Single Point of Failure and Inter-relationship between Stair Pressurisation System and Evacuation Strategy for Tall Buildings
|
|
- Claud Holt
- 5 years ago
- Views:
Transcription
1 5 th International Tall Building Fire safety Conference 19 June 2018 Single Point of Failure and Inter-relationship between Stair Pressurisation System and Evacuation Strategy for Tall Buildings M.C. Hui (CEng, CPEng, FIFireE, MSFPE, MIEAust) Fire Engineering Manager BCA Logic Pty Ltd
2 Contents Overview of occupant fire safety strategy Review egress provisions for buildings Single point of failure in egress system and protection options Pressurisation of escape stairs Inter-relationship between stair pressurisation and egress strategy Conclusions 2 of 21
3 WHY Occupant DO WE Fire NEED Safety TO Strategy PROVIDE A Our homes are our castles 3 of 21
4 WHY Provision DO WE of NEED Exits TO PROVIDE A Minimum number of exits (Hagiwara and Tanaka, 4 th IAFSS Proceedings, pp , 1994) USA International Building Code of 21
5 WHY Provision DO WE of NEED Multiple TO Exits PROVIDE Why? A Provide redundancy if one exit becomes unavailable, then there is an alternative exit. Reduce queuing time when there is a large population on the floor. 5 of 21
6 WHY Provision DO WE of NEED Multiple TO Exits PROVIDE The Inevitable A Layout The two stair entries are at 4.3m to 5.8m apart 6 of 21
7 Distance Between Alternative Exits Building Code of Australia (Class 2 to Class 9 Buildings) 2016 edition 7 of 21
8 Distance Between Alternative Exits Approved Document B (Buildings other than Dwellinghouses) 2006 edition including 2010 & 2013 amendments 8 of 21
9 The Blind Spot (Single Point of Failure) When the common corridor is significantly smoke logged, no occupants can reach the exit stairs 9 of 21
10 Options to Protect The Common Corridor Self-closing fire doors for the units Self-closing fire doors for the units complete with medium temperature smoke seals and intumescent fire seals Ventilating the corridor Smoke exhaust system for the corridor Pressurise the corridor Sub-dividing the corridor by fire door or smoke proof walls does not protect the corridor but discriminates a portion of the occupants on the floor! 10 of 21
11 The Escape Stair Is this the safe haven? Stair can be non-fire-isolated (Building Code of Australia) Connects not more than 3 consecutive storeys in apartment buildings, plus an extra storey if such storey is for car parking or other ancillary purposes Connects not more than 2 consecutive storeys in hotels, motels, hostels and the like, plus an extra storey if such storey is for car parking or other ancillary purposes Connects not more than 2 consecutive storeys of non-patient care areas in health-care buildings 11 of 21
12 The Escape Stair Is this the safe haven? Under the BCA, a stair does not need to be pressurised if it does not serve any storey above an effective height of 25m more than 2 below ground storeys an atrium a health-care or aged care building with a rise in storeys of not more than 2 12 of 21
13 Pressurised Escape Stair Requirements on pressure within the stair, velocity across the stair entry door, and door opening force vary amongst countries. The more important issue how many stair entry doors are assumed to be open in the stair pressurisation system design. 13 of 21
14 Pressurised Escape Stair AS/NZS :2015 Zone pressurisation dependent system or hot layer smoke control system: Fire stair entry door from fire-affected compartment Main discharge door from fire stair Air purge system, shutdown system and carpark ventilation system: Fire stair entry door from fire-affected compartment Door immediately above/adjacent to the fire-affected compartment Main discharge door from fire stair 14 of 21
15 Pressurised Escape Stair BS EN :2005 System Examples of use Design conditions A For means of escape. Defend in place Stair entry door on fire floor B C For means of escape and firefighting (lift shaft also pressurised) For means of escape by simultaneous evacuation Stair entry door on fire floor and floor above, door to lift lobby, final exit door Stair entry door on fire floor or final exit door D For means of escape. Sleeping risk Stair entry door on fire floor and final exit door E For means of escape by phased evacuation Stair entry door on fire floor and floor above, and final exit door 15 of 21
16 Pressurised Escape Stair NFPA and NFPA Number of doors assumed to be open is up to the stair pressurisation system designer. 16 of 21
17 WHY How DO does WE Stair NEED Pressurisation TO PROVIDE System A Work Building leakage 1.0 m/s Relief Ref: John H. Klote, Smoke Control in SFPE Handbook of Fire Protection Engineering, 5 th edition, Chapter 50, of 21
18 Occupant Evacuation Strategy and its Interrelationship SMOKE with Stair EXHAUST Pressurisation SYSTEM? System Highrise residential buildings Potentially long pre-movement times and no particular evacuation pattern Proulx and Fahy, Fire Safety Science Proceedings of the 5 th International Symposium, pp , of 21
19 Occupant Evacuation Strategy and its Interrelationship SMOKE with Stair EXHAUST Pressurisation SYSTEM? System Highrise buildings (other than private residential) Managed evacuation: Is the evacuation strategy compatible with the stair pressurisation system assumptions? Particular tenancy Work Health and Safety requirement: The evacuation protocol may pose significant challenges on the stair pressurisation system. 19 of 21
20 WHY Conclusions DO WE NEED TO PROVIDE A The path of travel to the fire escape stairs needs to be protected from the effect of fire and smoke to facilitate occupant evacuation, not just the stairs. Stair pressurisation system design must take into account the occupant evacuation strategy implemented for the building which dictates the number of stair entry doors being open at the same time, not just following the national engineering standards. 20 of 21
21 QUESTIONS? THANK YOU FOR NOT FALLING ASLEEP 21 of 21
NFPA (2012). In a high-rise building, stairwell pressurization systems typically utilize multiple fans distributed over the height of the stair, a duc
Numerical and Experimental Investigation of Pressurization System in a High-Rise Building with Stairwell Compartmentation B. Hepguzel 1,* 1 Mechanical Engineering Faculty, Istanbul Technical University,
More informationProtecting the Stair Enclosure in Tall Buildings Impacted by Stack Effect
Protecting the Enclosure in Tall Buildings Impacted by Stack Effect Michael J. Ferreira, P.E. and John Cutonilli Hughes Associates, Inc., 3610 Commerce Drive, Suite 817, Baltimore, MD 21227, USA Phone:
More informationPurpose. Scope. Stairway Identification Signs. Emergency Evacuation and Stairwell Signage Requirements
TOWN OF BRIGHTON Office of the Fire Marshal 2300 Elmwood Avenue Rochester, New York 14618 (585) 784-5220 Office (585) 784-5207 Fax Emergency Evacuation and Stairwell Signage Requirements The intent of
More informationOn Smoke Control by Pressurization in Stairwells and Elevator Shafts
On Smoke Control by Pressurization in Stairwells and Elevator Shafts Dr. Richard S. Miller anddr.donbeasley Department of Mechanical Engineering Clemson University Clemson, SC 29634-0921 August 8, 08 Ph:
More informationSuite Permission. Suites complying with shall be permitted to be used to meet the corridor access requirements of
Categorical Waiver Available: 5. Suites Sections 18/19.2.5 of the 2000 LSC requires every habitable room to have an exit access door leading directly to an exit access corridor; allows for exit access
More informationBackground: 5 th Edition (2014) Florida Building Code, Building
Issue DS 2017-019. The petitioner Robert C Shumake of Shumake Architecture is seeking a declaratory statement on whether FBC 1029.1 require an emergency escape and rescue opening from sleeping units located
More informationOn Smoke Control by Pressurization in Stairwells and Elevator Shafts
On Smoke Control by Pressurization in Stairwells and Elevator Shafts Dr. Richard S. Miller anddr.donbeasley Department of Mechanical Engineering Clemson University Clemson, SC 29634-0921 August 8, 08 Ph:
More informationDisability (Access to Premises Buildings) Standards
Disability (Access to Premises Buildings) Standards 2010 1 Disability Discrimination Act 1992 I, ROBERT McCLELLAND, Attorney-General, make these Standards under subsection 31 (1) of the Disability Discrimination
More informationRESEARCH PAPER AN AUDIT OF THE EGRESS SYSTEM IN MULTI-STOREY ANNEXES OF FOUR HALLS OF RESIDENCE AT KNUST, KUMASI, GHANA
Journal of Science and Technology, Vol. 32, No. 3 (2012), pp 49-60 49 2012 Kwame Nkrumah University of Science and Technology (KNUST) http://dx.doi.org/10.4314/just.v32i3.6 RESEARCH PAPER AN AUDIT OF THE
More informationBUILDING CODE COMMISSION
Ruling No. 08-03-1177 Application No. 2007-26 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 3.4.4.1.,
More information(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code)
(d) (e) (f) (g) (h) if emergency lighting is required if exit signs are required if additional requirements apply for high buildings the type of hardware required on exit and access to exit doors the required
More informationHigh-Rise Fire Sample Scenario with Stairwell Pressurization by Steve Kerber Fire Engineering Simulation
High-Rise Fire Sample Scenario with Stairwell Pressurization by Steve Kerber Fire Engineering Simulation This sample simulation utilizes multiple points of view to accomplish fire knockdown and stairwell
More informationSecondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements
Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements Alberta Building Code 2006 Alberta Building Code 2014 Change 9.37.2. Construction 9.37.2.1. Height of Rooms and Spaces 1) The
More informationPUBLICATION EFFICIENT EVACUATION METHODS IN TALL BUILDINGS
PUBLICATION EFFICIENT EVACUATION METHODS IN TALL BUILDINGS Marja-Liisa Siikonen E-mail: marja.liisa-siikonen@kone.com Henri Hakonen E-mail: henri.hakonen@kone.com This paper was presented at MILAN, the
More informationBUILDING CODE COMMISSION
Ruling No. 09-03-1215 Application No. B-2009-01 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Sentences 3.3.1.3.(9)
More informationContents: Notes: Application:
The West of England (WoE) local authorities' standards for licensed Hos in Multiple Occupation (HMOs) under Part 2 Housing Act 2004 (3 rd January 2013) Contents: i. Amenity standards for HMOs or parts
More informationContents: Notes: Application:
The West of England (WoE) local authorities' standards for licensed Hos in Multiple Occupation (HMOs) under Part 2 of the Housing Act 2004 (8th March 2018) Contents: Notes: 1. Amenity standards for HMOs
More informationHMO LICENSING STANDARDS FOR FACILITIES PROVIDED FOR SHARED AND EXCLUSIVE USE
Personal washing and toilet facilities HMO LICENSING STANDARDS FOR FACILITIES PROVIDED FOR SHARED AND EXCLUSIVE USE Location, size and condition All facilities should be located in rooms of an adequate
More informationPROPERTY CONDITION CHECK LIST FOR A LICENCED HMO
PROPERTY CONDITION CHECK LIST FOR A LICENCED HMO Address of property:... Inspection date:... No of bedrooms desired:... 1. Minimum Bedroom Sizes Depending On Communal Space Bedrooms If the property has
More informationEmergency Evacuation and Stairwell Signage
Orange County Fire Authority Community Risk Reduction 1 Fire Authority Road, Building A, Irvine, CA. 92602 www.ocfa.org 714-573-6100 Emergency Evacuation and Stairwell Signage Guideline E-02 Serving the
More informationERRATA AND REVISIONS MEASURES FOR FIRE SAFETY IN HIGH BUILDINGS
National Research Council Canada Conseil national de recherches Canada Associate Committee on the NATIONAL BUILDING CODE of Canada Comite associe du CODE NATIONAL DU BATIMENT du Canada Ottawa ERRATA AND
More informationDESIGN OF FLOW AND HOLDING CAPACITY OF ESCAPE ROUTES IN BUILDINGS
DESIGN OF FLOW AND HOLDING CAPACITY OF ESCAPE ROUTES IN BUILDINGS Prof. Peter H.E. van de Leur MSc. DGMR Consulting Engineers and University of Ghent Dr. Nico P.M. Scholten PhD. Foundation Expert centre
More informationMINIMUM HMO & HOSTEL STANDARDS
London Borough of Camden MINIMUM HMO & HOSTEL STANDARDS Housing Act 2004 These are the minimum standards that the London Borough of Camden will apply to houses in multiple occupation (HMOs). All HMOs in
More informationNet lettable area (NLA) is used to calculate tenancy areas in: office buildings office and business parks.
Net lettable areas Different types of buildings have different definitions of what is included in the building areas. The Property Council of Australia (PCA) has developed an industry standard for measuring
More informationTiny House on Wheels A Tiny House
TINY HOUSES November 2018 The term Tiny House means different things to different people. Some people use the term to refer to a Tiny House on Wheels while others refer to a smaller version of a detached
More informationAPPLICATION FOR CERTIFICATE OF ACCEPTANCE Section 97 Building Act 2004
FORM 8 APPLICATION FOR CERTIFICATE OF ACCEPTANCE Section 97 Building Act 2004 Basic instructions on how to apply are at the end of this form. For additional help go to: huttcity.govt.nz/apply-online Adobe
More informationESCAPE ROUTES DESIGN SPECIFICATION ANALYSIS FOR OPTIMUM EVACUATION OF 200 PEOPLE IN HIGH-RISE BUILDING
Jurnal Alam Bina, Jilid 13: No.4, 2008. ESCAPE ROUTES DESIGN SPECIFICATION ANALYSIS FOR OPTIMUM EVACUATION OF 200 PEOPLE IN HIGH-RISE BUILDING Yahya Mohamad Yatim Department of Quantity Survey, Faculty
More informationThe UBBL Applications of Fire Safety Provisions
The UBBL Applications of Fire Safety Provisions Atriums Open Structures and Corridors Fire Appliance Access Ar Chong Lee Siong APAM MIFireE MIArbs PAM-IFEM SEMINAR 2016 ATRIUMS UBBL clause 137 UBBL clause
More informationDRS RWANDA STANDARD. Code of practice for fire safety. of building. Part 5: Exit requirements and personal hazard.
RWANDA STANDARD DRS 186-5 Seconde dition Code of practice for fire safety of building Part 5: Exit requirements and personal hazard Reference number DRS 186-5: 2018 RBS yyyy CD RS 186-5:2013 ii Error!
More informationPresentation By. Chris Poujol. Jeffery Rodriguez. James Rigley
Means of Egress Presentation By Chris Poujol Jeffery Rodriguez James Rigley Table of Contents I. Means of Egress Definition II. History III. NYC Building Code IV. General Requirements IX. Exit Signs X.
More informationPP Course # Instructor Information. Patrick Vandergriff 35 Cottonwood Canyon Road La Luz, NM
Instructor Information PP Course #15788 Patrick Vandergriff 35 Cottonwood Canyon Road La Luz, NM 88337 1-575-430-8752 pvandergriff@codeconsult.org 1 Detailing of Mixed Occupancy Structures within the 2018
More information2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS
2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS Section 1001 ADMINISTRATIVE 1001.1 General 1001.2 Alterations to existing means of egress 1001.3 Maintenance 1001.4 Fire safety and evacuation plans
More informationDisability Access Regulations
Disability Access Regulations The purpose of this note is to provide members with an overview of the regulatory requirements relating to disability access to premises. Disability Discrimination Act 1992
More informationNEPAL NATIONAL BUILDING CODE NBC 206: 2015
i NEPAL NATIONAL BUILDING CODE NBC 206: 2015 ARCHITECTURAL DESIGN REQUIREMENTS Government of Nepal Ministry of Urban Development Department of Urban Development and Building Construction Babar Mahal, Kathmandu,
More informationOccupants: Behaviour in Response to the High-rise Apartments Fire in Hiroshima City
FIRE AND MATERIALS Fire. Mater. 23, 297}303 (1999) Occupants: Behaviour in Response to the High-rise Apartments Fire in Hiroshima City A. Sekizawa *, M. Ebihara, H. Notake, K. Kubota, M. Nakano, Y. Ohmiya,
More information2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC.
2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC. October 23, 2018 Section 1001. Administration. See Section 107.2.3 for Egress Drawing
More informationDraft Access Code for Buildings (Section 1.3.)
Draft Access Code for Buildings (Section 1.3.) 10 Draft Access Code for Buildings Table of Contents PART A GENERAL PROVISIONS...13 Clause A1.1 Fire Safety...13 Clause A1.2 Definitions...13 Specification
More informationFLOOR AREA REPORT GUIDE
June 2, 2018 1 Document No. 3511600 1 FLOOR AREA REPORT and FLOOR AREA REFERENCE MODEL - INTRODUCTION A FLOOR AREA REPORT ( FAR ) is required by the BUILDING DEPARTMENT to confirm zoning compliance for
More information2012 IBC Mixed Occupancies
Accreditation 2012 IBC Mixed Occupancies Based on the 2012 International Building Code (IBC ) The International Code Council has been accredited as an Authorized Provider by the International Association
More informationSPECIFIC GUIDANCE FOR A BEDSIT TYPE HOUSE IN MULTIPLE OCCUPATION (HMO)
Document A SPECIFIC GUIDANCE FOR A BEDSIT TYPE HOUSE IN MULTIPLE OCCUPATION (HMO) This document is intended as a specific guide for persons who own, manage or control Bedsit type - houses in multiple occupations
More informationMisawa Building (Hostess Bar "Raku Raku")
Building Name Address Use (as per FSA Annexed Table 1) Date and Time of Incident Structure and Stories Area Extent of Damage (Damaged Area/ Total Area) No. of Casualties Misawa Building (Hostess Bar "Raku
More informationCITY OF MOUNT PLEASANT ORDINANCE NO. 1017
CITY OF MOUNT PLEASANT ORDINANCE NO. 1017 AN ORDINANCE TO AMEND SECTIONS 152.004 AND 152.007 OF THE CODE OF ORDINANCES FOR THE CITY OF MOUNT PLEASANT TO ADOPT PROVISIONS OF THE 2012 INTERNATIONAL PROPERTY
More informationHOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist
: Initial Inspection Annual Inspection Re-Inspection Pass Tenant Name: Address: Number of Bedrooms: Build : Housing Type: Single Family Residence Duplex Low Rise(2-4 stories) High Rise(5 or More Stories)
More informationUnderstanding human behaviour in stressful situations
Understanding human behaviour in stressful situations Proulx, G. NRCC-45394 A version of this paper is published in / Une version de ce document se trouve dans: Workshop to Identify Innovative Research
More informationAnalyzing Ventilation Effects of Different Apartment Styles by CFD
Analyzing Ventilation Effects of Different Apartment Styles by CFD Xiaodong Li Lina Wang Zhixing Ye Associate Professor School of Municipal & Environmental Engineering, Harbin Institute of Technology,
More informationEquality and Access Plan The Abbey School, Reading
Equality and Access Plan 2017-2020 The Abbey School, Reading , Reading Accessibility Plan Scope The School recognises the benefits of a diverse School Community, with individuals who value one another
More informationBrighton & Hove City Council. Standards for Licensable Houses in Multiple Occupation
Brighton & Hove City Council Standards for Licensable Houses in Multiple Occupation 1 Standards for Licensing of Houses of Multiple Occupation These are the standards for deciding the suitability for occupation
More informationSample Questions for Paper 1 Statutory Controls in Building Works
1. One of the purposes of usable floor space in building plan submissions is for determining Ans. : A A. the area of the refuse chamber. B. the provision of sanitary fitments. C. the area within a flat,
More informationHigh Street Epping
Submission to Kaufland Stores in Victoria Advisory Committee (Epping) 592-694 High Street Epping Prepared by Akemi Traill, Senior Town Planner of Tract Consultants Pty Ltd 6 December 2018 1 Epping Hub
More informationTHE PREMISES STANDARDS
GUIDELINE ON THE APPLICATION OF THE PREMISES STANDARDS Legal status of this Guideline This Guideline has been developed by the Australian Human Rights Commission to assist building professionals and those
More informationApproved Document B Single stairways - Residential uses Part 1
Approved Document B 2006 - Single stairways - Residential uses Part 1 The three most significant changes for small fore storey single stairway residential buildings in the new Approved Document B 2006
More informationCompliance Schedules and Building Warrants of Fitness
Compliance Schedules and Building Warrants of Fitness What you should know. Contents About this pamphlet 1 What is a Compliance Schedule? 2 When is a Compliance Schedule required? 2 What is a Building
More informationDesign and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison
Design and Access Statement Volume III Part 6 of 9 Plot A1 May 2018 Allies and Morrison 6 OFFICE 135 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018 6.1 Introduction The office development
More informationA STUDY ON AN ESTIMATION METHOD OF THE EFFECTIVE OPENING AREA OF ENTRANCE DOORS AND WINTER AIRFLOW RATE INTO ATRIUM BUILDINGS
A STUDY ON AN ESTIMATION METHOD OF THE EFFECTIVE OPENING AREA OF ENTRANCE DOORS AND WINTER AIRFLOW RATE INTO ATRIUM BUILDINGS Kimiko Kohri Graduate School of Engineering, Utsunomiya University Utsunomiya
More informationFLOOR AND ROOM NUMBERING GUIDELINES
FLOOR AND ROOM NUMBERING GUIDELINES November 2018 GENERAL: These numbering conventions have been developed and should be followed throughout University of Hawaii at Manoa controlled facilities for the
More informationAppeal Decision Report
Appeal Decision Report 19 July 2017-21 August 2017 MAIDENHEAD Appeal Ref.: 16/60106/PRPA Planning Ref.: 16/02649/TPO PIns Ref.: ENV/3161802 Mrs Caroline Grant 2 Endfield Place Maidenhead SL6 4NZ Decision
More informationUNIVERSITY OF HONG KONG LIBRARY. This book was received in accordance with the Books Registration Ordinance Section 4
UNIVERSITY OF HONG KONG LIBRARY This book was received in accordance with the Books Registration Ordinance Section 4 CODE OF PRACTICE ON PROVISION OF MEANS OF ESCAPE IN CASE OF FIRE AND ALLIED REQUIREMENTS
More information1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System
Scope of Services Provided FND offers a comprehensive range of engineering consultation services in a wide spectrum of electrical & mechanical fields. We serve clients in the commercial, institutional,
More informationE1-12: Final Decision AS
BCAC COMPILATION OF GROUP A E1-12: Final Decision AS 202, 1006 (New), 1007 (New), 1014.3, 1015, 1020.1, 1021 (IFC [B] 1006 (New), 1007 (New), 1014.3, 1015, 1020.1, 1021) Proponent: Charles S. Bajnai, Chesterfield
More informationThe effect of the wind speed velocity on the stack pressure in medium-rise buildings in cold region of China
ARTICLE IN PRESS Building and Environment 42 (27) 181 188 www.elsevier.com/locate/buildenv The effect of the wind speed velocity on the stack pressure in medium-rise buildings in cold region of China Maatouk
More informationForm 6 - Application for Code Compliance Certificate
Private Bag 9023 Whangarei 0148 New Zealand T: 09 430 4200 0800 WDC INFO 0800 932 463 F: 09 438 7632 W: www.wdc.govt.nz E: mailroom@wdc.govt.nz Form 6 - Application for Code Compliance Certificate Section
More informationHIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL
HIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL Only a person authorized by the Los Angeles Fire Department shall approve High-rise Building Inventory Forms. All individuals authorized
More informationStudent Residential Accommodation Standard Design Guidelines August 2017
Student Residential Accommodation Standard Design Guidelines August 2017 Revision 05 1. Introduction 1.1. Objective The University s objective is to provide residential undergraduate student accommodation
More informationVILLAGE OF WEST HAVERSTRAW BUILDING DEPARTMENT RENTAL PROPERTY CODE 186. In-Person: Property Address City Zip
VILLAGE OF WEST HAVERSTRAW BUILDING DEPARTMENT RENTAL PROPERTY CODE 186 Rental Property Registration Form FOR INTERNAL USE ONLY Permit No. Rec d Date Initials Exp. Date Initials Approved Denied Instructions:
More informationCHAPTER 4 LIGHT, VENTILATION & OCCUPANCY LIMITATIONS
CHAPTER 4 LIGHT, VENTILATION & OCCUPANCY LIMITATIONS Chapter 4 establishes the minimum criteria for light and ventilation and identifies occupancy limitations. * Indicates code is still under review for
More informationGuidelines to the Disability Standards for Access to Premises (Buildings) 200X
to the Disability Standards for Access to Premises (Buildings) 200X Part 1 General Division 1.1 1.1 Name of These are the Disability Access to Premises (Buildings) 200X. 1.2 Purpose of The purpose of these
More informationOBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS
OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS A 2008 City Code amendment requires the owners of all rental dwelling units in the city to have a certificate of occupancy (CO) before
More information1.0 Introduction. November 9, 2017
November 9, 2017 Andrew Bone, Planner III Regional Planning Policy and Strategic Initiatives Halifax Regional Municipality 40 Alderney Drive Dartmouth, NS, B2Y 2N5 Subject: Application to amend the Bedford
More informationA Guide to Secondary Suites
A Guide to Secondary Suites Introduction Building on the Saanich Official Community Plan (OCP) that supported secondary suites as a form of affordable housing, studies were undertaken in 2009 and in 2014.
More informationAPPLICATION FOR CERTIFICATE OF ACCEPTANCE (FORM 8) Section 97, Building Act 2004
APPLICATION FOR CERTIFICATE OF ACCEPTANCE (FORM 8) Section 97, Building Act 2004 FOR OFFICE USE Project No.: Date Received: 1. THE BUILDING Street address of building:............. [If no street address
More informationApartment Lifts There are individual lifts dedicated to the Building. Security lifts to all levels including car park.
Atrium Building components The major components of the building consist of the following: Entry lobby The entry lobby will consist of paint finish walls and ceilings, tiled externally and internally, glass
More informationThe Impact of Balconies on Wind Induced Ventilation of Singlesided Naturally Ventilated Multi-storey Apartment
The Impact of Balconies on Wind Induced Ventilation of Singlesided Naturally Ventilated Multi-storey Apartment M. F. MOHAMED 1, D. PRASAD 1, S. KING 1, K. HIROTA 2 1 Faculty of the Built Environment, University
More informationHousing Quality Standards 24 CFR
Housing Quality Standards 24 CFR 982.401 Subpart I--Dwelling Unit: Housing Quality Standards, Subsidy Standards, Inspection and Maintenance 982.401 Housing quality standards (HQS). 982.402 Subsidy standards.
More informationGreat South Road
For Lease 660 670 Great South Road Greenlane 1 Central Park January 2017 For Lease 660-670 Great South Road, Greenlane One Central Park 393 sqm level 4, (top floor) Building 3 347 sqm ground 450 sqm level
More informationTOURIST TRAFFIC ACTS Registration and Renewal of Registration Regulations for Hotels 2016
TOURIST TRAFFIC ACTS 1939-2011 Registration and Renewal of Registration Regulations for Hotels 2016 1 FÁILTE IRELAND in accordance with the powers conferred on it by Section 20 of the Tourist Traffic Acts
More informationEVALUATION OF FIRE SERVICE POSITIVE PRESSURE VENTILATION TACTICS ON HIGH-RISE BUILDINGS
EVALUATION OF FIRE SERVICE POSITIVE PRESSURE VENTILATION TACTICS ON HIGH-RISE BUILDINGS Stephen Kerber Building and Fire Research Laboratory National Institute of Standards and Technology Gaithersburg,
More informationIDP REPORT EDAN - CHELSEA WARD ECW 0021 STUDENT NUMBER :
IDP REPORT EDAN - CHELSEA WARD ECW 0021 STUDENT NUMBER : 11025151 CONTENT Introduction... 02 01 CULTURAL CONTEXT... 03 - Site context... 04 - Existing floor plans... 05 - Proposed floor plans... 06 - Long
More informationARTICLE 15 - PLANNED UNIT DEVELOPMENT
Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned
More informationProposed Variation No. 5 (Student Accommodation) to the Cork City Development Plan April 16 th 2018
Proposed Variation No. 5 (Student Accommodation) to the Cork City Development Plan 2015-2021 April 16 th 2018 1 Proposed Variation No. 5 (Student Accommodation) The proposed variation consists of the following
More informationResidence Commodore
www.rentexclusive.be Residence Commodore Guidelines Belgian Coast Holiday accommodations for rent www.rentexclusive.be Residence Commodore Ostend 4 oktober 2012, Page 1 Bylaws 1. In the building it s strictly
More informationASPECTS OF A 3D CADASTRE IN THE NEW CITY OF MODI IN, ISRAEL
ASPECTS OF A 3D CADASTRE IN THE NEW CITY OF MODI IN, ISRAEL ARMI GRINSTEIN Armi Grinstein - Geodetic Engineering Ltd. Israel ABSTRACT 3 Dimensional Cadastre is a relatively new sphere in property registration,
More informationZoning Amendment. Public Meeting: February 7, 2018
Zoning Amendment Public Meeting: February 7, 2018 Application: Applicant: D14-01/18 HMAT Homes Inc Location of Subject Lands Lot 108 and Part of Lots 107 and 109, Plan 30, Bracebridge Ward of the Town
More informationApplication for code compliance certificate
Application for code compliance certificate Section 92, Building Act 2004, Form 6 - Building (Forms) Regulations 2004 About this form A Code Compliance Certificate is the Building Consent Authority (Council)
More informationHousing (Standards for Rented Houses) Regulations, 2008 S.I. No 534 of 2008 Technical Guidance Document
Housing (Standards for Rented Houses) Regulations, 2008 S.I. No 534 of 2008 Technical Guidance Document Contents Page Part A Introduction 1 Application/Exemptions 2 Transitional Arrangements 3 Tenants
More informationAccess Statement for Stoney Steps Flat 5 Ullswater Court Inn on the Lake Glenridding
Introduction Access Statement for Stoney Steps Flat 5 Ullswater Court Inn on the Lake Glenridding Stoney Steps is a small self catering holiday let, situated in a converted outhouse as part of The Inn
More informationthe little GREEN BOOK FIRST EDITION, 2018 Compiled by the Student Bar Association Housing Committee at Vermont Law School
the little GREEN BOOK FIRST EDITION, 2018 Compiled by the Student Bar Association Housing Committee at Vermont Law School HOW TO USE THIS GUIDE The first part of this guide is organized alphabetically
More informationINFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS
INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS Prepared by: Community Development Standards Branch Town of Innisfil www.innisfil.ca June 2016 Contents 1. Introduction... 1 2. Ontario Building
More informationLexisNexis Montana Code Annotated > Title 70 Property > Chapter 23 Unit Ownership Act Condominiums. Chapter 23 Unit Ownership Act Condominiums
Title 70, Ch. 23, MCA Note > Title 70 Property > Chapter 23 Unit Ownership Act Condominiums Chapter 23 Unit Ownership Act Condominiums Title 70, Ch. 23, Pt. 1, MCA Note > Title 70 Property > Chapter 23
More informationêéëé~êåü=üáöüäáöüí Code Requirements and Costs of Incorporating Accessory Apartments in Houses
êéëé~êåü=üáöüäáöüí May 2009 Technical Series 09-102 Code Requirements and Costs of Incorporating Accessory Apartments in Houses áåíêççìåíáçå Canada Mortgage and Housing Corporation commissioned a study
More informationStandards for Houses in Multiple Occupation
Standards for Houses in Multiple Occupation A guide to understanding the basic standards for Houses in Multiple Occupation September 2017 0 www.portsmouth.gov.uk Introduction This document has been produced
More information2012 IBC Means of Egress
12/11/2017 Introductions 2012 IBC Means of Egress Based on the 2012 International Building Code (IBC ) Instructor introduction Exits Cell phones & pagers Schedule & breaks Student introductions 2 Goal
More informationNATIONAL GALLERY OF ART EAST BUILDING RENOVATION & EXPANSION
NATIONAL GALLERY OF ART EAST BUILDING RENOVATION & EXPANSION BUILDING HISTORY The National Gallery of Art is one of the world s leading art museums with a significant collection of American and European
More informationFIREFIGHTING PROCEDURES VOLUME 1, BOOK 1, ADDENDUM 3 September 4, 2012 WIND IMPACTED FIRES IN FIREPROOF MULTIPLE DWELLINGS 1.
WIND IMPACTED FIRES IN FIREPROOF MULTIPLE DWELLINGS VOLUME 1, BOOK 1, ADDENDUM 3 September 4, 2012 1. INTRODUCTION 1.1 A wind impacted fire may be one of the most dangerous operations members of the FDNY
More information4. HOUSES IN MULTIPLE OCCUPATION (HMOs) AND LICENSABLE PROPERTIES
4. HOUSES IN MULTIPLE OCCUPATION (HMOs) AND LICENSABLE PROPERTIES Section 4 Houses in multiple occupation (HMOs) and licensable properties 4 Houses in multiple occupation [HMOs] and licensable properties
More informationRT-6 District Schedule
District Schedule 1 Intent The intent of this Schedule is to encourage the retention, renovation and restoration of existing residential buildings which maintain the historic architectural style and building
More informationPROJECT TYPE MULTI-RESIDENTIAL PROJECT ADDRESS CHAPEL STREET SOUTH YARRA, VICTORIA AUSTRALIA
11033 PROJECT TYPE MULTI-RESIDENTIAL PROJECT ADDRESS 681-709 CHAPEL STREET SOUTH YARRA, VICTORIA AUSTRALIA AWARDS 2015 AUSTRALIAN INSTITUTE OF ARCHITECTS AWARDS: VICTORIA _SHORTLISTED (RESIDENTIAL - MULTIPLE
More informationAttic Floor Bedrooms 1 & 2 Family Dwellings
Habitable Room Definition (2015 MN Residential Code R202) A space in a building for living, sleeping, eating or cooking is considered a habitable space. Bathrooms, toilet rooms, closets, halls, storage
More informationB&NES Additional HMO Licensing Conditions
B&NES Additional HMO Licensing Conditions *The Bath and North East Somerset HMO Licensing Standards referred to in this document are available separately Schedule 1 Mandatory conditions 1. If gas is supplied
More informationDESIGN, ACCESS & PLANNING STATEMENT
(MADRON STREET) LONDON SE1 5UB DESIGN, ACCESS & PLANNING STATEMENT The architectural response for the site has been designed with regard to the following: The New Southwark Plan The London Plan: Spatial
More informationCHANGE OF USE FROM A RESIDENTIAL DWELLING TO HOUSE IN MULTIPLE OCCUPANCY WITH 7 LETTABLE ROOMS (RETROSPECTIVE)
Application Number: 10/00433/FUL CHANGE OF USE FROM A RESIDENTIAL DWELLING TO HOUSE IN MULTIPLE OCCUPANCY WITH 7 LETTABLE ROOMS (RETROSPECTIVE) AT: 5 Rowton Heath, Oakhill, Milton Keynes FOR: Mr Michael
More information