MEMO. Upon reviewing the information submitted by the applicant for the proposed wells. Our comments follow:

Similar documents
HUERFANO COUNTY OIL AND GAS REGULATIONS SECTION 6.00

Weld County Oil & Gas Location Assessment (WOGLA) Application Requirements Checklist

A Affordable Storage CUP Amendment, in Section 20, T35N R2W NMPM, at 4340B US Hwy 160W and 122 Meadows Dr.

ARTICLE 9. Oil and Gas Drilling and Production Oil and Gas Drilling and Production Sec Purpose. Sec Definitions.

COGCC Staff s First Draft Proposed Rules Implementing Governor s Oil and Gas Task Force Recommendation Nos. 17 and 20 October 6, 2015

(Ord ) (Ord ) (Ord ) (Ord ) (Ord ) Sec Application fees. Sec Abandonment.

MINERAL COUNTY PLANNING STAFF FINDINGS OF FACT Proposed Elk Run at St. Regis. February 12, 2017

Oil and Gas Development: Land Use Considerations

Oil and Gas Operations

Charles E. Zech Denton, Navarro, Rocha & Bernal, P.C.

Bids Due and Opening Wednesday, December 7, 2016 Time 2:00 p.m.

High Plains Economic District Southeast Wyoming Oil Exploration Seminar Series: Part II. Terms of Oil and Gas Lease and Surface Damage Agreement

ORDINANCE NO. AN ORDINANCE OF THE TOWNSHIP OF CECIL, WASIDNGTON COUNTY, PENNSYLVANIA, PROVIDING FOR THE ZONING OF OIL AND GAS DRILLING OPERATIONS.

Fee $1, Property information and location (All lines applicable to this site must be filled in)

AN ORDINANCE OF THE TOWNSHIP OF ROSTRAVER, WESTMORELAND COUNTY, PENNSYLVANIA, AMENDING ORDINANCE NO. 300, CHAPTER 195 ZONING

Exploration & Production Operator s Compliance Manual for Energy Development Projects on the Southern Ute Indian Reservation

New Cingular Wireless Telecommunication Tower at County Road 48, Milner Conditional Use Permit

Town of Yampa Water Treatment Facility Setback Variance

Planning and Zoning Staff Report Pestcom Pest Management LLC CU-PH

WELD COUNTY OIL AND GAS LOCATION ASSESSMENT (WOGLA) PROCEDURAL GUIDE SUBMITTAL CHECKLIST

Greenbrier County Building Code Administrative Policy Manual

DEMOLITION REQUIREMENTS

ARTICLE XI CONDITIONAL USE PERMITS

RATE & FEE SCHEDULE. I. Introduction 1. II. Effective Date 1. III. Implementation 1. IV. Administrative Fees 3. V. Easements 3

City of San Juan Capistrano Supplemental Agenda Report

CASE NO.: PLN CASE NAME: OIL AND GAS TEXT AMENDMENTS TO CHAPTER 4

Conditional Use Permit / Standard Subdivision Application

ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES

CHAPTER 10 Planned Unit Development Zoning Districts

Guide to Preliminary Plans

RATE AND DAMAGE SCHEDULE

ARTICLE 8: SPECIAL LAND USES

Oil and Gas Development: Land Use Considerations. Planning Commission January 14, 2014

ARTICLE 24 SITE PLAN REVIEW

MINOR SUBDIVISION COMMITTEE COUNTY OF MONTEREY, STATE OF CALIFORNIA

Josephine County, Oregon

TOWNSHIP OF WANTAGE ORDINANCE #

TEMPORARY USE APPLICATION Sec and Temporary Housing

1.0 REQUEST. SANTA BARBARA COUNTY ZONING ADMINISTRATOR Coastal Zone Staff Report for Vincent New Single-Family Dwelling & Septic System

ATTACHMENT 4 CERCLA NOTICE, COVENANT, AND ACCESS PROVISIONS AND OTHER DEED PROVISIONS

This is a New Finding of Adequacy for a Recorded Plat (Plat Book 179, Page ) Replat: LAND USE Guard House Effective Plan: Davie.

OIL AND GAS LEASE for UMBERACRE

EXHIBIT A SCOPE OF SERVICES. Demolition & Removal Services for Crosstown Parkway from Manth Lane to SR-5 / US-1

The Ranches Sketch Plan

Encroachment Permit Application Instructions

MS MINOR SUBDIVISION TREVITHICK

Kitsap County Department of Community Development. Notice of Hearing Examiner Decision

CHAPTER FOUR - SPECIAL PROVISIONS. Purpose -- These provisions shall apply to all districts unless otherwise stated in the district regulations.

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

CHAPTER 3 PERMITS, PLANS AND ANNEXATION

SMOKY LAKE COUNTY. Alberta Provincial Statutes. To provide a process to close a Government Road Allowance, or cancel a surveyed Road Plan.

DIVISION 11: INFRASTRUCTURE STANDARDS AND REQUIREMENTS CHAPTER INFRASTRUCTURE STANDARDS: INTENT AND ORGANIZATION

Floodplain Development Land Use Review

Kitsap County Department of Community Development. Staff Report and Administrative Decision

Steamboat Fireworks for Free Special Use Permit

Kitsap County Department of Community Development. Administrative Staff Report

Bethel Romanian Church - Rezone, RZ

The Boeing Company On-Site Environment, Health and Safety Supplemental Provisions (SP4)

OFFICIAL TOWNSHIP OF NORTH HUNTINGDON PROPOSED ORDINANCE NO. 8 OF 2011 ORDINANCE NO. 2163

CHAPTER 16 ELECTRICAL CODE PAGE NO.

TEMPORARY WORKFORCE HOUSING ZONING

Guide to Minor Developments

IMPORTANT DOCUMENT PLEASE READ

Planning Commission Hearing Date: 2/21/2017 Board of County Commissioners Hearing Date: 3/8/2017

OVERVIEW OF LAWS RELATING TO MINERAL EXPLORATION, DEVELOPMENT & MINING IN COLORADO. by Mark T. Nesbitt Nesbitt & Associates LLC

Abandoned Wells

SKOKOMISH PUBLIC SEWER CONNECTION ORDINANCE TABLE OF CONTENTS

STAFF REPORT And INFORMATION FOR THE HEARING EXAMINER

Project File #: SF Project Name: Jackson Ranch Filing No. 4 Parcel Nos.: , and

RESOLUTION NO ORDINANCE NO. 02-1

KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT INSTRUCTIONS TO APPLICANT FILING MINISTERIAL OIL AND GAS CONFORMITY REVIEW TIER 1

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

GUIDELINES FOR SALT WATER DISPOSAL EASEMENTS

KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT INSTRUCTIONS TO APPLICANT FILING MINISTERIAL OIL AND GAS CONFORMITY REVIEW TIERS 2, 3, AND 5

SEWER RATES AND CHARGES

Guide to Combined Preliminary and Final Plats

THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ("Covenantor"). RECITALS

Finnerty, Shawn & Lori Water Front Setback

Appendix F - Earth Materials Extraction, Processing and Site Reclamation

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

This is a sample form for information ONLY. UTILITY INFRASTRUCTURE CONVEYANCE AND SERVICE AGREEMENT

Chapter 3 Holding Tanks

The University of Texas System Systemwide Policy. Policy: UTS Title. Environmental Review for Acquisition of Real Property. 2.

ARTICLE 1 GENERAL PROVISIONS

New York State School Boards Association 2009 Annual Convention, NYC October 15-18, Natural Gas and New York Public Schools 1

MONTEREY COUNTY PLANNING COMMISSION

Understanding the Conditional Use Process

Beltrami County Natural Resource Management Policy: Easements and Access Across County Lands

KUNIA AGRICULTURE PARK RULES

Chris & Pam King RV Park - Staff Report Comprehensive Plan Amendment/Zone Change/Conditional Use Permit

The following regulations shall apply in the R-E District:

Article 6: Planned Unit Developments

CITY OF LONGMONT OIL AND GAS PROPOSED NO-SURFACE-USE AGREEMENT PUBLIC QUESTION-AND-ANSWER FORUM MAY 15, 2018

PARK COUNTY ROAD WORK PERMIT APPLICATION

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

Enclosed is an application for the payment of proceeds in the above described lands. The following documents are attached.

ISSUING AGENCY: Commissioner of Public Lands - New Mexico State Land Office. [ NMAC - Rp,

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

NEW SINGLE FAMILY RESIDENTIAL

Transcription:

ARCHULETA COUNTY ROAD AND BRIDGE DEPARTMENT MEMO Date: June 13, 2018 To: John Shepard From: Yari Davis Cc: Bob Perry RE: BP Cox 3 Proposed Pad Upon reviewing the information submitted by the applicant for the proposed wells. Our comments follow: Prior to construction an Access Permit should be obtained. The construction of the well may affect CR 988, the road is in good condition. After the construction of the well, the applicant shall call the County s right-of way-technician, Tim Hatch at (970) 518-0415 for a final inspection. If the road is damaged due to the construction of the well, repairs to the road will be required. Tim will inform the applicant if the road should be repaired in a specific period of time. If the road is not repaired in that period the time, the County will use the applicant anti-damage bond for the mitigation of the damage to the road and/or right-of-way. The applicant shall take whatever steps that are necessary to minimize dust pollution generated during the construction and subsequent operation of the wells, along CR 988 and the private wells access road, and in any disturbed areas of ground, in and around the well pad site. 970-264-5660 FAX: 970-264-6815 PO BOX 1507 1122 S. HIGHWAY 84 PAGOSA SPRINGS, CO 81147 MEMO 6-12-18K:\PLANNING\SHARED - PLANNING\REVIEWS1\OIL & GAS\18-094 BP COX 3 SE\MEMO 6-12-18.DOC

May 1, 2018 County Commisioners / To whom it may concern Department Services- Planning Dept. Archuleta County Admin. Offices 398 Lewis St. Pagosa Springs, CO RE: BP Cox 3 Well pad We are expressing our concerns regarding the installation of proposed BP Cox 3 Well pad on the east side of County road 988 south of Colorado 151 in Allison. Although this is a rural community we still consider it our residential community and would hope that this proposed site would not be approved for an exception. We ask that you please look at where the other well pads in the area are located and note that they are all in locations well away from roads and homes in an effort to be as unobtrusive as possible. This proposed site would certainly not meet these precedents. We ask you to consider if this were your residential community if you or anyone in the BP family would like this to be made part of your daily living. We have well pads to the east and south of our properties that are noisy and dusty with constant comings and goings of service personnel. In addition, our water well is directly south of the proposed site, and as in previous drillings, we are VERY concerned that the quantity and quality of our water will be affected. This would detrimentally affect our property value. As this hearing is regarding obtaining an exception to allow for this well pad to proceed, we hope that the reasons above will encourage you to deny the exception for this proposed site. Thank you for your consideration, George and Elaine Nobriga 1841 CR 977 Ignacio ( Allison), CO

Archuleta County Department of County Development Building & Planning Department 46 Eaton Dr. Suite 1 P. O. Box 1507 Pagosa Springs, Colorado 81147 970-731-3877 Fax 970-731-3881 To: Energen Resources Corp. (Finney Land Company-Agent) From: Cindy Schultz, Associate Planner Re.: PERMIT for Minor Facility Gas Well Permit Application GW2007-05 Date: January 18, 2008 Project: Peterson 32-6 #14-4 Gas Well (Energen Resources Corporation) Location: T32N-R6W, Section 14 SE1/4, Archuleta County, Colorado. Owner: Sub-surface Mineral Rights: Energen Resources Inc. Surface Rights: Keith and Barbara Swain Applicant: Finney Land Company (for Energen Resources Corp.) Date of Application Submittal: September 25, 2007 (Application Deemed Complete on December 3, 2007) OPERATION DESCRIPTION: The proposal calls for a minor gas well facility ( well ) to be drilled on the property of Keith W. and Barbara J. Swain. The proposed well will be accessed off of County Road 977 to an existing access road. The proposed construction is an approximately.67 acre well pad expansion. Total disturbed area after expansion will be approximately 1.43 acres (including construction area). At the well location, a pad site will be expanded to consist of (maximum) the wellhead, meter, separator, dehydrator, steel water tanks (3-400 bbls.), 2 80-bbl fiberglass tanks, flowline, cathodic protection, telemetry, and chemical injection system. Possible additional equipment may include: 15 bhp pumping unit or artificial lift, 30 bhp compressor, and 5 bhp transfer pump. The well has been processed for permitting as a minor facility, based on the applicant s assertion and details regarding the involved equipment will not exceed a cumulative break-horsepower rating of 50 break horsepower (bhp). Any water required for drilling will come from Ignacio, CO. Water containment pits will be fenced and all containment and disposal will comply with local, state and federal - 1 -

regulations. As the site of disturbance will be greater than one acre, a stormwater permit shall be obtained from the Colorado Department of Public Health and Environment (CDPHE) and best management practices must be adhered to. The applicant anticipates minimal dust produced from operations, however, dust control is regulated under the Air Quality Division of CDPHE should there be any concern. An appropriate Weed Control Plan must be adhered to in conjunction with the Archuleta County Weed and Pest program. PUBLIC COMMENT The Archuleta County Land Use Regulations do not provide for public comment on minor facility permit applications. Owners of the surface rights were advised of this application however, no comments were provided to the County. CONCLUSION, CONDITIONS, AND RECOMMENDATIONS It is the opinion of Planning Staff the application for a Gas Well Development Permit as submitted by the applicant, Energen Resources Corporation; by Finney Land Company, meets all legal requirements for a project of this kind. This Oil and Gas Minor Facility permit (GW2007-05) is hereby APPROVED, subject to the following conditions: General Requirements: 1) Energen Resources Corp. shall provide a $5,000 performance bond per well or a $50,000 county-wide blanket bond for the period of 2 years to ensure compliance with mitigation and other performance requirements of this well permit in accordance with the applicable portions of Section 9 of the Archuleta County Land Use Regulations. 2) The applicant, Energen Resources Corp., shall comply with all Colorado Oil and Gas Conservation Commission (COGCC) rules, conditions, regulations, and requirements. 3) Failure to comply fully with these regulations will generate a non-compliance determination which may result in a cessation of operations at the well site. If conflict is discovered between the COGCC s requirements and the requirements of Archuleta County, the applicant shall immediately bring the conflict to the attention of the County Planning Staff for consideration and resolution, as needed. 4) The issuance of a minor gas facility permit authorizes only the well and related facilities for which it is issued; such permit shall run with the land. - 2 -

5) Wells shall be drilled within one (1) year of the date of approval; failure to commence drilling within this time will cause the permit to expire. 6) The county requests that all access to this well would be via County Road 988 only. 7) Compliance with Road and Bridge Department for access will be required to include, but not limited to: bonding in the amount of $20,000 for a 2 year period to cover potential damage to the right-of-way. Additional access permit terms and conditions will be determined through review of the access permit application. 8) Failure to maintain the conditions of approval will be a violation of these regulations and subject the permit holder to revocation and all other enforcement remedies and penalties. Pre-Construction Requirements: 1) The applicant shall submit to the Archuleta County Planning Department the groundwater sampling results as described in Section 9.2.6.3.4.4 of the Archuleta County Land Use Regulations. Well Operation Requirements: 1) Upon completion of the well s construction, an as-built facilities map shall be submitted, along with emergency contact information, to the Archuleta County Office of Emergency Management. The map shall show the exact name, location, and description of all facilities, including the size and type of all pipelines and isolation valves that make up and/or serve the well and the well site superintendent s name and phone numbers. Energen Resources Corp. will notify the Archuleta County Planning Department that the Office of Emergency Management has received this map and contact information, once it has been provided. 2) Energen Resources Corp. and its subcontractors shall adhere to all safety rules and regulations imposed by Archuleta County, the COGCC, and OSHA. Unsafe conditions or actions shall not be permitted anywhere on the Lyman property or within Archuleta County. Vehicles shall operate at posted speed limits and at low speed levels when on private property. Drivers shall remain vigilant to pedestrians, wildlife, and other potential roadway hazards. 3) The applicant shall notify the Archuleta County Planning Staff upon completion of the well. The applicant shall comply with all noxious weed abatement efforts - 3 -

prescribed by the County Weed and Pest Control Department. Any weed inspection and subsequent abatement efforts will need to be performed when suitable weather conditions permit. 4) The applicant shall submit a certificate of insurance showing a comprehensive general liability or approved self-insurance plan no less than $400,000 per occurrence covers this operation. - 4 -