DUES TO THE ARTM FOR THE REM May 14,

Similar documents
An Act respecting Ville de Verdun

Bill 212 (Private) An Act respecting Ville de Brownsburg-Chatham,Ville de Lachute and Municipalité de Wentworth-Nord

MAJOR RESIDENTIAL RENOVATION PROGRAM. June 2018

De la Commune Service Yard Building # De la Commune Street - Ville-Marie borough, H3C 4H5 Montréal, Province of Québec, Canada

ReNOVATION à la carte Program

Operations and Accomplishments

THE REGIONAL MUNICIPALITY OF HALTON BY-LAW NO

TORONTO COMMUNITY HOUSING - DEVELOPMENT PROGRAM Development and Redevelopment Projects Under Construction

TRANSPORTATION AND CAPITAL IMPROVEMENTS IMPACT FEES

Rénovation. municipal

SECTION 7. RESIDENTIAL DISTRICTS

REZONING REQUESTS. Rezoning to: Site Area 25,000 sq. ft. or less Site Area More than 25,000 sq. ft.

REZONING REQUESTS. Rezoning to: Site Area 25,000 sq. ft or less Site Area More than 25,000 sq ft

An Act respecting Municipalité de Sainte-Anne-de-Sorel

5 ft. When adjacent to MF 9 and MF 18: 20 ft. MAXIMUM SETBACKS Frontage Ground Floor Above Ground Floor State Road 7 30 ft. N/A MINIMUM ACTIVE USES

CITY OF KELOWNA BYLAW NO

Arch-Laclede s Landing Station

Lebanon Village Center Study

By-law C.P Guide to Development Charges

4 LAND USE 4.1 OBJECTIVES

CITY OF WATERLOO UPTOWN INCENTIVE PROGRAM APPLICATION FORM

BY-LAW CONCERNING THE ASSISTANCE PROGRAM FOR HOUSEHOLDS AWAITING RELOCATION AT PLACE DE L ACADIE

Index of Examples. Chapter 1 Letter of Transmittal Chapter 2 General Assumptions and Limiting Conditions... 19

Development Impact & Capacity Fees

THE CITY OF WINNIPEG. BY-LAW No. 127/2016, as amended

TENANT RELOCATION AND PROTECTION GUIDELINES

THE CITY OF WINNIPEG. BY-LAW No. 127/2016, as amended

ATTACHMENT 3 NOTICE OF EXEMPTION. Clerk of the Board County of Santa Barbara 105 E. Anapamu Street, Room 407 Santa Barbara, CA

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

SPECIAL USE PERMIT APPLICATION

An Act to increase the autonomy and powers of Ville de Montréal, the metropolis of Québec

TO TAKE PART IN THE CAMPAIGN

Oceanside Zoning Ordinance

4. Building plans should include top of foundation elevation

Westbury Affordable Housing Questions and Answers October 13, 2016

Summary of Inclusionary Zoning Practices in Colorado Communities

The Berkshire Building

Report of the Auditor General of Québec to the National Assembly for

RESOLUTION NO. -15 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SUNNYVALE ADOPTING HOUSING IMPACT FEES FOR NONRESIDENTIAL DEVELOPMENTS

Montréal Pierre Elliott Trudeau International Airport Zoning Regulation RDIMS #

INDEX INDEX DECEMBER 2014

RESOLUTION NO R-023

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

Below Market Rate (BMR) Housing Mitigation Program Procedural Manual

Gazette officielle du Québec

TORONTO MUNICIPAL CODE CHAPTER 415, DEVELOPMENT OF LAND. Chapter 415 DEVELOPMENT OF LAND. ARTICLE I Development Charges

RM-3 District Schedule

Acting Director, Community Planning, Scarborough District

Inclusionary Affordable Housing Implementation & Monitoring Procedures

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report

Municipal Home Ownership program

2. In this by-law, the expression "main campus grounds" refers to the main campus grounds made up of the green space on Plan 1 of Schedule A.

ARLINGTON COUNTY, VIRGINIA

(Use N/A when no is available)

Office for Sale or Lease

DRAFT. Development Impact Fee Model Ordinance. Mount Pleasant, SC. Draft Document. City Explained, Inc. J. R. Wilburn and Associates, Inc.

Director, Community Planning, North York District NNY 23 OZ and NNY 23 RH

Right to Farm -- ee~iuoo. Alarm systems -- See Ch Animals -- S.~~230.

Tiered Environmental Review Format (2017)

Part 2 GAZETTE OFFICIELLE DU QUÉBEC, August 4, 1999, Vol. 131, No

AS YOUR COMMUNITY EVOLVES, SO DOES OUR SUPPORT.

RAINBOW DUNES CENTRE. For Sale, Lease or Joint Venture. Las Vegas Redevelopment Opportunity ±7.64 ACRES/ ±106, 400 SF.

Part 2 GAZETTE OFFICIELLE DU QUÉBEC, July 30, 1997, Vol. 129, No

CONTRA COSTA LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT. May 12, 2010 (Agenda)

SPECIAL COUNCIL MEETING AGENDA December 12, 2017 Following Council Workshop Blaney Room 1 st Floor, Maple Ridge City Hall

Boise Outlet Conversion Opportunity. Now Leasing

City of Brooklyn Park Planning Commission Staff Report

POTENTIAL HIGH-RISE RESIDENTIAL DEVELOPMENT SITE

SPECIAL EXCEPTION GUIDELINES *PLEASE READ THESE GUIDELINES BEFORE COMPLETING YOUR APPLICATION*

RENOUPDATE. Renovations Continue at Habitations Delorimier. Habitations Delorimier. Informing Consulting Improving

CHAPTER CC (COMMUNITY COMMERCIAL) ZONE

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

~ FOR LEASE ~ RESTAURANT SITE WITH TRAFFIC LIGHT FULLY APPROVED PAD SITE WITH DRIVE-THRU. 68 Danbury Road, (Route 7), New Milford, CT

Rare Opportunity. Exclusively Represented by Kevin Guilfoyle Realty Solutions. Privately Owned

Accessory Dwelling Unit (ADU) Ordinance Update

1998 Style. Yes (1998) Yes ( ) Total Number of Floors Total Number of Units. Yes Building Area Lot Size Lot Area $2,589 (2016) $1,153 (2016)

CITY OF HAMILTON BY-LAW NO

Review Authority. CMC Section (D) requires that applications for a Site Plan Review be reviewed by the commission at a public hearing.

1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Rates effective January 1, 2018 barrie.ca Purpose of Development Charges

Key Findings. For more information, please or call

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

51-65 Quebec Avenue and High Park Avenue Residential Rental Demolition Application Final Report

Omnibus Zoning Amendment (FILE # D ) Proposals

RM-2 District Schedule

REPORT REQUIREMENTS FOR DISCRETIONARY PERMIT APPLICATION SUBMITTAL North County (Non-Coastal) Area Plan

For Sale 1490 Boulevard of the Arts

(,, po uox 653. i'atuxent BUmlvE, LE6NARDT.*N, MD aat. St. MenY's CoUNTY GovERNMENT DEPARTMENT OF LAND USE AND GROWTH MANAGEMENT.

THE CORPORATION OF THE CITY OF GUELPH. WHEREAS the City of Guelph will experience growth through development and redevelopment;

Development/Refurbishment Opportunity West Wing

New obligations concerning energy efficiency and sustainable development

COMMERCIAL BUILDINGS

R E A L E S T A T E S T A G I N G P R I C I N G C A N A D A

Development Land for Sale or Build to Suit

BY-LAW NO OF THE COUNTY OF GRANDE PRAIRIE NO. 1

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

WILLIAMS HALL FOOD HALL RETAIL & OFFICE FOR LEASE A AVENUE I EDMONTON I AB HIGHLIGHTS

ATCHISON COUNTY NEIGHBORHOOD REVITALIZATION PLAN

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

Transcription:

DUES TO THE ARTM FOR THE REM May 14, 2018 2018-04-12 1

PLAN Presentation of the Réseau express métropolitain Presentation of the ARTM s transportation dues Scenarios for transportation dues Public and one-on-one question period

Réseau express métropolitain Light rail 100% electric and automated 20 hours/day 7 days/week 26 stations 67 km (over 80 % on existing facilities)

CONTEXT LEGAL FRAMEWORK Act concerning the creation of the ARTM (sanctioned in May 2016) GOVERNMENT OF QUEBEC Act respecting the REM (assented to in September 2017) Regulation concerning the transportation dues (published on April 4, 2018) Application of the regulation and collection of the dues (May 1, 2018) AUTORITÉ RÉGIONALE DE TRANSPORT MÉTROPOLITAIN MUNICIPALITIES

CONTEXT LEGAL FRAMEWORK Limits provided by law: - The ARTM identifies zones within its territory that lend themselves to the coordination of urbanization and the public transportation services it finances, even in part, by imposing transportation dues. - These zones must be located within a radius not exceeding 1 km from each REM station. - Only works valued at over $756,150 and with a floor area of 186 m 2 and over (2,002 sq. ft.) are affected. - $600M financing target: The regulation will no longer apply when this target is reached or after 50 years.

CONTEXT APPLICATION OF THE REGULATION The Regulation came into force on May 1, 2018. Municipalities are responsible for applying the Regulation on behalf of the ARTM.

WHERE? ZONES SUBJECT TO TRANSPORTATION DUES 1 km Pointe-Claire Station (1 km radius)

WHERE? ZONES SUBJECT TO TRANSPORTATION DUES 1 km Des Sources Station (1 km radius)

WHERE? Non-affected construction (building located entirely outside the zone) Non-affected extension (building located entirely outside the zone) Boundary of the transportation due zone Affected construction (building partially located in the zone) Non-affected extension (building located entirely outside the zone) Affected expansion (building partially located in the zone)

THE CONDITIONS? WORKS SUBJECT TO PAYMENT OF DUES: 1. Those where the value of work exceeds $756,150 (amount indexed annually) AND 2. With a floor area of 186 m² and over (2,002 sq. ft. and over).

WHAT? WHAT IS AFFECTED 1. The construction of a building; 2. The reconstruction of a building except for the area resulting from an insurance claim that occurred in the past 24 months; 3. The increase in floor area of a building; 4. The redevelopment of a building including a change of use, even partial, consisting in a change to one of the 8 following categories: 1. Housing; 5. Institutions; 2. Retail, restaurant, or entertainment and personal service businesses; 6. Industries, wholesalers, para-industrial services, and automotive services; 3. Business offices and professional services; 7. Research and development industries and data centres; 4. Accommodation services and meeting places; 8. Others.

HOW? VALUE OF THE WORK Verified by the municipality; When the permit is issued; Includes all of the following costs (excluding taxes): 1. Excavation and backfilling costs; 2. Supply and installation of all materials and equipment integrated in the building, particularly including those related to the architecture, structure, mechanics and electricity, excluding costs for supplying and installing equipment related to the operation of an industrial process or production.

HOW? DETERMINING THE FLOOR AREA The floor area affected by work subject to dues is: The sum of the area of each floor affected by the work, including the area of any mezzanine, basement, interior parking, etc. The floor area is measured starting from the outer face of exterior walls.

WHO? EXEMPTED OWNERS 1. Public organizations [RLRQ c. A-2.1 art. 3] 2. Childcare centres [RLRQ c. S-4.1.1] 3. Non-profit organizations or solidarity cooperatives for buildings part of a program implemented under the Act respecting the Société d habitation du Québec* 4. Crown agents 5. Community action organizations funded by the Crown 1. registered as such on the list of the Ministère de l Emploi et de la Solidarité sociale; 2. certified by the Ministère de l Emploi et de la Solidarité sociale. 6. Any other person appointed by the government: 1. Work completed on agricultural operation buildings [RLRQ c. M-14 art. 36.2]. 2. Aéroports de Montréal when it completes work related to a control tower, hangar, terminal, or associated buildings on the site of Montreal-Pierre Elliott Trudeau International Airport or any other person completing such work on this site. [Décret 382-2018].

WHEN? Dues are calculated: When issuing the permit. Dues must be paid: In full when the permit is issued; By bank draft.

HOW MUCH? Dues = Rate of dues x Floor area of the work subject to dues $107.64/m² or $10 ft² The rate of dues Indexed is progressive every year and on indexed on annual basis: May 1, 2018 = 50% January 1 January 1, 2019 = 65% January 1, 2020 = 80% January 1, 2021 = 100%

OTHER PROVISIONS OBLIGATIONS OF MUNICIPALITIES ON BEHALF OF ARTM: Municipalities must ask for the information and supporting documentation required on the form. Municipalities must collect transportation dues.

SUMMARY Where? Is the building in question located completely or partially in a transportation due zone? Conditions? Does the project involve a floor area of 186 m² and + and does it have a value of over $756,150? What? Does the project involve: 1. The construction of a building; 2. The reconstruction of a building; 3. The increase in floor area of a building; 4. The redevelopment of a building related to a change of use, even partial. Who? Is the applicant excluded from the list of entities exempted from paying dues? 4 x YES = Transportation dues applicable

SCENARIO 1 Complete renovation of a single-family dwelling (192 m 2, $200K). Where? Is the building in question located completely or partially in a transportation due zone? Conditions? Does the project involve a floor area of 186 m² and + and does it have a value of over $756,150? No 1 x YES = No transportation dues

SCENARIO 2 Demolition and construction of a single-family dwelling (200 m 2, $800K). Where? Is the building in question located completely or partially in a transportation due zone? Conditions? Does the project involve a floor area of 186 m² and + and does it have a value of over $756,150? What? Does the project involve: 1. The construction of a building; 2. The reconstruction of a building; 3. The increase in floor area of a building; 4. The redevelopment of a building related to a change of use, even partial. Who? Is the applicant excluded from the list of entities exempted from paying dues? 4 x YES = Transportation dues applicable

SCENARIO 3 Conversion of two condo units (350 m 2, $850K) into a single unit. Where? Is the building in question located completely or partially in a transportation due zone? Conditions? Does the project involve a floor area of 186 m² and + and does it have a value of over $756,150? What? Does the project involve: 1. The construction of a building; 2. The reconstruction of a building; 3. The increase in floor area of a building; 4. The redevelopment of a building related to a change of use, even partial. No 2 x YES = No transportation dues

SCENARIO 4 Conversion of 3 condos (325 m 2, $1.5M) into local businesses (bakery, dry cleaner, convenience store). Where? Is the building in question located completely or partially in a transportation due zone? Conditions? Does the project involve a floor area of 186 m² and + and does it have a value of over $756,150? What? Does the project involve: 1. The construction of a building; 2. The reconstruction of a building; 3. The increase in floor area of a building; 4. The redevelopment of a building related to a change of use, even partial. Who? Is the applicant excluded from the list of entities exempted from paying dues? 4 x YES = Transportation dues applicable

SCENARIO 5 A grocery store changes banners (6,000 m², $1M). Where? Is the building in question located completely or partially in a transportation due zone? Conditions? Does the project involve a floor area of 186 m² and + and does it have a value of over $756,150? What? Does the project involve: 1. The construction of a building; 2. The reconstruction of a building; 3. The increase in floor area of a building; 4. The redevelopment of a building related to a change of use, even partial. No 2 x YES = No transportation dues

SCENARIO 6 Construction of a commercial building (225 m 2, $10M). Where? Is the building in question located completely or partially in a transportation due zone? Conditions? Does the project involve a floor area of 186 m² and + and does it have a value of over $756,150? What? Does the project involve: 1. The construction of a building; 2. The reconstruction of a building; 3. The increase in floor area of a building; 4. The redevelopment of a building related to a change of use, even partial. Who? Is the applicant excluded from the list of entities exempted from paying dues? 4 x YES = Transportation dues applicable

SCENARIO 7 Addition of a mezzanine for offices (150 m², $500K) and a mezzanine for mechanical equipment (125 m², $300K) in an industrial building. Where? Is the building in question located completely or partially in a transportation due zone? Conditions? Does the project involve a floor area of 186 m² and + and does it have a value of over $756,150? What? Does the project involve: 1. The construction of a building; 2. The reconstruction of a building; 3. The increase in floor area of a building; 4. The redevelopment of a building related to a change of use, even partial. Who? Is the applicant excluded from the list of entities exempted from paying dues? 4 x YES = Transportation dues applicable

QUESTIONS? THANK YOU! 2018-04-12 26