Master Plan Draft Document

Similar documents
PROPERTY APPRAISAL PROCEDURES. Budget, Finance & Audit Committee March 3, 2014

CITY UTILITIES DESIGN STANDARDS MANUAL

City of South Daytona Municipalization Evaluation. December 19, 2006 WHH Enterprises, Inc.

OVERALL & CONTRACT DBE GOAL METHODOLOGY. Goal Period FY /01/17 to 9/30/20 AIP No XXXX Corrie Esvelt-Siegford, T-O Engineers

Frequently Asked Questions About 20A Undergrounding Updated on June 17, 2014

Section 5 SERVICE EXTENSIONS Electric Tariff 1 st Revised Sheet No. 15 Filed with Iowa Utilities Board Cancels Original Sheet No.

Attachment 2 Civil Engineering

Application Training / Overview Questions and Answers July 10, 2018

Frequently Asked Questions About 20B Undergrounding Updated on June 17, 2014

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington

Regional Open Space Study

Underground Utilities Q&A June 20, 2016

VILLAGE OF MUNDELEIN NORTH LAKE STREET FAÇADE IMPROVEMENT PROGRAM ARCHITECTURAL DESIGN SERVICES

a. RIGHTS OF WAY: Utility will own, operate and maintain extension facilities only: ISSUED BY Date Filed: July 2, 1996

TOWN OF PALM BEACH. Utility Undergrounding Assessment Methodology Update. June 2, 2017

Attachment 8 Mechanical Engineering

Chapter 11. Competitive Negotiation: Procedure

Rule No. 15. Distribution Line Extensions Page 1 of 14

INVITATION FOR BIDS FRANCHISE AGREEMENT FOR FIBER OPTIC CABLE AT WEST MILITARY HIGHWAY FROM THE CHESAPEAKE CORPORATE LIMITS TO AND ON ABANDON ROAD

Architectural Process & Standard for Parish Construction Project Canons of the Episcopal Church in the Diocese of Alabama: Canon 6 Section 6

Sarpy Transmission Project & La Vista Transmission Project Project Updates. Tim Nissen, PE Director T&D Engineering & Substation August 17, 2017

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS

CHAPTER IV. ELECTRIC

City of O Fallon Project Management

City of Columbia ENgiNEEriNg regulations Part 8: sanitary sewer main EXtENsioN table of CoNtENts Paragraph Description Page No.

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 HOUSE BILL 501 RATIFIED BILL

Across-the-Fence Value and Hostage Occupancy Agreements

CITY OF BOYNTON BEACH SPECIAL MEETING

Establishing a Wetland Bank in Minnesota

To: Residents Interested in Forming An Assessment District to pay for the Undergrounding of Overhead Utilities

Attachment 10 Structural Engineering

FIMI CONSTRUCTION UPDATE

Final Report. Underground Utility Assessment Methodology Neighborhood Project LONGBOAT KEY FLORIDA. Town of. Rev.

REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN SERVICES. Channel Reconstruction at Short Hills Garden Apartments Site Millburn, New Jersey

Administrative Order 50 Disposal of Surplus Real Property Community Interest Category. PID#XXXXXX, Civic Address, Nova Scotia

REQUIREMENTS FOR CONSTRUCTION AND CONSTRUCTION RELATED CONTRACTS WITH VALUES OF LESS THAN $200,000

A Tale of Two Hospitals, Higher Education, and Changes to Construction Delivery Models in the State of Louisiana

Diligence. Due. Right. Done. Indiana Commercial Board of REALTORS 2015 Indiana Commercial Real Estate Conference. June 5, 2015

Temporary exemption from IAS 8 paragraphs 11 and 12

Update Land Use Regulations For the Town of Copake, NY

FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (C ) DRAFT

IC Chapter 7. Real Property Transactions

7. IMPLEMENTATION STRATEGIES

H. UNIVERSITY PROCUREMENT CODE

February 22, RFQ No. 1 California WaterFix Real Estate Services ADDENDUM NO. 2

12, 14 and 16 York Street Underground Pedestrian PATH Tunnel

Real Estate Services Division Real Estate Department Anchorage: Performance. Value. Results.

CHAPTER 154 RIGHTS OF WAY

Creation of the Lake Holiday Sanitary District;

Neighborhood Stabilization Program Frequently Asked Questions

REQUEST FOR QUALIFICATIONS

Rental Construction Financing Initiative

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Principles of Architecture and Construction

Recommendation to Place Alameda Clean Water, Pothole Repair, Disaster Preparedness Bond On June 2018 Ballot. February 20, 2018

PENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL TELEPHONE MEETING JUNE 5, :00 P.M. AGENDA

Riverside County Transportation Commission Rail Station Joint Development Guidelines June 2005

TOWNWIDE UNDERGROUNDING OF UTILITIES

FLOWCHART #3 - NEW BUILDING CONSTRUCTION AND MAJOR RENOVATION PLANNING MILESTONES

City Projects Concepts, Costing & Construction

CITY OF WEST PARK FENCE PERMIT REQUIREMENTS

Office of the County Auditor. Broward County Property Appraiser Report on Transition Review Services

Proposals are due by November 6, 2013 at 2 pm and will be considered for award by the Board of Selectmen on November 13, 2013.

Rosslyn Sector Plan Implementation Zoning Ordinance Amendments. NAIOP Meeting April 13, 2016

Implementation: Revenue and Leases

City Utilities of Springfield. Extension Policy & Outdoor Lighting Policy

REQUEST FOR COUNCIL ACTION

SUBJECT Study Session for Consideration of Proposed Development Requiring General Plan, Zoning Code and/or Downtown Precise Plan Amendments

LAKE ZUMBRO RESTORATION PROJECT FEASIBILITY REPORT

Property, Plant & Equipment Intangible Assets

REQUEST FOR EXPRESSIONS OF INTEREST Environmental Assessment Services

MPEEM The New and Improved Residual Technique of Reserve Valuation

Answers to Submitted Questions Request for Qualifications - TIF Scattered Site Rehabilitation Program Date: March 9, 2017

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING February 2, 2017 REGULAR AGENDA ITEM 7

State of New York Office of the State Comptroller Division of Management Audit and State Financial Services

City of Philadelphia POLICIES FOR THE SALE AND REUSE OF CITY OWNED PROPERTY. Approved By Philadelphia City Council on December 11, 2014

DRAFT FEASIBILITY REPORT CENTRAL HILL ESTATE LONDON BOROUGH OF LAMBETH

Adopts a revised Real Property Excess, Surplus, and Disposition Policy and supersedes Resolution No. R99-35.

REQUEST FOR PROPOSAL RFP # TOC17-001

PISMO BEACH COUNCIL AGENDA REPORT

Figures List for New LPA Manual

Request for Proposals

REQUEST FOR PROPOSALS

VHDA Low Income Housing Tax Credit Manual Version: K. Appraisal Guidelines

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

UNDERGROUND CABLE EASEMENT AGREEMENT

RESOLUTION NO. WHEREAS, the City of San José ( City ) has an interest in promoting affordable housing within the City; and

Trulia s Rent vs. Buy Report: Full Methodology

FOCUS ENGINEERING, inc.

Neighborhood Undergrounding Project Update

Housing Commission Report

Prospective Builders, Utilities, Public Agencies, and Engineering Firms

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension

Contract Risk Allocation Working Group. Recommended Practice for Managing Risks in Contracts Involving OWNER-FURNISHED PROPERTY

OFFICE OF INSPECTOR GENERAL PALM BEACH COUNTY

MARCH GUIDE TO BUILDING CONDITION ASSESSMENTS and RESERVE FUND STUDIES

Final Report. Underground Utility Assessment Methodology Gulf of Mexico Drive Project LONGBOAT KEY FLORIDA. Town of. Rev.

DESCRIPTION OF THE DISTRICT

DEPARTMENT OF HUMAN SERVICES SENIORS AND PEOPLE WITH DISABILITIES DIVISION OREGON ADMINISTRATIVE RULES CHAPTER 411

Town of Waldoboro ADMINISTRATIVE POLICY

Transcription:

Master Plan Draft Document

Master Plan Draft Document Accomplishments

Master Plan Draft Document Accomplishments TEAMWORK! - 35 Kimley-Horn Staff Members - 4 Specialty Subconsultants - 3 Utility Owners - 6 Public Infrastructure Stakeholders - 9 Town of Palm Beach Departments - UUTF, Mayor and Town Council - Numerous Individuals and Community Groups

Master Plan Draft Document Accomplishments TECHNICAL - 37 Miles of Overhead Infrastructure - Over 1,000,000 LF of Conduit - Nearly 2,000 poles - Multiple Infrastructure Programs Coordinated and Sequenced - Implementation Plans Assembled - Cost and Schedule Opinions Developed

Contents Master Plan Draft Document - Twelve Chapters - Process Description - Recommendations - Guide for Program Implementation

Master Plan Draft Document Chapter 1 Executive Summary

Master Plan Draft Document Chapter 2 Introduction and Project Goals

Master Plan Draft Document Chapter 3 Existing System Overview

Master Plan Draft Document Chapter 4 Data Collection

Master Plan Draft Document Chapter 5 Design Criteria and Conceptual Design Description

Master Plan Draft Document Chapter 6 Phasing and Sequencing

Master Plan Draft Document Chapter 7 Project Delivery Methods

Master Plan Draft Document Chapter 8 Risk Assessment

Master Plan Draft Document Chapter 9 Transportation Management Plan

Master Plan Draft Document Chapter 10 Public Outreach Program

Master Plan Draft Document Chapter 11 Overall Opinion of Schedule

Master Plan Draft Document Chapter 12 Overall Program Opinion of Probable Construction Costs

Master Planning Phase Progress Update Overall Cost/Master Schedule Refinement Draft MP Document for UUTF review and comment Meetings with Communications providers Draft Broadband RFI completed and submitted to Town staff for review and comment

Master Planning Schedule

Master Planning Phase Moving Forward February Tasks Continued meetings with utility owners to explore further opportunities to reduce costs Broadband Infrastructure Assessment RFI Advertisement

Detailed Design Phase Progress Update CMAR advertisement and preproposal meeting Concept Conduit Plans received for the north and south ends (AT&T and Comcast) Bid Document submittal Easement Acquisition

Detailed Design Phase Easement Acquisition Progress Update Phase 1 North Easements Required 48 Owners Contacted 39 Easements that have received Owner Approval and are in process Fully Executed Easements Received 3 Phase 1 South Easements Required 28 Owners Contacted 6 Easements that have received Owner Approval 5 Fully Executed Easements Received 0 11

Detailed Design Schedule

Detailed Design Phase Moving Forward February Tasks FP&L/AT&T/Comcast final design detail coordination Easement Acquisition process continues Value Engineering continues CMAR evaluation and recommendation for award Progress/Coordination Meetings

Saves and Raves Saves: For this program only, AT&T has agreed to modify their design standards that call for 2-4 conduits for their main line conduit runs to a single 5 conduit. This saves $3 to $9/LF depending on installation method. Raves: AT&T Again. They delivered their design two days early and were willing to modify their design standards to help the Town achieve cost savings.

Conceptual Opinion of Probable Cost for the Undergrounding Program

Conceptual Opinion of Probable Cost for the Undergrounding Program Opinion of Probable Cost Assumptions and Qualifications Cost / Revenue Refinement Process Description

Conceptual Opinion of Probable Cost for the Undergrounding Program Overall Program Opinion of Probable Cost Summary Total Program Cost (Today s Dollars) Contingency Inflation (Projected) Program Total (Rounded)

Conceptual Opinion of Probable Cost for the Undergrounding Program Overall Program Opinion of Probable Cost Summary Total Program Cost (Today s Dollars) $80,700,000 Contingency Inflation (Projected) Program Total (Rounded)

Conceptual Opinion of Probable Cost for the Undergrounding Program Overall Program Opinion of Probable Cost Summary Total Program Cost (Today s Dollars) $80,700,000 Contingency $8,840,000 Inflation (Projected) Program Total (Rounded)

Conceptual Opinion of Probable Cost for the Undergrounding Program Overall Program Opinion of Probable Cost Summary Total Program Cost (Today s Dollars) $80,700,000 Contingency $8,840,000 Inflation (Projected) $9,030,000 Program Total (Rounded)

Conceptual Opinion of Probable Cost for the Undergrounding Program Overall Program Opinion of Probable Cost Summary Total Program Cost (Today s Dollars) $80,700,000 Contingency $8,840,000 Inflation (Projected) $9,030,000 Program Total (Rounded) $98,600,000

Conceptual Opinion of Probable Cost for the Undergrounding Program Individual Phase Opinion of Probable Cost Summary Phase 1 North $4,920,000 Phase 5 North $6,650,000 Phase 1 South $7,030,000 Phase 5 South $7,620,000 Phase 2 North $4,260,000 Phase 6 North $5,430,000 Phase 2 South $5,000,000 Phase 6 South $11,560,000 Phase 3 North $4,130,000 Phase 7 North $5,770,000 Phase 3 South $6,810,000 Phase 7 South $6,030,000 Phase 4 North $5,150,000 Phase 8 $12,370,000 Phase 4 South $5,270,000

Conceptual Opinion of Probable Cost for the Undergrounding Program Assumptions and Qualifications (General) Like for Like Overhead to Underground Conversion Broadband Infrastructure Town Contractor will perform the bulk of the work Conduit will be installed in a joint trench Cost is based on the phased construction approach previously presented to the UUTF Legal Fees Landscape Screening Town Employees (Project Coordinator)

Conceptual Opinion of Probable Cost for the Undergrounding Program Assumptions and Qualifications (General) Service Entrances Rear to Front Conversion Spare Conduit Pavement Management Street Lighting Impacts Lake Worth UG Segment Master Planning Project Contingency Market Fluctuations

Conceptual Opinion of Probable Cost for the Undergrounding Program Assumptions and Qualifications (VE) Conduit vs. Direct Bury Cabling Direct Purchase of Materials Vista Switches / Standard Switches AT&T Design Standards Rear Easement Restoration

Opinion of Probable Line Item Cost Summary Description OPC Original Budget Diff. Utility Conversion Cost - FPL $43,270,000 $35,000,000 $8,270,000 GAF Waiver ($11,200,000) ($7,947,169) ($3,252,831) FPL Service Connections $4,020,000 $10,075,000 ($6,055,000) Utility Conversion Costs AT&T and Comcast $15,950,000 $8,900,000 $7,050,000 Restoration Costs $15,110,000 $1,500,000 $13,610,000 Pavement Milling/Resurfacing - $12,840,000 ($12,840,000) Engineering/Surveying $7,060,000 $6,632,000 $428,000 Construction Administration $3,930,000 $3,415,000 $515,000 Legal Fees $2,000,000 $4,285,000 ($2,285,000) Public Outreach $570,000 - $570,000 Contingency $8,840,000 $14,939,966 ($6,099,966) Inflation $9,030,000 - $9,030,000

Conceptual Opinion of Probable Cost for the Undergrounding Program Comparison Costs 2012 Edison Electric Institute Study (Electric Conversion Only) $190/LF Minimum Reported Cost (Urban) $950/LF Maximum Reported Cost (Urban) $238/LF Average (Palm Beach Urban)

Conceptual Opinion of Probable Cost for the Undergrounding Program Cost / Revenue Refinement Utility Owner Participation Broadband Revenue Grant Funding Palm Beach County Penny Sales Tax Surplus Real Estate

Conceptual Opinion of Probable Cost for the Undergrounding Program Process Description Recent Cost Information from Similar Projects Comprehensive Cost Information Consistent Methodology for Cost Application

Conceptual Opinion of Probable Cost for the Undergrounding Program Process Description Sample Project Areas o Single Family Residential o Multi-Family Residential o Mixed-Use Commercial

Conceptual Opinion of Probable Cost for the Undergrounding Program Process Description Quantity Estimation

Conceptual Opinion of Probable Cost for the Undergrounding Program Process Description Inflation

Conceptual Opinion of Probable Cost for the Undergrounding Program Questions?