Manager s Report. January-February 2008

Similar documents
U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS

Tiny House on Wheels A Tiny House

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

Riddell Gardens. Investment Package P HASE ONE - 18 UNITS CONDOMINIUM TOWNHOMES. 225 Riddell Street, Woodstock, Ontario VALOUR CAPITAL

Real Estate Assessment Checklist. 1. This assessment checklist has most of the essential features to look for in a house,

SMITH DOUGLAS H OMES P RE SENT S HIGHLANDS AT MADISON PARK BASE PRICE SHEET. The Benson 3 Beds / 2.5 Baths Approx 1,801 Sq. Ft.

CHAPTER 10 ARTICLE II DIVISION 2: MINIMUM STANDARDS

Renovation Progress. June 2-15, Weeks 35 & 36

Riddell Gardens. Investment Package CONDOMINIUM TOWNHOMES. 255 Riddell Street, Woodstock, Ontario VALOUR. Mortgages #12051

BUILDING SPECIFICATIONS

Contemporary villas Panoramic view 3 minutes from Bonita Beach

Who s Responsible? A guide to common property

Renovation Progress. May 5 11, Week 31

SELLER S PROPERTY DISCLOSURE STATEMENT

FICO Realty Group Presents 485 Washington Street Woburn MA 01801

PROPERTY INSPECTION REPORT

ACCESSORY DWELLING UNITS

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585)

ACCESSORY DWELLING UNITS

Riddell Gardens. Tenant Package CONDOMINIUM TOWNHOMES Riddell Street Woodstock

Information contained

PETITION B Reductions in Maintenance and Services, Habitability Problems, and/or Failure to Provide Maintenance and Services Required by Law

Renovation Progress. Apr , Week 29

OREGON SELLER S PROPERTY DISCLOSURE STATEMENT

HOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist

VIEW POINTE MAINTENANCE CORPORATION

Form 17 SELLER DISCLOSURE STATEMENT IMPROVED PROPERTY

Understanding Accessibility Features to Meet Housing Needs

QHOChomes.com. our Standard Features

House Bill 2140 Sponsored by Representative BOONE (Presession filed.)

National Trust Cottages Access Statement

Understanding Accessibility Features to Meet Housing Needs

RENTER'S INSPECTION WORKSHEET Free form provided at

SHEET 1 of 13 RECORDING REQUESTED BY AND WHEN RECORDED, RETURN TO: S&S CONTRACTORS, INC VENTURA BLVD., # 104 WOODLAND HILLS, CA 91364

Rules and Regulations

THE TEN AT LAKE FORREST. FROM THE $850's

WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes

MODERN LIVING IN LINDENLEA

SELLER DISCLOSURE STATEMENT IMPROVED PROPERTY

Red Run Condominium Association Rules & Regulations (Effective June 2, 2012)

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE

These requirements are listed in detail in the Decree N of August 26 th 1987 (Download).

Attic Floor Bedrooms 1 & 2 Family Dwellings

Kevin J. Maher Homes by Emerson 1B Swanson Road Auburn, MA 01501

National Trust Cottages Access Statement

Investigation Reference No. Investigation Status. Investigation Description

THE VILLAGE COLLECTION

FEMA National Floodplain Insurance Program (NFIP) Substantial Improvement/Substantial Damage Determination

SMITH DOUGL AS HOMES PRESENTS IRIS PARK

Landlord and Tenant agree to lease the premises pursuant to the following terms: 110 Steele (OR APPROPRIATE ADDRESS) Laramie, Wyoming

Alley Load Garage Plans

The Division of Responsibility within a Condominium Corporation

BUILDING CODE INTERPRETATION

KENDALL OVERLOOK CONDOMINIUM, INC.

WHERE WE CHOOSE to live

Home Plan Approx Bed Baths Garage Slab Basement Sq Ftg Base Price Base Price. Willow (Mstr Main) From $369,900 $410,900

FY 2018 FEE SCHEDULE (Effective )

39 Holly Street, Maugerville

SUNSET BAY VILLAS. CONDO ASSOCIATION NEWSLETTER: December 2017

Property Details 916 Youngs Road

Property Inspection Checklist

The. Conveniently Located on Heydenreich, Just North of Hall Road

Homes starting in the $330,000 s

Smith Douglas Homes Presents MORGAN S RUN

BOWDOIN COLLEGE RENTAL HOUSING POLICY AND GUIDELINES Revised March, 2014

Preventive Maintenance Program

EMERGENCY HOME REPAIR PROGRAM GUIDELINES AND APPLICATION

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

306,885 SF MANUFACTURING/WAREHOUSE 3401 E. 4TH AVENUE, HUTCHINSON, KANSAS 67501

1. PRESENTATION OF THE PROJECT

Access Statement: Cliff Top, 2 St Hilda s Cottages, East Cliff, Whitby detached cottage

BUILDING QUALITIES Santa Pola Bahia Arena GROUNDING WORKS STRUCTURE

MULTI-USE COMMERCIAL PROPERTY

Castle Gate Towers. Windsor s Newest Luxury Condo. Our vision of what maintenance free living should be

405 WINDSWEPT DR. #703 Central Asheville Mountain View Townhome

Residencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)

Your Guide to. Blackstone SW Park Ave Portland, OR 97201

Ordinance 991 CHAPTER 91 RENTAL HOUSING CODE

20294 E. Maplewood Pl. Centennial, CO List Of Custom Property Features & Amenities

City of Richmond Municipal Code

Welcome to Bankier Apartments

ENFIELD HOUSING AUTHORITY SECTION 8 OFFICE 1 Pearson Way, Enfield, CT Phone: Fax:

Accessibility Guide. We look forward to welcoming you.

FACT SHEET. October Property inspections

Renovating older apartment buildings A multi-disciplinary international project. Architectural design & construction

Common Property & Private Property

The Business of Infrared Home Inspections

Residential Accessible, Type A, and Type B Dwelling Unit Requirements 2012 International Building Code and 2009 ICC/ANSI A117.1

PINEWOOD VILLAGE Community Rules and Regulations. 3. Chalk writing by children is not permitted on the streets, sidewalks, or driveways.

Historical Architectural Review Board November 6, :00 p.m.

Investigation Reference No. Investigation Status. Investigation Description

VILLAGE AT RIVERBEND Residency Regulations

COUNCIL OF CO-OWNERS OF THE WESTERLIES CONDOMINIUM POLICY RESOLUTION NO (Policy Concerning Maintenance Responsibilities)

NEW OWNER S KIT WELCOME TO PARADISE PARK

DATE: 4/24/12 PRESENT AT SITE: Aaron Lobas, Daniel Imlay - URS JOB NAME: Cuyahoga County Huntington Park Garage JOB NUMBER:

Welcome to Meadowbrook Village in Pewaukee

Housing Choice Voucher Landlord Handbook

17A North West Arch, Twizel

Transcription:

January-February 2008 In addition to the normal plant operational activities and routine grounds maintenance, the following actions occurred this period: I. Building Repairs A. Carpentry Replaced the following bad deck and building materials as noted this period: o Deck joists-condo 47 (replaced entire deck structure beneath the 20 x 8 deck area north of the unit), condo 48 entry porch (35 of 2 x 8 joists), 48 north deck (3 ea. 2 x 8 x 10 and 7 ea. 2 x 8 x 6 ), and condo 52 (15 ea. 2 x 8 x 12 ). o Ledger band-condo 47 (20 ), condo 48 (14 ) and condo 52 (30 ). o Outer deck band-condo 47 (20 ), condo 49 (28 ) and condo 52 (28 ). o Decking-common stairway south of units 33-34 (16 ), condo 47 (480 ), condo 48 (north deck- 60 & entry deck-122 ), condo 49 (28 ) and condo 52 (86 ). o Balusters-condo 27 (2 ea.), condo 44 (3 ea.), condo 45 (15 ea.), condo 47 (30 ea.), condo 48 (south deck-9 ea. & north deck-40 ea.), condo 49 (33 ea.) and condo 50 (7 ea.). o Deck posts-condo 8 (2 ea.; 8 & 10 ), condo 48 (3 ea.; 4 & 2 ea. 8 ), condo 49 (3 ea., 3 ; 5 & 6 ) and condo 52 (2 ea. @ 4 ). o Building Siding-condo 47 (3 sheets), condo 49 (1/2), condo 52 (1) and condo 52 (1/2). o Hand railing-condo 47 (6 ), condo 48 (entry porch-11 ), condo 49 (28 ) and condo 50 (16 ). o Building trim-manager s unit-6, condo 47 (20 x 1 x 4) and condo 52 (32 x 1 x 4). o Porch beams-condo 48 (10 x 4 x 8) and condo 49 (5 x 4 x 10). o Porch rafters-condo 48 (3 ea. @ 4 x 6 x 12 ). o Support beams-clubhouse (beneath the exercise machine-10 ), and condo 52 (installed new 28 2 x 6 beam in the center of deck for improved stability). o Boxed porch support columns-condo 48 (2 ea.) and condo 49 (2 ea.), both 9 high w/trim). o Sofit-condo 52 (1/2 sheet) and condo 54 (½ sheet).

Page 2 B. Electrical o Toe kick boards-common stairway south of condo 33-34 (5 ea. @ 1 x 6) and common stairway north of condo s 50-51 (4 ea. @ 1 x 6). o Step replacements-condo 27 (lower north door/ 2 step riser) and common stairway north of condo s 46-47 (3 step riser). also leveled up entry porch steps @ condo s 1, 2 & 3. o Privacy fences-rebuilt the fence located on the lower level deck between condo s 7 & 8 and replaced 40 on the fence between condo s 48-49. o Misc.-pulled in and secured the deck at condo 8 to the building and installed 2 new sway braces, installed handrail trim at condo 50 (32 of 1 x 2), trimmed north entry door of condo 53 for improved operation, reframed the speed limit sign north of condo 54, jacked up, leveled and installed support posts beneath sagging floor truss beneath condo 49 (1 ea.) and main level support beam (1 ea.) and fabricated, primered and prepainted replacement corbels for the entryway fence (scheduled for March replacement). Repaired an electrical supply wire break beneath the common stairway landing south of condo s 33-34. Repaired electrical short next to the stairway south of condo s 23 & 24. C. Painting Prepainted all materials identified in Section IA. Carpentry. Interior repairs-due to the cold winter conditions this period, the following sheetrock and painting repairs were completed as noted: *Condo 1- setup scaffolding and repaired settling cracks on the living room walls and ceiling and painted the same. *Condo 9- applied stain sealer over a small roof stain in the bedroom. *Condo 11-repaired a small area on the sloped living room ceiling (sheetrock). *Condo 17-painted the living room cathedral ceiling and an upstairs bedroom ceiling. *Condo 40-repaired old settling cracks on the living room walls and ceiling and painted the ceiling in the living room due to a roof leak. *Condo 42-repaired upper bedroom ceiling sheetrock and painted same. *Clubhouse-repaired minor sheetrock cracks on the walls of the laundry and exercise area s; touched up the same afterwards. *Condo 46-painted the living room ceiling due to roof leak stains, repaired all wall and ceiling sheetrock (including texturing) after the freeze damaged pipes were repaired; followed up with the necessary painting.

Page 3 *Condo 47-repaired a small area on the cathedral ceiling due to a roof leak including retexturing. Painting is scheduled for the month of March. Building Painting-completed painting the north side of condo s 45 & 46 including privacy fences (except the porch rafters on condo 46) and the south sides of units 43-45. Also began surface preparation efforts on the area s above the roof area s this period. The east & west ends of the building, top areas and north side handrails are scheduled to be painted in March. D. Clubhouse/Pool Getting closer to opening the pool, won t be long! E. Plumbing. Repaired kitchen sink drain line. Repaired freeze damaged water line pipes below condo s 70 & 71. Replaced the main waterline control valves in condo s 46 & 67 (H.O. expense). Removed & replace the exterior water faucet at condo 48 to facilitate deck repairs. Repaired a main line water pipe crack beneath condo 8. Replaced the toilet ballcock assembly, wax ring and repaired a bathroom sink water supply line in condo 71 (H.O. expense). Replaced multiple freeze damaged water lines in the ceiling and upper level walls of condo 46, also replaced a freeze damaged bathroom faucet assembly. The interior mansard area was inspected for air infiltration and was further insulated and sealed in an effort to prevent the pipes from being damaged in the future. F. Roofs. Completed detailed roof inspections, repairs and P.M. s to the roofs over condo s 16-35. All remaining roof areas will be inspected and repaired as required in the month of March. Struggled to locate and repair a recurring pinhole leak over the clubhouse parapet roof area this period. With Board approval, contracted Dawson Roofing Co. (from Locust Grove) to install a new 60 mill thick, polyester mat reinforced, T.P.O. roof system over the existing roof and parapet walls. Spinnaker Point removed all of the loose gravel prior to the installation. Dawson Roofing also added enough perlite insulation board to the existing roof to create positive drainage prior to installation of the roof system. This revolutionary flat roof system is considered to be the replacement for the hot tar & gravel roof systems and is currently being used over all of the large

Page 4 box stores such as Lowe s, Home Depot s and Wal-Mart s. This $6,000 expenditure is funded from 2007-08 assessment money and will give us an opportunity to evaluate it for future flat roof replacements here at Spinnaker. G. Cable Television System. Nothing significant to report this period. II. Other Activities. A. Docks. Repaired hydro hoist airline leaks at slip 18 (H.O. Expense). Contracted Baker s Dock Construction to repair the walkway/main dock swivel connection on the northwest docks ($220). B. Landscaping. Replaced 2 rotted rope posts south of condo s 50-51. Cut down and removed numerous ice damaged trees located around the wastewater plant, and a fallen redbud tree located north of condo 36. Removed a large post oak tree which was knocked down by the refuse company adjacent to the dumpster area. Replaced 4 R.R. Ties along the drive west of condo 31 and 3 bad ties in the tie wall located along the main road north of condo 54. Replaced a bad section of 2 rope along the seawall north of condo 27. Installed cabling between 2 large trees located south of condo 5-6 to prevent deck damages due to wind movement. C. Other. Condos for Sale: Condo 7 - $220,000 waterfront Condo 38 - $265,000 - waterfront Contact Rob @ 918-782-9054 for more information, to list your condo for sale or lease, or to schedule your viewing appointment.

Page 5 Condo Sale-Spinnaker Point Sales & Leasing sold condo 67 within a week of receiving the listing agreement; please welcome Randall Romans and Beth from Independence Ks.! Delivered one rick of firewood to condo s 11 & 69 (H.O. expense). Replaced the flag and rope at the Point flagpole. Frost Patrol-cold temperatures forced Spinnaker Point personnel to activate the frost patrol as noted this period: Jan.3-4 & 19-25. Removed and stored all of the holiday lighting, wreaths, garland and bows. D. Water and Wastewater Facilities D.E.Q. Permit Approval- The Oklahoma Department of Environmental Quality renewed our 5 year O.P.D.E.S permit for our wastewater plant on Feb. 19, 2008. This will allow our wastewater facility to discharge treated effluent through Feb. 28, 2013. Site inspections, applications, official publications and public comment periods were all involved in this permitting process. Inspected and cleaned the chemical feed and clear well effluent pumps in the wastewater lab building. E. Planned March Activities. Continue with the on-going carpentry repairs around condo s 51-54. Complete the surface preparation efforts and building painting around condo s 43-46 and begin the same around condo s 47-50. Contract out tree removal efforts at the north side of condo 26 and the entryway and select difficult to reach broken limbs throughout the complex. Complete flat and sloped roof inspections and P.M. s (repairs). Begin detailed garden cleaning and spring grounds work (fertilizing, topsoil installation, grass seed sowing, etc.). Repair the leaning tie wall located north of condo 5 (remove and replace 3-4 sections of tie wall and replace 4 bad vertical replacement posts). Repair the structural deficiencies beneath condo 49. Install additional stairway lighting south of condo s 23-24, 33-34 and at condo 36. Begin sprinkler system activation efforts and repairs/adjustments.