TOWN OF MARKHAM ONTARIO

Similar documents
TARIFF OF FEES FOR PROCESSING OF PLANNING APPLICATIONS GENERAL TERMS

THE CORPORATION OF THE CITY OF MISSISSAUGA PLANNING ACT PROCESSING FEES AND CHARGES BY-LAW

Office Consolidation. Tariff of Fees By-Law with Respect To Planning and Other Municipal Applications By-Law 85-96

2018 DEVELOPMENT APPLICATION FEES Effective January 1, 2018

Committee of Adjustment Agenda

CONDOMINIUM APPLICATION GUIDE application for approval under Section 51 of the Planning Act, R.S.O. 1990

Town of Whitby By-law #

Development Application Type

EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER

Information related to the calculation of security for Subdivisions, Consent and Site Alteration Agreements can be found in Chapter 1.

PLEASE READ THE ENTIRE APPLICATION FORM PRIOR TO COMPLETING

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R) Town of Richmond Hill

Combined Zoning/Minor Variance and Boulevard Parking Agreement Exception

Frequently Asked Questions

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

THE CORPORATION OF THE CITY OF MISSISSAUGA ROAD OCCUPANCY, LOT GRADING, MUNICIPAL SERVICES PROTECTION DEPOSIT BY-LAW

ARTICLE 24 SITE PLAN REVIEW

MUNICIPAL DISTRICT OF ROCKY VIEW NO. 44 ELBOW VALLEY WEST DIRECT CONTROL DISTRICT BYLAW C

Committee of Adjustment Agenda

THE CORPORATION OF THE CITY OF ELLIOT LAKE. Consolidated Excerpt from Zoning By-law By-laws 05-5; 06-63; Shoreline Residential

Condominium Application Checklist

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R)-16002

SECTION 10.7 R-PUD (RESIDENTIAL PLANNED UNIT DEVELOPMENT) ZONE

Revised April 3/18 Sheet Effective April 3/18 B/L 6108

Policy and Standards for Public Local Residential Streets And Private Streets

For Vintages of Four Mile Creek Town of Niagara on the Lake, Ontario

CHARLES CITY COUNTY SITE PLAN ORDINANCE. This Ordinance shall be known as the Charles City County Site Plan Ordinance.

Consolidated as of May 14, 2012

Committee of Adjustment Agenda

FINAL DRAFT 12/1/16, Rev. to 7/18/17

SUBJECT: Official Plan and Zoning By-law Amendment Applications for 4853 Thomas Alton Boulevard

SUBDIVISION AND DEVELOPMENT STANDARDS BYLAW. Date: Monday, April 27, Annacis Room. 4:30-4:45 pm

TOTTENHAM SECONDARY PLAN

THE CITY OF ORILLIA DEVELOPMENT SERVICES AND ENGINEERING DEPARTMENT APPLICATION FOR SITE PLAN CONTROL

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Charter Township of Garfield Grand Traverse County

Staff Report for Council Public Meeting

APPLICATION FOR SITE PLAN CONTROL for applying under Section 41 of the Planning Act, R.S.O. 1990, CHAPTER P. 13 (as amended)

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

Kingston Road - Zoning Amendment and Draft Plan of Subdivision Applications - Preliminary Report

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT

THE CORPORATION OF THE CITY OF GUELPH. WHEREAS the City of Guelph will experience growth through development and redevelopment;

THE CORPORATION OF THE CITY OF MISSISSAUGA GENERAL FEES AND CHARGES BY-LAW

APPENDIX 2 PROCEDURES AND SUPPLEMENTARY INFORMATION

Application for Site Plan Agreement

DEVELOPMENT PLAN ORDINANCE

Section 7.22: Multifamily Assisted Housing in AA-30 Residential Zone (MAHZ) [Note: an additional line will be added to the Table in Article 3, 3.1.

SECTION 9 RESIDENTIAL R5 ZONE

Staff Report for Committee of the Whole Meeting

SCHEDULE A TO BYLAW Municipality of Hastings Highlands- Corporate Policies and Procedures DEPARTMENT: Planning

Application for Sketch Plan Review

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

BOUNDARY LINE ADJUSTMENT APPLICATION

and Members of Municipal Council

Article 7: Residential Land Use and Development Requirements

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

Guide to Minor Developments

THE CORPORATION OF THE MUNICIPALITY OF BLUEWATER BY - LAW NUMBER

8.5.1 R1, Single Detached Residential District

THE CORPORATION OF THE CITY OF MISSISSAUGA ROAD OCCUPANCY, LOT GRADING, MUNICIPAL SERVICES PROTECTION DEPOSIT BY-LAW

APPLICATION PROCEDURE

Greenfield Development Requirements

FREQUENTLY USED PLANNING & ZONING TERMS

Committee of Adjustment CONSENT INFORMATION/GUIDELINE The following is preliminary information only

ment a) Construction of Municipal Improvements including landscaping that will be on municipal property or rights-of-way.

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

Use permitted by: Right Special Exemption

Planning Department st Avenue East Kalispell, MT Phone: (406) Fax: (406)

SHADED AREAS FOR OFFICE USE ONLY. File No.: Date Entered in AMANDA: Entered By (Initials): Name Mailing Address & Postal Code Contact Information

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

Chapter Planned Residential Development Overlay

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

Hamilton Conservation Authority Watershed Planning and Engineering

MIDHURST DRAFT PLAN OF SUBDIVISION CONDITIONS OF APPROVAL SP-T-1004: Micks August 29, 2014August 2, 2017

ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

Guide to Preliminary Plans

Please read the entire application form prior to completing

Complete applications are due by 2:00 p.m. on the submission cut-off date.

PLANNED DEVELOPMENT DISTRICT STANDARDS. Cadence Site

Planning & Development. Background. Subject Properties

Committee of Adjustment Agenda

COMMITTEE OF ADJUSTMENT MINUTES

SUBDIVISION AND / OR LAND DEVELOPMENT SUBMITTAL REQUIREMENTS

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

(voice) (fax) (voice) (fax) Site Plan Review

Date Received: Application Complete? YES / NO

Chair and Members Planning and Economic Development Committee

MIDHURST DRAFT PLAN OF SUBDIVISION CONDITIONS OF APPROVAL SP-T-1005: D. Hickling August 29, 2014August 2, 2017

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

Committee of Adjustment Hearing Thursday, September 1, 2016 at 7 p.m. 225 East Beaver Creek Road, Richmond Hill, ON 1 st Floor (Council Chambers)

PUD Ordinance - Caravelle #2 of 2002

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

The purpose of this Chapter is to establish rules, regulations, standards and procedures for approval of subdivisions of land to promote and ensure:

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

ARTICLE 3 DEFINITIONS

Transcription:

TOWN OF MARKHAM ONTARIO BY-LAW 211-83 A BY-LAW TO PRESCRIBE A TARIFF OF FEES FOR THE PROCESSING OF PLANNING APPLICATIONS IN THE TOWN OF MARKHAM This By-law is printed under and by authority of the Council of the Town of Markham (Consolidated for convenience only to August, 2018) (Schedule/Attachment Included) AS AMENDED BY: By-law No. 226-83 September 13, 1983 By-law No. 100-84 March 27, 1984 By-law No. 96-86 March 11, 1986 By-law No. 82-88 March 8, 1988 By-law No. 60-89 March 14, 1989 By-law No. 39-90 February 13, 1990 By-law No. 18-92 February 11, 1992 By-law No. 177-92 September 29, 1992 By-law No. 62-93 April 13, 1993 By-law No. 263-94 November 1, 1994 By-law No. 104-95 June 27, 1995 By-law No. 221-95 December 12, 1995 By-law No. 116-96 May 28, 1996 By-law No. 31-97 February 11, 1997 By-law No. 170-2000 October 10, 2000 By-law No. 2001-249 September 25, 2001 By-law No. 2005-189 June 28 and 29, 2005 By-law No. 2005-357 December 13, 2005 By-law No. 2007-15 January 23, 2007 By-law No. 2007-267 November 27, 2007 By-law No. 2008-99 May 27, 2008 By-law No. 2008-257 December 16, 2008 By-law No. 2009-159 November 10, 2009 By-law No. 2011-61 March 1, 2011 By-law No. 2011-235 December 13, 2011 By-law No. 2012-244 November 20, 2012 By-law No. 2013-226 December 10, 2013 By-law No. 2015-3 December 16, 2014 By-law No. 2015-165 December 15, 2015 By-law No. 2016-149 December 13, 2016 By-law 2017-152 December 12, 2017 By-law 2018-103 June 26, 2018

Page 2 BY-LAW 211-83 A By-law to prescribe a Tariff of Fees for the Processing of Planning Applications THE COUNCIL OF THE CORPORATION OF THE TOWN OF MARKHAM HEREBY ENACTS AS FOLLOWS: 1. That pursuant to Section 68 of The Planning Act, Chapter 1, Statutes of Ontario, 1983, the Tariff of Fees for Processing Planning Applications, as shown in Schedule A attached hereto, is hereby adopted. 2. The payment of application fees is to be made in accordance with the following: (a) (b) (c) (d) Official Plan Amendment, Secondary Plan Amendment, Zoning By-law Amendment, Site Plan Control Applications At the time of submission of the application. Subdivision Applications the application fee to be paid prior to a staff report being submitted to Planning Committee; the remaining fee to be paid upon execution of the subdivision agreement. Condominium, Minister s Order Applications Prior to a staff report being submitted to Planning Committee. (Amended by By-law No. 100-84) Committee of Adjustment At the time of submission of the application. (Amended by By-law No. 226-83) 3. Notwithstanding the above provisions, Council may waive the requirement for the payment of a fee(s) or reduce the fee(s) in respect of an application(s) as Council deems reasonable. 4. Validity In the event any part of this by-law is held to be illegal or void, this shall not have the effect of making illegal or void any of the other parts or provisions thereof which may or shall be determined to be legal. READ A FIRST AND SECOND TIME THIS 16 TH DAY OF AUGUST, 1983. READ A THIRD TIME AND PASSED THIS 16 TH DAY OF AUGUST, 1983. Gary F. Roseblade GARY. F. ROSEBLADE CLERK Anthony Roman ANTHONY ROMAN MAYOR

Page 3 SCHEDULE A TO BY-LAW 211-83 (Replaced in its entirely by By-law 2017-152, effective January 1, 2018) TARIFF OF FEES FOR PROCESSING OF PLANNING APPLICATIONS GENERAL TERMS 1.0. Fee Acceptance 1.1. Fees shall only be accepted in conjunction with the filing of an application containing all submission requirements as determined by the Director of Planning and Urban Design or designate and/or Director of Engineering or designate. 1.2. Applicants shall not be permitted to pre-pay application fees upon submission of an incomplete 2.0. Fee Calculation application in order to lock in fees and avoid future fee increases. 2.1. For each development application type, fee shall be calculated, and may include Development Application Fees, Supplementary Fees, and Miscellaneous Fees as listed in this by-law. 2.2. Fees shall be calculated at the rate in effect on the date paid. Applications for which fees have been paid in part, prior to the effective date of this by-law, shall be required to pay any additional fees established by this by-law. 3.0. Fee Payable in stages 3.1. Unless otherwise noted, fees are payable at time of application. 3.2. Where the fee payable in respect of an application is payable in stages, the fee owing at each stage shall be the fee, for such stage, in effect on the date the payment is made. No additional fee or increase in fee is payable in respect of stages for which a fee has already been paid. 3.2.1. Where payment in full of all fees applicable to an application has been made, no additional fee, where established by this by-law, shall be payable. 3.2.2. Other City of Markham fees may be applicable. 4.0. Fee Adjustments 4.1. Adjustments are made to fees to reflect changes in the total number of Units/Lots/ Parcels/ GFA/ Land Area/Estimated Cost of Works, Consultants Review Fees, etc., 4.2. Adjustments to the total fee payable will be required at each payment stage. 5.0. Reimbursement of fees: 5.1. Fees shall be reimbursed upon applicant withdrawing the application, as determined by the Director of Planning & Urban Design or designate and/or Director of Engineering or designate: 5.1.1. Refund percentage is based on all fees received. 5.1.2. HST refund is calculated based on percentage of fee to be refunded. 5.1.3. Refund percentage (%) is based on the application stage as follows: 5.1.3.1. Prior to circulation of application 75% 5.1.3.2. From circulation to completion of preliminary report and/or holding of a public meeting, if required 5.1.3.3. Prior to Committee receiving recommendation report and/or prior to Site Plan Endorsement (Not applicable to Committee of Adjustment Applications) 5.1.3.4. After Site Plan Endorsement and/or after Recommendation Report/ Memorandum received by Committee Notes: a) For all application fees calculated, add HST as applicable. b) All cheques shall be payable to City of Markham. c) For assistance contact - City of Markham, Development Services Commission, 101 Town Centre Blvd., Markham, Ontario, L3R 9W3. Telephone: + (905) 475.4861 Fax: + (905) 479.7768 Email: dsc@markham.ca DEVELOPMENT APPLICATION FEES 50% 25% No refund

Page 4 1.0. OFFICIAL PLAN/SECONDARY PLAN AMENDMENT (Additional Supplementary Study fees apply as identified in the Complete Application) 1.1. Minor amendment (see notes for definition).. $23,300 per application 1.2. Major amendment (see notes for definition)...... $61,850 per application 2.0. ZONING BY-LAW AMENDMENT (Additional Supplementary Study fees apply as identified in the Complete Application) 2.1. Minor amendment (see notes for definition)...... $21,600 per application 2.2. Major amendment (see notes for definition)... $43,450 per application 2.3. Removal of H (Holding) provision..... $7,300 per application 3.0. PLAN OF SUBDIVISION 3.1. Draft Plan of Subdivision Fee shall include Planning, Urban Design and Engineering Review Fees as listed. (For draft plan of subdivision applications with unit counts over 1000 units, timing of payment of fees may be adjusted at the discretion of Council) 3.1.1. Planning Review (i) Base Fee... Unit Fee....... Single Detached, Semi Detached and/or Freehold Townhouse units (iii) Land Area Fee........ Applicable to blocks created for Residential, Mixed- Use, Institutional, Commercial or Industrial uses. (Excludes park blocks, valley lands, hazard lands, environmental buffer blocks, storm water management blocks, open space areas and public roads to be conveyed into public ownership). 3.1.2. Urban Design Review 3.1.2.1. Community Planning Review (i) Unit Fee.......... Single Detached, Semi Detached and/or Freehold Townhouse units Land Area Fee.... Applicable to blocks created for Residential, Mixed-Use, Institutional, Commercial or Industrial uses. (Excludes park blocks, valley lands, hazard lands, environmental buffer blocks, storm water management blocks, open space areas and public roads to be conveyed into public ownership). 3.1.2.2. Landscape Review (i) Base Fee..... Payable at first submission of Landscape drawings for each phase of the draft plan of subdivision Calculated Fee (whichever is higher) $33,300 per application $1,730 per unit $17,150 per hectare $330 per unit $17,150 per hectare $7,550

Page 5 3.1.3. Engineering Review a. Percentage of estimated cost..... of construction of landscape works b. Unit/Lot Fee...... up to 100 units/lots on plan of subdivision (i) Calculated Fee (whichever is higher) 60 % collected at submission of engineering drawings and 40% collected at execution of a pre-servicing (if applicable) or a subdivision agreement a. Percentage of estimated construction cost..... of internal and external works within the Plan of Subdivision, as prepared by the Consulting Engineer. Includes erosion and sediment controls, underground and above-ground works, streetlights, etc. plus a 10% contingency added to the estimate 12.0% $570 per unit or lot 10.0% b. Lot or Unit Fee....... $1,700 per lot or unit 3.2. Extension of Draft Plan Approval... $7,300 per application 3.3. Revision of Draft Approved Plan and/or Draft Plan Conditions, at request of owner 3.3.1. Minor (does not require report to Committee) $4,520 per application 3.3.2. Major (requires report to Committee)... $14,300 per application 3.4. Request for Subdivision Agreement 3.4.1. First phase of subdivision..... $47,900 per agreement 3.4.2. Subsequent phases. $33,650 per agreement 4.0. PLAN OF CONDOMINIUM 4.1. Standard Condominium or Vacant Land Condominium. $36,450 per application 4.2. All Condominium Types... (other than Standard or Vacant Land Condominium) $31,250 per application 4.3. Extension of Condominium Draft Approval..... $7,300 per application 4.4. Revision of Condominium Draft Approved Plan...... and/or Draft Plan Conditions and/or Amalgamation of multiple Condominiums, when requested by the owner $9,850 per application 5.0. SITE PLAN CONTROL NEW DEVELOPMENT/S New development means the construction, erection or placing of one or more buildings or structures on land or associated parking area. Fee shall be calculated as applicable, and shall include Planning, Urban Design and Engineering as listed: (including but not limited to new building(s) in a Heritage Conservation District) 5.1. Residential 5.1.1. Lots/ Blocks of 10 units or less Single Detached, Semi-Detached, Townhouse and/or Apartment Unit(s) (i) Planning Review Unit Fee............ $2,210 per unit Urban Design Review Unit Fee...... (iii) Engineering Review Unit Fee........ $750 per unit $740 per unit 5.1.2. Blocks of 11 units or more and/or Mixed Use development 5.1.2.1. Planning Review

Page 6 (i) Base Fee....... $10,150 per application Unit Fee...... Single Detached, Semi-Detached, Townhouse and/or Apartment Unit(s) (iii) Calculated GFA Fee... Applicable to building(s) with common areas (GFA of building(s) minus GFA of Units) 5.1.2.2. Urban Design Review $1,730 per unit $4.37 per m² of GFA (i) Base Fee..... $4,150 per application Percentage Fee....... (Estimated cost of construction of landscape works) (iii) Calculated GFA Fee... GFA of building(s) plus GFA of associated parking structure(s) (See notes for GFA definitions) 5.1.2.3. Engineering Review Includes Site Plan Works (see notes for definition) 12.0% $4.37 per m² of GFA (a) Base Fee..... $7,400 per application (b) (c) Percentage Fee....... (Estimated cost of internal and external works, see definitions) Calculated GFA Fee... GFA of building(s), plus GFA of associated parking structure(s) (See notes for GFA definitions) 5.2. Institutional, Commercial or Industrial (ICI) 5.2.1. Planning Review 11.0% $4.29 per m² of GFA 5.2.1.1. ICI development without units accommodating overnight or longer stay (i) Base Fee..... $10,150 per application GFA Fee..... (Total GFA of the development) $4.37 per m² of GFA 5.2.1.2. ICI development having units accommodating overnight or longer stay (e.g. Hotels, Senior Homes, etc.) (i) Base Fee... $10,150 per application Unit Fee (iii) Calculated GFA Fee... (GFA of building minus GFA of Units) 5.2.2. Urban Design Review $1,730 per unit $4.37 per m² of GFA (i) Base Fee..... $4,150 per application Percentage Fee...... (Estimated cost of construction of landscape 12.0%

Page 7 works) (iv) Calculated GFA Fee... GFA of building(s), plus GFA of associated parking structure(s) (See notes for GFA definitions) 5.2.3. Engineering Review Includes Site Plan Works (see notes for definition) $4.37 per m² of GFA (i) Base Fee.... $7,400 per application Percentage Fee... (Estimated cost of internal and external works, see definitions) (iii) Calculated GFA Fee... GFA of building(s), plus GFA of associated parking structure(s) (See notes for GFA definitions) 5.3. Parking Lot or Outdoor Patio to existing ICI development 11.0% $4.29 per m² of GFA 5.3.1. Planning Review........ $3,690 per application 5.3.2. Urban Design Review...... $750 per application 5.3.3. Engineering Review......... $740 per application 5.4. Extension of Site Plan Endorsement........ or Site Plan Approval/ Agreement 5.5. Heritage ICI Less than 50m²...... For 50m² or larger (item 5.2) is applicable $1,840 per application $1,050 per application 6.0. SITE PLAN CONTROL ADDITIONS OR ALTERATIONS Additions or Alterations means the making of an addition or alteration to a building or structure or associated parking areas that has the effect of substantially increasing the size or usability thereof. Fee shall be calculated as applicable, and includes Planning and/or Urban Design and/or Engineering as listed: (including but not limited to additions/alterations to a building(s) in a Heritage Conservation District) 6.1. Residential 6.1.1. Lots / Blocks of 10 units or less Single Detached, Semi-Detached, Townhouse and/or Apartment Unit(s) 6.1.1.1. Less than 50m²....... $150 per unit 6.1.1.2. 50m² or larger..... $750 per unit 6.1.1.3. If over 100 m² 6.1.1.3.1. Planning Review.... $750 per unit 6.1.1.3.2. Urban Design Review.... $670 per unit 6.1.1.3.3. Engineering Review.. $670 per unit 6.1.2. Blocks of 11 units or more and/or Mixed Use development 6.1.2.1. Planning Review.... (New Development(s) Fees are applicable) 6.1.2.2. Urban Design Review... (New Development(s) Fees are applicable) 6.1.2.3. Engineering Review... (New Development(s) Fees are applicable) 6.2 Institutional, Commercial or Industrial (ICI) 6.2.1. Planning Review...... (New Development(s) Fees are applicable) 6.2.2. Urban Design Review..... (New Development(s) Fees are applicable) Item 5.1.2.1. is applicable Item 5.1.2.2. is applicable Item 5.1.2.3. is applicable Item 5.2.1. is applicable Item 5.2.2. is applicable

Page 8 6.2.3. Engineering Review..... (New Development(s) Fees are applicable) 6.3. Heritage ICI 6.3.1. Less than 50m²........ For 50m² or larger New Development Site Plan Fee (item 5.2) is applicable 6.4. ICI Façade Major or Minor as determined by the Director of Planning & Urban Design or designate Item 5.2.3. is applicable $1,050 per application 6.4.1. Minor..... $750 per application 6.4.2. Major......... $3,690 per application 6.5. Residential driveway or parking area..... 6.6. ICI parking area or outdoor patio $150 per application 6.6.1. Planning Review........ $1,840 per application 6.6.2. Urban Design Review....... $750 per application 6.6.3. Engineering Review..... $740 per application 6.7. Minor changes to approved plans as determined by the Director of Planning & Urban Design or designate and/or Director of Engineering or designate 6.7.1. Planning Review........... $3,690 per application 6.7.2. Urban Design Review.......... $750 per application 6.7.3. Engineering Review...... $740 per application 7.0. COMMITTEE OF ADJUSTMENT 7.1. Minor Variance 7.1.1. With respect to Development Standards 7.1.1.1. Residential New construction less than 50 m 2 (Single Detached, Semi-Detached, Townhouses and Accessory Buildings and Structures) 7.1.1.2. Residential - New construction 50 m 2 or larger (Single Detached, Semi-Detached, Townhouses, Apartments, Condominiums and Mixed Use Building(s)) $2,110 per application $4,970 per application 7.1.1.3. ICI...... $4,970 per application 7.1.2. With respect to Use - Residential & ICI 7.1.3. With respect to both (Development Standards and Use) - Residential & ICI 7.1.4. Technical Variances to rectify existing site conditions.. requiring minor review by staff, at the discretion of the Director of Planning and Urban Design or designate 7.1.5. Multiple variances related to Draft Plan of Subdivision $11,450 per application $11,450 per application $1,730 per application (i) Base Fee... $8,300 per application Unit Fee.. Number of actual Units/ Lots (Decimal numbers round off to the next greater number) 7.1.6. By-law variance in Heritage District.. or a Heritage Property where Heritage Staff or Heritage Markham has requested the implementation of a historic condition or feature 7.2. Consent to Sever 7.2.1. Consent for creation of one or more lots $1,730 per unit/lot $0 per application (No Fee applicable) (i) Base Fee......... $11,450 per application Unit/ Lot Fee..... Consent creating a new Residential lot $1,730 per unit/lot

Page 9 (excluding Apartments, Condominiums and Mixed Use Building(s)) payable prior to finalization of consent (iii) Land Area Fee.... Consent creating a parcel for ICI, Residential (Apartment, Condominium and Mixed Use Building(s)), and all other, where the land area of the newly created parcel is considered Payable prior to finalization of consent 7.2.2. Consent for partial discharge of mortgage, easement or. lease of 21 years or more, and validation of title $17,150 per hectare $6,000 per application 7.2.3. Change of condition prior to final consent $1,510 per application 7.2.4. Re-Application of Provisionally approved Consent without completion of conditions within One (1) year timeframe..$4800 i). Application must be received within 6 months of the lapse of the original consent application ii) Proposed lot configuration and development must be identical to the lapsed application previously receiving provisional consent. (Amended by By-law 2018-103) SUPPLEMENTARY FEES The following are supplementary fees associated with all development applications: 1. Additional Public Meeting...... Due to revisions by owner/applicant Payable before meeting 2. Additional Report to Committee or Council.... Due to revisions by owner/applicant Payable before Committee meeting 3. Re-Circulation of Drawings Payable at circulation 3.1 For Consent to Sever, and Minor Variance Applications: Due to revisions by owner and/or after 1 year from the date of original application submission due to inaction by owner, or request for deferral by owner.. $7,000 per meeting $7,000 per report $450 per circulation 3.2 For all other application types: Due to revisions by owner. $4,550 per circulation 4. Four or more submissions of Drawings/Plans/Reports/Studies. (Planning or Urban Design & Landscape Plans or Engineering due to revisions by the owner or the owner s failure to revise drawings/plans/reports as requested by the City Payable at submission stage 5. More than two inspections are required.. Due to unaddressed deficiencies identified during earlier inspections Payable before inspection 6. Studies Payable at submission of studies 6.1. Planning and Urban Design Studies Review and approval of large scale major studies (Example: Community Design Plan, Precinct Plan etc., associated with a new Secondary Plan, major Official Plan Amendment /Secondary Plan Amendment, major Zoning or major Site Plan application on a large scale complex site) $5,550 per submission $1,430 per inspection 6.1.1. Update or Amendment to an existing Study.... $22,650 per study 6.1.2. New Study... $56,550 per study 6.2. Engineering Studies Review and approval of large scale major studies (Example: Master Transportation Study, Master Environmental

Page 10 Servicing Plan, Noise Study, Geotechnical Study, etc., associated with a new Secondary Plan, major Official Plan Amendment /Secondary Plan Amendment, major Zoning or major Site Plan application on a large scale complex site) 6.2.1. Update or Amendment to an existing Study.... $9,900 per Study 6.2.2. New Study... $29,550 per Study 7. Hire/ Retain a Consultant/ Vendor... Fees for the City to retain a consultant /vendor for the review, implementation or monitoring related to an application, as determined by the Director of Planning & Urban Design or designate and/or Director of Engineering or designate 8. Third Party Appeal of an Approved Development Application to the Ontario Municipal Board: City s cost to retain outside Legal Counsel and Planning, Urban Design, Engineering, and other external consultants/experts determined to be necessary by the City Solicitor and Commissioner of Development Services. Fee shall be payable in accordance with a Cost Acknowledgement Agreement between the City and the Applicant. 9. Request for Development Agreement Major or Minor as determined by the Director of Planning & Urban Design or designate and/or Director of Engineering or designate 9.1. Planning Actual cost of consultant/vendor, plus an administration fee in the amount of 25% of the actual cost of consultant/ vendor Actual cost of legal counsel and consultant, plus an administration fee in the amount of 26% of the actual cost of legal counsel and consultants 9.1.1. Major...... $7,550 per agreement 9.1.2. Minor..... $1,510 per agreement 9.2. Urban Design 9.2.1. Major...... $7,550 per agreement 9.2.2. Minor..... $1, 510 per agreement 9.3. Engineering 9.3.1. Major..... $7,400 per agreement 9.3.2. Minor..... $1, 480 per agreement 10. Sign Fee for Committee of Adjustment applications... One sign required on each public or private street upon which the subject site has frontage, as determined by the Secretary-Treasurer, Committee of Adjustment. $30 per sign MISCELLANEOUS FEES The following fees are in addition to or independent of development application fees and supplementary fees: 1. Review and comment on Minister s Zoning Orders..... $6,750 per application 2. Deeming By-law....... $7,300 per application 3. Exemption from Part Lot Control.... Where unit fees have not been received through a draft plan of subdivision application, they will apply through this application $7,300 per M-plan 4. Telecommunication Tower...... $17,600 per application 5. Model Home/Sales trailer agreement..... $4,700 per agreement 6. Heritage Permit for unauthorized work...... $480 per application 7. Townhouse Siting Unit Fee....... $530 per unit 8. Fence Variance 8.1. Residential... $2,110 per application 8.2. Industrial or Commercial. $7,000 per application 9. Residential Service Connection - Percentage fee.. (Total cost of Engineering work required within the municipal road 26.0%

Page 11 allowance) 10. Site Alteration Permit 10.1. Urban Design (i) Base Fee....... Area Fee....... 10.2. Engineering (i) Base Fee...... Area Fee...... 11. Construction Management Plan and/or Traffic Management Plan Review and/or Public Communication Plan/ Report Payable at submission of Plans 12. Shoring and Hoarding Encroachment Plan Review.... 13. Miscellaneous submissions not identified under a fee category as determined by the Director of Planning & Urban Design or designate and/or Director of Engineering or designate. 13.1. Percentage Fee (Estimate based on the cost of works)... 12.0% $4,890 per application $1,010 per hectare $4,800 per application $990 per hectare $4,240 per application $4,430 per application 13.2. Hourly Rate for Estimated hours... $230 per hour NOTES/DEFINITIONS OFFICIAL PLAN/SECONDARY PLAN AMENDMENT Minor: An application for a minor, site specific and small scale amendment or exception to Official Plan policies and designations, having limited impact or policy implications beyond the subject lands as determined by the Director of Planning and Urban Design. Major: An application to amend the Official Plan that is more significant in scale and scope than a minor official plan amendment, and which may have greater impact or policy implications beyond the subject lands as determined by the Director of Planning and Urban Design. Applications relating to more than one property would normally be in this category. A site specific application could also fall in this category, if considered to represent large scale redevelopment or significant change in use. An application involving significant changes to the text or policies of the Official Plan would also fall in this category. ZONING BY-LAW AMENDMENT Minor: An application for minor and small scale zoning amendment having no significant impact on adjoining lands as determined by the Director of Planning and Urban Design. Minor applications must be site specific and include: Request for additional permitted use, within an existing building with no significant impact on existing development standards; Changes in development standards to accommodate a residential severance to create one single family lot within an existing subdivision Application for Temporary Use Major: An application for a Zoning By-law Amendment that is more significant in scale and scope than a minor zoning amendment, and which may have greater impact beyond the subject lands as determined by the Director of Planning and Urban Design. Major applications include: Applications relating to more than one property A site specific application, if considered to represent large scale redevelopment COMMITTEE OF ADJUSTMENT Any change in use and/or zone category An application involving significant changes to the development standards or general provisions of the by-law Technical Variance: A minor variance related to an existing building or structure, but requires

Page 12 variance approval due to one or more minor siting errors. Determination of whether or not a variance is a Technical Variance is at the discretion of the Director of Planning and Urban Design, or designate. Development Standards: Any requirement of a zoning by-law other than permitted use (i.e. yard setbacks, building height, lot coverage). Use: Any requirement of a zoning by-law related to the types of uses permitted on a property. PLAN OF CONDOMINIUM Standard Condominium: A plan of condominium that consists of both individually owned units and common elements. Note that all condominiums that existed at the time that the Condominium Act, 1998 came into effect are deemed Standard Condominiums. Phased Condominium: A form of Standard Condominium (see above) that permits individually owned units and common elements to be added to a condominium corporation in phases, over a maximum of ten (10) years. Common Element Condominium: A plan of condominium that consist only of common elements (e.g. a laneway or a golf course), with no individually owned units. The owners of the common elements are owners of freehold parcels of tied land (POTLs) which are not part of the condominium property. Vacant Land Condominium: A plan of condominium where individually owned units are effectively vacant lots upon which buildings will be located after the condominium is registered. Amalgamated Condominium: A plan of condominium where two or more condominium corporations merge into one corporation. Leasehold Condominium: A plan of condominium where individually owned units and common elements are leased by the landowner to purchasers who will never own the land. The purchasers buy a leasehold interest in the units and common elements for a fixed number of years. ENGINEERING Definitions of internal and external works for site plan applications: Internal works - Include but are not limited to curbs, pavement, retaining walls, grading, water mains, sanitary sewers, storm sewers, manholes, catch basins and their leads, erosion and sediment controls and on site storm water management facilities (e.g., Oil Grit Separators (OGS), storage facilities, chambers, infiltration trenches/chambers, soakaway pits and bioretention systems). External works - Include but are not limited to sanitary and storm sewer connections, manholes, water service, driveways, sidewalks, boulevard treatment and other road works (Pavement, curbs, catch basins and their leads, hydrants, streetlighting, hydro poles, traffic controls). Site Alteration: Includes but not limited to, the removal of topsoil from land, placement or dumping of fill on land, the alteration of the grade of land or excavation by any means including the removal of vegetative cover, the compaction of soil or the creation of impervious surfaces, or any combination of these activities that would change the landform and natural vegetative characteristics of the land. Residential Service Connection: A watermain, sanitary sewer or storm sewer that connects from a residential house/unit to a municipal watermain, sanitary sewer or storm sewer. Engineering Plans: Technical plans that show sanitary, water and stormwater servicing schemes, grading, utilities location, erosion and sediment controls, shoring and construction details of the proposed development. Water Supply Analysis Report: Provides detailed design for a water supply distribution system including mitigation measures to ensure adequate water supply flow and pressure for the proposed development. Construction Management Plan: Technical plan that shows how construction works for a proposed development will be managed. The plan shows surface encroachment (e.g. vehicular lane, sidewalk, signage, utilities, trees and municipal easements), storage/loading areas, dewatering equipment, aerial/crane encroachment, vehicular and material access points, hoarding, traffic management, and

Page 13 possible impacts on properties (noise/vibration mitigation and construction condition surveys). Traffic Management Plan: Shows how the alterations and disruptions to traffic caused by the construction activities of the proposed development, servicing infrastructure, or road shall be mitigated and managed. Shoring Encroachment and Hoarding Plan: Technical plan that shows the design and installation of a shoring system consisting of piles and tie-back system, location of the utilities/services and hoarding, and any significant features pertinent to the municipal right-of-way encroachment, to facilitate the construction of underground and aboveground structures that are close to or within the municipal rightof-way. This plan helps ensure construction works do not impede pedestrian and vehicular traffic in any significant manner and do not impact any underground and aboveground utilities or infrastructures. Public Communication Plan/ Report: Outlines the planned public communication process and actions to inform the travelling public, project stakeholders, emergency response agencies, and directly impacted businesses and local residents about the planned construction activities and changes to traffic operations due to proposed temporary road closure and alterations and disruptions to traffic necessary to safely complete construction of proposed development, municipal services and roads. The Plan/Report may consist of any of the following elements: notices to the impacted residents, businesses and travelling public placed in print media, project road signs including detour routes, changeable message signage, notices to the public placed on Internet web pages, brochures, direct mail outs to impacted businesses and local residents, and public meetings. The Plan is modified throughout the project life cycle to address issues as they arise. GENERAL City: The Corporation of the City of Markham Committee: Committee is a group of individuals appointed by Council, such as the Development Services Committee (DSC), Markham Heritage Committee, Committee of Adjustment or any other sub-committee; with a specific function to review, comment and/or approve the related development applications. Heritage: Heritage designated building (Part IV designation) or any building located within the boundary of a Heritage Conservation District (Part V designation). ICI: Institutional, Commercial, Industrial Townhouse Siting: Review of the design aspects of townhouse blocks and ensures appropriate building placement and elevation treatments for specific townhouse blocks. Gross Floor Area (GFA) of Building(s): Defined as the total floor area (inside the building envelope, including the external walls, and excluding the roof) above and below grade less area dedicated to underground parking. Parking Structure: A multi-level parking structure located above or below ground, either within a building envelope or within a stand-alone building dedicated to parking. Gross Floor Area (GFA) of Parking Structure(s): Defined as the total floor area (inside the building envelope or within a stand-alone building, including the external walls, and excluding the roof) above and below grade dedicated to parking.