SCHEDULE OF EASEMENTS

Similar documents
SCHEDULE OF EASEMENTS

Plan: Plan of Subdivision of Lot 6 DP covered by Subdivision Certificate No. Full name and address of the owner of the land:

This is the Schedule referred to in Easement in Gross in Form 9 dated the day of 200. Title Reference:

Plan: Full name and address of the owner of the land:

Build Over Easement Guidelines

Title Reference [Title Reference] In this Easement unless the context or subject matter require otherwise:

Plan: Plan of Subdivision of Lots 101 & 102 DP and Lot 4 DP covered by Subdivision Certificate No.

Deed of Agreement for Easement [in relation to Connection Contract Contestable ASP/1 Connection]

TEMPORARY CONSTRUCTION EASEMENT JEA SEWER SYSTEM CUSTOMER OWNED, OPERATED AND MAINTAINED

City of Melissa, Texas Plat Dedication Language

Plan: Plan of Subdivision of Lot 5 DP and easements over Lot 6 DP covered by Subdivision Certificate No.

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

EASEMENT AGREEMENT (Distributor Performance Non-Exclusive)

GENESIS PIPELINE CANADA LIMITED AGREEMENT FOR EASEMENT PROVINCE OF ONTARIO

APPENDIX LIST. 4. Proposed resolution for privileges for marina berth owners (clause 36.6)

Please note that this is the only official copy we will issue. We will not issue a paper official copy.

SCHEDULE U : EASEMENT FOR PARKING TERMS OF INSTRUMENT PART 2

Deed of Agreement for Lease [in relation to Connection Contract Contestable ASP/1 Connection]

Plan: Plan of Subdivision of Lot 6 DP covered by Subdivision Certificate No. Full name and address of the owner of the land:

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

Recitals. WHEREAS, Grantor owns real property ("Property"), under which Improvements (as defined in Section 1 below) will pass; and

Full name and address of the owner of the SIDEHILL PTY LIMITED Land: ACN David Street ALBURY NSW 2640.

Dated the day of 201

UTILITY RIGHT-OF-WAY AND EASEMENT

PERMANENT EASEMENT AGREEMENT. good and valuable consideration, the sufficiency and receipt of which is hereby acknowledged, The Esther Harrison

Explanation of Permanent Stormwater Management Facilities Maintenance Agreement

CHAPTER 2 RELATED DOCUMENTS AND FORMS

Please note that this is the only official copy we will issue. We will not issue a paper official copy.

DEED OF OPTION DOUGLAS PAISLEY & EMERY SOLICITORS 46 LANGSTON PLACE EPPING NSW 2121 (PO BOX 215, EPPING NSW 1710) DX 4404 EPPING

RESOLUTION NUMBER 2017-

SPECIAL SERVICE AREA DISCLOSURE

POWER OF ATTORNEY. UNITED OVERSEAS BANK (MALAYSIA) BHD. (Company No K) LEG-066 PA(Contractor) (02/16)

CHAPTER 154 RIGHTS OF WAY

PERMANENT EASEMENT AGREEMENT

TEMPORARY CONSTRUCTION EASEMENT AND AGREEMENT JEA WATER AND WASTEWATER SYSTEMS CUSTOMER OWNED, OPERATED AND MAINTAINED

Bahama Reef Yacht & Country Club Section I

EASEMENT DEED. 2) Thence N 60º12 36 W through said Parcel 1 a distance of Two Hundred Ninety- Five and 97/100 (295.97) feet to a point;

AGREEMENT FOR TEMPORARY CONSTRUCTION EASEMENT AND PERMANENT SEWER UTILITY EASEMENT

ANNEXURE A. Referred to in the Contract For Sale of Land by Offer and Acceptance. made between as Buyer

Address of Property : 2 to 7, 12, 14 to 18, 28 to 33, 38 to 43, 91, 92, 93, 94, 95 and 96 Barnum Court, Swindon

There is no application or official search pending against this title. This register describes the land and estate comprised in the title.

INSTRUCTIONS Grant of Easement Form

Township of Collier 2418 Hilltop Road Presto, PA 15142

Condominium Unit Requirements.

Annexure Schedule 2 COVENANT 1

PIPELINE RIGHT-OF-WAY EASEMENT

Please note that this is the only official copy we will issue. We will not issue a paper official copy.

SUBDIVISION AND DEVELOPMENT STANDARDS BYLAW. Date: Monday, April 27, Annacis Room. 4:30-4:45 pm

Regional District of Central Kootenay Subdivision Bylaw No. 2159, 2011

MEMORANDUM OF ENCUMBRANCE

Covenant A relating to Stage 7 Riemore Downs, Tamborine Page 1 of 8 TABLE OF CONTENTS INTRODUCTION 3 1. WATER SUPPLY 3 2.

GUIDELINES FOR BUILD OVERS

WENTWORTH PHASE 1. RESTRICTIVE COVENANT AND EASEMENT Pursuant to Sections 48(1) and 68(1) of the Land Titles Act, Alberta

DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT

Annexure Schedule 2 COVENANT 1

Subdivision By-law No. 5208

ARTICLE 13 CONDOMINIUM REGULATIONS

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570)

Disclaimer. N: v1

Upper Bern Township, Berks County, Pennsylvania Street Occupancy Permit Application

STANDARDIZED LEGAL DESCRIPTIONS AND EXHIBITS

Contract for the sale and purchase of land edition TERM MEANING OF TERM NSW Duty: vendor s agent Celestino Realty Pty Limited ACN

APPENDIX 7 SPECIAL NOTES FOR PLATS AND CONSTRUCTION PLANS

SUBDIVISION CHECKLIST GREEN TREE BOROUGH Green Tree Planning Commission 10 West Manilla Avenue Pittsburgh, PA

: Land on the east side of Ashford Road, Sellindge, Ashford

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

See Exhibit "A", attached hereto, incorporated herein, and by this reference made a part hereof.

ANNEXURE A. Special Conditions

LETTER TO COMPANY - DRAFT CITY OF LONDON LAW SOCIETY LAND LAW COMMITTEE CERTIFICATE OF TITLE (7 TH EDITION 2016 UPDATE)

: Cleves, Manor Drive, Sutton Coldfield (B73 6ER)

APPENDIX C STANDARD FORMS OF LEGAL AGREEMENT

1483 Gin Gin Rd, Sharon QLD 4670

Town of Penetanguishene APPLICATION FOR SITE PLAN APPROVAL

Contract for the sale of land 2005 edition MEANING OF TERM. Vendor s agent. Vendor s Solicitor Fax. Folio Identifier

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

AMENDED DEED OF CONSERVATION EASEMENT

Please note that this is the only official copy we will issue. We will not issue a paper official copy.

TENANCY AGREEMENT (FIXED TERM)

DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS HICKORY NUT OF WILDEWOOD ASSOCIATION, INC.

This register describes the land and estate comprised in the title.

CERTIFICATE OF APPROVAL OF COUNTY COMMISSION

RESTRICTIVE COVENANT THIS RESTRICTIVE COENANT MADE THE DAY OF, 2017.

FINAL PLAN CHECKLIST

Exhibit E. Form of Release Deed for Outfall Easement. RELEASE DEED OF EASEMENT [Draw 7 Park 60 Drainage Easement]

CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS

: 25 Manor Place and Manor Place Depot, Penrose Street, London

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009

PERMANENT EASEMENT AGREEMENT

Preliminary Subdivision Application (Major) (Four (4) lots or more)

ORDINANCE NO. 782 AN ORDINANCE REGULATING THE USE AND OCCUPANCY OF THE RIGHT-OF-WAY OF THE CITY OF WASHINGTON, KANSAS.

SKOKOMISH PUBLIC SEWER CONNECTION ORDINANCE TABLE OF CONTENTS

Title Number : LN This title is dealt with by Land Registry, Telford Office.

SWIMMING POOL PERMIT APPLICATION PACKET

Title Number : NGL This title is dealt with by Land Registry Swansea Office.

Dallas Sloan General Manager Barron Area Phone: (715) Toll Free: Fax: (715) NEW SERVICE PROCESS

HOLDING TANK AGREEMENT

DEED OF EASEMENT AND AGREEMENT Forest Conservation Easement

LAND (AMENDMENT) ACT (NO. 2) 1991

APPLICATION FOR DEPOSIT OF A PLAN OF DIVISION (Pursuant to Part 19AB of the Real Property Act 1886)

LINE EXTENSION APPLICATION AGREEMENT PROJECT: LINK#

Transcription:

NOTE: THE SCHEDULE MUST BE SIGNED BY THE OWNERS & MORTGAGEES OF THE LAND AFFECTED. SIGNATURES MUST BE ATTESTED. PAGE 1 OF 6 PAGES EASEMENTS AND PROFITS Each lot on the plan is together with:- (1) such rights of drainage over the drainage easements shown on the plan (if any) as may be necessary to drain the stormwater and other surplus water from such lot; and (2) any easements or profits a prendre described hereunder. Each lot on the plan is subject to:- (1) such rights of drainage over the drainage easements shown on the plan (if any) as passing through such lot as may be necessary to drain the stormwater and other surplus water from any other lot on the plan; and (2) any easements or profits a prendre described hereunder. The direction of the flow of water through the drainage easements shown on the plan is indicated by arrows. Lot 3 is: Subject To a pipeline and services easement in gross (in favour of TasWater) over the land marked PIPELINE & Lot 4 is: Subject To a pipeline and services easement in gross (in favour of TasWater) over the land marked PIPELINE & Lot 5 is: (USE ANNEXURE PAGES FOR CONTINUATION) SUBDIVIDER: MALWOOD P/L FOLIO REF: 73690/50 SOLICITOR PLAN SEALED BY: CLARENCE CITY COUNCIL DATE: SD 2011/30... & REFERENCE: MURDOCH CLARKE REF NO. Council Delegate NOTE: The Council Delegate must sign the Certificate for the purposes of identification.

PAGE 2 OF 6 PAGES Lot 6 is: Lot 7 is: DRAINAGE EASEMENT VARIABLE WIDTH AND OVER THE LAND MARKED PIPELINE AND DRAINAGE EASEMENT 3.00 WIDE passing through that lot on the plan; DRAINAGE EASEMENT VARIABLE WIDTH AND OVER THE LAND MARKED PIPELINE AND DRAINAGE EASEMENT 3.00 WIDE ( the Easement Land ) passing through that lot on the plan. Lot 8 is: DRAINAGE EASEMENT 4.00 WIDE AND VARIABLE WIDTH passing through that lot on the plan; DRAINAGE EASEMENT 4.00 WIDE AND VARIABLE WIDTH ( the Easement Land ) passing through that lot on the plan. Lot 9 is: DRAINAGE EASEMENT 4.00 WIDE AND VARIABLE WIDTH passing through that lot on the plan; DRAINAGE EASEMENT 4.00 WIDE AND VARIABLE WIDTH ( the Easement Land ) passing through that lot on the plan.

PAGE 3 OF 6 PAGES Each lot on the plan is: TOGETHER WITH a right of drainage over the land marked DRAINAGE EASEMENT 3.00 WIDE on the plan. COVENANTS The owners of lots 3-12, on the plan covenant with the Vendors, Clarence City Council and the owners for the time being of every other lot shown on the plan to the intent that the burden of this covenant may run with and bind the covenantors lot and every part thereof and that the benefit thereof shall be annexed to and devolved with each and every lot shown on the plan and with the Clarence City Council to observe the following stipulation - 1. Not to develop a habitable building on such lot unless it is located and constructed in accordance with BAL 19 in AS 3959-2009 Construction of Buildings in Bushfire Prone Areas. FENCING PROVISION In respect to the lots on the plan (except lots 100, 101 and 102) the Vendor (Malwood Pty Ltd) shall not be required to fence. INTERPRETATION TasWater means the Tasmanian Water and Sewerage Corporation Pty Limited its successors & assigns Pipeline and services easement means- THE FULL RIGHT AND LIBERTY for the TasWater at all times to: (1) enter and remain upon the Easement Land with or without employees, contractors, agents and all other persons duly authorised by it and with or without machinery, vehicles, plant and equipment; (2) investigate, take soil, rock and other samples, survey, open and break up and excavate the Easement Land for any purpose or activity that TasWater is authorised to do or undertake; (3) install, retain, operate, modify, relocate, maintain, inspect, cleanse and repair the Infrastructure; (4) remove and replace the Infrastructure; (5) run and pass sewage, water and electricity through and along the Infrastructure; (6) do all works reasonably required in connection with such activities or as may be authorised or required by any law: (a) without doing unnecessary damage to the Easement Land; and

PAGE 4 OF 6 PAGES (b) leaving the Easement Land in a clean and tidy condition; and (7) if the Easement Land is not directly accessible from a highway, then for the purpose of undertaking any of the preceding activities TasWater may with or without employees, contractors, agents and all other persons authorised by it, and with or without machinery, vehicles, plant and equipment enter the Lot from the highway at any then existing vehicle entry and cross the Lot to the Easement Land; and (8) use the Easement Land as a right of carriageway for the purpose of undertaking any of the preceding purposes on other land, TasWater reinstating any damage that it causes in doing so to any boundary fence of the Lot PROVIDED ALWAYS THAT: (1) The registered proprietors of the Lot in the folio of the Register ( the Owner ) must not without the written consent of TasWater first had and obtained (which cannot be unreasonably refused) and only in compliance with any conditions which form the consent: (a) alter, excavate, plough, drill or otherwise penetrate the ground level of the Easement Land; (b) install, erect or plant any building, structure, fence, pit, well, footing, pipeline, paving, tree, shrub or other object on or in the Easement Land; (c) remove any thing that supports, protects or covers any Infrastructure on or in the Easement Land; (d) do anything which will or might damage or contribute to damage to any of the Infrastructure on or in the Easement Land; (e) in any way prevent or interfere with the proper exercise and benefit of the Easement Land by TasWater or its employees, contractors, agents and all other persons duly authorised by it; or (f) permit or allow any action which the Owner must not do or acquiesce in that action. (2) TasWater is not required to fence any part of the Easement Land. (3) The Owner may erect a fence across the Easement Land at the boundaries of the Lot. (4) The Owner may erect a gate across any part of the Easement Land subject to these conditions: (a) the Owner must provide TasWater with a key to any lock which would prevent the opening of the gate; and (b) if the Owner does not provide TasWater with that key or the key provided does not fit the lock, TasWater may cut the lock from the gate. (5) If the Owner causes damage to any of the Infrastructure, the Owner is liable for the actual cost to TasWater of the repair of the Infrastructure damaged. (6) If the Owner fails to comply with any of the preceding conditions, without forfeiting any right of action,

PAGE 5 OF 6 PAGES damages or otherwise against the Owner, TasWater may: (a) reinstate the ground level of the Easement Land; or (b) remove from the Easement Land any building, structure, pit, well, footing, pipeline, paving, tree, shrub or other object; or (c) replace anything that supported, protected or covered the Infrastructure. Infrastructure means- Infrastructure owned or for which TasWater is responsible and includes but is not limited to- (a) sewer pipes and water pipes and associated valves; (b) telemetry and monitoring devices; (c) inspection and access pits; (d) power poles and lines, electrical wires, electrical cables and other conducting media (excluding telemetry and monitoring devices); (e) markers or signs indicating the location of the Easement Land, the Infrastructure or any warnings or restrictions with respect to the Easement Land or the Infrastructure; (f) anything reasonably required to support, protect or cover any of the Infrastructure; (g) any other infrastructure whether of a similar nature or not to the preceding which is reasonably required for the piping of sewage or water, or the running of electricity, through the Easement Land or monitoring or managing that activity; and (h) where the context permits, any part of the Infrastructure. EXECUTED by MALWOOD PTY LTD (ACN 009 ) 577 931) by its Attorney RODERICK EDWARD ) SCURRAH under Power of Attorney Registered ). No PA105357 and the said RODERICK EDWARD ) SCURRAH declares that he has received no ) revocation of the said Power of Attorney in the ) presence of: ) WITNESS:... FULL NAME: ADDRESS: OCCUPATION:

PAGE 6 OF 6 PAGES EXECUTED by MURDOCH CLARKE MORTGAGE ) MANAGEMENT LIMITED ACN 115 958 560 as ) Responsible Entity of the MURDOCH CLARKE ) MORTGAGE FUND ARSN 093 255 559 by its duly ) authorised Attorney PAUL KUZIS ) pursuant to Power of Attorney registered on 15 th January ) 2018 PA109270 having received no notice ) of the revocation thereof ) PAUL KUZIS WITNESS:... FULL NAME: ADDRESS: OCCUPATION: