTER 10 Planned Unit Development Zoning Districts CHAPTER 10 Planned Unit Development Zoning Districts Section 10.1 Intent and Purpose The Planned Unit Development (PUD) districts are intended to offer design flexibility for projects that further the

More information

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals) E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals) 1. Name(s): 2. Address: 3. Telephone Number(s): 4. E-mail: 5. Owner Name(s) (if

More information

Amendments to Chapter proposed by the Assembly Title 21 Committee

Amendments to Chapter proposed by the Assembly Title 21 Committee Amendments to Chapter 21.04 proposed by the Assembly Title 21 Committee All page numbers refer to the S version. PZC recommended additions are underlined. PZC recommended deletions are in [BRACKETS AND

More information

Article III. Erosion and Sedimentation Control

Article III. Erosion and Sedimentation Control Article III. Erosion and Sedimentation Control Section 9.6 Erosion and Sedimentation Control Plan Requirements Section 9.6.1 Plan Submission A plan shall be prepared for all land-disturbing activities

More information

Packet Contents: Page #

Packet Contents: Page # CLEAR CREEK COUNTY PLANNING DEPARTMENT REQUIREMENTS FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS Prior to submitting a building permit application, the Planning staff will review the site plan and construction

More information

French, Bruce. The applicant is requesting a zone change from Suburban to Rural Service Center.

French, Bruce. The applicant is requesting a zone change from Suburban to Rural Service Center. BONNER COUNTY PLANNING DEPARTMENT PLANNING AND ZONING COMMISSION STAFF REPORT FOR FEBRUARY 2, 2017 Project Name: French, Bruce File Number,Type: ZC358-16, Zone Change Request: The applicant is requesting

More information

Draft Zoning Ordinance for Planning Board Review Town of Brunswick, Maine

Draft Zoning Ordinance for Planning Board Review Town of Brunswick, Maine Draft Zoning Ordinance for Planning Board Review Town of Brunswick, Maine PLANNING BOARD DRAFT Clarion Associates Brunswick Zoning Ordinance Rewrite Committee June 2016 Contents Chapter 1 General Provisions...

More information

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT Case File No. Property Identification No. City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT Requested Action Brief description of proposed project (Please describe the proposed amendment,

More information

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other. ARTICLE XIX SITE PLAN Sec. 20-1900 Site Plan Review Procedure - Intent The site plan review procedures are instituted to provide an opportunity for the Township Planning Commission to review the proposed

More information

Town of Chelsea. Subdivision Ordinance. Adopted: [Pick the date]

Town of Chelsea. Subdivision Ordinance. Adopted: [Pick the date] Town of Chelsea Subdivision Ordinance Adopted: [Pick the date] I. Purpose and Authority A. This ordinance will pertain to all land within the boundaries of the Town of Chelsea. The purpose of this ordinance

More information

ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS

ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS Section 21.1 Purpose and Intent... 2 Section 21.2 Administrative Site Plan Review

More information

PRELIMINARY PLAN CHECKLIST Major Land Development Projects. To initiate the application, the applicant shall submit to the Administrative Officer:

PRELIMINARY PLAN CHECKLIST Major Land Development Projects. To initiate the application, the applicant shall submit to the Administrative Officer: PRELIMINARY PLAN CHECKLIST Major Land Development Projects To initiate the application, the applicant shall submit to the Administrative Officer: 1. The application review fee, as established by the South

More information

Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585) Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY 14424 Phone: (585) 394-1120 / Fax: (585) 394-9476 NOTICE TO ALL PLANNING BOARD APPLICANTS FOR SINGLE STAGE PRELIMINARY/FINAL SUBDIVISION PLAT

More information

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

ARTICLE 900 PLAT AND PLAN REQUIREMENTS ARTICLE 900 PLAT AND PLAN REQUIREMENTS SEC. 900.1 ITEMS TO BE SHOWN ON PLAT OR PLAN General (1) Property lines of all property owners adjacent to the exterior boundaries of the project shall be located

More information

PLAINFIELD CHARTER TOWNSHIP COMMUNITY DEVELOPMENT DEPARTMENT PLANNING, ZONING & BUILDING SERVICES MEMORANDUM

PLAINFIELD CHARTER TOWNSHIP COMMUNITY DEVELOPMENT DEPARTMENT PLANNING, ZONING & BUILDING SERVICES MEMORANDUM PLAINFIELD CHARTER TOWNSHIP COMMUNITY DEVELOPMENT DEPARTMENT PLANNING, ZONING & BUILDING SERVICES 6161 BELMONT AVENUE N.E. BELMONT, MI 49306 PHONE 616-364-1190 FAX: 616-364-1170 www.plainfieldchartertwp.org

More information

Site Plan Application

Site Plan Application Site Plan Application City of St. Pete Beach Community Development Department 155 Corey Avenue St. Pete Beach, Florida 33706 (727) 367-2735 www.stpetebeach.org Case Number: PROPERTY OWNER: Name: Address:

More information

WHEREAS, the staff of The Maryland-National Capital Park and Planning Commission recommended APPROVAL of the application with conditions; and

WHEREAS, the staff of The Maryland-National Capital Park and Planning Commission recommended APPROVAL of the application with conditions; and R E S O L U T I O N WHEREAS, Redeemed Christian Church of God is the owner of a 2.83-acre parcel of land known as Lot 9, Lot 19, P/O Lot 1 and P/O Lot 18, Block B, Plat Book A, Plat 5, said property being

More information

Conditional Use Permit case no. CU 14-06: Bristol Village Partners, LLC

Conditional Use Permit case no. CU 14-06: Bristol Village Partners, LLC PLANNING AND ZONING COMMISSION STAFF REPORT August 7, 2014 Conditional Use Permit case no. CU 14-06: Bristol Village Partners, LLC CASE DESCRIPTION: LOCATION: LEGAL DESCRIPTION: EXISTING LAND USE: ZONING:

More information

Kitsap County Department of Community Development. Staff Report and Administrative Decision

Kitsap County Department of Community Development. Staff Report and Administrative Decision Kitsap County Department of Community Development Report Date: Staff Report and Administrative Decision Application Complete Date: March 19, 2018 Application Submittal Date: March 19, 2018 To: Seth Hanson,

More information

TRANSFERABLE DEVELOPMENT RIGHTS PROCESS GUIDE

TRANSFERABLE DEVELOPMENT RIGHTS PROCESS GUIDE TRANSFERABLE DEVELOPMENT RIGHTS PROCESS GUIDE Clear Creek County Planning Department P.O. Box 2000 Georgetown, Colorado 80444 (303) 679-2436 - phone (303) 569-1103 - fax 1 PURPOSE: A Transfer of Development

More information

STAFF REPORT. To: Planning Commission Meeting date: January 11, 2017 Item: UN Prepared by: Marc Jordan. Schoolhouse Development, LLC

STAFF REPORT. To: Planning Commission Meeting date: January 11, 2017 Item: UN Prepared by: Marc Jordan. Schoolhouse Development, LLC STAFF REPORT # 9 ) UN-05-17 AMERICAN LEADERSHIP ACADEMY SPECIAL USE PERMIT CHARTER SCHOOL PUBLIC HEARING To: Planning Commission Meeting date: January 11, 2017 Item: UN-05-17 Prepared by: Marc Jordan GENERAL

More information

4. If any perennial surface water passes through or along the property lines of the acreage, a minimum of 200 feet or frontage should be required.

4. If any perennial surface water passes through or along the property lines of the acreage, a minimum of 200 feet or frontage should be required. b. Provide adequate acreage for appropriate productive use of rural residential land, such as small numbers of livestock, large gardens, etc. 3. Minimum of 200 feet of frontage on an improved county or

More information

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report.

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report. STAFF REPORT Planning and Development Department Subject: Application by RYC Property to rezone a portion of lands on John Murray Dr. and Megan Lynn Dr. from R2 to R3 and to enter into a Development Agreement

More information

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

Chapter 100 Planned Unit Development in Corvallis Urban Fringe 100.100 Scope and Purpose. Chapter 100 Planned Unit Development in Corvallis Urban Fringe (1) All applications for land divisions in the Urban Residential (UR) and Flood Plain Agriculture (FPA) zones within

More information

A. Maintenance. All legally established, nonconforming structures can be maintained (e.g., painting and repairs);

A. Maintenance. All legally established, nonconforming structures can be maintained (e.g., painting and repairs); Chapter 24.50 NONCONFORMING USES, STRUCTURES AND LOTS Sections: 24.50.010 Nonconforming uses, structures, and lots Purpose. 24.50.020 Nonconforming uses, structures, and lots Alteration or expansion of