Draft Improvement Scheme No. 1 Khadka-Kirmiti- Shivmadkha-Panjari-Sumthana, Nagpur

Size: px
Start display at page:

Download "Draft Improvement Scheme No. 1 Khadka-Kirmiti- Shivmadkha-Panjari-Sumthana, Nagpur"

Transcription

1 Draft Improvement Scheme No. 1 Khadka-Kirmiti- Shivmadkha-Panjari-Sumthana, Nagpur Submission to the State Government under Section 43, NIT Act 1936 Part 1B Policies and Process Nagpur Improvement Trust (NIT) February 2013 Prepared by: HCP Design, Planning and Management Pvt. Ltd. Halcrow A CH2M HILL Company Knight Frank Pvt. Ltd Crisil Risk and Infrastructure Solutions Ltd.

2 CONTENTS A B C D Process to Prepare Improvement Schemes Policy Document for Improvement Schemes Memorandum of Understanding with Land Owners on Submission to State Government Final Agreement with Land Owners after Approval by State Government

3 A Process to Prepare Improvement Schemes in the Nagpur Metro Region under the provisions of the NIT Act The steps to undertake each Improvement Scheme (IS) are as below. A brief description of each step along with supporting explanatory notes is given below: Step 1 NIT shall Initiate & Approve the decision to frame the IS as per Section 36 (1) NIT will approve: o The decision to prepare a particular IS o Proceed with the process of preparing the IS Step 2 NIT to prepare IS as per Section 28/29/30/31/32/33/34/35/35A The following Steps 2a, 2b 2c & 2d are the actions taken by the NIT following the Board Resolution to prepare an IS. Step 2a Issue a Public Notice Under Section 54 and 55 in Local Newspapers of wide Circulation A Public Notice under Section 54 and 55 will be published in one or more local newspapers. The Public Notice will also be displayed at the Head Office of NIT and in other prominent places in Nagpur. The Public Notice will state the following: o NIT has resolved to prepare the particular IS. o NIT will carry out surveys and measurements for the lands included in the IS. o Request the land owners to submit land ownership records, layouts, hissa details and suggestions, if any, within a period of 45 days from the publication of the Notice at the office of Superintendent Engineer (Metro), Nagpur Improvement Trust, NIT Cultural Complex, North Ambazari Road, Opp NIT Swimming Pool, Nagpur If these are not submitted then the available documents will be used to establish ownerships and plots areas. o The plan of proposed IS boundary showing the khasra numbers of the included lands and a list of the same will be kept open for inspection at the following offices during office working hours: 1. Divisional Commissioner, Nagpur Divisions, Old Secretariat Building Civil Lines, Nagpur Superintending Engineer (Metro), Nagpur Improvement Trust, NIT Cultural Complex, North Ambazari Road, Opp NIT Swimming Pool, Nagpur Collector, Nagpur, Collector Office, Civil Lines, Nagpur Deputy Director, Town Planning, Nagpur Division, Nagpur Chief Executive Officer, Zilla Parishad, Civil Lines, Nagpur Tahsildar, Hingna, Tahsil Hingna, Distt. Nagpur HCP Design, Planning and Management Pvt Ltd. Page 1

4 o o o The process and policies along with draft Memorandum of Understanding (MOU) for the preparation of the proposed IS will also be available at the above mentioned office for inspection 1. Request the land owners to submit the MOU within a period of 60 days from date of publication of the Public Notice at the office of Superintendent Engineer (Metro), Nagpur Improvement Trust, NIT Cultural Complex, North Ambazari Road, Opp NIT Swimming Pool, Nagpur NIT shall commence total station survey of the IS area within next 7 days and all the land owners are requested to cooperate with NIT to carry out the survey work. Step 2b Dispatch a copy of the Public Notice under Section 54 & 55 to the State Government for Information NIT will send a copy of the Public Notice under Section 54 & 55 to the State Government for information. A plan of the area which is proposed to be included in the IS, process, policies along with draft MOU for the preparation of the proposed IS will also be sent to the State Government for information. Step 2c Intimate the Zilla Parishads and Gram Panchayats NIT will send a copy of the Public Notice under Section 54 & 55 to the respective Zilla Parishads and Gram Panchayats. Step 2d Keep the Copy of Plan of IS and Relevant Documents open for Inspection A copy of the area which is proposed to be included in the IS, process and policies along with draft MOU and for the preparation of the proposed IS will be kept open for public inspection at the offices listed in the Public Notice under Section 54 & 55 for a period of 60 days. Consideration shall be given to the suggestion and objections if any. Step 3 NIT to prepare IS as per Section 38 The following Steps 3a, 3b, 3c, 3d & 3e are the actions taken by the NIT after issuing the Public Notice under Section 54 & 55. Step 3a Prepare the Draft Area Statement, Base Map and List of Owners for the IS Area Procure the following records: o 7 x12 (from Tehsildar / Revenue Department). o Village maps (Ekatrikaran maps) at 1:5000 scale. o Resurvey sheets (from Dy. SLR) at Scale 1:1000. o NA TP layouts (from Collector Office). Prepare a draft area statement from the 7 x 12 documents for all the khasra numbers Digitize and overlay the resurvey sheets obtained from the Dy. SLR on Google satellite images to obtain a consolidated map. Fit/match the khasra lines on the image and verify the area with as indicated in the 7 x 12 documents. Insert the NA TP layout on the khasras. 1 The mechanism to implement the IS is legalized by the way of a MOU between the land owner and NIT and subsequently a Final Agreement between the the land owner and NIT. Refer Policy No. 12 in the Policy Document. HCP Design, Planning and Management Pvt Ltd. Page 2

5 Tentatively mark the hissa subdivision as obtained from the 7 x 12 records on the satellite image wherever possible. Step 3b Conduct Total Station Survey of IS Area Submit a list of khasra numbers with areas from the 7 x 12 documents to the Land Record Department (LRD). LRD to assess the measurement fee and NIT to pay the measurement fee. Commence a detailed and accurate survey of the ground situation using Total Station Survey As per Policy No. 1. During the survey, a representative from the Land Record Department (LRD) will be present, if necessary. Step 3c Finalize the Area Statement, Base Map and List of Owners of the IS Area Overlay the resurvey sheets obtained from the Dy. SLR on the total station survey drawing to obtain the area under possession and finalize the areas as per Policy No. 2: Base Map, Area Statements and Ownership Status in the IS Area in the Policy Document. LRD will certify both the area statement and the base map. Prepare a final list of land owners from the 7 x 12 documents and information from Tehsildar / Patwari of the village. These will keep getting updated as the process of preparing the IS moves forward particularly during & after the Publication and land Owners Meeting. Step 3d Prepare Conceptual Plan for Draft IS Prepare conceptual plan on the approved base map and as per the approved policies. Keep in view the following aspects: o Topography and site conditions o Regional plan proposals o Development plan proposals (forth coming) o Specific uses such as quarries and archeologically important sites. o Highway buffer zones o PWD roads o Government lands o NA TP permissions The IS will be termed as Draft IS at this stage. Prepare volume of the Draft IS with the drawing and the support documents / reports for approval of NIT Board in the prescribed format in the Policy Document. Step 3e Review of Conceptual Plan of Draft IS by NIT Board The Draft IS proposals will be placed before the NIT Board for review. The Draft IS may be modified if required. Step 4 NIT to publish the Notice of the IS as per Section 39 (1), (2) The Draft IS plan will be published by NIT. A Public Notice to this effect will be prepared. The Public Notice will state o An IS has been prepared o Boundaries of the area comprised in the IS HCP Design, Planning and Management Pvt Ltd. Page 3

6 o Place at which particulars of the IS, map of the area and proposals of the IS can be seen along with statements of redistribution of land and Net Demand 2. NIT shall publish the Notice in Gazette and every week for 3 consecutive weeks in local newspapers. The notice will state that a meeting of all land owners will be held on a particular date, time and location. Step 5 NIT to send Notices Within a period of 30 days from the date of publication under Section 39 NIT will send two notices simultaneously to the land owners: Notice 1: Under Section: 41 (1), (2), (3) for consent for acquisition by agreement as per Section 58 of NIT Act, This notice shall state - The NIT proposes to appropriate land by consent in the IS and recover Net Demand for the purposes of carrying out the IS The land owner can submit their objections / suggestions within a period of 60 days from the date of the service of the notice. Notice 2: Notice to intimate the land owners about the owners meeting to explain the proposals of the IS. This notice shall state - Details of final plot area, land appropriated and the Net Demand. The date, time and place of the Owners Meeting. The place where the configuration of the final plots and other proposals of the IS can be seen. The owners can send objections and suggestion within a period of 60 days from the date of service of the notice and 45 days from the Owners Meeting. Step 6 Owners Meeting The Owners Meeting will be held at the office of NIT or a premise owned / hired by NIT which can accommodate all the land owners within 15 days from the date of service of the notice under Section 41 NIT will explain the proposals of the draft IS to the owners The land owners will get to review a copy of the Final Agreement that will be executed between them and NIT. Land owners can give their representation in writing within 45 days from the Owners Meeting. Step 7 Affected Land Owners to make Representation to NIT on the Draft IS as per Section 41 (2) Within 60 days from the notification under section 39 or Serving of notice under Sec 41 (2), or within 45 days from the Owners Meeting, the land owners shall make a representation to NIT in writing. Step 8 Modifications to the Draft IS Plan after Owners Meeting NIT will consider the representations made by the land owners. 2 For definition of Net Demand see Policy No. 8 in the Policy Document. HCP Design, Planning and Management Pvt Ltd. Page 4

7 All the representations will be systematically listed and remarks will be made whether to consider them or not, stating the reasons by NIT. Individual hearings will be given to the land owners at NIT. NIT may modify the proposals of the IS to accommodate the representations received. Step 9 NIT Board to Approve the State Government Submission NIT Board will approve the submission to the State Government for sanction. The submission shall include: o IS details drawings and support documents o All representations made by the land owners o Statement of response by NIT to each representation o Signed MOU by land owners Step 10 NIT to submit the IS to the State Government for sanction as per Section 43 (1), (2) The submission shall include: o IS details drawings and support documents o All representations made by the land owners o Statement of response by NIT to each representation o Signed MOU by land Owners Step 11 Response by State Government a) State Government sanctions b) State Government may suggest minor modifications c) State Government may suggest major modifications d) State Government refuses to sanction Step 12 Response by NIT a) NIT proceeds to steps 13 to 19 b) NIT incorporates the modifications and proceeds to steps 13 to 19 c) NIT to prepare the IS again and repeat steps 1 to 11 Step 13 NIT to publish the submission of IS to State Government for sanction in Official Gazette and Newspapers as per Section 43 (4) NIT will publish a notice to this effect in the local newspapers and Gazette for 2 consecutive weeks. Step 14 State Government sanctions the IS as per Section 44 (1) and issues notification in the Official Gazette for the implementation of the IS by NIT as per Section 45 (1) Step 15 NIT to Issues Notices to land owners to submit Final Agreements After sanction of the IS by the State Government, NIT will issues notices to the land owners to sign the Final Agreements at NIT within a period of 60 days from the date of notification in the Official Gazette. HCP Design, Planning and Management Pvt Ltd. Page 5

8 Step 16 NIT to acquire lands of the land owners unwilling to participate in the IS NIT shall proceed to acquire the land owners who have not submitted the MOUs and Final Agreements. NIT shall submit the proposal to the Collector, Nagpur for land acquisition for implementing the IS The entire proceedings of the land acquisition shall be completed within a period of 3 years from the date of sanction of the IS. Step 17 NIT to get the IS Land Records updated Upon receipt of the Final Agreements and completion of 60 days from the date of sanction of the IS NIT will submit the entire sanctioned IS documents to the Collector / LRD to update the land records new 7 x 12 documents for the FPs will be prepared and issued to the land owners. The old 7 x 12 documents will cease to exist. Step 18 NIT to get the FPs demarcated Post the updation of the records, NIT will commence the demarcation of roads and final plots. Step 19 NIT to Commence Construction of Roads and Infrastructure Post the creation of new records, NIT will commence the construction of roads and infrastructure. HCP Design, Planning and Management Pvt Ltd. Page 6

9 B Policy Document for Improvement Schemes The Improvement Schemes (IS) will be prepared on the basis of following set of policies: Policy No. 1 Total Station Survey of the IS Area A topographical Total Station Survey of the entire area declared under the IS will be carried out using the total station survey equipment. The survey will capture the following details: o Existing roads (major and minor) with cross drainage (CD) works. o Bund lines / fences / plot divisions o Levels o Existing structures o Power supply lines o Wells o Water courses A representative of Land Record Department (LRD) will remain present during the total station survey. In case of land plots with Hissas for which there are no map records with SLR / Tehsildar, it is advisable that a representative of the land owner remains present at the time of the total station survey and indicates these on site to the survey team. Policy No. 2 Base Map, Area Statements and Ownership Status in the IS Area The Base Map will be prepared by superimposing the Resurvey Sheets at 1:1000 obtained from Dy. SLR on the physical survey. For each land plot the areas from the 7 x 12 documents obtained from the respective Tehsildar / Revenue Department will be taken as final. Upon superimposing the Resurvey Sheets on the physical survey of the IS area the onsite possession of the land plots will be obtained. The areas obtained from the 7 x 12 records and from the site will be compared. If the difference between 7 x 12 and site measurement is within 5%, the area in the 7 x 12 document will be treated as final. In case the discrepancies are too large (greater than 5%), these will be submitted to the LRD for resolution. LRD s decision will be final and binding. In case of plots with hissas, the areas from the 7 x 12 documents will be taken as final. As the physical demarcation of hissas is not available, these will be derived from available sources such as approved layouts and demarcations (by the way of fences/bunds) from site during the survey. A request will also be made to the owners to submit these immediately to NIT, upon declaration of intention for survey of IS. Also during the total station survey, the land owners will be requested to be present on site to show their hissas; and an officer/representative of the LRD will be present during the total station survey. Here the hissas will be measured from the survey (fences / bund HCP Design, Planning and Management Pvt Ltd. Page 7

10 lines or as indicated by the owners or from the approved layouts) and areas will be reconciled with the 7 x 12 document. If the difference between 7 x 12 and site measurement is within 5%, the area in the 7 x 12 document will be treated as final. In case the discrepancies are too large (greater than 5%), these will be submitted to the LRD for resolution. LRD s decision will be final and binding. Both the Base Map and the Area Statement will be certified by the LRD. Policy No. 3 Plot Reconstitution and Deduction All khasra numbers in a village will be give continuous numbers in a sequence. These will be referred to as Original Plot or OP. All the khasra numbers in a village which are under same ownership, have the same tenure status and are contiguous will be consolidated together and treated as one OP. Land will be appropriated 3 from each OP and will be used to provide for roads, social amenities & utilities 4, open spaces, plotable land for NIT for residential and commercial use out of which 20% land will be reserved for poor. A tentative break-up of the percentages for this is given in the table below. The % are given in the table are indicative and for the purpose of guidance when preparing the IS. They are derived on the basis of standards prescribed for open space, amenities such as education and health and meeting the GOM compliance 5 as regards to the provision of land for housing for poor (EWS/LIG 6 ). However the exact land area under various public purpose may vary. To begin the first variable is the area under access roads it may increase in case of taking care of proposed expansions for say highways that may pass through the IS or if the plot sizes are small. The land required for open space and amenities and utilities will depend on the population to be housed in the area which will in turn depend on the proposed zoning in the IS. The land for housing for urban poor (EWS/LIG) is dependent on the plotable land for NIT.. No. Detail % A Land returned to the Owner (in case of Agricultural Plots) 60 B Land appropriation by NIT in the IS 40 1 Roads 15 2 Amenities and utilities 6 3 Open space/green space 5 4 Plotable Land for NIT for residential and commercial use of which 20% is retained for housing for poor 14 C Total The term appropriation here means the voluntary land contribution of each land owner towards the provision of major access roads and common amenities in the IS. 4 Amenities and utilities include health, education, water supply installations and sewage treatment installations. Apart from these some land will be left vacant for uses such electric substations, telephone/communication installations, police stations, fire fighting services etc which may be allocated as when the need arises. 5 GOM, UDD, No. TBP/4307/CR-334/2007/UD EWS = Economically weaker section; LIG = Lower income group. HCP Design, Planning and Management Pvt Ltd. Page 8

11 In case of land plots which are agricultural, 40% of land will be appropriated or deducted from each land plot. Appropriation / deduction in case of plots that have obtained NA TP from the Collector / Town Planning will be dealt in the following manner: No. 1 NA TP with approved layout but not developed on site and / or sub plots sold 2 NA TP with approved layout, developed on site and / or sub plots sold % Deduction 25 25, land for sale placed on 25% of the plot which the layout owners will have to purchase this land at the FP value determined by NIT for the plot. OR Actual possible deduction from the land allocated in the layout for PU / Open space and if the layout developer is willing to surrender some plots. Note: For land parcels with 25% or less deduction, the Net Demand per sq m will be higher than those plots with 40%. contribution. The reason for this is less land Unauthorized layouts will be treated at par with agricultural plots, that is 40% of the land will be appropriated / deducted. Additional charges for regularizing the layout will have to be paid by the land owner / owners as per the prevailing laws/regulations/policies with regard to unauthorized developments. In case of land plots with 25% appropriation / deduction or less a higher Net Demand per sq m will be levied. The reason for this is less land contribution. Land owners of NA plots will be given a choice on whether their land can be treated as per the agricultural plot policy and they will pay lower Net Demand. If they do so, then their FP will be treated as NA, they will not have to seek NA again. All the OPs will be reconstituted that is each plot will be reshaped in a manner appropriate for development and given access. The final reconstituted plot will be termed as Final Plot or FP. As far as possible the location of the final plot or FP will be retained close to its original location unless a specific planning concern warrants its shift. In case such a situation arises, NIT reserves the right to locate the final plots. A hissa with a separate 7 x 12 document and different owners will be treated as an OP. In case the hissa divisions are not available then tentatively the FP will be allocated within or in the vicinity of the OP. HCP Design, Planning and Management Pvt Ltd. Page 9

12 Policy No. 4 Ownership Rights and Encumbrances All owners listed in the 7 x 12 documents will be treated as the legal and rightful owners of the land plot. Updations will be incorporated in the IS upon submission of updated 7 x 12 documents. All the rights on the revenue records that is the 7 x 12 document will be transferred to the final reconstituted plot. Once the IS is sanctioned by the State Government, NIT will hand over the final plan with the reconstituted plots to the LRD for mutation of the records. The Owners will receive a new 7 x 12 document for the FP in lieu of the OP which is the original khasra plot held by him / her. The cost of this process will be included in the cost of developing the IS. Policy No. 5 Applicable Land Use Zones and DCRs Upon sanction of the Improvement Scheme by the State Government the zones prescribed in the zoning plan for the Improvement Scheme will be applicable. Separate DCRSs are framed for IS Khadka Kirmati Shivdmadka Panjari Sumthana. These are published along with the IS proposals report. The FP owner will be responsible for obtaining all permissions and requisite No Objection Certificates required for the development of the FP. The FP owners will be responsible for some of the compliances imposed the State Government such as Environmental Clearance, provisions of housing for poor etc. The FP owner will submit layout development / building plans to NIT as per applicable Development Control Rules for the IS scheme. The FP will have to pay necessary charges as per the rules for the sanction of building plans and commencing any construction activity on plots. NIT will not sanction any layout plans / building plans till the FP owner pays the full and final amount of the Net Demand. All FPs in the Improvement Scheme sanctioned by State Government will be treated as deemed NA and NIT will submit the approved plan to the Competent Authority. However while applying for development permission the FP owners will have to obtain formal NA permission from Competent Authority of the Revenue Department as per provisions of Maharashtra land Revenue Code, If an OP is already an NA plot then the FP will also be treated as NA and the land owners will not be required to go through the NA process. In case of layout development the FP owner will have to enter into a development agreement with NIT and abide by it. The release of the plots will be as per the terms and conditions laid out in the agreement executed between the FP owners and NIT. HCP Design, Planning and Management Pvt Ltd. Page 10

13 In case of group housing scheme layouts the FP owner will have to enter into a development agreement with NIT and abide by it. The release of the tenements / flats will be as per the terms and conditions laid out in the agreement executed between the FP owners and NIT. Policy No.6 Environmental Clearances and Provision of STPs Environmental clearances applicable as per the Environment Protection Act, 1986 and other prevailing law shall be necessary on the FP. The FP owners can apply for the MOEF clearance after the sanction of the Improvement Scheme by the State Government, signing after the final Agreement and handing over of FP. NIT will ease the process as far as possible by providing the required documents and drawings required for obtaining clearances with regard to water supply, sewerage etc. Policy No. 7 Type of Infrastructure Services to be Provided in the I.S. The following infrastructure services that will be provided by NIT in the IS Area: o Road development works including development o full right of way and culvert works. o Water supply works intake works, zonal works and distribution network. o Sewerage works distribution network and STP. o Storm water drains network o Recycling water works and network o Development of open spaces NIT will be providing infrastructure, FP owners will have to pay the usage, consumption and maintained charges levied by the agencies responsible for the respective services subsequently. For example, in case of water supply the FP owners will have to pay the charges for the water consumed as levied by the agency supplying water. Regarding electrification the landowners have to pay the charges as demanded by MSEDCL. This infrastructure will not include the infrastructure within the FP of the land owner. The land owner will be responsible for all the required infrastructure within his/ her FP as the prevalent norms stipulated in the prevalent DCRs, NIT and relevant applicable regulations. Policy No. 8 Valuation of Land All original plots or OPs will be valued at the Government Ready Recknor rates. This will be called the original plot (OP) value. Land compensation for the % of the land appropriated from the land owners will be computed at ready reckoner rates. HCP Design, Planning and Management Pvt Ltd. Page 11

14 Policy No. 9 Computing the Cost of Developing the IS, Increment in Land Value, Contribution and Net Demand As NIT will be implementing the Scheme and developing the infrastructure there will an increase in the land values. NIT will recover a part of this to finance the cost of developing this infrastructure and the IS in the form of Net Demand. The total Costs of developing the IS will be estimated as follows : 1. Costs of developing the infrastructure listed in Policy No. 6 will be estimated. 2. Some amount of administrative costs for preparing and implementing the IS will be considered. This will include the cost of mutating the final records by the LRD, Nagpur. 3. NIT will also have to compensate the land owners for the land appropriated for the purposes outlined in Policy No.3 Plot Reconstitution and Deduction. Hence the Land Compensation to be paid to each land owner will be computed. The total compensation to be paid to the land owners will also be considered as an input to the cost of developing the IS. As NIT will effect infrastructure improvements in the IS area and undertake better planning, there will be an increase in the land values. The increase in the land values of each of the FPs will be estimated and the total Increment in the Land Value that will accrue to the land owner will be computed. Half of this increment will be appropriated by NIT as Contribution towards the IS. Next NIT will deduct the Land Compensation to be paid to each land owner from the Contribution and compute the Net Demand on each FP. The net demand will depend on % of land appropriated and land value, where the % of land deducted is lower the Net Demand will be higher. The net demand is computed and indicated in the Land Valuation and Distribution Statement for each FP. It is a one time charge calculated at the time of preparing the Improvement Scheme for providing the stipulated infrastructure. The Net Demand collected from the land owners will be maintained in a separate account by NIT and will be used only for the infrastructure works proposed in the IS by NIT. HCP Design, Planning and Management Pvt Ltd. Page 12

15 Policy No. 10 Payment of Net Demand The land owner will pay the net demand to NIT. This can be as per the following instalment schedule: No. Instalment Time 1 1st Instalment (15%) Along with signing of the Final Agreement upon approval of the IS by the State Government. 2 2nd Instalment (10%) At 3 months from the date of sanction by State Government. 3 3rd Instalment (10%) At 6 months from the date of sanction by State Government. 4 4th Instalment (10%) At 9 months from the date of sanction by State Government. 5 5th Instalment (15%) At 12 months from the date of sanction by State Government. 6 6th Instalment (10%) At 15 months from the date of sanction by State Government. 7 7th Instalment (10%) At 18 months from the date of sanction by State Government. 8 8th Instalment (10%) At 21 months from the date of sanction by State Government. 9th Instalment (10%) At 24 months from the date of sanction by State Government Total = 100% At the time of development permission Land owners can pay the entire amount in the beginning itself. In such cases the net present value of the Net Demand will be computed. For example is a person has to pay a Net Demand of Rs. 100 over a period of 2 years (24 months) as per the schedule of above prescribed schedule, he / she will pay Rs. 85 (present value of Rs. 100 discounted at 3.5% over a period of 2 years and 9 equal instalments). Part development permissions on large plots may be issued by NIT at any given point in time. That is if say a land owner is seeking development permission for developing 10,000 sq m on a plot which is 20,000 sq m then he / she will have to pay the Net Demand on the 10,000 sq m atleast on then he / she will be granted development permission. If a land owner is seeking development permission on the entire plot then the he / she will have to pay the entire Net Demand only then will NIT issue the development permission. In case there is a delay by the land owners to pay the instalments, an interest at an annual rate of 15% will be charged. In case the land owners cannot pay the net demand or do not wish to pay the net demand, they can contribute additional land from their FPs of the same value as the net demand. In such instances, the proposed value of the FP in the land redistribution and valuation statement will be used to determine the land value and used to compute the amount of land the FP owner will have to give to NIT. The land owner will have to indicate this in the hearing scheduled at NIT Office after the publication of the IS and before it is submitted to the State Government for sanction. HCP Design, Planning and Management Pvt Ltd. Page 13

16 Policy No. 11 Construction of the Infrastructure by NIT NIT shall commence the construction of roads within six months from the date of sanction of IS by the State Government. The remaining infrastructure will be constructed in a phased manner in a period of 3 years from the date of sanction of the IS by the State Government subject to the realization of the Net Demand from the land owners. Priority of construction of infrastructure will be given in the areas where the land owners have contributed the Net Demand in a substantial quantum. Policy No. 12 Maintenance of the Infrastructure Created NIT shall develop the above mentioned infrastructure and hand it over to the respective Local Authorities / Gram Panchayats for maintenance. The respective Local Authorities / Gram Panchayats will levy the maintenance charges as per their rules and regulations from the FP owners. Alternatively if the NIT Act 1936 is amended and NIT is empowered to levy property taxes / ground rent then it will take the responsibility of maintaining infrastructure. Policy No. 13 Mechanism to Implement the IS The mechanism to implement the proposals of the IS in the spirit of Public Private Partnership is the understanding and agreement between the land owners and NIT. This is institutionalized & legalized by way of MOU and agreements that will be executed at two stages in the process of preparing the IS. 1 MOU between NIT and Land Owner The Memorandum of Understanding (MOU) will be executed after the Publication of the IS under Section 39 of the NIT Act This would essentially be an understanding between the land owner and NIT to the effect that the land owner understands the polices & benefits of undertaking the IS; is giving consent to NIT to undertake the IS and is agreeing to hand over 40% (or 25% or as per the actual % as agreed with NIT) of the land in lieu of services provided and land required for public purpose uses (Policy No. 3) at the time of signing the Final Agreement. 2 Final Agreement between NIT and Land Owner The Final Agreement will be executed within 60 days of approval of the IS by the State Government. This agreement essentially gives the details of the final plot to be allocated to the land owner, the net demand to be paid by the land owner, his / her development rights, land vested with NIT for public purpose and general conditions. The 40% or 25% (or the actual %) land appropriated from each land owner shall vest in NIT free of all encumbrances for the purpose of important scheme and the land owner will have no claim of whatsoever nature in future over the land vested in NIT. HCP Design, Planning and Management Pvt Ltd. Page 14

17 Policy No. 14 Formats to Present the IS Drawings and Statements A new of formats to present the IS proposals in the form of drawings and statements is prepared. These are indicated below: No. Map / Table No. Particular 1 Table No. 1 IS Area Statement indicating names of owners, tenure and area certified by LRD Nagpur 2 Map No. 1 Base Map land records reconciled with the Total Station Survey and certified by LRD, Nagpur showing the following: o IS boundary o Village boundaries o Khasra boundaries and numbers o Water courses o Gaothans o Major HT lines o NA plots with approved layouts (if there) 3 Map No. 1A Base Map (Ownership) showing the various categories as described below: 1. IS boundary 2. Village boundaries 3. Khasra boundaries and numbers 4. Water courses 5. Gaothans 6. Major HT lines 7. Jhupi jungles 8. Government lands 9. Major private land ownerships (if there) 5 Table No. 2 Percentage deduction table indicating the area of land deducted from each land plot 6 Map No. 2 Map showing original plots 7 Map No. 3 Map showing original plots, final plots, roads and appropriated plots 8 Map No. 4 Map showing final plots, roads and appropriated plots 9 Table No. 3 IS summary showing the status (area & %) of the lands before the IS and after the IS; details of appropriate plots for NIT and details of land deduction. 10 Table No. 4 List of Appropriations for NIT 11 Table No. 4A Amenity Standards Adopted 12 Map No. 5 Proposed Land Use Zones 13 Table No. 5 Proposed Land Use Zones 14 Table No. 6.1 IS Finances 15 Table No. 6.2 Proposed Development Works and Costs 16 Table No. 6.2A Cost of Road Development and Culvert Works 17 Map No. 6A Proposed Road Network (Plan) 18 Table No. 6.2B Cost of water supply works 19 Map No. 6B Proposed Water Supply Networks 20 Table No. 6.2C Cost of Sewerage Works 21 Map No. 6C Proposed Sewerage Network HCP Design, Planning and Management Pvt Ltd. Page 15

18 22 Table No. 6.2D Cost of Storm Water Works 23 Map No. 6D Proposed Storm Water Network 24 Table No. 6.2E Cost of Recycling Water Works 25 Map No. 6E Proposed Recycling Water Network 26 Table No. 6.2F Cost of Developing Open Spaces 27 Map No. 6F Proposed Open Spaces 28 Table No. 7 Land Redistribution and Valuation Statement 29 Table No. 7A Original Plot Values 30 Map No. 7A Original Plot Values 31 Table No. 7B Final Plot Values 32 Map No. 7B Final Plot Values 33 Table No. 7C Locational Land Value Increase Policy No. 15 Other Applicable Taxes Etc. All applicable taxes, charges free and cess on the original khasra plots be applicable on the FP after the approval of the IS. The land owner will pay Property Tax and other taxes/charges as leviable by the concerned Gram Panchayat. The land owner will pay the revenue assessment as leviable by the revenue department on the FP after the approval of the IS. Abbreviations Used: CD DCR FP HT IS LRD MOU NIT OP Cross Drainage Development Control Regulations Final Plot High Tension Improvement Scheme Land Record Department Memorandum of Understanding Nagpur Improvement Trust Original Plot HCP Design, Planning and Management Pvt Ltd. Page 16

19 C Memorandum of Understanding with Land Owners on Submission to SG NAGPUR IMPROVEMENT TRUST DEVELOPMENT OF NAGPUR METROPOLITAN AREA MEMORANDUM OF UNDERSTANDING (MOU) FOR DEVELOPMENT OF LANDS IN NAGPUR METROPOLITAN AREA, NAGPUR BY PUBLIC PARTICIPATION METHOD This Memorandum of Understanding (MOU) is executed at Nagpur on this day of BETWEEN 1. The Nagpur Improvement Trust, a statutory body constituted under the provisions of Nagpur Improvement Trust Act, 1936, having office at Sadar, Nagpur, hereinafter in short referred to as the NIT (Party No. 1), which expression shall, unless repugnant to the context or meaning thereof, always mean and include the said NIT, acting through its Executive Engineer (Metro) as the PARTY NO.1. AND 2. Shri Resident of Tehsil District hereinafter referred to as the owner (Party No. 2), which expression shall, unless repugnant to the context or meaning thereof, always mean and include anyone delegated to act as such and all its duly authorized executives, power of attorney, legal heirs etc of the PARTY NO WHEREAS, the Government of Maharashtra, by Notification No.TPS- 1899/1191/CR-80/99/UD-13 dated 23 rd July 1999 has declared the Nagpur Metropolitan Area which includes 9 Tehsils & 726 Villages therein. 4. WHEREAS, Government of Maharashtra by Notification No.NIT/2202/4025/CR- 493/2002/UD-26 dated. 24/12/2002 has extended the jurisdiction of Nagpur Improvement Trust to the Nagpur Metropolitan Area (Area mentioned in Notification dated 23 rd July 1999) 5. WHEREAS, Government of Maharashtra has appointed Nagpur Improvement Trust (NIT) as Special Planning Authority for Nagpur Metropolitan Area, vide G.R. No. TPS-2409/2890/CR-356/09/UD-9, Dt. 31/8/2010 under section 40 (1) of the MRTP Act, The said G.R. has been published in the Government Gazette dated 2/9/2010. HCP Design, Planning and Management Pvt Ltd. Page 17

20 6. WHEREAS, the Party No. 1 vide Board Resolution No. 18/1085/22/02/2010 has decided to develop the Nagpur Metropolitan Area by Public Participation Method using the modified & improved Improvement Scheme mechanism under NIT Act 1936 & has approved the Process for preparing Improvement Schemes and Policies undertaking the preparation of Improvement Schemes and Memo of Understanding (MOU) for development of lands in Nagpur Metropolitan Area by Public Participation Method vide B.R. No. 29/1100 dated 28/09/2011. All the documents are part of the IS Report and have been pursued and understood by Party No WHEREAS the Party No. 1 has powers under section 58 of NIT Act-1936 empowering it to enter into an agreement with any person for the acquisition by purchase, lease or exchange by the Trust from such person of any land (within the area comprised in a sanctioned scheme). 8. WHEREAS the Party No. 1 has decided to develop KHADKA KIRMITI SHIVMADKA PANJARI SUMTHANA, Tehsil Hingna, District Nagpur Improvement Scheme on Public Participation Method for planned development under provisions of NIT Act 1936 vide NIT Board Resolution No. 8/1099 dated 30/08/ WHEREAS the Party No. 1 has Declared the Intention to carry out the survey of the lands of KHADKA KIRMITI SHIVMADKA PANJARI SUMTHANA Improvement Scheme in Tehsil Hingna, District Nagpur U/S of NIT Act, 1936 which is published in the local news papers Deshonatti, Lokmat Samachar, The Hitvad dated 4 Feb 2012 informing the land owners about the lands included in the Improvement Scheme and the approved Process, Policies and draft MOU & Agreement. 10. WHEREAS a notification under Section 39 of NIT Act, 1936 was published on 20 September AND WHEREAS the Party No. 2 is the owner of land / plot bearing the following Khasra Nos in Nagpur Metropolitan Area which are included in the KHADKA KIRMITI SHIVMADKA PANJARI SUMTHANA Improvement Scheme. Khasra Mouza Tehsil & Khasra to North Khara to South Khasra to East Khasra to West Area Sq m TOTAL AREA (SQ M) HCP Design, Planning and Management Pvt Ltd. Page 18

21 11. WHEREAS the Party No. 2 has read and understood the Process, Policy Document & MOU and for, for preparation and subsequent implementation of the KHADKA KIRMITI SHIVMADKA PANJARI SUMTHANA Improvement Scheme in Nagpur Metropolitan Area on Public Participation Method, Party No. 2 hereby gives his consent for developing his / her land/s described in Para 10 above in accordance with the Final Policy and Process for Improvement Scheme attached with this MOU as Annexure 1 and 2 and enters into MOU with Party No. 1 as per section 58 of the NIT Act 1936, the terms & conditions of which are reduced herein as under. Now therefore this MOU witnesseth as follows i. That Party No. 2 is giving its voluntary consent to Party No. 1 to participate in the KHADKA KIRMITI SHIVMADKA PANJARI SUMTHANA Improvement Scheme in Tehsil Hingna, District Nagpur. ii. iii. iv. That Party No. 2 will comply with and adhere to the provisions of the Process and Polices defined and approved by Party No. 1 which is also referred to in Para 6 and 11. That Party No. 2 hereby permits Party No. 1 to undertake the Total Station Survey within its land plot/premises; prepare the Master Plan and undertake the reconstitution of the land comprised in the aforesaid Khasra Nos. belonging to him / her as per the approved Policy Document. The Party No. 2 shall not create any obstruction or hindrance. That Party No. 2 will hand over 40% (or as may be applicable %) of the land to Party No. 1 by way of exchange in lieu of the development charges and as also for the grant of permission for change of user of the land and development of the land as per the Scheme by Party No.1. The Party No.2 hereby declares that the land under the MOU is free from all encumbrances. After the final agreement the 40% (or as may be applicable %) of the total land of Party No.2 in the Scheme or as may be applicable % shall vest with the Party No.1 exclusively for the purposes of the said Scheme. The Party No.2 shall render all the necessary assistance required for transferring the land in the name of Party No.1 in the records of revenue and land record authorities. The Party No.1 is free to use the land for public purpose uses such as roads, opens spaces, amenities, utilities and be free to dispose some of the land vested in it as per its rules and regulations; thereafter Party No.2 will have no title over the said land and Party No.2 voluntarily agree to relinquish its title, rights, claims of whatsoever nature on the land vested in Party No.1. Party No.2 shall not be entitled to claim any monetary compensation for the same. Remaining 60% (or as may be applicable %) will form the FP in the Improvement Scheme and will not attract stamp duty.. v. That Party No. 2 will pay the Net Demand towards the cost of development of the said Scheme as per the schedule given in Policy No. 10 after sanction of said Improvement Scheme by the Govt. under Section 44 of N.I.T. Act, HCP Design, Planning and Management Pvt Ltd. Page 19

22 vi. vii. viii. ix. That the Party No. 1 shall construct the stipulated infrastructure in the manner as stated in Policy No. 7. The development works in the Scheme shall be limited to the amount of Net demand deposited by the land owners of the Scheme with the Party No.1. That the development in the FP shall be permitted in the manner prescribed in the Policy Document / IS Proposals and DCRs for IS. That the Party No. 1 will undertake the process of updating of land records after the IS is sanctioned by the State Government and the cost of this process is included in the cost of developing the IS. x. That the Party No. 2 will not sell or transfer in any manner the land in his / her possession after signing of this MOU till the signing of the Final Agreement. If he / she sells the land after signing the MOU then the conditions of this MOU and the Final Agreement will be binding on the new land owner. xi. xii. xiii. xiv. xv. xvi. xvii. That the conditions mentioned in this MOU between Party No. 1 and 2, will Mutatis Mutandis be applicable to the Final Agreement. The parties shall endeavour to execute the Final Agreement at the earliest. That, in case any additional clauses/ modifications is required to this MOU, Final Agreement or the Policy Document; it shall be executed in due course by mutual consent of both the parties. That all the matters differences, questions disputes arising out of present MOU shall be referred and adjudicated upon by the Chairman, Nagpur Improvement Trust. Interpretation of the Clauses of this MOU, the IS process and the Policy Document by the Chairman NIT shall be final and binding on Party No. 2. Any typographic error or arithmetical error in the MOU, shall not render it invalid. Such an error shall be rectified by mutual consent of both the Parties. In case of breach of prescribed terms & conditions by either of the parties the decision of the Chairman Nagpur Improvement Trust shall be final and binding on both the parties. That if due to any unforeseen reason the said Improvement Scheme is not executed then the decision taken by the Chairman, Nagpur Improvement Trust in this regard shall prevail. That, Party No. 1 reserves the right to cancel this MOU at any point of time without giving any reason thereof. 18. That this MOU is made in duplicate on a Rs. 100 stamp paper. Each Party has to this MOU has retained one stamped copy each. IN WITNESS Thereof, the parties hereto have set their respective hands and have signed the present MOU on the day, date, month and the year mentioned herein above in presence of the following attesting witnesses. HCP Design, Planning and Management Pvt Ltd. Page 20

23 PARTY NO. 1 SIGNED, SEALED BY Executive Engineer (Metro), Nagpur Improvement Trust, Nagpur. PARTY NO. 2 Name: Shri / Smt. Age: Occupation: Address: In the presence of Witness 1 Name Age: Occupation: Address: Witness 2 Name: Age: Occupation: Address: Enclosures: Annex 1 Final Policy Document Annex 2 Final Process Document True copies of 7 x 12 records of all khasras included in the Improvement Scheme POA in the name of the authorized person to sign this MOU. HCP Design, Planning and Management Pvt Ltd. Page 21

24 D Final Agreement with Land Owners after Approval by SG NAGPUR IMPROVEMENT TRUST DEVELOPMENT OF NAGPUR METROPOLITAN AREA AGREEMENT FOR DEVELOPMENT OF LANDS IN NAGPUR METROPOLITAN AREA, NAGPUR BY PUBLIC PARTICIPATION METHOD This Agreement is executed at Nagpur on this day of BETWEEN 1. The Nagpur Improvement Trust, a statutory body constituted under the provisions of Nagpur Improvement Trust Act, 1936, having office at Sadar, Nagpur, hereinafter in short referred to as the NIT (Party No. 1), which expression shall, unless repugnant to the context or meaning thereof, always mean and include the said NIT, acting through its Executive Engineer (Metro) as PARTY NO. 1. AND 2. Shri Resident of Tehsil District hereinafter referred to as the owner (Party No. 2), which expression shall, unless repugnant to the context or meaning thereof, always mean and include anyone delegated to act as such and all its duly authorized executives, power of attorney, legal heirs etc of the PARTY NO WHEREAS, the Government of Maharashtra, by notification No.TPS- 1899/1191/CR-80/99/UD-13 dated 23 rd July 1999 has declared the Nagpur Metropolitan Area which includes 9 Tehsils & 726 Villages therein. 4. WHEREAS, Government of Maharashtra by notification No.NIT/2202/4025/CR- 493/2002/UD-26 dated. 24/12/2002 has extended the jurisdiction of Nagpur Improvement Trust to the Nagpur Metropolitan Area (Area mentioned in Notification dated 23 rd July 1999) 5. WHEREAS, Government of Maharashtra has appointed Nagpur Improvement Trust (NIT) as Special Planning Authority for Nagpur Metropolitan Area, vide G.R. No. TPS-2409/2890/CR-356/09/UD-9, Dt. 31/8/2010 under section 40 (1) of the MRTP Act, The said G.R. has been published in the Government Gazette dated 2/9/2010. HCP Design, Planning and Management Pvt Ltd. Page 22

25 6. WHEREAS, the Party No. 1 vide Board Resolution No. 18/1085/22/02/2010 has decided to develop the Nagpur Metropolitan Area by Public Participation Method using the modified & improved Improvement Scheme mechanism under NIT Act 1936 & has approved the Process for preparing Improvement Schemes and Policies undertaking the preparation of Improvement Schemes and Memo of Understanding (MOU) for development of lands in Nagpur Metropolitan Area by Public Participation Method vide B.R. No. 29/1100 dated 28/09/2011. All the documents are part of the IS Report and have been pursued and understood by Party No WHEREAS the Party No. 1 has powers under section 58 of NIT Act-1936 empowering it to enter into an agreement with any person for the acquisition by purchase, lease or exchange by the Trust from such person of any land (within the area comprised in a sanctioned scheme). 8. WHEREAS the Party No. 1 has decided to develop KHADKA KIRMITI SHIVMADKA PANJARI SUMTHANA, Tehsil Hingna, District Nagpur Improvement Scheme on Public Participation Method for planned development under provisions of NIT Act 1936 vide NIT Board Resolution No. 8/1099 dated 30/08/ WHEREAS the Party No. 1 has Declared the Intention to carry out the survey of the lands of KHADKA KIRMITI SHIVMADKA PANJARI SUMTHANA Improvement Scheme in Tehsil Hingna, District Nagpur U/S of NIT Act, 1936 which is published in the local news papers Deshonatti, Lokmat Samachar, The Hitvad dated 4 Feb 2012 informing the land owners about the lands included in the Improvement Scheme and the approved Process, Policies and draft MOU & Agreement. 11. AND WHEREAS the Party No. 2 is the owner of land / plot bearing the following Khasra Nos in Nagpur Metropolitan Area which are included in the KHADKA KIRMITI SHIVMADKA PANJARI SUMTHANA Improvement Scheme. Khasra Mouza Tehsil & Khasra to North Khara to South Khasra to East Khasra to West Area Sq m TOTAL AREA (SQ M) 12 WHEREAS the Party No. 2 has already executed an MOU with Party No. 1 on dated and has permitted Party No. 1 to prepare and implement KHADKA KIRMITI SHIVMADKA PAJNARI SUMTHANA Improvement Scheme of Nagpur Metropolitan Area on Public Participation Method. 13. WHEREAS the Party No. 1 has followed the due approved Process and Policy Document and prepared the IS. HCP Design, Planning and Management Pvt Ltd. Page 23

NAGPUR IMPROVEMENT TRUST Station road, Sadar, Nagpur

NAGPUR IMPROVEMENT TRUST Station road, Sadar, Nagpur 1 NAGPUR IMPROVEMENT TRUST Station road, Sadar, Nagpur 440 001 (Rs. 20 Including Sale Tax) (SPECIAL PLANNING AUTHORITY FOR NAGPUR METROPOLITAN AREA APPOINTED BY GOVT. OF MAHARASHTRA VIDE NOTIFICATON NO.

More information

NAGPUR IMPROVEMENT TRUST

NAGPUR IMPROVEMENT TRUST NAGPUR IMPROVEMENT TRUST CONSULTATION PAPER FOR IMPLEMENTATION OF TOWN PLANNING SCHEMES UNDER THE NAGPUR IMPROVEMENT TRUST ACT 1936 AND PROPOSAL OF DEVELOPMENT OF NAGPUR METRO POLITAN AREA ON PUBLIC PARTICIPATION

More information

Industries Department, Haryana Template regarding Commercial Contracts

Industries Department, Haryana Template regarding Commercial Contracts *Disclaimer This legal form and document is for reference only. Any document that you enter into, should be in consultation with an Advocate or a Solicitor. The Government will not be responsible for any

More information

PACKAGE DEAL AGREEMENT FOR SALE OF FLATS IN BULK TO A PURCHASER. THIS AGREEMENT made at... on... this

PACKAGE DEAL AGREEMENT FOR SALE OF FLATS IN BULK TO A PURCHASER. THIS AGREEMENT made at... on... this PACKAGE DEAL AGREEMENT FOR SALE OF FLATS IN BULK TO A PURCHASER THIS AGREEMENT made at... on... this... day of..., 2000, Between (1) A, son of... resident of... (2) B, son of... resident of... and (3)

More information

SALE DEED FOR SUPERSTRUCTURE OF RESIDENTIAL UNIT AND SUB-LEASE- DEED FOR LAND. Sale consideration Rs. Super Area Sq. Mtrs. Stamp Duty Rs.

SALE DEED FOR SUPERSTRUCTURE OF RESIDENTIAL UNIT AND SUB-LEASE- DEED FOR LAND. Sale consideration Rs. Super Area Sq. Mtrs. Stamp Duty Rs. SALE DEED FOR SUPERSTRUCTURE OF RESIDENTIAL UNIT AND SUB-LEASE- DEED FOR LAND Sale consideration Rs. Super Area ------ Sq. Mtrs. Stamp Duty Rs. There is no facility of Club, Swimming Pool, Gymnasium and

More information

SHAPATH HEXA. Please affix your photograph. Please affix your photograph. Please affix your photograph

SHAPATH HEXA. Please affix your photograph. Please affix your photograph. Please affix your photograph Corporate Office: B-900, Shapath - 4, Opp: Karnavati Club,S. G. Highway, Ahmedabad - 380051. Tel: 079-40002900 Fax: 079-40002929 Email: marketing@savvygroup.in web:www.savvygroup.in OFFICE NO. Date: /

More information

HARYANA GOVT. GAZ. (EXTRA.), FEB. 16, 2018 (MAGH. 27, 1939 SAKA) 555. Form REP-I PART-A

HARYANA GOVT. GAZ. (EXTRA.), FEB. 16, 2018 (MAGH. 27, 1939 SAKA) 555. Form REP-I PART-A HARYANA GOVT. GAZ. (EXTRA.), FEB. 16, 2018 (MAGH. 27, 1939 SAKA) 555 PART-A To Sir, The Haryana Real Estate Authority Gurugram [I/We] hereby apply for the grant of registration of my/our project to be

More information

DRAFT LEASE DEED Office premises (LIC as a tenant)

DRAFT LEASE DEED Office premises (LIC as a tenant) DRAFT LEASE DEED Office premises (LIC as a tenant) THIS DEED OF LEASE made on this.. day of 20.. at... Between. D/S/o... residing.. hereinafter referred to as the Lessor (which term shall mean and include

More information

Total Consideration Rs. Lease Money Rs. Total Rs 3% of total cost Rs. LEASE DEED

Total Consideration Rs. Lease Money Rs. Total Rs 3% of total cost Rs. LEASE DEED Total Consideration Rs. Lease Money Rs. Total Rs 3% of total cost Rs. LEASE DEED This Indenture made this day of 2005 at Shimla between the Governor of Himachal Pradesh (Hereinafter called' The Lessor')

More information

4. A copy of this Order is available on the Internet and can be accessed at the address

4. A copy of this Order is available on the Internet and can be accessed at the address GOVERNMENT OF ANDHRA PRADESH A B S T R A C T Municipal Administration and Urban Development Department - The Andhra Pradesh Building Rules, 2017 Amendments - Notification - Orders Issued. MUNICIPAL ADMINISTRATION

More information

PROCEDURE FOR MUTATION OF PROPERTY IN ASSESSMENT & COLLECTION DEPARTMENT MUNICIPAL CORPORATION OF DELHI

PROCEDURE FOR MUTATION OF PROPERTY IN ASSESSMENT & COLLECTION DEPARTMENT MUNICIPAL CORPORATION OF DELHI PROCEDURE FOR MUTATION OF PROPERTY IN ASSESSMENT & COLLECTION DEPARTMENT MUNICIPAL CORPORATION OF DELHI Change of name of taxpayer u/s 128(5) of the DMC Act is culmination of notice of transfer / devolution

More information

Developed Industrial Plot Allotment Policy

Developed Industrial Plot Allotment Policy GREENTECH MEGA FOOD PARK LIMITED CIN: U45201RJ2012PLC039560 Reg. Office: Village & Tehsil Roopangarh, Bhadun Road, Ajmer-305814 (Rajasthan) Corporate Office: A-2, Ganpati Enclave, Civil Lines, Ajmer Road,

More information

Registration of Cooperative Housing Society

Registration of Cooperative Housing Society Lecture on Registration of Cooperative Housing Society under Maharashtra Cooperative Societies Act, 1960 By Shri Sunil Deshmukh Important Provisions of MSC Act, 1960 4. Societies which may be registered.

More information

CONVEYANCE DEED 1. NAME OF VENDEE (S) 2. ADDRESS OF VENDEE (S) 3. PROPERTY NO. AND DETAILS 4. SEGMENT/ BLOCK (NAME & CODE)

CONVEYANCE DEED 1. NAME OF VENDEE (S) 2. ADDRESS OF VENDEE (S) 3. PROPERTY NO. AND DETAILS 4. SEGMENT/ BLOCK (NAME & CODE) CONVEYANCE DEED 1. NAME OF VENDEE (S) 2. ADDRESS OF VENDEE (S) 3. PROPERTY NO. AND DETAILS 4. SEGMENT/ BLOCK (NAME & CODE) 5. VILLAGE/ CITY (NAME & CODE) 6. CARPET AREA 7. SALE CONSIDERATION 8. STAMP DUTY

More information

DELHI DEVELOPMENT AUTHORITY NOTIFICATION

DELHI DEVELOPMENT AUTHORITY NOTIFICATION DELHI DEVELOPMENT AUTHORITY NOTIFICATION S. O.... - In exercise of the powers conferred by sub-section (1) of Section 57 of the Delhi Development Act, 1957, the Delhi Development Authority, with the previous

More information

THE KIAMBU COUNTY VALUATION AND RATING BILL, 2015 ARRANGEMENT OF CLAUSES PART I PRELIMINARY PART II ADMINISTRATION PART III- VALUATION

THE KIAMBU COUNTY VALUATION AND RATING BILL, 2015 ARRANGEMENT OF CLAUSES PART I PRELIMINARY PART II ADMINISTRATION PART III- VALUATION THE KIAMBU COUNTY VALUATION AND RATING BILL, 2015 ARRANGEMENT OF CLAUSES Clause PART I PRELIMINARY 1- Short title. 2- Interpretation. 3- Purpose of the Act. PART II ADMINISTRATION 4- Functions of the Department.

More information

SALE DEED. THIS INDENTURE OF SALE DEED (hereinafter referred Sale Deed ) is made and entered into at, on day of,

SALE DEED. THIS INDENTURE OF SALE DEED (hereinafter referred Sale Deed ) is made and entered into at, on day of, SALE DEED THIS INDENTURE OF SALE DEED (hereinafter referred Sale Deed ) is made and entered into at, on day of, BETWEEN: of aged yrs., an Indian inhabitant of Mumbai, residing at, hereinafter called as

More information

AGREEMENT FOR SALE (APARTMENT IN CO-OP. SOCIETY)

AGREEMENT FOR SALE (APARTMENT IN CO-OP. SOCIETY) AGREEMENT FOR SALE (APARTMENT IN CO-OP. SOCIETY) THIS AGREEMENT is made at (City) on the day of [Year] Between [Name/s], aged about years, son of, residing at, hereinafter called "The Vendor" (which expression

More information

MAHARASHTRA PROVISION OF FACILITIES FOR AGRICULTURAL CREDITS BY BANK ACT, 1974 [ 5 OF 1975 ] *

MAHARASHTRA PROVISION OF FACILITIES FOR AGRICULTURAL CREDITS BY BANK ACT, 1974 [ 5 OF 1975 ] * MAHARASHTRA PROVISION OF FACILITIES FOR AGRICULTURAL CREDITS BY BANK ACT, 1974 [ 5 OF 1975 ] * 10 th March 1975 An Act to make better provision for the adequate supply of credit or increasing agricultural

More information

TENDER DOCUMENT FOR HIRING OF BUILDING FOR BRANCH OFFICE DHARUHERA

TENDER DOCUMENT FOR HIRING OF BUILDING FOR BRANCH OFFICE DHARUHERA EMPLOYEES STATE INSURANCE CORPORATION (Ministry of Labour & Employment, Govt. of India) SUB-REGIONAL OFFICE, Plot No. 47, Sector 34, Near Hero Honda Chowk, Gurgaon - 122001 TENDER DOCUMENT FOR HIRING OF

More information

NOTICE INVITING TENDER FOR PURCHASE OF PLOT AT GERUGAMBAKKAM, KANCHEEPURAM DISTRICT

NOTICE INVITING TENDER FOR PURCHASE OF PLOT AT GERUGAMBAKKAM, KANCHEEPURAM DISTRICT NOTICE INVITING TENDER FOR PURCHASE OF PLOT AT GERUGAMBAKKAM, KANCHEEPURAM DISTRICT Bank of Baroda invites proposal / offers in two bid system from owners having clear and marketable title, also no objection

More information

TENDER FOR PURCHASE OF BUILDINGS/BUILT UP FLOOR(S)

TENDER FOR PURCHASE OF BUILDINGS/BUILT UP FLOOR(S) TENDER FOR PURCHASE OF BUILDINGS/BUILT UP FLOOR(S) The Institute of Company Secretaries of India herein after referred as Institute is a statutory body constituted under an Act of Parliament, i.e. the

More information

DECLARATION OF THE APPLICANTS, i.e. TRANSFEROR AND THE PROPOSED TRANSFEREE :

DECLARATION OF THE APPLICANTS, i.e. TRANSFEROR AND THE PROPOSED TRANSFEREE : DECLARATION OF THE APPLICANTS, i.e. TRANSFEROR AND THE PROPOSED TRANSFEREE : 1. That Dwelling Unit No in Sector Chandigarh was allotted by the Chandigarh Housing Board to Sh./Smt./Ms. vide letter dated

More information

EXPRESSION OF INTEREST FOR SHOP SELECTION BY JHARKHAND STATE BEVERAGES CORPORATION LIMITED

EXPRESSION OF INTEREST FOR SHOP SELECTION BY JHARKHAND STATE BEVERAGES CORPORATION LIMITED EXPRESSION OF INTEREST FOR SHOP SELECTION BY JHARKHAND STATE BEVERAGES CORPORATION LIMITED Head Office/ Regd. Office: T.A. Building, Near GolChakkar, Sector-3, Dhurwa, Ranchi-834004 Tel: 0651-2446060 jsbcl.jharkhand@gmail.com

More information

DEED IN RESPECT OF LEASEHOLD LAND

DEED IN RESPECT OF LEASEHOLD LAND DEED IN RESPECT OF LEASEHOLD LAND THIS INDENTURE made at... the... day of... 19... between ABC & CO. LTD, a company incorporated under the Companies Act, 1956 and having its registered office at... (hereinafer

More information

UTTARPARA-KOTRUNG MUNICIPALITY

UTTARPARA-KOTRUNG MUNICIPALITY UTTARPARA-KOTRUNG MUNICIPALITY Miscellaneous Receipt No. SL No. Date - Date of Issue - APPLICATION FORM OF SANCTION OF BUILDING PLAN (Valid upto sixty days from the date of issue of this Form) Issued to

More information

DRAFT DEED OF SUB LEASE

DRAFT DEED OF SUB LEASE 1 Draft Deed of Sub-lease DRAFT DEED OF SUB LEASE THIS DEED OF SUB LEASE ( Sub-lease ) entered into at Chennai on this the------- day of. 2011 between M/s. Tamil Nadu Road Development Company Limited with

More information

AGREEMENT FOR SALE FOR PURCHASE OF A PLOT FOR CONSTRUCTING FLATS. THIS AGREEMENT of sale made at... on this

AGREEMENT FOR SALE FOR PURCHASE OF A PLOT FOR CONSTRUCTING FLATS. THIS AGREEMENT of sale made at... on this AGREEMENT FOR SALE FOR PURCHASE OF A PLOT FOR CONSTRUCTING FLATS THIS AGREEMENT of sale made at... on this... day of..., 2000, between (1) A, son of... (2) B, son of... (3) C, son of... (4) D, son of...

More information

Stringent provisions made for future:

Stringent provisions made for future: 1 1. Background The Government of Punjab vide it s Notification No.GSR. 41/PA14/1995/Ss 38 & 45/ Amd (2)/ 2010 dated 09-12-2010 had amended the Punjab Apartment and Property Regulation Rules 1995 to incorporate

More information

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT July 2009 1 CONTENTS CHAPTER 1 PRELIMINARY... 3 Title, extent and commencement...

More information

Introduction: Model Cows Lease Agreement for Dairy Stock

Introduction: Model Cows Lease Agreement for Dairy Stock Introduction: Model Cows Lease Agreement for Dairy Stock The model Cows Lease Agreement has been prepared as a template which can be modified to suit individual circumstances. It has been drafted so that

More information

FORM A [See rule 3(3)] APPLICATION FOR REGISTRATION OF PROJECT

FORM A [See rule 3(3)] APPLICATION FOR REGISTRATION OF PROJECT FORM A [See rule 3(3)] APPLICATION FOR REGISTRATION OF PROJECT To, The Maharashtra Real Estate Regulatory Authority Sir, I/We hereby apply for the grant of registration of my/our project to be set up at

More information

GOVERNMENT OF PUNJAB DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HOUSING-II BRANCH)

GOVERNMENT OF PUNJAB DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HOUSING-II BRANCH) GOVERNMENT OF PUNJAB DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HOUSING-II BRANCH) Notification The 9 th December, 2010 No.G.S.R.41/P.A.14/1995/Ss.38 and 45/Amd.(2)/2010- With reference to the Government

More information

DELHI DEVELOPMENT AUTHORITY Notification New Delhi,, September, 2014

DELHI DEVELOPMENT AUTHORITY Notification New Delhi,, September, 2014 DELHI DEVELOPMENT AUTHORITY Notification New Delhi,, September, 2014 In exercise of powers conferred by Section 57 of the Delhi Development Act, 1957, the Delhi Development Authority with the previous

More information

Formalities by purchaser

Formalities by purchaser PROCEDURE FOR TRANSFER OF MEMBERSHIP RIGHTS THROUGH POWER OF ATTORNEY (PURCHASER) FAZAIA HOUSING SCHEME KARACHI (APARTMENTS) Formalities by the seller The seller is to provide the following to Directorate

More information

Direction for General Regulation Concerning Jointly Owned Properties. Chapter One Definitions and General Provisions

Direction for General Regulation Concerning Jointly Owned Properties. Chapter One Definitions and General Provisions Direction for General Regulation Concerning Jointly Owned Properties Chapter One Definitions and General Provisions Article (1) Terms used in the Law In these Regulations, the terms and expressions defined

More information

NOTICE INVITING TENDER FOR PURCHASE OF PLOT AT - BILHARI

NOTICE INVITING TENDER FOR PURCHASE OF PLOT AT - BILHARI NOTICE INVITING TENDER FOR PURCHASE OF PLOT AT - BILHARI Bank of Baroda invites proposal / offers in two bid system from owners having clear and marketable title, also no objection to use the property

More information

DEED OF CONVEYANCE OF SITE SOLD BY ALLOTMENT BETWEEN AND

DEED OF CONVEYANCE OF SITE SOLD BY ALLOTMENT BETWEEN AND DEED OF CONVEYANCE OF SITE SOLD BY ALLOTMENT ON NON JUDICIAL STAMP PAPERS WORTH Rs. /- ( ) KITAS, VIDE Sr. No., DATED / /, ISSUED BY DISTT. TREASURER, TREASURY OFFICE, PANCHKULA. THIS DEED OF CONVEYANCE

More information

No. NSG/SAS/115 Dated: 17 Mar Notice No.171. Subject: Notice No Agreement to Transfer of Sub lease hold rights

No. NSG/SAS/115 Dated: 17 Mar Notice No.171. Subject: Notice No Agreement to Transfer of Sub lease hold rights NSG SAHKARI AWAS SAMITI LTD. PLOT NO. 2, POCKET NO. 6 BUILDERS AREA, GREATER NOIDA, DISTT GAUTAM BUDH NAGAR (UP) Office Phone No: 0120-2343622/Website: www.nsgsas.com E-mail id - admin@nsgsas.com No. NSG/SAS/115

More information

STOCK HOLDING CORPORATION OF INDIA LTD.

STOCK HOLDING CORPORATION OF INDIA LTD. Page 1 of 14 STOCK HOLDING CORPORATION OF INDIA LTD. REGD. OFFICE :301,Centre Point, Dr.Babasaheb Ambedkar Road, Parel, Mumbai 400 012 CIN: U67190MH1986GOI040506 TENDER NOTICE PREQUALIFICATION OF CIVIL

More information

DELHI DEVELOPMENT AUTHORITY OFFICE OF PR.COMMISSIONER(H,LD&CWG)

DELHI DEVELOPMENT AUTHORITY OFFICE OF PR.COMMISSIONER(H,LD&CWG) 1 DELHI DEVELOPMENT AUTHORITY OFFICE OF PR.COMMISSIONER(H,LD&CWG) Sub: Draft Slum Rehabilitation Policy based on Mumbai s Slum Rehabilitation Policy One of the major challenges that face DDA is to handle

More information

SALE DEED (General) In favour of. Sri./Smt. S/o./W/o., occupation, aged years, residing at.

SALE DEED (General) In favour of. Sri./Smt. S/o./W/o., occupation, aged years, residing at. SALE DEED (General) This deed of sale is executed on day of month of year by Sri./Smt., S/o./ W/o., occupation, and aged years, residing at. hereinafter called the "SELLER". 1 In favour of Sri./Smt. S/o./W/o.,

More information

NATIONAL COMPANY LAW APPELLATE TRIBUNAL, NEW DELHI. Company Appeal (AT) (Insolvency) No. 155 of 2018

NATIONAL COMPANY LAW APPELLATE TRIBUNAL, NEW DELHI. Company Appeal (AT) (Insolvency) No. 155 of 2018 1 NATIONAL COMPANY LAW APPELLATE TRIBUNAL, NEW DELHI (Arising out of Order dated 12 th March, 2018 passed by the Adjudicating Authority (National Company Law Tribunal), New Delhi Bench, New Delhi, in CP

More information

TENDER DOCUMENT FOR HIRING OF BUILDING FOR BRANCH OFFICE RAJIV CHOWK

TENDER DOCUMENT FOR HIRING OF BUILDING FOR BRANCH OFFICE RAJIV CHOWK EMPLOYEES STATE INSURANCE CORPORATION (Ministry of Labour & Employment, Govt. of India) SUB-REGIONAL OFFICE, Plot No. 47, Sector 34, Near Hero Honda Chowk, Gurgaon - 122001 TENDER DOCUMENT FOR HIRING OF

More information

DEVELOPMENT AGREEMENT RIVER EDGE COLORADO PLANNED UNIT DEVELOPMENT

DEVELOPMENT AGREEMENT RIVER EDGE COLORADO PLANNED UNIT DEVELOPMENT DEVELOPMENT AGREEMENT RIVER EDGE COLORADO PLANNED UNIT DEVELOPMENT THIS AGREEMENT, is made and entered into between the BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF GARFIELD, a body politic and corporate

More information

SAMPLE OF LEASE/ RENT AGREEMENT

SAMPLE OF LEASE/ RENT AGREEMENT SAMPLE OF LEASE/ RENT AGREEMENT THIS LEASE DEED is executed at New Delhi on this [Date] day of [Month], [Year] by and between Mr. [Name of the Owner], Resident of [Address of the Owner] (hereinafter jointly

More information

Real estate market has an eye on stamp duty

Real estate market has an eye on stamp duty Real estate market has an eye on stamp duty Introduction Stamp duty is a form of tax that is imposed on instruments 1 by which right or liability is or purports to be created, transferred, limited, extended,

More information

Booking Application Form

Booking Application Form Booking Application Form Partner Code: To, Jupiter Lifespaces Bangalore Private Limited (Previously known as Azcap Realty Ventures Private Limited ) the LAND OWNER/DEVELOPERS Bangalore. I/We, the PURCHASER

More information

RECITALS. PPAB v3 PPAB v4

RECITALS. PPAB v3 PPAB v4 STATE OF SOUTH CAROLINA ) AGREEMENT FOR DEVELOPMENT COUNTY OF OCONEE ) FOR JOINT COUNTY INDUSTRIAL/BUSINESS ) PARK (OCONEE-PICKENS INDUSTRIAL COUNTY OF PICKENS ) PARK PROJECT MACKINAW) THIS AGREEMENT for

More information

THE HIMACHAL PRADESH AGRICULTURAL CREDIT OPERATIONS AND MISCELLANEOUS PROVISIONS (BANKS) ACT, 1972 ARRANGEMENT OF SECTIONS.

THE HIMACHAL PRADESH AGRICULTURAL CREDIT OPERATIONS AND MISCELLANEOUS PROVISIONS (BANKS) ACT, 1972 ARRANGEMENT OF SECTIONS. THE HIMACHAL PRADESH AGRICULTURAL CREDIT OPERATIONS AND MISCELLANEOUS PROVISIONS (BANKS) ACT, 1972 Sections: ARRANGEMENT OF SECTIONS CHAPTER I PRELIMINARY 1. Short title, extent and commencement. 2. Definitions.

More information

KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION

KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION In exercise of the powers conferred by clauses 1 & 2 of Section (50) of the Kerala Industrial Infrastructure Development Act, 1993, the Kerala Industrial

More information

Ref. No. SCMF/ENG/ NIT-24/ Date: N O T I C E I N V I T I N G T E N D E R

Ref. No. SCMF/ENG/ NIT-24/ Date: N O T I C E I N V I T I N G T E N D E R Fax : 033 2441 4372 THE WEST BENGAL benfed Website :- www.benfed.org STATE CO-OPERATIVE Phones : 033 2441 4366 MARKETING FEDERATION LTD. 4367 SOUTHEND CONCLAVE 3 rd Floor. 4368 1582, Rajdanga Main Road,

More information

BETWEEN. (Company No. ) (as the Assignor) AND. UNITED OVERSEAS BANK (MALAYSIA) BHD (Company No K) (as the Bank)

BETWEEN. (Company No. ) (as the Assignor) AND. UNITED OVERSEAS BANK (MALAYSIA) BHD (Company No K) (as the Bank) BETWEEN (Company No. (as the Assignor AND UNITED OVERSEAS BANK (MALAYSIA BHD (Company No. 271809 K (as the Bank ********************************************************************* DEED OF ASSIGNMENT

More information

DELHI DEVELOPMENT AUTHORITY HOUSING DEPARTMENT (LIG) CIRCULAR

DELHI DEVELOPMENT AUTHORITY HOUSING DEPARTMENT (LIG) CIRCULAR DELHI DEVELOPMENT AUTHORITY HOUSING DEPARTMENT (LIG) Dated: 17.01.2019 CIRCULAR LAUNCHING DATE AND TIME: 18.01.2019 AT 15.00 HRS Subject:- Launching of Online Running Scheme for disposal of old inventory

More information

SINDH BUILDING CONTROL AUTHORITY

SINDH BUILDING CONTROL AUTHORITY SINDH BUILDING CONTROL AUTHORITY Note: (Typed on Rs. 100/- Stamp Paper) MODEL OF AGREEMENT BETWEEN THE BUILDER / DEVELOPER AND THE ALLOTTEE FOR BOOKING OF APARTMENT / SHOP / HOUSE / OFFICE / PLOT IN A

More information

VIEWS ON CLUSTER DEVELOPMENT URBAN RENEWAL SCHEME/CLUSTER DEVELOPMENT [DCR 33/9]

VIEWS ON CLUSTER DEVELOPMENT URBAN RENEWAL SCHEME/CLUSTER DEVELOPMENT [DCR 33/9] VIEWS ON CLUSTER DEVELOPMENT By Chaitanya Mehta, Solicitor. URBAN RENEWAL SCHEME/CLUSTER DEVELOPMENT [DCR 33/9] The Cluster Redevelopment Approach has successfully transformed the cities of Hong Kong,

More information

CONSENT TO ASSIGNMENT OF LEASE

CONSENT TO ASSIGNMENT OF LEASE CONSENT TO ASSIGNMENT OF LEASE TO: AND TO: AND TO: AND TO: * ("Assignor" * ("Assignee" * ("Indemnifier" * ("Landlord" DATE: * WHEREAS A. By a lease dated the ** day of **, ** (the "Lease", the Landlord

More information

FORM A [See rule 3 (2)] APPLICATION FOR REGISTRATION OF PROJECT To The Real Estate Regulatory Authority

FORM A [See rule 3 (2)] APPLICATION FOR REGISTRATION OF PROJECT To The Real Estate Regulatory Authority FORM A [See rule 3 (2)] APPLICATION FOR REGISTRATION OF PROJECT To The Real Estate Regulatory Authority Sir, I/We hereby apply for the grant of registration of my/our project to be set up at Taluk District

More information

INSTITUTE OF HOTEL MANAGEMENT, CATERING TECHNOLOGY & APPLIED NUTRITION (MUMBAI) SOCIETY

INSTITUTE OF HOTEL MANAGEMENT, CATERING TECHNOLOGY & APPLIED NUTRITION (MUMBAI) SOCIETY INSTITUTE OF HOTEL MANAGEMENT, CATERING TECHNOLOGY & APPLIED NUTRITION (MUMBAI) SOCIETY MEMORANDUM OF ASSOCIATION (1989) MEMORANDUM OF ASSOCIATION In the matter of Act-XXI of 1860 being an Act for the

More information

The Cantonments (Requisitioning of Immovable Property) Ordinance,1948.

The Cantonments (Requisitioning of Immovable Property) Ordinance,1948. The Cantonments (Requisitioning of Immovable Property) Ordinance,1948. THE CANTONMENTS (REQUISITIONING OF IMMOVABLE PROPERTY) ORDINANCE 1948. (Ordinance No. IV of 1948) (28th January 1948) Whereas an emergency

More information

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in Lok Sabha on September 7, 2011. On December 17, 2012, during the winter session of Parliament, the government circulated

More information

AGREEMENT OF SALE. This Agreement of Sale is made and executed on this the day of at Secunderabad by and between:

AGREEMENT OF SALE. This Agreement of Sale is made and executed on this the day of at Secunderabad by and between: AGREEMENT OF SALE This Agreement of Sale is made and executed on this the day of at Secunderabad by and between: M/S. KADAKIA & MODI HOUSING, a registered partnership firm having its office at 5-4-187/3&4,

More information

Practice Followed by APIIC in Land Acquisition & Industrial Area Management

Practice Followed by APIIC in Land Acquisition & Industrial Area Management Practice Followed by APIIC in Land Acquisition & Industrial Area Management Acquisition, Allotment and Disposal of Land for Industrial Purpose Gives highest priority to creation of quality infrastructure

More information

ANNEXURE III TERMS & CONDITIONS OF SALE

ANNEXURE III TERMS & CONDITIONS OF SALE ANNEXURE III TERMS & CONDITIONS OF SALE Whereas the Bank acting through its Authorised Officer, in exercise of its power under Section 13(4) of the Securitisation Reconstruction of Financial Assets and

More information

Deed of Assignment of Business with Goodwill and Immovable Property

Deed of Assignment of Business with Goodwill and Immovable Property Deed of Assignment of Business with Goodwill and Immovable Property THIS DEED OF ASSIGNMENT made at this day of 200 between ABC Ltd, a Public Limited Company incorporated under the Indian Companies Act,

More information

Sr.Divisional Manager LIFE INSURANCE CORPORATION OF INDIA Divisional Office :Jeevan Prakash, Nagpur Road,Madan Mahal,JABALPUR

Sr.Divisional Manager LIFE INSURANCE CORPORATION OF INDIA Divisional Office :Jeevan Prakash, Nagpur Road,Madan Mahal,JABALPUR Life Insurance Corporation of India. Divisional Office, Jeevan Prakash, Nagpur Road Madan Mahal, Jabalpur (MP) Ph. 0761-2671240, 2679660 Instructions to Bidder 1. The tender forms will be available from

More information

CHAPTER I INTRODUCTION

CHAPTER I INTRODUCTION 1.1 General CHAPTER I INTRODUCTION Land is a premium asset and an important resource which contributes significantly to the economy of the State. Government lands not required for immediate use are given

More information

Signature of the Applicant(s) Page 1 of 11. Application Form. Date:..

Signature of the Applicant(s) Page 1 of 11. Application Form. Date:.. Application Form To, M/s. Purvanchal Projects Pvt. Ltd. Purvanchal Business World, A-103, Sector-136, Noida -201305 Distt. Gautam Budh Nagar, (U.P.) RERA Registration No. : UPRERAPRJ3137 Date:.. Dear Sir,

More information

7. The Lessee has taken possession of the B Schedule property in as is where is condition and no further demand for any development, such as

7. The Lessee has taken possession of the B Schedule property in as is where is condition and no further demand for any development, such as DRAFT LEASE DEED MEMORANDUM OF Lease Deed entered into at Chennai on this... day of... 2009 BETWEEN Electronics Corporation of Tamil Nadu Limited, (ELCOT), a Company incorporated under the Companies Act,

More information

Public Relations Department, Chandigarh Administration Press Release

Public Relations Department, Chandigarh Administration   Press Release Public Relations Department, Chandigarh Administration www.chandigarh.gov.in Press Release Chandigarh, December 14:- The Chandigarh Administration has made amendments in the Chandigarh Estate Rules, 2007

More information

Registering Property

Registering Property Registering Property Delhi 1. Description of Reform: For procedure 3 Conduct charges search at the Registrar of Companies, Doing Business 2018 records that the buyer must conduct a search in office of

More information

: Lease Accommodation for Office Space. Tender Ref. No. : PHL/ER/HR&A/OFF/2017 dated 24/02/2017

: Lease Accommodation for Office Space. Tender Ref. No. : PHL/ER/HR&A/OFF/2017 dated 24/02/2017 Type of Organisation Tender Title : Service Provider (Aviation Industry) : Lease Accommodation for Office Space Tender Ref. No. : PHL/ER/HR&A/OFF/2017 dated 24/02/2017 Product Category : Lease Sub Category

More information

Signature(s)... (Stamp required in case of firm/ company)

Signature(s)... (Stamp required in case of firm/ company) APPLICATION FORM Application Date:... To, DWARKADHIS PROJECTS PVT. LTD. (Hereinafter called the Developer ) Regd. Off.: PD- 4A, Pitampura, New Delhi - 110088 Corp. Off: Bldg # 2007, Main Road, Sector 45

More information

THE COTTON CORPORATION OF INDIA LIMITED (A GOVERNMENT OF INDIA UNDERTAKING)

THE COTTON CORPORATION OF INDIA LIMITED (A GOVERNMENT OF INDIA UNDERTAKING) 1 THE COTTON CORPORATION OF INDIA LIMITED (A GOVERNMENT OF INDIA UNDERTAKING) BRANCH OFFICE: ADDRESS: CONTRACT NO: DATE : Type of Sales: E-Auction Sub : Sale Contract It is confirmed that the Cotton Corporation

More information

SAMPLE ESCROW AGREEMENT APPLICATION SOFTWARE SOURCES CODE., (hereinafter Escrow Agent ) whose main office. is located at,, and,

SAMPLE ESCROW AGREEMENT APPLICATION SOFTWARE SOURCES CODE., (hereinafter Escrow Agent ) whose main office. is located at,, and, SAMPLE ESCROW AGREEMENT APPLICATION SOFTWARE SOURCES CODE This AGREEMENT between. (hereinafter ) located at, (hereinafter Escrow Agent ) whose main office is located at,, and,, (hereinafter Contractor

More information

6. The Screening Committee will meet every fortnight and consider all the cases received.

6. The Screening Committee will meet every fortnight and consider all the cases received. Guidelines of Mega Projects A) GENERAL PROCEDURE (MEGA PROJECTS) 1. Application for approval of mega project will be received in the office of the concerned nodal agency i.e. the Punjab Urban Development

More information

Province of Alberta LAND TITLES ACT FORMS REGULATION. Alberta Regulation 480/1981. With amendments up to and including Alberta Regulation 170/2012

Province of Alberta LAND TITLES ACT FORMS REGULATION. Alberta Regulation 480/1981. With amendments up to and including Alberta Regulation 170/2012 Province of Alberta LAND TITLES ACT FORMS REGULATION Alberta Regulation 480/1981 With amendments up to and including Alberta Regulation 170/2012 Office Consolidation Published by Alberta Queen s Printer

More information

MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY. 1. This Act shall be called the Mines and Minerals Management Act 1995.

MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY. 1. This Act shall be called the Mines and Minerals Management Act 1995. MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY 1. This Act shall be called the Mines and Minerals Management Act 1995. 2. The Act shall come into force on the First Day of September 1995.

More information

ALBERTA REGULATION 480/81 Land Titles Act FORMS REGULATION

ALBERTA REGULATION 480/81 Land Titles Act FORMS REGULATION (Consolidated up to 149/2007 ALBERTA REGULATION 480/81 1 The forms in the Schedule are the forms prescribed for the purposes of the sections indicated on the forms. AR 480/81 s1 2 For the purpose of ensuring

More information

ANNEXURE A. Referred to in the Contract For Sale of Land by Offer and Acceptance. made between as Buyer

ANNEXURE A. Referred to in the Contract For Sale of Land by Offer and Acceptance. made between as Buyer Drover s Retreat Stage 1 R5 Special Residential Lots - Pre-sales 2011 Page 1 of 8 ANNEXURE A Referred to in the Contract For Sale of Land by Offer and Acceptance made between as Buyer and Ardross Estates

More information

SHIVSHAHI PUNARVASAN PRAKALP LTD. (Company of Government of Maharashtra)

SHIVSHAHI PUNARVASAN PRAKALP LTD. (Company of Government of Maharashtra) SHIVSHAHI PUNARVASAN PRAKALP LTD. (Company of Government of Maharashtra) RFI CUM RFP FOR AFFORDABLE HOUSING PROJECTS AND SLUM REHABILITATION PROJECTS IN MUMBAI METROPOLITAN REGION 1. Objectives of RFI

More information

India Infrastructure Finance Company Limited Registered Office: 8 th Floor, HT House, 18 & 20, K. G. Marg, New Delhi

India Infrastructure Finance Company Limited Registered Office: 8 th Floor, HT House, 18 & 20, K. G. Marg, New Delhi India Infrastructure Finance Company Limited Registered Office: 8 th Floor, HT House, 18 & 20, K. G. Marg, New Delhi 110001 Premises Required for Regional Office, Mumbai INDIA INFRASTRUCTURE FINANCE COMPNANY

More information

a. Technical bid for hiring office space for CBN, Chennai. b. Financial bid for hiring office space for CBN, Chennai.

a. Technical bid for hiring office space for CBN, Chennai. b. Financial bid for hiring office space for CBN, Chennai. Tender documents for hiring of office accommodation at Chennai The tender consists of three parts Part A Terms and conditions Part B- Technical bid Part C Financial bid Both Part B and C should be sealed

More information

Deed of Assignment of Business with Goodwill and Tenancy Rights

Deed of Assignment of Business with Goodwill and Tenancy Rights Deed of Assignment of Business with Goodwill and Tenancy Rights THIS DEED OF ASSIGNMENT made at this day of 200 Between M/S. SUPER PHARMA AND CHEMICALS, a Proprietory concern of ABC having address at hereinafter

More information

TENDER FOR SALE OF BPCL OWNED HOUSING COMPLEX AGRA TECHNO- COMMERCIAL BID

TENDER FOR SALE OF BPCL OWNED HOUSING COMPLEX AGRA TECHNO- COMMERCIAL BID TENDER FOR SALE OF BPCL OWNED HOUSING COMPLEX AGRA TECHNO- COMMERCIAL BID 1 RE: AGRA: HSG.CMPLX Date : 20-01-2011 TENDER COVER LETTER Tender for Sale of BPCL owned Housing Complex, 17 nos. flats at Municipal

More information

PLANNING AND ZONING DEPARTMENT

PLANNING AND ZONING DEPARTMENT Town of Minturn Development Review Process: Guide To Planned Unit Developments (Concept Plan) This guide describes the Planned Unit Development Process. This guide should be utilized in conjunction with

More information

FAQs for MahaRERA Website

FAQs for MahaRERA Website FAQs for MahaRERA Website I. General FAQs 1. What are the objects and reasons for which the Real Estate (Regulation and Development) Act 2016 has been framed? Ans: The Real Estate Act is intended to achieve

More information

STATUTORY CONTROL GUIDELINE MANUAL

STATUTORY CONTROL GUIDELINE MANUAL CHAPTER 13 SUB-DIVISION OF LAND 13.1 OVERVIEW 3 13.2 AUTHORITY OF AND/OR RESTRICTIONS PLACED ON SANRAL BY SECTION 49 OF THE ACT 4 13.3 APPLICATION PROCEDURES 5 13.4 POLICIES, REQUIREMENTS AND/OR STIPULATIONS

More information

LAND ACQUISITION FOR RAILWAY INFRASTRUCTURE PROJECTS

LAND ACQUISITION FOR RAILWAY INFRASTRUCTURE PROJECTS LAND ACQUISITION FOR RAILWAY INFRASTRUCTURE PROJECTS Manish Gandhi, Nishant Doshi Manuscript History Number: IJIRAE/RS/Vol.05/Issue02/FBAE10084 DOI: 10.26562/IJIRAE.2018.FBAE10084 Received: 13, February

More information

P r o c e d u r e F o r V e n d o r R e g i s t r a t i o n

P r o c e d u r e F o r V e n d o r R e g i s t r a t i o n P r o c e d u r e F o r V e n d o r R e g i s t r a t i o n Procedure for Vendor Registration: (A) Process for the New Vendor registration / addition of item / Shifting of premises / Name Change Application

More information

COUNTER INDEMNITY FOR BUYER S CREDIT/LETTER OF UNDERTAKING/LETTER OF CONFORT LIMIT. and having its Registered Office at

COUNTER INDEMNITY FOR BUYER S CREDIT/LETTER OF UNDERTAKING/LETTER OF CONFORT LIMIT. and having its Registered Office at IBD 7 COUNTER INDEMNITY FOR BUYER S CREDIT/LETTER OF UNDERTAKING/LETTER OF CONFORT LIMIT THIS COUNTER INDEMNITY is executed at Thane on day of 2010 by and having its Registered Office at through its authorised

More information

(i) To pay by Banker s cheque or otherwise as agreed / the said monthly rent hereby reserved on the day and in the manner aforesaid subject to TDS.

(i) To pay by Banker s cheque or otherwise as agreed / the said monthly rent hereby reserved on the day and in the manner aforesaid subject to TDS. ANNEXURE-6.4: SAMPLE FORMAT OF LEASE AGREEMENT The Lease Agreement is made on this day of 200 between Shri /Smt. son/wife of Shri (hereinafter referred to as the lessor which expression unless repugnant

More information

2011 Farmland Bill. The Union Government of the Republic of the Union of Myanmar Farmland Law

2011 Farmland Bill. The Union Government of the Republic of the Union of Myanmar Farmland Law 2011 Farmland Bill Note: This 2011 Farmland Bill was approved by the second regular session of the first Pyithu Hluttaw on 20 September, 2011 and passed in line with Pyithu Hluttaw Rules 159(d). The Union

More information

RULES AND REGULATIONS OF MARTIN COUNTY WATER AND SEWER DISTRICT NO. 1. C. Metering Individual Trailers in Mobile Home Parks

RULES AND REGULATIONS OF MARTIN COUNTY WATER AND SEWER DISTRICT NO. 1. C. Metering Individual Trailers in Mobile Home Parks RULES AND REGULATIONS OF MARTIN COUNTY WATER AND SEWER DISTRICT NO. 1 I. CLASSIFICATION OF SERVICE All services are classified under one category to include residential, schools, churches, and commercial

More information

Date:.. To, M/s. Purvanchal Construction Works Pvt. Ltd. Purvanchal House, N-4, Sector-18, Noida Distt. Gautam Budh Nagar, (U.P.

Date:.. To, M/s. Purvanchal Construction Works Pvt. Ltd. Purvanchal House, N-4, Sector-18, Noida Distt. Gautam Budh Nagar, (U.P. To, M/s. Purvanchal Construction Works Pvt. Ltd. Purvanchal House, N-4, Sector-18, Noida -201301 Distt. Gautam Budh Nagar, (U.P.) Date:.. Dear Sir, I/.We request that I /We maybe registered for provisional

More information

Formats of Certificates of Architect, Engineer and Chartered Accountant:

Formats of Certificates of Architect, Engineer and Chartered Accountant: Formats of Certificates of Architect, Engineer and Chartered Accountant: The certificates, issued by the project architect, project engineer, chartered accountant and submitted to the banks for getting

More information

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in the Lok Sabha by the Minister for Rural

More information

NATIONAL INDUSTRIAL PARKS

NATIONAL INDUSTRIAL PARKS NATIONAL INDUSTRIAL PARKS DEVELOPMENT AND MANAGEMENT COMPANY TERMS AND CONDITIONS FOR PLOT OF LAND AT BIN QASIM INDUSTRIAL PARK THE FOLLOWING TERMS AND CONDITIONS APPLY TO AND ARE BINDING ON THE PERSON

More information

MADE EASY WEST BENGAL CO-OPERATIVE SOCIETIES LAW

MADE EASY WEST BENGAL CO-OPERATIVE SOCIETIES LAW MADE EASY WEST BENGAL CO-OPERATIVE SOCIETIES LAW 1. What Act and Rules are applicable in this law? The West Bengal Co-operative Societies (Amendment) Act, 2011 as well as Rules, 2011 are applicable relating

More information

CONDITIONS OF SALE IMMOVABLE PROPERTY

CONDITIONS OF SALE IMMOVABLE PROPERTY CONDITIONS OF SALE IMMOVABLE PROPERTY CLAREMART AUCTIONEERS (PTY) LTD T/A CLAREMART AUCTION GROUP (the Auctioneer ) DULY INSTRUCTED BY CB ST CLAIR COOPER, JOINT TRUSTEE IN THE MATTER OF INSOLVENT ESTATE

More information